Pet. No. |
Subject |
Date of Hearing |
Date of Order |
200/2009
|
Revision of incentive for (i) 400 kV D/C Gorakhpur-Lucknow transmission line, (ii) 400 kV D/C Bareilly-Mandola transmission line and (iii) 400 kV D/C Muzaffarpur-Gorakhpur transmission line associated with Tala Hydro Electric Power, East-North inter-connector and Northern region transmission system. Powerlinks Transmission Limited, New Delhi |
03-12-2009 |
22-12-2008 |
201/2009
|
Revision of incentive for the year 2007-08 in respect of 400 kV D/C Siliguri Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)- Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorakhpur (50%) transmission line associated with Tala Hydro Electric project, East-North inter - connector and Northern Region transmission system. Powerlinks Transmission Limited, New Delhi |
03-12-2009 |
22-12-2009 |
192/2009 |
Determination of final transmission tariff of (i) LILO of both circuits of Madurai-Trivendrum 400 kV D/C line and 1x 63 MVAR Bus reactor, (ii) 1x 315, 400/220 kV MVA Transformer (iii) 2nd 400 kV, 63 MVAR Bus Reactor, (iv) 2nd 1x 315 MVA , 400/220 kV Auto transformer and (v) 3 no. 1x 63 MVAR Reactor along with associated bays and equipments at Tiruneveli sub-station under "transformer system associated with Kudamkulam Atomic Power Project (2X 1000 MW) in Southern Region for the period from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
17-11-2009 |
21-12-2009 |
76/2009
|
Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2008 -09 for 400 kV Ramagundam Transmission System, including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region for the period from 1.4.2008 to 31.3.2009. Power Grid Corporation of India Limited, New Delhi |
- |
10-12-2009 |
I.A. 59/2009
in
205/2009
|
Approval of incentive based on availability of transmission system for the year 2007-08 for Western Region. Power Grid Corporation of India Limited, Gurgaon |
24-11-2009 |
02-12-2009 |
I.A.No. 59/2009
in
162/2009
|
Approval of incentive based on availability of transmission system of Northern Region for the year 2008-09. Power Grid Corporation of India Limited, Gurgaon |
19-11-2009 |
24-11-2009 |
173/2009
|
Approval of incentive based on availability of 400 kV D/C Gorakhpur-Lucknow transmission line, 400 kV D/C Barielly-Mandola transmission line and 400 kV D/C Muzaffarpur-Gorakhpur transmission line (50% share), associated with Tala Hydro Electric Power Project, East-North inter-connector and Northern Region Transmission System for the year 2008-09. Powerlinks Transmission Limited, New Delhi |
24-09-2009 |
14-10-2009 |
174/2009
|
Approval for incentive for the year 2007-08 in respect of 400 kV D/C Siliguri Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)- Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorakhpur (50%) transmission line associated with Tala Hydro Electric project, East-North interconnector and Northern Region transmission system. Powerlinks Transmission Limited, New Delhi |
24-09-2009 |
14-10-2009 |
83/2006 |
Determination of transmission tariff for the transmission system associated with Loktak HEP in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
08-09-2009 |
131/2009
|
Approval of transmission tariff for Stage-I of 400 kV Thyristor controlled series compensation project (FACTS Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
25-08-2009 |
14-09-2009 |
92/2007
|
Approval of incentive based on availability of transmission system for the year 2006-07 for Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
28-05-2009 |
07-09-2009 |
87/2006 |
Determination of transmission tariff for ATS of Kathalguri GBPP in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
07-09-2009 |
77/2008 |
Approval of incentive based on availability of transmission system for the year 2007-08 for North-Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
28-05-2009 |
07-09-2009 |
98/2008 |
Approval of incentive based on availability of transmission system for the year 2007-08 for Eastern Region Power Grid Corporation of India Limited, Gurgaon |
28-05-2009 |
07-09-2009 |
104/2009 |
