Pet. No. |
Subject |
Date of Hearing |
Date of Order |
321/2010
|
|
12-07-2011 |
30-12-2011 |
149/2011
|
|
29-09-2011 |
30-12-2011 |
347/2010
|
|
06-09-2011 |
28-12-2011 |
47/2011
|
|
25-08-2011 |
26-12-2011 |
108/2009
|
|
9-06-2011 |
15-09-2011 |
18/2011
|
|
19-05-2011 |
13-12-2011 |
346/2010
|
|
19-07-2011 |
29-11-2011 |
317/2010
|
|
12-07-2011 |
29-11-2011 |
313/2010
|
|
07-06-2011 |
23-11-2011 |
174/TT/2010
|
|
18-10-2011 |
14-11-2011 |
89/2009
|
|
15-09-2011 |
14-11-2011 |
335/2010
|
|
19-07-2011 |
09-11-2011 |
144/2009
|
|
04-08-2011 |
28-10-2011 |
98/TT/2011
|
|
18-08-2011 |
25-10-2011 |
99/TT/2011
|
|
04-08-2011 |
21-10-2011 |
16/2011
|
|
19-07-2011 |
13-10-2011 |
15/2011
|
|
12-07-2011 |
12-10-2011 |
01/2011
|
Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations 2004, for determination of final transmission tariff for (i) LILO of 220kV Tanakpur- Bareilly Transmission Line (Ckt.-II) at Sitarganjalongwith associated bays (ii) 220/ 132kV ICT-I at Sitarganjalongwith associated bays under System Strengthening Scheme in Uttaranchal in Northern Region 2004-09 tariff block..
Power Grid Corporation of India Limited, Gurgaon
|
04-08-2011 |
04-10-2011 |
350/2010
|
Determination of transmission tariff for 400 kV D/C Raigarh-Raipur transmission line along with associated bays and combined assets of 400 kV D/C Raigarh- Raipur transmission line along with associated bays and 400 kV D/C Ranchi-Rourkela transmission line along with associated bays under East-West Transmission Corridor Strengthening Scheme for the period from the date of commercial operation to 31.3.2014.Power Grid Corporation of India Limited, Gurgaon |
23-6-2011 |
16-9-2011 |
108/2011
|
|
26-07-2011 |
28-10-2011 |
170/2010
|
Application under Section 63 of the Electricity Act, 2003 for adoption of Transmission Charges for North Karanpura Transmission Company Ltd, based on tariff determined through transparent process of bidding in accordance with guidelines issued by Ministry of Power, Govt. of India.
1. North Karanpura Transmission Company Ltd, New Delhi
|
19-10-2010 |
13-09-2011 |
100/2011
|
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 for determination of transmission tariff for 400 KV D/C Koderma TPS- Biharsharif Transmission Line and 2 nos. associated Line bays at Biharsharif Substation under Transmission System for Start-up Power to DVC and Maithon Right Bank Generation Projects in Eastern Region from anticipated DOCO (1.4.2011) to 31.3.2014.
.Power Grid Corporation of India Ltd., Gurgaon |
09-8-2011 |
27-9-2011 |
58/2011
|
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 of transmission tariff for the period 2009-14 for LILO of Vemagiri- Gajuwaka 400 kV D/C Line at SIMHADRI-II TPS (Anticipated DOCO: 01.05.2011) under Transmission System Associated with SIMHADRI-II Generation project in Southern Region
.Power Grid Corporation of India Limited, Gurgaon |
28-6-2011 |
27-9-2011 |
269/2010
|
|
23-6-2011 |
16-9-2011 |
324/2010
|
|
9-8-2011 |
16-9-2011 |
68/2011
|
Approval under regulation-86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations 2009 for determination of Transmission tariff for 220/132 kV, 160 MVA ICT at Baripada under ERSS-II in Eastern Region from anticipated DOCO (01.04.11) to 31.03.2014 Power Grid Corporation of India Limited, Gurgaon |
07-07-2011 |
05-09-2011 |
11/2011
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business ) Regulations 1999 and Central Electricity Regulatory Commission ( Terms & Conditions of Tariff ) Regulations 2009 for determination of transmission tariff for LILO of 400 kV Bongaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
12-07-2011 |
23-08-2011 |
306/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Tirunelveli- Edamon 400kV D/C line (initially to be operated at 220 kV) along with associated bays and equipments at Tirunelveli and Edamon (KSEB) under transmission system associated with Kudankulam Atomic Power Project in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
05-05-2011 |
19-08-2011 |
310/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for (a) LILO of one circuit of Trichy-Madurai 400 kV D/C line at Karaikudi along with 1x80 MVAR Bus Reactor and associated bays & Equipments at 400/230 kV Karaikudi Sub-station, (b) 400/220 kV, 2x315 MVA Auto Transformers & Down stream System with associated bays and equipments at Karaikudi Sub-station, (c) LILO of one circuit of existing Talaguppa - Neelamangala 400 kV D/C line along with 1x80 MVAR Line Reactor at Hassan, and (d) 400/220 kV, 2X315 MVA Transformers & Down stream System with associated bays and equipment at Hassan Sub-station under System Strengthening – VII of S R Grid for the period 2009-14 Power Grid Corporation of India Limited, Gurgaon |
24-05-2011 |
19-08-2011 |
232/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations 2009, for LILO of Ckt-I of 400 kV D/C Maithon-Jamshedpur line at Mejia “B” TPS including PLCC Equipment (excluding Wave Trap) for the transmission line under Transmission System for Start-up Power to DVC and Maithon Right Bank Generation Projects in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
08-02-2011 |
18-08-2011 |
6/2011
|
Application under Section 63 of the Electricity Act, 2003 for adoption of transmission charges with respect to transmission system being established by Raichur Sholapur Transmission Company Limited, New Delhi. Raichur Sholapur Transmission Company Ltd, New Delhi |
21-04-2011 |
12-08-2011 |
325/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for One circuit of 132 kV D/C SEWA-II-Hiranagar line along with associated bays at Hiranagar Sub-station and one Circuit of 132 kV D/C SEWA-II-Mahanpur line along with associated bays at Mahanpur and Second circuit of 132 kV D/C SEWA-II-Hiranagar line along with associated bays at Hiranagar Sub-station of Transmission System associated with SEWA-II HEP (part) in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
07-06-2011 |
10-08-2011 |
90/2009
|
Approval of transmission tariff for transmission system associated with NLC Stage-II transmission system in Southern Region for the period from 1.4.2009 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
08-02-2011 |
01-08-2011 |
275/2010
|
Determination of transmission tariff for transmission system associated with Vindhyachal Stage-I in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
15-03-2011 |
