cerc-logo

Final Tariff Orders 2010

Pet. No.
Subject
Date of Hearing
Date of Order

-

Detailed procedure under REC mechanism submitted by the Central Agency (NLDC) (First Amendment).
-
09-11-2010

255/2010
(suo-motu)
Determination of Benchmark capital cost norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2011-12 19-10-2010
09-11-2010

256/2010
(suo-motu)

Determination of generic levellised generation tariff (FY 2011-12) under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 and Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2010.
19-10-2010
09-11-2010

230/2010
(Suo Motu)

Determination of Fee and Charges payable under Regulation 11 of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010.
Suo Motu
21-09-2010

99/2010 (Suo Motu)
Determination of Forbearance and Floor Price for the REC framework.
-
01-06-2010

-

Central Electricity Regulatory Commission (Terms and conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 .
Detailed procedure under REC mechanism submitted by the Central Agency (NLDC).
-
01-06-2010

53/2010 (Suo Motu)

Determination of generic levellised generation tariff under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 and Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2010.
09-03-2010
26-04-2010

268/2009
17-12-2009
11-01-2010
Pet. No.
Subject
Date of Hearing
Date of Order
M.A.31/2010
in
128/2010

Application for extension of time in complying with the order dated 2.8.2010 passed by the Commission under Regulation 115 and 116 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations.
Petition for approval of unit configuration change and consequential amendments to the Power Purchase Agreements (PPAs). Coastal Andhra Power Ltd (CAPL), Navi Mumbai
- 11-11-2010

125/2009

Approval of final tariff for Unit-I (from 1.8.2008 to 29.12.2008) and Unit-I & II (combined) (from 30.12.2008 to 31.3.2009) in respect of Kahalgaon Super Thermal Power Station, Stage-II (2 x 500 MW) NTPC Ltd, New Delhi
- 27-10-2010

194/2009

Revision of fixed charges for the period 2006-09 due to additional capital expenditure incurred during the years 2006-07 (1.6.2006 to 31.3.2007), 2007-08 and 2008-09 at Badarpur Thermal Power Station (705 MW). NTPC Ltd, New Delhi
06-05-2010
28-09-2010
230/2009

Fixation of tariff in respect of NLC-TPS-I Expansion (2 x 210 MW) for the period from 1.4.2009 to 31.3.2014. Neyveli Lignite Corporation Ltd, Neyveli
08-04-2010
31-08-2010

308/2009

Approval of tariff of Unit – I (250 MW) for the period 22.4.2009 to 20.10.2009 and for the Station (Unit-I and Unit-II) (2x 250 MW) for the period from 21.10.2009 to 31.03.2014 of Bhilai Expansion Power Project of NTPC-SAIL Power Company Ltd. NTPC-SAIL Power Company Ltd, New Delhi
11-03-2010
29-07-2010

125/2009
With
I.A.63/2009
Approval of final tariff for Unit-I (from 1.8.2008 to 29.12.2008) and Unit-I & II (combined) (from 30.12.2008 to 31.3.2009) in respect of Kahalgaon Super Thermal Power Station, Stage-II (2 x 500 MW) NTPC Ltd, New Delhi
25-02-2010
05-07-2010

12/2009

Combining Stage-I (3 x 210 MW) and Stage-II (4 x 210 MW) of NLC-Thermal Power Station-II generating station for the limited purpose of scheduling and UI computation and also to consider special treatment of Mines' load in the case of Generating Stations owned by NLC Neyveli Lignite Corporation Ltd.
08-04-2010
02-07-2010

218/2009

Application under Section 63 of the Electricity Act, 2003 for adoption of tariff for the supply of electricity from the Tilaiya Ultra Mega Power Project of Jharkhand Integrated Power Limited, awarded to M/s Reliance Power Limited based on tariff determined through a transparent and International Competitive Bidding process in accordance with the guidelines issued by the Ministry of Power, Government of India. Jharkhand State Electricity Board, Ranchi
-
23-06-2010

146/2009

Petition for approval of provisional tariff of Kahalgaon Stage-II (3x500 MW) for the period from 1.4.2009 to 31.3.2014. NTPC Ltd. New Delhi
-
21-06-2010

1/2003

Revision of tariff in respect of Talcher Super Thermal Power Station, Stage-II (4 x 500 MW) for the period 1.8.2003 to 31.3.2004 as a result of implementation of the judgment of the Appellate Tribunal for Electricity dated 30.3.2007 in Appeal No. 117/2006. NTPC Ltd, New Delhi.
-
16-06-2010

126/2009
with
IA.38/2009

Determination of impact of additional capital expenditure incurred during the years 2006-07, 2007-08 and 2008-09 on fixed charges in respect of Kahalgaon Super Thermal Power Station, Stage-I (840 MW). NTPC Ltd, New Delhi
09-02-2010
15-06-2010

63/2009

Approval of tariff of Sipat Super Thermal Power Station, Stage-II (1000 MW) for the period 20.6.2008 to 31.3.2009. NTPC Ltd.
-
17-02-2010

93/2009

Petition for approval of tariff of Unit-1(250MW) for the period from 22.4.2009 to 20.10.2009 and Station (2x250 MW) for the period from 21.10.2009 to 31.3.2014 of Bhilai expansion power project (2x250 MW). NTPC-SAIL Power Company Private Ltd, New Delhi
-
10-02-2010
109/2009

Approval of tariff of SUGEN 1147.5 MW power plant of Torrent Power Limited for the period from the date of commercial operation of Block 10 (First Block) up to 31.03.2014. Torrent Power Ltd., Ahmedabad
08-10-2009
11-01-2010

