170/2004

National Thermal Power Corporation Ltd

Approval of revised fixed charges due to additional capitalisation for the period 1.4.2001 to 31.3.2004 in respect of Farakka Super Thermal Power Station (1600 MW).

-

18-01-05

95/2005

Gujarat Urja Vikas Nigam Ltd., Vadodara

Direction to NTPC to tie up and procure adequate quantum of Gas at economical rates for Kawas and Gandhar Power Stations and give consent to Gujarat State Petronet Ltd. for laying pipeline in the premises of Kawas and Gandhar Power Stations for supply of gas from Gujarat State Petroleum Corporation Ltd.

17-11-05

17-11-05

18/2005

Power Grid Corporation of India Ltd.

Implementation of 400 kV D/C Bina-Nagda-Dehgam transmission lines by Powergrid on the basis of process of approved cost estimate in vogue.

02-08-05

14-06-05

40/2005

Nagarjuna Power Corporation Ltd

Approval of tariff of Nagarjuna Power Project (1015 MW) for the period 1.9.2008 onwards.

25-10-05

25-08-05

-

-

Generic Procedure on regulation of power supply to beneficiaries in case of non-payment of dues of Central Power Utilities.

26-12-05

-

116/2005

Northern Regional Load Despatch Centre, New Delhi

Bringing Bhakra Beas Management Board (BBMB) power stations under the purview of Unscheduled Interchange (UI) mechanism at the regional level

15-12-05

15-12-05

59/2005

Bihar State Electricity Board, Patna

Sharing of the transmission charges of the 220 kV D/C Birpara-Salakati transmission line and associated sub-station at Birpara (ER) & Salakati (NER) as inter-regional assets between ER and NER.

14-12-05

8-12-05

89/2002

Power Grid Corporation of India Ltd.

Approval of incentive for Transmission System of Eastern Region for the year 2001-02.

16-12-05

6-12-05

129/2005

(Suo Motu)

Reimbursement of application fee and publication charges to Central Power Sector Utilities.

22-11-05

 

10/2003

GRID Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996

25-11-05

22-11-05

Pet in 9/2003 &
11/2003
& 12/2003

GRID Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from January 2001 to July 2001. & Payment of outstanding dues by APTRANSCO to GRIDCO for the period from October to December 2000 and March-April 2002 & Payment of outstanding dues by APTRANSCO to GRIDCO for the period from September to December 2001

25-11-05

22-11-05

66/2005

Damodar Valley Corporation.

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-state Transmission of Electricity.  

18-10-05

18-10-05

66/2005

Damodar Valley Corporation

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity

03-11-05

28-10-05

95/2004

PGCIL

Prayer for issue of direction to Bihar State Electricity Board for sharing the transmission charges of inter-regional assets.

19-01-05

28-12-04

89/2004

Neyveli Lignite Corporation Limited

Levy of transmission charges and applying Regional transmission losses to NLC
Mines.

24-02-05

10-02-05

198/2004

Global Energy Limited

Grant of open access for inter-state transmission of electricity.

06-01-05 

30.12.2004

18/2005

PGCIL

Implementation of 400 kV D/C Bina-Nagda-Dehgam transmission lines by Powergrid on the basis of process of approved cost estimate in vogue.

02-08-05

14-06-05

21/2005

(Suo motu)

Development of market in electricity sector.

04-03-05

 

6/2004

Madhya Pradesh State Electricity Board

Fixation of Wheeling Charges in respect of Transmission System of Grid Corporation of Orissa Ltd. for wheeling of power from NTPC power stations in Eastern Region (ER) through their system to Madhya Pradesh State Electricity Board (MPSEB), Jabalpur with effect from 1.4.2001.

28-07-05

19-07-05

5/2005

Tripura State Electricity Corporation Limited

Relief from excessive per unit charge from the hydro electric projects under NEEPCO mainly Ranganadi and Doyang in the post-ABT period, regulation over transmission constraints/contingency/natural calamities causing adverse effect on drawal/trading of power and surrendering of share of Doyang Hydro Electric Project

30-09-05

12-07-05

43/2005

Maharashtra State Electricity Board, Mumbai

Petition seeking directions to the Madhya Pradesh State Electricity Board to pay the amounts due to Maharashtra State Electricity Board.

20-09-05

 

66/2005

Damodar Valley Corporation

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity

21-06-05

14-06-05

43/2005

Maharashtra State Electricity Board, Mumbai

Seeking direction by CERC to the Madhya Pradesh State Electricity Board to pay the amount due to Maharashtra State Electricity Board.

02-08-05

26-07-05

66/2005

Damodar Valley Corporation

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity

29-07-05

26-07-05

Petition No. 9/2003

10/2003

11/2003

12/2003

Grid Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from January 2001 to July 2001.
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from October to December 2000 and March-April 2002
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from September to December 2001

12-07-05

12-07-05

4/2005

National Thermal Power Corporation Limited

Renovation and Modernisation of Auraiya Gas Power Station (663.36 MW)

07-07-05

23-06-05

43/2005

Maharashtra State Electricity Board, Mumbai

Seeking direction by CERC to the Madhya Pradesh State Electricity Board to pay the amount due to Maharashtra State Electricity Board.

14-06-05

9-06-05

Review 55/2005
In
196/2004
(Suo motu)

National Hydro Power Corporation Ltd.

Review of order dated 28.2.2005 in Petition No.196/2004 (suo motu) - Revision of O&M expenses for the years 2001-02 to 2003-04

09-06-05

07-06-05

-

-

Amendment to the Central Electricity Regulatory Commission (Open Access in inter state transmission) Regulations, 2004.

10-02-05

-

-

-

Generic procedure on regulation of power supply to beneficiaries in case of non-payment of dues of Central Power Utilities  

12-04-05

-

9/2003

GRID CORPORATION OF ORISSA LTD.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from January 2001 to July 2001.

21-04-05

21-04-05

6/2004

Madhya Pradesh State Electricity Board 

Fixation of Wheeling Charges in respect of Transmission System of Grid Corporation of Orissa Ltd. for wheeling of power from NTPC power stations in Eastern Region (ER) through their system to Madhya Pradesh State Electricity Board (MPSEB), Jabalpur with effect from 1.4.2001.

03-03-05

24.2.2005

9/2003

11/2003

12/2003

10/2003

GRID Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from January 2001 to July 2001.
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from October to December 2000 and March-April 2002
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from September to December 2001
Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996

08-02-05 


Thermal(Coal)
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

IA No. 41/2005 in
Petition No. 142/2004
IA No. 51/2005 in
Petition No. 150/2004
IA No. 52/2005 in
Petition No. 151/2004
IA No. 56/2005 in
Petition No. 157/2004

National Thermal Power Corporation Ltd.

