Pet. No. |
Petitioner. |
Subject |
Date of Hearing |
Date of Order |
87/2002
44/2003 |
Power Grid Corporation of India Limited |
Approval of incentive based on availability of transmission system of Southern Region for the year 2001-02. |
14-12-05 |
06-12-05 |
88/2002
37/2003 |
Power Grid Corporation of India Limited |
Approval of Incentive based on availability of transmission system for the year 2001-2002 for Western Region.
Approval of Incentive based on availability of transmission system for the year 2002-2003 for Western Region. |
28-12-05 |
06-12-05 |
52/2005 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for 40% Fixed Series Compensation on existing Gooty-Neelmangala 400 kV S/C transmission line and two circuits of Nagarjunasagar-Cuddaph 400 kV S/C lines under FSC project in Southern Region for the period from 1.11.2004 to 31.3.2009. |
21-12-05 |
22-09-05 |
124/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Chukha Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
21-12-05 |
28-07-05 |
138/2004 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for 400 kV D/C Ramagundam-Bhadrawati (Chandrapur) Transmission System in Southern Region and Western Region for the period from 1.4.2004 to 31.3.2009. |
20-12-05 |
21-09-05 |
135/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Central Transmission Project-I in Southern Region for the period from 1.4.2004 to 31.3.2009. |
14-12-05 |
21-09-05 |
127/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV Kahalgaon Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
14-12-05 |
04-08-05 |
117/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV Korba Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009 |
15-12-05 |
08-09-05 |
113/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV D/C Singrauli-Vindhyachal Transmission line with (2x250 MW) HVDC back to back at Vindhyachal between Northern Region and Western Region for the period from 1.4.2004 to 31.3.2009 |
15-12-05 |
07-09-05 |
111/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Transmission System associated with Vindhyachal Stage-I in Western Region for the period from 1.4.2004 to 31.3.2009 |
14-12-05 |
07-09-05 |
98/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 220 kV Anta Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009 |
15-12-05 |
17-08-05 |
134/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for NLC Stage-I Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009 |
23-11-05 |
15-09-05 |
41/2005 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for 400 kV Ramagundam-Hyderabad D/C transmission line (under Ramagundam Stage-III associated transmission system) along with associated bays and equipment in Southern Region for the period from 1.11.2004 to 31.3.2009. |
21-12-05 |
29-09-05 |
105/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for Transmission System associated with Auraiya Gas Power Project in Northern Region for the period from 1.4.2004 to 31.3.2009 |
12-12-05 |
24-08-05 |
102/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for Singrauli Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009. |
30-11-05 |
18-08-05 |
100/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for Transmission System associated with Uri Hydroelectric Project (4x120 MW) in Northern Region for the period from 1.4.2004 to 31.3.2009. |
23-11-05 |
17-08-05 |
57/2003 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for LILO of 400 kV S/C Chamera I – Kishenpur transmission line at Chamera-II under Transmission System associated with Chamera HEP Stage-II in Northern Region for the period 1.8.2003 to 31.3.2004. |
23-11-05 |
24-02-05 |
110/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Salal Stage-I Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009 |
28-11-05 |
25-08-05 |
100/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for Transmission System associated with Uri Hydroelectric Project (4x120 MW) in Northern Region for the period from 1.4.2004 to 31.3.2009. |
23-11-05 |
17-08-05 |
110/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for Salal Stage-I Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009 |
28-11-05 |
25-08-05 |
134/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for NLC Stage-I Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009 |
23-11-05 |
15-09-05 |
120/2004 |
Power Grid Corporation of India Ltd. |
Approval of transmission charges for 50 MVA Auto Transformer at Malda sub-station in Eastern Region for the period from 1.4.2004 to 31.3.2009 |
23-11-05 |
28-07-05 |
188/2004 |
Power Grid Corporation of India Ltd. |
Approval for transmission tariff for Khammam-Nagarjunasagar 400 kV S/C transmission line alongwith extension of Khammam & Nagarjunasagar 400/220 kV sub-stations under scheme for strengthening of Grid System and evacuation of power from Ramgundam Stage-III in Southern Region for the period up to 31.3.2004. |
18-08-05 |
21-06-05 |
101/2003 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004. |
09-11-05 |
06-04-04 |
132/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Special Energy Meters in Southern Region for the period from 1.4.2004 to 31.3.2009 |
31-10-05 |
15-09-05 |
114/2004 |
Power Grid Corporation of India Limited |
Approval for transmission tariff for Kawas transmission system in Western Region for the period from 1.4.2004 to 31.3.2009. |
26-10-05 |
08-09-05 |
82/2005 |
Madhya Pradesh State Electricity Board |
Miscellaneous petition under CERC (Conduct of Business Regulations) 1999 for clarification in the order dated 18.7.2003 in Petition No.49/2002 in the matter of approval of transmission tariff for Korba-Budhipadar Transmission System in Western Region for the period 1.4.2001 to 31.3.2004. |
26-09-05 |
22-09-05 |
131/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for NLC Stage-II Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009 |
07-11-05 |
15-09-05 |
115/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Kakrapar transmission system in Western Region for the period from 1.4.2004 to 31.3.2009 |
19-10-05 |
08-09-05 |
66/2005 |
Damodar Valley Corporation. |
Tariff for sale of electricity by Damodar Valley Corporation and the Inter-state Transmission of Electricity. |
08-10-05 |
18-10-05 |
70/2003 |
Power Grid Corporation of India Ltd |
Approval of tariff for 315 MVA, 400 kV, 3rd ICT at Biharshariff along with associated bays under Bihar Grid Strengthening Scheme in Eastern Region from 1.10.2003 to 31.3.2004. |
18-10-05 |
|
191/2004 |
Power Grid Corporation of India Ltd.