01-08-2011 |
329/2010
|
Determination of transmission tariff for 400 kV D/C Kanpur-Ballabhgarh line along with its associated bays under transmission system associated with Northern Region System Strengthening Scheme-IX in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
08-03-2011 |
01-08-2011 |
303/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Transmission System associated with Ranganadi HEP in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-05-2011 |
01-08-2011 |
282/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for (a) Line Reactors at Trichy & Madurai, (b) Bus Reactor at Hossur & Salem, (c) Bus Reactor at Sriperumbudur, (d) Bus Reactor at Kolar, Hyderabad & Munirabad, (e) Bus Reactor at Hiriyur, (f) Line Reactor at Udumalpet, (g) Line Reactor at Trivandrum along with associated bays under System Strengthening-VIII of SR Grid in Southern Region from their respective dates of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
19-05-2011 |
28-07-2011 |
330/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for 315 MVA 400/220 kV ICT-I, ICT-II and ICT III at Bhinmal along with associated bays and 2 Nos 220 kV Line Bays at Hissar under Transmission System associated with Northern Region System Strengthening Scheme-VIII (NRSS-VIII), in Northern Region from their respective dates of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-05-2011 |
28-07-2011 |
336/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for 400 kV 315 MVA Transformer at Bina under WRSS VI Scheme in Western Region for tariff block 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
08-03-2011 |
21-07-2011 |
258/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for (i) 3rd 315 MVA Transformer at Udumalpet S/S with associated bays and equipments, (ii) 315 MVA 400/220 kV ICT-III at Trivendrum S/S with associated bays and equipments, (iii) 400 kV Tirunelveli-Udumalpet D/C Line and (iv) 1x63 MVAR Reactors at Tirunelveli S/S under transmission system associated with Kudunkulum Atomic Power Project in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
19-05-2011 |
20-07-2011 |
159/2009
|
Determination of transmission tariff of 400 kV LILO of Gandhar (Jhanor)-Vapi at Sugen generation switchyard in Western Region for the period from 1.4.2009 to 31.3.2014 for the period from 1.4.2009 to 31.3.2014. Torrent Power Grid Limited, Ahmadabad |
08-07-2010 |
19-07-2011 |
304/2010
|
Determination of transmission tariff for 315 MVA, 400/220 kV ICT-III at Ludhiana with associated bays, along with 220 kV line bays under transmission system associated with Northern Region System Strengthening Scheme-VII (NRSS-VII) in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
05-05-2011 |
19-07-2011 |
271/2009
|
Determination of transmission tariff for 400 KV D/C Ramagundam- Bhadrawati (Chandrapur) Transmission System in Southern and Western Regions for the period 2009-14. Power Grid Corporation of India Limited, Gurgaon |
15-03-2011 |
12-07-2011 |
275/2009
|
Determination of interim transmission tariff of 400 kV LILO of Gandhar (Jhanor)-Vapi at Sugen generation switchyard in Western Region for the period from 1.3.2009 to 31.3.2009. Torrent Power Grid Limited, Ahmedabad |
08-07-2010 |
11-07-2011 |
288/2010
|
Approval of Transmission Tariff for Special Energy Meters in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
05-05-2011 |
12-07-2011 |
12/2011
|
Determination of revised transmission tariff after approval of revised cost estimate for (i) LILO of both circuits of Madurai-Trivendrum 400 kV D/C line and 1x 63 MVAR Bus reactor; (ii) 1 x 315, 400/220 kV MVA Transformer; (iii) 2nd 400 kV, 63 MVAR Bus Reactor; (iv) 2nd 1x 315 MVA , 400/220 kV Auto transformer; and (v) 3 no. 1x 63 MVAR Reactor along with associated bays and equipments at Tiruneveli sub-station under "transformer system associated with Kudamkulam Atomic Power Project (2X 1000 MW) in Southern Region for the period from the date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
26-05-2011 |
06-07-2011 |
294/2010
|
Determination of transmission tariff from date of commercial operation to 31.3.2014 for Northern Region System Strengthening Scheme-V (Part) for tariff block 2009-14 in Northern Region. Power Grid Corporation of India Ltd.,Gurgaon |
08-02-2011 |
05-07-2011 |
91/2009
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for the Transmission System associated with 400 kV Central transmission Project-I in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
15-03-2011 |
04-07-2011 |
58/2010
|
Revision of transmission tariff due to de-capitalization and additional capital expenditure incurred during 2004-09 for (a) 500 kV HVDC line along with HVDC terminal stations (pole-I) at Talcher and Kolar; (b) 400 kV Hossur-Salem S/C line and 1x135 MVA Auto Transformer-I at Hossur along with the associated bay at Hossur and bay extension at Salem; (c) 1x315 MVA Auto transformer-II at Hossur along with associated 400 kV bay and complete 220 kV bays/yard at Hossur; (d) 400 kV AC Kolar-Arakkonam-Madras line along with bays at Kolar and Sriperumbudur (Madras) and LILO of 400 kV Cuddapah-Banglore S/C line along with associated bays at Kolar; and (e) 400 kV Kolar-Hoody D/C line along with associated bays extensions (Kolar-I and Kolar-II) at Hoody sub-station, Hoody-I and Hoody-II bays at Kolar sub-station and 4x167 MVA auto transformer along with associated bays on 400 and 220 kV side and complete 220 kV sub-station at Kolar under the Transmission System associated with Talcher-II project in Southern Region for the period from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
19-08-2010 |
29-06-2011 |
302/2010
|
Determination of transmission tariff for Special Protection Scheme for Rihand Dadri HVDC Bio-pole and Gorakhpur-Muzzafarpur 400 kV line in Northern Regional for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-05-2011 |
27-06-2011 |
244/2010
|
Determination of Transmission Tariff for Combined Asset: (i) 400 kV S/C Jalandhar-Amritsar line along with associated bays at Amritsar & Jalandhar, ICT-I along with associated bays at Amritsar sub-station & 220 kV Verpal feeder bays I & II at Amritsar sub-station, (ii) 315 MVA 400/220 kV ICT-II at Gorakhpur S/s along with associated bays (includes 2 No. 220 kV Line Bays) and (iii) LILO of Bawana-Bhiwani line along with associated bays at Bahadurgarh, 315 MVA ICT-I along with associated bays at Bahadurgarh Sub-station & 220 kV Nuna Majra Feeder Bays at Bahadurgarh S/s under Transmission System associated with system strengthening scheme (Formerly Tala Supplementary Scheme) in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd.,Gurgaon |