Determination of final transmission tariff for (i) 40% series compensation on Meramundali-Jeypore 400 kV S/C transmission line at Jeypore (Eastern Region scheme) (ii) 50% Fixed Series Compensation on 400 kV Jeypore-Gazuwaka D/C transmission line at Jeypore (inter-regional scheme between ER and SR ) associated with augmentation of capacity of Gazuwaka HVDC back-to-back project for the period from 1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited |
14-07-2009 |
28-08-2009 |
91/2008 |
Approval of incentive based on availability of transmission system for the year 2007-08 for Western Region. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
28-08-2009 |
90/2007 |
Approval of incentive based on availability of transmission system for the year 2006-07 for Western Region. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
27-08-2009 |
90/2006 |
Determination of transmission tariff for Ranganadi-Ziro transmission system in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
28-05-2009 |
21-08-2009 |
89/2006 |
Determination of transmission tariff for associated transmission system of Doyang HEP in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
21-08-2009 |
88/2006 |
Determination of transmission tariff for Augmentation Scheme in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
21-08-2009 |
86/2006 |
Determination of transmission tariff for associated transmission system of Agartala GBPP in North Eastern Region for the period from 1.4.2004 to 1.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
21-08-2009 |
84/2006 |
Determination of transmission tariff for Ranaganadi transmission system in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
19-08-2009 |
68/2009 |
Determination of final transmission tariff for (i) 315 MVA, 400/220 kV, ICT at Siliguri for the period 1.10.2006 to 31.3.2009, and (ii) 400 kV D/C Biharshariff-Muzaffarpur transmission line, Biharshariff 400 kV extension and Muzaffarpur 400 kV extension for the period 1.11.2006 to 31.3.2009 under System Strengthening Scheme for Eastern Region (formerly part of Tala Supplementary Scheme). Power Grid Corporation of India Limited |
16-06-2009 |
19-08-2009 |
85/2006 |
Determination of transmission tariff for transmission system associated with Kopili Hydroelectric Stage-I extension project (2x50 MW) in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
28-05-2009 |
12-08-2009 |
82/2006 |
Determination of transmission tariff for Ranganadi-Ziro transmission system in North Eastern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
28-05-2009 |
11-08-2009 |
104/2008 |
Approval of incentive based on availability of transmission system for the year 2007-08 for Southern Region. Power Grid Corporation of India Limited, Gurgaon |
21-05-2009 |
11-08-2009 |
78/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during the years 2006-07 and 2007-08 for extension of Biharshariff sub-station with 400/220 kV, 1 No. 315 MVA transformer with associated bays, (ii) All other assets covered under Bihar Grid Strengthening Scheme except extension of Biharshariff sub-station with 400/220 kV, 1 No. 315 MVA transformer with associated bays in Eastern Region for the period from 1.4.2006 to 31.3.2009. Power Grid Corporation of India Limited |
16-06-2009 |
07-08-2009 |
73/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during 2005-06 for Fixed and Thyristor Controlled Series Compensation for 400 KV D/C Raipur- Rourkela Transmission Line at Raipur in Western Region for the period from 1.4.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
23-06-2009 |
07-08-2009 |
74/2006 |
Approval of charges for Unified Load Despatch & Communication Scheme in Eastern Region for the period from 1.9.2005.to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
28-07-2009 |
117/2006 |
Approval of incentive based on availability of transmission system for the year 2005-06 for Northern Region. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
27-07-2009 |
91/2006 |
Approval of incentive based on availability of transmission system for the year 2005-06 for Western Region. Power Grid Corporation of India Limited, Gurgaon |
23-04-2009 |
22-07-2009 |
5/2009 |