120/2005
05-11-2009
11-01-2010
Pet. No.
Subject
Date of Hearing
Date of Order

57/2010

Suo motu review of the tariff order dated 6.9.2010 in respect of SEWA Hydro electric project, Stage-II (3 x 40 MW) located at Kathua, State of J&K, for the period from 1.3.2010 to 31.3.2014. NHPC Ltd.
-
22-09-2010
190/2009

Determination of impact of annual fixed charges on account of additional capital expenditure incurred during the years 2006-07, 2007-08 and 2008-09, in respect of Chamera Hydroelectric Project, Stage-II. NHPC Ltd, Faridabad
22-07-2010
07-09-2010

57/2010

Approval of generation tariff of SEWA Hydro electric project, Stage-II (3 x 40 MW) located at Kathua, State of J&K, for the period from 1.3.2010 to 31.3.2014. NHPC Ltd.
18-05-2010
06-09-2010

206/2009

Determination of impact of annual fixed charges on account of additional capital expenditure incurred during the financial years 2006-07, 2007-08 and 2008-09 in respect of Chamera Hydroelectric Project, Stage-I. NHPC Ltd.
22-07-2010
03-09-2010

176/2009

Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during the years 2006-07, 2007-08 and 2008-09 in respect of Rangit Hydroelectric Project, (3 x 20 MW) for the period 1.4.2004 to 31.3.2009. NHPC Ltd, Faridabad
21-01-2010
03-09-2010
214/2009

Approval of two-part tariff for Kopili Hydroelectric Project, Stage-II (25 MW) for the period from 26.7.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Shillong
-
25-08-2010

214/2009

Approval of two-part tariff for Kopili Hydroelectric Project, Stage-II (25 MW) for the period from 26.7.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Shillong
18-02-2010
15-06-2010

210/2009

Approval of two-part tariff for Kopili Hydro Electric Project-Kopili Power Station (4 x 50 MW) for the period from 1.4.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Shillong
18-02-2010
02-06-2010

143/2006

Petition under Section 79 (1) (f) of the Electricity Act, 2003 . Indraprastha Power Generation Company Ltd, New Delhi
11-05-2010
25-05-2010

211/2009

Approval of two-part tariff for Ranganadi Hydro Electric Project (3 x 135 MW) for the period from 1.4.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Shillong
18-02-2010
17-05-2010

212/2009

Approval of two-part tariff for Agartala Gas Turbine Power Project (4 x 21 MW) for the period from 1.4.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan and Deutsche Bank loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Shillong
18-02-2010 11-05-2010
213/2009

Approval of two-part tariff for Assam Gas Based Power Project (291 MW) for the period from 1.4.2004 to 31.3.2009 after inclusion of actual additional capital expenditure and application of actual interest rates incurred on the syndicated loan for the period 1.4.2006 to 31.3.2009. North Eastern Electric Power Corporation Ltd, Meghalaya
18-02-2010 11-05-2010
204/2009

Determination of impact of annual fixed charges on account of release of balance deferred liabilities and additional capital expenditure incurred during the years 2007-08 and 2008-09, in respect of Dulhasti Hydroelectric Project, (3 x 130 MW). NHPC Ltd, Faridabad
21-01-2010
09-03-2010

132/2009

Approval of generation tariff for Teesta HE Project Stage-V for the period from 1.3.2008 to 31.3.2009. NHPC Ltd.
08-10-2009
05-01-2010
 
Pet. No.
Subject
Date of Hearing
Date of Order
296/2010

Request for extension of the Required Commercial Operation Date (RCOD) for execution of Western Region System Strengthening Scheme-II (Projects B & C)
1. Western Region Transmission (Gujarat) Pvt.Ltd., Mumbai
2. Western Region Transmission (Maharashtra) Pvt.Ltd.,Mumbai
28-12-2010 31-12-2010
147/2010

Approval of transmission tariff for LILO of 220 kV S/C Panki-Naubasta transmission line at Kanpur in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
07-09-2010 16-12-2010

107/2009

Approval of tariff for transmission system associated with Uri Hydroelectric project (4x120 MW) in Northern Region for the period 2009-14. Power Grid Corporation of India Limited, Gurgaon
11-11-2010 16-12-2010

173/2010


Determination of transmission tariff for combined stage-I asset consisting of (a) 220 kV Allahabad Rewa Road D/C Transmission line Ckt-I; (b) 220 kV Allahabad-Rewa Road transmission line Ckt-II;
(c ) LILO of 220 kV Modipuram-Nara transmission line; (d) LILO of 220 kV Modipuram-Simbholi transmission line and (e) 220 kV Allahabad-Phulpur S/C transmission line (Asset-I); and Stage-II asset consisting of 220 kV S/C Meerut-Shatabdinagar transmission line (Asset-II) under Transmission System associated with 220 kV system strengthening Scheme in UP in Northern Region for the tariff period 2009-14.