Approval of tariff for Feroz Gandhi Unchahar Thermal Power Station Stage-I (420MW) for the period from 1.4.2004 to 31.3.2009.
Approval of tariff for Feroze Gandhi Unchahar Thermal Power Station Stage-II (420 MW) for the period from 1.4.2004 to 31.3.2009
Approval of tariff of Rihand Super Thermal Power Station (1000 MW) for the period from 1.4.2004 to 31.3.2009.

07-11-05

29-09-05

IA No. 40/2005
In Petition No. 149/2004

National Thermal Power Corporation Ltd.

Approval of tariff of Simhadri Thermal Power Station (1000 MW) for the period from 1.4.2004 to 31.3.2009.

22-12-05

15-12-05

IA No. 45/2005
In Petition No. 128/2004
IA No. 43/2005 In Petition No. 146/2004
IA No. 50/2005
In Petition No. 159/2004

National Thermal Power Corporation Ltd.

Approval of tariff of Vindhyachal Super Thermal Power Station Stage-I for the period from 1.4.2004 to 31.3.2009.
Approval of tariff of Vindhyachal Super Thermal Power Station Stage-II for the period from 1.4.2004 to 31.3.2009.
Approval of tariff of Korba Super Thermal Power Station (2100 MW) for the period from 1.4.2004 to 31.3.2009.

22-12-05

22-12-05

122/2005

National Thermal Power Corporation Ltd.

Claiming abnormal O&M expenses for Feroze Gandhi Unchahar Thermal Power Station Stage-II for the period 1.4.2001 to 31.3.2004.

08-12-05

08-12-05

IA No. 45/2005
In
PetNo. 128/2004

National Thermal Power Corporation Ltd.

Approval of tariff of Vindhyachal Super Thermal Power Station Stage-I for the period from 1.4.2004 to 31.3.2009.

22-12-05

22-12-05

IA No. 40/2005
In Pet No. 149/2004

National Thermal Power Corporation Ltd.

Approval of tariff of Simhadri Thermal Power Station (1000 MW) for the period from 1.4.2004 to 31.3.2009.

22-12-05

15-12-05

IA No. 41/2005 in Pet No. 142/2004

National Thermal Power Corporation Ltd.

Approval of tariff for Feroz Gandhi Unchahar Thermal Power Station Stage-I (420MW) for the period from 1.4.2004 to 31.3.2009.

07-11-05

29-09-05

IA Petition No. 39/2005
In Pet No. 148/2004


National Thermal Power Corporation Ltd.

Approval of tariff of Ramagundam Super Thermal Power Station (2100 MW) Stage I & II for the period from 1.4.2004 to 31.3.2009.

15-12-05

15-12-05

IA No. 44/2005 in
Pet No. 162/2004


National Thermal Power Corporation Ltd.

Petition under Section 62 and 79(1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for approval of tariff of National Capital Thermal Station, Dadri (840 MW) for the period 1.4.2004 to 31.3.2009.

15-12-05

15-12-05

163/2004

National Thermal Power Corporation Ltd., New Delhi

Approval of tariff of Tanda Thermal Power Station (440 MW) for the period 1.4.2004 to 31.3.2009.

13-12-05

13-12-05

139/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-I

31-03-05

30.11.04

186/2004

Neyveli Lignite Corporation Limited, Neyveli

Fixation of tariff for NLC TPS-I (600 MW) for the period 1.4.2004 to 31.3.2009.

20-10-05

20-10-05

IA No. 45/2005 in
Pet No. 128/2004

National Thermal Power Corporation Ltd

Approval of tariff for Vindhyachal Super Thermal Power Station Stage-I (1260 MW) for the period from 1.4.2004 to 31.3.2009.

02-11-05

27-09-05

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period for 2001-02 to 2003-04.

02-11-05

15-09-05

91/2005

National Thermal Power Corporation Ltd.

Revision of norms of Target Availability in respect of Farakka Super Thermal Power Station on account of acute shortage and poor quality of coal during the year 2004-05.

24-10-05

20-09-05

8/2005

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure incurred during 14.1.2000 to 31.3.2004 in respect of Tanda Thermal Power Station (440 MW).

24-10-05

03-03-05

186-04

Neyveli Lignite Corporation Limited, Neyveli

Fixation of tariff for NLC TPS-I (600 MW) for the period 1.4.2004 to 31.3.2009.

20-10-05

20-10-05

IA No. 19/2005
in Pet No. 56/2005

National Thermal Power Corporation Limited

Petition to claim abnormal O & M Expenses not included in the normalised O&M Expenses for Korba STPS for the period 1.4.2001 to 31.3.2004.

26-07-05

26-07-05

83/2005

National Thermal Power Corporation

Approval of tariff of Rihand Super Thermal Power Station, Stage-II, unit-I (500 MW) for the period 1.8.2005 to 31.3.2009.

21-09-05

13-09-05

IA No. 38/2005 in
Pet No. 147/2004

National Thermal Power Corporation Ltd

Approval under regulation-86 for transmission tariff for Kayamkulam Combined Cycle Power Project (359.58 MW) for the period from 1.4.2004 to 31.3.2009.

17-10-05

06-10-05

144/2004

National Thermal Power Corporation Ltd

Approval of tariff of Talcher Super Thermal Power Station Stage-I (1000 MW) for the period from 1.4.2004 to 31.3.2009.

17-10-05

06-10-05

I.A. 24/2003
in
Petition No. 38/2001

National Thermal Power Corporation Ltd.

Generation Tariff for Rihand STPS in Northern Region for the period from 1.4.2001 to 31.3.2004.

06-10-05

29-09-05

74/2005

National Thermal Power Corporation Ltd

Petition under Section 62 and 79(1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for approval to allocate capital expenditure on assets of Corporate, Regional and other offices to the capital cost of different stations for the purpose of recovery through tariff.

28-07-05

28-07-05

IA No. 20/2005
in Petition No. 57/2005

National Thermal Power Corporation Ltd.

Extension of time for compliance with the CERC order dated 23.6.2005 to file additional data on employee cost element of O&M expenses in respect of Ramagundam STPS Stage I & II.

21-07-05

-

8/2005

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure incurred during 14.1.2000 to 31.3.2004 in respect of Tanda Thermal Power Station 440 MW.

03-03-05

03-03-05

195/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges due to additional capitalisation for the period 1.4.2001 to 31.3.2004 in respect of Korba Super Thermal Power Station (2100 MW)

14-07-05

18-01-05

4/2005

National Thermal Power Corporation Limited

Renovation and Modernisation of Auraiya Gas Power Station (663.36 MW)

07-07-05

23-06-05

4/2005

National Thermal Power Corporation Limited

Renovation and Modernisation of Auraiya Gas Power Station (663.36 MW)

02-02-05 

25.1.2005

10/2005

National Thermal Power Corporation Ltd, New Delhi

Tariff for Unit-I of Riihand Super Thermal Power Station Stage-II.
Tariff for infirm power supply prior to the date of commercial operation.
National Thermal Power Corporation Ltd, New Delhi

10-03-05

10.3.2005

40/2005

Nagarjuna Power Corporation Limited

Approval of tariff of Nagarjuna Power Corporation Limited (1015 MW) for the period 1.9.2008 onwards.

