cerc-logo

Final Tariff Orders 2011

Pet. No.
Subject
Date of Hearing
Date of Order

179/2004
- 29-12-2011

258/2009
06-05-2010 26-12-2011

125/2009
- 29-11-2011

160/2009
- 17-10-2011

123/2009
- 12-10-2011

139/2008
- 12-10-2011

127/2009
- 12-10-2011

126/2009
- 12-10-2011

182/2009
- 05-10-2011

150/2004
- 05-10-2011

14/2010
08-03-2011 30-09-2011

63/2009 & 140/2009
- 30-09-2011

129/2009
- 30-09-2011

128/2009
- 29-09-2011

147/2009

Revision of Commission's order dated 11.1.2010 in the light of the judgment of the Appellate Tribunal for Electricity dated 13.6.2007 in Appeal No.217/2006 and judgments dated 16.3.2009 and 1.9.2010 in Appeal No. 133, 135, 136 and 148/2008 and Appeal No. 58/2010 respectively.
Approval of revised fixed charges for the period 2004-09, after considering the impact of additional capital expenditure incurred during 2007-08 and 2008-09 in respect of Vindhyachal STPS, Stage-I (1260 MW).
NTPC Ltd, New Delhi
-
19-08-2011

181/2011

Determination of tariff for generation and inter-State transmission of electricity from Bhakra-Nangal and Beas Projects of Bhakra Beas Management Board. Bhakra Beas Management Board, Chandigarh
-
15-09-2011

122/2011

Petition under Section 79 (1)(c) and (f)of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access and Medium Term Access to Inter State Transmission and related matters) Regulations, 2009 for considering Korba STPS Stage-III as ISGS its beneficiary States/UTs as long term customers with effect from the date of commercial operation. NTPC Limited, New Delhi
19-05-2011
06-09-2011

120/2009

Revision of tariff in the light of the judgment dated 13.6.2007 of the Appellate Tribunal for Electricity in Appeal No.151/2006 (against order dated 5.5.2006 in Petition No. 162/2004)
Revision of annual fixed charges due to additional capital expenditure incurred during 2006-07, 2007-08 and 2008-09 in respect of National Capital Thermal Power Station, Dadri, Stage-I (840 MW). NTPC Ltd, New Delhi
-
05-09-2011

146/2004

Revision of order dated 21.8.2006 in the light of the judgment of the Appellate Tribunal for Electricity dated 13.6.2007 in Appeal No.239/2006-Approval of tariff in respect of Vindhyachal STPS, Stage-II (1000 MW). NTPC Ltd, New Delhi
-
03-08-2011

155/2004

Revision of order dated 3.2.2009 in the light of the judgment dated 13.6.2007 of the Appellate Tribunal for Electricity in Appeal No.154/2006-Approval of tariff in respect Dadri GPS (829.78 MW) for the period from 1.4.2004 to 31.3.2009. NTPC Ltd, New Delhi
-
21-07-2011

80/2005

Revision of order dated 22.10.2007 in the light of the judgments of the Appellate Tribunal for Electricity -Approval of annual fixed charges in respect of Jhanor Gandhar Gas Power Station (657.39 MW) for the period 2004-09. NTPC Ltd, New Delhi
-
21-07-2011

142/2009

Revision of order dated 11.1.2010 in the light of the judgment of the Appellate Tribunal for Electricity dated 13.6.2007 in Appeal No.216/2006 and judgment dated 19.4.2011 in Appeal No. 86/2011-Approval of revised fixed charges for the period 2004-09, after considering the impact of additional capital expenditure incurred during 2006–07, 2007-08 and 2008–09 for Ramagundam STPS, Stages-I & II (2100 MW). NTPC Ltd, New Delhi
-
07-07-2011

339/2010

Determination of tariff for Chandrapura Thermal Power Station (Units 7 & 8) of Damodar Valley Corporation (DVC) from the date of commercial operation to 31.3.2014. Damodar Valley Corporation, Kolkata
23-06-2011
06-07-2011

231/2009

Approval of annual fixed charges and Energy charges in respect of NLC TPS-II, Stage-I (630 MW) and Stage-II (840 MW) for the period from 1.4.2009 to 31.3.2014. Neyveli Lignite Corporation Limited, Chennai
22-07-2010
27-06-2011

195/2009

Revision of order dated 20.1.2011 in the light of the judgment dated 13.6.2007 of the Appellate Tribunal for Electricity in Appeal No.156/2006- Determination of annual fixed charges due to impact of additional capital expenditure incurred during the period 2004-09 in respect of Talcher STPS-Stage-I (1000 MW) and Order of the Commission dated 1.6.2011 in Review Petition No.1/2011. NTPC Ltd, New Delhi
-
23-06-2011

171/2009

Petition for fixation of tariff for Circulating Fluidized Bed Combustion (CFBC) Technology based Barsingsar Thermal Power Plant (2 x 125 MW) of Neyveli Lignite Corporation Ltd, for the period from 2009-10 to 2013-14. Neyveli Lignite Corporation Limited
-
20-06-2011

245/2010

Revision of norms for Target Availability in respect of Bhilai Expansion Power Project (2 x 250 MW) for recovery of annual capacity charges for the period 22.4.2009 to 31.3.2010 on account of acute coal shortage during the period 22.4.2009 to 31.10.2009. NTPC-SAIL Power Company Private Ltd (NSPCL), New Delhi
21-04-2011
27-05-2011

324/2009

Petition for approval of Renovation and Modernization of Badarpur Thermal Power Station NTPC Ltd
09-09-2010
12-05-2011

230/2009

Fixation of tariff in respect of NLC-TPS-I Expansion (2 x 210 MW) for the period from 1.4.2009 to 31.3.2014. Neyveli Lignite Corporation Ltd, Neyveli
-
23-03-2011
Pet. No.
Subject
Date of Hearing
Date of Order

121/2010
10-02-2011 30-11-2011

294/2009

Fixation of tariff in respect of sale of power from Kopili Hydro Electric Project-Kopili Power Station (4 x 50 MW) of North Eastern Electric Power Corporation Ltd, Shillong for the period from 1.4.2009 to 31.3.2014. North Eastern Electric Power Corporation Ltd, Shillong
28-10-2010 30-09-2011

297/2009

Fixation of tariff in respect of sale of power from Khandong Power Station ( 2 x 25 MW) of Kopili Hydroelectric Project of North Eastern Electric Power Corporation Ltd, Shillong for the period from 1.4.2009 to 31.3.2014. North Eastern Electric Power Corporation Ltd, Shillong
28-10-2010 30-09-2011

295/2009

Fixation of tariff in respect of sale of power from Assam Gas Based Power Project (291 MW) of North Eastern Electric Power Corporation Ltd, Shillong for the period from 1.4.2009 to 31.3.2014. North Eastern Electric Power Corporation Ltd, Shillong
12-05-2011
06-09-2011

215/2009

Under generation of Assam Gas Based Power Project (AGBPP) having 291 MW installed capacity of North Eastern Electric Power Corporation Ltd (NEEPCO), Shillong.
Review of generation tariff of AGBPP station under Section 79 (f) in regard to matter connected with clause 79 (a) of the Electricity Act, 2003 Lower Assam Electricity Distribution Company Limited, Guwahati
12-05-2011
05-09-2011

