cerc-logo

Technical Validation - NTPC

Petition No. Subject Date
119/GT/2023
Petition under Section 62 and 79(1)(a) of the Electricity Act, 2003 read with Regulation 29 of the CERC (Terms and Condition of Tariff) Regulations, 2019 for determination of tariff on installation of various Emission Control Systems at National Capital Thermal Power Station (NCTPS) Dadri Stage-I (840MW) in compliance of Revised Emission Standards. 18.10.2024
58/GT/2022
Request for time extension in Petition No. 58/GT/2022 -reg. 14.10.2024
189/GT/2020
Petition for approval of tariff of Barauni Thermal Power Station Stage -I (220 MW) for the period 2019-24. 30.08.2024
120/GT/2023
Request for time extension in Petition No. 120/GT/2023 - reg. 22.08.2024
2/GT/2024
Request for time extension in Petition No. 2/GT/2024 -reg. 05.07.2024
74/GT/2024
Request for time extension in Petition No. 74/GT/2024 -reg. 05.07.2024
189/GT/2020
Request for time extension in Petition No. 189/GT/2020 -reg. 05.07.2024
189/GT/2020
Request for time extension in Petition No. 189/GT/2020 -reg. 22.05.2024
58/GT/2022
Request for time extension in Petition No. 58/GT/2022 -reg. 22.05.2024
2/GT/2024
Request for time extension in Petition No. 2/GT/2024 -reg. 22.05.2024
236/GT/2021
Request for time extension in Petition No. 236/GT/2021 -reg. 25.04.2024
120/GT/2023
Request for time extension in Petition No. 120/GT/2023 - reg. 12.04.2024
440/GT/2020
Request for time extension in Petition No. 440/GT/2020 - reg. 12.04.2024
181/GT/2019
Request for time extension in Petition No. 181/GT/2019 - reg. 12.04.2024
154/GT/2023
Request for time extension in Petition No. 154/GT/2023 - reg. 09.04.2024
582/GT/2020 & 246/GT/2021
Request for time extension in Petition Nos. 582/GT/2020 & 246/GT/2021 -reg. 21.03.2024
387/GT/2020 & 436/GT/2020
Request for time extension in Petition Nos. 387/GT/2020 & 436/GT/2020 -reg. 21.03.2024
439/GT/2020
Request for time extension in Petition No. 439/GT/2020 -reg. 18.03.2024
145/GT/2019
Request for time extension in Petition No. 145/GT/2019-reg. 11.03.2024
181/GT/2019
Request for time extension in Petition No. 181/GT/2019-reg. 11.03.2024
221/GT/2020
Request for time extension in Petition No. 221/GT/2020 -reg. 04.03.2024
236/GT/2021
Request for time extension in Petition No. 236/GT/2021 -reg. 14.02.2024
91/GT/2023
Request for time extension in Petition No. 91/GT/2023 -reg. 08.02.2024
348/GT/2022
Request for time extension in Petition No. 348/GT/2022 -reg. 18.01.2024
154/GT/2023
Request for time extension in Petition No. 154/GT/2023 -reg. 18.01.2024
119/GT/2023
Request for time extension in Petition No. 119/GT/2023 -reg. 18.01.2024
236/GT/2021
Request for time extension in Petition no. 236/GT/2021-reg. 14.11.2023
21/RP/2023
Request for time extension in Petition No. 21/RP/2023 -reg. 31.10.2023
348/GT/2022
Request for time extension in Petition No. 348/GT/2022 -reg. 23.08.2023
236/GT/2021
Request for time extension in Petition No. 236/GT/2021 -reg. 07.06.2023
399/GT/2020
Request for time extension in Petition No. 399/GT/2020-reg. 07.06.2023
145/GT/2019
Request for time extension in Petition No. 145/GT/2019 -reg. 30.05.2023
281/GT/2020
Request for time extension in Petition No. 281/GT/2020 -reg. 12.05.2023
281/GT/2020
Petition for approval of tariff of Tanda STPS Stage-II (1320 MW) for the period from anticipated COD of Unit- I (1.11.2019 to 31.3.2024). 17.04.2023
183/GT/2022
Petition for approval of tariff of Meja Thermal Power Station Stage-I for the period from COD of Unit- I (30.4.2019 to 31.3.2024). 13.04.2023
348/GT/2022
Request for time extension in Petition No. 348/GT/2022 -reg. 05.04.2023
281/GT/2020
Request for time extension in Petition No. 281/GT/2020 -reg. 17.02.2023
154/MP/2021
Petition No. 154/MP/2021 – Filing of additional information reg. 17.02.2023
407/GT/2020
Request for time extension in Petition No. 407/GT/2020 -reg 28.12.2022
191/GT/2020
Petition for revision of tariff of Singrauli Super Thermal Power Station, (2000 MW) for the period from 1.4.2014 to 31.3.2019, after truing up exercise. 07.11.2022
392/GT/2020 & 441/GT/2020
a) Petition for revision of tariff of Talcher Super Thermal Power Station, Stage II (2000 MW) for the period from 1.4.2014 to 31.3.2019 (Petition No. 392/GT/2020).
(b) Petition for approval of tariff of Talcher Super Thermal Power Station, Stage-II (2000MW) for the period from 1.4.2019 to 31.3.2024 (Petition No. 441/GT/2020).
10.08.2022
181/GT/2019
Petition for approval of tariff of Gadarwara Super Thermal Power Station (2x800 MW) for the period from anticipated Date of Commercial Operation of Unit 1 (i.e. 30.4.2019) to 30.3.2024. 03.12.2020
253/GT/2020
Petition for revision of tariff of Kawas GPS (656.20 MW) for the period from 1.4.2014 to 31.3.2019 after the truing up exercise. 02.11.2020
301/GT/2020
Petition for revision of tariff of Jhanor Gandhar GPS (657.39 MW) for the period from 1.4.2014 to 31.3.2019 after truing up exercise. 02.11.2020
368/GT/2019
Petition under Section 62 and 79(1) (a) of the Electricity Act, 2003 read with Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 along with CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 for determination of project specific levelised tariff for 100 MW floating Solar Photo Voltaic Plant at water reservoir of Reamagundam Super Thermal Power Station (RSTPS), Ramagundam, Telengana. Ms. Ritu Apurva, Advocate, MSA Partners 20.12.2019
243/GT/2017
Petition No. 243/GT/2017- Determination of tariff of Bongaigaon Thermal Power Station (3 x 250 MW) for the period from date of commercial operation of Unit-I (1.4.2016) to 31.3.2019 AGM (Commercial), NTPC Bhawan 08.07.2019
130/GT/2014
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019 General Manager (Commercial), NTPC Bhawan 30.04.2019
199/GT/2017
Petition for determination of tariff of Kudgi Super Thermal Power Station, Stage-I (3 x 800 MW) for the period from anticipated date of commercial operation of Unit-I (25.7.2017) to 31.3.2019 25.02.2019