20-01-2011 |
22-06-2011 |
328/2010
|
Determination of transmission tariff for transmission system associated with TALA HEP East-North Inter-connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
26-04-2011 |
21-06-2011 |
327/2010
|
Determination of transmission tariff for 400 kV D/C Meerut-Kaithal (Quad) transmission line along with its associated bays and equipments under transmission system associated with Northern Region System Strengthening Scheme-VI (NRSS-XI) in Northern Region for the period from date of commercial operation to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-05-2011 |
21-06-2011 |
178/2010
|
Approval of transmission tariff for (a) Ramagundam-Hyderabad 400 kV S/C line-2 in Southern Region; and (b) Bhadrawati (Chandrapur) HVDC back to back station (2x500 MW) in Western Region-Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
13-01-2011 |
20-06-2011 |
301/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004, for determination of revised transmission tariff due to replacement of Government of India Loan by LIC-III Loan for ATS of Ranganadi HEP in North Eastern Region from 01.04.2004 to 31.03.2009. Power Grid Corporation of India Ltd., Gurgaon |
26-04-2011 |
17-06-2011 |
284/2010
|
Determination of transmission tariff for 400 kV D/C Raighar-Raipur transmission line along with associated bays with East West transmission corridor in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
22-02-2011 |
08-06-2011 |
144/2010
|
Miscellaneous petition under sub-section (4) of Section 28 of the Electricity Act, 2003 and Regulation 44 “Power to Relax” of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, in the matter of approval of transmission tariff for Stage-I of 400 kV Thyristor controlled series compensation project (FACTS Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2009 to 31.3.2014 (in petition no. 131/2009). Power Grid Corporation of India Ltd., Gurgaon |
25-05-2010 |
08-06-2011 |
238/2010
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999, and CERC (Terms and Conditions of Tariff) Regulations, 2009, for determination of transmission tariff for 765 kV S/C Seoni-Bina Transmission Line along with its associated bays under Barh Transmission System in Western Region for the period from 01.04.2009 to 31.03.2014. Power Grid Corporation of India Ltd., Gurgaon |
25-01-2011 |
08-06-2011 |
72/2010
|
Determination of transmission tariff for (i) LILO of one circuit of Madurai-Trichy 400 kV D/C line along with 1 x 80 MVAR line reactor at Karikudi sub-station and (ii) 2 X 315 MVA Auto Transformers and Down Stream System with associated bays and equipments at Karaikudi sub-station under System Strengthening-VII of Southern Region Grid in Southern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd., Gurgaon |
09-11-2010 |
01-06-2011 |
197/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (conduct of business) Regulations' 1999 and Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations' 2009 for determination of transmission tariff for the Transmission System associated with Doyang HEP in North Eastern Region from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd. |
23-11-2010 |
01-06-2011 |
319/2010
|
Determination of transmission tariff for combined assets of transmission system associated with Rihand Stage-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
05-04-2011 |
30-05-2011 |
10/2011
|
Determination of transmission tariff for 400 kV Biharshariff-Sasaram-Sarnath Transmission Lines along with bays etc. under Eastern-Northern inter-regional HVDC Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
05-05-2011 |
30-05-2011 |
196/2010
|
Miscellaneous petition for approval under Regulation 86 of Central Electricity Regulatory Commission (conduct of business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of tariff) Regulations, 2004 for determination of revised transmission tariff for Doyang Transmission System in North Eastern Region from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
23-11-2010 |
30-05-2011 |
80/2011
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for strengthening of Farakka Malda transmission link and additional 315 MVA transformers at Malda in Eastern Region for the period from 1.4.2009 to 31.3.2014 PowerGrid Corporation of India Ltd., Gurgaon |
26-04-2011 |
30-05-2011 |
251/2010
|
Determination of transmission tariff for (i) LILO of 400 kV Hissar Bassi transmission line at Bhiwadi; and (ii) LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi and 400 kV D/C Agra-Bhiwadi transmission line under Northern Region system Strengthening Scheme-V in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
08-02-2011 |
25-05-2011 |
320/2010
|
Determination of transmission tariff for LILO of S/C Singrauli-Kanpur line-I, 400 kV sub-station at Allahabad and LILO of Singrauli-Kanpur line-II including ICT-I and ICT-II at Allahabad with associated bays in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-04-2011 |
24-05-2011 |
322/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for the combined assets of Northern Region System Strengthening Scheme – I in Northern Region for the period from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd., Gurgaon |
26-04-2011 |
23-05-2011 |
263/2010
|
Approval of transmission tariff for LILO of 400 kV D/C Bonaigaon-Malda line at Purnea and sub-station at Purnea (New) in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
05-05-2011 |
23-05-2011 |
276/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for the 1x125 MVAR Bus Reactor at Khandwa and 1x125 MVAR Bus Reactor at Dehgam along with bays associated under WRSS VII Transmission Scheme in Western Region from period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
25-01-2011 |
16-05-2011 |
309/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations’1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations’2009, for Tariff determination for the 1x125 MVAR Bus Reactor at Khandwa and 1x125 MVAR Bus Reactor at Dehgam along with bays associated under WRSS VII Transmission Scheme in Western Region from period from 1.4.2009 to 31.3.2014.
