Petition No. Subject Date
390/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Determination of Transmission Tariff from COD to 31.3.2024 for Asset-I: 400 kV D/C Mohindergarh-Bhiwani TL along with communication equipment at both ends and OPGW in place of one earth wire under “Northern region System Strengthening Scheme (NRSSS)-XXXV” scheme in Northern Region and Asset-II: 2 Nos. 400 kV Line bays at Bhiwani (POWERGRID) Sub-station under “Construction of two Nos. 400 kV Line bays at Bhiwani (POWERGRID) Sub-station” scheme in the Northern Region. 29.08.2024
183/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Transmission Asset: 1 no. 220 kV Line Bay (209) for Termination of Gola (UP) - Shahjahanpur (PG) Ckt-1 at Shahjahanpur (PG) 400/220 kV Sub-station under “Implementation of 220 kV Bay at Shahjahanpur (PG) 400/220 kV Sub-station”. 29.08.2024
181/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: 2 No. 420 kV, 3-phase 63 MVAr Switchable Line Reactor one in each circuit of Silchar (POWERGRID) – Imphal (POWERGRID) 400 kV D/C line at Imphal end and Asset-2: 100 MVA, 220/132 kV ICT (3rd) along with associated bays at Salakati Sub-station under Project – " North Eastern Region Strengthening Scheme-XI". 29.08.2024
150/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: Conversion of 240 MVAr Non-switchable Line reactor at Raipur PS (associated with Raipur PS-Champa PS 765 kV Ckt-1) into Switchable Line reactor along with NGR bypass arrangement and Asset-2: Conversion of 240 MVAr Non-switchable Line reactor at Raipur PS (associated with Raipur PS-Champa PS 765 kV Ckt- 2) into Switchable Line reactor along with NGR bypass arrangement under “Western Region Expansion Scheme- XXIV (WRES-XXIV)” in the Western Region. 29.08.2024
208/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Proposed COD to 31.3.2024 for Asset-1: 1 no. 400 kV Bay at 765/400 kV Kurnool (New) Sub-station under implementation of 1 no. 400 kV Bay at 765/400 kV Kurnool (New) Sub-station in Southern Region. 29.08.2024
187/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for “Provision of SPARE ICTs” in Eastern Region 29.08.2024
184/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Transmission Asset:-1: 1x500 MVA, 400/220kV ICT along with associated bays at Kurukshetra (PG) Sub-station and Asset:-2: 1x500 MVA, 400/220 kV ICT along with 400kV & 220 kV Bays at Patiala (PG) Sub-station under “Augmentation of Transformation Capacity at 400/220 kV Kurukshetra (PG) & Patiala (PG) Sub-station”. 29.08.2024
182/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business)Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Proposed COD to 31.3.2024 for Transmission Asset:-1:- 4 nos. of 220kV line bays at Khatkar (Jind) Sub-station for LILO of both circuit of 220 kV Jind HVPNL to PTPS D/C line at 400 kV PGCIL Khatkar (Jind) Sub-station and Asset-2: - 2 nos. of 220 kV line bays at Naggal (Panchkula) Sub-station for 220 kV D/C line from 400 kV PGCIL (Panchkula) to proposed 220 kV Sub-station Sadhaura under “220 kV Bays at 400 kV Sub-station PG Khatkar (Jind) & Naggal (Panchkula) Sub-station” 29.08.2024
149/TT/2024
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for 2 nos. of 400 kV line bays at Padghe (PG) GIS for termination of Padghe (PG) – Kharghar 400 kV D/c (quad) line under Western Region System Strengthening Scheme – XIX. 29.08.2024
159/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Asset 1- OPGW link for 765 kV Bina-Jabalpur (230 kms) under central sector, Combined Asset 2, (Asset 2A-OPGW link for 220 kV Vapi-Kharadpada (30 Kms) & Asset 2B-OPGW link for 66 kV Kharadpada-Ambali (15 Kms) under Central Sector), Asset 3- OPGW link for 400 kV Bina-Bina (JP) (20 kms) under Central Sector, Asset 4- OPGW link for 220 kV RBPH-CHPH (1.20 kms) under Central Sector, Asset 5- OPGW link for 400 kV Bhachau-Vasrana (9.25 kms) under Central Sector, Asset 6-OPGW link for 765 kV Bina-Indore (311 kms) under Central Sector, Asset-7- OPGW link for 400 kV Nagda-Dehgam (331 kms) ... 29.08.2024
185/TT/2024
Approval under Regulation 23 of CERC (Conduct of Business)Regulations, 2023 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Determination of Transmission Tariff from Actual COD to 31.3.2024 for Asset-1: 765 kV Spare (1-ph) Reactor unit at 765 kV Chilakaluripeta Sub-station & Asset-2: Scheme to bypass NGR to use Switchable line reactor as Bus reactor at 765 kV Chilakaluripeta Sub-station in the Southern Region. 29.08.2024
389/TT/2023
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from proposed COD to 31.3.2024 for Transmission Asset: 500MVA, 400/220kV ICT-8 along with associated 400kV and 220kV bays at Bhadla Substation under “Implementation of the 1x500MVA, 400/220kV ICT (8th) at Bhadla Pooling Station Scheme in Northern Region” 22.04.2024
369/TT/2023
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Transmission Asset: Replacement of 1X250 MVA, 400/220 kV ICT at 765/400/220 kV Moga (PG) Substation with 1X500 MVA, 400/220kV ICT along with associated works at 220kV level under “Replacement of 1X250 MVA, 400/220 kV ICT at 765/400/220 kV Moga (PG) Substation with 1X500 MVA, 400/220kV ICT along with associated works at 220kV level. 22.04.2024
367/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Asset -1: 02 nos. 220 kV Line bays at Navsari Sub-station (GIS) (for Navsari-Bhestan 220kV D/c line), Asset –2: 1X125MVAr,400kV Bus Reactor at Vododara Sub Station along with associated 400kV bus reactor bay and Asset-3: 01 number 400 kV Line bay at 400 kV Vadodara (GIS) Sub-station under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. 22.04.2024
359/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Asset (01 nos) under “Northern Region System Strengthening - XL” in Northern Region. 22.04.2024
351/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from from DOCO to 31-03-2024 for “Eastern Region Expansion Scheme - XXVI” in Eastern Region. 22.04.2024
350/TT/2023
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from proposed COD to 31.3.2024 for Bypassing of Ranchhodpura (GETCO) – Dehgam (PG) 400 kV D/c line at Dehgam (PG) S/s and connecting it with Dehgam (PG) – Pirana 400 kV D/c line (one circuit via Nicol) so as to form Ranchhodpura (GETCO) – Pirana (PG) 400 kV D/c line (one circuit via Nicol) under “Scheme for fault level control at Dehgam (PG) & Ranchhodpura (GETCO) S/s” in Western Region.” 22.04.2024
127/TT/2024
Approval under Regulation 86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from DOCO to 31.03.2024 for Asset 1: 01 No 400/220KV, 500 MVA ICT along with associated bays at Bhatapara substation under “Augmentation of 1x500 MVA, 400/220 kV ICT (3rd) at Bhatapara (PG)” in Western Region. 22.04.2024
95/TT/2024
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.03.2024 for combined assets under Reliable Communication Scheme under Central Sector for Western Region. 22.04.2024
86/TT/2024
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Asset I- 132 kV D/C Roing (PG) - Chapakhowa (AEGCL) Transmission Line along with associated line bays at Roing (PG) and - Chapakhowa (AEGCL) end under Project – "North Eastern Region Strengthening Scheme-X”. 22.04.2024
85/TT/2024
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from Anticipated DOCO to 31-03-2024 for 03 Nos of Assets under “Augmentation of Transformation Capacity” in Southern Region. 22.04.2024
392/TT/2023
Petition for determination of Transmission Tariff from proposed COD to 31.3.2024 for Asset 1 - LILO of Palatana – Surajmaninagar (ISTS) 400 kV D/C line at 400/132 kV Surajmaninagar (TSECL) Substation under Project– "Transmission System for North Eastern Region Strengthening Scheme-XIV" in the North Eastern Region. 15.04.2024
391/TT/2023
Petition for determination of tariff and Truing up of Transmission tariff for 2014-19 tariff period for Asset-1 and Determination of transmission tariff for 2019-24 tariff period for Asset-1 and from COD to 31.3.2024 for Asset 2 to Asset 15 under “Establishment of Fibre Optic Communication System in Northern Region under fibre optic expansion project (Additional Requirement)” 15.04.2024
390/TT/2023
Petition for Determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: 400kV D/C Mohindergarh-Bhiwani TL along with communication equipment at both ends and OPGW in place of one earth wire under “Northern region System Strengthening Scheme (NRSSS)-XXXV” scheme in Northern Region and Asset-2: 2 Nos. 400kV Line bays at Bhiwani (POWERGRID) sub-station under “Construction of two Nos. 400kV Line bays at Bhiwani (POWERGRID) sub-station” scheme in the Northern Region. 15.04.2024
370/TT/2023
Petition for Determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: Addition of 1x500 MVA, 400/230 kV ICT (5th) along with associated bays & equipment at Tuticorin-II GIS Substation & Asset-2: Addition of 1x500 MVA, 400/230 kV ICT (4th) along with associated bays & equipment at Tuticorin-II GIS Substation under “Evacuation of RE in Tirunelveli and Tuticorin wind energy zone (Tamil Nadu) 500 MW” in the Southern Region 15.04.2024
360/TT/2023
Petition for for determination of transmission tariff from COD to 31.3.2024 for Replacement of 1x315 MVA, 400/220kV ICT (ICT-1) at 400/220kV Ludhiana (PG) Substation with 1x500MVA, 400/220kV ICT under “Replacement of 1x315 MVA 400/220kV ICT (ICT-1) at 400/220kV Ludhiana (PG) S/s with 1x500MVA 400/220kV ICT”. 15.04.2024
349/TT/2023
Petition for Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for Assets under ” Transmission System Associated with Parbati-III HEP” in the Northern Region. 15.04.2024
96/TT/2024
Petition for Determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: Phase -I Unified Real Time Dynamic State Measurement (URTDSM) For NLDC, Backup NLDC And NTAMC System-Phase -I Unified Real Time Dynamic State Measurement (URTDSM) For NLDC, Backup NLDC And NTAMC System-Phasor Data Concentrator (PDC) At NLDC, Backup NLDC And NTAMC System and Asset-2: URTDSM System (Control Center equipment, PMUs and associated equipment integrated and commissioned at ERLDC (07 PMUs) under “Phase-I- Unified Real Time Dynamic State Measurement (URTDSM)”. 15.04.2024
94/TT/2024
Petition for determination of transmission tariff from COD to 31.3.2024 for Asset 1- Reconductoring of 400kV Kolhapur (PG) – Kolhapur (MSETCL) TL - Ckt 1 along with upgradation of 400kV bays at Kolhapur (MSETCL) substation and Asset 2- Reconductoring of 400kV Kolhapur (PG) – Kolhapur (MSETCL) TL - Ckt 2 along with upgradation of 400kV bays at Kolhapur (MSETCL) substation under “Transmission system strengthening beyond Kolhapur for export of power from Solar & Wind energy zones in Southern Region - Re-conductoring of Kolhapur (PG) - Kolhapur 400 kV D/c line”. 15.04.2024
90/TT/2024
Petition for determination of Transmission Tariff from COD to 31.3.2024 for Transmission Asset: 1x500MVA, 400/220kV ICT (3rd) at 400/220kV Sohawal (PG) Substation under “1x500MVA, 400/220kV ICT Augmentation (3rd) at Sohawal (PG) under System Strengthening” 15.04.2024
26/RP/2022 in 719/TT/2020
Petition seeking review of the Commission’s order dated 25.11.2021 in Petition No. 719/TT/2020 whereby transmission tariff for the 2014-19 period in respect ATS of Meja Thermal Power Project was trued up and transmission tariff for 2019-24 period was determined – reg. 20.11.2023
330/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Determination of Transmission Tariff from COD to 31.3.2024 for Three No. of Assets under “System Strengthening Scheme in Northern Region–XXXVII (NRSS-XXXVII)”. 07.11.2023
329/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for 02 Nos. of 132 kV GIS line bays at Nirjuli Substation for termination of LILO of one circuit of Pare HEP – North Lakhimpur (AEGCL) 132 kV D/C line (Line works under TBCB) under “North Eastern Region Strengthening Scheme-IX.” 07.11.2023