Petition No. 46/MP/2018
Petition No. 46/MP/2018- Petition for revision of the Normative Annual Plant Availability Factor in respect of NTPC’s Power Stations on account of Shortage of Coal availability. 09.11.2018

Petition No. 130/GT/2014
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019. 18.04.2018

Petition No. 65/TD/2018
Petition for seeking grant of Category-I inter-State trading licence. 02.04.2018

Petition No.130/GT/2014
Approval of tariff of Barh STPS Stage-II of 1st unit for the period from 15.11.2014 to 31.3.2019. 13.03.2018

-
:Terms and conditions of tariff for the tariff period starting from 1.4.2019- Seeking of information from Central Generating Companies, Joint Ventures Companies, Independent Power Producers and Central/Inter-State Transmission Companies whose tariff is being regulated by CERC. 29.12.2017

Petition No. 64/MP/2016
: Petition Nos. 64/MP/2016 & 311/MP/2015- Submission of additional information. 08.06.2017

Petition No. 130/GT/2014
Petition No. 130/GT/2014-Record of Proceedings (RoP) for the hearing held on 6.9.2016 (Barh Stage-II, 2x660 MW). 03.10.2016

Petition No. 328/GT/2014 339/GT/2014
Approval of tariff of Mauda Super Thermal Power Station (1000 MW) for the period from 1.4.2014 to 31.3.2019. 12.08.2016

Petition No. 263/GT/2014
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019 – Petition No. 263/GT/2014. 11.08.2016

Petition No. 263/GT/2014
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019. 19.07.2016

Petition No. 263/GT/2014
Approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2014 to 31.3.2019. 28.06.2016

Petition No. 293/GT/2014
Approval of tariff of Talcher Super Thermal Power Station (2000 MW) Stage- II for the period from 1.4.2014 to 31.3.2019. 28.06.2016

Petition no: 318/GT/2014
Submission of information in compliance to ROP issued in Petition No. 318/GT/2014, 372/GT/2014, 330/GT/2014, 308/GT/2014 & 299/GT/2014. 22.06.2016

-
Submission of information in compliance to ROP issued in Petition No. 296/GT/2014 & 327/GT/2014, 342/GT/2014 & 343/GT/2014, 344/GT/2014 & 322/GT/2014, 295/GT/2014 & 337/GT/2014 and 345/GT/2014 & 323/GT/2014. 13.06.2016