14-07-05

14-07-05

190/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges due to additional capitalisation for the period 1.4.2001 to 31.3.2004 in respect of Singrauli Super Thermal Power Station (2000 MW)

07-07-05

27-07-05

19/2005

National Thermal Power Corporation Ltd.

Revision of rate of infirm power supplied from Ramagundam Super Thermal Power Stations Stage-III approved vide order dated 31.8.2004 in Petition No. 63/2004.

10-05-05

26-04-04

173/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges due to additional capitalisation for the period 1.4.2001 to 31.3.2004 in respect of Ramagundam STPS ( 2100MW)

03-05-05

13-01-05

174/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Anta Gas Power Station

13-4-05

13-1-05

169/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Vindhyachal Super Thermal Power Station Stage – I.

13-04-05

13-1-05

167/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Dadri Gas Power Station

13-04-05

13-1-05

161/2004

NTPC

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Faridabad Gas Power Station.

07-04-05

23-12-04

154/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Vindhyachal Super Thermal Power Station Stage – II.

04-04-05

23-12-04

143/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-II

04-04-05

30.11.2004

165/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.3.2003 to 31.3.2004 in respect of Simhadri Thermal Power Station.

04-04-05

23.12.2004

141/2004

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kayamkulam Gas Power Station

04-04-05

30.11.2004

40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

26-07-05

-

40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

07-07-05

15-06-05

40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

01-04-05

-

40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

25-05-05

16-05-05

98/2002

National Thermal Power Corporation Ltd.

Approval of revised fixed charges from 1.4.1997 to 31.3.2000 based on additional capitalisation and effect of Foreign Exchange Rate Variation and revised tariff from 1.4.2000 to 31.3.2001 for Kahalgaon Super Thermal Power Station

09-05-05

-

1/2003

National Thermal Power Corporation Ltd.

Petition for approval of tariff of Unit 1& II of Talcher STPS Stage-II (4x500MW)

13-06-05

07-10-04

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2003-2004.

03-05-05

21-04-05

40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

29-04-05

21-04-05

Review Pet No. 28/2005 in Pet No. 194/2004

TAMIL NADU ELECTRICITY BOARD

Fixation of tariff for Neyveli Thermal Power Station-I (600 MW) for the period 1.4.2002 to 31.3.2004

21-04-05

21-04-05

IA no. 48/2004
and no. 50/2004
in Pet No.
40/2004

Badarpur Thermal Power Station, New Delhi

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period from 1.4.2004 to 31.3.2009.

10-03-05

10-03-05

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2005-2006.

03-03-05

3.3.2005

194/2004

Neyveli Lignite Corporation Ltd

Non-compliance of the Commission's order dated 31.8.2004 by TNEB in respect of fixation of tariff for Thermal Power Station-I (600 MW) for the period from 1.4.2002 to 31.3.2004.

01-02-05

27.1.2005

91/2004

National Thermal Power Corporation Ltd

Approval of tariff of Talcher Thermal Power Station (460 MW) for the period from 1.4.2004 to 31.3.2009.

27-01-05

27.1.2005

179/2004

National Thermal Power Corporation Ltd.

Petition for approval of tariff for power supplied from Talcher STPS Stage-II (4x500 MW) for the period 1.4.2004 to 31.3.2009.

14-01-05

28.12.2004


Thermal(Gas Based)
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
114/2005 National Thermal Power Corporation Ltd. Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Gandhar Gas Thermal Power Station (657.39 MW). 02-11-05 28-10-05
IA No. 42/2005 in Pet No. 155/2004 National Thermal Power Corporation Ltd. Petition under Section 62 and 79(1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for approval of tariff of Dadri Gas Power Station (829.78 MW) for the period 1.4.2004 to 31.3.2009.. 04-10-05 24-10-05
IA No. 47/2005 in Pet No. 160/2004 National Thermal Power Corporation Ltd. Interlocutory application for amendment of tariff calculations enclosed to the Petition No.160/2004 for approval of tariff of Anta Gas Power Station (419.33 MW) for the period 1.4.2004 to 31.3.2009. 04-10-05 24-10-05
32/2003 North Eastern Electric Power Corporation Ltd. Approval of tariff in respect of Agartala Gas Turbine Power Project for the period from 1.4.2001 to 31.3.2004. 09-09-05 07-06-05
33/2003 North Eastern Electric Power Corporation Ltd. Approval of tariff in respect of Assam Gas Based Power Station for the period from 1.4.2001 to 31.3.2004. 22-08-05 07-06-05
33/2003 NEEPC Fixation of two part tariff of electricity from Assam Gas Based Power Project (291 MW) of NEEPCO for the year 2003-2004. 07-04-05 29-03-05
32/2003 NEEPC Fixation of two-part tariff of electricity from Agartala Gas Turbine Power Project (84 MW) of NEEPCO for the year 2003-2004 07-04-05 29-03-05
31/2001 NTPC Approval of tariff in respect of Kawas Gas Power Station for the period from 1.4.2001 to 31.3.2004 07-04-05 09-12-04
33/2001 National Thermal Power Corporation Ltd. Approval of tariff in respect of Gandhar Gas Power Station for the period from 1.4.2001 to 31.3.2004. 01-04-04 2.11.2004