327/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from the COD to 31.3.2024 for Asset-1: 2 Nos. 400kV GIS line bays at Koteshwar substation under “Line bays associated with the Northern region System Strengthening Scheme-XXXVI” in the Northern Region. 07.11.2023
326/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2019 for determination of Transmission Tariff from COD to 31.3.2024 for assets under “Reliable Communication Scheme under Central Sector for Southern Region” 07.11.2023
323/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for Truing up of Transmission tariff for 2014-19 tariff period and Determination of Transmission tariff for 2019-24 tariff period for Asset 1: OPGW link for Betul-Khandwa under Central Sector, Asset 2: OPGW link (125 km) for Mauda-Wardha under Central Sector, Asset 3: 6 no. OPGW link (92.66 km) under State Sector, Asset 4A: 3 no. OPGW link (656.926 km) under Central Sector, Asset 4B: OPGW link for Korba-Birsinghpur under Central Sector, Asset 5A: OPGW link (15.462 km) for 400kV Xeldom-Madgaon under State sector , Asset 5B: OPGW link for 400kV Vapi–Magarwada under Central Sector and Asset 6: 9 no. of OPGW link under State Sector- OPGW link (169 km) for) associated “Establishment of Fibre Optic Communication System in Western Region under Master Communication Plan (Additional Requirement)” 07.11.2023
38/MP/2023
Petition for approval of Central Electricity Regulatory Commission for inclusion of 400/220/66 kV GIS Pooling Sub-Station Wangtoo (Sherpa Colony) of H.P. Power Transmission Corporation Limited under PoC mechanism for recovery of transmission charges under Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020. 18.09.2023
209/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for ... 14.09.2023
194/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.3.2024 for Asset-I: Yelahanka- Tumkur (73.412km) OPGW communication link along with associated Communication Equipment’s and Asset-II: NCTPS (TNEB) - Tondiarpet (TNEB) (17.893 km) OPGW communication link along with associated Communication Equipment's under “Fiber Optic Communication system for central sector Sub-stations & Generating Stations in Southern Region.” 14.09.2023
193/TT/2023
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Actual COD to 31.3.2024 for Asset under “Regional Strengthening Scheme to mitigate the overloading of 400 kV NP Kunta -Kolar S/C line” in the Southern Region. 14.09.2023
191/TT/2023
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: Extension of 400 kV Bachau substation with line reactor along with associated line bays and Asset-2: Essar Gujarat TPS-Bachau 400 kV D/C (triple) line under “Transmission System for connectivity of Essar Power Gujarat Limited” in the Western Region. 14.09.2023
132/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-I: Combined Asset of (1) LILO of one circuit of Bamnauli- Jattikalan 400 kV D/C line along with associated bays at Dwarka-I substation, (2) 400/200 kV, 500 MVA ICT-I, II & III along with associated bays at Dwarka-I substation, (3) 400 kV, 125 MVAR bus reactor along with associated bay at Dwarka-I substation;Asset-II: 400/200kV, 500 MVA ICT-IV along with associated bays at Dwarka-I substation; Asset-III: LILO of circuit-2 of 400 kV D/C Bawana-Mandola line at Maharanibagh substation along with associated bays; Asset-IV: LILO of circuit-1 of 400 kV D/C Bawana-Mandola line at Maharanibagh substation along with associated bays ; Asset-V: By passing of LILO of one circuit of 400 kV Dadri–Ballabhgarh D/C line at Maharanibagh (existing) (to be used during emergency) under “Creation of 400/220 kV Substations in NCT of Delhi during 12th plan period (Part-A)” 14.09.2023
52/TT/2023
Determination of transmission tariff from COD to 31.3.2014 for Asset-1 : 500MVA, 400/220kV, 3Ph, ICT-5 alongwith associated bays at Bhadla S/s, Asset-2: 500MVA, 400/220kV, 3Ph, ICT-3 alongwith associated bays at Saharanpur S/s, Asset-3: 500MVA, 400/220kV, 3Ph, ICT-4(5th ICT) alongwith associated bays at Bhadla S/s, Asset-4 400kV,125MVAR Bus Reactor-2 along with asscoaited bays at Sikar S/s, Asset-5: 400 kV, 125 MVAR, 3 Ph Bus Reactor along with associated bays at Mandola Substation, Asset-6: 500 MVA, 400/220 kV, 3 Ph ICT along with associated ... 14.09.2023
15/TT/2023
Determination of transmission tariff from COD to 31.3.2014 for Asset-1: Bypassing of 400 kV D/C Farakka - Kahalgaon (Ckt-3 & Ckt-4) and 400 kV S/C Farakka - Durgapur (Ckt-1 & Ckt-2) existing Transmission Line from NTPC, Farakka so as to form 400 kV D/C Kahalgaon - Durgapur along with upgraded bays at Durgapur SS and Kahalgaon Sub-station; Asset-2: 01 no. 500 MVA, 400/220 kV Transformer (4th ICT) along with 01 no. 400 kV ICT bay (AIS) & 01 No. 220 kV ICT bay (GIS) along with 220 kV Cable from ICT to GIS bay at Muzaffarpur (POWERGRID) 400/220 kV sub-station and Asset-3: LILO of both Circuits of Kishanganj (POWERGRID) - Darbhanga (DMTCL) 400 kV D/C (Quad) Line at Saharsa New (POWERGRID) sub-station along with associated 04 nos 400kV Line Bays at Saharsa New (POWERGRID) sub-station under “Eastern Region Strengthening Scheme-XXIII” in the Eastern Region. 14.09.2023
9/TT/2023
Determination of transmission tariff from COD to 31.3.2014 for Asset-I: 400/220 kV 500 MVA ICT IV along with 400kV Bay at Biharsharif (POWERGRID) substation and 220kV Bay at Biharsharif (BSPTCL) substation along with 220 kV interconnecting line from Biharsharif (BSPTCL) substation to 220 kV bushing of ICT installed at Biharsharif (POWERGRID) substation, Asset-II: Replacement of 220/132 kV, 1X50 MVA ICT with 220/132 kV 160 MVA ICT along with suitable modification of bay equipment at Malda substation, Asset-III: Reconductoring of 220kV D/C New Purnea – Purnea Ckt.-I and Ckt.-II transmission line ... 14.09.2023
4/TT/2023
Determination of transmission tariff from COD to 31.3.2024 for Transmission Assets under “POWERGRID works associated with immediate evacuation for North Karanpura (3x660 MW) generation project of NTPC" in the Eastern Region. 14.09.2023
295/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 ... 13.09.2023
180/TT/2021
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.3.2024 for Asset-I: LILO of 400kV S/C Lonikhand (MSETCL) – Kalwa (MSETCL) Line at Navi-Mumbai alongwith 400/220 kV Navi Mumbai ( GIS Substation) at Navi Mumbai under ‘Western Region System Strengthening Scheme V’ 13.09.2023
177/TT/2023
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Actual/Anticipated COD to 31.3.2024 for Asset-1: 1 x 500 MVA, 400/220kV Transformer along with associated bays at Hiriyur Substation and Asset-2: 1 x 500 MVA, 400/220 kV Transformer along with associated bays at Kochi Substation unde Augmentation of Transformation capacity at existing Hiriyur and Kochi Substations in the Southern Region 13.09.2023
159/TT/2023
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for ... 13.09.2023
133/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: “02 nos 400 KV GIS Line Bays at 765/400 kV Varanasi substation” covered under "Construction of 2 nos. of 400 kV Hybrid/GIS Line bays at Varanasi (PG) Substation" in the Northern Region. 13.09.2023
116/TT/2023
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for ... 13.09.2023
115/TT/2023
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset-1: 1x1500MVA, 765/400 kV ICT (3rd) along with associated bays at Vadodara substation under “Transmission Network Expansion in Gujarat to increase its ATC from ISTS (Part A)” 13.09.2023
15/TT/2023
Determination of transmission tariff from COD to 31.3.2014 for Asset-1: Bypassing of 400 kV D/C Farakka - Kahalgaon (Ckt-3 & Ckt-4) and 400 kV S/C Farakka - Durgapur (Ckt-1 & Ckt-2) existing Transmission Line from NTPC, Farakka so as to form 400 kV D/C Kahalgaon - Durgapur along with upgraded bays at Durgapur SS and Kahalgaon Sub-station; Asset-2: 01 no. 500 MVA, 400/220 kV Transformer (4th ICT) along with 01 no. 400 kV ICT bay (AIS) & 01 No. 220 kV ICT bay (GIS) along with 220 kV Cable from ICT to GIS bay at Muzaffarpur (POWERGRID) 400/220 kV sub-station and Asset-3: LILO of both Circuits of Kishanganj (POWERGRID) -Darbhanga (DMTCL) 400 kV D/C (Quad) Line at Saharsa New (POWERGRID) sub-station along with associated 04 nos 400kV Line Bays at Saharsa New (POWERGRID) sub-station under “Eastern Region Strengthening Scheme-XXIII” in the Eastern Region. 24.02.2023
8/TT/2023
Approval under regulation-86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for Truing up of Transmission tariff for 2014-19 tariff period and Determination of Transmission tariff for 2019-24 tariff period For “Transmission System for Ultra Mega Solar Park in Anantpur District, Andhra Pradesh - Part B (Phase-II)” in the Southern Region. 24.02.2023
4/TT/2023
Determination of transmission tariff from COD to 31.3.2014 for Transmission Assets under “POWERGRID works associated with immediate evacuation for North Karanpura (3x660 MW) generation project of NTPC” in the Eastern Region. 24.02.2023
Diary No. 67/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in the Northern Region & approval under Regulation 76 and Regulation 77 of CERC (Terms and Conditions of Tariff) Regulations’ 2019, “Power to Relax” and “Power to Remove Difficulty” for one-time reimbursement of unrecovered depreciation for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in the Northern Region. 15.09.2022
Diary No. 106/ 2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from Actual DOCO to 31-03-2024 for 2024 for Asset-I:+/-300 MVAR STATCOM at 400kV Lucknow S/s (DOCO: 25.12.2020) under “Provision of STATCOM at Nalagarh & Lucknow in Northern region”. 07.09.2022
Diary No. 220/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for transmission asset “Replacement of existing 4 x 105 MVA, 400/220 kV, 1-Ph ICTs with 1x500 MVA, 400/220 kV, 3Ph ICT at Misa Sub-station” under “North eastern Region Strengthening Scheme-IV (NERSS-IV)” in the North-Eastern Region. 07.09.2022
Diary No. 286/2022
Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.03.2024 for Asset 1: 1 no. 125 MVAr, 400 kV Bus Reactor along with associated 400 kV bay at 400/220 kV Khandwa S/S, Asset 2: 1 no. 240 MVAr Bus Reactor along with 765kV bay at 765kV Solapur S/S, Asset 3: 1 no. 125 MVAR, 400 kV Bus Reactor along with associated 400 kV bays at 400/220 kV Rajgarh S/s , Asset 4: 1 no. 330 MVAr Bus Reactor along with 765kV bays at 765kV Wardha S/s, Asset 5: 1 no. 240 MVAr Bus Reactor along with 765kV bays at 765kV Aurangabad S/s, Asset 6: 1 no. 125MVAr 400kV Bus Reactor along with associated 400 kV bays at 400/220 kV Champa Pooling split section, Asset 7: 1 no. 400/220 KV 500 MVA ICT along with associated Bays at 400/220 kV Jabalpur S/s, Asset 8: 1 no. 400/220 kV 500 MVA ICT along with associated bays at 400/220 kV Itarsi S/S under Western Region System Strengthening -XX (WRSS-XX). 07.09.2022
Diary No. 166/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for (i) Truing up of Transmission tariff for 2014- 19 tariff block and (ii) Determination of Transmission tariff for 2019-24 tariff block for various assets covered under “Installation of Bus Reactor & ICT in Western Region” in the Western Region. 06.09.2022
164/TT/2022
Approval under sub-section (4) of Section 28 & 79(1)(d) of Electricity Act 2003 and Regulation, 86 of CERC (Conduct of Business) Regulations, 1999 for determination of
(i) Truing up of Annual Fees and Charges for 2014-19 tariff block
(ii) Fees and Charges for the period 2019-24 tariff block
in respect of Transmission Assets (02 Nos.) under the scheme “Fibre Optic Communication system in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave links in the North Eastern region.”