-
Submission of information in compliance to ROP issued in Petition No. 306/GT/2014, 338/GT/201, 325/GT/2014, 326/GT/2014 & 23/GT/2013. 27.05.2016

Petition No. 219/GT/2014 268/GT/2014
Approval of tariff of Ramagundam Super Thermal Power Station Stage-III for the period from 1.4.2009 to 31.3.2014 after truing-up. 27.05.2016

Petition No. 296/GT/2014
Submission of information in compliance to ROP issued in Petition No. 296/GT/2014 & 327/GT/2014, 342/GT/2014 & 343/GT/2014, 346/GT/2014 & 341/GT/2014, 344/GT/2014 & 322/GT/2014, 295/GT/2014 & 337/GT/2014 and 345/GT/2014 & 323/GT/2014. 17.05.2016

Petition No. 437/GT/2014
Grant of tariff of Indira Gandhi Super Thermal Power Station (1500 MW) based on audited accounts as on 31.3.2014, for the period from the COD of Unit-I (5.3.2011) to 31.3.2014. 16.05.2016

-
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. 18.04.2016

Petition Nos. 277/GT/2014
Approval of tariff for Vallur Thermal Power Project (3X500 MW) for the period 2014-19. 07.04.2016

Petition Nos. 274/GT/2014
Revision of tariff for Farakka Super Thermal Power Station, Stage – I & II (1600 MW) for the period 2009-14. 04.04.2016

Petition Nos. 277/GT/2014
Approval of tariff for Vallur Thermal Power Project (3X500 MW) for the period 2014-19. 23.03.2016

-
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. 15.03.2016

-
General directions with respect to third proviso to clause (3) of Regulation 27 of the 2014 Tariff Regulations. 15.03.2016

Petition Nos. 273/GT/2014
Revision of tariff for Talcher Thermal Power Project (460 MW) for the period 2009-14 – Petition No. 273/GT/2014. 11.03.2016

Petition No. 107/GT/2015
Grant of interim tariff for Koldam Hydroelectric Power Project (4x200 MW) for the period from the COD of Units - I & II (18.7.2015) to 31.3.2019 – Petition No. 107/GT/2015. 08.03.2016

Petition Nos. 437/GT/2014
Grant of tariff of Indira Gandhi Super Tthermal Power Station (1500 MW) based on audited accounts as on 31.3.2014, for the period from the COD of Unit-I (5.3.2011) to 31.3.2014 – Petition No. 437/GT/2014. 08.03.2016

Petition No. 258/GT/2014
Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2009 to 31.3.2014 – Petition No. 258/GT/2014. 29.01.2016

Petition Nos. 320/GT/2014
Approval of tariff of Feroze Gandhi Unchahar Stage-I (420 MW) for the period from 1.4.2009 to 31.3.2014. 01.01.2015

Petition Nos. 321/GT/2014
Approval of tariff of Feroze Gandhi Unchahar Stage-III (210 MW) for the period from 1.4.2009 to 31.3.2014. 01.01.2015

Petition Nos. 331/GT/2014
Approval of tariff of Anta GPS (419.33MW) for the period from 1.4.2009 to 31.3.2014. 23.12.2015

Petition Nos. 332/GT/2014
Approval of tariff of Feroze Gandhi Unchahar Stage - II (420MW) for the period from 1.4.2009 to 31.3.2014. 23.12.2015

Petition Nos. 335/GT/2014
Approval of tariff of Auriya GPS (663.36MW) for the period from 1.4.2009 to 31.3.2014. 23.12.2015

Petition No. 282/GT/2014
Revision of tariff of Farakka STPS, Stage-III,(500 MW) for the period from COD i.e. 4.2.2012 to 31.3.2014 after the truing up exercise. 04.09.2015

Petition No. 229 of 2009
Approval of tariff of Tanda Thermal Power Station for the period from 1.4.2014 to 31.3.2019. 11-06-2015

Petition No. 302/GT/2014
Approval of Tariff for Badarpur Thermal Power Station (705 MW) for the tariff period 2009-14 after truing up exercise. 01-06-2015

Petition No. 277/GT/2014
Extension of Time for Submission of Additional Information as per RoP dated 26.03.2015 . 15-04-2015

270/GT/2014 & 294/GT/2014
Approval of tariff of Simhadri Super Thermal Power Station Stage-I (2 x 500 MW) for the period from 1.4.2014 to 31.3.2019. 17-03-2015

Petition No. 258/GT/2015
Petition for approval of tariff of Ratnagiri sPower Station (1967.08 MW) for the period from 1.4.2009 to 31.3.2014. 03-03-2015