26-10-2010 14-12-2010

101/2009

Approval of transmission tariff for 400 kV Talcher Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014.
21-10-2010 14-12-2010

80/2010

Approval of transmission tariff for 400/220 kV Khandwa sub-station and LILO of 400 kV D/C Itrasi-Dhule transmission line at Khandwa in Western Region for the period from 1.4.2009 to 31.3.2014.
11-11-2010 14-12-2010

119/2010

Approval of transmission tariff for combined elements of (i) 315 MVA 400/220 kV Auto transformer at Hyderabad, and (ii) 50 MVAR Reactor at Cuddapah under CTP augmentation in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-09-2010 08-12-2010

203/2010

Determination of transmission tariff for combined asset of LILO of 1st Ckt-I and Ckt-II of Patratu-Hatia-Chandil 220 kV D/C line at Ranchi sub-station associated with 220 kV Inter-connection with Jharkhand State Electricity Board system at Ranchi sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-11-2010 08-12-2010

133/2009

Approval of transmission tariff for ICTs at Kishenpur under Dulhasti transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-10-2010 01-12-2010

148/2010

Approval of transmission tariff for transmission system associated with Loktak HEP in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd.,Gurgaon
07-09-2010 01-12-2010

79/2010

Approval of transmission tariff for (i) 315 MVA 400/220 kV ICT-I along with associated bays at Roorkree sub-station; and (ii) LILO of 400 kV Rishikesh-Muzzafarnagar transmission line at Roorkee along with associated bays at Roorkee under System Strengthening Scheme in Roorkee in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-08-2010 01-12-2010

106/2010

Approval of transmission tariff for Moga-Hissar-Bhiwani Transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-09-2010 01-12-2010

150/2010

Determination of transmission tariff for LILO of one circuit of existing Neyveli-Trichy 400 kV D/C line at Neyveli TPS-I Expansion switchyard in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-09-2010 01-12-2010

130/2010

Application under Section 63 of the Electricity Act, 2003 for adoption of Transmission charges with respect to transmission system being established by East-North Interconnection company Limited. East-North Interconnection company Limited, New Delhi
08-07-2010 28-10-2010

113/2010

Approval of transmission tariff for Transmission System associated with Bairasuil in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-08-2010 24-11-2010

152/2010

Approval under Regulation 86 for determination of transmission tariff for Bhadrawati-Chandrapur 400 kV D/C transmission line including bays at Bhadrawati (PowerGrid) switching station (extensions) and Chandrapur (MSEB) switchyard in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-08-2010 24-11-2010

111/2010

Approval of transmission tariff for additional converter transformer (Spare) for Rihand-Dadri Bi-pole in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
14-09-2010 15-11-2010

96/2010

Approval of transmission tariff for 315 MVA, 440/220 kV ICT-IV at Ballabgarh sub-station with associated bay equipments in Northern Region for the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Limited, Gurgaon
09-09-2010 15-11-2010

153/2010

Approval of transmission tariff for transmission system associated with Agartala GBPP in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd.,Gurgaon
23-09-2010 04-11-2010

140/2010

Approval of transmission tariff for Salal-II transmission system associated with Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
07-09-2010 04-11-2010

125/2010

Approval of transmission tariff for 400/220 kV 315 MVA Transformer at Jeypore along with associated bays in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-09-2010 04-11-2010

145/2010

Application under Section 63 of the Electricity Act, 2003 for adoption of Transmission charges with respect to transmission system being established by Talcher II Transmission Company Limited. Talcher II Transmission Company Limited, New Delhi
08-07-2010 04-11-2010

98/2010

Approval of transmission tariff for 230 kV Neyveli-Bahoor transmission line in Southern Region for the period 1.4.2009 to 31.3.2014 Power Grid Corporation of India Limited, Gurgaon
09-09-2010 03-11-2010

143/2010

Correction of ministerial errors in the order dated 7.10.2010 in Petition No. 143/2010 regarding approval of transmission tariff for Salal-I transmission system associated with Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
- 03-11-2010

312/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) TCSC and 2 Nos of 400 kV bays at Gorakhpur sub-station associated with 400 kV Muzaffarpur-Gorakhpur line of Powerlinks; and (ii) 2 Nos of 400 kV bays at Muzaffarpur with line reactor associated with 400 kV Muzaffarpur-Gorakhpur transmission line of Powerlinks, under transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region. Power Grid Corporation of India Limited, Gurgaon
24-06-2010 03-11-2010

114/2010

Approval of transmission tariff for Series Capacitors on circuit I and II of 220 kV D/C Kishenpur-Pampore transmission line at Kishanpur sub-station in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
14-09-2010
20-10-2010

115/2010

Approval of transmission tariff for LILO of 400 kV S/C Chamera-I-Kishenpur transmission line at Chamera-II under transmission system associated with Chamera HEP Stage-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
14-09-2010
20-10-2010

116/2010

Approval of transmission tariff for 400 kV D/C Madurai-Trivendrum transmission system in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-09-2010
20-10-2010

55/2010

Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2008 -09 for NLC stage-I transmission system in Southern Region. Power Grid Corporation of India Limited, Gurgaon
19-08-2010 18-10-2010

82/2010

Approval of transmission tariff for Chamera Stage-I Transmission System in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-08-2010 15-10-2010

102/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2004-05 for 400/229 kV Bhiwadi sub-station along with LILO of Ballabhgarh-Bassi 400 kV S/C line and ICT-I and ICT-II at Bhiwadi in Northern Region. Power Grid Corporation of India Limited, Gurgaon
19-08-2010 15-10-2010

290/2009

Correction of ministerial errors in the order dated 13.5.2010 in Petition No. 290/2009 regarding revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) 50 MVAR Reactor at Narendra; (b) Narendra-Devangiri transmission line and Bus Reactor at Mysore; and (c) 2 nd 315 MVA Auto Transformer at Hiriyur sub-station along with associated bays under Transmission System associated with Kaiga-3 and 4 (2X235 MW) project in Southern Region. Power Grid Corporation of India Limited, Gurgaon
- 14-10-2010

132/2010

Approval of transmission tariff for (a) 220 kV D/C Kayamkulam-Edamon transmission line; and (b) 220 kV D/C Kayamkulam-Pallon transmission line with associated bays under Kayamkulam Transmission System in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
13-07-2010 11-10-2010

54/2010

Approval of transmission tariff for combined elements of 50 MVAR Reactor along with associated equipment at Chandrapur sub-station in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-08-2010 07-10-2010