18.08.2022
Diary No. 253/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Actual DOCO to 31-03-2024 for Asset-1: Conversion of existing 2x63MVAR Line Reactors at Bhachau end of Bhachau – EPGL 400kV D/c line to Switchable Line Reactors along with two nos. of 400kV Reactor bays associated with Part A: PG works associated with Western Region Strengthening Scheme - 21 and Asset-2: 1 No. 220 kV GIS Line Bay at Bhuj S/S associated with Part-B: Extension works at Bhuj PS for interconnection of RE projects under “Extension works at POWERGRID Substations for interconnection of RE projects”. 03.08.2022
Diary No. 261/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Actual DOCO to 31-03-2024 for (i) Revision/ Determination of Transmission tariff for 2019-2024 Tariff block for Bhadrawati (Chandrapur) HVDC back to back station (2x500 MW) in Southern Region and Western Region. 03.08.2022
Diary No. 260/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) Truing up of Transmission tariff for 2014-19 tariff block and (ii) Determination of Transmission tariff for 2019-24 tariff block various assets covered under “Green Energy Corridors-Inter State Transmission Scheme (ISTS) Part-B” in WR & NR. 03.08.2022
Diary No. 229/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from Actual DOCO to 31-03-2024 for 2 Nos. 765 kV line bays at Raigarh (Tamnar) Powergrid pooling station And 2 Nos. 765 kV line bays at 765kV Dharamajaygarh Powergrid pooling station (For Termination of Dharamajaygarh PS section B – Raigarh (Tamnar) PS 765 kV D/c line, Under TBCB) under Additional System for Power Evacuation from Generation Projects pooled at Raigarh (Tamnar) Pool. 03.08.2022
Diary No. 158/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for For 765 kV Line Bays and 240 MVAr Switchable Line Reactor at Raichur and Sholapur Sub-stations Under “Line bays and reactor at POWERGRID sub-station for Raichur – Sholapur transmission line for Synchronous interconnection between SR and WR”. 03.08.2022
Diary No. 238/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for Transmission Assets under “Eastern Region Strengthening Scheme XX (ERSS – XX)'' in the Eastern Region. 03.08.2022
Diary No. 132/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period in respect of 400kV D/C Solapur (STPP) - Solapur (PG) T/L along with bay extension at Solapur (PG) S/S– Asset I & Extension of 400/220kV Solapur S/S - Augmentation of Substation by 500 MVA (3rd) Transformer (by Shifting of 500 MVA Transformer from Wardha to Solapur)– Asset II under “Transmission System for Solapur STPP (2x660 MW)” in Western Region. 03.08.2022
Dy. No. 12/2022
Approval under sub-section (4) of Section 28 & 79(1)(d) of Electricity Act 2003 and Regulation, 86 of CERC (Conduct of Business) Regulations, 1999 for determination of
(i) Truing up of Annual Fees and Charges for 2014-19 tariff block
(ii) Fees and Charges for the period 2019-24 tariff block
in respect of Assets covered in order dated 22.2.2019 in Petition No. 169/TT/2018.
03.08.2022
Diary No. 198/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for assets under the scheme “Fiber Optic Communication system for central sector Sub-stations & Generating Stations in Southern Region.” 25.07.2022
Diary No. 67/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in the Northern Region & approval under Regulation 76 and Regulation 77 of CERC (Terms and Conditions of Tariff) Regulations’ 2019, “Power to Relax” and “Power to Remove Difficulty” for one-time reimbursement of unrecovered depreciation for Series Compensation on Panki-Muradnagar 400 kV S/C line of UPPCL in the Northern Region. 25.07.2022
Diary No. 24/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for Asset 1: OPGW link for LILO of Lonikhand-Kalwa at Navi Mumbai Transmission Line (Central sector); Asset 2: OPGW link for Vapi-Kudus (upto LILO of Kala from Vapi) Transmission Line (Central sector); Asset 3: OPGW link for 220 kV Kawas-Vav and 220 kV Kawas – Navsari Transmission Line (Central sector) and Asset 4: OPGW link for 220 kV Bhopal-Govindpur SLDC (MPPTCL) Transmission Line (State sector) under “Establishment of Fibre Optic Communication System under Master Communication Plan” in the Western Region. 25.07.2022
193/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) Truing up of Transmission tariff for 2014-19 tariff block and (ii) determination of Transmission Tariff for 2019-24 tariff block for Asset-1 (a): Associated bays of “315 MVA, 400/220 kV ICT” at Fatehabad Substation (ICT to be shifted from Ballabgarh) and Asset-1 (b): 315 MVA ICT at Fatehabad Substation (Only ICT shifted from Ballabgarh SS under ICT-IV at Ballabgarh) under “Augmentation of Transformation capacity at Fatehabad (PG)” in Northern Region 22.07.2022
192/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for Asset 1- 11 Nos. of Central Sector Communication Links and Asset 2- 1 No. of Central Sector Communication Links under project- “Fibre Optic Communication system in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave links in the North Eastern Region.”. 22.07.2022
168/TT/2022
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999, and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Asset-1: Bhiwani-Hisar 400 kV D/C line along with associated bays at Bhiwani and Hisar; Asset-2: LILO of Moga Bhiwadi 400 kV D/C line at Hisar along with associated bays and Asset-3: 765 kV S/C Jaipur (RVPN)- Bhiwani TL (circuit-II) along with associated bays under “Northern Region system Strengthening Scheme XXV” in the Northern Region. 22.07.2022
167/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of Transmission Tariff from DOCO to 31.3.2024 for Transmission Assets under Project – "POWERGRID works associated with North Eastern Region Strengthening Scheme-V” 22.07.2022
165/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) Truing up of Transmission tariff for 2014-19 tariff block and (ii) determination of Transmission Tariff for 2019-24 tariff block for Transmission assets 400kV D/C Kameng- Balipara transmission line along with associated bays at Balipara Substation under “Transmission system associated with North East-Northern/Western Inter Connector-I” 22.07.2022
91/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) Revision of Transmission Tariff for 2004-09 tariff block, 2009-14 tariff block, (ii) Truing up of Transmission tariff for 2014-19 tariff block and (iii) Determination of Transmission tariff for 2019-24 tariff block 22.07.2022
Diary No. 240/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for (i) Truing up of Transmission tariff for 2014- 19 tariff block and (ii) Determination of Transmission tariff for 2019-24 tariff block for Assets under Strengthening Scheme in Northern Region in the Northern Region. 22.07.2022
Diary No. 186/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for combined asset associated with Western Region Strengthening Scheme VI in the Western region. 22.07.2022
Diary No. 184/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for assets covered under " Transmission system for Solar Energy Zone in Rajasthan" in Northern Region. 22.07.2022
Diary No. 66/ 2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for Asset-I: The Bus splitting scheme at Moga Substation under " Transmission Scheme for controlling high loading and high short circuit level at Moga Substation” 22.07.2022
185/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for “Transmission System for Ultra Mega Solar Park in Anantpur District, Andhra Pradesh - Part C (Phase-III) in the Southern Region. 21.07.2022
110/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for determination of Transmission Tariff from COD to 31.3.2024 for various assets covered under System Strengthening Scheme at Tuticorin- II and Bhuj PS in the Western Region and Southern Region. 21.07.2022
185/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for “Transmission System for Ultra Mega Solar Park in Anantpur District, Andhra Pradesh - Part C (Phase-III) in the Southern Region. 21.07.2022
196/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from Actual DOCO to 31-03-2024 for Asset-1: 2No.s of 220kV line bays at 400/220KV cochin East (pallikkara) substation for termination of Cochin East (Pallikara) – Aluva 220kV D/c line , to be implemented by KSEBL and Asset-2: 2 No.s of 400kV line bays at Kozhikode (Areakode) substation for termination of North Trissur (Madakkathara) - Kozhikode (Areakode) 400kV (Quad) D/c line, to be implemented by KSEBL under System strengthening – XXVI in Southern Region 20.07.2022
184/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of Transmission Tariff from Anticipated DOCO to 31.3.2024 for Transmission Assets under Project – "North Eastern Region Strengthening Scheme-VIII" 20.07.2022
83/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of Transmission Tariff from Anticipated DOCO to 31.3.2024 for Asset-1: Tumkur (Pavagada) Pooling station – Devanahally (KPTCL) 400kV D/C (Quad) line along with associated bays and equipment’s at Tumkur (Pavagada) Pooling station & Devanahally (KPTCL) under Additional ATS for Tumur (Pavagada) under Transmission system for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka - Phase II (Part B) in Southern Region 20.07.2022
255/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Assets (04 nos.) under “Eastern Region Strengthening Scheme V (ERSS-V)” in the Eastern Region. 12.07.2022
270/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for 400 kV S/C Tehri (Generation) –Tehri (Koteshwar) (Quad) line along with associated bays at both ends under “Transmission system associated with Tehri Pump Storage Plant (PSP)” in the Northern Region. 12.07.2022
253/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from actual COD to 31-03-2024 for 02 number of 63 MVAr Bus Reactor along with associated bays and equipment at Yelahanka GIS under System Strengthening -XXIII in Southern Region. 11.07.2022
254/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block in respect of Asset I: 02 Nos. of 220 kV line bays at 400 kV Subhasgram S/S under Transmission System for “Eastern Region Strengthening Scheme – VIII” in Eastern Region. 11.07.2022
180/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Asset-I: LILO of 400 kV S/C Lonikhand (MSETCL)-Kalwa (MSETCL) Line at Navi-Mumbai alongwith 400/220 kV Navi Mumbai (GIS Sub-station) at Navi Mumbai under ‘Western Region System Strengthening Scheme V’. 04.07.2022
17/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Asset-I: 2 Nos. 400kV GIS line bays at Koteshwar S/s under Extension of 400/220kV Koteshwar pooling station and Asset-II: 1 Nos. 220kV line bay at 400/220kV Roorkee S/s under Line bays associated with Northern region System Strengthening Scheme-XXXVI 11.04.2022
19/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for (i) Truing up of Transmission tariff for 2014-19 tariff block and (ii) Determination of Transmission tariff for 2019-24 tariff block For Transmission assets under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in Southern Region 11.04.2022
20/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Asset 1: 1 no. 400 kV Line bay (at POWERGRID, Sikar end) along with 50 MVAR Non-Switchable line reactor for Circuit-I of 400 kV D/C Bikaner (RVPNL)- Sikar (PG) line; Asset 2: 1 no. 400 kV Line bay (at POWERGRID, Sikar end) along with 50 MVAR Non-Switchable line reactor for Circuit-II of 400 kV D/C Bikaner (RVPNL)- Sikar (PG) line and Asset 3: 2 Nos. 220kV Line bays at 765/400/220kV Fatehpur Sub-station under “Line bays associated with various Regional Strengthening Schemes in the Northern Region”. 11.04.2022
22/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for 765/400 kV, 333 MVA single phase auto transformer at Bhiwani Substation under “Spare Transformers in Northern Region”. 11.04.2022
23/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for “2 Nos. of 240 MVAR, 765kV Switchable Line Reactors (6x80MVAR, 765kV, 1-Ph Shunt Reactor), along with Reactor Bays & 2 Nos. 765kV Line Bays excluding PLCC, Telecom equipment and Line Terminal equipment such as LA, CVT & Wave Trap" at 765/400 kV Kurnool Sub-station” under “Substation works associated with additional inter-regional AC link for import of power into the Southern Region i.e., Warora- Warangal and Chilakaluripeta- Hyderabad - Kurnool 765kV Link''. 11.04.2022
41/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.3.2024 for Asset I- 420 kV, 1 X 80MVAR, 3-Ph Bus Reactor in existing GIS bays at 400/220 kV Misa GIS Substation (Extn.), Asset II- 2 nos. 132 kV line bays at Biswanath Chariali Substation (for termination of Biswanath Chariyali – Itanagar (Arunachal Pradesh) 132 kV D/C (Zebra Conductor) line- line under TBCB) and Asset III- 2 nos. 400 kV (GIS) bays at Silchar and 2 nos. 400 kV (GIS) bays along with 2X 80 MVAR Switchable Line Reactors at Misa for 400 kV D/C (Quad) Silchar-Misa Tr. line (Line under TBCB scope) under Project – "POWERGRID works associated with North Eastern Region Strengthening Scheme-II, Part-B (NERSS-II-B)". 11.04.2022
55/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Assets under NRSS-XXXII in Northern Region 22.03.2022
45/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for for Transmission Assets under Project – "POWERGRID works associated with North Eastern Region Strengthening Scheme-VI”. 22.03.2022
