154/GT/2023 |
Petition for approval of tariff for Telangana Super Thermal Power Station Stage-I (2x800 MW) from COD of Unit-I to 31.3.2024 |
12.12.2024 |
91/GT/2023 |
Petition for determination of tariff of North Karanpura STPP (1980 MW) for the period from anticipated COD of Unit- I (1.3.2023) to 31.3.2024. |
12.12.2024 |
91/GT/2023 |
Request for filing rejoinder in Petition No. 91/GT/2023 -reg. |
02.12.2024 |
119/GT/2023 |
Petition under Section 62 and 79(1)(a) of the Electricity Act, 2003 read with Regulation 29 of the CERC (Terms and Condition of Tariff) Regulations, 2019 for determination of tariff on installation of various Emission Control Systems at National Capital Thermal Power Station (NCTPS) Dadri Stage-I (840MW) in compliance of Revised Emission Standards. |
18.10.2024 |
58/GT/2022 |
Request for time extension in Petition No. 58/GT/2022 -reg. |
14.10.2024 |
189/GT/2020 |
Petition for approval of tariff of Barauni Thermal Power Station Stage -I (220 MW) for the period 2019-24. |
30.08.2024 |
120/GT/2023 |
Request for time extension in Petition No. 120/GT/2023 - reg. |
22.08.2024 |
2/GT/2024 |
Request for time extension in Petition No. 2/GT/2024 -reg. |
05.07.2024 |
74/GT/2024 |
Request for time extension in Petition No. 74/GT/2024 -reg. |
05.07.2024 |
189/GT/2020 |
Request for time extension in Petition No. 189/GT/2020 -reg. |
05.07.2024 |
189/GT/2020 |
Request for time extension in Petition No. 189/GT/2020 -reg. |
22.05.2024 |
58/GT/2022 |
Request for time extension in Petition No. 58/GT/2022 -reg. |
22.05.2024 |
2/GT/2024 |
Request for time extension in Petition No. 2/GT/2024 -reg. |
22.05.2024 |
236/GT/2021 |
Request for time extension in Petition No. 236/GT/2021 -reg. |
25.04.2024 |
120/GT/2023 |
Request for time extension in Petition No. 120/GT/2023 - reg. |
12.04.2024 |
440/GT/2020 |
Request for time extension in Petition No. 440/GT/2020 - reg. |
12.04.2024 |
181/GT/2019 |
Request for time extension in Petition No. 181/GT/2019 - reg. |
12.04.2024 |
154/GT/2023 |
Request for time extension in Petition No. 154/GT/2023 - reg. |
09.04.2024 |
582/GT/2020 & 246/GT/2021 |
Request for time extension in Petition Nos. 582/GT/2020 & 246/GT/2021 -reg. |
21.03.2024 |
387/GT/2020 & 436/GT/2020 |
Request for time extension in Petition Nos. 387/GT/2020 & 436/GT/2020 -reg. |
21.03.2024 |
439/GT/2020 |
Request for time extension in Petition No. 439/GT/2020 -reg. |
18.03.2024 |
145/GT/2019 |
Request for time extension in Petition No. 145/GT/2019-reg. |
11.03.2024 |
181/GT/2019 |
Request for time extension in Petition No. 181/GT/2019-reg. |
11.03.2024 |
221/GT/2020 |
Request for time extension in Petition No. 221/GT/2020 -reg. |
04.03.2024 |
236/GT/2021 |
Request for time extension in Petition No. 236/GT/2021 -reg. |
14.02.2024 |
91/GT/2023 |
Request for time extension in Petition No. 91/GT/2023 -reg. |
08.02.2024 |
348/GT/2022 |
Request for time extension in Petition No. 348/GT/2022 -reg. |
18.01.2024 |
154/GT/2023 |
Request for time extension in Petition No. 154/GT/2023 -reg. |
18.01.2024 |
119/GT/2023 |
Request for time extension in Petition No. 119/GT/2023 -reg. |
18.01.2024 |
236/GT/2021 |
Request for time extension in Petition no. 236/GT/2021-reg. |
14.11.2023 |
21/RP/2023 |
Request for time extension in Petition No. 21/RP/2023 -reg. |
31.10.2023 |
348/GT/2022 |
Request for time extension in Petition No. 348/GT/2022 -reg. |
23.08.2023 |
236/GT/2021 |
Request for time extension in Petition No. 236/GT/2021 -reg. |
07.06.2023 |
399/GT/2020 |
Request for time extension in Petition No. 399/GT/2020-reg. |
07.06.2023 |
145/GT/2019 |
Request for time extension in Petition No. 145/GT/2019 -reg. |
30.05.2023 |
281/GT/2020 |
Request for time extension in Petition No. 281/GT/2020 -reg. |
12.05.2023 |
281/GT/2020 |
Petition for approval of tariff of Tanda STPS Stage-II (1320 MW) for the period from anticipated COD of Unit- I (1.11.2019 to 31.3.2024). |
17.04.2023 |
183/GT/2022 |
Petition for approval of tariff of Meja Thermal Power Station Stage-I for the period from COD of Unit- I (30.4.2019 to 31.3.2024). |
