cerc-logo

ADDITIONAL CAPITALISATION 2009

Thermal
Pet. No.
Subject
Date of Hearing
Date of Order
44/2009

Determination of impact of additional capital expenditure incurred during the years 2004-05, 2005-06, 2006-07 and 2007-08 for Kawas GPS (656.20 MW). NTPC Ltd, New Delhi.
18-08-2009
30-12-2009
11/2009

Approval of revised fixed charges for NLC TPS-II, Stage-I (630 MW) and Stage-II (840 MW) for the period from 1.4.2004 to 31.3.2009 after considering the impact of additional capital expenditure incurred during the period 2007-08 to 2008-09 and impact of year-wise lignite price for the period 2007-09 on energy charges and capacity charges. Neyveli Lignite Corporation Limited, Chennai.
15-09-2009
30-12-2009
97/2008

Determination of impact of liabilities discharged and additional capital expenditure incurred during the years 2005-06 (15.8.2005 to 31.3.2006) 2006-07 and 2007-08 for Rihand STPS, Stage-II (1000 MW). NTPC Ltd, New Delhi
28-07-2009
30-12-2009
32/2007

Revision of fixed charges for the period 2004-09 after considering the impact of additional capital expenditure incurred during 2004-05 and 2005-06 in respect of Farakka STPS, (1600 MW). NTPC Ltd, New Delhi
22-10-2009
23-12-2009
14/2009

Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2007-08 and 2008-09 and impact of year-wise lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS –I (600 MW). Neyveli Lignite Corporation Limited, Chennai
15-09-2009
18-12-2009
13/2009

Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2007-08 and 2008-09 and impact of year-wise lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS –I (600 MW). Neyveli Lignite Corporation Limited, Chennai
15-09-2009
18-12-2009

32/2009

Determination of impact of additional capital expenditure incurred during the years 2004-05, 2005-06, 2006-07 and 2007-08 for Anta GPS (419.33 MW). NTPC Ltd, New Delhi
16-07-2009
18-12-2009

30/2009

Determination of impact of additional capital expenditure incurred during the years 2004-05, 2005-06, 2006-07 and 2007-08 on fixed charges in respect of Feroze Gandhi Unchahar Thermal Power Station, Stage-I (420 MW) for the period from 1.4.2004 to 31.3.2009. NTPC Ltd, New Delhi
16-07-2009
27-10-2009
8/2005

Approval of revised fixed charges on account of additional capital expenditure incurred during 14.1.2000 to 31.3.2004 in respect of Tanda Thermal Power Station (440 MW). National Thermal Power Corporation Ltd.
-
01-07-2009

50/2008

Miscellaneous petition to order to refund the excess tariff collected on the capitalization of outstanding liability not materialized and consequent withdrawal of such excess capitalization in respect of Ramagundam Super Thermal Power Station, Stage I & II (2100 MW) and other NTPC stations during the tariff period 2001-04. Tamil Nadu Electricity Board, Chennai
16-12-2008 03-02-2009

25/2008

Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW). NTPC Limited, New Delhi
12-08-2008 03-02-2009

47/2007

Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during 2004-05 and 2005-06 for Tanda Thermal Power Station (440 MW). NTPC Limited, New Delhi
23-10-2007 23-01-2009
Hydro
Pet. No.
Subject
Date of Hearing
Date of Order
187/2009

Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during the years 2006-07, 2007-08 and 2008-09 in respect of Tanakpur Hydroelectric Project, (3 x 31.4 MW) for the period 1.4.2004 to 31.3.2009. NHPC Ltd.
12-11-2009 23-12-2009
198/2009

Determination of impact of annual fixed charges on account of additional capitalization/de-capitalization incurred during the years 2006-07 to 2008-09, in respect of Bairasiul Hydroelectric Project. NHPC Ltd.
12-11-2009
18-12-2009

39/2009

Approval of revised fixed charges after considering the impact of additional capital expenditure during the years 2004-05 and 2005-06 in respect of Loktak Hydroelectric Project (3 x 35 MW), for the period 1.4.2004 to 31.3.2009 NHPC Ltd.
16-07-2009
27-10-2009

33/2009

Approval of revised fixed charges on account of additional capitalization for the period 25.8.2005 to 31.3.2009 in respect of Indira Sagar Hydroelectric Project (8 x 125 MW). Narmada Hydroelectric Development Corporation Ltd.
12-05-2009
20-10-2009

24/2009

Approval of revised fixed charges after considering the impact of additional capital expenditure/decapitalisation incurred during the years 2004-05 and 2005-06 in respect of Uri Hydroelectric Project, (4 x 120 MW) for the period 1.4.2004 to 31.3.2009. NHPC Ltd.
24-03-2009 25-06-2009