Petition Nos. 310/GT/2013 & 298/GT/201
Approval of tariff in respect Rihand STPS Stage-II (1000 MW) – Extension of time - reg. 17-12-2014

Petition No. 205/GT/2013
Approval of tariff in respect Rihand STPS Stage-III (1000 MW) – Extension of time - reg. 17-12-2014

Petition No. 305/GT/2014
Revision of tariff of Korba Super Thermal Power Station, Stage-III (500 MW) from 21.3.2011 to 31.3.2014 after truing-up. 10-12-2014

Petition No. 377/TT/2014
Petition for approval of tariff of 400 kV D/C Dadri-Loni Road Transmission Line of NTPC Ltd. for the period from the date of anticipated commercial operation to 31.3.2019. 27-11-2014

Petition No. 205/GT/2013
Approval of tariff of Rihand Super Thermal Power Station Stage-III (1000 MW) for the period from the anticipated date of Commercial Operation till 31.03.2014. 13-11-2014

Petition No. 198/GT/2013
Approval of tariff of Vallur Thermal Power Project for the period from anticipated date of commercial operation of Unit-I i.e. 29.11.2012 to 31.3.2014. 05-09-2014

Petition No. 198/GT/2013
Approval of tariff of Vallur Thermal Power Project for the period from anticipated date of commercial operation of Unit-I i.e. 29.11.2012 to 31.3.2014. 19-08-2014

Petition No. 132/GT/2014
Revision of Tariff of NTPC SAIL Power Company Pvt. Ltd. for the period from DOCO to 31.3.2014, after truing up. 14-07-2014

Petition No. 206/GT/2013
Revision of tariff of Kahalgaon STPS, Stage-II (1500 MW) from 1.4.2009 to 31.03.2014. 16-07-2014

Petition No. D-110/GT/2012 Petition No. 220/GT/2013
Revision of tariff of Bhilai Expansion Power Plant (2 x 250 MW) from 21.10.2009 to 31.03.2014. 05-06-2014

Petition No. 253/GT/2013
Revision of Tariff of Faridabad Gas Power Station (431.586 MW) from 1.4.2009 to 31.3.2014, after truing up. 02-06-2014

Petition No. 206/GT/2013
Petition for revision of tariff of Kahalgaon STPS, Stage-II (1500 MW) from 1.4.2009 to 31.3.2014. 27-05-2014

Petition No. 70/GT/2013
Determination of tariff of Vindhyachal Super Thermal Power Station Stage-IV (2x500 MW) for the period from date of commercial operation of Unit-I to 31.3.2014. 15-05-2014

Petition No. 310/GT/2013
Approval of tariff of Rihand STPS Stage-II (1000 MW) for the period 1.4.2009 to 31.3.2014, after Truing up. 13-05-2014

Petition No: 310/GT/2013
Petition No: 310/GT/2013– Approval of revised tariff of Rihand Super Thermal Power Station, Stage-II (1000 MW) for the period from 1.4.2009 to 31.03.2014, after the truing up exercise. 08-05-2014

Petition No. 205/GT/2013
Approval of Tariff for Rihand Thermal Power Station Stage-III (2x500=1000 MW) for the period from anticipated dates of Commercial Operation to 31.03.2014. 28-04-2014

Petition No. 320/GT/2013
Petition for revision of Tariff of Talcher STPS, Stage-II (2000 MW) for the period from 1.4.2009 to 31.3.2014, after Truing up. 15-04-2014

Petition No. 69/GT/2013
Determination of Tariff of Mauda STPS Stage-1 (2x500 MW) for the period from anticipated date of commercial operation Unit-1 to 31.3.2014. 15-04-2014

Petition No. 121/MP/2011
Petition under Regulation 44 of the CERC (Terms & Conditions of tariff) Regulation, 2009 read with Regulation 111 and other related Regulations of CERC (Conduct of Business) Regulations, 1999 for recovery of additional cost incurred due to abnormal increase in water charges at NTPC stations. 03-04-2014

Petition No. 284/GT/2013
Approval of revised tariff of Feroze Gandhi Unchahar TPS Stage-I (420 MW) for the period 1.4.2009 to 31.3.2014 after the Truing up. 03-04-2014

Petition No. 284/GT/2013
Approval of revised tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-I (420 MW) for the period from 01.04.2009 to 31.03.2014 after the Truing up. 31-03-2014

Petition No. 235/GT/2013
Petition No. 235/GT/2013 of NTPC in respect of Tanda Thermal Power Station (440 MW). 25-03-2014

Petition No. 260/GT/2013
Approval of tariff of Dadri TPS Stage-I (840 MW) for the period 1.4.2009 to 31.3.2014 after the Truing up. 11-03-2014