Determination of final transmission tariff for (i) 50 MVAR Reactor at Narendra, (ii) Narendra- Devangiri transmission line and Bus Reactor at Mysore and (iii) 2 nd 315 MVA Auto Transformer at Hiriyur sub-station along with associated bays under Transmission System associated with Kaiga-3 and 4 (2X235 MW) project in Southern Region from date of commercial operation to 31.3.2009 and approval of additional capitalization from date of commercial operation to 31.3.2008. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
20-07-2009 |
I.A. 26/2008
In
118/2009 |
Approval of incentive based on availability of transmission system of Southern Region for the year 2008-09. Power Grid Corporation of India Limited, Gurgaon |
16-07-2009 |
17-07-2009 |
170/2008 |
Determination of final transmission tariff and additional capitalization up to 31.3.2008 for (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220/132 kV ICT-III at Raibareilly along with associated bays and (ii) 100 MVA, 220/132 kV ICT-II at Raibareilly sub-station along with associated bays under Unchahar-III transmission system in Northern Region for the period 2004-09. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
30-06-2009 |
128/2008 |
Determination of final transmission tariff and additional capitalization up to 31.3.2008 for (i) 315 MVA ICT-IV along with associated bays at Moga substation and (ii) ICT-II along with associated bays and 2 nos PSEB feeder bays at Amritsar sub-station, and 400 kV Bus reactor bay & 2 nos PSEB line bays at Moga sub-station under augmentation of transformation capacity at Amritsar and Moga sub-stations in Northern Region for the period 2004-09. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
30-06-2009 |
49/2009 |
Revision of transmission tariff due to additional capital expenditure incurred during 2006-07 for 40% Fixed Series Compensation on 400 kV Gooty-Neelmangala transmission line (Ckt-II) at Gooty under FSC project in Southern Region. Power Grid Corporation of India Limited, New Delhi |
21-05-2009 |
26-06-2009 |
51/2009 |
Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 for 400 kV D/C Mysore-Neelamangala transmission line along with Mysore sub-station and bay at Neelamangala under 400 kV D/C Mysore-Neelamangala Transmission system in Southern Region. Power Grid Corporation of India Limited, New Delhi |
21-05-2009 |
25-06-2009 |
48/2009 |
Approval of transmission tariff due to additional capitalization incurred during 2007-08 in respect of (i) 400 kV D/C Vindhyachal-Satna transmission line 3rd circuit along with associated bay equipment and (ii) 400/220 kV, 315 MVA ICT-II along with associated bay equipment at Satna sub-station along with associated bay equipment under Vindhyachal transmission system-III in Western Region. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
19-06-2009 |
46/2009 |
Approval of transmission tariff due to additional capitalization incurred during 2006-07 and 2007-08 in respect of Tarapur Transmission System associated with Tarapur Atomic Station Stages 3 & 4 in Western Region for period 2006-09. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
19-06-2009 |
56/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during 2007-08 for Bhadrawati-Chandrapur 400 kV D/C transmission line including bays at Bhadrawati (Power Grid) switching station (extension) and Chandrapur (MSEB) switchyard (extension) in Western Region for the tariff block 2007-09 period. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
18-06-2009 |
42/2009 |
Determination of revised transmission tariff considering additional capitalization incurred during 2007-08 for LILO of Korba-Raipur 400 kV S/C line at Sipat under Sipat-I Transmission system in Western Region for the tariff block 2007-09 period. Power Grid Corporation of India Limited, Gurgaon |
19-05-2009 |
17-06-2009 |
45/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during the years 2006-07 and 2007-08 for 400 kV Madurai-Trivendrum Transmission System in Southern Region for the period 1.4.2006 to 31.3.2009. Power Grid Corporation of India Limited, New Delhi |
21-05-2009 |
17-06-2009 |
3/2009 |
Determination of final transmission tariff up to the date of commercial operation and additional capitalization from the date of commercial operation to 31.3.2008 for (i)765 S/C Bina-Gwalior transmission line along with Gwalior sub-station and associated 400 kV bays at Bina (Power Grid) sub-station, (ii) 315 MVA, 400/220/33 kV Auto Transformer along with associated bays at Gwalior sub-station and (iii) LILO of 400 kV S/C Korba-Raipur transmission line at Bhatapara sub-station along with associated bay equipment including ICT- I of Bhatapara sub-station under Sipat-II Transmission System in Western Region for tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaon |
