FINAL TARIFF ORDERS 2007

Pet. No.
Subject
Date of Hearing
Date of Order


128/2002

Approval of tariff in respect of National Capital Thermal Power Station, Dadri for the period 1.4.1998 to 31.3.2001. National Thermal Power Corporation Ltd.

-

31-12-2007


163/2004

Approval of Tariff of Tanda TPS (440MW) for the period from 1.4.2004 to 31.3.2009 on account of revision of operational parameters and norms. NTPC Ltd., New Delhi,Uttar Pradesh Power Corporation Ltd, Lucknow.

-

14-12-2007


139/2007
In
65/2007

Approval of generation tariff for the Muzaffarpur TPS, (2X110 MW) for the period from 8.9.2006 to 31.3.2009. Vaishali Power Generating Company Ltd, New Delhi ,Bihar State Electricity Board, Patna

27-11-2007

05-12-2007


127/2002
In
30/2002

Review of order dated 4.10.2002 in Petition No. 30/2002 - Approval of tariff of Rihand Super Thermal Power Station for the period from 1.4.1997 to 31.3.2001. National Thermal Power Corporation Ltd.

18-09-2007

30-11-2007


99/2002

Approval of tariff in respect of Kawas Gas Power Station (656.2 MW) for the period 1.4.1998 to 31.3.2001. NTPC Limited

-

02-11-2007


80/2005

Approval of tariff in respect of Jhanor Gandhar Gas Power Station (657.39 MW) for the period 1.4.2004 to 31.3.2009. NTPC Limited

-

22-10-2007


109/2007

Adoption of tariff for supply of electricity from the Sasan Ultra Mega Power Project of Sasan Power Limited. Madhya Pradesh Power Trading Company Limited

-

17-10-2007


106/2006

Approval of tariff in respect of Rihand Super Thermal Power Station Stage - II (2 x 500 MW) for the period 15.8.2005 to 31.3.2009. National Thermal Power Corporation Ltd.

22-05-2007

15-10-2007


140/2005

Approval of tariff in respect of Ramagundam Super Thermal Power Station Stage - III (500 MW) for the period 25.3.2005 to 31.3.2009. NTPC Ltd

22-05-2007

15-10-2007


L-7/25(5)/
2003-CERC

statement of reasons - amendment of operational norms for Talcher TPS.

-

26-09-2007


18/2007

Adoption of tariff for supply of electricity from the Mundra Ultra Mega Power Project of Coastal Gujarat Power Limited. Coastal Gujarat Power Limited

-

19-09-2007


67/2007
in113/2006

Review of the order dated 23.3.2007 in Petition No. 113/2006 -Adoption of tariff in respect of 2000 MW Thermal Power Station proposed to be established by ISN International Pvt. Limited in District Sidhi, Madhya Pradesh.

21-08-2007

27-08-2007


59/2007

Revision of the operational parameters and norms for determination of tariff in respect of Talcher Thermal Power Station (TTPS) for 2004-05 to 2008-09 and for directions.

14-08-2007

20-08-2007


25/2007
40/2004

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

19-07-2007

24-07-2007


96/2006
159/2004

Review of order dated 19.7.2006 for approval of tariff of Korba Super Thermal Power Station for the period 1.4.2004 to 31.3.2009.

12-06-2007

15-06-2007

5/2002

Revised tariff of Thermal Power Station II of NLC for the period 1.4.2001 to 31.3.2004.

22-02-2007

23-03-2007

68/2005

Approval of tariff for Neyveli Thermal Power Station-I (Expansion) (2x210 MW) for the period from 1.4.2004 to 31.3.2009.

17-08-2006

23-03-2007

91/2004

Approval of tariff in respect of Talcher TPS (460 MW) for the period from 1.4.2004 to 31.3.2009.

14-11-2006

23-03-2007

113/2006

Adoption of tariff in respect of 2000 MW Thermal Power Station proposed to be established by ISN International Company Pvt. Limited in District Sidhi, Madhya Pradesh.

02-02-2007

23-03-2007

IA No.
82 of 2006
in
139/2004

Interlocutory Application for implementation of order dated 7.7.2006 passed by the Appellate Tribunal for Electricity in Appeal No.36 of 2006

16-01-2007

16-01-2007

Pet. No.
Subject
Date of Hearing
Date of Order

70/2006

Approval of tariff in respect of Kopili Hydro Electric Project Stage-II (25 MW ) of North Eastern Electric Power Corporation Limited, Shillong for the period from 26.7.2004 to 31.3.2009. North Eastern Electric Power Corporation Limited.