Petition No. 254/GT/2013
Gandhi Unchahar TPS Stage-III (210 MW). 29-01-2014

Petition No. D-320/GT/2013
Revision of Tariff for Talcher Super Thermal Power Station Stage-II (2000 MW) for the period 1.4.2009-31.3.2014 after truing up. 27-01-2014

Petition No. 260/GT/2013
Approval of revised tariff of National Capital Thermal Power Station, Dadri Stage-I (840 MW) for the period from 01.04.2009 to 31.03.2014, after Truing up. 21-01-2014

Petition No. 253/GT/2013
Revision of Tariff of Faridabad Gas Power Station (431.586 MW) from 1.4.2009 to 31.3.2014, after the Truing up. 21-01-2014

Petition No. 254/GT/2013
Petition for Revision of Tariff of Feroz Gandhi Unchahar TPS Stage-III (210 MW) for the Period 2009-14 after Truing Up Exercise-Petition No. 254/GT/2013. 31-12-2013

Petition No. D-84/GT/2013
Petition under Section 62 and 79(1)(a) of the Electricity Act, 2003 read with Chapter-V of CERC (Conduct of Business) Regulations, 1999 for approval of tariff of RGCCPP Kayamkulam (359.58 MW) from 1.4.2009 to 31.3.2014 after truing up exercise. 19-12-2013

Docket No. 41/GT/2013
Revision of tariff of Simhadri STPS Stage-II (1000 MW) from COD of Unit-I to 31.3.2014. 17-12-2013

Petition No. 17/GT/2013
Revision of tariff of National Capital TPS stage-II (2x490 MW) for the period from 31.1.2010 to 31.3.2014 after Truing up exercise. 20-11-2013

Petition No: D- 98/GT/2013
Revision of Tariff filed by NTPC vide affidavit dated 16.08.2013 for Simhadri Super Thermal Power Station Stage-I (1000 MW) for the Period 01.04.2009-31.03.2014 after the truing up exercise. 11-11-2013

Petition No. 198/GT/2013
Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. 01-11-2013

Petition No. 229/2010
Approval of tariff of Indira Gandhi super thermal power project of Aravali Power Company Pvt. Limited. 01-11-2013

Docket No. 70/GT/2012
Revision of tariff of Kahalgaon STPS, Stage-II (1500MW) from 01.04.2209 to 31.03.2014. 30-10-2013

Petition No. 250/GT/2013
Approval of tariff of Simhadri-I (1000 MW) from 01.04.2009 to 31.03.2014 after the truing up exercise. 25-10-2013

Docket No. 63/GT/2013
Docket No. 63/GT/2013: Revision of tariff (Truing up) in Petition No. 222/2009 pertaining to Farakka Super Thermal Power Station, Stage-I and II (1600MW) for the period from 01.04.2009 to 31.03.2014. 11-10-2013

Docket No.:77/2013
Approval of tariff of Tanda TPS (440 MW) for the period 1.4.2009 to 31.3.2014 after Truing up exercise. 08-10-2013

Petition No. 67/GT/2012
Approval of tariff of Mauda Super Power Station Stage-I (2X500 MW) for the period from anticipated Date of Commercial Operation to 31.3.2014. 06-09-2013

Petition No. 104/GT/2012
Approval of tariff of Vindhyachal Super Power Station Stage-IV (2X500 MW) for the period from the date of its commercial operation of Unit to 31.3.2014. 09-09-2013

Petition No. D-85-GT-2012
Approval of tariff of Korba Super Thermal Power Station Stage-III (500 MW) from 21.03.2011 to 31.03.2014, after the truing up exercise. 06-09-2013

Petition No. D-84-GT-2013
Approval of tariff of RGCCPP Kayamkulam (359.58 MW) for the period from 1.4.2009 to 31.3.2014 after truing up exercise. 05-09-2013

Dock No. 56/GT/2012
Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. 04-09-2013

Petition No. D-85/2013
Approval of tariff of Talcher Super Thermal Power Station Stage-I, (1000 MW) for the period from 01.04.2009 to 31.03.2014 after truing up exercise. 03-09-2013

Petition No. D-63/GT/2013
Revision of tariff (Truing up) in Petition No. 222/2009 pertaining to Farakka STPS, Stage I & II (1600 MW) for the period from 01.04.2009 to 31.03.2014. 03-09-2013

Petition No. 56/GT/2013
Petition No. 56/GT/2013: Approval of tariff of Vallur Thermal Power Project (3X500 MW) for the period from anticipated Date of Commercial Operation of Unit-I to 31.3.2014. 06-08-2013