Hydro
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
Review Pet No. 132/2005
in Pet No.32/2003
North Eastern Electric Power Corporation Ltd. Review of order dated 9.9.2005 in Petition No.32/2003 for approval of generation tariff of Agartala Gas Turbine Power Project for the tariff period 1.4.2003 to 31.3.2004. 09-12-05 24-11-05
20/2005 National Hydroelectric Power Corporation Ltd. Provisional Approval of Generation Tariff of Dhauliganga HE Project Stage – I for the period 1.4.2005 to 31.3.2006. 25-10-05 18-10-05
103/2005 Uttaranchal Jal Vidyut Nigam Limited Petition under Section 62 and 79 of the Electricity Act, 2003 seeking permission for filing the proposed tariffs for financial years 2005-06 to 2008-09 of Uttaranchal Jal Vidyut Nigam Limited and for determination of hydro generation tariff for its inter-state electricity generation stations. 10-11-05 10-11-05
36/2003 North Eastern Electric Power Corporation Ltd. Approval of Generation Tariff of Kopili Hydroelectric Project (250 MW) 16-08-05 05-02-04
79/2004 North Eastern Electric Power Corporation Ltd., Shillong Fixation of tariff in respect of sale of power from Kopili Hydro Electric Project Stage-II (1x25 MW) of North-Eastern Electric Power Corporation Limited for the period from 26.7.2004 to 31.3.2009 09-11-05 25-10-05
62/2005 North Eastern Electric Power Corporation Ltd., Shillong Fixation of two-part tariff of Doyang Hydro Electric Project (3x25 MW) for the period from 1.4.2004 to 31.3.2009 31-10-05 25-10-05
185/2004 National Hydroelectric Power Corporation Ltd Approval of tariff in respect of Chamera Hydroelectric Project Stage II for the period from 2.11.2003 to 31.3.2004. 15-09-05 05-04-05
64/2004 Narmada Hydroelectric Development Corporation Ltd Provisional approval of generation tariff of Indira Sagar Hydroelectric Project (8x125 MW) under Clause 79 (1) of the CERC (Conduct of Business), Regulations 1999 and Section 79(1) (a) of the Electricity Act, 2003 12-05-05 20-01-05
91/2002 North Eastern Electric Power Corporation Ltd. Fixation of tariff for sale of power from Doyang Hydro Electric Project (3x25 MW) for the period from 10.7.2000 to 31.3.2004 04-04-05 29.3.2005
62/2001 Approval of Generation Tariff of Tanakpur HE Project Approval of Generation Tariff of Tanakpur HE Project 07-02-05 12.8

Transmission PGCIL
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

87/2002
44/2003

Power Grid Corporation of India Limited

Approval of incentive based on availability of transmission system of Southern Region for the year 2001-02.

14-12-05

06-12-05

88/2002
37/2003

Power Grid Corporation of India Limited

Approval of Incentive based on availability of transmission system for the year 2001-2002 for Western Region.
Approval of Incentive based on availability of transmission system for the year 2002-2003 for Western Region.

28-12-05

06-12-05

52/2005

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for 40% Fixed Series Compensation on existing Gooty-Neelmangala 400 kV S/C transmission line and two circuits of Nagarjunasagar-Cuddaph 400 kV S/C lines under FSC project in Southern Region for the period from 1.11.2004 to 31.3.2009.

21-12-05

22-09-05

124/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Chukha Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009.

21-12-05

28-07-05

138/2004

Power Grid Corporation of India Limited

Approval of transmission tariff for 400 kV D/C Ramagundam-Bhadrawati (Chandrapur) Transmission System in Southern Region and Western Region for the period from 1.4.2004 to 31.3.2009.

20-12-05

21-09-05

135/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Central Transmission Project-I in Southern Region for the period from 1.4.2004 to 31.3.2009.

14-12-05

21-09-05

127/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV Kahalgaon Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009.

14-12-05

04-08-05

117/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV Korba Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009

15-12-05

08-09-05

113/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV D/C Singrauli-Vindhyachal Transmission line with (2x250 MW) HVDC back to back at Vindhyachal between Northern Region and Western Region for the period from 1.4.2004 to 31.3.2009

15-12-05

07-09-05

111/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Transmission System associated with Vindhyachal Stage-I in Western Region for the period from 1.4.2004 to 31.3.2009

14-12-05

07-09-05

98/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 220 kV Anta Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009

15-12-05

17-08-05

134/2004

Power Grid Corporation of India Limited

Approval of transmission charges for NLC Stage-I Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009

23-11-05

15-09-05

41/2005

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for 400 kV Ramagundam-Hyderabad D/C transmission line (under Ramagundam Stage-III associated transmission system) along with associated bays and equipment in Southern Region for the period from 1.11.2004 to 31.3.2009.

21-12-05

29-09-05

105/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for Transmission System associated with Auraiya Gas Power Project in Northern Region for the period from 1.4.2004 to 31.3.2009

12-12-05

24-08-05

102/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for Singrauli Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009.

30-11-05

18-08-05

100/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for Transmission System associated with Uri Hydroelectric Project (4x120 MW) in Northern Region for the period from 1.4.2004 to 31.3.2009.

23-11-05

17-08-05

57/2003

Power Grid Corporation of India Ltd.

Petition for approval of tariff for LILO of 400 kV S/C Chamera I – Kishenpur transmission line at Chamera-II under Transmission System associated with Chamera HEP Stage-II in Northern Region for the period 1.8.2003 to 31.3.2004.

23-11-05

24-02-05

110/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Salal Stage-I Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009

28-11-05

25-08-05

100/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for Transmission System associated with Uri Hydroelectric Project (4x120 MW) in Northern Region for the period from 1.4.2004 to 31.3.2009.

23-11-05

17-08-05

110/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for Salal Stage-I Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009

28-11-05

25-08-05

134/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for NLC Stage-I Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009

23-11-05

15-09-05

120/2004

Power Grid Corporation of India Ltd.

Approval of transmission charges for 50 MVA Auto Transformer at Malda sub-station in Eastern Region for the period from 1.4.2004 to 31.3.2009

23-11-05

28-07-05

188/2004

Power Grid Corporation of India Ltd.

Approval for transmission tariff for Khammam-Nagarjunasagar 400 kV S/C transmission line alongwith extension of Khammam & Nagarjunasagar 400/220 kV sub-stations under scheme for strengthening of Grid System and evacuation of power from Ramgundam Stage-III in Southern Region for the period up to 31.3.2004.

18-08-05

21-06-05

101/2003

Power Grid Corporation of India Ltd.

Petition for approval of tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004.

09-11-05

06-04-04

132/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Special Energy Meters in Southern Region for the period from 1.4.2004 to 31.3.2009  

31-10-05

15-09-05

114/2004

Power Grid Corporation of India Limited

Approval for transmission tariff for Kawas transmission system in Western Region for the period from 1.4.2004 to 31.3.2009.  

26-10-05

08-09-05

82/2005

Madhya Pradesh State Electricity Board

Miscellaneous petition under CERC (Conduct of Business Regulations) 1999 for clarification in the order dated 18.7.2003 in Petition No.49/2002 in the matter of approval of transmission tariff for Korba-Budhipadar Transmission System in Western Region for the period 1.4.2001 to 31.3.2004.  

26-09-05

22-09-05

131/2004

Power Grid Corporation of India Limited

Approval of transmission charges for NLC Stage-II Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009

07-11-05

15-09-05

115/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Kakrapar transmission system in Western Region for the period from 1.4.2004 to 31.3.2009  

19-10-05

08-09-05

66/2005

Damodar Valley Corporation.

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-state Transmission of Electricity.

08-10-05

18-10-05

70/2003

Power Grid Corporation of India Ltd

Approval of tariff for 315 MVA, 400 kV, 3rd ICT at Biharshariff along with associated bays under Bihar Grid Strengthening Scheme in Eastern Region from 1.10.2003 to 31.3.2004.

18-10-05

 

191/2004


Power Grid Corporation of India Ltd.

Approval of tariff for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in Northern Region for the period 1.2.2004 to 31.3.2004.

