FINAL TARIFF ORDERS 2014

Pet. No.
Subject
Date of Hearing
Date of Order


I.A. No. 26/2014 in Petition No. 327/MP/2013

30.06.2014

30-06-2014
Pet. No.
Subject
Date of Hearing
Date of Order


250/GT/2013

15-03-2014

12-11-2014


233/GT/2013

06-03-2014

12-11-2014


230/GT/2013

04-03-2014

05-11-2014


I.A. No. 48/2014 with Petition No. 252/GT/2013

30-09-2014

09-10-2014


21/RP/2014 in Petition No. 176/GT/2013

01-10-2014

01-10-2014


50/GT/2014

-

27-08-2014


182/GT/2013

07.08.2014

22-08-2014


50/GT/2014

------

14-07-2014


69/GT/2013

22.05.2014

02-07-2014


50/GT/2014 with I.A No.17/2014

17.06.2014

24-06-2014


271/2010

29.10.2013

13-05-2014


304/2009

26.11.2013

15-05-2014


135/GT/2013

15.04.2014

13-05-2014


139/GT/2013

15.04.2014

15-05-2014


148/GT/2013

15.04.2014

15-05-2014


176/GT/2013

15.04.2014

15-05-2014


135/GT/2013

15.04.2014

13-05-2014


188/GT/2013

19.11.2013

15-05-2014


Corrigendum in Petition No. 189/GT/2013

-

13-03-2014


189/GT/2013

19.11.2013

26-02-2014


272/2010

-

26-02-2014


160/GT/2012

10.09.20143

20-02-2014


148/GT/2011

08.08.2013

18-02-2014
Pet. No.
Subject
Date of Hearing
Date of Order


221/GT/2013

06-03-2014

01-10-2014


238/GT/2013

04.03.2014

04-07-2014


236/GT/2013

04.03.2014

02-07-2014


228/GT/2013

15.04.2014

25-06-2014


250/2010

-

05-06-2014


177/GT/2013

24.10.2013

09-06-2014


265/2010

-

09-06-2014


229/GT/2013

07.11.2013

26-02-2014


142/GT/2013

12.09.2013

18-02-2014


141/GT/2013

10.09.2013

13-02-2014


155/GT/2013

10.09.2013

13-02-2014


27/GT/2013

16.07.2013

23-01-2014


45/2010

03.01.2013

02-01-2014
Pet. No.
Subject
Date of Hearing
Date of Order


13/RP/2014

15-07-2014

11-12-2014


24/RP/2014 in RC/003/2014 & RC/322/2014

30-09-2014

03-12-2014


14/RP/2014 in Petition No. 160/GT/2012

15-07-2014

03-12-2014


19/RP/2014 in 148/GT/2013

11-09-2014

20-11-2014


16/RP/2014 in Petition No.188/GT/2013

11-09-2014

01-10-2014


17/RP/2014 in 304/2009

21-08-2014

24-09-2014


RC/79/2014

05.09.2014

09-09-2014


03/RP/2014

17.04.2014

11-06-2014


11/RP/2014 in Petition No.12/MP/2014

15.04.2014

24-04-2014


12/RP/2014 in Petition No.11/MP/2014

15.04.2014

24-04-2014


Review Petition No.1/RP/2014 in Petition No. 170/MP/2013

07.01.2014

21-04-2014


05/RP/2014

27-02-2014

25-03-2014


Petition No. 10/RP/2013 in Petition No. 272/2010.