Power Grid Corporation of India Ltd., Gurgaon
|
26-04-2011 |
13-05-2011 |
224/2010
|
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business), Regulation s 1999 and Central Electricity Regulatory Commission CERC (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff from date of commercial aoperation to 31.3.2014 for Asset-I : LILO of One Circuit of 400 kV D/C Kankroli- Zarda line at Bhinmal along with 80 MVAR Bus Reactor at Bhinmal and Asset- 2 : 400 kV /220 kV 315 MVA ICT-I at Bhinmal S/S along with associated bays at Bhinmal Sub- Station under Transmission System associated with Northern Region System Strengthening Scheme- VIII (NRSS-VIII), in the Northern Region. Power Grid Corporation of India Ltd.,Gurgaon |
22-02-2011 |
16-05-2011 |
92/2009
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for the transmission system associated with NLC Stage – I in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
15-03-2011 |
13-05-2011 |
76/2010
|
Approval of transmission tariff for Dehri-Karamnasa Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
09-09-2010 |
11-05-2011 |
297/2010
|
Determination of transmission tariff in respect of (a) 400 kV Jeypore-Gazuwaka transmission line along with associated bays; and (b) 500 MW HVDC back to back stations at Gazuwaka in Southern Region for the period from 1.4.2009 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
10-02-2011 |
10-05-2011 |
341/2010
|
Petition for approval of revised transmission tariff for ATS of Kopili-Khandong [Additional Transmission Gohpur-Itanagar (ATGI)] in North Eastern Region from 1.4.2004 to 31.3.2009. Petition for approval of revised transmission tariff for ATS of Kopili-Khandong [Additional Transmission Gohpur-Itanagar (ATGI)] in North Eastern Region from 1.4.2004 to 31.3.2009. Power Grid Corporation of India Ltd.,Gurgaon |
25-01-2011 |
09-05-2011 |
118/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for (i) 220 kV D/C Faridabad- Samaypur transmission line with associated bays; and (ii) 220 kV D/C Faridabad-Palla transmission line with associated bays under Transmission System associated with Faridabad Gas Based Combined Cycle Power Project in Northern Region for tariff block 2009-14. Power Grid Corporation of India Limited, Gurgaon |
09-11-2010 |
06-05-2011 |
191/2010
|
Approval of transmission tariff for combined elements for (i) 400 kV Vindhyachal-Satna Bina transmission line; (ii) 400 kV S/C Korba-Raipur and Korba Bhilai ckt-III; and (iii) 315 MVA ICT and LILO of Bhilai-Chandrapur of transmission system associated with Vindhyachal stage-II in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
05-05-2011 |
193/2010
|
Approval of transmission tariff for combined assets for (a) 400 kV Ramagundam-Hyderabad D/C transmission line; (b) 400 kV S/C Gooty-Neelmangala transmission line; (c) 400 kV Hyderabad-Kurnool-Gooty transmission line and (d) 400 kV S/C Khammam-Nagarjunasagar transmission line along with associated bays and equipment under Ramagundum Stage-III Transmission System in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
05-05-2011 |
307/2010
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999, and CERC (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Kudankulam (NPC) – Tirunelveli (POWERGRID) 400 kV (QUAD) D/C Line – I & II with associated bays and equipments under Kudankulam Transmission system in Southern Region for the 2009-14 period. Power Grid Corporation of India Limited, Gurgaon |
22-02-2011 |
04-05-2011 |
254/2010
|
Approval of transmission tariff for 400 kV Kahalgaon Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
20-01-2011 |
02-05-2011 |
166/2010
|
Determination of transmission tariff for (i) combined asset of 400 kV Gandhar-Padge S/C transmission line with associated bays and 400 kV Gandhar-Gandhar S/C transmission line; (ii) 220 kV Gandhar-Bharuch D/C transmission line with associated bays and 400 kV Gandhar-Dehgam D/C transmission line with sub-station at Dehgam under Gandhar Gas Power Station (Stage-I) in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-11-2010 |
02-05-2011 |
228/2010
|
Petition for approval of revision of tariff for the period from 1.4.2004 to 31.3.2009 due to additional capital expenditure incurred during 2004-05 to 2008-09 for 1X500 MW HVDC back to back station at Sasaram with associated AC switchboard at Sasaram and Allahabad and Auxiliary system including 400 kV Sarnath-Allahabad transmission line with associated bays under Eastern-Northern Inter-regional HVDC transmission system. Power Grid Corporation of India Limited, Gurgaon |
18-01-2011 |
02-05-2011 |
L-1/44/2010
|
Approval of Transmission Service Agreement, Revenue Sharing Agreement, Billing, Collection and Disbursement Procedure under CERC (Sharing of Transmission Charges and Losses), Regulations, 2010. Power Grid Corporation of India Ltd. (PGCIL) |
- |
29-04-2011 |
267/2010
|
Determination of transmission tariff for Barh-Balia 400 k V D/C (Quad) line under Transmission System associated with Barh Generation Project (3x660 MW) in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-01-2011 |
29-04-2011 |
285/2010
|
Determination of transmission tariff for combined assets of (a) 220 kV D/C Unchahar-Kanpur transmission line-I with associated bays; (b) 220 kV D/C Unchahar-Kanpur transmission line-II with associated bays; and (c) LILO of one ckt of 220 kV D/C Panki-Mainpuri line of transmission system associated with Unchahar Stage-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
08-03-2011 |
27-04-2011 |
270/2010
|