27-07-05

16-06-05

132/2002

Power Grid Corporation of India Ltd.

Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.3.2003 to 31.3.2004.

03-08-05

15-04-04

8/2003

Power Grid Corporation of India Ltd.

Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III at Meerut sub-station with associated bays in Northern Region for the period from the date of commercial operation to 31.3.2004.

07-09-05

19-04-05

138/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for LILO of 400 kV D/C Bogaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.8.2003 to 31.3.2004.

13-07-05

16-03-05

192/2004

Power Grid Corporation of India Ltd.

Approval of tariff for Agra (Powergrid)-Agra (UPPCL) 400 kV inter-connection in Northern Region for the period 1.7.2003 to 31.3.2004.

21-07-05

16-06-05

30/2004

Power Grid Corporation of India Ltd.

Approval of charges for Unified Load Despatch & Communication Scheme in North Eastern Region.

20-09-05

15-06-04

3/2005

Power Grid Corporation of India Limited

Implementation of the order dated 6.9.2004 against petition No. 13/2004 and revised petition No. 40/2000 and 110/2000 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004.

07-09-05

04-10-05

83/2002

Power Grid Corporation of India Ltd.

Approval of charges for Unified Load Despatch & Communication Scheme in Southern Region

13-09-05

15-06-04

12/2005

Power Grid Corporation of India Ltd.

Petition for approval of tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period 1.11.2003 to 31.3.2004.

07-09-05

19-07-05

83/2005

National Thermal Power Corporation

Approval of tariff of Rihand Super Thermal Power Station, Stage-II, unit-I (500 MW) for the period 1.8.2005 to 31.3.2009.

21-09-05

13-09-05

74/2004

Power Grid Corporation of India Limited

Approval of transmission tariff for Kayamkulam transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009.

14-09-05

14-09-05

70/2004

Power Grid Corporation of India Limited

Approval of transmission tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Guzuwaka in Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009

14-09-05

14-09-05

191/2004

Power Grid Corporation of India Limited

Approval of tariff for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in Northern Region for the period 1.2.2004 to 31.3.2004.

27-07-05

16-06-05

96/2004

Power Grid Corporation of India Limited

Approval for transmission tariff for Rihand Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009.

14-09-05

07-09-05

69/2004

Power Grid Corporation of India Limited

Approval for transmission tariff for Korba-Budhipadar Transmission System for the period 1.4.2004 to 31.3.2009

22-09-05

21-07-05

32/2005

Power Grid Corporation of India Limited

Approval for provisional transmission tariff for 400/220 kV Khandwa sub-station and LILO of 400 kV D/C Itarsi-Dhule transmission line at Khandwa in Western Region for the period from 1.2.2005 to 31.3.2009.

14-09-05

08-09-05

192/2004

Power Grid Corporation of India Limited

Approval of tariff for Agra (Powergrid)-Agra (UPPCL) 400 kV inter-connection in Northern Region for the period 1.7.2003 to 31.3.2004.

21-07-05

16-06-05

122/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Jeypore –Talcher Transmission system in Eastern Region for the period from 1.4.2004 to 31.3.2009

14-09-05

28-07-05

132/2002

Power Grid Corporation of India Ltd

Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.3.2003 to 31.3.2004.

03-08-05

15-04-04

IA No. 19/2005
in
Pet No. 56/2005

National Thermal Power Corporation Limited

Petition to claim abnormal O & M Expenses not included in the normalised O&M Expenses for Korba STPS for the period 1.4.2001 to 31.3.2004.

26-07-05

26-07-05

8/2003

Power Grid Corporation of India Ltd

Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III at Meerut sub-station with associated bays in Northern Region for the period from the date of commercial operation to 31.3.2004.

07-09-05

19-04-05

138/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for LILO of 400 kV D/C Bogaigaon-Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.8.2003 to 31.3.2004.

13-07-05

16-03-04

IA No. 31/2005
in
Pet No. 131/2002

Power Grid Corporation of India Ltd.

Approval of tariff for Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004

22-09-05

22-09-05

103/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Salal Stage II Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009

09-09-05

18-08-05

27/2005

PGCIL

Prayer for issue of direction regarding refund/adjustment of development surcharge collected by Powergrid during 2003-04 from the state utilities and deployed alongwith its interest thereon.

07-04-05

 

38/2005

Power Grid Corporation of India Ltd.

Miscellaneous petition under Regulations 24 and 111 of the CERC (Conduct of Business) Regulations, 1999 for approval of CERC for procurement of 2 Nos. Converter Transformer for Rihand-Dadri HVDC link in Northern Region

21-06-05

9-06-05

80/2004

Power Grid Corporation of India Ltd

Approval of abnormal operation and maintenance expenses on account of additional security for the year 2003-2004 in Northern Region.  

22-02-05 

21.9.2004

54/2005

(Suo motu)

Engagement in the business of telecommunication by the Central Transmission Utility.

27-05-05

 

22/2005

Power Grid Corporation of India Ltd, Gurgaon

Approval of abnormal Operation and Maintenance expenses on account of additional security for the year 2003-04 in North-Eastern Region.

26-05-05

17-05-05

99/2004

Power Grid Corporation of India Limited  

Approval of transmission charges for 400 kV S/C Chamera I – Kishenpur Transmission line in Northern Region for the period from 1.4.2004 to 31.3.2009

06-09-05

17-08-05

107/2004

Power Grid Corporation of India Limited  

Approval of transmission charges for additional converter transformer (spare) for Rihand-Dadri Bi-pole in Northern Region for the period from 1.4.2004 to 31.3.2009

07-09-05

24-08-05

119/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 63 MVAR line reactor on 400 kV Kolaghat – Rengali transmission line at Rengali sub-station in Eastern Region for the period from 1.4.2004 to 31.3.2009

02-09-05

21-07-05

104/2004

Power Grid Corporation of India Limited

Approval of transmission charges for ICTs at Kishenpur in Northern Region for the period from 1.4.2004 to 31.3.2009

09-09-05

18-08-05

140/2004

Power Grid Corporation of India Ltd.

Approval for determination of provisional transmission tariff for 220 kV Allahabad-Phulpur S/C Transmission Line under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.6.2004 to 31.3.2009.

30-05-05

26-04-05

83/2004

Power Grid Corporation of India Ltd.

Approval of abnormal operation and maintenance expenses on account of additional security for the year 2003-2004 in Eastern Region.  

22-02-05 

21.9.2004

28/2003

Power Grid Corporation of India Limited

Approval under Regulation-86 for transmission tariff for (i) 400 kV D/C Nathpa Jhakri-Nalagarh line with associated bays & 2 Nos.400 kV bays at Nalagarh for Kunihar and (ii) 400 kV D/C Nathpa Jhakri-Abdullapur line, ICT-I, Bus Reactor & 2 Nos.220 kV bays for Tepla (HVPNL) at Abdullapur and other associated bays under Nathpa-Jhakri Transmission System in Northern Region, for the period from 01.04.2003 to 31.03.2004.