Petition No. D-41/GT/2013
Revision of tariff (Truing up) for the period 16.09.2011 to 31.03.2014 in respect of Simhadri Super TPS Stage II (2x500MW). 31-07-2013

Petition No. D-70/GT/2012
Petition No. D-70/GT/2012: Revision of tariff of Kahalgaon STPS, Stage– II (1500 MW) from 1.4.2009 to 31.03.2014. 13-06-2013

Petition No. 67/GT/2012
Approval of tariff of Mauda Super Power Station Stage-I (2X500 MW) for the period from anticipated Date of Commercial Operation to 31.3.2014. 16-07-2013

Petition No. D-52-GT-2013
Approval of tariff of Korba Super Thermal Power Station Stage-I&II (2100 MW) from 01.04.2009 to 31.03.2014, after truing up exercise. 03-07-2013

Petition No. D-45-GT-2013
Approval of tariff of Vindhyachal Super Thermal Power Station Stage-I (1240 MW) from 01.04.2009 to 31.03.2014, after the truing up exercise. 03-07-2013

Petition No. D-77/2013
Approval of tariff of Tanda Thermal Power Station, (440 MW) for the period from 01.04.2009 to 31.03.2014, after truing up exercise. 03-07-2013

Petition No. 114/GT/2012
approval of tariff of Ramagundam Super Thermal Power Station, Stage-I & II, (2100 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. 28-06-2013

Petition No. D-97/GT/2012
Approval of tariff of Vindhyachal Super Thermal Power Station, Stage-III, (1000 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. 12-07-2013

Petition No. D-45/GT/2013
Approval of tariff of Vindhyachal Super Thermal Power Station, Stage-I, (1260 MW) from 1.4.2009 to 31.03.2014 after truing up exercise. 01-07-2013

Petition No. 112/GT/2012
Revision of tariff of Feroze Gandhi Unchahar TPS stage-II (420 MW) for the period 01.04.2009 to 31.03.2014 (Truing up petition in petition no. 323/2009). 14-06-2013

Petition No. D-52/GT/2012
For approval of tariff of Korba Super Thermal Power Station, Stage I& II, 2100 MW from 1.4.2009 to 31.03.2014 after truing up exercise. 21-06-2013

Petition No. D-85-GT-2012
Approval of tariff of Korba Super Thermal Power Station Stage-III (500 MW) from 21.03.2011 to 31.03.2014, after the truing up exercise. 17-06-2013

Petition No. D-110/GT/2012
Revision of tariff of Bhilai Expansion Power Plant (2X250 MW) for the period from 21.10.2009 to 31.03.2014. 17-06-2013

Docket No.:036//2013
Approval of tariff of Singrauli STPS (2000 MW) for the period 1.4.2009 to 31.3.2014 after Truing up exercise. 14-06-2013

Docket No. 52/GT/2012
Revision of tariff of Vindhyachal STPS, Stage II (1000 MW) from 1.4.2009 to 31.3.2014 after Truing up exercise. 05-04-2013

Docket No. 110/GT/2012

Revision of tariff of Bhilai Expansion Power Plant (2 x 250 MW) from 21.10.2009 to 31.3.2014.
05-04-2013

Docket No. 30/GT/2013

Revision of tariff of Rihand STPS, Stage-I (1000 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.
01-04-2013

Docket No. 114/GT/2012

Revision of tariff of Ramagundam STPS Stage I & II (2100 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.
21-03-2013

Docket No. 112/GT/2012

Revision of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-II, (420 MW) from 01.04.2009 to 31.03.2014 after the truing up exercise.
14-03-2013

Docket No. 112/GT/2012

Petition for revision of tariff of Feroze Gandhi Unchahar TPS Stage II (420 MW) for the period 1.4.2009 to 31.3.2014. [Truing-up].
27-02-2013

Docket No. 97/GT/2012

Approval of tariff of Vindhyachal Super Thermal Power Station Stage III (1000 MW) for the period 1.4.2009 to 31.3.2014. [Truing- up].
27-02-2013

Petition No. 75/GT/2012

Approval of tariff of Ramagundan Super Thermal Power Station Stage III (500 MW) from 1.4.2009 to 31.3.2014.
27-02-2013

Petition No. 69/GT/2012

Approval of tariff of Sipat Super Thermal Power Station (2x500 MW) for the period 1.4.2009 to 31.3.2014 before truing- up.
19-02-2013

Docket No. 89/GT/2012

Approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.
18-02-2013

Docket No. 67/GT/2012

Petition for determination of tariff of Mauda Super Thermal Power Station, Stage-I (2x500 MW) for the period from anticipated COD of Unit I to 31.3.2014.
12-02-2013