Determination of transmission tariff for Combined Assets of (i) LILO of Korba- Raipur at Sipat(DOCO: 01.05.2006), (ii) 765 kV Sipat- Seoni Ckt-I… (DOCO: 01.11.2007), (iii) 400/220 kV ICT-I at Seoni…(DOCO: 01.12.2007), (iv) Ckt-II of 400 kV Nagda- Dehgam line (DOCO: 01.01.2008), (v) Ckt-I of Nagda- Dehgam line (DOCO: 01.02.2008), (vi) 400 kV Seoni- Khandwa T/L , 80 MVAR Bus Reactor, 765/400 kV ICT-II at Seoni S/S, LILO of Sardar- Sarovar- Nagda line at Rajgarh (DOCO: 01.04.2008) and (vii) 765 kV Sipat- Seoni Ckt-II (DOCO: 01.05.2008) (Notional DOCO: 01.05.2008) & Combined assets of (i) 315 MVA 400/220 kV ICT-II at Seoni S/S, 315 MVA 400/220 kV ICT-I at Rajgarh (DOCO: 01.04.2008) and (ii) 315 MVA ICT-II at Rajgarh (DOCO: 01.04.2009) (Notional DOCO: 01.04.2009) under Sipat-I Transmission System in Western Region for the period from 01.04.2009 to 31.03.2014. Power Grid Corporation of India Ltd.,Gurgaon |
20-01-2011 |
27-04-2011 |
262/2010
|
Determination of transmission tariff for 400 kV D/C Raipur-Rourkela transmission line along with Rourkela extension under Eastern-Western inter-regional link for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
24-02-2010 |
25-04-2011 |
291/2010
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations'1999, and CERC (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for the Combined Asset which comprises (i) 765 KV S/C Bina-Gwalior transmission line, (ii)315 MVA,400/220/33 KV ICT-I along with associated bays at Gwalior S/S, (iii) LILO of 400 KV S/C Korba-Raipur transmission line at Bhatapara S/S along with associated bays (iv) 400 KV Khandwa-Rajgarh Ckt-II along with associated bays and 765/400 kV ICT-III at Seoni sub-station (v) 400 KV Khandwa-Rajgarh Ckt-I along with associated bays, 63 MVAR Bus reactor at Bina sub-station and the single asset viz. 400 KV ICT-II at Gwalior S/S under Sipat II Transmission system in Western Region from period from 1.4.2009 to 31.3.2014. PowerGrid Corporation of India Ltd., Gurgaon |
10-02-2011 |
19-04-2011 |
103/2010
|
Approval of transmission tariff for 50 MVA Auto transformer at Malda sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
19-10-2010 |
13-04-2011 |
127/2010
|
Approval of transmission tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
16-09-2010 |
13-04-2011 |
227/2010
|
Determination of transmission tariff for 2 nd 315 (3x105) MVA, 400/220 kV transformer at Indravati (OHPC) Switchyard in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
19-10-2010 |
13-04-2011 |
242/2010
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations'1999, and CERC (Terms and Conditions of Tariff) Regulations'2009, for Tariff determination for 500 MW HVDC back to back station at Gazuwaka, (Asset-I), Vijayawada-Gazuwaka 400 kV D/C Line & (b) 50% FSC Jeypore-Gazuwaka 400 kV D/C T/L at Jeypore (Asset-II) and 40% FSC on Rengali-Indravati 400 kV S/C T/L & (b) 40% FSC on Meramundali-Jeypore 400 kV S/C T/L at Jeypore.( Asset-III) under ”Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” for the period from 1.4.2009 to 31.3.2014 in Southern Region and Eastern Region. PowerGrid Corporation of India Ltd., Gurgaon |
23-12-2010 |
11-04-2011 |
199/2010
|
Determination of transmission tariff for (a) Neelamangala-Somanahally 400 kV D/C line along with bays; and (b) Gooty-Raichur 400 kV D/C transmission line with bays under system strengthening-III for the period from 1.4.2009 to 31.3.104 in Southern Region. Power Grid Corporation of India Limited, Gurgaon |
25-01-2011 |
11-04-2011 |
225/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined elements of (i) Tala–Siliguri transmission system and(ii) remaining part of Tala-Siliguri transmission system in Eastern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
08-04-2011 |
268/2010
|
Determination of transmission tariff for assets of Northern Region System Strengthening Scheme-III in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
24-02-2011 |
04-04-2011 |
206/2010
|
Determination of transmission tariff for 400 kV D/C Kaiga-Sirsi transmission line in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-01-2011 |
01-04-2011 |
211/2010
|
Approval for transmission tariff for combined assets of 400 kV D/C Kaiga-Narendra Transmission line, 400/200 kV sub-station at Narendra with one 315 MVA ICT and 2nd 315 MVA ICT at Narendra sub-station under Kaiga-Narendra Transmission system in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
09-11-2010 |
31-03-2011 |
273/2010
|
Determination of transmission tariff for 400 kV D/C Kota-Merta transmission line (Ckt-I and II) along with associated bays under system strengthening in South West part of Northern Grid (Part-A) Transmission System in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
21-12-2010 |
28-03-2011 |
187/2010
|
Determination of transmission tariff for combined assets of (i) 40% Fixed Series Compensation package for 400 kV D/C Khandwa-Seoni transmission line at Khandwa sub-station and 400 kV D/C Sipat-Raipur transmission line along with sub-station bays at Raipur and Sipat; and (ii) 315 MVA, 400/220 kV ICT with associated Unchahar-Raibareilly transmission line along with associated 220 kV bays associated with Itrasi (PG) (MPPTCL) Ckt-II and 220 kV bays , associated with Itrasi (PG)-Bhopal (MPTCL) Ckt-II associated with WRSS-I scheme in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
30-11-2010 |
23-03-2011 |
264/2010
|
Determination of transmission tariff for LILO of one circuit of 132 kV D/C Siliguri-Ranjit line at Gangtok in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-11-2010 |
23-03-2011 |
89/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (terms and Conditions of Tariff) Regulations'2009 for Determination of Transmission tariff from date of commercial operation to 31.03.2014 for 400Kv S/C RAPP-Kota Line along with 80MVAR Bus Reactor (Asset-1) and 400kV/220kV 315 MVA ICT-I and ICT-II at Kota S/S and ICT-III at Kankroli S/S along with associated bays at Kota and Kankroli Substation ( Asset-2) under Transmission System associated with RAPP 5 & 6, in Northern Region. Power Grid Corporation of India Ltd, Gurgaon |