84/2010

Approval of generation tariff for Chamera-I Hydroelectric project, (540 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
07-12-2010 12-07-2011

104/2010

Approval of generation tariff in respect of Salal Hydroelectric Project (6 x 115 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad.
17-08-2010
27-06-2011

74/2010

Approval of generation tariff in respect of Uri Hydroelectric Project, (4 x 120 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
20-07-2010
16-06-2011

90/2010

Approval of generation tariff for Bairasiul Hydroelectric Project, (3 x 66 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
19-08-2010
15-06-2011

108/2010

Approval of generation tariff for Loktak Hydroelectric Project (105 MW) for the period 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
17-08-2010
14-06-2011

60/2010

Approval of generation tariff for Dulhasti Hydroelectric Project, (3 x 130 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
20-07-2010 30-05-2011

75/2010

Approval of generation tariff in respect of Tanakpur Hydroelectric Project (3 x 31.4 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad.
19-08-2010 10-05-2011

296/2009

Fixation of tariff in respect of sale of power from Ranganadi Hydro Electric project (3 x 135 MW) of North Eastern Electric Power Corporation Limited, from 1.4.2009 to 31.3.2014. North Eastern Electric Power Corporation Ltd, Shillong
28-10-2010
10-05-2011

109/2010

Approval of generation tariff for Dhauliganga Hydroelectric Project, Stage-I (4 x 70 MW) for the period from 1.4.2009 to 31.3.2014. NHPC Ltd, Faridabad
17-08-2010
14-03-2011
Pet. No.
Subject
Date of Hearing
Date of Order

321/2010
12-07-2011 30-12-2011

149/2011
29-09-2011 30-12-2011

347/2010
06-09-2011 28-12-2011

47/2011
25-08-2011 26-12-2011

108/2009
9-06-2011 15-09-2011

18/2011

Petition under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 for determination of transmission tariff for assets of (i) Bay Extension at 400/220kV Limbdi Sub-station (GETCO) & Ranchchodpura (Vadavi) (GETCO) Sub-station for 400 kV D/C Limbdi - Vadavi (WRGL) Transmission Line & Bay Extension at 400/220 kV Ranchchodpura (Vadavi) (GETCO) Sub-station & Zerda Sub-station (GETCO) for 400 kV D/C Vadavi - Zerda (WRGL) TL and (ii) Combined assets of (i) and Bay Extension at 400/220 kV Rajgarh Sub-station (PowerGrid) along with 25% FSC & Bay extension at 400/220 kV Karamsad (Kasor) (GETCO) Sub-station for 400 kV D/C Rajgarh - Kasor (WRGL ) TL under WRSS-II, Set C Scheme of Western Region for tariff block 2009-14 period .Power Grid Corporation of India Limited, Gurgaon
19-05-2011 13-12-2011

346/2010
19-07-2011 29-11-2011

317/2010
12-07-2011 29-11-2011

313/2010
07-06-2011 23-11-2011

174/TT/2010
18-10-2011 14-11-2011

89/2009
15-09-2011 14-11-2011

335/2010
19-07-2011 09-11-2011

144/2009
04-08-2011 28-10-2011

98/TT/2011
18-08-2011 25-10-2011

99/TT/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for 400 kV Bays at Maithon Sub- station for 400 kV D/C Maithon-Mejia Transmission Line (Anticipated DOCO:01.05.2011) under Common Scheme for 765 kV Pooling Stations and Network for Northern Region (Common for Sasan UMPP + NKP + Maithon/ Koderma/ Mejia/ Bokaro/ Raghunathpur/ Durgapur + Import by NR from ER and from NER/SR/WR via ER) and Common Scheme for network for Western Region (Common for NKP + Maithon/ Koderma/ Mejia/ Bokaro/ Raghunathpur/ Durgapur + Import by Western Region from Eastern Region and from North Eastern Region/ Southern Region/ Western Region via Eastern Region) in Eastern Region from anticipated DOCO (01.05.2011) to 31.03.2014.. Power Grid Corporation of India Ltd., Gurgaon
04-08-2011 21-10-2011

16/2011
19-07-2011 13-10-2011

15/2011
12-07-2011 12-10-2011

01/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations 2004, for determination of final transmission tariff for (i) LILO of 220kV Tanakpur- Bareilly Transmission Line (Ckt.-II) at Sitarganjalongwith associated bays (ii) 220/ 132kV ICT-I at Sitarganjalongwith associated bays under System Strengthening Scheme in Uttaranchal in Northern Region 2004-09 tariff block.. Power Grid Corporation of India Limited, Gurgaon
04-08-2011
04-10-2011


350/2010

Determination of transmission tariff for 400 kV D/C Raigarh-Raipur transmission line along with associated bays and combined assets of 400 kV D/C Raigarh- Raipur transmission line along with associated bays and 400 kV D/C Ranchi-Rourkela transmission line along with associated bays under East-West Transmission Corridor Strengthening Scheme for the period from the date of commercial operation to 31.3.2014.Power Grid Corporation of India Limited, Gurgaon
23-6-2011
16-9-2011

108/2011
26-07-2011 28-10-2011

170/2010

Application under Section 63 of the Electricity Act, 2003 for adoption of Transmission Charges for North Karanpura Transmission Company Ltd, based on tariff determined through transparent process of bidding in accordance with guidelines issued by Ministry of Power, Govt. of India. 1. North Karanpura Transmission Company Ltd, New Delhi
19-10-2010
13-09-2011


100/2011

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 for determination of transmission tariff for 400 KV D/C Koderma TPS- Biharsharif Transmission Line and 2 nos. associated Line bays at Biharsharif Substation under Transmission System for Start-up Power to DVC and Maithon Right Bank Generation Projects in Eastern Region from anticipated DOCO (1.4.2011) to 31.3.2014. .Power Grid Corporation of India Ltd., Gurgaon
09-8-2011
27-9-2011


58/2011

Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 of transmission tariff for the period 2009-14 for LILO of Vemagiri- Gajuwaka 400 kV D/C Line at SIMHADRI-II TPS (Anticipated DOCO: 01.05.2011) under Transmission System Associated with SIMHADRI-II Generation project in Southern Region .Power Grid Corporation of India Limited, Gurgaon
28-6-2011
27-9-2011

269/2010
23-6-2011
16-9-2011

324/2010
9-8-2011
16-9-2011

68/2011

Approval under regulation-86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations 2009 for determination of Transmission tariff for 220/132 kV, 160 MVA ICT at Baripada under ERSS-II in Eastern Region from anticipated DOCO (01.04.11) to 31.03.2014 Power Grid Corporation of India Limited, Gurgaon
07-07-2011 05-09-2011

11/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business ) Regulations 1999 and Central Electricity Regulatory Commission ( Terms & Conditions of Tariff ) Regulations 2009 for determination of transmission tariff for LILO of 400 kV Bongaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
12-07-2011
23-08-2011

306/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Tirunelveli- Edamon 400kV D/C line (initially to be operated at 220 kV) along with associated bays and equipments at Tirunelveli and Edamon (KSEB) under transmission system associated with Kudankulam Atomic Power Project in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
05-05-2011 19-08-2011