|
Approval of tariff for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in Northern Region for the period 1.2.2004 to 31.3.2004. |
27-07-05 |
16-06-05 |
132/2002 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.3.2003 to 31.3.2004. |
03-08-05 |
15-04-04 |
8/2003 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III at Meerut sub-station with associated bays in Northern Region for the period from the date of commercial operation to 31.3.2004. |
07-09-05 |
19-04-05 |
138/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for LILO of 400 kV D/C Bogaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.8.2003 to 31.3.2004. |
13-07-05 |
16-03-05 |
192/2004 |
Power Grid Corporation of India Ltd. |
Approval of tariff for Agra (Powergrid)-Agra (UPPCL) 400 kV inter-connection in Northern Region for the period 1.7.2003 to 31.3.2004. |
21-07-05 |
16-06-05 |
30/2004 |
Power Grid Corporation of India Ltd. |
Approval of charges for Unified Load Despatch & Communication Scheme in North Eastern Region. |
20-09-05 |
15-06-04 |
3/2005 |
Power Grid Corporation of India Limited |
Implementation of the order dated 6.9.2004 against petition No. 13/2004 and revised petition No. 40/2000 and 110/2000 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004. |
07-09-05 |
04-10-05 |
83/2002 |
Power Grid Corporation of India Ltd. |
Approval of charges for Unified Load Despatch & Communication Scheme in Southern Region |
13-09-05 |
15-06-04 |
12/2005 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period 1.11.2003 to 31.3.2004. |
07-09-05 |
19-07-05 |
83/2005 |
National Thermal Power Corporation |
Approval of tariff of Rihand Super Thermal Power Station, Stage-II, unit-I (500 MW) for the period 1.8.2005 to 31.3.2009. |
21-09-05 |
13-09-05 |
74/2004 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for Kayamkulam transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009. |
14-09-05 |
14-09-05 |
70/2004 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Guzuwaka in Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009 |
14-09-05 |
14-09-05 |
191/2004 |
Power Grid Corporation of India Limited |
Approval of tariff for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in Northern Region for the period 1.2.2004 to 31.3.2004. |
27-07-05 |
16-06-05 |
96/2004 |
Power Grid Corporation of India Limited |
Approval for transmission tariff for Rihand Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009. |
14-09-05 |
07-09-05 |
69/2004 |
Power Grid Corporation of India Limited |
Approval for transmission tariff for Korba-Budhipadar Transmission System for the period 1.4.2004 to 31.3.2009 |
22-09-05 |
21-07-05 |
32/2005 |
Power Grid Corporation of India Limited |
Approval for provisional transmission tariff for 400/220 kV Khandwa sub-station and LILO of 400 kV D/C Itarsi-Dhule transmission line at Khandwa in Western Region for the period from 1.2.2005 to 31.3.2009. |
14-09-05 |
08-09-05 |
192/2004 |
Power Grid Corporation of India Limited |
Approval of tariff for Agra (Powergrid)-Agra (UPPCL) 400 kV inter-connection in Northern Region for the period 1.7.2003 to 31.3.2004. |
21-07-05 |
16-06-05 |
122/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Jeypore –Talcher Transmission system in Eastern Region for the period from 1.4.2004 to 31.3.2009 |
14-09-05 |
28-07-05 |
132/2002 |
Power Grid Corporation of India Ltd |
Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.3.2003 to 31.3.2004. |
03-08-05 |
15-04-04 |
IA No. 19/2005
in
Pet No. 56/2005 |
National Thermal Power Corporation Limited |
Petition to claim abnormal O & M Expenses not included in the normalised O&M Expenses for Korba STPS for the period 1.4.2001 to 31.3.2004. |
26-07-05 |
26-07-05 |
8/2003 |
Power Grid Corporation of India Ltd |
Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III at Meerut sub-station with associated bays in Northern Region for the period from the date of commercial operation to 31.3.2004. |
07-09-05 |
19-04-05 |
138/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for LILO of 400 kV D/C Bogaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.8.2003 to 31.3.2004. |
