cerc-logo

Provisional Tariff Orders 2013

Transmission
Pet. No.
Subject
Date of Hearing
Date of Order


TT/281/2013

03.12.2013

19-12-2013


184/TT/2013

03.12.2013

18-12-2013


TT/287/2013

03.12.2013

18-12-2013


TT/289/2013

03.12.2013

18-12-2013


TT/299/2013

03.12.2013

18-12-2013


TT/301/2013

03.12.2013

18-12-2013


303/TT/2013

03.12.2013

16-12-2013


224/TT/2013

21.11.2013

16-12-2013


258/TT/2013

03.12.2013

16-12-2013


288/TT/2013

03.12.2013

16-12-2013


TT/290/2013

03.12.2013

16-12-2013


TT/291/2013

03.12.2013

16-12-2013


TT/295/2013

03.12.2013

16-12-2013


TT/296/2013

03.12.2013

16-12-2013


TT/297/2013

03.12.2013

16-12-2013


TT/300/2013

03.12.2013

16-12-2013


TT/305/2013

03.12.2013

16-12-2013


TT/307/2013

03.12.2013

16-12-2013


TT/308/2013

03.12.2013

16-12-2013


108/TT/2013

Provisional Transmission Tariff for (I) Bay extension at 765 kV Satna SS along with Line Reactor in Sasan#2 Line Bay of 765 kV S/C Sasan-Satna Ckt#2 (DOCO: 1.4.2013) (II) 765kV S/C Sasan-Satna Ckt#2 TL Portion only along with PLCC Equipments at both ends (Ant. DOCO: 1.5.2013) (III) 765kV, 240 MVAR (3*80MVAR) Bus Reactor at BINA SS along with associated bays of 765kV (Ant. DOCO 1.9.2013) (IV) 765kV, 240MVAR (3*80MVAR) Bus Reactor at Gwalior SS along with associated bays of 765kV (Ant. DOCO: 1.7.2013) (V) 765kV, 4*80MVAR Bus Reactor at Indore & 400kV, 63MVAR Bus Reactor at Indore SS (Ant. DOCO: 1.10.2013) (VI) 765/400kV, Indore Sub Station (New) including (a) Bay extension at Indore to facilitate charging of Bina (PG)-Indore (PG) TL at 765kV level (initially charged at 400kV on 1.4.2012) along with 3*80MVAR Line Reactor at Indore SS, (b) Bay Extension at Indore (PG) for direct connection of Indore (MPPTCL)-Indore (PG) 400kV D/C Tr. Line (initially made direct interconnection under interim contingency scheme) & (c) 765/400kV ICT#1 (3*500MVA) along with 765kV & 400kV bays (Ant. DOCO: 1.7.2013) (VII) 765/400kV ICT#2 (4*500MVA) along with 765kV & 400kV Isolator bays at Indore SS (Ant. DOCO: 1.9.2013) under Sasan UMPP TS in Western Region for the tariff block 2013-14.Power Grid Corporation of India Ltd., Gurgaon.

-

10-09-2013


163/TT/2013

-

09-09-2013


165/TT/2013

-

09-09-2013


162/TT/2013 166/TT/2013

-

09-09-2013

120/TT/2013

-

11-06-2013

108/TT/2013 113/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2009 for determination of Transmission Tariff for (I) Bay extension at 765 kV Satna SS along with Line Reactor in Sasan#2 Line Bay of 765 kV S/C Sasan-Satna Ckt#2 (DOCO: 1.4.2013) (II) 765kV S/C Sasan-Satna Ckt#2 TL Portion only along with PLCC Equipments at both ends (Ant. DOCO: 1.5.2013) (III) 765kV, 240 MVAR (3*80MVAR) Bus Reactor at BINA SS along with associated bays of 765kV (Ant. DOCO 1.9.2013) (IV) 765kV, 240MVAR (3*80MVAR) Bus Reactor at Gwalior SS along with associated bays of 765kV (Ant. DOCO: 1.7.2013) (V) 765kV, 4*80MVAR Bus Reactor at Indore & 400kV, 63MVAR Bus Reactor at Indore SS (Ant. DOCO: 1.10.2013) (VI) 765/400kV, Indore Sub Station (New) including (a) Bay extension at Indore to facilitate charging of Bina (PG)-Indore (PG) TL at 765kV level (initially charged at 400kV on 1.4.2012) along with 3*80MVAR Line Reactor at Indore SS, (b) Bay Extension at Indore (PG) for direct connection of Indore (MPPTCL)-Indore (PG) 400kV D/C Tr. Line (initially made direct interconnection under interim contingency scheme) & (c) 765/400kV ICT#1 (3*500MVA) along with 765kV & 400kV bays (Ant. DOCO: 1.7.2013) (VII) 765/400kV ICT#2 (4*500MVA) along with 765kV & 400kV Isolator bays at Indore SS (Ant. DOCO: 1.9.2013) under Sasan UMPP TS in Western Region. Power Grid Corporation of India Limited, Gurgaon.

-

06-06-2013

109/TT/2013 110/TT/2013 111/TT/2013

-

06-06-2013

105/TT/2013

-

05-06-2013

101/TT/2013

-

05-06-2013

97/TT/2013 98/TT/2013 100/TT/2013

-

29-05-2013

102/TT/2013

-

29-05-2013

70/GT/2013

-

05-04-2013

145/2009

07-06-2012

03-04-2013

24/TT/2011

16-02-2012

02-04-2013

57/TT/2013

-

25-03-2013

58/TT/2013

-

25-03-2013

60 /TT/2013

-

25-03-2013

61 /TT/2013

-

25-03-2013

53/TT/2013
- 18-03-2013

48/TT/2013
- 18-03-2013

53/TT/2013
- 18-03-2013

50/TT/2013
- 18-03-2013

46/TT/2013
- 18-03-2013

54/TT/2013
- 18-03-2013

47/TT/2013
- 18-03-2013

39/TT/2013
- 18-03-2013

45/TT/2013 44/TT/2013
Approval of date of commercial operation under Regulation-3 (12) (c) of Central Electricity Regulatory Commission (Terms and Conditions of tariff) Regulations, 2009 and Regulation-24 and 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 for determination of transmission Tariff from the date of commercial operation to 31.3.2014 for 400 kV D/C Balipara- Bongaigaon (Quad) transmission line along with 2 Nos 63 MVAR line reactors at both end and 30% FSC at Balipara S/S (anticipated date of commercial operation 1.4.2013) and 80 MVAR, 420 kV bus reactor at Bonaigaon S/S under transmission system at Bonaigaon S/S along with associated bays (anticipated date of commercial operation1.4.2013) under North east/North Western Interconnector I and transmission system of Kameng Hydro-Electric Project for tariff block 2009-14 period in North Eastern Region.Power Grid Corporation of India Limited, Gurgaon.
- 18-03-2013

35/TT/2013 36/TT/2013 34/TT/2013 38/TT/2013 31/TT/2013 37/TT/2013 32/TT/2013 33/TT/2013
- 1-03-2013

-
- -
ULDC/RLDC
Pet. No.
Subject
Date of Hearing
Date of Order
-

 

-

-