10-08-2010 |
17-03-2011 |
287/2009
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for transmission tariff for (i)400 KV D/C Gorakhpur-Lucknow Transmission Line(Asset-I) and (ii)400 kV D/C Bareilly-Mandola Transmission Line (Asset-II) in Northern Region associated with Tala Hydro Electric Project, East – North Interconnector and Northern Region Transmission System for the period from 1.4.2009 to 31.3.2014. Powerlinks Transmission Ltd. |
23-09-2010 |
17-03-2011 |
288/2009
|
Approval of transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line and 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North Inter-connector and Northern Region transmission system for the period from 2009-14. Powerlinks Transmission Limited, New Delhi |
24-06-2010 |
17-03-2011 |
240/2010
|
Determination of transmission tariff for 2nd 400 kV D/C Kahalgaon-Biharshariff transmission line in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
20-01-2011 |
15-03-2011 |
190/2010
|
Determination of transmission tariff for integration of Sikkim transmission system with Eastern Region by LILO of Siliguri-Gangtok Section 132 kV Rangit-Siliguri transmission line at Melli in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
11-01-2011 |
15-03-2011 |
260/2010
|
Approval of transmission tariff for 765 kV S/C Bina Gwalior transmission line-II along with associated bays under WRSS-II, Set D scheme in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-01-2011 |
14-03-2011 |
111/2009
With I. A. No.
6/2010
|
Determination of transmission tariff for Kakrapar Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
16-12-2010 |
11-03-2011 |
217/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined Asset-1 comprising 400/220 kV Damoh S/S along with bays and 400 kV 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh S/S and combined Asset-2 comprising 400/220 kV ICT-I at Damoh S/S along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh S/S under WRSS-IV Transmission Scheme in Western Region for the tariff block 2009-14. Power Grid Corporation of India Ltd |
13-01-2011 |
15-03-2011 |
182/2010
|
Determination of tariff for (i) 765 kV S/C Seoni-Wardha transmission line with associated bays and 400 kV D/C Wardha-Akola transmission line with associated bays; (ii) Combined assets of 765 kV S/C Seoni-Wardha transmission line with associated bays and 400 kV D/ C Wardha Akola transmission line with associated bays and 400 kV D/C Akola-Aurangabad transmission line and associated bays at Akola and Auranagabad and 400 kV D/C bus reactor at Wardha sub-station; and (iii) 400/220 kV ICT-I at Wardha sub-station with associated bays under SIPAT-II supplementary transmission system in Western Region for tariff period 2009-14. Power Grid Corporation of India Limited, Gurgaon |
25-01-2011 |
15-03-2011 |
194/2010
|
Approval of transmission tariff for combined element of (i) 400 kV D/C Tarapur-Padghe Ckt-I transmission line; (ii) 400 kV D/C Tarapur-Padghe Ckt-II transmission line; and (iii) 220 kV D/C Tarapur-Boisor transmission line under Tarapur Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-10-2010 |
11-03-2011 |
142/2010
|
Approval of transmission tariff for 63 MVAR line Reactor on 400 kV Kolaghat-Rengali line at Rengali sub-station in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
21-09-2010 |
11-03-2011 |
93/2010
|
Approval of transmission tariff for Hathidah River Crossing section of 220 kV D/C Biharshariff-Begusarai transmission line in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
22-06-2010 |
10-03-2011 |
123/2010
|
Approval of transmission tariff for combined elements of (a) LILO of Nagarjunasagar-Raichur 400 kV S/C line at Mehboobnagar; and (b) LILO of both the circuits of Nellor-Sriperumbudur 400 kV D/C line at Almathi along with associated bays under system strengthening scheme-IV in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
16-09-2010 |
08-03-2011 |
195/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for determination of Transmission Tariff for 400 kV Jeypore-Tarcher transmission system in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
13-01-2010 |
08-03-2011 |
162/2010
|
Determination of transmission tariff for combined element of (i) 315 MVA ICT-IV along with associated bays at Moga sub-station; and (ii) ICT-II along with associated bays and 2 Nos. PSEB feeder bays at Amritsar sub-station and 400 kV bus reactor bay and 2 Nos. PSEB line bays at Moga sub-station under Augmentation of transformation capacity at Amritsar and Moga sub-station under Augmentation of transformation capacity at Amritsar and Moga sub-station in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-09-2010 |
01-03-2011 |
202/2010
|
Approval of transmission tariff for (i) LILO of both circuit of 400kV D/C Gazuwaka-Vijayawada line at Vemagiri and (ii) Extension of 400/220 kV sub-station at Vijayawada under System Strengthening-VI of Southern Region Grid in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
25-02-2011 |
110/2009
|
Determination of transmission tariff for Kawas Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
25-02-2011 |
218/2010
|
Petition for determination of Transmission Tariff for Agra (Power Grid) – Agra (UPPCL) 400 kV D/C Interconnection in Northern Region for the tariff block 2009 -14. Power Grid Corporation of India Limited, Gurgaon |
07-12-2010 |
25-02-2011 |
311/2010
|
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2009 for determination of transmission tariff from 1.4.2009 to 31.3.2014 for 400/220 KV Bhiwadi S/S along with LILO of Ballabhgarh-Bassi 400 KV S/C line and ICT-I & ICT-II at Bhiwadi in Northern Region for tariff block 2009-14 period. Power Grid Corporation of India Ltd.,Gurgaon |