13.04.2023 |
348/GT/2022 |
Request for time extension in Petition No. 348/GT/2022 -reg. |
05.04.2023 |
281/GT/2020 |
Request for time extension in Petition No. 281/GT/2020 -reg. |
17.02.2023 |
154/MP/2021 |
Petition No. 154/MP/2021 – Filing of additional information reg. |
17.02.2023 |
407/GT/2020 |
Request for time extension in Petition No. 407/GT/2020 -reg |
28.12.2022 |
191/GT/2020 |
Petition for revision of tariff of Singrauli Super Thermal Power Station, (2000 MW) for the period from 1.4.2014 to 31.3.2019, after truing up exercise. |
07.11.2022 |
392/GT/2020 & 441/GT/2020 |
a) Petition for revision of tariff of Talcher Super Thermal Power Station, Stage II (2000 MW) for the period from 1.4.2014 to 31.3.2019 (Petition No. 392/GT/2020). (b) Petition for approval of tariff of Talcher Super Thermal Power Station, Stage-II (2000MW) for the period from 1.4.2019 to 31.3.2024 (Petition No. 441/GT/2020). |
10.08.2022 |
181/GT/2019 |
Petition for approval of tariff of Gadarwara Super Thermal Power Station (2x800 MW) for the period from anticipated Date of Commercial Operation of Unit 1 (i.e. 30.4.2019) to 30.3.2024. |
03.12.2020 |
253/GT/2020 |
Petition for revision of tariff of Kawas GPS (656.20 MW) for the period from 1.4.2014 to 31.3.2019 after the truing up exercise. |
02.11.2020 |
301/GT/2020 |
Petition for revision of tariff of Jhanor Gandhar GPS (657.39 MW) for the period from 1.4.2014 to 31.3.2019 after truing up exercise. |
02.11.2020 |
368/GT/2019 |
Petition under Section 62 and 79(1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 along with CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 for determination of project specific levelised tariff for 100 MW floating Solar Photo Voltaic Plant at water reservoir of Reamagundam Super Thermal Power Station (RSTPS), Ramagundam, Telengana. Ms. Ritu Apurva, Advocate, MSA Partners |
20.12.2019 |
243/GT/2017 |
Petition No. 243/GT/2017- Determination of tariff of Bongaigaon Thermal Power Station (3 x 250 MW) for the period from date of commercial operation of Unit-I (1.4.2016) to 31.3.2019 AGM (Commercial), NTPC Bhawan |
08.07.2019 |
130/GT/2014 |
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019 General Manager (Commercial), NTPC Bhawan |
30.04.2019 |
199/GT/2017 |
Petition for determination of tariff of Kudgi Super Thermal Power Station, Stage-I (3 x 800 MW) for the period from anticipated date of commercial operation of Unit-I (25.7.2017) to 31.3.2019 |
25.02.2019 |
Petition No. 46/MP/2018
|
Petition No. 46/MP/2018- Petition for revision of the Normative Annual Plant Availability Factor in respect of NTPC’s Power Stations on account of Shortage of Coal availability. |
09.11.2018 |
Petition No. 130/GT/2014
|
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019. |
18.04.2018 |
Petition No. 65/TD/2018
|
Petition for seeking grant of Category-I inter-State trading licence. |
02.04.2018 |
Petition No.130/GT/2014
|
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019. |
13.03.2018 |
-
|
:Terms and conditions of tariff for the tariff period starting from 1.4.2019- Seeking of information from Central Generating Companies, Joint Ventures Companies, Independent Power Producers and Central/Inter-State Transmission Companies whose tariff is being regulated by CERC. |
29.12.2017 |
Petition No. 64/MP/2016
|
: Petition Nos. 64/MP/2016 & 311/MP/2015- Submission of additional information. |
08.06.2017 |
Petition No. 130/GT/2014
|
Petition No. 130/GT/2014-Record of Proceedings (RoP) for the hearing held on 6.9.2016 (Barh Stage-II, 2x660 MW). |
03.10.2016 |
Petition No. 328/GT/2014 339/GT/2014
|
Approval of tariff of Mauda Super Thermal Power Station (1000 MW) for the period from 1.4.2014 to 31.3.2019. |
12.08.2016 |
Petition No. 263/GT/2014
|
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019 – Petition No. 263/GT/2014. |
11.08.2016 |
Petition No. 263/GT/2014
|
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019. |
19.07.2016 |
Petition No. 263/GT/2014
|
Approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019. |