13-07-05 |
16-03-04 |
IA No. 31/2005
in
Pet No. 131/2002 |
Power Grid Corporation of India Ltd. |
Approval of tariff for Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004 |
22-09-05 |
22-09-05 |
103/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Salal Stage II Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009 |
09-09-05 |
18-08-05 |
27/2005 |
PGCIL |
Prayer for issue of direction regarding refund/adjustment of development surcharge collected by Powergrid during 2003-04 from the state utilities and deployed alongwith its interest thereon. |
07-04-05 |
|
38/2005 |
Power Grid Corporation of India Ltd. |
Miscellaneous petition under Regulations 24 and 111 of the CERC (Conduct of Business) Regulations, 1999 for approval of CERC for procurement of 2 Nos. Converter Transformer for Rihand-Dadri HVDC link in Northern Region |
21-06-05 |
9-06-05 |
80/2004 |
Power Grid Corporation of India Ltd |
Approval of abnormal operation and maintenance expenses on account of additional security for the year 2003-2004 in Northern Region. |
22-02-05 |
21.9.2004 |
54/2005 |
(Suo motu) |
Engagement in the business of telecommunication by the Central Transmission Utility. |
27-05-05 |
|
22/2005 |
Power Grid Corporation of India Ltd, Gurgaon |
Approval of abnormal Operation and Maintenance expenses on account of additional security for the year 2003-04 in North-Eastern Region. |
26-05-05 |
17-05-05 |
99/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV S/C Chamera I – Kishenpur Transmission line in Northern Region for the period from 1.4.2004 to 31.3.2009 |
06-09-05 |
17-08-05 |
107/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for additional converter transformer (spare) for Rihand-Dadri Bi-pole in Northern Region for the period from 1.4.2004 to 31.3.2009 |
07-09-05 |
24-08-05 |
119/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 63 MVAR line reactor on 400 kV Kolaghat – Rengali transmission line at Rengali sub-station in Eastern Region for the period from 1.4.2004 to 31.3.2009 |
02-09-05 |
21-07-05 |
104/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for ICTs at Kishenpur in Northern Region for the period from 1.4.2004 to 31.3.2009 |
09-09-05 |
18-08-05 |
140/2004 |
Power Grid Corporation of India Ltd. |
Approval for determination of provisional transmission tariff for 220 kV Allahabad-Phulpur S/C Transmission Line under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.6.2004 to 31.3.2009. |
30-05-05 |
26-04-05 |
83/2004 |
Power Grid Corporation of India Ltd. |
Approval of abnormal operation and maintenance expenses on account of additional security for the year 2003-2004 in Eastern Region. |
22-02-05 |
21.9.2004 |
28/2003 |
Power Grid Corporation of India Limited |
Approval under Regulation-86 for transmission tariff for (i) 400 kV D/C Nathpa Jhakri-Nalagarh line with associated bays & 2 Nos.400 kV bays at Nalagarh for Kunihar and (ii) 400 kV D/C Nathpa Jhakri-Abdullapur line, ICT-I, Bus Reactor & 2 Nos.220 kV bays for Tepla (HVPNL) at Abdullapur and other associated bays under Nathpa-Jhakri Transmission System in Northern Region, for the period from 01.04.2003 to 31.03.2004. |
16-08-05 |
03-02-04 |
134/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 400/220 kV Bhiwadi sub-station along with LILO of Ballabhgarh-Bassi 400 kV S/C line and ICT-I & II at Bhiwadi in Northern Region for the period from 1.3.2003 to 31.03.2004. |
10-03-05 |
6.4.2004 |
102/2004 |
Grid Corporation of India Limited |
Approval for transmission tariff for Singrauli Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009. |
29-08-05/
01-09-05 |
18-08-05 |
IA No. 22/2005
in Pet No. 140/2004 |
Power Grid Corporation of India Ltd. |
Approval for determination of provisional transmission tariff for 220 kV Allahabad-Phulpur S/C Transmission Line under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.6.2004 to 31.3.2009. |
30-08-05 |
25-08-05 |
139/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 400/220 kV 315 MVA Transformer at Jeypore in Eastern Region for the period 1.10.2002 to 31.3.2004. |
09-03-05 |
16-03-04 |