310/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for (a) LILO of one circuit of Trichy-Madurai 400 kV D/C line at Karaikudi along with 1x80 MVAR Bus Reactor and associated bays & Equipments at 400/230 kV Karaikudi Sub-station, (b) 400/220 kV, 2x315 MVA Auto Transformers & Down stream System with associated bays and equipments at Karaikudi Sub-station, (c) LILO of one circuit of existing Talaguppa - Neelamangala 400 kV D/C line along with 1x80 MVAR Line Reactor at Hassan, and (d) 400/220 kV, 2X315 MVA Transformers & Down stream System with associated bays and equipment at Hassan Sub-station under System Strengthening – VII of S R Grid for the period 2009-14 Power Grid Corporation of India Limited, Gurgaon
24-05-2011
19-08-2011

232/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations 2009, for LILO of Ckt-I of 400 kV D/C Maithon-Jamshedpur line at Mejia “B” TPS including PLCC Equipment (excluding Wave Trap) for the transmission line under Transmission System for Start-up Power to DVC and Maithon Right Bank Generation Projects in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
08-02-2011
18-08-2011

6/2011

Application under Section 63 of the Electricity Act, 2003 for adoption of transmission charges with respect to transmission system being established by Raichur Sholapur Transmission Company Limited, New Delhi. Raichur Sholapur Transmission Company Ltd, New Delhi
21-04-2011
12-08-2011

325/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for One circuit of 132 kV D/C SEWA-II-Hiranagar line along with associated bays at Hiranagar Sub-station and one Circuit of 132 kV D/C SEWA-II-Mahanpur line along with associated bays at Mahanpur and Second circuit of 132 kV D/C SEWA-II-Hiranagar line along with associated bays at Hiranagar Sub-station of Transmission System associated with SEWA-II HEP (part) in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
07-06-2011
10-08-2011

90/2009

Approval of transmission tariff for transmission system associated with NLC Stage-II transmission system in Southern Region for the period from 1.4.2009 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
08-02-2011
01-08-2011

275/2010

Determination of transmission tariff for transmission system associated with Vindhyachal Stage-I in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
15-03-2011
01-08-2011

329/2010

Determination of transmission tariff for 400 kV D/C Kanpur-Ballabhgarh line along with its associated bays under transmission system associated with Northern Region System Strengthening Scheme-IX in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
08-03-2011
01-08-2011

303/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Transmission System associated with Ranganadi HEP in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-05-2011
01-08-2011

282/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for (a) Line Reactors at Trichy & Madurai, (b) Bus Reactor at Hossur & Salem, (c) Bus Reactor at Sriperumbudur, (d) Bus Reactor at Kolar, Hyderabad & Munirabad, (e) Bus Reactor at Hiriyur, (f) Line Reactor at Udumalpet, (g) Line Reactor at Trivandrum along with associated bays under System Strengthening-VIII of SR Grid in Southern Region from their respective dates of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-05-2011
28-07-2011

330/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for 315 MVA 400/220 kV ICT-I, ICT-II and ICT III at Bhinmal along with associated bays and 2 Nos 220 kV Line Bays at Hissar under Transmission System associated with Northern Region System Strengthening Scheme-VIII (NRSS-VIII), in Northern Region from their respective dates of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-05-2011 28-07-2011

336/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for 400 kV 315 MVA Transformer at Bina under WRSS VI Scheme in Western Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
08-03-2011 21-07-2011

258/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for (i) 3rd 315 MVA Transformer at Udumalpet S/S with associated bays and equipments, (ii) 315 MVA 400/220 kV ICT-III at Trivendrum S/S with associated bays and equipments, (iii) 400 kV Tirunelveli-Udumalpet D/C Line and (iv) 1x63 MVAR Reactors at Tirunelveli S/S under transmission system associated with Kudunkulum Atomic Power Project in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
19-05-2011 20-07-2011

159/2009

Determination of transmission tariff of 400 kV LILO of Gandhar (Jhanor)-Vapi at Sugen generation switchyard in Western Region for the period from 1.4.2009 to 31.3.2014 for the period from 1.4.2009 to 31.3.2014. Torrent Power Grid Limited, Ahmadabad
08-07-2010
19-07-2011

304/2010

Determination of transmission tariff for 315 MVA, 400/220 kV ICT-III at Ludhiana with associated bays, along with 220 kV line bays under transmission system associated with Northern Region System Strengthening Scheme-VII (NRSS-VII) in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
05-05-2011
19-07-2011

271/2009

Determination of transmission tariff for 400 KV D/C Ramagundam- Bhadrawati (Chandrapur) Transmission System in Southern and Western Regions for the period 2009-14. Power Grid Corporation of India Limited, Gurgaon
15-03-2011
12-07-2011

275/2009

Determination of interim transmission tariff of 400 kV LILO of Gandhar (Jhanor)-Vapi at Sugen generation switchyard in Western Region for the period from 1.3.2009 to 31.3.2009. Torrent Power Grid Limited, Ahmedabad
08-07-2010
11-07-2011

288/2010

Approval of Transmission Tariff for Special Energy Meters in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
05-05-2011
12-07-2011

12/2011

Determination of revised transmission tariff after approval of revised cost estimate for (i) LILO of both circuits of Madurai-Trivendrum 400 kV D/C line and 1x 63 MVAR Bus reactor; (ii) 1 x 315, 400/220 kV MVA Transformer; (iii) 2nd 400 kV, 63 MVAR Bus Reactor; (iv) 2nd 1x 315 MVA , 400/220 kV Auto transformer; and (v) 3 no. 1x 63 MVAR Reactor along with associated bays and equipments at Tiruneveli sub-station under "transformer system associated with Kudamkulam Atomic Power Project (2X 1000 MW) in Southern Region for the period from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
26-05-2011
06-07-2011

294/2010

Determination of transmission tariff from date of commercial operation to 31.3.2014 for Northern Region System Strengthening Scheme-V (Part) for tariff block 2009-14 in Northern Region. Power Grid Corporation of India Ltd.,Gurgaon
08-02-2011
05-07-2011

91/2009

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for the Transmission System associated with 400 kV Central transmission Project-I in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
15-03-2011
04-07-2011

58/2010

Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2004-09 for (a) 500 kV HVDC line along with HVDC terminal stations (pole-I) at Talcher and Kolar; (b) 400 kV Hossur-Salem S/C line and 1x135 MVA Auto Transformer-I at Hossur along with the associated bay at Hossur and bay extension at Salem; (c) 1x315 MVA Auto transformer-II at Hossur along with associated 400 kV bay and complete 220 kV bays/yard at Hossur; (d) 400 kV AC Kolar-Arakkonam-Madras line along with bays at Kolar and Sriperumbudur (Madras) and LILO of 400 kV Cuddapah-Banglore S/C line along with associated bays at Kolar; and (e) 400 kV Kolar-Hoody D/C line along with associated bays extensions (Kolar-I and Kolar-II) at Hoody sub-station, Hoody-I and Hoody-II bays at Kolar sub-station and 4x167 MVA auto transformer along with associated bays on 400 and 220 kV side and complete 220 kV sub-station at Kolar under the Transmission System associated with Talcher-II project in Southern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
19-08-2010
29-06-2011