16-08-05

03-02-04

134/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 400/220 kV Bhiwadi sub-station along with LILO of Ballabhgarh-Bassi 400 kV S/C line and ICT-I & II at Bhiwadi in Northern Region for the period from 1.3.2003 to 31.03.2004.

10-03-05

6.4.2004

102/2004

Grid Corporation of India Limited

Approval for transmission tariff for Singrauli Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009.

29-08-05/
01-09-05

18-08-05

IA No. 22/2005
in Pet No. 140/2004

Power Grid Corporation of India Ltd.

Approval for determination of provisional transmission tariff for 220 kV Allahabad-Phulpur S/C Transmission Line under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.6.2004 to 31.3.2009.

30-08-05

25-08-05

139/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 400/220 kV 315 MVA Transformer at Jeypore in Eastern Region for the period 1.10.2002 to 31.3.2004.

09-03-05

16-03-04

122/2002

Power Grid Corporation of India Ltd.

Approval of transmission tariff for (A) Talcher-Kolar HVDC line (Pole-I), (B) LILO of 400 kV S/C Cuddapah-Banglore S/C line and common facilities at Kolar, (C) 400 kV S/C Kolar-Madras line, (D) 400 kV S/C Hossur-Salem line, 315 MVA Auto Transformer-I at Hossur, alongwith 220 kV switchyard (E) 315 MVA Auto Transformer-2 at Hossur, (F) 500 MVA Auto-transformer (comprising of 4x167 MVA single phase units) at Kolar alongwith 220 kV switchyard, and (G) 400 kV D/C Kolar-Hoody line, under Transmission System associated with Talcher-II Project for the period 1.12.2002 to 31.3.2004.

10-05-05

15-04-04

IA No. 11/2005
In
Petition No. 101/2003

Power Grid Corporation of India Ltd.

Approval of Transmission tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004.

27-05-05

 

101/2003

Power Grid Corporation of India Ltd.

Approval of Transmission tariff for Special Energy Meters in Northern Region for the period from 1.5.2002 to 31.3.2004.

26-04-05

6-04-04

58/2002

Power Grid Corporation of India Ltd

Petition for approval of tariff for LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-I at Allahabad, LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-II at Allahabad, ICT-I and ICT-II at Allahabad along with associated bay in Northern Region from the date of commercial operation of the respective asset to 31.3.2004.

13-04-05

13.4.2005

110/2002

Power Grid Corporation of India Ltd .

Petition for approval of tariff for 315 MVA, 400/220 kV ICT-IV at Ballabhgarh in Northern Region for the period from 1.7.2002 to 31.03.2004.

13-04-05

1.4.2004

121/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 400 kV Raipur-Rourkela D/C transmission line along with extension of Raipur and Rourkela sub-stations under Eastern-Western inter-regional link for the period 1.4.2003 to 31.3.2004.

04-04-05

 

113/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 400 kV Jamshedpur-Rourkela S/C transmission line in Eastern Region for the period 1.1.2003 to 31.3.2004.

04-04-05

4.3.2004

111/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 1x 500 MW HVDC back-to-back station at Sasaram with associated AC switchyard at Sasaram and Allahabad and AuxiliarySystem including 400 kV Sarnath Allahabad D/C line with associated bays etc. under Eastern-Northern inter-regional HVDC transmission system for the period from 1.12.2002 to 31.3.2004.

24-04-05

23.3.2004

116/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for Stage I of 400 kV Thysistor controlled series compensation project (FACTS Device) on Kanpur-Ballabhgarh 400 kV S/C line at Ballabhgarh in Northern Region for the period from 1.7.2002 to 31.03.2004.

23-03-05

1.4.2004

123/2002

Power Grid Corporation of India Ltd

Approval of transmission tariff for 400 kV D/C Vijayavada – Nellore line, 400 kV D/C Nellore-Sriperumbudur line, New 400 kV switching station at Nellore, and extension of Vijaywada and Sriperumbudur sub-station with associated bays under the system strengthening scheme in Southern Region for the period 1.3.2003 to 31.3.2004.

16-03-05

15.4.04

55/2002

Power Grid Corporation of India Ltd

Petition for approval of tariff for 400 kV Biharsharif – Sasaram -Sarnath D/C transmission line under Eastern–Northern inter-regional HVDC Transmission System, for the period 1.7.2001 to 31.3.2004.

03-03-05

23.3.2004

57/2003

Power Grid Corporation of India Ltd.

Approval of tariff for LILO of 400 kV S/C Chamera-I-Kishenpur line at Chamera-II under the transmission system associated with Chamera HEP Stage-II in Northern Region from 1.8.2003 to 31.3.2004

24-02-05

24.2.2005

10/2002

Power Grid Corporation of India Ltd

Petition for approval of tariff for 220 kV Jallandhar-Hamirpur D/C Transmission Line along with associated bay in Northern Region for the period from 1.9.2001 to 31.03.2004.

21-02-05

1.4.2004

57/2002

Power Grid Corporation of India Ltd.

Approval of transmission tariff for LILO of one circuit of existing Neyveli-Trichy 400 kV D/C line at Neyveli TPS-I (Expansion) in Southern Region for the period 1.2.2002 to 31.3.2004.

21-02-05

15.4.2004


Thermal(Coal)
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

66/2005

66/2005
Determination of tariff for generation and inter-State transmission of electricity by Damodar Valley Corporation for the period 1.4.2006 to 31.3.2009, in terms of the directions of the Appellate Tribunal for Electricity dated 23.11.2007 in Appeal No. 273/2006. Damodar Valley Corporation, Kolkata 16-06-2009
&
07-07-2009
06-08-2009

Review- General
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
- - - - -

Review- Thermal
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

IA No. 9/2005
in Review Pet No. 37/2005
in Pet No. 196/2004

National Thermal Power Corporation Ltd

Review of Commission's order dated 28.2.2005 in Petition No. 196/2004 (suo motu) – revision of O&M expenses for the year 2001-02 to 2003-04

06-05-05

 

Review Pet No. 37/2005
In
Pet No. 196/2004
(Suo motu)

National Thermal Power Corporation Ltd.

Review of order dated 28.2.2005 in Petition No.196/2004 (suo motu) - Revision of O&M expenses for the years 2001-02 to 2003-04

07-06-05

19-05-05

90/2003

Neyveli Lignite Corporation Ltd.

Review of order of CERC dated 29.5.2004 in respect of Petition No. 90/2003 on Revised UI accounting methodology by SREB

25-05-05

02-11-04

Review Pet No. 98/2005
in Pet No. 105/2002

Tamil Nadu Electricity Boad, Chennai

Review of Commission's Order dated 7.4.2005 in Petition No. 105/2002, awarding of fixed charges and provisional energy charges for NLC TPS-I (Expansion) (2x210 MW) for the period from 9.5.2003 to 31.3.2004.