143/2010
22-07-2010
07-10-2010

97/2010

Approval of transmission tariff for 132 kV S/C Mau-Balia transmission line in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
13-07-2010
28-09-2010

149/2010

Revision of transmission tariff due to de-capitalization incurred during 2008-09 for Singrauli transmission system in Northern Region for the tariff block 2004-09 . Power Grid Corporation of India Limited, Gurgaon
24-08-2010
27-09-2010

110/2010

Approval of transmission tariff for transmission system associated with Kopli Hydroelectric Stage-I extension project (2x50 MW) in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd.,Gurgaon
22-06-2010 22-09-2010

56/2010

Approval of transmission tariff for 400 kV D/C Vijayawada-Nellore transmission line, 400 kV D/C Nellore-Sriperumbudur line, New 400 kV Switching station at Nellore, extension of Vijayawada and Sriperumbudur sub-station with associated bays under system strengthening scheme in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-06-2010
17-09-2010

167/2010

Approval of transmission tariff for 400 kV S/C Vindhyachal-Korba Ckt-II along with associated bay equipment at Vindhyachal and Korba in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
12-08-2010
17-09-2010

7/2010
with
I.A. 16/2010
Approval of transmission tariff for Korba-Budhipadar transmission system for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
29-04-2010
15-09-2010

71/2010

Approval of transmission tariff for combined elements of (i) additional bays at Kolar and Hosur for second circuit of Kolar-Hosur 400 kV D/C line and (ii) 400 kV Hiryur sub-station, including 315 MVA auto transformer and LILO of Devangere-Hoody 400 kV D/C line at Hiriyur with associated bays under system strengthening scheme-II in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
22-06-2010
01-09-2010

30/2010

Application for grant of inter-State trading licence to PCM Power Trading Corporation Ltd., Kolkata. Power Grid Corporation of India Limited, Gurgaon
24-08-2010
01-09-2010

78/2010

Approval of transmission tariff for combined elements of 400 kV D/C Kolhapur-Mapusa transmission line (Ckt- I and Ckt-II) and associated bays in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
22-06-2010
27-08-2010

235/2009

Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2008-09 for the tariff period 2004-09 for Ramagundam Transmission System including ICT at Khammam and Reactor at Gazuwaka in Southern Region. Power Grid Corporation of India Ltd., Gurgaon
11-05-2010
20-08-2010

286/2009

Approval of transmission tariff for 400 kV D/C Muzaffarpur-Gorakhpur transmission line in Eastern-Northern Inter-connector associated with Tala Hydro Electric Power, east-north interconnector and Northern Region transmission system for the period from 2009-14. Powerlinks Transmission Limited, New Delhi
24-06-2010
18-08-2010

70/2010

Determination of transmission tariff for Fixed and Thyristor controlled series compensation for 400 kV D/C Raipur-Rourkela line at Raipur in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-06-2010
18-08-2010

43/2010

Determination of final transmission tariff and additional capital expenditure incurred from the date of commercial operation to 31.3.2009 for (i) 400 k V D/C RAPP-Kankroli transmission line along with associated bays (ii) 400/220 kV 315 MVA ICT-II along with associated bays and two No. 220 kV line bays at Kankroli sub-station under RAPP 5 and 6 transmission system in Northern Region for tariff block 2004-09 . Power Grid Corporation of India Limited, Gurgaon
11-05-2010
05-08-2010

331/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) 80 MVAR Reactor along with Nellore 400 kV bay extension work; (b) 315 MVA ICT along with Cuddapah 400 kV bay extension work; (c) 315 MVA ICT along with Gooty sub-station bay extension work and IInd 3x167 MVA Auto transformer at Kolar and switching arrangement for reactor at Somanhalli; (d) 315 MVA ICT along with Guzuwaka sub-station bay extension work; (e) 315 MVA ICT at Munirabad sub-station bay extension work; and (f) 315 MVA ICT along with Khammam sub-station bay extension work under the system strengthening Scheme-V in Southern Region Grid. Power Grid Corporation of India Limited, Gurgaon
- 20-07-2010

33/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2006-07, 2007-08 and 2008-09 for 400 kV D/C Ranganadi-Balipara Transmission Line under ATS of Ranganadi HEP in North Eastern Region . Power Grid Corporation of India Ltd.,Gurgaon
25-05-2010
20-07-2010

318/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for LILO of one circuit of 132 kV D/C Siliguri-Rengit at Gangtok in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
11-02-2010 02-07-2010

39/2010

Determination of revised transmission tariff due to additional capital expenditure during 1.4.2007 to 31.3.2009 for (i) 400 kV Siliguri sub-station (extension) (relevant portion), 400 kV Purnea sub-station (extension) (relevant portion) (excluding 400/220 kV, 315 MVA ICT at Purnea sub-station), 40% Fixed Series Compensation (FSC) and 5% to 15% Thyristor Controlled Series Compensation (TCSC) on each Ckt of Purnea-Muzaffarpur 400 kV D/C line at Purnea, (ii) 400/220 kV, 315 MVA ICT at Purnea sub-station, (iii) 400/220 kV Muzaffarpur sub-station (New) (Excluding 2 no, 400 kV bays at Muzaffarpur with line reactors for Muzaffarpur Gorkhpur line and ICT-II at Muzaffapur sub-station), 220 kV Muzaffarpur sub-station (BSEB Kanti) Extension and (iv) 400/220 kV, 315 MVA ICT-II at Muzaffarpur sub-station associated with Tala HEP in East-North Inter-connector and Northern Region Transmission system. Power Grid Corporation of India Limited, Gurgaon
29-04-2010 18-06-2010