23-04-2009 |
15-06-2009 |
50/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during 2006-07 and 2007-08 for Raipur-Chandrapur (Bhadrawati) 400 kV D/C transmission line including bay extension at Raipur and Bhadrawati sub-stations in Western Region for the period 1.4.2006 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
19-05-2009 |
15-06-2009 |
102/2007
|
Approval of incentive based on availability of transmission system for the year 2006-07 for Southern Region. Power Grid Corporation of India Limited, Gurgaon |
21-05-2009 |
09-06-2009 |
41/2009 |
Determination of revised transmission tariff due to additional capitalization incurred during 2006-07 and 2007-08 for 400 kV D/C Dhauliganga HEP-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the tariff block 2004-09. Power Grid Corporation of India Limited, Gurgaon |
12-05-2009 |
09-06-2009 |
27/2009 |
Determination of revised transmission tariff considering additional capitalization incurred during 2007-08 for 400 kV D/C Agra-Bassi transmission line (Ckt-III and II) along with associated bays under Northern Region System Strengthening Scheme-II for the tariff block 2004-09. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
09-06-2009 |
31/2009 |
Determination of revised transmission tariff considering additional capitalization incurred during 2007-08 for 220 kV S/C Meerut-Shatabdinagar transmission line under System improvement Scheme in Uttar Pradesh in Northern Region for the tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaon |
12-05-2009 |
08-06-2009 |
78/2006 |
Approval of incentive based on availability of transmission system for the year 2005-06 for Southern Region. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
08-06-2009 |
118/2009 |
Approval of incentive based on availability of transmission system for the year 2005-06 for Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
16-04-2009 |
28-05-2009 |
168/2008 |
Petition for approval of final transmission tariff and additional capital expenditure up to 31.3.2008 for 400 kV Bina-Nagda D/C transmission line along with associated bay equipment at Nagda and Bina in Western Region from 1.11.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
23-04-2009 |
27-05-2009 |
79/2009 |
Miscellaneous application for extension of time for the filing the fresh petition for approval of final transmission tariff pertaining to Petition No. 103/2008, 106/2008, 112/2008, 118/2008, 122/2008,123/2008,149/2008,150/2008 and 151/2008 for the period from respective date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited |
14-05-2009 |
15-05-2009 |
75/2008 |
Miscellaneous petition for determination of tariff for 400 kV D/C Bongaigaon-Malda transmission line under Kathalguri transmission system for 2004-09 period in view of the judgment of Appellate Tribunal for Electricity dated 5.2.2008 in appeal No. 106 of 2007 directing the Commission to re-determine the transmission tariff w.e.f. 1.4.2000 for Bongaigaon-Malda inter-regional line between ER and NER on the basis of approved revised cost estimate of Kathalguri transmission system. Power Grid Corporation of India Limited |
19-03-2009 |
15-05-2009 |
26/2009 |
Determination of revised transmission tariff due to approval of RCE and additional capitalization incurred in 2006-07 and 2007-08 for 400 kV D/C Kanpur-Auraiya transmission line along with bays at Auraiya under Northern Region System Strengthening Scheme-I in Northern Region for tariff block 2004-09. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
13-05-2009 |
33/2008 |
Permission for access to inter-State transmission mechanism for injecting electricity from wind power projects on deviation (un-scheduled interchange) basis without scheduling requirement Gujarat Flurochemicals Ltd (GFL), Ranjit Nagar |
02-04-2009 |
13-05-2009 |
6/2009 |