10/2009

Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during 2004-05 and 2005-06 in respect of Chamera Hydroelectric Project, Stage-II for the period 1.4.2004 to 31.3.2009 NHPC Ltd
17-03-2009 09-06-2009
Transmission
Pet. No.
Subject
Date of Hearing
Date of Order
164/2009

Determination of final transmission tariff and additional capitalization up to 31.3.2009 for (i) circuit-II of 400 kV D/C Teesta (Stage-V) Siliguri transmission line along with associated bays, and (ii) 315 MVA, 400/220 kV ICT-II at Baripada Sub-Station of transmission system associated with Teesta (Stage-V) HEP in Eastern Region for the period from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
17-11-2009
21-12-2009

47/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2006-07 for 315 MVA ICT-III at Nagarjunasagar sub-station along with associated bay equipment in Southern Region. Power Grid Corporation of India Limited, New Delhi.
-
23-10-2009

70/2006

Revision of tariff due to additional capital expenditure incurred during 2006-07 and 2007-08 for Rihand Stage-II Transmission System in Northern Region for the period from 1.4.2006 to 31.3.2009. Power Grid Corporation of India Limited
25-06-2009 07-09-2009

77/2009

Approval of transmission tariff due to additional capitalization incurred during 2007-08 in respect of (i) TCSC and 2 nos of 400 kV bays at Gorakhpur sub-station associated with 400 kV Muzaffarpur-Gorakhpur line of Powerlinks (ii) 2 nos of 400 kV bays at Muzaffarpur with line reactor associated with 400 kV Muzaffarpur-Gorkhpur line of Powerlinks, under transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system, an interregional asset between Northern Region and Eastern Region from1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited
16-06-2009 17-08-2009

76/2009

Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2008-09 for 400 kV Ramagundam Transmission System, including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region for the period from 1.4.2008 to 31.3.2009. Power Grid Corporation of India Limited, New Delhi
23-06-2009 07-08-2009

64/2009

Approval of transmission tariff due to additional capitalization incurred during 2007-08 and 2008-09 in respect of (i) 400 kV D/C Gorakhpur-Lucknow transmission line (ii) 400 kV D/C Bareilly-Mandola transmission line in Northern Region associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system for the period from 1.4.2007 to 31.3.2009. Powerlinks Transmission Limited, New Delhi
25-06-2009 30-07-2009

65/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 and 2008-09 for 400 kV D/C Purnea-Muzaffarpur transmission line and 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North Inter-connector and Northern Region transmission system for the period 1.4.2007 to 31.3.2009. Powerlinks Transmission Limited, New Delhi
25-06-2009 30-07-2009

66/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 and 2008-09 for 400 kV D/C Muzaffarpur-Gorakhpur transmission line in Eastern-Northern inter-connector associated with Tala Hydro Electric Project, East-North Inter-connector and Northern Region transmission system for the period from 1.4.2007 to 31.3.2009. Powerlinks Transmission Limited, New Delhi
25-06-2009 29-07-2009

74/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 for system strengthening scheme in Northern Region (formerly part of Tala Supplementary Scheme) for the block 2004-2009. Power Grid Corporation of India Limited
25-06-2009 23-07-2009

75/2009

Approval of transmission tariff due to additional capitalization incurred during 2007-08 in respect of (i) 400 kV Bareilly sub-station (UPPCL) (extension) and 400 kV Mandaula sub-station (extension) associated with 400 kV Mandaula-Bareily transmission line of Powerlinks (ii) 400 kV D/C Lucknow (Power Grid)-Unnao (UPPCL) transmission line with associated bays at both ends, 400 kV D/C Gorakhpur (Power Grid)-Gorakhpur (UPPCL) transmission line with bays at both ends, 2 Nos 400 kV bays at Gorakhpur (Power Grid) and 2 Nos 400 kV bays at Lucknow (Power Grid) for 400 kV D/C Gorakhpur-Lucknow transmission line of Powerlinks, 400/220 kV 315 MVA ICT at Lucknow with associated bays and 400/220 kV 315 MVA ICT-I at Gorakhpur (Power Grid) with associated bays under the transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission System for the period from 1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited
25-06-2009 22-07-2009

61/2009

Determination of revised transmission tariff due to additional capitalization incurred during 2004-05, 2005-06 and 2007-08 for 400 kV S/C Jameshedpur-Rourkela (Ckt-II) transmission line along with its associated bays in Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon
16-06-2009 22-07-2009