25-01-2011 |
25-02-2011 |
141/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for revision of transmission tariff from 1.4.2004 to 31.3.2009 due to de-capitalization during 2007-08 for the strengthening of Farakka – Malda Transmission link and additional 315 MVA transformer at Malda in Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
21-09-2010 |
25-02-2011 |
177/2010
|
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations'1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009, for Tariff determination for 400 kV D/C Talcher- Meramundali Transmission Line in Eastern Region for the period 2009-14. Power Grid Corporation of India Ltd., Gurgaon |
13-01-2011 |
23-02-2011 |
200/2010
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999, and CERC (Terms and Conditions of Tariff) Regulations 2009, for determination of transmission tariff for Neelmangala - Mysore 400 kV D/C Transmission line along with 2X315 MVA, 400/200 kV ICTs at Mysore Sub Station in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-10-2010 |
21-02-2011 |
73/2010
|
Determination of transmission tariff for (i) one circuit of 132 kV D/C Sewa-II-Hiranagar line along with associated bay at Hiranagar sub-station; and (ii) one circuit of 132 kV D/C Sewa-II-Mahanpur line along with associated bays at Mahanpur-sub-station under transmission system associated with SEWA-II HEP in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
25-11-2010 |
15-02-2011 |
186/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for LILO of Kolaghat – Rengali, 400 kV S/C line at Baripada in Eastern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
15-02-2011 |
300/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for KAHALGAON St-II ph – I transmission system in Eastern Region, Northern Region and Inter-regional link between Northern and Western Region for the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon |
25-01-2011 |
15-02-2011 |
226/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff in respect of 400 kV D/C Ranchi-Sipat transmission line with associated bays at Ranchi and Sipat S/S (Asset 1) and 40% FSC on 400 kV Ranchi-Sipat Line at Ranchi S/S(Asset 2) under Kahalgaon Stage II Phase II Transmission System in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
15-02-2011 |
236/2010
|
Determination of transmission tariff for 132 kV S/C NER Augmentation Transmission system in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
14-02-2011 |
85/2010
|
Approval of incentive based on availability of transmission system for the years 2004-05, 2005-06 and 2006-07 for North Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
09-12-2010 |
14-02-2011 |
241/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999 and Central Electricity Regulatory Commission (Term and Conditions of Tariff) Regulations, 2009 for determination of Transmission Tariff for transmission assets under “Kaiga 3 & 4 Transmission System” in the Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd, Gurgaon |
16-11-2010 |
14-02-2011 |
175/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for combined elements of (i) extension of 400/220 kV Kolhapur (MSEB) sub-station; (ii) 220 kV D/C Vapi- Magarwada transmission line; and (iii) 220 kV D/C Vapi-Khardpada transmission line along with associated bays with WRSS –III transmission system in Western Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
11-02-2011 |
266/2010
|
Approval of transmission tariff for combined assets for (a) 80 MVAR bus reactor along with Nellor 400 kV bay extension; (b) 315 MVA ICT with Cuddapah 400 kV bay extension; (c) 315 MVA ICT with Gooty Extension and IInd 3X167 MVA auto transformer at Kolar and switching arrangement for reactor at Somanahalli; (d) 315 MVA ICT with Gazuwaka sub-station bay extension; (e) 315 MVA ICT with Munirabad sub-station bay extension; and (f) 315 MVA ICT with Khammam sub-station bay extension under System Strengthening Scheme V in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
11-02-2011 |
164/2010
|
Determination of transmission tariff for (i) 400 kV D/C Dulhasti-Kishenpur transmission line with associated bays; and (ii) 400 kV Kishenpur-Wagoora transmission line along with associated bays at Kishenpur and Wagoora sub-stations under Dulhasti combined transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
26-10-2010 |
11-02-2011 |
253/2010
|
Determination of transmission tariff for combined assets of (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220 /132 kV ICT-III at Raibareilly along with associated bays; and (ii) 100 MVA, 220/132 kV ICT- II at Raibareilly Sub-station along with associated bays under Unchahar - III Transmission System in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
09-12-2010 |
10-02-2011 |
233/2010
|
Determination of transmission tariff for 400 kV D/C Dhauliganga HEP- Bareilly (UPPCL) Transmission Line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
10-02-2011 |
112/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff i) 40% fixed series compensation on Gooty – Neelmangla line-II at Gooty and ii) 40% fixed series compensation on Gooty – Neelmangla line-I at Gooty , Kadapa Nagarjunasagar Circuit –I and Circuit-II at Kadapa under Fixed Series Compensation Package in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd., Gurgaon |
23-12-2010 |
09-02-2011 |
287/2010
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for SPECIAL ENERGY METERS in Southern Region from the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Ltd., Gurgaon |
16-12-2010 |
09-02-2011 |
243/2010
|