65/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) 50 MVAR Bus Reactor at Hissar sub-station, (ii) LILO of 400 KV Moga- Hissar line, ICT-I at Fatehabad sub-station, 4 nos 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAR Bus Reactor bay along with associated bays at Fatehabad sub-station. (iii) 315 MVA, 400/220 kV ICT-II along with associated bays at 400/220 kV Fatehabad sub-station under Northern Region System Strengthening Scheme– III in Northern Region . Power Grid Corporation of India Limited, Gurgaon
22-04-2010 18-06-2010

34/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2006-07, 2007-08 and 2008-09 for 132 kV S/C NER augmentation transmission system in North Eastern Region. Power Grid Corporation of India Ltd.,Gurgaon.
29-04-2010 18-06-2010

42/2010

Reimbursement of additional expenditure towards deployment of Special Security Forces (CISF) at Salakati and Bongaigaon sub-stations for the year 2008-09 in Eastern Region. Power Grid Corporation of India Ltd., Gurgaon
22-04-2010 18-06-2010

44/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays; (ii) 400/220 kV, 315 MVA I CT-II at Satna sub-station; (iii) Ckt-IV of 400 k V D/C Vindhyachal-Satna line along with associated bays; (iv) LILO of 400 kV Satna-Bina Ckt- I & II at Bina (Power Grid) sub-station; (v) Circuit IV of 400 kV D/C Satna-Bina transmission line; (vi) Circuit III of 400 kV D/C Satna-Bina transmission line; (vii) LILO of 400 kV D/C Raipur-Rourkela transmission line along with associated bays; and (viii) 400/220 kV 315 MVA ICT-II along with associated bays equipment at Raigarh sub-station under Vindhyachal Stage-III transmission system in Western Region. Power Grid Corporation of India Limited, Gurgaon
22-04-2010 18-06-2010

242/2009

Determination of final transmission tariff and additional capital expenditure from the date of commercial operation to 31.3.2009 for 315 MVA ICT –II at Bhattapara sub- station under Sipat –II transmission system of Western Region. Power Grid Corporation of India Limited, Gurgaon
22-12-2009 18-06-2010

23/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 and 2008-09 for 500MW HVDC back to back station at Gazuwaka (Inter regional asset of Eastern Region and Southern Region) and 400 kV D/C Vijayawada–Gazuwaka transmission line along with bay extensions and equipments at Vijayawada–Gazuwaka (Southern Region) under augmentation of capacity of Gazuwaka HVDC back to back project (500 MW). Power Grid Corporation of India Limited, Gurgaon
13-04-2010
17-06-2010

77/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2005-06 for Agra (Power Grid)–Agra (UPPCL) 400 kV D/C interconnection in N orthern Region . Power Grid Corporation of India Limited, Gurgaon
29-04-2010 16-06-2010
29/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2007-08 and 2008-09 for 132 kV S/C Ranganadi-Ziro transmission system in North Eastern Region. Power Grid Corporation of India Ltd., Gurgaon
15-04-2010 15-06-2010

4/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) 400 kV Balia-Lucknow Ckt I & II, 400 kV Balia-Mau Ckt-I, 400 kV D/C Patna-Balia transmission line including associated bays at Patna and Balia. (ii) 400 kV Balia-Mau Ckt-II, 40% FSC at Lucknow as 400 kV D/C Lucknow-Balia transmission line, (iii) 80 MVAR Bus Reactor of Biharshariff sub-station, (iv) 400 kV Lucknow-Bareilly Ckt-I & II along with associated bays, (v) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays, and (vi) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II Phase-I Transmission system in Northern Region . Power Grid Corporation of India Limited, Gurgaon
22-04-2010 02-06-2010

49/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2006-07 and 2007-08 for (i) HVDC terminal station at Talcher and Kolar with Pole- II; (ii) 400 KV Kolar-Hossur D/C line along with the associated bay at kolar and Hossur; and (iii)400 KV Salem-Udumalpet S/C Transmission Line along with associated bays extensions at Salem and Udumalpet under the Talcher Transmission System in Southern Region. Power Grid Corporation of India Limited, Gurgaon
15-04-2010 01-06-2010

165/2009

Determination of final transmission tariff and additional capital expenditure from the date of commercial operation to 31.3.2009 for (i) 400 kV D/C Seoni-Khandwa transmission line along with associated line bays at Seoni and Khandwa sub-station, 80 MVAR Bus Reactor, 400/220 kV ICT-II and 765 /400 kV ICT-II at Seoni sub-station and LILO of 400 D/C Sardarsarover-Nagda transmission at Rajgarh sub-station along with associated bays and 315 MVA 400/220 kV ICT-I for the period 1.4.2008 to 31.3.2009 ; and (ii) 765 kV Sipat-Seoni Ckt- II along with 3 x 80 MVAR Line reactor and associated bays at Seoni sub-station under Sipat-I transmission system for the period 1.5.2008 to 31.3.2009 in Western Region. Power Grid Corporation of India Limited, Gurgaon
24-11-2009 01-06-2010

24/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for 400 kV Circuit-I of Teesta (Stage-V)-Siliguri transmission system associated with Teesta (Stage-V) in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
29-04-2010 01-06-2010

9/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Tarapur Transmission System associated with Tarapur Atomic Station Stages 3 & 4 in Western Region. Power Grid Corporation of India Limited, Gurgaon
23-03-2010 01-06-2010

5/2010

Determination of revised transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) 400/220 kV sub-station at Narendra with one 315 MVA ICT, (b) 2nd 315 MVA ICT at Narendra sub-station associated with establishment of 400/220 kV sub-station at Narendra in Southern Region. Power Grid Corporation of India Limited, Gurgaon
18-03-2010 24-05-2010