28.06.2016 |
Petition No. 293/GT/2014
|
Approval of tariff of Talcher Super Thermal Power Station (2000 MW) Stage- II for the period from 1.4.2014 to 31.3.2019. |
28.06.2016 |
Petition no: 318/GT/2014
|
Submission of information in compliance to ROP issued in Petition No. 318/GT/2014, 372/GT/2014, 330/GT/2014, 308/GT/2014 & 299/GT/2014. |
22.06.2016 |
-
|
Submission of information in compliance to ROP issued in Petition No. 296/GT/2014 & 327/GT/2014, 342/GT/2014 & 343/GT/2014, 344/GT/2014 & 322/GT/2014, 295/GT/2014 & 337/GT/2014 and 345/GT/2014 & 323/GT/2014. |
13.06.2016 |
-
|
Submission of information in compliance to ROP issued in Petition No. 306/GT/2014, 338/GT/201, 325/GT/2014, 326/GT/2014 & 23/GT/2013. |
27.05.2016 |
Petition No. 219/GT/2014 268/GT/2014
|
Approval of tariff of Ramagundam Super Thermal Power Station Stage-III for the period from 1.4.2009 to 31.3.2014 after truing-up. |
27.05.2016 |
Petition No. 296/GT/2014
|
Submission of information in compliance to ROP issued in Petition No. 296/GT/2014 & 327/GT/2014, 342/GT/2014 & 343/GT/2014, 346/GT/2014 & 341/GT/2014, 344/GT/2014 & 322/GT/2014, 295/GT/2014 & 337/GT/2014 and 345/GT/2014 & 323/GT/2014. |
17.05.2016 |
Petition No. 437/GT/2014
|
Grant of tariff of Indira Gandhi Super Thermal Power Station (1500 MW) based on audited accounts as on 31.3.2014, for the period from the COD of Unit-I (5.3.2011) to 31.3.2014. |
16.05.2016 |
-
|
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. |
18.04.2016 |
Petition Nos. 277/GT/2014
|
Approval of tariff for Vallur Thermal Power Project (3X500 MW) for the period 2014-19. |
07.04.2016 |
Petition Nos. 274/GT/2014
|
Revision of tariff for Farakka Super Thermal Power Station, Stage – I & II (1600 MW) for the period 2009-14. |
04.04.2016 |
Petition Nos. 277/GT/2014
|
Approval of tariff for Vallur Thermal Power Project (3X500 MW) for the period 2014-19. |
23.03.2016 |
-
|
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. |
15.03.2016 |
-
|
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. |
15.03.2016 |
Petition Nos. 273/GT/2014
|
Revision of tariff for Talcher Thermal Power Project (460 MW) for the period 2009-14 – Petition No. 273/GT/2014. |
11.03.2016 |
Petition No. 107/GT/2015
|
Grant of interim tariff for Koldam Hydroelectric Power Project (4x200 MW) for the period from the COD of Units - I & II (18.7.2015) to 31.3.2019 – Petition No. 107/GT/2015. |
08.03.2016 |
Petition Nos. 437/GT/2014
|
Grant of tariff of Indira Gandhi Super Tthermal Power Station (1500 MW) based on audited accounts as on 31.3.2014, for the period from the COD of Unit-I (5.3.2011) to 31.3.2014 – Petition No. 437/GT/2014. |
08.03.2016 |
Petition No. 258/GT/2014
|
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2009 to 31.3.2014 – Petition No. 258/GT/2014. |
29.01.2016 |
Petition Nos. 320/GT/2014
|
Approval of tariff of Feroze Gandhi Unchahar Stage-I (420 MW) for the period from 1.4.2009 to 31.3.2014. |
01.01.2015 |
Petition Nos. 321/GT/2014
|
Approval of tariff of Feroze Gandhi Unchahar Stage-III (210 MW) for the period from 1.4.2009 to 31.3.2014. |
01.01.2015 |
Petition Nos. 331/GT/2014
|
Approval of tariff of Anta GPS (419.33MW) for the period from 1.4.2009 to 31.3.2014. |
23.12.2015 |
Petition Nos. 332/GT/2014
|
Approval of tariff of Feroze Gandhi Unchahar Stage - II (420MW) for the period from 1.4.2009 to 31.3.2014. |
23.12.2015 |
Petition Nos. 335/GT/2014
|
Approval of tariff of Auriya GPS (663.36MW) for the period from 1.4.2009 to 31.3.2014. |
23.12.2015 |
Petition No. 282/GT/2014
|
Revision of tariff of Farakka STPS, Stage-III,(500 MW) for the period from COD i.e. 4.2.2012 to 31.3.2014 after the truing up exercise. |
04.09.2015 |
Petition No. 229 of 2009
|
Approval of tariff of Tanda Thermal Power Station for the period from 1.4.2014 to 31.3.2019. |
11-06-2015 |
Petition No. 302/GT/2014
|
Approval of Tariff for Badarpur Thermal Power Station (705 MW) for the tariff period 2009-14 after truing up exercise. |
01-06-2015 |
Petition No. 277/GT/2014
|