122/2002 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for (A) Talcher-Kolar HVDC line (Pole-I), (B) LILO of 400 kV S/C Cuddapah-Banglore S/C line and common facilities at Kolar, (C) 400 kV S/C Kolar-Madras line, (D) 400 kV S/C Hossur-Salem line, 315 MVA Auto Transformer-I at Hossur, alongwith 220 kV switchyard (E) 315 MVA Auto Transformer-2 at Hossur, (F) 500 MVA Auto-transformer (comprising of 4x167 MVA single phase units) at Kolar alongwith 220 kV switchyard, and (G) 400 kV D/C Kolar-Hoody line, under Transmission System associated with Talcher-II Project for the period 1.12.2002 to 31.3.2004. |
10-05-05 |
15-04-04 |
IA No. 11/2005
In
Petition No. 101/2003 |
Power Grid Corporation of India Ltd. |
Approval of Transmission tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004. |
27-05-05 |
|
101/2003 |
Power Grid Corporation of India Ltd. |
Approval of Transmission tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004. |
26-04-05 |
6-04-04 |
58/2002 |
Power Grid Corporation of India Ltd |
Petition for approval of tariff for LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-I at Allahabad, LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-II at Allahabad, ICT-I and ICT-II at Allahabad along with associated bay in Northern Region from the date of commercial operation of the respective asset to 31.3.2004. |
13-04-05 |
13.4.2005 |
110/2002 |
Power Grid Corporation of India Ltd . |
Petition for approval of tariff for 315 MVA, 400/220 kV ICT-IV at Ballabhgarh in Northern Region for the period from 1.7.2002 to 31.03.2004. |
13-04-05 |
1.4.2004 |
121/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 400 kV Raipur-Rourkela D/C transmission line along with extension of Raipur and Rourkela sub-stations under Eastern-Western inter-regional link for the period 1.4.2003 to 31.3.2004. |
04-04-05 |
|
113/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 400 kV Jamshedpur-Rourkela S/C transmission line in Eastern Region for the period 1.1.2003 to 31.3.2004. |
04-04-05 |
4.3.2004 |
111/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 1x 500 MW HVDC back-to-back station at Sasaram with associated AC switchyard at Sasaram and Allahabad and AuxiliarySystem including 400 kV Sarnath Allahabad D/C line with associated bays etc. under Eastern-Northern inter-regional HVDC transmission system for the period from 1.12.2002 to 31.3.2004. |
24-04-05 |
23.3.2004 |
116/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for Stage I of 400 kV Thysistor controlled series compensation project (FACTS Device) on Kanpur-Ballabhgarh 400 kV S/C line at Ballabhgarh in Northern Region for the period from 1.7.2002 to 31.03.2004. |
23-03-05 |
1.4.2004 |
123/2002 |
Power Grid Corporation of India Ltd |
Approval of transmission tariff for 400 kV D/C Vijayavada – Nellore line, 400 kV D/C Nellore-Sriperumbudur line, New 400 kV switching station at Nellore, and extension of Vijaywada and Sriperumbudur sub-station with associated bays under the system strengthening scheme in Southern Region for the period 1.3.2003 to 31.3.2004. |
16-03-05 |
15.4.04 |
55/2002 |
Power Grid Corporation of India Ltd |
Petition for approval of tariff for 400 kV Biharsharif – Sasaram -Sarnath D/C transmission line under Eastern–Northern inter-regional HVDC Transmission System, for the period 1.7.2001 to 31.3.2004. |
03-03-05 |
23.3.2004 |
57/2003 |
Power Grid Corporation of India Ltd. |
Approval of tariff for LILO of 400 kV S/C Chamera-I-Kishenpur line at Chamera-II under the transmission system associated with Chamera HEP Stage-II in Northern Region from 1.8.2003 to 31.3.2004 |
24-02-05 |
24.2.2005 |
10/2002 |
Power Grid Corporation of India Ltd |
Petition for approval of tariff for 220 kV Jallandhar-Hamirpur D/C Transmission Line along with associated bay in Northern Region for the period from 1.9.2001 to 31.03.2004. |
21-02-05 |
1.4.2004 |
57/2002 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for LILO of one circuit of existing Neyveli-Trichy 400 kV D/C line at Neyveli TPS-I (Expansion) in Southern Region for the period 1.2.2002 to 31.3.2004. |
21-02-05 |
15.4.2004 |