02-08-2007

01-01-2008

107/2006

Approval of final tariff in respect of Dhauliganga Hydroelectric Project Stage-I (4x70MW) of National Hydroelectric Power Corporation Limited for the period from 1.10.2005 to 31.3.2009. National Hydroelectric Power Corporation Limited

29-05-2007

13-12-2007

119/2005

Approval of final tariff of Indira Sagar Hydroelectric Project(8x125 MW)for the periods 14.1.2004 to 31.3.2004 and 1.4.2004 to 31.3.2009.

17-08-2006

06-02-2007

 49/2006
in
175/2004

 

Review of order dated 9.5.2006 in Petition No.175/2004, for approval of tariff in respect of Rangit Hydroelectric Project, for the period 1.4.2004 to 31.3.2009.

28-12-2006

05-02-2007

 64/2006
in
39/2005

 

Review of order dated 9.5.2006 in Petition No. 39/2005, for approval of tariff in respect of Chamera Hydroelectric Project Stage I for the period 1.4.2004 to 31.3.2009.

28-12-2006

05-02-2007

46/2006 in
197/2004
47/2006 in 47/2005
68/2006 in
30/2005

Review of order dated 9.5.2006 in Petition No.197/2004, for approval of tariff in respect of Salal Hydroelectric Project for the period 1.4.2004 to 31.3.2009.

28-12-2006

05-02-2007

61/2006
in
158/2004

Review of order dated 9.5.2006 in Petition No. 158/2004, for approval of tariff in respect of Bairasiul Hydroelectric Project for the period 1.4.2004 to 31.3.2009.

28-12-2006

05-02-2007

Pet. No.
Subject
Date of Hearing
Date of Order


3/2007

Determination of transmission tariff for Fixed and Thyristor Controlled Series Compensation for 400 kV D/C Raipur-Rourkela transmission line at Raipur in Western Region for the period from 1.11.2004 to 31.3.2009. Power Grid Corporation of India Ltd, Gurgaon

27-09-2007

31-10-2007


77/2007
in
128/2006
95/2007 in
130/2006

1. Review of order dated 15.3.2007 in Petition No.128/2006 - Approval of transmission tariff for 400 kV D/C Kaiga-Narendra transmission line and 400/220 kV sub-station at Narendra including additional capitalization from DOCO (1.11.2005) to 31.3.2006 in Southern Region for the period from 1.11.2005 to 31.3.2009. Tamil Nadu Electricity Board, Chennai.Power Grid Corporation of India Limited, Gurgaon
2. Review of order dated 15.3.2007 in Petition No.130/2006 - Approval of transmission tariff for 400 kV S/C Gooty-Neelmangala transmission line along with bay extension and equipment at Gooty and Neelmangala associated with Ramagundam-III Transmission System in Southern Region for the period from 1.5.2005 to 31.3.2009. Tamil Nadu Electricity Board, Chennai.Power Grid Corporation of India Limited, Gurgaon

18-09-2007

15-10-2007


1/2007

Approval of final transmission tariff of LILO of Kolaghat-Rengali 400 kV S/C line at Baripada and establishment of new 400/220/132 kV sub-station at Baripada in Eastern Region for the period from 1.7.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon

14-08-2007

15-10-2007


49/2007

Approval of final transmission tariff for 40% Fixed Series Compensation on existing 400 kV S/C Rengali-Indravati transmission line associated with augmentation of capacity of Gazuwaka HVDC back-to-back project in Eastern Region for the period from 1.10.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon

14-08-2007

15-10-2007


12/2007

Approval of final transmission tariff for LILO of one circuit of 132 kV D/C Siliguri-Rangit transmission line at Gangtok in Eastern Region for the period from 1.10.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon

14-08-2007

15-10-2007


2/2007

Determination of final transmission tariff for 400 kV D/C Rihand-Allahabad, Allahabad-Mainpuri & Mainpuri-Ballabhgarh transmission lines with associated bays, ICT-I & II at Patiala sub-station, LILO of one circuit of Nallagarh-Hissar transmission line at Kaithal, LILO of one circuit of Nalagarh-Hissar line at Patiala, 400 kV S/C Patiala-Malerkotla transmission line, ICT-III at Abdullapur sub-station and 400 kV S/C Dadri-Panipat transmission line with associated bays and 2 nos of bays at Abdullapur sub-station under Rihand STPS Stage-II Transmission System in Northern Region for tariff block 2004-09 period.

28-06-2007

27-09-2007


45/2007
in
69/2004

Review of the order dated 16.3.2006 - Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009.