Extension of Time for Submission of Additional Information as
per RoP dated 26.03.2015
. |
15-04-2015 |
270/GT/2014 & 294/GT/2014
|
Approval of tariff of Simhadri Super Thermal Power Station Stage-I (2 x 500 MW) for the period from 1.4.2014 to 31.3.2019. |
17-03-2015 |
Petition No. 258/GT/2015
|
Petition for approval of tariff of Ratnagiri sPower Station (1967.08 MW) for the period from 1.4.2009 to 31.3.2014. |
03-03-2015 |
Petition Nos. 310/GT/2013 & 298/GT/201
|
Approval of tariff in respect Rihand STPS Stage-II (1000 MW) – Extension of time - reg. |
17-12-2014 |
Petition No. 205/GT/2013
|
Approval of tariff in respect Rihand STPS Stage-III (1000 MW) – Extension of time - reg. |
17-12-2014 |
Petition No. 305/GT/2014
|
Revision of tariff of Korba Super Thermal Power Station, Stage-III (500 MW) from 21.3.2011 to 31.3.2014 after truing-up. |
10-12-2014 |
Petition No. 377/TT/2014
|
Petition for approval of tariff of 400 kV D/C Dadri-Loni Road Transmission Line of NTPC Ltd. for the period from the date of anticipated commercial operation to 31.3.2019. |
27-11-2014 |
Petition No. 205/GT/2013
|
Approval of tariff of Rihand Super Thermal Power Station Stage-III (1000 MW) for the period from the anticipated date of Commercial Operation till 31.03.2014. |
13-11-2014 |
Petition No. 198/GT/2013
|
Approval of tariff of Vallur Thermal Power Project for the period from anticipated date of commercial operation of Unit-I i.e. 29.11.2012 to 31.3.2014. |
05-09-2014 |
Petition No. 198/GT/2013
|
Approval of tariff of Vallur Thermal Power Project for the period from anticipated date of commercial operation of Unit-I i.e. 29.11.2012 to 31.3.2014. |
19-08-2014 |
Petition No. 132/GT/2014
|
Revision of Tariff of NTPC SAIL Power Company Pvt. Ltd. for the period from DOCO to 31.3.2014, after truing up. |
14-07-2014 |
Petition No. 206/GT/2013
|
Revision of tariff of Kahalgaon STPS, Stage-II (1500 MW) from 1.4.2009 to 31.03.2014. |
16-07-2014 |
Petition No. D-110/GT/2012 Petition No. 220/GT/2013
|
Revision of tariff of Bhilai Expansion Power Plant (2 x 250 MW) from 21.10.2009 to 31.03.2014. |
05-06-2014 |
Petition No. 253/GT/2013
|
Revision of Tariff of Faridabad Gas Power Station (431.586 MW) from 1.4.2009 to 31.3.2014, after truing up. |
02-06-2014 |
Petition No. 206/GT/2013
|
Petition for revision of tariff of Kahalgaon STPS, Stage-II (1500 MW) from 1.4.2009 to 31.3.2014. |
27-05-2014 |
Petition No. 70/GT/2013
|
Determination of tariff of Vindhyachal Super Thermal Power Station Stage-IV (2x500 MW) for the period from date of commercial operation of Unit-I to 31.3.2014. |
15-05-2014 |
Petition No. 310/GT/2013
|
Approval of tariff of Rihand STPS Stage-II (1000 MW) for the period 1.4.2009 to 31.3.2014, after Truing up. |
13-05-2014 |
Petition No: 310/GT/2013
|
Petition No: 310/GT/2013– Approval of revised tariff of Rihand Super Thermal Power Station, Stage-II (1000 MW) for the period from 1.4.2009 to 31.03.2014, after the truing up exercise. |
08-05-2014 |
Petition No. 205/GT/2013
|
Approval of Tariff for Rihand Thermal Power Station Stage-III (2x500=1000 MW) for the period from anticipated dates of Commercial Operation to 31.03.2014. |
28-04-2014 |
Petition No. 320/GT/2013
|
Petition for revision of Tariff of Talcher STPS, Stage-II (2000 MW) for the period from 1.4.2009 to 31.3.2014, after Truing up. |
15-04-2014 |
Petition No. 69/GT/2013
|
Determination of Tariff of Mauda STPS Stage-1 (2x500 MW) for the period from anticipated date of commercial operation Unit-1 to 31.3.2014. |
15-04-2014 |
Petition No. 121/MP/2011
|
Petition under Regulation 44 of the CERC (Terms & Conditions of tariff) Regulation, 2009 read with Regulation 111 and other related Regulations of CERC (Conduct of Business) Regulations, 1999 for recovery of additional cost incurred due to abnormal increase in water charges at NTPC stations. |
03-04-2014 |
Petition No. 284/GT/2013
|
Approval of revised tariff of Feroze Gandhi Unchahar TPS Stage-I (420 MW) for the period 1.4.2009 to 31.3.2014 after the Truing up. |
03-04-2014 |
Petition No. 284/GT/2013
|