302/2010

Determination of transmission tariff for Special Protection Scheme for Rihand Dadri HVDC Bio-pole and Gorakhpur-Muzzafarpur 400 kV line in Northern Regional for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-05-2011
27-06-2011

244/2010

Determination of Transmission Tariff for Combined Asset: (i) 400 kV S/C Jalandhar-Amritsar line along with associated bays at Amritsar & Jalandhar, ICT-I along with associated bays at Amritsar sub-station & 220 kV Verpal feeder bays I & II at Amritsar sub-station, (ii) 315 MVA 400/220 kV ICT-II at Gorakhpur S/s along with associated bays (includes 2 No. 220 kV Line Bays) and (iii) LILO of Bawana-Bhiwani line along with associated bays at Bahadurgarh, 315 MVA ICT-I along with associated bays at Bahadurgarh Sub-station & 220 kV Nuna Majra Feeder Bays at Bahadurgarh S/s under Transmission System associated with system strengthening scheme (Formerly Tala Supplementary Scheme) in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd.,Gurgaon
20-01-2011
22-06-2011

328/2010

Determination of transmission tariff for transmission system associated with TALA HEP East-North Inter-connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
26-04-2011
21-06-2011

327/2010

Determination of transmission tariff for 400 kV D/C Meerut-Kaithal (Quad) transmission line along with its associated bays and equipments under transmission system associated with Northern Region System Strengthening Scheme-VI (NRSS-XI) in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-05-2011
21-06-2011

178/2010

Approval of transmission tariff for (a) Ramagundam-Hyderabad 400 kV S/C line-2 in Southern Region; and (b) Bhadrawati (Chandrapur) HVDC back to back station (2x500 MW) in Western Region-Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
13-01-2011
20-06-2011

301/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004, for determination of revised transmission tariff due to replacement of Government of India Loan by LIC-III Loan for ATS of Ranganadi HEP in North Eastern Region from 01.04.2004 to 31.03.2009. Power Grid Corporation of India Ltd., Gurgaon
26-04-2011
17-06-2011

284/2010

Determination of transmission tariff for 400 kV D/C Raighar-Raipur transmission line along with associated bays with East West transmission corridor in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
22-02-2011
08-06-2011

144/2010

Miscellaneous petition under sub-section (4) of Section 28 of the Electricity Act, 2003 and Regulation 44 “Power to Relax” of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, in the matter of approval of transmission tariff for Stage-I of 400 kV Thyristor controlled series compensation project (FACTS Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2009 to 31.3.2014 (in petition no. 131/2009). Power Grid Corporation of India Ltd., Gurgaon
25-05-2010
08-06-2011

238/2010

Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999, and CERC (Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for 765 kV S/C Seoni-Bina Transmission Line along with its associated bays under Barh Transmission System in Western Region for the period from 01.04.2009 to 31.03.2014. Power Grid Corporation of India Ltd., Gurgaon
25-01-2011
08-06-2011

72/2010

Determination of transmission tariff for (i) LILO of one circuit of Madurai-Trichy 400 kV D/C line along with 1 x 80 MVAR line reactor at Karikudi sub-station and (ii) 2 X 315 MVA Auto Transformers and Down Stream System with associated bays and equipments at Karaikudi sub-station under System Strengthening-VII of Southern Region Grid in Southern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd., Gurgaon
09-11-2010 01-06-2011

197/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (conduct of business) Regulations' 1999 and Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations' 2009 for determination of transmission tariff for the Transmission System associated with Doyang HEP in North Eastern Region from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd.
23-11-2010 01-06-2011

319/2010

Determination of transmission tariff for combined assets of transmission system associated with Rihand Stage-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
05-04-2011
30-05-2011

10/2011

Determination of transmission tariff for 400 kV Biharshariff-Sasaram-Sarnath Transmission Lines along with bays etc. under Eastern-Northern inter-regional HVDC Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
05-05-2011 30-05-2011

196/2010

Miscellaneous petition for approval under Regulation 86 of Central Electricity Regulatory Commission (conduct of business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of tariff) Regulations, 2004 for determination of revised transmission tariff for Doyang Transmission System in North Eastern Region from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon
23-11-2010
30-05-2011

80/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for strengthening of Farakka Malda transmission link and additional 315 MVA transformers at Malda in Eastern Region for the period from 1.4.2009 to 31.3.2014 PowerGrid Corporation of India Ltd., Gurgaon
26-04-2011
30-05-2011

251/2010

Determination of transmission tariff for (i) LILO of 400 kV Hissar Bassi transmission line at Bhiwadi; and (ii) LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi and 400 kV D/C Agra-Bhiwadi transmission line under Northern Region system Strengthening Scheme-V in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
08-02-2011
25-05-2011

320/2010

Determination of transmission tariff for LILO of S/C Singrauli-Kanpur line-I, 400 kV sub-station at Allahabad and LILO of Singrauli-Kanpur line-II including ICT-I and ICT-II at Allahabad with associated bays in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-04-2011
24-05-2011

322/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for the combined assets of Northern Region System Strengthening Scheme – I in Northern Region for the period from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd., Gurgaon
26-04-2011 23-05-2011

263/2010

Approval of transmission tariff for LILO of 400 kV D/C Bonaigaon-Malda line at Purnea and sub-station at Purnea (New) in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
05-05-2011
23-05-2011

276/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for the 1x125 MVAR Bus Reactor at Khandwa and 1x125 MVAR Bus Reactor at Dehgam along with bays associated under WRSS VII Transmission Scheme in Western Region from period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
25-01-2011
16-05-2011

309/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations’1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations’2009, for Tariff determination for the 1x125 MVAR Bus Reactor at Khandwa and 1x125 MVAR Bus Reactor at Dehgam along with bays associated under WRSS VII Transmission Scheme in Western Region from period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
26-04-2011
13-05-2011

224/2010

Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business), Regulation s 1999 and Central Electricity Regulatory Commission CERC (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff from date of commercial aoperation to 31.3.2014 for Asset-I : LILO of One Circuit of 400 kV D/C Kankroli- Zarda line at Bhinmal along with 80 MVAR Bus Reactor at Bhinmal and Asset- 2 : 400 kV /220 kV 315 MVA ICT-I at Bhinmal S/S along with associated bays at Bhinmal Sub- Station under Transmission System associated with Northern Region System Strengthening Scheme- VIII (NRSS-VIII), in the Northern Region. Power Grid Corporation of India Ltd.,Gurgaon
22-02-2011
16-05-2011

92/2009

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for the transmission system associated with NLC Stage – I in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
15-03-2011
13-05-2011

76/2010

Approval of transmission tariff for Dehri-Karamnasa Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-09-2010
11-05-2011

297/2010

Determination of transmission tariff in respect of (a) 400 kV Jeypore-Gazuwaka transmission line along with associated bays; and (b) 500 MW HVDC back to back stations at Gazuwaka in Southern Region for the period from 1.4.2009 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
10-02-2011
10-05-2011