12.11.2013

28-01-2014


Review Petition No 7/RP/2013 in Petition No 250/2010

27.08.2013

07-01-2014
Pet. No.
Subject
Date of Hearing
Date of Order


242/TT/2014

17-12-2014

17-12-2014


245/TT/2014

17-12-2014

17-12-2014


69/TT/2012

11-03-2014

03-12-2014


107/TT/2013

27-03-2014

03-12-2014


72/TT/2012

Approval of transmission tariff for (I) Combined Asset of Establishment of 765/400 kV Wardha S/S with 1500 MVA ICT –1, 240 MVAR Bus Reactor and Switchable 240 MVAR Line Reactor at Seoni, Bays for Seoni-Wardha ckt-2 at Wardha S/S & Seoni S/S & 765/400 kV 1500 MVA ICT 3 with bays at Wardha S/S (Anticipated Date of commercial operation: 01.03.2012), New 400/220 kV Bachchau Substation (Gujarat) and 1*63 MVAR Bus Reactor at Bachchau Substation (New) along with associated bays (Anticipated/Actual Date of commercial operation: 01.06.2011/01.10.2011) and 400 kV Gandhar (NTPC) - Navsari line along with associated bays at Gandhar (NTPC) and Navsari (GIS)S/S, Navsari GIS S/S (New) (Anticipated date of commercial operation: 01.03.2012) (Notional DOCO :01.03.2012) and (II) Combined Asset (I) and 765/400 kV 1500 ICT 2 at Wardha S/S with bays & Bay Extension at 765 kV Seoni S/S & Wardha S/S for 765 Seoni- Wardha Ckt-1 along with switchable Line Reactor at Seoni (Anticipated Date of commercial operation: 01.04.2012) (Notional Date of commercial operation: 01.04.2012) under Associated Transmission System for Mundra (4000 MW) Ultra Mega Power Project for the period from Date of commercial operation to 31.03.2014 under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009.Power Grid Corporation of India Limited.

25-02-2014

01-12-2014


81/TT/2012

26-11-2013

30-10-2014


40/TT/2013

23-03-2014

15-10-2014


77/TT/2012

01-04-2014

31-10-2014


100/TT/2013

22-04-2014

31-10-2014


107/TT/2012

26-11-2013

19-05-2014


255/TT/2013

24-06-2014

31-10-2014


68/TT/2012

25-02-2014

31-10-2014


39/TT/2014

-

07-10-2014


84/TT/2012

-

24-09-2014


85/TT/2012

-

24-09-2014


192/TT/2014

01-09-2014

24-09-2014


139/TT/2014

01-09-2014

26-09-2014


93/TT/2012

19-11-2013

19-09-2014


98/TT/2012

Approval of transmission tariff from anticipated Notional DOCO to 31.3.2014 for Assets: (i) 132kV Silchar-Hailakandi (AEGCL) line along-with associated bays (Anticipated DOCO 01.04.2012) (ii) 200MVA, 400/132kV, ICT-II at Silchar along-with associated bays (Anticipated DOCO 01.04.2012) (iii) 400kV D/C Pallatana-Surajmaninagar line (Charged at 132kV) alongwith associated bays (Anticipated DOCO 01.07.2012) (iv) 400kV Silchar-Purbakanchanbari line (Charged at 132kV) along-with associated bays (Anticipated DOCO 01.07.2012) (v) 80 MVAR, 420kV Bus Reactor at Bongaigaon along-with associated bay (Anticipated DOCO 01.07.2012)Under transmission system associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14 under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009.Power Grid Corporation of India Limited.