Determination of final transmission tariff and additional capitalization from the date of commercial operation to 31.3.2008 for (i) 400 kV Balia-Lucknow Ckt I &II, 400 kV Balia-Mau Ckt-I, 400 kV D/C Patna-Balia transmission line including associated bays at Patna and Balia (ii) 400 kV Balia-Mau Ckt-II, 40% FSC at Lucknow as 400 kV D/C Lucknow-Balia transmission line, (iii) 80 MVAR Bus Reactor of Biharshariff sub-station, (iv) 400 kV Lucknow-Bareilly Ckt-I & II along with associated bays, (v) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays, and (vi) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II transmission system under Kahalgaon Stage-II Phase-I Transmission system in Northern Region for tariff period up to 2009. Power Grid Corporation of India Limited, Gurgaon |
21-04-2009 |
13-05-2009 |
1/2009 |
Determination of final transmission tariff of 400 kV D/C Kahalgaon-Patna line (including 1x50 MVAR line reactor, 1x80 MVAR Bus Reactor with associated bay at Patna sub-station, 2 nos. 220 kV line bays at Patna sub-station for BSEB sub-station and 400 and 220 kV bays for ICT-I at Patna sub-station, (ii) 400 kV D/C Maithon-Ranchi line along with associated bays, 400/220 kV, 315 MVA, ICT-II along with associated bays at Ranchi sub-station and 220 Patratlu & Chandil bays at Ranchi sub-station, (iii) 80 MVAR Bus Ractor at Ranchi and 2 nos of 220 kV line bays at Ranchi DOCO 1.9.2007. (iv) ICT-I at Patna sub-station, (v) 400/220 kV ICT-I at Ranchi sub-station along with associated bays and 2nos line bays at Patna sub-station, and (iv) ICT-II at Patna sub-station along with associated bays under Kahalgaon stage-II Phase-I (2x500 MW) Transmission system in Eastern Region for the period up to 2009. Power Grid Corporation of India Ltd., Gurgaon |
16-04-2009 |
06-05-2009 |
4/2009 |
Determination of final transmission tariff LILO of 1st Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station and LILO of 2nd Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station for the period from 1.9.2007 to 31.3.2009 associated with 220 kV Interconnection with Jharkhand State Electricity Board system at Ranchi sub-station in Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
16-04-2009 |
06-05-2009 |
131/2008 |
Determination of final transmission tariff including tariff on additional capital expenditure during 2007-08 for upgradation of transfer capacity of Talcher-Kolar HVDC Bipole from 1.8.2007 to 31.3.2009 in Southern Region. Power Grid Corporation of India Limited, Gurgaon |
17-02-2009 |
30-04-2009 |
124/2008 |
Petition for approval of final transmission tariff and additional capital expenditure up to 31.3.2008 for 400 kV S/C Vindhyachal-Kanpur line at Singrauli along with bays at Singrauli end (Realiqnment of Vindhyachal-Kanpur S/C line at Singrauli and Singraluli-Vindhyahal 2nd 400 kV Ckt ) and Bus coupler bay at Vindhyachal HVDC under System Strengthening Scheme in Singrauli-Vindhyachal corridor in Northern Region for the period from 1.5.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
29-04-2009 |
167/2008 |
Petition for approval of final transmission tariff and additional capital expenditure up to 31.3.2008 for Agra-Gwalior 765 kV S/C transmission line along with 400 kV Agra (PGCIL) switching station extension and 400/220 kV Gwalior (PGCIL) sub-station extension under Kahalgaon Stage-II Phase-I transmission system in Western Region and Northern Region from 1.4.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
29-04-2009 |
126/2008 |
Determination of final transmission tariff for (i) Gooty-Raichur 400 kV D/C transmission line along with bay extensions at Gooty and Raichur including 1st additional capitalziation from the date of commercial operation to 31.3.2008 and (ii) Transmission tariff due to additional capital expenditure (2nd additional capitalization from 1.1.2007 to 31.3.2008) for Neelmangala-Somanahally 400 kV D/C line along with bay extension under scheme for system strengthening -III of Sourthern Region Grid in Southern Region Grid in Southern Region. Power Grid Corporation of India Limited |
17-02-2009 |
24-04-2009 |
136/2008 |