341/2010

Petition for approval of revised transmission tariff for ATS of Kopili-Khandong [Additional Transmission Gohpur-Itanagar (ATGI)] in North Eastern Region from 1.4.2004 to 31.3.2009. Petition for approval of revised transmission tariff for ATS of Kopili-Khandong [Additional Transmission Gohpur-Itanagar (ATGI)] in North Eastern Region from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon
25-01-2011
09-05-2011

118/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for (i) 220 kV D/C Faridabad- Samaypur transmission line with associated bays; and (ii) 220 kV D/C Faridabad-Palla transmission line with associated bays under Transmission System associated with Faridabad Gas Based Combined Cycle Power Project in Northern Region for tariff block 2009-14. Power Grid Corporation of India Limited, Gurgaon
09-11-2010
06-05-2011

191/2010

Approval of transmission tariff for combined elements for (i) 400 kV Vindhyachal-Satna Bina transmission line; (ii) 400 kV S/C Korba-Raipur and Korba Bhilai ckt-III; and (iii) 315 MVA ICT and LILO of Bhilai-Chandrapur of transmission system associated with Vindhyachal stage-II in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
05-05-2011

193/2010

Approval of transmission tariff for combined assets for (a) 400 kV Ramagundam-Hyderabad D/C transmission line; (b) 400 kV S/C Gooty-Neelmangala transmission line; (c) 400 kV Hyderabad-Kurnool-Gooty transmission line and (d) 400 kV S/C Khammam-Nagarjunasagar transmission line along with associated bays and equipment under Ramagundum Stage-III Transmission System in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010 05-05-2011

307/2010

Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999, and CERC (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Kudankulam (NPC) – Tirunelveli (POWERGRID) 400 kV (QUAD) D/C Line – I & II with associated bays and equipments under Kudankulam Transmission system in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon
22-02-2011
04-05-2011

254/2010

Approval of transmission tariff for 400 kV Kahalgaon Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
20-01-2011 02-05-2011

166/2010

Determination of transmission tariff for (i) combined asset of 400 kV Gandhar-Padge S/C transmission line with associated bays and 400 kV Gandhar-Gandhar S/C transmission line; (ii) 220 kV Gandhar-Bharuch D/C transmission line with associated bays and 400 kV Gandhar-Dehgam D/C transmission line with sub-station at Dehgam under Gandhar Gas Power Station (Stage-I) in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-11-2010 02-05-2011

228/2010

Petition for approval of revision of tariff for the period from 1.4.2004 to 31.3.2009 due to additional capital expenditure incurred during 2004-05 to 2008-09 for 1X500 MW HVDC back to back station at Sasaram with associated AC switchboard at Sasaram and Allahabad and Auxiliary system including 400 kV Sarnath-Allahabad transmission line with associated bays under Eastern-Northern Inter-regional HVDC transmission system. Power Grid Corporation of India Limited, Gurgaon
18-01-2011 02-05-2011

L-1/44/2010

Approval of Transmission Service Agreement, Revenue Sharing Agreement, Billing, Collection and Disbursement Procedure under CERC (Sharing of Transmission Charges and Losses), Regulations, 2010. Power Grid Corporation of India Ltd. (PGCIL)
-
29-04-2011

267/2010

Determination of transmission tariff for Barh-Balia 400 k V D/C (Quad) line under Transmission System associated with Barh Generation Project (3x660 MW) in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-01-2011
29-04-2011

285/2010

Determination of transmission tariff for combined assets of (a) 220 kV D/C Unchahar-Kanpur transmission line-I with associated bays; (b) 220 kV D/C Unchahar-Kanpur transmission line-II with associated bays; and (c) LILO of one ckt of 220 kV D/C Panki-Mainpuri line of transmission system associated with Unchahar Stage-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
08-03-2011 27-04-2011

270/2010

Determination of transmission tariff for Combined Assets of (i) LILO of Korba- Raipur at Sipat(DOCO: 01.05.2006), (ii) 765 kV Sipat- Seoni Ckt-I… (DOCO: 01.11.2007), (iii) 400/220 kV ICT-I at Seoni…(DOCO: 01.12.2007), (iv) Ckt-II of 400 kV Nagda- Dehgam line (DOCO: 01.01.2008), (v) Ckt-I of Nagda- Dehgam line (DOCO: 01.02.2008), (vi) 400 kV Seoni- Khandwa T/L , 80 MVAR Bus Reactor, 765/400 kV ICT-II at Seoni S/S, LILO of Sardar- Sarovar- Nagda line at Rajgarh (DOCO: 01.04.2008) and (vii) 765 kV Sipat- Seoni Ckt-II (DOCO: 01.05.2008) (Notional DOCO: 01.05.2008) & Combined assets of (i) 315 MVA 400/220 kV ICT-II at Seoni S/S, 315 MVA 400/220 kV ICT-I at Rajgarh (DOCO: 01.04.2008) and (ii) 315 MVA ICT-II at Rajgarh (DOCO: 01.04.2009) (Notional DOCO: 01.04.2009) under Sipat-I Transmission System in Western Region for the period from 01.04.2009 to 31.03.2014. Power Grid Corporation of India Ltd.,Gurgaon
20-01-2011 27-04-2011

262/2010

Determination of transmission tariff for 400 kV D/C Raipur-Rourkela transmission line along with Rourkela extension under Eastern-Western inter-regional link for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
24-02-2010 25-04-2011

291/2010

Approval under Regulation 86 of CERC (Conduct of Business) Regulations'1999, and CERC (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for the Combined Asset which comprises (i) 765 KV S/C Bina-Gwalior transmission line, (ii)315 MVA,400/220/33 KV ICT-I along with associated bays at Gwalior S/S, (iii) LILO of 400 KV S/C Korba-Raipur transmission line at Bhatapara S/S along with associated bays (iv) 400 KV Khandwa-Rajgarh Ckt-II along with associated bays and 765/400 kV ICT-III at Seoni sub-station (v) 400 KV Khandwa-Rajgarh Ckt-I along with associated bays, 63 MVAR Bus reactor at Bina sub-station and the single asset viz. 400 KV ICT-II at Gwalior S/S under Sipat II Transmission system in Western Region from period from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd., Gurgaon
10-02-2011 19-04-2011

103/2010

Approval of transmission tariff for 50 MVA Auto transformer at Malda sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-10-2010
13-04-2011

127/2010

Approval of transmission tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-09-2010
13-04-2011

227/2010

Determination of transmission tariff for 2 nd 315 (3x105) MVA, 400/220 kV transformer at Indravati (OHPC) Switchyard in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
19-10-2010
13-04-2011

242/2010

Approval under Regulation 86 of CERC (Conduct of Business) Regulations'1999, and CERC (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for 500 MW HVDC back to back station at Gazuwaka, (Asset-I), Vijayawada-Gazuwaka 400 kV D/C Line & (b) 50% FSC Jeypore-Gazuwaka 400 kV D/C T/L at Jeypore (Asset-II) and 40% FSC on Rengali-Indravati 400 kV S/C T/L & (b) 40% FSC on Meramundali-Jeypore 400 kV S/C T/L at Jeypore.( Asset-III) under ”Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” for the period from 1.4.2009 to 31.3.2014 in Southern Region and Eastern Region. PowerGrid Corporation of India Ltd., Gurgaon
23-12-2010
11-04-2011