43/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for Hot Line Speech Communication (Computer Dialing) System for Grid Operation consisting of PABX & Associated items as installed and commissioned in NERLDC & 07 nos. SLDCs (Assam, Meghalaya, Tripura, Nagaland, Mizoram, Ar. Pradesh, Manipur) of North Eastern Region under project- “Establishment of Fiber Optic Communication under Wide band Communication Expansion plan in the North Eastern Region”. 22.03.2022
42/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for assets under “Green Energy Corridors-Inter State Transmission Scheme (ISTS) Part-C” in the Western Region. 22.03.2022
18/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Asset-1: Central Sector Portion for 660.145 km of Fibre Optic Communication System; Asset-2: UPPTCL Portion for 252.913 km of Fibre Optic Communication System; Asset-3: Establishment of Fiber Optic Communication System in Northern Region Kishenpur-New Wanpoh Link (137.52 km) (Central Sector Portion); Asset-4: Establishment of Fiber Optic Communication System in the Northern Region Bairasul-Pong Link (96.77 km) (Central Sector Portion) under “Establishment of Fibre Optic Communication System in Northern Region under fibre optic expansion project (Additional Requirement )”. 22.03.2022
16/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for 400 kV Dharmapuri (Salem New) – Somanahalli 400 kV D/C Quad Line along with Bay Extensions at Dharmapuri (Salem New) and Somanahalli Substations under Transmission System associated with “System Strengthening in the Southern Region – XIV”. 22.03.2022
15/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period determination of transmission tariff for the 2019-24 tariff period for 2x1500 MVA 765/400 kV ICTs along with associated bays at Srikakulam Pooling station under “Common System associated with East Coast Energy private limited and NCC power projects limited LTOA generation projects in Srikakulam Area Part-C” in the Southern Region and the Eastern Region. 22.03.2022
11/TT/2022
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the 2019-24 tariff period for 400 kV line bays at Bhiwani Sub-station for termination of 400 kV Babai-Bhiwani D/C Line under Provision of 400 kV Line bays at Bhiwani (PG) in the Northern Region. 22.03.2022
21/TT/2022
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission line elelments covered under the Transmission Project of Parbati Koldam Transmission Company Limited. 21.03.2022
161/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Tariff for the year 2019-20 in respect of RVPN owned transmission lines /system connecting with other States and Intervening transmission lines incidental to inter-State transmission of electricity for Inclusion in the POC transmission charges. 21.03.2022
1/TT/2022
Determination & Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission Asset-I: 01 Nos of OPGW link along with communication equipment for BSPTCL, Asset-II: 10 Nos of OPGW link along with communication equipment for BSPTCL, Asset-III: 01 Nos of OPGW link along with communication equipment for BSPTCL, Asset-IV: 12 Nos of OPGW link along with communication equipment for BSPTCL, Asset-V: 09 Nos of OPGW link along with communication equipment for BSPTCL, Asset-VI: 11 Nos of PLCC link and associated equipment for BSPTCL, Asset-VII: 07 Nos of PLCC link and associated equipment for BSPTCL, Asset-VIII: 10 Nos of PLCC link and associated equipment for BSPTCL, Asset-IX: 06 Nos of PLCC link and associated equipment for BSPTCL, Asset-X: 02 Nos of PLCC link and associated equipment for BSPTCL and Asset-XI: 03 Nos of PLCC link and associated equipment for BSPTCL under Establishment of Communication system under Expansion/Up gradation of SCADA/EMS System at SLDCs of Eastern Region (BSPTCL). 21.03.2022
2/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 determination of tariff for (1) 400KV Uravakonda - Veltoor I & II feeders for FY 2016-17 to FY 2018-19 for inclusion in PoC mechanism. 21.03.2022
6/TT/2022
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission Asset-1: Replacement of 3x167 MVA, 400/220KV ICTs with 1X500 MVA ICT at Somanhalli substation, Asset-2: Replacement of 4x167 MVA, 400/220KV ICTs with 1X500 MVA ICT at Somanhalli substation, Asset-3: Replacement of 1x50MVAr Bus reactor with 1x125MVAr Bus reactor at 400/220kV Narendra Substation, Asset-4: 01 Nos. 500MVA, 765/400kV Regional Spare ICTs at Thiruvalam substation and Asset-5: 01 Nos. 500MVA, 765/400kV Regional Spare ICTs at Raichur substation under System strengthening-XXIII” in Southern Region. 21.03.2022
7/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Transmission Asset under “Baharampur (POWERGRID) - Bheramara (BANGLADESH) 02nd 400kV D/C transmission line (INDIAN PORTION)'' in Eastern Region. 21.03.2022
8/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of transmission tariff from DOCO to 2024 period for Asset-I: 2 Nos. 400kV Line bays of 400kV D/C Barmer (RRVPNL)- Bhinmal (PG) line at Bhinmal S/s under “Line bays associated with various regional strengthening schemes in NR”. 21.03.2022
9/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of transmission tariff from DOCO to 2024 period for LILO of Sagardighi – Subhashgram 400kV S/C line at Jeerat and 02 nos 400kV GIS line bays at Jeerat sub-station of West Bengal under “Eastern Region Strengthening Scheme XV (ERSS – XV)'' in Eastern Region 21.03.2022
10/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2019 for determination of transmission tariff from DOCO to 2024 period for Asset-I: 400/220/33kV, 500MVA ICT-4 along with associated bays at Amritsar (PG) Substation under Additional 1X500 MVA, 400/220kV (4th) transformer at Amritsar (Balachak) Sub-station under ISTS. 21.03.2022
12/TT/2022
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2004-09 and 2009-14 (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for Combined Asset: (i) LILO of Korba-Raipur at Sipat, (ii) 765 kV Sipat-Seoni Ckt-I & 765/400 KV ICT-I at Seoni and LILO of 400 kV Bhilai-Satpura line along with bay equipment at Seoni (iii) 400/220 kV ICT-I along with two 220 kV line bays at Seoni (iv) Ckt-II of 400 kV Nagda-Dehgam Line, (v) Ckt-I of Nagda-Dehgam Line, (vi) 400 kV D/C Seoni-Khandwa T/L alongwith associated bays, 80 MVAR Bus Reactor, 765/400 kV ICT-II at Seoni S/S, LILO of Sardar-Sarovar-Nagda Line & 315MVA, 400/220kV ICT-I at Rajgarh, (vii) 765 kV Sipat-Seoni Ckt-II and (viii) 315 MVA, 400/220 kV ICT-II at Seoni S/S, ICT-I at Rajgarh and (ix) 315 MVA, 400/220kV ICT-II at Rajgarh under Sipat-I Transmission System in Western Region. 21.03.2022
13/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2019 for determination of Transmission Tariff from DOCO to 31-03-2024 for Asset under “POWERGRID works associated with Eastern Region Strengthening Scheme XVIII” in Eastern Region. 21.03.2022
14/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for
(i) Truing up of Transmission tariff for 2014-19 tariff block and
(ii) Determination of Transmission tariff for 2019-24 tariff block
For Assets (04 nos.) under “Eastern Region Strengthening Scheme – V (ERSS-V)”in Eastern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
21.03.2022
37/TT/2022
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for
(i) Determination & Truing up of Transmission tariff for 2014-19 tariff block and
(ii) Determination of Transmission tariff for 2019-24 tariff block
In respect of Asset I: LILO of one circuit of 400 KV D/C Vapi- Navi Mumbai line transmission line along with 400/220 KV GIS KALA Substation (NEW) in UT DNH 315 MVA 400/220 KV ICT-I & ICT-II and 80 MVAR, 420 KV Bus Reactor alongwith 4 Nos. of 220kV downstream bays and Asset 2: LILO of 2nd Ckt of 400KV D/C Vapi-Navi Mumbai TL alongwith associated bays at Kala substation under Establishment of 400/220kV GIS Substation at Kala in UT of D&NH in Western Region
21.03.2022
204/TT/2021
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission Asset-1: Central Sector Portion for 89.148 KM & Telecom Sharing of 903.892 KM of Establishment of Fiber Optic Communication System, Asset-2: DTL Portion for 264.294 KM of Establishment of Fiber Optic Communication System, Asset-3: UPPTCL Portion of 96.335 KM of Establishment of Fiber Optic Communication System, Asset-4: PSTCL portion of 215.548 KM of Establishment of Fiber Optic Communication System, Asset-5: HPSEB portion of 360.571 KM of Establishment of Fiber Optic Communication System under Establishment of Fiber Optic Communication System in Northern Region. 21.03.2022
243/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Asset-1: Pugalur HVDC station –Edayarpalayam (TANTRANSCO) 400 kV (Quad) D/C transmission line along with associated bays at Pugalur HVDC Station & Edayarpalayam (TANTRANSCO) - Udumalpet 400 kV (Quad) D/C transmission line along with associated bays at Udumalpet S/S (Pugalur HVDC– Edayarpalayam line and Edayarpalayam – Udumalpet line are bypassed at Edayarpalayam S/s to make Pugalur HVDC – Udumalpet line as an interim arrangement) and Asset-2: Pugalur (HVDC Station) – Thiruvallam 400 kV (Quad) D/C Transmission line along with associated bays and equipments at both ends and 2 nos. 80 MVAR line Reactors at Pugalur (HVDC Station) & 2 nos. 63 MVAR line reactors at Thiruvallam (existing 63 MVAR Bus reactor at Thiruvallam shall be utilized as line reactor in one circuit and second circuit shall have new 63 MVAR Line Reactor) under “HVDC Bipole link between Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu) – North Trichur (Kerala) – Scheme #2 AC System strengthening at Pugalur end” in the Southern Regional Grid. 23.11.2021
242/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Asset-1: ±800kV 1500 MW (Pole-IV) HVDC terminals each at Raigarh (HVDC Station) & Pugalur (HVDC Station) under “HVDC Bipole link between the Western Region (Raigarh, Chattisgarh) and the Southern Region (Pugalur, Tamil Nadu) – North Trichur (Kerala) – Scheme #1: Raigarh - Pugalur 6000MW HVDC System” in the Southern Regional grid. 23.11.2021
654/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for Asset-I: Conversion of 02 No's 400 kV, 50MVAR line reactors into switchable line reactors at Abdullapur Substation, Asset-II: Conversion of 63 MVAR Fixed Line Reactor of 400kV Balia (PG)-Sohawal (PG) Line Circuit -1 & 2 to Switchable Line Reactor at Balia (PG) and Conversion of 50 MVAR Fixed Line Reactor of 400kV Balia (PG)-Sohawal (PG) Line Circuit -1 & 2 to Switchable Line Reactor at Sohawal (PG) and Asset-III: Conversion of 50 MVAR Fixed Line Reactor of 400kV Kankroli-Zerda Line to Switchable Line Reactor at kankroli Substation under "Conversion of Fixed Line Reactors into Switchable Line Reactors in the Northern Region. 21.10.2021
173/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Asset-1: ±800kV 1500 MW (Pole-II) HVDC terminals each at Raigarh (HVDC Station) & Pugalur (HVDC Station) and Asset-2: ±800kV 1500 MW (Pole-III) HVDC terminals each at Raigarh (HVDC Station) & Pugalur (HVDC Station) under “HVDC Bipole link between Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu)-North Trichur (Kerala)-Scheme #1: Raigarh - Pugalur 6000MW HVDC System” in the Southern Regional grid. 21.10.2021
172/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Transmission Assets under “HVDC Bipole link between Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu) – North Trichur (Kerala) – Scheme #3: Pugalur-Trichur 2000MW VSC based HVDC System”. 21.10.2021
112/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Asset-I: 400 kV D/C Hiriyur - Mysore transmission line along with associated bays and 2X80 MVAR switchable line reactors along with associated bays at 400/220 kV Mysore S/S, Asset-2: 1X500 MVA 400/220 kV 1CTs along with associated bays at Tumkur (Pavagada)S/S, Asset-3: 1X125 MVA 400kV Bus Reactor along with associated bays at Tumkur (Pavagada) pooling S/S and Asset-4: 1X500 MVA 400/220 kV ICT along with associated bays and equipments at Tumkur (Vasantnarsapur) S/S under Transmission system for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka-Phase II (Part A). 21.10.2021
690/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff for the period from Commercial Operation Date (COD) to 31.3.2024 for Asset-I: Pole-III (1500MW) Extension of ± 800 kV Champa & Kurukshetra HVDC stations for upgradation of existing HVDC convertor stations from 3000MW to 6000MW and Asset-II: Pole-IV (1500MW) Extension of ± 800 kV Champa & Kurukshetra HVDC stations for upgradation of existing HVDC convertor stations from 3000MW to 6000MW under “Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh”. 30.09.2021
665/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for assets under PowerGrid works associated with “TBCB lines under common transmission system for Phase-II generation projects in Odisha” in Eastern & Western Region. 30.09.2021
423/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for the 2019-24 period for transmission assets under “Expansion/ Upgradation of SCADA/EMS system at SLDCs of the North Eastern Region”. 30.09.2021
113/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Assets (03 nos) under POWERGRID works associated with “Transmission system strengthening in Indian System for transfer of power from new HEPs in Bhutan” in the Eastern Region. 30.09.2021