166/2009

Determination of final transmission tariff for (i) 400 kV Khandwa-Rajgarh Ckt-II along with associated bays, ICT II at Gwalior sub-station and 765/400 kV ICT-III at Seoni sub-station, (ii) 400 kV Khandwa-Rajgarh Ckt-I along with associated bays, 63 MVAR Bus reactor at Bina sub-station under Sipat-II transmission system of Western Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
24-11-2009
19-05-2010

290/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) 50 MVAR Reactor at Narendra; (b) Narendra- Devangiri transmission line and Bus Reactor at Mysore; and (c) 2 nd 315 MVA Auto Transformer at Hiriyur sub-station along with associated bays under Transmission System associated with Kaiga-3 and 4 (2X235 MW) project in Southern Region. Power Grid Corporation of India Limited, Gurgaon
11-03-2010
13-05-2010

247/2009

Determination of final transmission tariff and additional capital expenditure (i) 400 kV D/C Ranchi-Sipat transmission line with associated bays at Ranchi and Sipat sub-station and (ii) 40% FSC of 400 kV Ranchi-Sipat D/C transmission line at Ranchi sub-station under Kahalgaon Stage-II, Phase-II Transmission System in Western Region and Eastern Region for the period from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
22-12-2009 13-05-2010

I.A. 22/2010
in
91/2009
Approval of transmission tariff for transmission system associated with NLC Stage-I transmission system Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon -
10-05-2010

I.A. 23/2010
in
92/2009
Approval of transmission tariff for transmission system associated with NLC Stage-I transmission system Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon -
10-05-2010

251/2009

Determination of final transmission tariff and additional capital expenditure up to 31.3.2009 for 400 kV D/C Kota-Merta transmission line (Ckt I & II) along with associated bays under system Strengthening in South West part of Northern Grid (Part-A) Transmission System in Northern Region for the period from 1.2.2009 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
23-03-2010
10-05-2010

330/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i)765 S/C Bina-Gwalior transmission line along with Gwalior sub-station and associated 400 kV bays at Bina (Power Grid) sub-station, (ii) 315 MVA, 400/220/33 kV Auto Transformer along with associated bays at Gwalior sub-station and (iii) LILO of 400 kV S/C Korba-Raipur transmission line at Bhatapara sub-station along with associated bays under Sipat-II Transmission System in Western Region for the block 2004-09. Power Grid Corporation of India Limited, Gurgaon
23-03-2010
10-05-2010

3/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) LILO of Korba-Raipur 400 kV S/C line at Sipat, (ii) 765 kV Sipat-Seoni transmission line, Ckt-I along with associated bays; (iii) 400/220 kV ICT-I along with two 220 kV line bays at Seoni sub-station; (iv) Ckt II of 400 kV D/C Nagda- Dehgam line; and (v) Ckt I of 400 kV D/C Nagda-Dehgam line under Sipat-I Transmission System in Western Region for the block 2004-09. Power Grid Corporation of India Limited, Gurgaon
23-03-2010
10-05-2010

6/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for LILO of 1st Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station and LILO of 2nd Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station for the period from 1.9.2007 to 31.3.2009 associated with 220 kV Interconnection with Jharkhand State Electricity Board system at Ranchi sub-station in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
23-03-2010
10-05-2010

I.A. 21/2010
in
144/2009

Approval of transmission tariff for Vindhyachal Stage-I additional transmission system in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
- 04-05-2010

I.A. 20/2010
in
145/2009

Approval of transmission tariff for 400 kV Korba Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
- 04-05-2010

325/2009

Determination of revised transmission tariff due to additional capital expenditure during 1.4.2008 to 31.3.2009 for (i) 315 MVA, 400/220 kV, ICT at Siliguri ; (ii) 400 kV D/C Biharshariff-Muzaffarpur line, Biharshariff 400 kV extension and Muzaffarpu r 400 kV extension ; (iii) 315 MVA, 400/220 kV, ICT-I Subhashgram sub-station (New) ; and (iv) LILO of one circuit of 400 kV D/C Farakka -Jeerat line at Subhashgram and establishment of 400/220 kV sub-station (New) at Subhashgram including 1X315 MVA, ICT-II under system strengthening Scheme for Eastern Region (formerly part of Tala Supplementary Scheme). Power Grid Corporation of India Limited, Gurgaon
11-03-2010 26-04-2010
249/2009

Determination of final transmission tariff and additional capital expenditure up to 31.3.2009 for Special Protection scheme for Rihand Dadri HVDC Bi-pole and Gorkahpur-Muzzafarpur 400 kV line in Northern Region for the period from 1.8.2008 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
16-03-2010 26-04-2010

320/2009

Determination of revised transmission tariff due to additional capital expenditure incurred during 2007-08 and 2008-09 for 2 nd 315 (3 x 105) MVA, 400/220 kV transformer at Indravati (OHPC) Switchyard in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
11-03-2010 26-04-2010

41/2010

Determination of revised transmission tariff due to additional capital expenditure incurred during 2008-09 for remaining part of Tala-Siliguri Transmission System Commission (Asset-2) in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
23-03-2010 26-04-2010

319/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for 400 kV S/C Jameshedpur-Rourkela (Ckt-II) transmission line along with its associated bays in Eastern Region . Power Grid Corporation of India Limited, Gurgaon
11-03-2010 26-04-2010

I.A. 17/2010
in
271/2009

Approval of transmission tariff for 400 kV D/C Ramagundam-Bhadrawati (Chandrapur) Transmission system in Southern Region and Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
- 19-04-2010