-

08-08-2007


I.A.No.
29/2007
in
105/2005

Review of the order dated 16.3.2006 - Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009.

-

08-08-2007


73/2007
in
138/2006

Review under Regulation 103 (1) of the CERC (Conduct of Business) Regulations 1999 of Order dated 21.3.2007 of the Central Electricity Regulatory Commission in Petition No.138/2006 in the matter of approval of transmission tariff for 400 kV D/C Dhauliganga-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.8.2005 to 31.3.2009.

05-07-2007

16-07-2007


10/2007

Determination of transmission tariff for 220 kV S/C Meerut-Shatabdinagar transmission line under system improvement scheme in Uttar Pradesh for the period from up to 31.3.2009.

29-05-2007

-


24/2007
in
111/2006

Approval of provisional transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line associated with Tala Hydro Electric Power, East-North inter- connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009.

-

28-06-2007


57/2007

Determination of provisional transmission tariff for 400 kV D/C Agra-Bassi transmission line (ckt-III and II) along with associated bays under Northern Region System Strengthening Scheme-II in Northern Region for the period from 1.1.2007 to 31.3.2009.

28-06-2007

28-06-2007


20/2007 in
134/2006

Correction of error in order dated 6.2.2007 in Petition No 134/2006 determining final transmission tariff for 400 kV D/C transmission line including bay extension at Raipur and Bhadrawati sub-stations in Western Region for the period 1.6.2005 to 31.3.2009.

-

15-06-2007

I.A.No.
72/2006 in
Petition
127/2005

Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.4.2004 to 31.3.2009.

-

20-04-2007

I.A.No.
71/2006 in
105/2005

Approval of transmission charges for Hiriyur sub-station (including 315 MVA Auto Transformer), LILO of Davangere-Hoody 400 kV D/C line at Hiriyur and additional bays at Kolar and Hosur sub-station for 2nd circuit of Kolar-Hosur 400 kV D/C transmission line under System Strengthening Scheme-II in Southern Region for the period from 1.4.2004 to 31.3.2009.

-

23-04-2007

138/2006

Approval of transmission tariff for 400 kV D/C Dhauliganga-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.8.2005 to 31.3.2009.

25-01-2007

21-03-2007

129/2006

Approval of transmission tariff for (1) 40% Fixed Series Compensation on 400 kV Gooty-Neelmangala transmission line-II at Gooty under FSC project in Southern Region for the period 1.5.2005 to 31.3.2009 including additional capitalization from the date of commercial operation to 31.3.2006 and (2) Revision of transmission tariff for 40% Fixed Series Compensation (FSC) on Gooty-Neelmangla 400 kV S/C transmission line-I and on Nagarjunasagar-Cuddapah 400 kV transmission lines at Cuddapah end consequent to additional capitalization from date of commercial operation to 31.3.2006 in Southern Region.

18-01-2007

23-03-2007

138/2006

Approval of transmission tariff for 400 kV D/C Dhauliganga-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.8.2005 to 31.3.2009.

25-01-2007

21-03-2007

I.A.No.
8/2007
in
133/2005

Approval of transmission charges for strengthening of 220 kV transmission system under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.4.2004 to 31.3.2009.

-

09-03-2007

I.A.No.
7/2007
in
2/2006

Approval of transmission charges for Special Energy Meters in Northern Region for the period from 1.4.2004 to 31.3.2009.

-

12-03-2007

128/2006

Approval of transmission tariff for 400 kV D/C Kaiga-Narendra transmission line and 400/220 kV sub-station at Narendra including additional capitalization from DOCO (1.11.2005) to 31.3.2006 in Southern Region for the period from 1.11.2005 to 31.3.2009.

18-01-2007

15-03-2007

130/2006

Approval of transmission tariff for 400 kV S/C Gooty-Neelmangala transmission line along with bay extension and equipment at Gooty and Neelmangala associated with Ramagundam-III Transmission System in Southern Region for the period from 1.5.2005 to 31.3.2009.

18-01-2007

15-03-2007

48/2006

Petition for approval of transmission tariff for 400 kV S/C Meramundali-Jeypore transmission line along with extension of Meramundali and Jeypore sub-stations in Eastern Region for the period 1.6.2004 to 31.3.2009.

16-11-2006

06-02-2007

134/2006

Approval of transmission tariff for Raipur-Chandrapur (Bhadrawati) 400 kV D/C transmission line including bay extension at Raipur and Bhadrawati sub-stations in Western Region for the period 1.6.2005 to 31.3.2009.

23-01-2007

06-02-2007

135/2006

Determination of transmission tariff for Tarapur Transmission System associated with Tarapur Atomic Power Station Stages 3 & 4 in Western Region for the period up to 31.3.2009.