Docket No. 70/GT/2012

Revision of tariff of Kahalgaon Super Thermal Power Station Stage II (1500 MW) from 1.4.2009 to 31.3.2014.
11-02-2013

Docket No. 97/GT/2012

Approval of tariff of Vindhyachal Super Thermal Power Station Stage III (1000 MW) for the period 1.4.2009 to 31.3.2014. [Truing- up].
08-02-2013

Petition No. 85/GT/2012

Approval of tariff of Korba Super Thermal Power Station Stage III (500 MW) from 21.3.2011 to 31.3.2014 after the truing up exercise.
08-02-2013

Docket No. 81/GT/2012

Petition for Approval of tariff from the anticipated Date of commercial operation (COD) of Unit-I to 31.3.2014 of Muzaffarpur TPS (2x110 MW)..
07-02-2013

Docket No. 59/GT/2012

Petition for revision of tariff of Anta Gas Power Station (419.33 MW) from 1.4.2009 to 31.3.2014 after truing up.
01-02-2013

Docket No. 52/GT/2012

Petition for revision of tariff in respect of Vindhyachal Super Thermal Power project, stage-II (1000 MW) for the period from 2009-14 before truing up after 31.3.2014.
31-01-2013

Petition No. 69/GT/2012

Approval of tariff of Sipat Super Thermal Power Station (2x500 MW) for the period 1.4.2009 to 31.3.2014 before truing- up.
31-01-2013

Petition No. 55/GT/2012

For revision of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up.
31-01-2013

Petition No. 52/GT/2012

Petition for approval of tariff of Vindhyachal Super Thermal Power Station, Stage-II (1000 MW) from 1.4.2009 to 31.3.2014, after truing up.
14-01-2013

: Docket No. 53/GT/2012

For approval of tariff of Kawas Gas Power Station (656.20 MW) from 1.4.2009 to 31.3.2014 after truing up.
14-01-2013

Docket No. 73/GT/2012

For approval of tariff of Auraiya Gas Power Station (663.36 MW) from 1.4.2009 to 31.3.2014, after truing up.
11-01-2013

Docket No. 89/GT/2012

For approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.
11-01-2013

Docket No. 75/GT/2012

Revision of tariff of Ramagundam Super Thermal Power Station, Stage III (500 MW) from 1.4.2009 to 31.3.2014.
08-01-2013

Docket No.
104/GT/2012

Petition for determination of tariff of Vindhyachal Super Thermal Power Station, Stage IV (2x500 MW) for the period from anticipated COD to 31.3.2012..
26-12-2012

Docket No.
101/GT/2012

Approval of tariff of Badarpur Thermal Power Station (705 MW) for the period 1.4.2009 to 31.3.2014.
08-01-2013

Petition No.
204/GT/2011

Approval of tariff of Farakka Super Thermal Power Station Stage-III from 4.4.2012 to 31.3.2014.
14-12-2012

Docket No.
81/GT/2012

Petition for Approval of tariff from the anticipated Date of commercial operation (COD) of Unit-I to 31.3.2014 of Muzaffarpur TPS (2x110 MW). .
14-12-2012

Petition No.
28/2011

Approval of tariff of Sipat Power Station, Stage I (3X660 MW) from 1.4.2011 to 31.3.2014..
07-12-2012

Petition No.
68/GT/2012

Petition for determination of tariff of Rihand Super Thermal Power Station, Stage III (2x500 MW) for the period from anticipated COD to 31.3.2012.
21-11-2012

Petition No.
204/GT/2011.

Approval of Tariff of Farakka Super Thermal Power Station – Stage III (1x500 MW) for period from the COD (4.4.2012) to 31.3.2014- Amended Petition.
09-11-2012

Docket No.
75/GT/2012

Docket No. 75/GT/2012: Revision of tariff of Ramagundam Super Thermal Power Station, Stage III (500 MW) from 1.4.2009 to 31.3.2014..
12-10-2012

Docket No.
71/GT/2012

Docket No. 71/GT/2012: for approval of tariff of Dadri Gas Power Station (829.78 MW) from 1.4.2009 to 31.3.2014, after truing up..
11-10-2012

Docket No.
89/GT/2012

Docket No. 89/GT/2012: for approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise..
09-10-2012

Docket No.
59/GT/2012

Docket No. 59/GT/2012: for approval of tariff of Kahalgaon Super Thermal Power Station, Stage I (840 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise..
09-10-2012

28/2011

Petition No. 28/2011: Approval of tariff of Sipat Power Station, Stage I (3X660 MW) from 1.4.2011 to 31.3.2014..
28-09-2012