Approval of revised tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-I (420 MW) for the period from 01.04.2009 to 31.03.2014 after the Truing up. |
31-03-2014 |
Petition No. 235/GT/2013
|
Petition No. 235/GT/2013 of NTPC in respect of Tanda Thermal Power Station (440 MW). |
25-03-2014 |
Petition No. 260/GT/2013
|
Approval of tariff of Dadri TPS Stage-I (840 MW) for the period 1.4.2009 to 31.3.2014 after the Truing up. |
11-03-2014 |
Petition No. 254/GT/2013
|
Gandhi Unchahar TPS Stage-III (210 MW). |
29-01-2014 |
Petition No. D-320/GT/2013
|
Revision of Tariff for Talcher Super Thermal Power Station Stage-II (2000 MW) for the period 1.4.2009-31.3.2014 after truing up. |
27-01-2014 |
Petition No. 260/GT/2013
|
Approval of revised tariff of National Capital Thermal Power Station, Dadri Stage-I (840 MW) for the period from 01.04.2009 to 31.03.2014, after Truing up. |
21-01-2014 |
Petition No. 253/GT/2013
|
Revision of Tariff of Faridabad Gas Power Station (431.586 MW) from 1.4.2009 to 31.3.2014, after the Truing up. |
21-01-2014 |
Petition No. 254/GT/2013
|
Petition for Revision of Tariff of Feroz Gandhi Unchahar TPS Stage-III (210 MW) for the Period 2009-14 after Truing Up Exercise-Petition No. 254/GT/2013. |
31-12-2013 |
Petition No. D-84/GT/2013
|
Petition under Section 62 and 79(1)(a) of the Electricity Act, 2003 read with Chapter-V of CERC (Conduct of Business) Regulations, 1999 for approval of tariff of RGCCPP Kayamkulam (359.58 MW) from 1.4.2009 to 31.3.2014 after truing up exercise. |
19-12-2013 |
Docket No. 41/GT/2013
|
Revision of tariff of Simhadri STPS Stage-II (1000 MW) from COD of Unit-I to 31.3.2014. |
17-12-2013 |
Petition No. 17/GT/2013
|
Revision of tariff of National Capital TPS stage-II (2x490 MW) for the period from 31.1.2010 to 31.3.2014 after Truing up exercise. |
20-11-2013 |
Petition No: D- 98/GT/2013
|
Revision of Tariff filed by NTPC vide affidavit dated 16.08.2013 for Simhadri Super Thermal Power Station Stage-I (1000 MW) for the Period 01.04.2009-31.03.2014 after the truing up exercise. |
11-11-2013 |
Petition No. 198/GT/2013
|
Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. |
01-11-2013 |
Petition No. 229/2010
|
Approval of tariff of Indira Gandhi super thermal power project of Aravali Power Company Pvt. Limited. |
01-11-2013 |
Docket No. 70/GT/2012
|
Revision of tariff of Kahalgaon STPS, Stage-II (1500MW) from 01.04.2209 to 31.03.2014. |
30-10-2013 |
Petition No. 250/GT/2013
|
Approval of tariff of Simhadri-I (1000 MW) from 01.04.2009 to 31.03.2014 after the truing up exercise. |
25-10-2013 |
Docket No. 63/GT/2013
|
Docket No. 63/GT/2013: Revision of tariff (Truing up) in Petition No. 222/2009 pertaining to Farakka Super Thermal Power Station, Stage-I and II (1600MW) for the period from 01.04.2009 to 31.03.2014. |
11-10-2013 |
Docket No.:77/2013
|
Approval of tariff of Tanda TPS (440 MW) for the period 1.4.2009 to 31.3.2014 after Truing up exercise. |
08-10-2013 |
Petition No. 67/GT/2012
|
Approval of tariff of Mauda Super Power Station Stage-I (2X500 MW) for the period from anticipated Date of Commercial Operation to 31.3.2014. |
06-09-2013 |
Petition No. 104/GT/2012
|
Approval of tariff of Vindhyachal Super Power Station Stage-IV (2X500 MW) for the period from the date of its commercial operation of Unit to 31.3.2014. |
09-09-2013 |
Petition No. D-85-GT-2012
|
Approval of tariff of Korba Super Thermal Power Station Stage-III (500 MW) from 21.03.2011 to 31.03.2014, after the truing up exercise. |
06-09-2013 |
Petition No. D-84-GT-2013
|
Approval of tariff of RGCCPP Kayamkulam (359.58 MW) for the period from 1.4.2009 to 31.3.2014 after truing up exercise. |
05-09-2013 |
Dock No. 56/GT/2012
|
Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. |
04-09-2013 |
Petition No. D-85/2013
|
Approval of tariff of Talcher Super Thermal Power Station Stage-I, (1000 MW) for the period from 01.04.2009 to 31.03.2014 after truing up exercise. |
03-09-2013 |
Petition No. D-63/GT/2013
|
Revision of tariff (Truing up) in Petition No. 222/2009 pertaining to Farakka STPS, Stage I & II (1600 MW) for the period from 01.04.2009 to 31.03.2014. |