23-01-2007

06-02-2007

136/2006

Approval of transmission tariff for 400 kV D/C Madurai-Thiruvananthapuram Transmission System in Southern Region for the period from 1.8.2005 to 31.3.2009.

23-01-2007

06-02-2007

137/2006

Approval of transmission tariff for 2nd 400 kV D/C Kahalgaon-Biharshariff transmission line in Eastern Region for the period 1.12.2004 to 31.3.2009.

23-01-2007

06-02-2007

I.A.No.
2/2007
in
117/2005

Review of the order dated 9.5.2006 in Petition No.3/2005

-

22-01-2007

I.A.No.
3/2007
in
118/2005

Approval of transmission charges for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in Northern Region for the period from 1.4.2004 to 31.3.2009.

-

25-01-2007

45/2006

Approval of transmission tariff for 132 kV S/C Mau-Balia transmission line in Northern Region for the period 1.4.2004 to 31.3.2009.

16-11-2006

09-01-2007

114/2006

Approval of provisional transmission tariff for
(i) 400/220 kV 315 MVA ICT at Gorakhpur (Powergrid) with associated bays,
(ii) 400 kV D/C Lucknow (Powergird)-Unnao (UPPCL) transmission line with associated bays at both ends,
(iii) 400/220 kV 315 MVA ICT at Lucknow with associated bays,
(iv) 2 nos. 400 kV bays at Gorakhpur (Powergrid) and 2 nos. 400 kV bays at Lucknow (Powergrid) for 400 kV D/C Gorakhpur-Lucknow transmission line of Powerlinks,
(v) Gorakhpur (Powergrid)-Gorakhpur (UPPCL) 400 kV D/C transmission line with bays at both ends, under transmission system associated with Tala HEP, East-North inter-connector and Northern Region transmission system from 1.8.2006 to 31.3.2009.

16-01-2007

16-01-2007

154/2006

Approval of provisional transmission tariff for
(i) TCSC and 2 nos of 400 kV bays at Gorakhpur sub-station associated with 400 kV Muzaffarpur-Gorakhpur transmission line of Powerlinks
(ii) 2 nos of 400 kV bays at Muzaffarpur with line reactor associated with 400 kV Muzaffarpur-Gorakhpur transmission line of Powerlinks under transmission system associated with Tala HEP, East-North inter-connector and Northern Region transmission system, an inter-regional asset between Northern Region and Eastern Region from 1.9.2006 to 31.3.2009.

16-01-2007

16-01-2007

131/2006

Approval of provisional transmission tariff for 400 kV D/C Muzaffarpur- Gorakhpur transmission line in Eastern-Northern inter-connector associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.

16-01-2007

16-01-2007

132/2006

Approval of provisional transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line and 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North inter connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.

16-01-2007

16-01-2007

I.A.No.
1/2007
in
102/2005

Approval of transmission charges for LILO of 220 kV Panki-Naubasta transmission line at Kanpur sub-station in Northern Region for the period from 1.4.2004 to 31.3.2009.

-

22-01-2007

102/2006

Approval of transmission tariff for 400 kV D/C Talcher-Meramundali transmission line in Eastern Region for the period 1.4.2004 to 31.3.2009.

10-01-2007

14-12-2006

116/2006

Petition for approval of tariff for Purnea sub-station (new) and LILO of 400 kV D/C Bongaigaon-Malda at Purnea (New) in Eastern Region for the period 1.4.2004 to 31.3.2009.

18-01-2007

13-02-2007

I.A.No.
6/2007
in
48/2000

Approval of transmission tariff for 400 kV Malda-Bongaigaon transmission line with associated bays (under Kathalguri Project) between Eastern Region and North-Eastern Region for the period from 1.4.2000 to 31.3.2001.

27-02-2007

05-03-2007

129/2006

Approval of transmission tariff for (1) 40% Fixed Series Compensation on 400 kV Gooty-Neelmangala transmission line-II at Gooty under FSC project in Southern Region for the period 1.5.2005 to 31.3.2009 including additional capitalization from the date of commercial operation to 31.3.2006 and (2) Revision of transmission tariff for 40% Fixed Series Compensation (FSC) on Gooty-Neelmangla 400 kV S/C transmission line-I and on Nagarjunasagar-Cuddapah 400 kV transmission lines at Cuddapah end consequent to additional capitalization from date of commercial operation to 31.3.2006 in Southern Region.

-

23-04-2007

Pet. No.
Subject
Date of Hearing
Date of Order

-

 

-

-