Docket No.
56/GT/2012

Docket No. 56/GT/2012: Petition for approval of tariff in respect of Vallur Thermal Power Project (3x500 MW) for the period from anticipated COD of Unit-1 to 31.3.2014..
26-09-2012

Docket No.
71/GT/2012

Docket No. 71/GT/2012: for approval of tariff of Dadri Gas Power Station (829.78 MW) from 1.4.2009 to 31.3.2014, after truing up..
20-09-2012

Docket No.
73/GT/2012

Docket No. 73/GT/2012: for approval of tariff of Auraiya Gas Power Station (663.36 MW) from 1.4.2009 to 31.3.2014, after truing up. .
20-09-2012

53/GT/2012

Petition No. 53/GT/2012: for approval of tariff of Kawas Gas Power Station (656.20 MW) from 1.4.2009 to 31.3.2014 after truing up. .
12-09-2012

55/GT/2012

Petition No. 55/GT/2012: for approval of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up. .
12-09-2012

55/GT/2012

Petition No. 55/GT/2012: for revision of tariff of Jhanor Gandhar Gas Power Station (657.39 MW) from 1.4.2009 to 31.3.2014 after truing up.. .
22-08-2012

70/GT/2012

Petition No. 70/GT/2012: for revision of tariff of Kahalgaon Super Thermal Power Station, Stage II (1500 MW) from 1.4.2009 to 31.3.2014 after the truing up exercise.. .
09-08-2012

58/GT/2012

Petition for revision of tariff of National Capital Thermal Power Station Stage-II (2 x 490 MW) from 31.1.2010 to 31.3.2014 after truing up. .
20-07-2012

151/MP/2012

Petition for relaxation of provisions in regard to Additional Capitalization from the Date of Commercial Operation up to the cut-off date for determination of tariff in respect of Bhilai Expansion Power Station (2 x 250 MW) for the period from 1.4.2009 to 31.3.2014. .
20-07-2012

52/GT/2012

Petition for revision of tariff in respect of Vindhyachal Super Thermal Power project, stage-II (1000 MW) for the period from 2009-14 before truing up after 31.3.2014. .
02-07-2012

56/GT/2012

Petition for approval of tariff in respect of Vallur Thermal Power project (3X 500 MW) for the period from anticipated COD of Unit-1 to 31.3.2014 .
26-06-2012

204/GT/2011

Approval of tariff of Farakka Super Thermal Power Station, Stage-III (1 x500 MW) from the anticipated Date of commercial operation (1.10.2011) to 31.3.2014 .
28-05-2012


247/2010


Approval of Tariff of Korba STPS, Stage-III (500 MW) for the period from COD to 31.3.2014 .
21-12-2011

271/2010

Petition No. 271/2010 for Grant of Provisional Tariff to Muzaffarpur Thermal Power Station, Unit-ll (110 MW) for the period from 15.10.2010 to 31.03.2014. .
11-11-2011

281/2009

Approval of tariff of Rajiv Gandhi Combined Cycle Power Project, Kayamkulam Stage-I (359.58 MW) for the period from 01.04.2009 to 31.03.2014..
19-10-2011

21/GT/2011

Petition for approval of tariff of Farakka Super Thermal Power Station, Stage-III (1X500MW) for the period from anticipated date of commercial operation i.e. 01.10.2011 to 31.3.2014.
.
11-10-2011

279/2009

Amendment of petition in respect of Unchahar Thermal Power Station Stage-III (210 MW) for approval of tariff period 2009-14
.
07-10-2011

222/2009

Amendment of petition No. 222/2009 in respect of Farakka Super Thermal Power Station (1600 MW) for approval of tariff period 2009-14.
05-10-2011

224/2009

Approval of Tariff of Dadri Gas Power Station (829.78 MW) for the period from 01.04.2009 to 31.03.2014. .
21-09-2011

323/2009

Approval of Tariff of FGUTPS, Stage-II (420 MW) for the period from 01.04.2009 to 31.03.2014.
01-09-2011

245/2009,
189/2010

Approval of tariff of Kahalgaon Super Thermal Power Station Stage-I (840 MW) coupled with revision of Normative Annual Plant Availability Factor in respect of NTPCs Power Stations in Eastern Region
16-08-2011

35/MP/2011,
36/MP/2011
...

Recovery of additional cost incurred consequent to pay revision of Employees & CISF for all NTPC Stations from 1.1.2006 to 31.3.2009
16-08-2011

270/2009

Approval of tariff of Auraiya Gas Power Station (663.36 MW) for the period from 01.04.2009 to 31.03.2014. (Amended Petition)
16-08-2011

-

NTPC petitions for determination of tariff for the period 2009-14
10-08-2011