75/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for determination of transmission tariff from actual COD to 31.3.2024 for transmission asset “NNTPS switchyard – Ariyalur (Villupuram) 400kV D/C Twin line” and “2 nos of 400kV Line bays at Ar iyalur SS (TANTRANSCO) for terminating NNTPS Switchyard – Ariyalur (Villupuram) 400kV D/C line” under “Transmission system for evacuation of power from 2X500MW Neyveli Lignite Corp. Ltd TS-1 (Replacement) (NNTPS)” in Southern Regional grid". 30.09.2021
731/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from COD to 31.03.2019 for Asset 1: OPGW link for Betul-Khandwa under Central Sector, Asset 2: OPGW link (125km) for Mauda-Wardha under Central Sector, Asset 3: 6 no. OPGW link (92.66km) under State Sector, Asset 4A: 3 no. OPGW link (656.926km) under Central Sector, Asset 4B: OPGW link for Korba-Birsinghpur under Central Sector, Asset 5A: OPGW link (15.462km) for 400kV Xeldom-Madgaon under State sector, Asset 5B: OPGW link for 400kV Vapi–Magarwada under Central Sector and Asset 6: 9 no. of OPGW link under State Sector- OPGW link (169km) for) associated “Establishment of Fibre Optic Communication System in Western Region under Master Communication Plan (Additional Requirement)”. 15.09.2021
707/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Madhugiri – Yelahanka 400kV D/C (Quad) Line with a small portion to be strung on multi-circuit tower of the SRSS-XII scheme with high ampacity conductor in Bengaluru area along with associated bays & equipments at Madhugiri Substation and Yelahanka GIS under "Transmission system associated with System strengthening -XIII in Southern Regional Grid”. 15.09.2021
686/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for 500 MVA single phase unit of 765/400 kV ICT (cold spare) Stationed at Ranchi (new)” under “Eastern Region strengthening scheme IX'' in the Eastern Region. 15.09.2021
645/TT/2020
Determination of transmission tariff from COD to 31.3.2019 for Asset 1- OPGW link (242km) for 765 kV Sasan-Satna Ckt- 1 under Central Sector, Asset 2- OPGW link (36km) for 220 kV Indore-Pithampura (MPPTCL) under State Sector & Asset 3- OPGW link (336km) for Satna Gwalior Ckt-1 under Central Sector under "Establishment of Fibre Optic Communication System under Master Communication Plan in the Western Region". 15.09.2021
272/TT/2020
Approval under sub-section(4) of Section 28 of Electricity Act 2003 for truing up of Charges for the 2014-19 tariff period and determination of Fees and Charges for the 2019-24 tariff period for Unified Load Despatch & Communication Scheme (POWERGRID portion i.e. Communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in the North Region. 15.09.2021
142/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Truing up of Transmission tariff for 2014-19 period and Determination of Transmission tariff for 2019-24 period for 400 kV D/C Mundra UMPP – Bhuj (Triple Snowbird) Circuit-2 Transmission Line along with extension of 400 kV Mundra UMPP Switchyard and 400 kV Bhuj Pooling Station under Transmission System Strengthening Associated with Mundra UMPP (Part-B) in the Western Region. 15.09.2021
68/TT/2021
Determination of transmission tariff from COD to 31.3.2019 for Transmission Asset “Replacement of existing 4 x 105 MVA, 400/220 KV, 1-Ph ICTs with 1x500 MVA, 400/220Kv, 3Ph ICT at Misa Sub-station” under “North eastern Region Strengthening Scheme-IV (NERSS-IV)” in the North-Eastern Region. 15.09.2021
37/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for assets under Establishment of Fibre Optic Communication System under Master Communication Plan in Western Region. 15.09.2021
26/TT/2021
Determination of transmission tariff from COD to 31.3.2024 for Asset-1: Replacement of existing 1 no. 220/132 kV, 50MVA, ICT(existing) by 160MVA, 220/132 kV ICT-I at Balipara(PG) Sub-station along with replacement of 132kV equipments and Asset-2: 2nd 400/220 kV, 315MVA ICT, new 220 kV Bus arrangement (GIS) with 4 nos. of 220 kV Bays at Bongaigaon Sub-station of POWERGRID along with stringing of 2nd Circuit of 220 kV D/C Bongaigaon-Salakati Transmission Line and 1 no. of 220 kV line bay at Salakati Sub-station (for 220 kV D/C Bongaigaon-Salakati Transmission Line) under “North Eastern Region Strengthening Scheme-III” in the North-Eastern Region. 15.09.2021
685/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for ±800 kV 6000 MW Raigarh (HVDC Station)-Pugalur (HVDC Station) HVDC Link along with ± 800 kV 1500 MW (Pole-I) HVDC terminals each at Raigarh (HVDC Station) & Pugalur (HVDC Station) under “HVDC Bipole link between Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu) – North Trichur (Kerala) – Scheme #1: Raigarh - Pugalur 6000 MW HVDC System” in the Southern Regional grid. 07.09.2021
693/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for a) 400 kV Pugalur (HVDC Station) - Pugalur (Existing) (Quad) D/C Transmission line along with associated bays at Pugalur (HVDC Station) & Pugalur (Existing) Sub-station and b) 400 kV Pugalur (HVDC Station) – Arasur (Quad) D/C Transmission line along with associated bays at Pugalur (HVDC Station) & Arasur station under “HVDC Bipole link between the Western Region (Raigarh, Chattisgarh) and the Southern Region (Pugalur, Tamil Nadu) – North Trichur (Kerala) – Scheme #2 AC System strengthening at Pugalur end” in the Southern Regional grid. 07.09.2021
129/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for assets under “Expansion/ Upgradation of SCADA/EMS system at SLDC of Western Region” in the Western Region. 07.09.2021
102/TT/2020
Approval under sub-section(4) of Section 28 of Electricity Act 2003 for truing up of Charges for the period 2014-19 tariff period and determination of Fees and Charges for the 2019-24 tariff period for Unified Load Despatch & Communication Scheme (POWERGRID portion i.e. Communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in the North Eastern Region. 07.09.2021
711/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 2 no. of assets under “Expansion and Replacement of existing SCADA/EMS System at SLDC’s of Northern Region (NR ULDC Phase-II)”. 06.09.2021
694/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for 2 Nos 765kV line bays at 765/400kV Indore Substation of POWERGRID (for Khandwa PS(TBCB)-Indore 765 kV D/c line) & 240MVAr, 765 KV Switchable Line Reactors along with 700 Ohms NGR at 765/400KV Indore Substation end of each ckt of Khandwa Pool- Indore 765kV D/c line (line being implemented under TBCB) under “POWERGRID Works associated with Transmission system Strengthening in WR associated with Khargone TPS” in Western Region. 06.09.2021
684/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for 400kV D/C Mundra UMPP – Bhuj (Triple Snowbird) Ckt-1 Transmission Line alongwith associated bays at 400kV Mundra UMPP Switchyard and 400kV Bhuj Pooling Station under Transmission System Strengthening Associated with Mundra UMPP (Part-B). 06.09.2021
674/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for 2X1500 MVA 765/400 kV ICTs along with associated bays and split bus arrangement at 765 kV Bus at Jharsugura (Sundargrah) GIS” under POWERGRID work associated with common transmission system for Phase-II generation projects in odisha under Eastern Region. 06.09.2021
673/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset-I: Combined Assets of 1) Charging of Tehri Pooling-Meerut line Ckt-I at 765kV level along with associated bays at Koteshwar (Tehri Pooling Station) end and 240 MVAR switchable line reactor and associated bay at Meerut end 2) 765/400kV 800 MVA ICT- II alongwith associated bays at Koteshwar (Tehri Pooling Station) 3) 765/400kV 800 MVA ICT- III alongwith associated bays at Koteshwar (Tehri Pooling Station) 4) 765/400kV 800 MVA ICT- IV alongwith associated bays at Koteshwar (Tehri Pooling Station); Asset-II: Combined Assets of 1) Charging of Tehri Pooling-Meerut line Ckt-II at 765kV level along with associated bays at Koteshwar end and 240 MVAR switchable line reactor and associated bays at Meerut end 2) 765/400kV 800 MVA ICT- I alongwith associated bays at Tehri (Koteshwar) (GIS Pooling Station) 3) 765/400kV 1500 MVA ICT alongwith associated bays at Meerut Substation 4) Modification of series capacitor at Meerut Substation for operation at 765 kV level 5) 765 kV 240 MVAR Bus Reactor along with associated bay at Tehri (Koteshwar) under Transmission system associated with Tehri Pump Storage Plant (PSP). 06.09.2021
666/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from CDOD to 2024 period for Replacement of existing 315 MVA, 400/220 kV ICT II with 500 MVA, 400/220 kV ICT-II at Pusauli Sub-station” under “Eastern Region Strengthening Scheme XII'' in Eastern Region. 06.09.2021
664/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset 1- 01 No. Spare 201 MVA, 1 ph 3 winding Converter Transformer and Asset 2- 01 No. Spare 234 MVA, 1ph 3 winding Converter Transformer at Vizag HVDC Terminal Station under “Procurement of Spare Converter Transformer For Vizag HVDC System in Southern Region.” 06.09.2021
662/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset 1- Installation of +/- 200 MVAR Dynamic Compensation (STATCOM) along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400kV Hyderabad Substation, Asset 2- Installation of +/- 200 MVAR STATCOM along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400/230 kV Udumalpet Substation and Asset 3- Installation of +/- 200 MVAR STATCOM along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400/230 kV Trichy Substation under “System Strengthening in Southern Region XXI” in Southern Region. 06.09.2021
660/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Transmission Asset “1 X 500MVA, 400/220/33 kV, 3-Ph ICT-3 with GIS bays in 400 Kv side and AIS bays in 220 Kv side at Misa Substation under “North eastern Region Strengthening Scheme-IV (NERSS-IV)” in North-Eastern Region. 06.09.2021
652/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Fixed Series Capacitor (40%) on Circuit-I & II of 400 kV Tumkur (Pavagada) - Tumkur (Vasantharapura) D/c Quad Line at Tumkur (Pavagada) PS end under Transmission System for Ultra Mega Solar Power Park at Tumkur (Pavagada), Karnataka -Phase-II (Part C) in Southern Region (SRTS II). 06.09.2021
649/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset I - 1X1500 MVA 765/400kV ICT-II alongwith associated bays and 2 Nos. 400 kV Line Bays for termination of 400 kV D/C Prithala-Aligarh TBCB Line at Aligarh 765 kV Switching Sub-station and Asset II - 1X1500 MVA 765/400 kV ICT-I at Aligarh 765 kV Switching Sub-station under ICTs and Bays Associated with Northern Region System Strengthening Scheme (NRSS-XXXVIII). 06.09.2021
644/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset-I: Singrauli – Allahabad 400kV S/c Line along with associated bays at both ends including 1X50 MVAR Line Reactor at Allahabad end under NRSS-XXX. 06.09.2021
479/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04, 2004-09 and 2009-14 (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for Asset – (a) 400 kV Jeypore- Gazuwaka transmission line along with associated bays; and Asset – (b) 500 MW HVDC back to back stations at Gazuwaka under Gazuwaka HVDC back to back project in Southern Region. 06.09.2021
419/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for communication system for DVC under Expansion/ Up gradation of SCADA/ EMS System of SLDCs of Eastern Region. 06.09.2021
169/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period Transmission Asset “04 Nos Line Bays (GIS) at (Hyderabad) Maheshwaram 765/400kV SS, 02 Nos Line Bays at Warangal 400/220 kV SS and Balance items (PLCC, Telecom equipment and Line Terminal equipment such as LA, CVT & Wave Trap) at Kurnool 765/400kV SS” under “Sub-station works associated with additional inter-regional AC link for import of power into Southern Region i.e., Warora- Warangal and Chilakaluripeta-Hyderabad - Kurnool 765kV Link''. 06.09.2021
94/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 10 nos. of Assets under Expansion/Upgradation of SCADA/EMS system of SLDCs of Eastern Region. 06.09.2021
22/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for Asset-I: 220kV Kishanganga-Wagoora D/C line Partially on M/C tower along with associated bays at Wagoora S/S under Transmission system associated with Kishenganga HEP. 06.09.2021
8/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) determination of transmission tariff from COD to 2024 period for 240 MVAr Switchable line reactor along with 850 ohm NGR and 765kV switchable line reactor bay (GIS) at 765/400kV Pune (GIS) substation under Western Region System Strengthening Scheme XVII. 06.09.2021
11/TT/2021
Approval under regulation-86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations, 1999and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 fortruing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff periodfor Asset-I: 2 No. Line bays at Amritsar 400/220 kV Sub-station, Asset-II (a): 2 No. Line bays at Malerkotla GIS 400/220 kV Sub-station, Asset-II (b): 2 No. Line bays at Malerkotla GIS 400/220 kV Sub-station, Asset -III: 2 nos. 400 kV Malerkotla Bays at 400/220 kV GIS Substation at Kurukshetraunder Northern Region System Strengthening Scheme-XXXI(Part-B) in the Northern Region. 23.07.2021
382/TT/2020