07-10-05

04-10-05

69/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Anta Gas Power Station (419.33 MW).

19-10-05

27-09-05

57/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Ramagundam STPS

11-08-05

23-06-05

56/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Korba STPS

11-08-05

07-06-05

57/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for Ramagundam STPS approved by the Commission by order dated 6.8.2003 in Petition o. 34/2001.

23-06-05

23-06-05

196/2004

Rev. Pet. No. 76/2003
In Pet. No. 39/2001

Uttar Pradesh Power Corporation Ltd

Revision of O&M expenses for the years 2001-02 to 2003-04

Amendment of order dated 23.7.2003 on the limited issue of escalation factor for O&M expenses in the tariff for the period 1.4.2001 to 31.3.2004 in petition No.39/2001 in respect of Singrauli STPS.

28-02-05

2.11.2004

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2003-2004.

05-07-05

21-06-05

Review Pet No. 76/2004
in Pet No. 99/2002

Madhya Pradesh State Electricity Board

Review of Commission's order dated 18.5.2004 in Petition No.99/2002 – Approval of tariff for Kawas GPS for the period from 1.4.1998 to 31.3.2001

28-03-05

20-01-05

99/2002

Madhya Pradesh State Electricity Board

Review of Commission's order dated 18.5.2004 in Petition No.99/2002 – Approval of tariff for Kawas GPS for the period from 1.4.1998 to 31.3.2001

28-03-05

20.1.2005

Review- Hydro

Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
Review Pet No. 113/2005
in Pet No.36/2003
North Eastern Electric Power Corporation Ltd. Review of order dated 16.8.2005 in Petition No.36/2003 for approval of generation tariff of Kopili Hydroelectric Project for the tariff period 1.4.2001 to 31.3.2004. 20-12-05 29-11-05
5/2005 Tripura State Electricity Corporation Ltd., Agartala Seeking relief from excessive rise in per unit charge from the hydro electric projects under NEEPCO mainly Ranganadi & Doyang in post ABT period, regulation over transmission constraints/contingency/natural calamities causing adverse effect on drawal/trading of power and surrendering of share of Doyang HEP, Nagaland. 25-05-05 17-05-05
19/2004 Narmada Hydroelectric Development Corporation Ltd Review of Commission's order dated 6.12.2004 in Pettion No. 19/2004 – approval of generation tariff of Indira Sagar Project. 27-01-05 27.1.05

Review- Transmission
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
RevPet No. 34/2005
In
Pet. No 89/2004
Neyveli Lignite Corporation Limited Review of order dated 24.2.2005 in petition No.89/2004 - Levy of transmission charges and applying Regional transmission losses to NLC Mines. 19-07-05 12-07-05
Review Pet No. 2/2005 in
Pet No. 13/2004
North Eastern Electric Power Corpn. Ltd. Review of Commission' Order dated 6.9.2004 in petition No. 13/2004 in respect of calculation of Power Grid transmission tariff for post ABT period from 1.11.2003. 07-06-05 21-06-05
Review Pet No. 189/2004
In
Pet No. 13/2004
Assam State Electricity Board Review of Commission's Order dated 6.9.2004 in petition No. 13/2004 Implementation of the order dated 1.1.2002 in Petition No. 40/2000 and Review Petition No. 110/2000 for approval of transmission tariff of assets in North Eastern Region covered in petition No. 40/2000 for the period from 1.2.2000 to 31.3.2004. 21-06-05 21-06-05
3/2005 Power Grid Corporation of India Ltd., New Delhi Review of Commission' Order dated 6.9.2004 in petition No. 3/2004 - Implementation of the order dated 1.1.2002 in Petition No. 40/2000 and Review Petition No. 110/2000 for approval of transmission tariff of assets in North Eastern Region covered in Petition No. 40/2000 for the period from 1.2.2000 to 31.3.2004 for the pre-ABT period. 28-06-05 21-06-05

Provisional Tariff-Thermal
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
13/2005 National Thermal Power Corporation Ltd. Approval of provisional tariff for power supplied from Ramagundam Super Thermal Power Station, Stage-III. 10-05-05 26-04-05

Provisional Tariff-Hydro
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
184/2004 Satluj Jal Vidyut Nigam Limited Approval of provisional generation tariff of Nathpa Jhakri Hydroelectric Project for the period 1.4.2004 to 31.3.2009. 17-06-05 26.4.2005
Provisional Tariff-Transmission
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
IA No. 3/2005
in
Petition No. 11/2005
Power Grid Corporation of India Ltd. Approval of provisional transmission tariff for Fixed and Thyristor Controlled Series Compensation for 400 kV D/C Raipur-Rourkela Transmission Line at Raipur in Western Region for the period from 1.11.2004 to 31.3.2009. 26-05-05 29-03-05
11/2005 Power Grid Corporation of India Ltd. Approval of provisional transmission tariff for Fixed and Thyristor Controlled Series Compensation for 400 kV D/C Raipur-Rourkela Transmission Line at Raipur in Western Region for the period from 1.11.2004 to 31.3.2009. 04-04-05 29.3.2005