168/2009

Determination of final transmission tariff for (i) 40% Fixed Series Compensation for 400 kV D/C Seoni Khandwa Ckt I and II, (ii) 315 MVA, 400/220 kV ICT with associated bays, 220 kV bays associated with Itarsi (PG)-Itarsi (MPPTCL) Ckt-II and 220 kV bays associated with Itarsi (PG)-Bhopal (MPPTCL) Ckt-II and (iii) 400 kV D/C Raipur-Sipat transmission line along with sub-station bays at Raipur and Sipat under WRSS-I Transmission System in Western Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
24-11-2009 19-04-2010

313/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Agra-Gwalior 765 kV S/C transmission line along with 400 kV Agra (PGCIL) switching station extension and 400/220 kV Gwalior (PGCIL) sub-station extension under Kahalgaon Stage-II Phase-I transmission system in Western Region and Northern Region. Power Grid Corporation of India Limited, Gurgaon
23-02-2010
08-04-2010

307/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for 400 kV S/C Vindhyachal-Korba Ckt-II along with associated bay equipment at Vindhyachal and Korba switchyards in Western Region. Power Grid Corporation of India Limited, Gurgaon
23-02-2010
08-04-2010

329/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for LILO of both circuits of 400 kV D/C Guzuwaka-Vijaywada transmission line at Vemagiri and extension of 400/220 kV Sub-station at Vijayawada under "system strengthening-VI" in Southern Region. Power Grid Corporation of India Limited, Gurgaon
16-02-2010
08-04-2010

306/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for 400 kV Bina-Nagda D/C transmission line along with associated bay equipment at Nagda and Bina in Western Region. Power Grid Corporation of India Limited, Gurgaon
16-02-2010
07-04-2010
309/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Raipur-Chandrapur (Bhadrawati) 400 kV D/C transmission line including bay extension at Raipur and Bhadrawati sub-stations in Western Region. Power Grid Corporation of India Limited, Gurgaon
23-02-2010 07-04-2010

314/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Bhadrawati-Chandrapur 400 kV D/C transmission line including bays at Bhadrawati (Power Grid) switching station (extension) and Chandrapur (MSEB) switchyard (extension) in Western Region. Power Grid Corporation of India Limited, Gurgaon
23-02-2010 07-04-2010

I.A. 12/2010
in
202/2009

Determination of provisional transmission tariff for (i) LILO of 220 kV Tanakpur-Bareilly transmission line (Ckt-II) at Sitarganj along with associated bays (ii) 220/132 ICT-I at Sitarganj along with associated bays under System Strengthening Scheme in Uttaranchal in Northern Region. Power Grid Corporation of India Limited, Gurgaon
- 25-03-2010

328/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) Neelmangala-Somanahally 400 kV D/C transmission line (b) Gooty-Raichur 400 kV D/C transmission line along with bay extension under scheme for System Strengthening-III in Southern Region. Power Grid Corporation of India Limited, Gurgaon
16-02-2010 19-03-2010

331/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (a) 80 MVAR Reactor along with Nellore 400 kV bay extension work; (b) 315 MVA ICT along with Cuddapah 400 kV bay extension work; (c) 315 MVA ICT along with Gooty sub-station bay extension work and IInd 3x167 MVA Auto transformer at Kolar and switching arrangement for reactor at Somanhalli; (d) 315 MVA ICT along with Guzuwaka sub-station bay extension work; (e) 315 MVA ICT at Munirabad sub-station bay extension work; and (f) 315 MVA ICT along with Khammam sub-station bay extension work under the system strengthening Scheme-V in Southern Region Grid. Power Grid Corporation of India Limited, Gurgaon
16-02-2010 18-03-2010

167/2009

Determination of final transmission tariff for (i) 400/220 kV Damoh sub-station with ICT-I along with associated bays; (ii) 400/220 kV 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh sub-station; and (iii) 400 kV 63 MVAR factor along with associated 400 kV bay at Damoh sub-station under WRSS-IV transmission system in Western Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
24-11-2009 16-03-2010

272/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for system strengthening scheme in Northern Region (formerly part of Tala Supplementary Scheme) for the block 2004-2009. Power Grid Corporation of India Limited, Gurgaon
11-02-2010 16-03-2010

180/2009

Determination of final transmission tariff for (a) LILO of Kolar-Sriperumbudur 400 kV S/C transmission line along with one 50 MVAR reactor at Kalvindapattu (Melakottaiyur); (b) 1 st 315 MVA Auto transformer at Kavindapattu sub-station and (c) 2 nd 315 MVA Auto transformer at Kalvindapattu sub-station along with associated bays and equipments under "Transmission system associated with Kaiga-3 and 4 (2 x 235 MW) Project" from the date of commercial operation to 31.3.2009 in Southern Region. Power Grid Corporation of India Limited, Gurgaon
14-01-2010 11-03-2010

263/2009

Revision of transmission tariff due to additional capital expenditure for (i) Tehri-Meerut Ckt-I along with associated bay at Meerut end; (ii) Tehri-Meerut Ckt-II along with associated bay at Meerut end and 400 kV S/C Meerut Muzaf f arnagar Transmission line along with associated bays and (iii) ICT at Muzaffarnagar along with one No. 400 kV and one No. 220 kV associated bay under Tehri transmission system in Northern Region during 2008-09. Power Grid Corporation of India Limited, Gurgaon
19-01-2010 11-03-2010

292/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for (i) 315 MVA ICT-IV along with associated bays at Moga sub-station; and (ii) ICT-II along with associated bays and 2 Nos. PSEB feeder bays at Amristsar sub-station and 400 kV Bus Reactor and 2 Nos PSEB line bays at Moga sub-station under augmentation of transformation capacity at Amirtsar and Moga sub-stations in Northern Region. Power Grid Corporation of India Limited, Gurgaon
21-01-2010 11-03-2010
4/2010
In
101/2009
Approval of transmission tariff of 400 kV Talcher transmission system in Eastern Region for the period from 1.4.2009 to 31.3.2014. - 03-03-2010