Approval under Regulation86 of CERC (Conduct of Business)Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations,2019 for truing up of Transmission tariff for the 2014-19 tariff period and determination of Transmission tariff for the 2019-24 tariff period for Assets under “Transfer of Power from Generation Projects in Sikkim toNR / WR Part-B” in the Eastern Region. 23.07.2021
656/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations,2019 for truing up of transmission tariff for the 2014-19 tariff periodand determination of transmission tariff for the 2019-24 tariff period for the transmission asset-1X500 MVA 400/220 kV ICTs along with the associated bays at Tumkur (Pavagada) Substationunder Transmission system for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka -Phase II (Part A)in the Southern Region. 23.07.2021
689/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff for 2019-24 tariff period for Asset: 01 No. 160 MVA, 220/132kV, 3-Phase ICT at Baripada Sub-station (Shifted to Purnea Sub-Station) under Provision of Spare ICTs and Reactors for Eastern, Northern, Southern and Western Regions in Eastern Region 14.07.2021
646/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff for 2019-24 tariff period for replacement of existing 1 no. 50 MVA, 220/132 kV ICTs by 160 MVA, 220/132 kV ICT at Balipara Sub-station along with replacement of 132 kV equipment under "North Eastern Region Strengthening Scheme-III (NERSS-III)" in the North Eastern Region 14.07.2021
289/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for Provision of Spare ICTs and Reactor for the Southern Region. 14.07.2021
103/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for Additional Special Energy Meters in Northern Region. 14.07.2021
33/TT/2021
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for for Asset-I: Pole-I of the ±800 kV, 3000 MW Champa Pooling Station & Kurukshetra HVDC Terminals along with ±800 kV Champa Pooling station -Kurukshetra HVDC Transmission Line; Asset-II: 02 Nos. 400/220 kV, 500 MVA ICTs along with associated bays at 400/220 kV GIS substation at Kurukshetra; Asset-III: 8 nos. 220 kV Line Bays at 400/220 kV GIS substation at Kurukshetra; Asset-IV: Pole-II of the ±800 kV, 3000 MW Champa & Kurukshetra HVDC Terminals along with associated bays; Asset-V: Kurukshetra (NR) - Jallandhar 400 kV D/C (Quad) line, one ckt. via 400/220 kV Nakodar (PSTCL) Sub-station along with associated bays (2 nos. GIS bays at Kurukshetra, 2 nos. conventional bays at Jallandhar, 2 nos. conventional bays at Nakodar, 1 no. 50 MVAR Line Reactor at Nakodar and 1 no. 50 MVAR Line Reactor at Jallandhar), LILO of Abdullapur-Sonepat 400 kV D/C (Triple) at Kurukshetra Substation along with associated bays (4 nos. GIS Bays at Kurukshetra) and, 1 no. 400 kV 125 MVAR Bus Reactor at Kurukshetra along with 1 no. associated GIS Bay at Kurukshetra under “WR-NR HVDC interconnector for IPP projects in Chattisgarh” in the Northern Region & Western Region. 14.07.2021
28/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for assets under Transmission system associated Western Region System Strengthening Scheme XVI in the Western Region 14.07.2021
7/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for the assets of “Transmission System of Vindhyachal -IV & RIHAND - III {1000MW} Generation Project. 14.07.2021
89/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff blocks, (ii) truing up of transmission tariff of 2014-19 period and (iii) determination of transmission tariff of 2019-24 tariff block for 400 kV D/C Ramagundam- Bhadrawati (Chandrapur) Transmission System in Southern and Western Regions. 30.06.2021
88/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 period and (ii) determination of transmission tariff of 2019-24 tariff block for Kudus (MSETCL) Sub-station under “Western Region System Strengthening Scheme - V” in Western Region. 30.06.2021
12/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff blocks, (ii) truing up of transmission tariff of 2014-19 tariff block, and (iii) determination of transmission tariff of 2019-24 tariff block for Special Energy Meters in Northern Region. 30.06.2021
15/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 tariff period for Asset 1: 2 No. 400 kV line bays at Samba Sub-station & 2 No. 400 kV line bays at Jallandhar Sub-station and Asset 2: 2 No. 400 kV line bays at Samba Sub-station & 2 No. 50 MVAR line reactor at Samba Sub-station under Northern Region System Strengthening Scheme-XXIX in the Northern Region. 30.06.2021
64/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 tariff period for Asset-I: Two nos. Bays at Nalagarh Extension, Asset-II: Two nos. Bays at Kota Extension, Asset-III: 400 kV D/C Bahadurgarh- Sonepat Line along with its associated bays at Bahadurgarh & Sonepat, Asset-IV: 315 MVA ICT-II at Sonepat, Asset -V: 315 MVA ICT-I at Sonepat, Asset -VI: Two nos. Bays at Bhiwadi Extension and Asset -VII: 125 MVAR 400 kV Bus-Reactor at Sonepat along with its associated bay under under Northern Region System Strengthening Scheme-XII in the Northern Region. 30.06.2021
214/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of Transmission Tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission system associated with Kopili hydroelectric Stage-I extension project (2x50MW) in the North Eastern Region. 30.06.2021
219/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 tariff period for the assets of “Transmission System associated with Krishnapatnam UMPP - PART B
a. covered in CERC order dated 31.05.2016 in petition no. 418/TT/2014
b. covered in CERC order dated 10.12.2018 in petition no. 101/TT/2018
30.06.2021
248/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 for revision of transmission tariff for the 2004-09 tariff period and 2009-14 tariff period and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the following assets:
Asset-I: (a) 50 MVAr Reactor at Narendra Sub-station, (b) Narendra – Davanagere 400 kV D/C transmission libe and 50 MVAr Bus Reactor at Mysore, (c) LILO of Kolar-Sripreumbudur 400 kV S/C line along with 50 MVAr reactor at Kalivanthapattu; ...
30.06.2021
251/TT/2020
Revision of transmission tariff for 2001-04, 2004-09 & 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for combined elements of (i) 315 MVA 400/220 kV Auto transformer at Hyderabad, and (ii) 50 MVAR Reactor at Cuddapah under CTP Augmentation in the Southern Region. 30.06.2021
274/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for Revision of Transmission Tariff for 2001-04, 2004-09 and 2009-14 tariff period, Truing up of Transmission tariff for 2014-19 period and Determination of Transmission tariff for 2019-24 period for Transmission System associated with Kathalguri Gas based Combined Cycle Project in the North Eastern Region. 30.06.2021
317/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 for revision of transmission tariff for the 2001-04 tariff period, 2004-09 tariff period and 2009-14 tariff period and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for asset under Korba Transmission System in the Western Region. 30.06.2021
25/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 tariff periods, truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff for 2019-24 tariff period for up-gradation of transfer capacity of Talcher-Kolar HVDC Bi-pole in the Southern Region. 23.06.2021
141/TT/2020
Revision of transmission tariff for 2004-09 & 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for (a) LILO of both circuit of 400kV D/C Gazuwaka-Vijayawada line at Vemagiri and (b) Extension of 400/220 kV substation at Vijayawada under System Strengthening-VI in Southern Region 23.06.2021
195/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 tariff periods, truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff for 2019-24 tariff period for Combined Assets of 400 kV D/C Ranchi - Sipat Transmission Line with associated bays at Ranchi & Sipat Sub-stations and 40% FSC on 400 kV Ranchi - Sipat Transmission Line at Ranchi Sub-station under Kahalgaon - II, Phase II Transmission System in the Western Region. 23.06.2021
289/TT/2020
Revision of transmission tariff for 2004-09 & 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for (a) 400 kV D/C Dulhasti-Kishenpur Transmission Line with associated bays, (b) 400 kV Kishenpur-Wagoora Transmission Line along with associated bays at Kishenpur and Wagoora Sub-Stations and (c) ICTs at Kishenpur under Dulhasti Transmission System in the Northern Region 23.06.2021
322/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of Transmission Tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 50MVAR Reactor along with associated equipment at Chandrapur Substation in Western Region. 23.06.2021
678/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: URTDSM System (Control Center Equipment, PMU’s and associated equipments) integrated and commissioned at ERLDC Kolkata, SLDCs WBSETCL & DVC, Asset-II: URTDSM System (Control Center Equipment, PMU’s and associated equipments) integrated and commissioned at SLDCs of OPTCL of Eastern Region under “Phase-I- Unified Real Time Dynamic State Measurement (URTDSM)”. 23.06.2021
6/TT/2021
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of Transmission Tariff for the 2001-04 tariff period, 2004-09 tariff period and 2009-14 tariff period, truing up of Transmission Tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Combined Asset-1 & 2: Combined Assets of 500 MVA 400/220 kV ICT-III & 500 MVA 400/220 kV ICT-IV along with associated bay at Maharanibagh Sub-Station (DOCO: 1.12.2010), Asset-3: 500MVA, 400/220 kV ICT-II along with associated bays at Lucknow (DOCO: 1.2.2012), Asset-4: 400/220 kV ICT along with associated bays at Bahadurgarh Sub-Station (DOCO: 1.11.2011) covered under Transmission System associated with “Northern Region System Strengthening Scheme- XXIII” in the Northern Region. 23.06.2021
78/TT/2021
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of Transmission Tariff for the 2001-04 tariff period, 2004-09 tariff period and 2009-14 tariff period, truing up of Transmission Tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Rihand Transmission System in the Northern Region. 23.06.2021
116/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of Transmission Tariff for the 2004-09 tariff period, 2009-14 tariff period, truing up of transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Asset-a: 400 kV D/C Kanpur – Auraiya transmission line along with bays at Auraiya, Asset-b: Two Nos. 400 kV bays at Kanpur Sub Station associated with 400 kV Kanpur- Auraiya transmission line, Asset-c: LILO of 400 kV D/C Bareilly – Mandola transmission line at Bareilly & Bus Reactor at Bareilly, Asset-d: LILO of 400 kV S/c Lucknow – Moradabad transmission line at Bareilly, Asset-e: LILO of 400 kV Lucknow (UPPCL) – Sultanpur (UPPCL) at Lucknow, Asset-f: 80 MVAR, 420 kV Bus Reactor at Lucknow Substation and Asset-g: 400 kV Bareilly –Moradabad transmission line along with associated bays under Northern Region System Strengthening Scheme - I in the Northern Region. 23.06.2021
23/TT/2021
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for 13 no. of assets for Transmission assets under “System strengthening-XX” in Southern Region. 14.06.2021
24/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 for Asset-A : 1 no. 765 kV line bay at 765/400kV Bilaspur Pooling Station (for Sipat STPS (NTPC) - Bilaspur PS (PG) 765kV 3rd S/c) & Asset-B: 2 Nos. 765 kV line bays at 765/400kV Bilaspur Pooling Station(POWERGRID) (for Bilaspur PS (PG)-Rajnandgaon (TBCB) 765kV D/c line) alongwith 2 Nos. 240MVAR, 765kV switchable line Reactors at 765/400kV Bilaspur Pooling Station end under under “POWERGRID Works associated with Additional System Strengthening for Sipat STPS” in Western Region. 14.06.2021
44/TT/2021
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for Combined Assets consisting of 15assets covered under “765KV System for Central Part of Northern Grid – Part-II” in Northern Region. 14.06.2021
133/TT/2021
Revision of transmission tariff for 2004-09 tariff block, 2009-14 tariff block, Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for LILO of one circuit of existing Neyveli-Trichy 400kV D/C Line at Neyveli TPS-I Expansion switchyard Transmission system associated with Neyveli TS-I in Southern Region. 14.06.2021
243/TT/2021
Revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for assets under NLC-I transmission system in Southern Region 14.06.2021
320/TT/2020
Revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for assets under Nathpa-Jhakri Transmission System in Northern Region. 14.06.2021
316/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for Kakrapar Transmission System in Western Region. 14.06.2021
653/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission asset – Tumkar(Pavagada) Pool – Hiriyur 400kV D/C line along with associated bays and equipment at both ends under “Transmission System for Ultra mega Solar Power Park at Tumkar(Pavagada), Karnataka-Phase-I” 14.06.2021
732/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for assets “Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER” in Northern, Eastern & Western Region 14.06.2021
447/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for LILO of both circuits of Mundra UMPP–Limbdi 400 kV D/C line (triple snowbird) at Bachau Sub-station alongwith extension of 400 kV Bachau Sub-station under “Transmission System Strengthening associated with Mundra UMPP (Part-A)” in Western Region. 14.06.2021