2/2009

Determination of final transmission tariff for (i) 765 kV Sipat-Seoni transmission line, Ckt-I along with associated bays, 765/400 KV ICT-I at Seoni and LILO of 400 kV Bhilai-Satpura line along with bay equipment at Seoni, (ii) 400/220 kV ICT-I along with two 220 kV line bays at Seoni (New sub-station), (iii) Ckt II of 400 kV D/C Nagda- Dehgam line and (iv) Ckt I of 400 kV D/C Nagda-Dehgam line ( DOCO: 01.02.2008) under Sipat-I Transmission System in Western Region from date of commercial operation to 31.3.2009 and approval of additional capitalization up to 31.3.2008. Power Grid Corporation of India Limited, Gurgaon
23-04-2009 22-07-2009

69/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 for 400 kV Kishenpur-Wagoora transmission line along with associated bays at Kishenpur and Wagoora sub-stations under Dulshasti combined transmission system in Northern Region. Power Grid Corporation of India Limited
25-06-2009 22-07-2009

88/2009

Determination of revised transmission tariff due to additional capitalization incurred during 2005-06, 2006-07 and 2007-08 for LILO of 400 kV D/C Itarsi-Dhule transmission line at Khandwa including 400/220 kV Khandwa sub-station in Western Region for the period from 1.4.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon
23-06-2009 22-07-2009

5/2009

Determination of final transmission tariff for (i) 50 MVAR Reactor at Narendra, (ii) Narendra- Devangiri transmission line and Bus Reactor at Mysore and (iii) 2nd 315 MVA Auto Transformer at Hiriyur sub-station along with associated bays under Transmission System associated with Kaiga-3 and 4 (2X235 MW) project in Southern Region from date of commercial operation to 31.3.2009 and approval of additional capitalization from date of commercial operation to 31.3.2008. Power Grid Corporation of India Limited, Gurgaon
21-04-2009 20-07-2009

43/2009

Determination of revised transmission tariff due to additional capitalization incurred during 2004-05 and 2005-06 for 400 kV D/C Vijayawada-Nellore transmission line, 400 kV D/C Nellore-Sriperumbudur line, New 400 kV Switching station at Nellore, extension of Vijayawada and Sriperumbudur sub-station with associated bays under system strengthening scheme in Southern Region. Power Grid Corporation of India Limited, New Delhi
21-05-2009 20-07-2009

57/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 for (i) ICT-I along with associated bays at Meerut sub-station (ii) Tehri-Meerut Ckt-I along with associated bay at Meerut end and (iii) Tehri-Meerut transmission line Ckt-II along with associated bay at Meerut end and 400 kV S/C Meerut-Muzzafarnagar transmission line along with associated bays under Tehri transmission system in Northern Region for the period from 1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited
26-05-2009 20-07-2009

168/2009

Petition for approval of final transmission tariff and additional capital expenditure up to 31.3.2008 for 400 kV Bina-Nagda D/C transmission line along with associated bay equipment at Nagda and Bina in Western Region from 1.11.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
23-04-2009 27-05-2009

18/2009

Determination of revised transmission tariff due to additional capitalization incurred during 2004-05 and 2005-07 for 400 kV S/C Meramundali-Jeypore transmission line along with extension of Meramundali and Jeypore sub-stations in Eastern Region for the period 1.6.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon
16-04-2009 13-05-2009

23/2009

Approval of transmission tariff due to additional capitalization incurred during 2007-08 in respect of LILO of Nagarjunasagar-Raichur 400 KV S/C transmission line at Mehboobnagar and LILO of both the circuits of Nellor-Sriperumbudur 400 KV D/C transmission line at Almathi along with associated bays at Mehboobnagar and Almathi under System Strengthening Scheme-IV in Southern Region for the period from 1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited
21-04-2009 13-05-2009

113/2008

Determination of transmission tariff for additional capitalization for (i) 400 kV Ramagundam-Hyderabad D/C transmission line, (ii) 400 kV S/C Hyderabad-Kurnool-Gooty transmission line, (iii) 400 kV S/C Khammam-Nagarjunasagar transmission line and (iv) 400 kV S/C Gooty-Neelmangla transmission line along with associated bays and equipment under Ramagundam Stage-III transmission system in Southern Region. Power Grid Corporation of India Limited
16-12-2008 03-02-2009

99/2008

Determination of transmission tariff for additional capitalization incurred during 2007-08 for Tala-Siliguri transmission system in Eastern Region commissioned on 1.10.2005 and remaining transmission system commissioned on 1.5.2006. Power Grid Corporation of India Limited, Gurgaon
18-11-2008 29-01-2009