217/2009

Determination of final transmission tariff and additional capital expenditure for (i) extension of 400/220 kV Kolhapur (MSEB) sub-station; (ii) 220 kV D/C Vapi-Magarwada transmission line; and (iii) 220 kV D/C Vapi-Khardpada transmission line along with associated bays with WRSS -III transmission system in Western Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
14-01-2010 23-02-2010

289/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Neelamangala-Mysore 400 kV D/C transmission line along with 2x315 MVA 400/220 kV ICTs at Mysore sub-station and bay extension at Neelamangala (KPTCL) 400/220 kV sub-station for the tariff period 2004-09 in Southern Region. Power Grid Corporation of India Limited, Gurgaon
09-02-2010
23-02-2010

274/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Northern Region System Strengthening Scheme-II in Northern Region . Power Grid Corporation of India Limited, Gurgaon
19-01-2010
23-02-2010

161/2009

Determination of final transmission tariff and additional capital expenditure for (i) 80 MVAR, 420 kV Bus Reactor at Lucknow sub-station, and (ii) second 400 kV S/C Bareilly-Mordabad transmission line along with associated bays under Northern Region System Strengthening Scheme-I in Northern Region for the period from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
19-11-2009
22-02-2010

236/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Rihand Stage-II Transmission System in Northern Region. Power Grid Corporation of India Limited, Gurgaon
14-01-2010
15-02-2010

163/2009

Determination of final transmission tariff and additional capital expenditure up to 31.3.2009 for (i) ICT-I along with associated bays at Ludhiana sub-station; (ii) Total Upstream system including Malerkotla-Ludhiana-Jalandhar transmission line along with associated bays at Ludhiana sub-station, Malerkotla sub-station and Jalandhar sub-station and shunt reactor along with associated bays at Ludhiana sub-station; (iii) ICT-II along with associated bays at Ludhiana sub-station under Northern Region System Strengthening Scheme-III in Northern Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
19-11-2009 15-02-2010

291/2009

Revision of transmission tariff due to additional capital expenditure incurred during 2008 -09 for 400 kV Madurai-Trivendrum Transmission system in Southern Region. Power Grid Corporation of India Limited, Gurgaon
12-01-2010
03-02-2010

I.A. 6/2010
In
111/2009

In the matter of approval for revision/amendment of transmission tariff petitions for the assets under Petition No. 111/2009 in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
02-02-2010

I.A. 7/2010
In
144/2009

In the matter of approval for revision/amendment of transmission tariff petitions for the assets under Petition No. 144/2009 in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
02-02-2010

I.A. 8/2010
In
145/2009

In the matter of approval for revision/amendment of transmission tariff petitions for the assets under Petition No. 145/2009 in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
02-02-2010

I.A. 5/2010
In
110/2009

Approval of transmission tariff for Kawas Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
- 01-02-2010

169/2009

Determination of final transmission tariff and additional capitalization up to 31.3.2009 for (i) 315 MVA 400/220 kV ICT-I along with associated bays and two No. 220 kV line bays at Kankroli sub-station; (ii) 50 MVAR Bus reactor along with associated bays at Kankroli sub-station under RAPP 5 & 6 Transmission system in Northern Region from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
19-11-2009
25-01-2010

I.A. 2/2010
in
91/2009

Approval of transmission tariff for transmission system associated with 400 kV Central Transmission Project-I in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
21-01-2010

I.A. 3/2010
in
92/2009

Approval of transmission tariff for transmission system associated with NLC Stage-I transmission system in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
20-01-2010

I.A. 1/2010
in
271/2009

Approval of transmission tariff for 400 kV D/C Ramagudam-Bhadrawati (Chandrapur) Transmission system in Southern Region and Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
-
19-01-2010

273/2009
22-12-2009
12-01-2010
Pet. No.
Subject
Date of Hearing
Date of Order

Review
59/2010
in
123/2009
27-07-2010
12-10-2010

Review
64/2010
against
129/2009

Review of order dated 11.1.2010 in Petition No.129/2009 pertaining to the determination of impact of additional capital expenditure incurred during the period 2008-09 in respect of Feroze Gandhi Unchahar Thermal Power Station, Stage-I. NTPC Ltd, New Delhi
27-07-2010
27-09-2010

Review
25/2010
against
32/2009

Review of order dated 18.12.2009 in Petition No.32/2009 pertaining to the determination of impact of additional capital expenditure incurred during the period 2004-05 to 2007-08 in respect of Anta GPS (419.33 MW). NTPC Ltd, New Delhi
27-07-2010
23-09-2010

Review
52/2010
In
149/2009

Petition for issuing orders to NTPC to submit the FERV computations for 2007-08 and 2008-09 as mentioned in the filings in I.A.No.35/2009 in Petition No. 149/2009 before the Hon'ble CERC in respect of Simhadri Power Project, Stage-I.1. Transmission Corporation of Andhra Pradesh, Hyderabad
2. A.P. Eastern Power Distribution Company Ltd., Visakhapatnam

3. A.P. Southern Power Distribution Company Ltd., Tirupathi

4. A. P. Northern Power Distribution Company Ltd., Warangal

5. A.P Central Power Distribution Company Ltd., Hyderabad
27-07-2010
02-08-2010

Review
115/2009
In 159/2008

Order dated 11.1.2010 in Review Petition No.115/2009 in Petition No.159/2008.
-
12-04-2010

Review 262/2009
In
131/2009
03-12-2009
11-02-2010