481/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 4 no. of assets under “Installation of STATCOMs in Western Region”. 14.06.2021
467/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for combined assets of i) 400 kV Gandhar-Padge S/C transmission line with associated bays and 400 kV Gandhar-Gandhar S/C transmission line and ii) 220 kV Gandhar-Bharuch D/C transmission line with associated bays and 400 kV Gandhar-Dehgam D/C transmission line with sub-station at Dehgam associated with Gandhar Gas Power Station (Stage-I) in Western Region. 14.06.2021
27/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 period for Raipur Pooling Station – Wardha 765 kV D/C second line with bay extension and equipment at 765 kV Raipur Pooling station and Wardha Sub-station under System Strengthening in Raipur - Wardha Corridor for IPP Projects in Chhattisgarh (IPP-F) in Western Region. 14.06.2021
30/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 for 2 Nos. 765 kV line bays at 765/400 kV Raipur Pooling Station (POWERGRID) for Raipur PS (POWERGRID)- Rajnandgaon (TBCB) 765 kV D/C line under “POWERGRID works associated with additional System Strengthening Scheme for Chhattisgarh IPPs (Part-B)” in Western Region”. 14.06.2021
32/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 for in respect of assets under “Northern Region System Strengthening Scheme- XXVIII” in Northern Region. 14.06.2021
40/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 under "Transmission System associated with RAPP 7 & 8, Part-B." 14.06.2021
73/TT/2021
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 tariff block for the assets covered under “Transmission System for Phase-1 Generation Projects in Orissa Part-C.” 14.06.2021
118/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 for 02 nos. of 400 kV line bays at Neemrana Sub-station for termination of 400 kV D/C Neemrana-Dhanonda Transmission Line under “ICTs and Bays Associated with Northern Region System Strengthening Scheme (NRSS-XXXVIII)”. 14.06.2021
207/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04, 2004-09 and 2009-14 (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for for LILO of 400 kV D/C Bonaigaon- Malda line at Purnea and sub-station at Purnea (New) in Eastern Region. 14.06.2021
213/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) Revision of Transmission Tariff of 2001-04, 2004-09 and 2009-14 tariff blocks ,(ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for “400 kV Talcher Transmission System” in Eastern Region. 14.06.2021
217/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2004-09 and 2009-14 periods (ii) truing up of transmission tariff of 2014-19 period, and (iii) determination of transmission tariff of 2019-24 tariff period for 2 assets under “Fixed Series Compensation on 400 kV lines” in Southern Region. 14.06.2021
252/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 and 2009-14 tariff blocks (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for Transmission System associated with 132 kV S/C NER Augmentation in North Eastern Region.” 14.06.2021
271/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04, 2004-09 and 2009-14 periods (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for 8 no. of assets under “Tehri Transmission System” in Northern Region. 14.06.2021
325/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff for 2001-04, 2004-09 and 2009-14 tariff blocks (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for Kawas Transmission System in Western Region”. 14.06.2021
352/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 tariff block for assets under “Inter-Regional System Strengthening Scheme in WR and NR (Part-B)” in Northern and Western Region. 14.06.2021
655/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 tariff block for 3 no. of assets under “Spare 765/400 kV Transformers for Northern Region” in Northern Region. 14.06.2021
663/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for “Circuit-I of Tirunelveli-Muvathapuza (Cochin) 400kV quad D/C line (Tirunelveli to Edmon on Multi Ckt line and Edmon to Cochin on D/C line) (Asset-I) and Circuit-II of Tirunelveli-Muvathapuza (Cochin) 400kV quad D/C line (Tirunelveli to Edmon on Multi Ckt line and Edmon to Cochin on D/C line) (Asset-II) under Transmission System associated with Kudamkulam Atomic Power Project (2X1000 MW)” in the Southern Region 07.06.2021
39/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Asset 1: Splitting of Dharamjaygarh Pool 765 kV Bus with necessary switching arrangement, installation of 76 5kV 1x330 MVAr Bus Reactor alongwith associated bay at 765 kV Bus Section B of Dharamjaygarh Pool and installation of 420 kV 1x125 MVAr Bus Reactor alongwith associated bay at 400kV Bus of Dharamjaygarh Pool, Asset 2: Splitting of Raigarh (Kotra) Pool 765 kV and 400 kV Bus with necessary switching arrangement, installation of 765 kV 1x240MVAr Bus Reactor alongwith associated bay at 765 kV Bus Section A of Raigarh (Kotra) Pool and installation of 765 kV Bus Reactor Bay at 765 kV Bus Section A of Raigarh (Kotra) Pool and installation of 420 kV, 1x125MVAr Bus Reactor alongwith associated bay at 400 kV Bus Section A of Raigarh (Kotra) Pool and Asset 3: Installation of 765 kV 1X240 MVAr Bus Reactor alongwith associated bay at 765 kV Bus Section A of Champa Pool under Western Region system Strengthening Scheme (XVIII) in the Western Region. 07.06.2021
34/TT/2021
Determination of transmission tariff from COD to 31.3.2014 for Asset-I: Combined Asset of a) 765 kV D/C Ajmer(New)- Bikaner (New) line along with 240 MVAR, 765 kV switchable line reactor and associated bays at Ajmer end and 330 MVAR, 765 kV switchable line reactor and associated bays at Bikaner end; b) 2 Nos. of 765/400 kV 3*500 MVA ICT along with associated bays at Bikaner S/S; c) 1 number 765 kV, 3*110 MVAR Bus Reactor along with associated bays at Bikaner (New) Sub-station; d) 1 number of 400 kV, 125MVAR Bus Reactor along with associated bay at Bikaner(New) Sub-station ; e) LILO of 01 ckt. of 400 kV Badhla (RVPNL) - Bikaner (RVPNL) D/C line at Bikaner (New) along with associated Bays; Asset-II: 765 kV D/C Bikaner( new)-Moga line along with 2 nos. 330 MVAR, 765 kV Switchable line reactor and associated bays at Bikaner end and 2 nos. 330 MVAR, 765 kV switchable line reactor and associated bays at Moga end under “Green Energy Corridor ISTS-Part-D” in the Northern Region. 07.06.2021
9/TT/2021
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of transmission tariff from COD to 31.3.2024 for Asset-1: Combined Asset of a) 400KV D/C Bhadla (POWERGRID)- Bhadla (RVPNL) Ckt -1 & 2 along with associated bays; b) 1 no. of 400KV, 125 MVAR Bus Reactor along with associated bays at Bhadla (POWERGRID) Substation; c) 400KV, 500 MVA ICT-2 along with associated bays at Bhadla (POWERGRID) Substation; d) 220KV, Adani Bhadla (Pooling station) line-1 bay at Bhadla (POWERGRID) Substation, Asset-2: 220 KV Sourya Urja line-2 Bay at Bhadla (POWERGRID) Substation, Asset-3: 500 MVA ICT-3 along with associated bays at Bhadla (POWERGRID) Substation, Asset-4: 500 MVA ICT-1 along with associated bays at Bhadla (POWERGRID) Substation, Asset-5: 2 nos. 220 kV line bays (205 & 206) at badhla (POWERGRID) Substation , Asset-6: 02 no. 400 kV line bays at Bhadla (POWERGRID) Substation, Asset-7: Combined Asset of a) 765 kV D/C Bhadla (POWERGRID)- Bikaner (POWERGRID) along with 2 nos. 240 MVAR Switchable Line Reactors along with associated bays at Bhadla (POWERGRID) S/s and 2 nos. 240MVAR Switchable Line Reactors along with associated bays at Bikaner (POWERGRID) S/s ; b) 765/400KV, 1500MVA ICT-1, 2 and 3 along with associated bays at Bhadla (POWERGRID) Substation; c) 1 no. of 240MVAR Bus Reactor along with associated bays at Bhadla (POWERGRID) Substation under "Transmission System for Solar Power Park at Bhadla" in the Northern Region. 07.06.2021
74/TT/2021
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for asset under “Supplementary Transmission System for Ultra Mega Solar Power Park (700 MW) at Banaskantha (Radhanesda), Gujarat” in Western Region. 02.06.2021
49/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for 2X240 MVAR 765 kV Bus Reactors along with associated bays at Thiruvalam Sub-station under “Installation of Bus reactors at Cuddapah, Nellore PS, Kurnool, Raichur and Thiruvalam in Southern Region.” 02.06.2021
675/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for Asset-I: 400 kV D/C Nabinagar - Patna line along with 2X80 MVAR switchable line reactor and associated bays at Patna Sub-station, Asset-II: 765/400 kV 3X500 MVA ICT-IV along with associated bays at Gaya Sub-station and Asset-III: 80 MVAR switchable Line reactor in 400 kV Barh-I line at Patna Sub-Station alongwith associated bay under Transmission System associated with Nabinagar-II TPS (3X660 MW) under Eastern Region. 29.04.2021
661/TT/2020
Determination of transmission tariff from COD to 31.3.2024 for Transmission assets associated with Strengthening of Transmission System beyond Vemagiri in Southern Region. 29.04.2021
273/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from COD to 31.3.2024 for Asset 1*100 MVA, 220/132 kV ICT-III at Sitarganj Sub-station (100 MVA ICT shifted from Raebareli) under “Augmentation of Transformation Capacity at Raebareli & Sitarganj 220/132 kV Sub-stations”. 29.04.2021
326/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 and 2009-14 tariff blocks, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for 1 no. of asset under Korba-Budhipadar Transmission System in Western Region. 28.03.2021
321/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 and 2009-14 tariff blocks, (ii) truing up of transmission tariff of 2014-19 tariff block, and (iii) determination of transmission tariff of 2019-24 tariff block for Combined Asset under Vindhyachal Stage-I Transmission System in Western Region. 28.03.2021
511/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for Revision of Transmission Tariff for 2004 -09 and 2009-14 tariff block, Truing up of Transmission tariff for 2014- 19 tariff block and Determination of Transmission tariff for 2019- 24 tariff block for Combined elements of Kaiga - Narendra 400 kV D/C Transmission Line, 400/220 kV Sub-station at Narendra with one 315 MVA ICT and 2nd 315 MVA ICT at Narendra Sub-station under Kaiga-Narendra Transmission System in the Southern Region. 09.03.2021
507/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 500 MW HVDC back to back station at Gazuwaka (Asset-I), Vijayawada-Gazuwaka 400 kV D/C Line & 50% FSC Jeypore-Gazuwaka 400 kV D/C T/L at Jeypore (Asset-II) and (a) 40% FSC on Rengali-Indravati 400 kV S/C T/L & (b) 40% FSC on Meramundali-Jeypore 400 kV S/C T/L at Jeypore (Asset-III) under “Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” in the Southern Region and the Eastern Region 09.03.2021
506/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for 2004-09 tariff period, 2009-14 tariff period and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-I: 80 MVAR bus reactor along with Nellore 400 kV bay extension, Asset-II: 315 MVA ICT with cuddapah 400 kV bay extension, Asset-III: 315 MVA ICT with Gooty Extension and IInd 3X167 MVA auto transformer at Kolar and switching arrangement for reactor at Somanahalli, Asset-IV: 315 MVA ICT with Gazuwaka sub-station bay extension, Asset-V: 315 MVA ICT with Munirabad sub-station bay extension and Asset-VI: 315 MVA ICT with Khammam sub-station bay extension under System Strengthening Scheme V in the Southern Region. 09.03.2021
472/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Asset-A: (A1)Associated bays of 765 kV S/C Lucknow-Barielly transmission line including 3×80 MVAR switchable line reactor at Lucknow (New) and line reactor at Bareilly (New) Sub-station, (A2):2nd Circuit of 400 kV D/C (Quad) Bareilly (New)-Bareilly (Old) transmission line with associated bays, and (A3) : 765/400 kV 1500 MVA ICT-I at Bareilly (New) Sub-station along with associated bays, Asset-B: 765 kV, 3x80 MVAR Bus reactors at Bareilly (New) Sub-station, Asset-C: Associated bays of 1st circuit of 400 kV D/C (Quad) Bareilly (New)- Bareilly (Old) Transmission Line, Asset-D: 765/400 kV 1500 MVA ICT-II at Bareilly (New) Sub-station along with associated bays, Asset-E: 1st circuit of 400 kV D/C (Quad) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays, Asset-F: 2nd circuit of 400 kV D/C (Quad) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays, Asset-G: 400 kV D/C Kashipur-Roorkee line along with associated bays, Asset-H: 400 kV D/C Roorkee- Saharanpur line along with associated bays, Asset-I: 125 MVAR Bus Reactor at Roorkee Sub-station, Asset-J: 765 kV S/C Bareilly- Lucknow Transmission Line at 400kV level, Asset-K: One circuit of 400 kV D/C Bareilly (New)-Bareilly (Existing) Transmission Line under “Northern Region System Strengthening Scheme - XXI” in the Northern Region. 09.03.2021
469/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the following assets
Asset-I: Combined Asset-A&B: (Asset A: 315 MVA ICT-I at Sikar 400/200 kV new Sub-station with 1 No. 220 kV Line bay and Asset-B: LILO of Ckt-I of Sikar (RVPN) - Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), Asset-C: LILO of Ckt-II of Sikar(RVPN)-Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), ...