03-09-2013 |
Petition No. 56/GT/2013
|
Petition No. 56/GT/2013: Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. |
06-08-2013 |
Petition No. D-41/GT/2013
|
Revision of tariff (Truing up) for the period 16.09.2011 to 31.03.2014 in respect of Simhadri Super TPS Stage II (2x500MW). |
31-07-2013 |
Petition No. D-70/GT/2012
|
Petition No. D-70/GT/2012: Revision of tariff of Kahalgaon STPS, Stage– II (1500 MW) from 1.4.2009 to 31.03.2014. |
13-06-2013 |
Petition No. 67/GT/2012
|
Approval of tariff of Mauda Super Power Station Stage-I (2X500 MW) for the period from anticipated Date of Commercial Operation to 31.3.2014. |
16-07-2013 |
Petition No. D-52-GT-2013
|
Approval of tariff of Korba Super Thermal Power Station Stage-I&II (2100 MW) from 01.04.2009 to 31.03.2014, after truing up exercise. |
03-07-2013 |
Petition No. D-45-GT-2013
|
Approval of tariff of Vindhyachal Super Thermal Power Station Stage-I (1240 MW) from 01.04.2009 to 31.03.2014, after the truing up exercise. |
03-07-2013 |
Petition No. D-77/2013
|
Approval of tariff of Tanda Thermal Power Station, (440 MW) for the period from 01.04.2009 to 31.03.2014, after truing up exercise. |
03-07-2013 |
Petition No. 114/GT/2012
|
approval of tariff of Ramagundam Super Thermal Power Station, Stage-I & II, (2100 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. |
28-06-2013 |
Petition No. D-97/GT/2012
|
Approval of tariff of Vindhyachal Super Thermal Power Station, Stage-III, (1000 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. |
12-07-2013 |
Petition No. D-45/GT/2013
|
Approval of tariff of Vindhyachal Super Thermal Power Station, Stage-I, (1260 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. |
01-07-2013 |
Petition No. 112/GT/2012
|
Revision of tariff of Feroze Gandhi Unchahar TPS stage-II (420 MW) for the period 01.04.2009 to 31.03.2014 (Truing up petition in petition no. 323/2009). |
14-06-2013 |
Petition No. D-52/GT/2012
|
For approval of tariff of Korba Super Thermal Power Station, Stage I& II, 2100 MW from 1.4.2009 to 31.03.2014 after truing up exercise. |
21-06-2013 |
Petition No. D-85-GT-2012
|
Approval of tariff of Korba Super Thermal Power Station Stage-III (500 MW) from 21.03.2011 to 31.03.2014, after the truing up exercise. |
17-06-2013 |
Petition No. D-110/GT/2012
|
Revision of tariff of Bhilai Expansion Power Plant (2X250 MW) for the period from 21.10.2009 to 31.03.2014. |
17-06-2013 |
Docket No.:036//2013
|
Approval of tariff of Singrauli STPS (2000 MW) for the period 1.4.2009 to 31.3.2014 after Truing up exercise. |
14-06-2013 |
Docket No. 52/GT/2012
|
Revision of tariff of Vindhyachal STPS, Stage II (1000 MW) from 1.4.2009 to 31.3.2014 after Truing up exercise. |
05-04-2013 |
Docket No. 110/GT/2012
|
Revision of tariff of Bhilai Expansion Power Plant (2 x 250 MW) from 21.10.2009 to 31.3.2014. |
05-04-2013 |
Docket No. 30/GT/2013
|
Revision of tariff of Rihand STPS, Stage-I (1000 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise. |
01-04-2013 |
Docket No. 114/GT/2012
|
Revision of tariff of Ramagundam STPS Stage I & II (2100 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise. |
21-03-2013 |
Docket No. 112/GT/2012
|
Revision of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II, (420 MW) from 01.04.2009 to 31.03.2014 after the truing up exercise. |
14-03-2013 |
Docket No. 112/GT/2012
|
Petition for revision of tariff of Feroze Gandhi Unchahar TPS Stage II (420 MW) for the period 1.4.2009 to 31.3.2014. [Truing-up]. |
27-02-2013 |
Docket No. 97/GT/2012
|
Approval of tariff of Vindhyachal Super Thermal Power Station Stage III (1000 MW) for the period 1.4.2009 to 31.3.2014. [Truing- up]. |
27-02-2013 |
Petition No. 75/GT/2012
|
Approval of tariff of Ramagundan Super Thermal Power Station Stage III (500 MW) from 1.4.2009 to 31.3.2014. |
27-02-2013 |
Petition No.
69/GT/2012
|
Approval of tariff of Sipat Super Thermal Power Station (2x500 MW) for the period 1.4.2009 to 31.3.2014 before truing- up. |
19-02-2013 |
Docket No.