Approval of transmission tariff for combined assets for (i) Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays; (ii) 400/220 kV, 315 MVA ICT-II at Satna sub-station; (iii) Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; (iv) LILO of 400 kV Satna-Bina Ckt- I & II at Bina (Power Grid) sub-station; (v) Circuit IV of 400 kV D/C Satna-Bina transmission line; (vi) Circuit III of 400 kV D/C Satna-Bina transmission line; (vii) LILO of 400 kV D/C Raipur-Rourkela transmission line along with associated bays; and (viii) 400/220 kV 315 MVA ICT-II along with associated bays equipment at Raigarh sub-station under Vindhyachal Stage-III transmission system in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
08-02-2011 |
176/2010
|
Approval of transmission tariff for 400 kV Bina-Nagda D/C transmission line along with associated bay equipment at Nagda and Bina in Western Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
28-10-2010 |
08-02-2011 |
62/2010
|
Approval of transmission tariff for 315 MVA ICT-III at Nagarjunasagar sub-station with associated bay equipments in Southern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
24-08-2010 |
08-02-2011 |
95/2009
|
Approval of transmission tariff for Tanakpur transmission system in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
09-11-2010 |
01-02-2011 |
198/2010
|
Determination of transmission tariff for 132 kV S/C Ranganadi-Ziro Transmission system in North Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd.,Gurgaon |
23-12-2010 |
24-01-2011 |
174/2010
|
Determination of Transmission Tariff for (i) Single Asset Agra - Gwalior 765 kV 2 nd S/C line along with associated bays at Agra and Gwalior Sub-stations and (ii) Combined Assets Agra - Gwalior 765 kV 2nd S/C line & 400 kV D/C Zerda-Kankroli line along with associated bays at Agra, Gwalior and Zerda, Kankroli sub-station under Transmission System associated with North-West corridor strengthening scheme, for tariff block 2009-14 period in both Western and Northern Region. Power Grid Corporation of India Ltd., Gurgaon |
09-11-2010 |
20-01-2011 |
201/2010
|
Petition for approval of transmission tariff for 400 kV Vindhyachal-Kanpur line at Singrauli along with bays at Singrauli end (Realignment of Vindhyachal-Kanpur S/C line at Singrauli and Singraluli-Vindhyahal 2 nd 400 kV Ckt ) and Bus coupler bay at Vindhyachal HVDC under System Strengthening Scheme in Singrauli-Vindhyachal corridor in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
23-12-2010 |
14-01-2011 |
235/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for 400 kV S/C Jamshedpur Rourkela (Ckt II) Transmission line along with associated bays in Eastern Region, for Tariff Block 2009-14. Power Grid Corporation of India Limited, Gurgaon |
25-11-2010 |
14-01-2011 |
169/2010 |
Approval of transmission tariff for Rangit Transmission System in Eastern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
21-09-2010 |
13-01-2011 |
122/2009
|
Approval of transmission tariff for 400 kV S/C Chamera-I Kishenpur Transmission Line in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
21-10-2010 |
13-01-2011 |
216/2010
|
Revision of transmission tariff for the tariff period from 1.4.2004 to 31.3.2009 due to additional capitalization incurred during 2004-05 to 2008-09 for 400 kV Biharshariff-Sasaram-Sarnath transmission line along with bays etc. under Eastern- Northern Region inter-regional HVDC transmission system. Power Grid Corporation of India Limited, Gurgaon |
09-11-2010 |
12-01-2011 |
157/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2004 for revision of transmission tariff from 1.4.2004 to 31.3.2009 due to additional capitalization during 1.4.2004 to 31.3.2009 for LILO of 400 kV Bongaigaon – Malda transmission line at Silliguri and sub station at Silliguir (New) in Eastern Region. Power Grid Corporation of India Limited, Gurgaon |
23-09-2010 |
11-01-2011 |
148/2009
|
Approval under Regulation 86 of Central Electrical Regulatory Commission (Conduct of Business) Regulations, 1999 for determination of Transmission Tariff for 220 kV Jallandhar-Hamirpur D/C transmission line along with associated bays in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Ltd, Gurgaon |
11-11-2010 |
11-01-2011 |
163/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and conditions of tariff) Regulations 2009 for transmission tariff for (i) 400 kV D/C Agra –Bassi Transmission Line with associated bays, (ii) 3x105 MVA 400/220/33 kV ICT-III along with associated bays at Wagoora Sub-Station and (iii) 220 kV Zankot III & IV bays at Wagoora Sub-Station, under Transmission System associated with Northern Region System Strengthening Scheme-II in Northern Region for the period from 1.4.2009 to 31.3.2014. Power Grid Corporation of India Limited, Gurgaon |
21-09-2010 |
11-01-2011 |
71/2010
|
Order dated 1.9.2010 in Petition No. 71/2010 regarding transmission tariff for combined elements of (i) additional bays at Kolar and Hosur for second circuit of Kolar-Hosur 400 kV D/C line and (ii) 400 kV Hiryur sub-station, including 315 MVA auto transformer and LILO of Devangere-Hoody 400 kV D/C line at Hiriyur with associated bays under system strengthening scheme-II in Southern Region for the period from 1.4.2009 to 31.3.2014-Issue of corrigendum. Power Grid Corporation of India Limited, Gurgaon |
- |
10-01-2011 |
122/2010
|
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 for transmission tariff for Kishenpur Moga transmissions system in Northern Region for the period from 1.4.2009 to 31.3.2014 Power Grid Corporation of India Limited, Gurgaon |
16-09-2010 |
06-01-2011 |
120/2010 |
Revision of transmission tariff due to additional capital expenditure incurred during 2004-09 for 400 kV D/C Nathpa-Jhakri-Nalagarh transmission line along with associated bays and 2 No. bays at Nalagarh for Kunihar (HPSEB) associated with Nathpa-Jhakri Transmission System in Northern Region. Power Grid Corporation of India Limited, Gurgaon |
19-08-2010 |
05-01-2011 |