License
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
16/2005 Suryachakra Power Corporation Pvt. Ltd. Application for grant of licence to Suryachakra Power Corporation Ltd. 12-01-06 12-01-06
94/2005 Essar Electric Power Development Corporation Limited Grant of licence for inter-state trading in electricity to Essar Electric Power Development Corporation Limited, Mumbai. 14-12-05 13-12-05
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 29-07-05 26-05-05
16/2005 Suryachakra Power Corporation Ltd. Grant of licence for inter-state trading in electricity to Suryachakra Power Corporation Ltd. 06-12-05 06-12-05
94/2005 Essar Electric Power Development Corporation Ltd, Mumbai Grant of licence for inter-state trading in electricity to Essar Electric Power Development Corporation Limited, Mumbai. 11-11-05 10-11-05
94/2005 Essar Electric Power Development Corporation Ltd, Mumbai Grant of licence for inter-state trading in electricity to Essar Electric Power Development Corporation Limited, Mumbai 25-10-05 25-10-05
I.A.No. 58/2005
in
Pet No. 7/2004
Sumex Organics Private Limited Application for grant of licence for inter-state trading in electricity to Sumex Organics Private Limited, Mumbai. 03-11-05 -
16/2005 Suryachakra Power Corporation Ltd. Grant of licence for inter-state trading in electricity to Suryachakra Power Corporation Ltd. 02-11-05 -
15/2005 Instinct Advertising & Marketing (Pvt) Ltd Grant of licence for inter-state trading in electricity to Instinct Advertising & Marketing (Pvt.) Limited. 19-07-05 19-07-05
58/2005 21ST Century Infrastructure (India) Pvt. Ltd. Grant of licence for inter-state trading in electricity to 21ST Century Infrastructure (India) Pvt. Ltd. 20-09-05 20-09-05
16/2005 Suryachakra Power Corporation Ltd. Grant of licence for inter-state trading in electricity to Suryachakra Power Corporation Ltd. 07-10-05 04-10-05
15/2005 Instinct Advertisement & Marketing Pvt. Limited Grant of licence for inter-state trading in electricity to Instinct Advertisement & Marketing Pvt. Limited. 07-09-05 07-09-05
28/2003 Grid Corporation of India Limited Approval under Regulation-86 for transmission tariff for (i) 400 kV D/C Nathpa Jhakri-Nalagarh line with associated bays & 2 Nos.400 kV bays at Nalagarh for Kunihar and (ii) 400 kV D/C Nathpa Jhakri-Abdullapur line, ICT-I, Bus Reactor & 2 Nos.220 kV bays for Tepla (HVPNL) at Abdullapur and other associated bays under Nathpa-Jhakri Transmission System in Northern Region, for the period from 01.04.2003 to 31.03.2004. 16-08-05 03-02-04
15/2005 Instinct Advertising & Marketing (Pvt) Ltd Application for grant of inter-state trading licence 11-08-05 -
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 29-07-05 26-05-05
65/2005 (TATA) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005
(Sumex)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005
(Reliance)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (PTC) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (NTPC) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (MMTC) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (Lanco) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (Karam) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (Jindal) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (GMR) - Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (DLF)
(Suo motu)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (chatti)
(Suo motu)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
65/2005 (Adani)
(Suo motu)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 24-06-05 -
Petition No. 65/2005
(Suo motu)
- Compliance of Central Electricity Regulatory Commission (Procedure, Terms & Conditions for grant of Trading Licence and other related matters) Regulations, 2004. 13-06-05 -
Review Pet No. 45/2005
In
Pet No. 20/2004
Shri Gajendra Haldea Review of order dated 30.6.2004 in Petition No.20/2004 - Grant of licence for inter-state trading in Electricity to Power Trading Corporation of India Ltd. 08-06-05 24-5-05
7/2005 Subhash Kabini Power Corporation Ltd… Grant of licence for inter-state trading in electricity to Subhash Kabini Power Corporation Ltd. 05-05-05 26-4-05
9/2004 TGV Projects and Investments Pvt. Ltd. Application for grant of licence for inter-state trading in electricity. 24-05-05 17-05-05
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 26-05-05 26-05-05
183/2004 Induj Enertech Limited, Mumbai Application for grant of licence for inter-state Trading in electricity. 12-05-05 26-4-05
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 27-04-05 27-4-05
85/2004 RETL Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL) . 28-03-05 22-03-05
21/2004 DLF Power Limited, New Delhi Grant of licence for inter-state trading in electricity to DLF Power Ltd. 24-03-05 24-03-05
9/2004 TGV Projects and Investments Pvt. Ltd. Application for grant of licence for inter-state trading in electricity. 10-03-05 10-03-05
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 09-03-05 01-03-05
166/2004 Application for grant of licence for inter-state Trading in electricity. Application for grant of licence for inter-state Trading in electricity. 08-02-05 8.2.2005
183/2004 Induj Enertech Limited, Mumbai Application for grant of licence for inter-state Trading in electricity. 08-02-05 08-02-05
85/2004 Reliance Energy Transmission Limited (RETL) Application for grant of transmission licence to Reliance Energy Transmission Limited (RETL). 08-02-05 08-02-05
71/2004 North Eastern Electric Power Corporation Limited, Shillong Grant of licence for inter state trading in electricity to North Eastern ElectricPower Corporation Limited (NEEPCO) 02-02-05 20.1.2005
15/2004 Ispat Energy Ltd. (IEL) Application for grant of licence for inter-state trading in electricity. 25-01-05 25-01-05
9/2004 TGV Projects and Investments Pvt. Ltd Application for grant of licence for inter-state trading in electricity. 18-01-05 18.1.2005

ABT, UI & IEGC Matters
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
99/2005 Regional Load Despatch Centre, New Delhi Maintaining the regional grid frequency above 49.0 Hz by curbing overdrawals in line with section 6.2(l) and 7.4.4 respectively of the Indian Electricity Grid Code (IEGC). 20-10-05 20-10-05
82/2002 Power Grid Corporation of India Ltd. Approval of charges for Unified Load Despatch & Communication Scheme in Northern Region 02-09-05 15-06-04
24/2005 Eastern Regional Load Despatch Centre, Kolkata Non-payment of Unscheduled Interchange (UI) charges by Bihar State Electricity Board (BSEB), Patna. 21-07-05 -
33/2005 Delhi Transco Limited Application for non-payment of Unscheduled Interchange (UI) charges by Power Development Department, Jammu & Kashmir and Uttar Pradesh Power Corporation Limited (UPPCL) under Chapter 7.1(d) of Indian Electricity Grid Code (IEGC). 19-07-05 12-07-05
67/2003
(Suo motu)
- Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single beneficiary State in which situated, under the purview of Availability Based Tariff (ABT) 04-07-05 -
29/2005 Western Regional Load Despatch Center Non-payment of Unscheduled Interchange (UI) charges by Madhya Pradesh State Electricity Board (MPSEB) 14-06-05 9-06-05
- Show cause notice dated 12.2.2000. Maintenance of Grid Frequency in the Southern Region 21-06-05 9-06-05
23/2005 Eastern Regional Load Despatch Centre Non-payment of Unscheduled Interchange (UI) charges by Jharkhand State Electricity Board (JSEB), Ranchi. 07-06-05 07-06-05
24/2005 Eastern Regional Load Despatch Center, Kolkata Non-payment of Unscheduled Interchange (UI) charges by Bihar State Electricity Board (JSEB), Ranchi. 07-06-05 07-06-05
29/2004 Northern Regional Load Despatch Centre (NRLDC) Non-payment of Unscheduled Interchange (UI) Charges and Reactive Energy (RE) charges by Power Development Department, Jammu and Kashmir 22-02-05 10.2.2005

RLDC/ULDC
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
9/2005 Northern Regional Load Despatch Centre Maintaining grid security by taking appropriate actions in line with section 7.4.5 and 7.4.4 of the Indian Electricity Grid Code (IEGC) 29-06-05 23-06-05
8/2004 Power Grid Corporation of India Ltd. Approval of fees and charges payable to Regional Load Despatch Centres for undertaking load despatch functions for the period 1.4.2004 to 31.3.2007 29-07-05 -
Disclaimer: While every care has been taken to ensure the accuracy of information furnished in this website, CERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of this information. However, CERC shall be obliged if errors/omissions are brought to its notice for carrying out corrections in the next update.