89/GT/2012
|
Approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise. |
18-02-2013 |
Docket No.
67/GT/2012
|
Petition for determination of tariff of Mauda Super Thermal Power Station, Stage-I (2x500 MW) for the period from anticipated COD of Unit I to 31.3.2014. |
12-02-2013 |
Docket No. 70/GT/2012
|
Revision of tariff of Kahalgaon Super Thermal Power Station Stage II (1500 MW) from 1.4.2009 to 31.3.2014. |
11-02-2013 |
Docket No. 97/GT/2012
|
Approval of tariff of Vindhyachal Super Thermal Power Station Stage III (1000 MW) for the period 1.4.2009 to 31.3.2014. [Truing- up]. |
08-02-2013 |
Petition No. 85/GT/2012
|
Approval of tariff of Korba Super Thermal Power Station Stage III (500 MW) from 21.3.2011 to 31.3.2014 after the truing up exercise. |
08-02-2013 |
Docket No. 81/GT/2012
|
Petition for Approval of tariff from the anticipated Date of commercial operation (COD) of Unit-I to 31.3.2014 of Muzaffarpur TPS (2x110 MW).. |
07-02-2013 |
Docket No. 59/GT/2012
|
Petition for revision of tariff of Anta Gas Power Station (419.33 MW) from 1.4.2009 to 31.3.2014 after truing up. |
01-02-2013 |
Docket No. 52/GT/2012
|
Petition for revision of tariff in respect of Vindhyachal Super Thermal Power project, stage-II (1000 MW) for the period from 2009-14 before truing up after 31.3.2014. |
31-01-2013 |
Petition No. 69/GT/2012
|
Approval of tariff of Sipat Super Thermal Power Station (2x500 MW) for the period 1.4.2009 to 31.3.2014 before truing- up. |
31-01-2013 |
Petition No. 55/GT/2012
|
For revision of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up. |
31-01-2013 |
Petition No. 52/GT/2012
|
Petition for approval of tariff of Vindhyachal Super Thermal Power Station, Stage-II (1000 MW) from 1.4.2009 to 31.3.2014, after truing up. |
14-01-2013 |
: Docket No. 53/GT/2012
|
For approval of tariff of Kawas Gas Power Station (656.20 MW) from 1.4.2009 to 31.3.2014 after truing up. |
14-01-2013 |
Docket No. 73/GT/2012
|
For approval of tariff of Auraiya Gas Power Station (663.36 MW) from 1.4.2009 to 31.3.2014, after truing up. |
11-01-2013 |
Docket No. 89/GT/2012
|
For approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise. |
11-01-2013 |
Docket No. 75/GT/2012
|
Revision of tariff of Ramagundam Super Thermal Power Station, Stage III (500 MW) from 1.4.2009 to 31.3.2014. |
08-01-2013 |
Docket No. 104/GT/2012
|
Petition for determination of tariff of Vindhyachal Super Thermal Power Station, Stage IV (2x500 MW) for the period from anticipated COD to 31.3.2012.. |
26-12-2012 |
Docket No. 101/GT/2012
|
Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period 1.4.2009 to 31.3.2014. |
08-01-2013 |
Petition No. 204/GT/2011
|
Approval of tariff of Farakka Super Thermal Power Station Stage-III from 4.4.2012 to 31.3.2014. |
14-12-2012 |
Docket No. 81/GT/2012
|
Petition for Approval of tariff from the anticipated Date of commercial operation (COD) of Unit-I to 31.3.2014 of Muzaffarpur TPS (2x110 MW). . |
14-12-2012 |
Petition No. 28/2011
|
Approval of tariff of Sipat Power Station, Stage I (3X660 MW) from 1.4.2011 to 31.3.2014.. |
07-12-2012 |
Petition No. 68/GT/2012
|
Petition for determination of tariff of Rihand Super Thermal Power Station, Stage III (2x500 MW) for the period from anticipated COD to 31.3.2012. |
21-11-2012 |
Petition No. 204/GT/2011.