199/2010

Determination of transmission tariff for (a) Neelamangala-Somanahally 400 kV D/C line along with bays; and (b) Gooty-Raichur 400 kV D/C transmission line with bays under system strengthening-III for the period from 1.4.2009 to 31.3.104 in Southern Region. Power Grid Corporation of India Limited, Gurgaon
25-01-2011
11-04-2011

225/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined elements of (i) Tala–Siliguri transmission system and(ii) remaining part of Tala-Siliguri transmission system in Eastern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
08-04-2011

268/2010

Determination of transmission tariff for assets of Northern Region System Strengthening Scheme-III in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-02-2011 04-04-2011

206/2010

Determination of transmission tariff for 400 kV D/C Kaiga-Sirsi transmission line in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-01-2011
01-04-2011

211/2010

Approval for transmission tariff for combined assets of 400 kV D/C Kaiga-Narendra Transmission line, 400/200 kV sub-station at Narendra with one 315 MVA ICT and 2nd 315 MVA ICT at Narendra sub-station under Kaiga-Narendra Transmission system in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-11-2010
31-03-2011

273/2010

Determination of transmission tariff for 400 kV D/C Kota-Merta transmission line (Ckt-I and II) along with associated bays under system strengthening in South West part of Northern Grid (Part-A) Transmission System in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
21-12-2010 28-03-2011

187/2010

Determination of transmission tariff for combined assets of (i) 40% Fixed Series Compensation package for 400 kV D/C Khandwa-Seoni transmission line at Khandwa sub-station and 400 kV D/C Sipat-Raipur transmission line along with sub-station bays at Raipur and Sipat; and (ii) 315 MVA, 400/220 kV ICT with associated Unchahar-Raibareilly transmission line along with associated 220 kV bays associated with Itrasi (PG) (MPPTCL) Ckt-II and 220 kV bays , associated with Itrasi (PG)-Bhopal (MPTCL) Ckt-II associated with WRSS-I scheme in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
30-11-2010
23-03-2011

264/2010

Determination of transmission tariff for LILO of one circuit of 132 kV D/C Siliguri-Ranjit line at Gangtok in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-11-2010
23-03-2011

89/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (terms and Conditions of Tariff) Regulations'2009 for Determination of Transmission tariff from date of commercial operation to 31.03.2014 for 400Kv S/C RAPP-Kota Line along with 80MVAR Bus Reactor (Asset-1) and 400kV/220kV 315 MVA ICT-I and ICT-II at Kota S/S and ICT-III at Kankroli S/S along with associated bays at Kota and Kankroli Substation ( Asset-2) under Transmission System associated with RAPP 5 & 6, in Northern Region. Power Grid Corporation of India Ltd, Gurgaon
10-08-2010
17-03-2011

287/2009

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for transmission tariff for (i)400 KV D/C Gorakhpur-Lucknow Transmission Line(Asset-I) and (ii)400 kV D/C Bareilly-Mandola Transmission Line (Asset-II) in Northern Region associated with Tala Hydro Electric Project, East – North Interconnector and Northern Region Transmission System for the period from 1.4.2009 to 31.3.2014. Powerlinks Transmission Ltd.
23-09-2010
17-03-2011

288/2009

Approval of transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line and 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North Inter-connector and Northern Region transmission system for the period from 2009-14. Powerlinks Transmission Limited, New Delhi
24-06-2010
17-03-2011

240/2010

Determination of transmission tariff for 2nd 400 kV D/C Kahalgaon-Biharshariff transmission line in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
20-01-2011 15-03-2011

190/2010

Determination of transmission tariff for integration of Sikkim transmission system with Eastern Region by LILO of Siliguri-Gangtok Section 132 kV Rangit-Siliguri transmission line at Melli in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
11-01-2011 15-03-2011

260/2010

Approval of transmission tariff for 765 kV S/C Bina Gwalior transmission line-II along with associated bays under WRSS-II, Set D scheme in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-01-2011
14-03-2011

111/2009
With I. A. No.
6/2010

Determination of transmission tariff for Kakrapar Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-12-2010
11-03-2011

217/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined Asset-1 comprising 400/220 kV Damoh S/S along with bays and 400 kV 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh S/S and combined Asset-2 comprising 400/220 kV ICT-I at Damoh S/S along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh S/S under WRSS-IV Transmission Scheme in Western Region for the tariff block 2009-14. Power Grid Corporation of India Ltd
13-01-2011 15-03-2011

182/2010

Determination of tariff for (i) 765 kV S/C Seoni-Wardha transmission line with associated bays and 400 kV D/C Wardha-Akola transmission line with associated bays; (ii) Combined assets of 765 kV S/C Seoni-Wardha transmission line with associated bays and 400 kV D/ C Wardha Akola transmission line with associated bays and 400 kV D/C Akola-Aurangabad transmission line and associated bays at Akola and Auranagabad and 400 kV D/C bus reactor at Wardha sub-station; and (iii) 400/220 kV ICT-I at Wardha sub-station with associated bays under SIPAT-II supplementary transmission system in Western Region for tariff period 2009-14. Power Grid Corporation of India Limited, Gurgaon
25-01-2011
15-03-2011

194/2010

Approval of transmission tariff for combined element of (i) 400 kV D/C Tarapur-Padghe Ckt-I transmission line; (ii) 400 kV D/C Tarapur-Padghe Ckt-II transmission line; and (iii) 220 kV D/C Tarapur-Boisor transmission line under Tarapur Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-10-2010
11-03-2011

142/2010

Approval of transmission tariff for 63 MVAR line Reactor on 400 kV Kolaghat-Rengali line at Rengali sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
21-09-2010
11-03-2011

93/2010

Approval of transmission tariff for Hathidah River Crossing section of 220 kV D/C Biharshariff-Begusarai transmission line in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
22-06-2010
10-03-2011

123/2010

Approval of transmission tariff for combined elements of (a) LILO of Nagarjunasagar-Raichur 400 kV S/C line at Mehboobnagar; and (b) LILO of both the circuits of Nellor-Sriperumbudur 400 kV D/C line at Almathi along with associated bays under system strengthening scheme-IV in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
16-09-2010
08-03-2011

195/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of Transmission Tariff for 400 kV Jeypore-Tarcher transmission system in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
13-01-2010
08-03-2011

162/2010

Determination of transmission tariff for combined element of (i) 315 MVA ICT-IV along with associated bays at Moga sub-station; and (ii) ICT-II along with associated bays and 2 Nos. PSEB feeder bays at Amritsar sub-station and 400 kV bus reactor bay and 2 Nos. PSEB line bays at Moga sub-station under Augmentation of transformation capacity at Amritsar and Moga sub-station under Augmentation of transformation capacity at Amritsar and Moga sub-station in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-09-2010
01-03-2011

202/2010

Approval of transmission tariff for (i) LILO of both circuit of 400kV D/C Gazuwaka-Vijayawada line at Vemagiri and (ii) Extension of 400/220 kV sub-station at Vijayawada under System Strengthening-VI of Southern Region Grid in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
25-02-2011