22-04-2014

16-09-2014


86/TT/2012

04.09.2014

09-09-2014


TT/308/2013

-

02-09-2014


93/TT/2014

15.07.2014

22-08-2014


325/TT/2013

27.02.2014

20-08-2014


1/TT/2014

27.05.2014

12-08-2014


89/TT/2014

24.06.2014

07-08-2014


198/TT/2012

21.11.2013

07-08-2014


111/TT/2012

05.08.2014

06-08-2014


38/TT/2013

25.02.2014

17-07-2014


66/TT/2014

15.07.2014

23-07-2014


58/2011

-

22-07-2014


217/TT/2012

21.07.2014

22-07-2014


82/TT/2012

04.03.2014

03-07-2014


49/TT/2013

12.11.2013

03-07-2014


64/TT/2012

26.11.2013

03-07-2014


97/TT/2013

27.03.2014

02-07-2014


94/TT/2012

04.03.2014

25-06-2014


TT/99/2014 TT/100/2014 TT/107/2014

12.06.2014

23-06-2014


TT/46/2014

12.06.2014

23-06-2014


60/TT/2012

-

19-06-2014


101/TT/2013

04.03.2014

11-06-2014


323/TT/2013

27.02.2014

20-05-2014


112/TT/2012

26.11.2013

19-05-2014


284/2010

01.04.2014

19-05-2014


88/TT/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, and Central Electricity Regulatory Commission(Terms and Conditions of Tariff) Regulations 2009, for determination of Transmission Tariff for Asset 1 (a) LILO of 400 kV D/C Bina –Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur & Switchable Scheme for Reactor at Bina & Nagda S/S, and (b) New 400/220 kV S/S at Shujalpur(Anticipated Date of commercial operation: 1.4.2011), Asset 2: Combined Asset of (a) LILO of 400 kV D/C Bina –Nagda at Shujalpur S/S along with 50 MVAR line Reactor at Shujalpur & Switchable Scheme for Reactor at Bina & Nagda S/S (b) New 400/220 kV S/S at Shujalpur (Anticipated Date of commercial operation: 1.4.2011 and 400kV, 63 MVAR Bus Reactor at Shujalpur along with associated bays of 400kV(Anticipated Date of commercial operation :1.8.2011) Asset 3: 400/220 kV ICT I at Shujalpur along with associated bays of 400kV & 220kV (Anticipated DOCO 1.6.2011)and Asset 4: Combined Asset of (a) 400/220 kV ICT II at Shujalpur along with associated bays of 400kV & 220kV(Anticipated Date of commercial operation 1.8.2011) (Notional Date of commercial operation 1.8.2011) under WRSS IX Transmission scheme in WR, for the Tariff Block 2009-2014.Power Grid Corporation of India Limited, Gurgaon.

01.04.2014

15-05-2014


65/TT/2012

01.04.2014

13-05-2014


TT/047/2014

07.03.2014

13-05-2014


255/TT/2013

11.03.2014

13-05-2014


209/TT/2013 210/TT/2013 211/TT/2013

25.03.2014

06-06-2014


224/TT/2013

21.11.2013

04-03-2014


101/TT/2012

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 of Asset-I: 400 kV D/C (Quad) LILO of Barh-Balia Line at Patna along with associated bays at Patna S/S (Anticipated DOCO: 1.7.2012; Asset-II: 765/415 kV, 3x500 MVA ICT-I Ranchi along with associated bays at 765 kV Ranchi S/S (Anticipated DOCO: 1.9.2012); Asset-III: Combined Assets of 400 kV D/C (Quad) Ranchi (New) – Ranchi (Old) – I T/L and associated 400 kV Line bays at Ranchi (New) S/S & Ranchi(old) S/S; and 400 kV D/C (Quad) Ranchi (New)- Ranchi(Old) – II T/L and associated 400 kV line bays at Ranchi(New) S/S & Ranchi (Old) S/S; and 765/415 kV, 3x500 MVA ICT II at Ranchi along with associated bays at 765 kV Ranchi S/S (Anticipated DOCO: 1.9.2012); Asset-IV: 765/415 kV, 3x500 MVA ICT at Sasaram along with associated bays (anticipated DOCO: 1.9.2012) under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for Network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period.Power Grid Corporation of India Limited.

21.11.2013

28-02-2014


90/TT/2012

13.08.2013

21-02-2014


184/TT/2011

13.08.2013

22-02-2014


332/2010

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 of Transmission Tariff for (1) Combined assets of LILO of Ramagundam– Khammam T/L at Warangal S/S, Neyveli - Pugalur –Madurai 400 kV D/C T/L, Udumalpet-Arasur 400 kV D/C line along with 400/220 kV Sub-station at Arasur and associated bays at Udumalpet and LILO of Neyveli- Sriperumbudur 400 kV S/C line at Puducherry S/S with associated bays, (2) Combined assets of LILO of Ramagundam – Khammam T/L at Warangal S/S, Neyveli - Pugalur –Madurai 400 kV D/C T/L, Udumalpet- Arasur 400 kV D/C line along with 400/220 kV Sub-station at Arasur and associated bays at Udumalpet, LILO of Neyveli- Sriperumbudur 400 kV S/C line at Puducherry S/S with associated bays, and 2 nos. of 50 MVAR line reactors at Pugalur 400/220 kV S/S along with associated bays at Pugalur, (3) Combined assets of 2x315 MVA Auto Transformer & 400/220 kV Bays Equipment at Pugalur S/S and 2 nos. 315 MVA ICTs along with associated bays and 220 kV downstream equipment at Arasur 400/220 kV S/S and (4) 2 nos. 400/230 kV 315 MVA ICTs along with associated bays and downstream equipment at 400/230 kV Puducherry sub-station under “Transmission System associated with Neyveli Lignite Corporation–II (NLC-II) Expansion Project” in Southern Region for the tariff block 2009-14.Power Grid Corporation of India Ltd., Gurgaon.

26.06.2013

21-02-2014


185/TT/2011

17.09.2013

21-02-2014


213/TT/2012

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 for determination of transmission tariff for Asset-I : LILO of 400 kV S/C Baripada – Rengali TL and associated bays at Keonjhar; Asset-II : 1 No of 400/220 kV, 315 MVA (1st) ICT along with associated bays and 2nos 220 kV line bays at Keonjhar; Asset-III : 1 no of 400/220 kV, 315 MVA (2nd) ICT along with associated bays and 2 no 220 kV line bays at Keonjher; Asset-IV 1 no of 80 MVAR, 420 kV Bus Reactor and associated bays at Keonjhar associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO (1.12.2012) to 31.3.2014.Power Grid Corporation of India Limited.