|
Approval of Tariff of Farakka Super Thermal Power Station – Stage III (1x500 MW) for period from the COD (4.4.2012) to 31.3.2014- Amended Petition. |
09-11-2012 |
Docket No. 75/GT/2012
|
Docket No. 75/GT/2012: Revision of tariff of Ramagundam Super Thermal Power Station, Stage III (500 MW) from 1.4.2009 to 31.3.2014.. |
12-10-2012 |
Docket No. 71/GT/2012
|
Docket No. 71/GT/2012: for approval of tariff of Dadri Gas Power Station (829.78 MW) from 1.4.2009 to 31.3.2014, after truing up.. |
11-10-2012 |
Docket No. 89/GT/2012
|
Docket No. 89/GT/2012: for approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.. |
09-10-2012 |
Docket No. 59/GT/2012
|
Docket No. 59/GT/2012: for approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.. |
09-10-2012 |
28/2011
|
Petition No. 28/2011: Approval of tariff of Sipat Power Station, Stage I (3X660 MW) from 1.4.2011 to 31.3.2014.. |
28-09-2012 |
Docket No. 56/GT/2012
|
Docket No. 56/GT/2012: Petition for approval of tariff in respect of Vallur Thermal Power Project (3x500 MW) for the period from anticipated COD of Unit-1 to 31.3.2014.. |
26-09-2012 |
Docket No. 71/GT/2012
|
Docket No. 71/GT/2012: for approval of tariff of Dadri Gas Power Station (829.78 MW) from 1.4.2009 to 31.3.2014, after truing up.. |
20-09-2012 |
Docket No. 73/GT/2012
|
Docket No. 73/GT/2012: for approval of tariff of Auraiya Gas Power Station (663.36 MW) from 1.4.2009 to 31.3.2014, after truing up. . |
20-09-2012 |
53/GT/2012
|
Petition No. 53/GT/2012: for approval of tariff of Kawas Gas Power Station (656.20 MW) from 1.4.2009 to 31.3.2014 after truing up. . |
12-09-2012 |
55/GT/2012
|
Petition No. 55/GT/2012: for approval of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up. . |
12-09-2012 |
55/GT/2012
|
Petition No. 55/GT/2012: for revision of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up.. . |
22-08-2012 |
70/GT/2012
|
Petition No. 70/GT/2012: for revision of tariff of Kahalgaon Super Thermal Power Station, Stage II (1500 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.. . |
09-08-2012 |
58/GT/2012
|
Petition for revision of tariff of National Capital Thermal Power Station Stage-II (2 x 490 MW) from 31.1.2010 to 31.3.2014 after truing up. . |
20-07-2012 |
151/MP/2012
|
Petition for relaxation of provisions in regard to Additional Capitalization from the Date of Commercial Operation up to the cut-off date for determination of tariff in respect of Bhilai Expansion Power Station (2 x 250 MW) for the period from 1.4.2009 to 31.3.2014. . |
20-07-2012 |
52/GT/2012
|
Petition for revision of tariff in respect of Vindhyachal Super Thermal Power project, stage-II (1000 MW) for the period from 2009-14 before truing up after 31.3.2014. . |
02-07-2012 |
56/GT/2012
|
Petition for approval of tariff in respect of Vallur Thermal Power project (3X 500 MW) for the period from anticipated COD of Unit-1 to 31.3.2014
. |
26-06-2012 |
204/GT/2011
|
Approval of tariff of Farakka Super Thermal Power Station, Stage-III (1 x500 MW) from the anticipated Date of commercial operation (1.10.2011) to 31.3.2014
. |
28-05-2012 |
|
Approval of Tariff of Korba STPS, Stage-III (500 MW) for the period from COD to 31.3.2014
. |
21-12-2011 |
271/2010
|
Petition No. 271/2010 for Grant of Provisional Tariff to Muzaffarpur Thermal
Power Station, Unit-ll (110 MW) for the period from 15.10.2010 to
31.03.2014.
. |
11-11-2011 |
281/2009
|
Approval of tariff of Rajiv Gandhi Combined Cycle Power Project, Kayamkulam Stage-I (359.58 MW) for the period from 01.04.2009 to 31.03.2014.. |
19-10-2011 |
21/GT/2011
|
Petition for approval of tariff of Farakka Super Thermal Power Station, Stage-III (1X500MW) for the period from anticipated date of commercial operation i.e. 01.10.2011 to 31.3.2014.. |
11-10-2011 |
279/2009
|
Amendment of petition in respect of Unchahar Thermal Power Station Stage-III (210 MW) for approval of tariff period 2009-14 . |
07-10-2011 |
222/2009
|
Amendment of petition No. 222/2009 in respect of Farakka Super Thermal Power Station (1600 MW) for approval of tariff period 2009-14. |
05-10-2011 |
224/2009
|
Approval of Tariff of Dadri Gas Power Station (829.78 MW) for the period from 01.04.2009 to 31.03.2014. . |
21-09-2011 |
323/2009
|
Approval of Tariff of FGUTPS, Stage-II (420 MW) for the period from 01.04.2009 to 31.03.2014. |
01-09-2011 |
245/2009,
189/2010
|
Approval of tariff of Kahalgaon Super Thermal Power Station Stage-I (840 MW) coupled with revision of Normative Annual Plant Availability Factor in respect of NTPCs Power Stations in Eastern Region |
16-08-2011 |
35/MP/2011,
36/MP/2011
...
|
Recovery of additional cost incurred consequent to pay revision of Employees & CISF for all NTPC
Stations from 1.1.2006 to 31.3.2009 |
16-08-2011 |
270/2009
|
Approval of tariff of Auraiya Gas Power Station (663.36 MW) for the period from 01.04.2009 to 31.03.2014. (Amended Petition) |
16-08-2011 |
-
|
NTPC petitions for determination of tariff for the period 2009-14 |
10-08-2011 |