110/2009

Determination of transmission tariff for Kawas Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
25-02-2011

218/2010

Petition for determination of Transmission Tariff for Agra (Power Grid) – Agra (UPPCL) 400 kV D/C Interconnection in Northern Region for the tariff block 2009 -14. Power Grid Corporation of India Limited, Gurgaon
07-12-2010
25-02-2011

311/2010

Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2009 for determination of transmission tariff from 1.4.2009 to 31.3.2014 for 400/220 KV Bhiwadi S/S along with LILO of Ballabhgarh-Bassi 400 KV S/C line and ICT-I & ICT-II at Bhiwadi in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd.,Gurgaon
25-01-2011
25-02-2011

141/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for revision of transmission tariff from 1.4.2004 to 31.3.2009 due to de-capitalization during 2007-08 for the strengthening of Farakka – Malda Transmission link and additional 315 MVA transformer at Malda in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
21-09-2010
25-02-2011

177/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for 400 kV D/C Talcher- Meramundali Transmission Line in Eastern Region for the period 2009-14. Power Grid Corporation of India Ltd., Gurgaon
13-01-2011
23-02-2011

200/2010

Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999, and CERC (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Neelmangala - Mysore 400 kV D/C Transmission line along with 2X315 MVA, 400/200 kV ICTs at Mysore Sub Station in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-10-2010
21-02-2011

73/2010

Determination of transmission tariff for (i) one circuit of 132 kV D/C Sewa-II-Hiranagar line along with associated bay at Hiranagar sub-station; and (ii) one circuit of 132 kV D/C Sewa-II-Mahanpur line along with associated bays at Mahanpur-sub-station under transmission system associated with SEWA-II HEP in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
25-11-2010
15-02-2011

186/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for LILO of Kolaghat – Rengali, 400 kV S/C line at Baripada in Eastern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
15-02-2011

300/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for KAHALGAON St-II ph – I transmission system in Eastern Region, Northern Region and Inter-regional link between Northern and Western Region for the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon
25-01-2011
15-02-2011

226/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff in respect of 400 kV D/C Ranchi-Sipat transmission line with associated bays at Ranchi and Sipat S/S (Asset 1) and 40% FSC on 400 kV Ranchi-Sipat Line at Ranchi S/S(Asset 2) under Kahalgaon Stage II Phase II Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
15-02-2011

236/2010

Determination of transmission tariff for 132 kV S/C NER Augmentation Transmission system in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
14-02-2011

85/2010

Approval of incentive based on availability of transmission system for the years 2004-05, 2005-06 and 2006-07 for North Eastern Region. Power Grid Corporation of India Limited, Gurgaon
09-12-2010 14-02-2011

241/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999 and Central Electricity Regulatory Commission (Term and Conditions of Tariff) Regulations, 2009 for determination of Transmission Tariff for transmission assets under “Kaiga 3 & 4 Transmission System” in the Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd, Gurgaon
16-11-2010
14-02-2011

175/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined elements of (i) extension of 400/220 kV Kolhapur (MSEB) sub-station; (ii) 220 kV D/C Vapi- Magarwada transmission line; and (iii) 220 kV D/C Vapi-Khardpada transmission line along with associated bays with WRSS –III transmission system in Western Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
11-02-2011

266/2010

Approval of transmission tariff for combined assets for (a) 80 MVAR bus reactor along with Nellor 400 kV bay extension; (b) 315 MVA ICT with Cuddapah 400 kV bay extension; (c) 315 MVA ICT with Gooty Extension and IInd 3X167 MVA auto transformer at Kolar and switching arrangement for reactor at Somanahalli; (d) 315 MVA ICT with Gazuwaka sub-station bay extension; (e) 315 MVA ICT with Munirabad sub-station bay extension; and (f) 315 MVA ICT with Khammam sub-station bay extension under System Strengthening Scheme V in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
11-02-2011

164/2010

Determination of transmission tariff for (i) 400 kV D/C Dulhasti-Kishenpur transmission line with associated bays; and (ii) 400 kV Kishenpur-Wagoora transmission line along with associated bays at Kishenpur and Wagoora sub-stations under Dulhasti combined transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
26-10-2010
11-02-2011

253/2010

Determination of transmission tariff for combined assets of (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220 /132 kV ICT-III at Raibareilly along with associated bays; and (ii) 100 MVA, 220/132 kV ICT- II at Raibareilly Sub-station along with associated bays under Unchahar - III Transmission System in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-12-2010
10-02-2011

233/2010

Determination of transmission tariff for 400 kV D/C Dhauliganga HEP- Bareilly (UPPCL) Transmission Line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
10-02-2011

112/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff i) 40% fixed series compensation on Gooty – Neelmangla line-II at Gooty and ii) 40% fixed series compensation on Gooty – Neelmangla line-I at Gooty , Kadapa Nagarjunasagar Circuit –I and Circuit-II at Kadapa under Fixed Series Compensation Package in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon
23-12-2010
09-02-2011

287/2010

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for SPECIAL ENERGY METERS in Southern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon
16-12-2010
09-02-2011

243/2010

Approval of transmission tariff for combined assets for (i) Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays; (ii) 400/220 kV, 315 MVA ICT-II at Satna sub-station; (iii) Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; (iv) LILO of 400 kV Satna-Bina Ckt- I & II at Bina (Power Grid) sub-station; (v) Circuit IV of 400 kV D/C Satna-Bina transmission line; (vi) Circuit III of 400 kV D/C Satna-Bina transmission line; (vii) LILO of 400 kV D/C Raipur-Rourkela transmission line along with associated bays; and (viii) 400/220 kV 315 MVA ICT-II along with associated bays equipment at Raigarh sub-station under Vindhyachal Stage-III transmission system in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
08-02-2011

176/2010

Approval of transmission tariff for 400 kV Bina-Nagda D/C transmission line along with associated bay equipment at Nagda and Bina in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
28-10-2010
08-02-2011

62/2010

Approval of transmission tariff for 315 MVA ICT-III at Nagarjunasagar sub-station with associated bay equipments in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
24-08-2010
08-02-2011

95/2009

Approval of transmission tariff for Tanakpur transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
09-11-2010
01-02-2011

198/2010

Determination of transmission tariff for 132 kV S/C Ranganadi-Ziro Transmission system in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd.,Gurgaon
23-12-2010
24-01-2011

174/2010

Determination of Transmission Tariff for (i) Single Asset Agra - Gwalior 765 kV 2 nd S/C line along with associated bays at Agra and Gwalior Sub-stations and (ii) Combined Assets Agra - Gwalior 765 kV 2nd S/C line & 400 kV D/C Zerda-Kankroli line along with associated bays at Agra, Gwalior and Zerda, Kankroli sub-station under Transmission System associated with North-West corridor strengthening scheme, for tariff block 2009-14 period in both Western and Northern Region. Power Grid Corporation of India Ltd., Gurgaon
09-11-2010
20-01-2011