01.10.2013

22-02-2014


25/TT/2011 & I.A. 23/2013

01.10.2013

22-02-2014


61/TT/2012

11.04.2013

22-02-2014


195/TT/2012

30.07.2013

21-02-2014


90/TT/2012

13.08.2013

21-02-2014


202/TT/2012

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 for determination of transmission tariff of Asset I: LILO of 400kV D/C Kahalgaon-Biharshariff T/L (2nd Line) and associated bays at Banka S/s (Anticipated DOCO: 1.11.2012); Asset II: 400/132kV, 200 MVA ICT-I along with associated bays at Banka S/s (Anticipated DOCO: 01.11.2012); Asset III: 400/132kV, 200 MVA ICT-II along with associated bays at Banka S/s (Anticipated DOCO: 1.12.2012): Asset IV: 400 kV, 80 MVAR, Bus Reactor with associated bays at Banka S/s (Anticipated DOCO: 1.11.2012) associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO to 31.3.2014.Power Grid Corporation of India Limited.

01.10.2013

21-02-2014


216/TT/2012

24.09.2013

18-02-2014


152/TT/2013

17.09.2014

18-02-2014


298/2010

16.07.2013

18-02-2014


46/TT/2013

21.11.2013

17-02-2014


183/TT/2011

20.06.2013

13-02-2014


136/2010

-

10-02-2014


110/TT/2012

13.08.2014

31-01-2014


104/TT/2012

04.07.2013

06-02-2014


96/TT/2012

13.08.2013

04-02-2014


186/TT/2011

13.08.2013

03-02-2014


58/TT/2012

01.10.2013

31-01-2014


79/TT/2012

30.07.2013

31-01-2014


103/TT/2012

-

31-01-2014


74/TT/2012

23.07.2013

27-01-2014


97/TT/2011

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 of tariff for Assets of (i) 400 kV Parli Switching Station (New) with Bus Reactor and Bhadrawati- Parli 400 kV D/C Line Parli (POWERGRID) - Parli (MSETCL) first circuit (Anticipated DOCO: 01.04.2011), (ii) Combined Assets of 400 kV Parli Switching Station (New) with Bus Reactor and 400 kV D/C Bhadrawati - Parli Line, 400 kV Parli (POWERGRID)- Parli (MSETCL) 1st circuit (Anticipated DOCO 01.04.2011) & 400 kV Parli (PowerGrid)- Parli (MSETCL) 2nd Circuit (Anticipated DOCO: 01.05.2011), (iii) Combined Assets of (ii) & 400 kV D/C Wardha – Parli line along with associated bays (Anticipated DOCO: 01.07.2011) under WRSS-II, Set A Scheme of Western Region for tariff block 2009-14 period.Power Grid Corporation of India Limited.

04.07.2013

27-01-2014


196/TT/2012

30.10.2013

27-01-2014


108/TT/2012

24.09.2013

27-01-2014


192/TT/2013

15.10.2013

23-01-2014


205/TT/2012

30.07.2013

23-01-2014


111/TT/2011

18.06.2013

20-01-2014


150/TT/2013

08.08.2013

20-01-2014


85/TT/2011

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 for determination of Transmission Tariff from Anticipated date of commercial operation to 31.3.2014 (I) Koteshwar - Tehri Pooling Point (Koteshwar) 400 kV D/C line (Expected date of commercial operation: 1.4.2011), (II) LILO of Tehri- Meerut 765 kV Lines (Charged at 400 kV level) at Tehri Pooling Point (Koteshwar) (Loop in with 400 kV D/C Triple Snowbird line & Loop out with 765 kV S/C lines) (Expected date of commercial operation: 1.4.2011), (III) 400 kV Tehri- Pooling Point (Koteshwar) Gas Insulated Sub-station (GIS) – New (Expected date of commercial operation: 1.4.2011) under Transmission System associated with Koteshwar HEP, for tariff block 2009-14 period in Northern Region.Power Grid Corporation of India Limited.

20.06.2013

20-01-2014


Petition No. 50/TT/2013

23.07.2013

16-01-2014


190/TT/2013

05.10.2013

09-01-2014