Determination of final transmission tariff up to the date of commercial operation and additional capitalization from the date of commercial operation to 31.3.2008 for (i) Two nos 400 kV bays at Kanpur sub-station associated with Kanpur-Auraiya transmission line, (ii) LILO of 400 kV D/C Bareilly-Mandola transmission line at Bareilly and Bus Reactor at Bareilly, (iii) LILO of 400 kV S/C Lucknow-Moradabad transmission line at Bareilly and (iv) LILO of 400 kV Lucknow (UPPCL)-Sultanpur (UPPCL) transmission line at Lucknow (Power Grid) under Northern Region system strengthening scheme-I in Northern Region for the period 2004-09. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
24-04-2009 |
135/2008 |
Determination of final transmission tariff and additional capitalization from the date of commercial operation to 31.3.2008 for (i) 3 x 105 MVA 400/220/33 kV ICT-III at Wagoora sub-station and (ii) 220 kV Zainkot III & IV Bays at Wagoora sub-station under Northern Region Strengthening Scheme-II in Northern Region for period up to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
22-04-2009 |
129/2008 |
Determination of final transmission tariff and additional capitalization from the date of commercial operation to 31.3.2008 for (i) LILO of one Ckt. of 400 kV D/C Ballabgarh-Dadri transmission line at Maharanibagh GIS along with associated bays and 315 MVA 400/220/33 kV ICT-I at Maharanibagh GIS along with associated bays (ii) 315 MVA 400/220/33 kV ICT-II at Maharanibagh GIS along with associated bays under Tala HEP, East-North Inter-connector and Northern Region Transmission System for period up to 2009. Power Grid Corporation of India Limited, Gurgaon |
26-03-2009 |
20-04-2009 |
132/2008 |
Determination of final transmission tariff up to the date of commercial operation and additional capitalization from the date of commercial operation to 31.3.2008 for (i) LILO of 400 kV Satna-Bina Ckt-I at Bina (Power Grid) along with associated bays (ii) Circuit # IV & III of 400 kV D/C Satna-Bina transmission line (iii) LILO of Raipur-Rourkela D/C line at Raigarh and Raigarh sub-station with one ICT & 315 MVA 400/220 kV ICT-II at Raigarh sub-station under Vindhyachal Stage-III transmission system in Western Region for the period up to 2009. Power Grid Corporation of India Limited, Gurgaon |
12-03-2009 |
20-04-2009 |
134/2008 |
Determination of final transmission tariff up to the date of commercial operation and additional capitalization from the date of commercial operation to 31.3.2008 for (i) 50 MVAR Bus Reactor at Hissar sub-station, (ii) LILO of 400 KV Moga- Hissar line, ICT-I at Fatehabad sub-station, 4 nos 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAR Bus Reactor bay along with associated bays at Fatehabad sub-station. (iii) 315 MVA, 400/220 kV ICT-II along with associated bays at 400/220 kV Fatehabad sub-station under Northern Region System Strengthening Scheme- III in Northern Region for tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaons |
26-03-2009 |
20-04-2009 |
127/2008 |
Petition for approval of final transmission tariff of 400 kV S/C Vindhyachal-Korba Ckt-II along with associated bay equipment at Vindhyachal and Korba switchyards in Western Region for the period from 1.6.2007 to 31.3.2009 Power Grid Corporation of India Limited, Gurgaon |
12-03-2009 |
09-04-2009 |
133/2008 |
Petition for approval of final transmission tariff of 400/220 kV, 315 MVA ICT-II at Muzaffarpur sub-station associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from 1.6.2007 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
19-02-2009 |
08-04-2009 |
144/2008 |
Determination of revised transmission tariff due to 2nd additional capitalization incurred during 2006-07 and 2007-08 for LILO of one circuit of 132 kV D/C Siliguri-Rengit at Gangtok in Eastern Region. Power Grid Corporation of India Ltd., Gurgaon |
19-02-2009 |
02-04-2009 |
141/2008 |
Determination of revised transmission tariff due to 2nd additional capitalization incurred during 2006-07 and 2007-08 for 40% Fixed Series Compensation on existing 400 kV S/C Rengali-Indravati transmission line associated with augmentation of capacity of Gazuwaka HVDC back-to-back project in Eastern Region. Power Grid Corporation of India Ltd., Gurgaon |
19-02-2009 |
31-03-2009 |
142/2008 |
Determination of revised transmission tariff due to 2nd additional capitalization incurred during 2006-07 and 2007-08 for LILO of Kolaghat-Rengali 400 kV S/C transmission line at Baripada and establishment of New 400/220/132 kV sub-station at Baripada in Eastern Region. Power Grid Corporation of India Ltd., Gurgaon |