201/2010

Petition for approval of transmission tariff for 400 kV Vindhyachal-Kanpur line at Singrauli along with bays at Singrauli end (Realignment of Vindhyachal-Kanpur S/C line at Singrauli and Singraluli-Vindhyahal 2 nd 400 kV Ckt ) and Bus coupler bay at Vindhyachal HVDC under System Strengthening Scheme in Singrauli-Vindhyachal corridor in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
23-12-2010
14-01-2011

235/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for 400 kV S/C Jamshedpur Rourkela (Ckt II) Transmission line along with associated bays in Eastern Region, for Tariff Block 2009-14. Power Grid Corporation of India Limited, Gurgaon
25-11-2010
14-01-2011
169/2010

Approval of transmission tariff for Rangit Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
21-09-2010
13-01-2011

122/2009

Approval of transmission tariff for 400 kV S/C Chamera-I Kishenpur Transmission Line in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
21-10-2010
13-01-2011

216/2010

Revision of transmission tariff for the tariff period from 1.4.2004 to 31.3.2009 due to additional capitalization incurred during 2004-05 to 2008-09 for 400 kV Biharshariff-Sasaram-Sarnath transmission line along with bays etc. under Eastern- Northern Region inter-regional HVDC transmission system. Power Grid Corporation of India Limited, Gurgaon
09-11-2010
12-01-2011

157/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for revision of transmission tariff from 1.4.2004 to 31.3.2009 due to additional capitalization during 1.4.2004 to 31.3.2009 for LILO of 400 kV Bongaigaon – Malda transmission line at Silliguri and sub station at Silliguir (New) in Eastern Region. Power Grid Corporation of India Limited, Gurgaon
23-09-2010
11-01-2011

148/2009

Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for 220 kV Jallandhar-Hamirpur D/C transmission line along with associated bays in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd, Gurgaon
11-11-2010
11-01-2011

163/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for (i) 400 kV D/C Agra –Bassi Transmission Line with associated bays, (ii) 3x105 MVA 400/220/33 kV ICT-III along with associated bays at Wagoora Sub-Station and (iii) 220 kV Zankot III & IV bays at Wagoora Sub-Station, under Transmission System associated with Northern Region System Strengthening Scheme-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon
21-09-2010
11-01-2011

71/2010

Order dated 1.9.2010 in Petition No. 71/2010 regarding transmission tariff for combined elements of (i) additional bays at Kolar and Hosur for second circuit of Kolar-Hosur 400 kV D/C line and (ii) 400 kV Hiryur sub-station, including 315 MVA auto transformer and LILO of Devangere-Hoody 400 kV D/C line at Hiriyur with associated bays under system strengthening scheme-II in Southern Region for the period from 1.4.2009 to 31.3.2014-Issue of corrigendum. Power Grid Corporation of India Limited, Gurgaon
-
10-01-2011

122/2010

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 for transmission tariff for Kishenpur Moga transmissions system in Northern Region for the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Limited, Gurgaon
16-09-2010
06-01-2011

120/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2004-09 for 400 kV D/C Nathpa-Jhakri-Nalagarh transmission line along with associated bays and 2 No. bays at Nalagarh for Kunihar (HPSEB) associated with Nathpa-Jhakri Transmission System in Northern Region. Power Grid Corporation of India Limited, Gurgaon
19-08-2010
05-01-2011
Pet. No.
Subject
Date of Hearing
Date of Order

Review
5/2011
in
94/2010

Review of the order dated 17.3.2011 in Petition No. 94/2010 relating to approval under sub-section (4) of Section 28 of Electricity Act, 2003 read with Regulation 4 of Central Electricity Regulatory Commission (Fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009 for Southern Regional Load Despatch Centre (SRLDC) Charges (POSOCO Portion) for the control period 1.4.2009 to 31.3.2014. Power System Operation Corporation Ltd. (POSOCO)
09-06-2011
06-09-2011

Review 10/2011
in
100/2010

Review of the order dated 18.3.2011 in Petition No. 100/2010 relating to approval under sub-section (4) of Section 28 of Electricity Act, 2003 read with Regulation 4 of Central Electricity Regulatory Commission (Fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009 for NERLDC charges (POSOCO Portion) for the control period 1.4.2009 to 31.3.2014. Power System Operation Corporation Ltd. (POSOCO)
-
10-08-2011

Review
126/2010 in
138/2009
with I.A.
49/2009

Review of order dated 19.2.2010 in Petition No.138/2009 relating to determination of impact of additional capitalization during the period 2008-09 in respect of Talcher STPS-Stage-II (2000 MW). NTPC Ltd, New Delhi
27-07-2010
06-07-2011

Review
9/2011 in
92/2010

Review of the order dated 11.3.2011 in Petition No. 92/2010 relating to approval under sub-section (4) of Section 28 of Electricity Act, 2003 read with Regulation 4 of Central Electricity Regulatory Commission (Fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009 for WRLDC charges (POSOCO Portion) for the control period 1.4.2009 to 31.3.2014. Power System Operation Corporation Ltd. (POSOCO)
-
04-07-2011

Review
8/2011 in
91/2010

Review of the order dated 11.3.2011 in Petition No. 91/2010 relating to approval under sub-section (4) of Section 28 of Electricity Act, 2003 read with Regulation 4 of Central Electricity Regulatory Commission (Fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009 for NRLDC charges (POSOCO Portion) for the control period 1.4.2009 to 31.3.2014. Power System Operation Corporation Ltd. (POSOCO)
-
04-07-2011

Review
2/2011
in 189/2009

Review of order dated 21.1.2011 in Petition No.189/2009 relating to determination of revised fixed charges due to additional capital expenditure incurred during the period 2006-09 in respect of Singrauli STPS (2000 MW). NTPC Ltd, New Delhi
24-03-2011
15-06-2011

Review
1/2011
in
195/2009

Review of order dated 20.1.2011 in Petition No.195/2009 relating to determination of revised fixed charges due to additional capital expenditure incurred during the period 2004-09 in respect of Talcher STPS-Stage-I (1000 MW). NTPC Ltd, New Delhi
24-03-2011 01-06-2011

Review
139/2010
in
146/2008

Review of order dated 05.01.2010 in Petition No.146/2008 relating to determination of tariff by considering the impact of additional capitalization during the period 2004-08 for Talcher STPS, Stage-II (2000 MW). Tamil Nadu Electricity Board
21-09-2010 30-05-2011

Review
204/2010
in
126/2009

Review of order dated 15.6.2010 in Petition No.126/2009 pertaining to the determination of impact of additional capital expenditure incurred during the years 2006-07, 2007-08 and 2008-09 on fixed charges in respect of Kahalgaon Super Thermal Power Station, Stage-I (840 MW). NTPC Ltd, New Delhi
13-01-2011
22-02-2011

Review
246/2010
in
128/2010

Review of the order of the Commission dated 2.8.2010 in Petition No.128/2010 pertaining to the approval of unit configuration change and consequential amendments to the Power Purchase Agreements (PPAs). 1. Andhra Pradesh Central Power Distribution Company Ltd, Hyderabad
2. Andhra Pradesh Southern Power Distribution Company Ltd, Tirupati
3. Andhra Pradesh Eastern Power Distribution Company Ltd, Vishakapatnam
4. Andhra Pradesh Northern Power Distribution Company Ltd, Warangal
07-12-2011
24-01-2011