19-02-2009 |
19-03-2009 |
130/2008 |
Petition for approval of final transmission tariff of Circuit-I of 400 kV D/C Teesta (Stage-V)-Siliguri transmission system associated with Teesta (Stage-V) HEP, in Eastern Region for the period 1.2.2008 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
19-02-2009 |
16-03-2009 |
125/2008 |
Determination of final transmission tariff for (a) 80 MVAR Reactor at Nellore (b) 315 MVA ICT at Cuddapah (c) 315 MVA ICT at Gooty, 3x167 MVA ICT at Kolar and provision of switching arrangement for existing reactor at Somanhalli (d) 315 MVA ICT at Guzuwaka (e) 315 MVA ICT at Munirabad and (f) 315 ICT at Khammam including tariff on additional capital expenditure from the date of commercial operation to 31.3.2008 for all the above assets except ICT at Khammam under system strengthening-V of Southern Region Grid from the date of commercial operation to 31.3.2009 in Southern Region. Power Grid Corporation of India Limited, Gurgaon |
17-02-2009 |
16-03-2009 |
31/2008 |
Approval of revised fixed charges for the period 2004-09 after considering the impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 in respect of Talcher Thermal Power Station (460 MW). National Thermal Power Corporation Ltd. |
30-09-2008 |
03-02-2009 |
80/2008 |
Re-determination of transmission tariff for the period 2004-09 considering decapitalization/additional capitalization of 3 nos ICTs under Rihand Transmission System in Northern Region. Power Grid Corporation of India Limited, Gurgaon |
27-11-2008 |
03-02-2009 |
64/2008
67/2008 |
1. Fixation of and adjudication on the transmission charges for use of the Gujarat transmission system for conveyance of central sector power to Union Territory of Daman & Diu (DD) under sections 62 and 79 of the Electricity Act, 2003
2. Fixation of and adjudication on the transmission charges for use of the Gujarat transmission system for conveyance of central sector power to Union Territory of Dadra and Nagar Haveli (DNH) under sections 62 and 79 of the Electricity Act, 2003 Gujarat Energy Transmission Corporation Ltd., Vadodra |
23-12-2008 |
03-02-2009 |
68/2008 |
Determination of final transmission tariff for (i) 315 MVA 400/220 kV ICT I &II along with associated bays and four nos of 220 kV transmission line bays at Kaithal sub-station (ii) 315 MVA 400/220 kV ICT I & II along with associated bays and four nos of 220 kV transmission line bays at Mainpuri sub-station, and (iii) 2 nos. of 220 kV bays at Abdullapur sub-station under Rihand Stage-II Transmission System in Northern Region for tariff block 2004-09. Power Grid Corporation of India Limited, Gurgaon |
27-11-2008 |
03-02-2009 |
96/2008 |
Determination of final transmission tariff for 400 kV D/C RAPP-Kankroli transmission line along with associated bays and 400/220 kV 315 MVA ICT-II along with associated bays and two nos. 220 kV line bays at Kankroli sub-station under RAPP 5 & 6 transmission system in Northern Region from 1.4.2008 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
27-11-2008 |
23-01-2009 |
42/2008 |
Determination of final transmission tariff for LILO of 400 kV S/C Korba (STPS)- Raipur (MPEB) transmission line at Sipat in Western Region for the period from 1.5.2006 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
15-07-2008 |
23-01-2009 |
94/2008
I.A. No.
20/2008 |
Determination of final transmission tariff for LILO of both circuits of 400 kV D/C Guzuwaka-Vijaywada transmission line at Vemagiri (APTRANSCO) and extension of 400/220 kV Sub-station at Vijayawada (Power Grid) under "system strengthening-VI of Southern Region Grid" from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited |
16-12-2008 |
22-01-2009 |
48/2000
71/2002 |
1. Approval of tariff in respect of 400 kV Bongaigaon-Malda transmission line between Eastern and North-eastern Regions for the period from 1.4.2000 to 31.3.2001.
2. Approval of tariff in respect of 400 kV Bongaigoan-Malda transmission line in Eastern and North-eastern Region for the period from 1.4.2001 to 31.3.2004. Power Grid Corporation of India Ltd., Gurgaon |
18-09-2008 |
07-01-2009 |