09.03.2021
465/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of Transmission Tariff for the 2004-09 period and the 2009-14 period, truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the following assets
Asset-I:- combined assets of Ckt-I & Ckt-II (Asset-II) of 400 kV Teesta (Stage-V) Siliguri transmission line; ...
09.03.2021
448/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2001-04 tariff period, 2004-09 tariff period, 2009-14 tariff period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400 kV Jeypore-Talcher transmission system in the Eastern Region. 09.03.2021
380/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, truing up of transmission tariff of 2009-14 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of
Asset-I: 765 kV S/C Gwalior-Agra transmission line Circuit-II along with 400 kV bays at Agra-Gwalior S/S ...
09.03.2021
371/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2004-09 and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for
Asset I - LILO of 220 kV Tanakpur-Bareilly Transmission Line (Ckt-II) at Sitarganj along with associated bays; ...
09.03.2021
353/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Ramagundam- Hyderabad 400 kV S/C line-2 and Bhadrawati (Chandrapur) HVDC back to back station (2x500 MW) in the Southern Region and Western Region 09.03.2021
708/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for
Asset 1 - Replacement of 1X100MVA, 220/132kV ICT-II by 1X200 MVA, 220/132 kV ICT-II at Raebareli Sub-station;
Asset 2 - Replacement of 1X100MVA, 220/132 kV ICT-III by 1X200 MVA, 220/132 kV ICT-III at Raebareli Sub-station in the Northern Region
09.02.2021
704/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset A1: 2 Nos. Line bays along with 2 Nos. 50 MVAR Line Reactors (charged as bus reactor) at Jabalpur Pooling Station and Asset B1 : MB TPS (Anuppur)-Jabalpur Pooling Station 400 kV D/C (triple Snowbird) line under Transmission System for connectivity of MB Power(M.P.) Limited the in the Western Region. 09.02.2021
712/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for transmission system associated with Bairasuil in Northern Region 28.01.2021
476/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for Transmission system associated in Farakka-III in Eastern Region. 28.01.2021
59/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for Transmission asset under “Removal of Constraints in 400kV Bays Extensions at 400kV Vemagiri S/S” in Southern Region. 28.01.2021
355/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Asset consisting of various assets as described in the petition under “Supplementary Transmission System associated with DVC and Maithon Right Bank Project” in the Eastern and Northern Regions 28.01.2021
471/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of 220 kV Kishanganga - Amargarh D/C line on M/C tower under the scheme “Transmission system associated with Kishenganga HEP” in the Northern Region. 28.01.2021
14/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-a: 50 MVAr Bus reactor at Hisar Sub-station, Asset-b: LILO of 400 kV Moga-Hissar line, ICT-I at Fatehabad Sub-station, 4 nos. 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAr bus reactor bay along with associated bays at Fatehabad Sub-station, Asset-c: Total upstream system including Malerkotla-Ludhiana- Jalandhar transmission line along with associated bays at Ludhiana Sub-station Malerkotla Sub-station, Asset-d: ICT-I along with associated bays at Ludhiana Sub-station, Asset-e: ICT-II along with associated bays at Ludhiana Sub-station, Asset-f: 315 MVA, 400/220 kV ICT-I along with associated bays at 400/220 kV Fatehabad Sub-station under the Northern Region System Strengthening Scheme-III in the Northern Region. 28.01.2021
547/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Assets consisting of Asset A: 400kV, 125 MVAR Bus Reactor at Gorakhpur ... 28.01.2021
581/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for
Asset-I- 1 No. of 12ῼ Series Bus reactor at Mandola 400/220 kV POWERGRID) Sub-station along with associated bays,
Asset-II- 1 No. of 12ῼ Series Bus reactor at Ballabhgarh 400/220 kV (POWERGRID) Sub-station along with associated bays, 1 no. Series Line Reactor of 12ῼ in Dadri-Mandola 400 kV, Ckt-I and 1 no. Series Line Reactor of 12ῼ in Dadri-Mandola 400 kV, Ckt-II under the scheme “Provision of Series Reactors in the Northern Region”
28.01.2021
650/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the Combined Asset consisting of
Asset I: Extension of 765/400 kV Bilaspur Pooling Station (near Sipat) alongwith LILO of Sipat-Sconi Ckt 2 with 240 MVAr Line Reactor and
Asset-II: Installation of 765/400 kV, 1500 MVA iCT-3 at Bilaspur Pooling Station under WRSS XI Scheme.
28.01.2021
658/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-I: STATCOM System (+/-) 300 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor), cooling system & STATCOM protection / controller etc at Rourkela Sub-station; ... 28.01.2021
669/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for 1X125 MVAR 400 kV Bus reactor along with associated bays at Cuddapah Sub-station, 1X240 MVAR 765 kV Bus reactor along with associated bays at Kurnool Sub-station, 1X240 MVAR 765 kV Bus reactor along with associated bays at Nellore PS Sub-station, 1X240 MVAR 765 kV Bus reactor along with associated bays at Raichur Substation under “Installation of Bus reactors at Cuddapah, Nellore PS, Kurnool, Raichur and Thiruvalam” in the Southern Region. 28.01.2021
679/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing upof transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Tuticorin Pooling Station- alem Pooling Station 765 kV D/C line (initially charged at 400 kV) along with Bay extensions at Salem Pooling Station and Tuticorin Pooling Station and 80 MVAR Line Reactors at each end of both circuits of Tuticorin Pooling Station-Salem Pooling Station 765 kV D/C line (initially charged at 400 kV) under “Common System Associated with Coastal Energen Private Limited & Ind-Bharat Power (Madras) Limited-LTOA Generation Projects in Tuticorin Area-Part-B ” in the Southern Region 28.01.2021
691/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for the Combined Asset-I : (i) 765 kV S/C Bina -Gwalior Transmission Line; (ii) 315 MVA, 400/220/33 kV ICT-I along with associated bays at Gwalior Sub-station (iii) LILO of 400 kV S/C Korba-Raipur line at Bhatapara Sub-station along with associated bays; (iv) 400 kV Khandwa Rajgarh Ckt-II along with associated bays and 765/400 kV ICT-III at Seoni Sub-station; (v) 400 kV Khandwa Rajgarh Ckt-I along with associated bays and 63 MVAR Bus Reactor Bina Sub-station; (vi) 400 kV ICT-II at Gwalior Substation; (vii) 400/220 kV ICT-II at Bhatapara Sub-station under Sipat-II Transmission System in the Western region 28.01.2021
696/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for
Asset I: LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi along with associated bays; ...
28.01.2021
706/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for transmission system associated with Auraiya Gas Power Project in the Northern Region. 28.01.2021
710/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2009-14 and 2014-19 periods and determination of transmission tariff for 2019-24 period for Asset-1: 765 kV S/C Moga-Bhiwani transmission line;... 28.01.2021
715/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for 400 kV S/C Chamera II pooling Station Transmission Line, 400/220kV GIS Pooling Station at Rajera with 400/220kV 315 MVA ICT-I and ICT-II under Chamera II System and 400kV S/C Chamera II pooling Station Transmission Line, 400/220kV GIS Pooling Station at Rajera with 80 MVAR Bus Reactor at Pooling Point under Chamera II System. 28.01.2021
716/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Assets consisting of
Asset A: 400 kV D/C Kishenpur-Samba transmission line along with bays at both ends, 01 no. 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 03 nos. 220 kV line bays;...
28.01.2021
719/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for
Asset-1(a): 400 kV Allahabad-Meja line-1 along with 1 no 400 kV Allahabad bay and
Asset-1(b): 400 kV Allahabad-Meja line-II along with 1 no 400 kV Allahabad bay under “Transmission System Associated with Meja TPS”.
28.01.2021
671/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 6 assets under “Western Region System Strengthening Scheme-XIV”. 28.01.2021
676/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 8 assets under “Augmentation of Transformers in Northern region Part-A” in Northern Region. 28.01.2021
667/TT/2020
Truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Transmission assets “Radial Interconnection between India (NER) and Bangladesh-Indian Portion” in North-Eastern Region. 28.01.2021
668/TT/2020
Truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Transmission assets under Augmentation of transformation capacity in Southern Region. 28.01.2021
670/TT/2020
Truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for 21 nos. of Assets under Eastern Region Strengthening scheme XII in Eastern Region. 28.01.2021
695/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for Salal–II Transmission System associated with Northern Region 28.01.2021
681/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 period and (ii) determination of transmission tariff for 2019-24 period for 19 no. of assets under “Transmission system associated with North East-Northern/Western Inter Connector-I” in North Eastern Region. 28.01.2021
683/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) revision of transmission tariff for 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for 2 no. assets under Moga-Hissar-Bhiwani Transmission System in Northern Region. 28.01.2021
315/TT/2019
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC(Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of Transmission Tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, truing up of Transmission tariff for 2014-19 tariff block and determination of Transmission tariff for 2019-24 tariff block for 400/220 kV Bhiwadi Sub-station along with LILO of Ballabhgarh-Bassi 400 kV S/C line and ICT-I & ICT-II at Bhiwadi in the Northern Region. 18.01.2021
218/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff of 2014-19 tariff block and determination of transmission tariff of 2019-24 tariff block for procurement of 3 Nos. Spare Converter Transformers (234 MVA, 1-ph, 3 winding) at Bhadrawati HVDC back to back station under “Installation of Transformer and Procurement of Spare Converter Transformer at Bhadrawati HVDC Back to Back Station” 08.01.2021
372/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for assets under “Eastern Region Strengthening Scheme – III (ERSS-III)” in Eastern Region. 29.12.2020
377/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for 7 no. of assets under Bus Reactors in Northern Region (Phase-II). 29.12.2020
455/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for 4 no. of assets under Creation of 400/220 kV GIS Sub-stations in NCT of Delhi during 12th Plan Period (Part-B1) in Northern Region. 29.12.2020
269/TT/2020
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Chukka Transmission System in Eastern Region. 22.12.2020
223/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission assets under “Installation of Transformer and Procurement of Spare Convertor Transformer at Bhadrawati Back to Back Station” in Western Region. 19.12.2020
104/TT/2019
Petition for determination of transmission tariff from COD to 31.3.2019 for Asset-I: Extension of Kota 400/220 kV Sub-station (POWERGRID) shifting of 400 kV, 50 MVAR line reactor from Merta to Kota Sub-station for its use as Bus Reactor and 400 kV bus reactor bay; Asset-II: Extension of Koteshwar 400/220 kV Sub-station (THDC) installation of 400 kV, 125 MVAR bus reactor along with associated bay at Koteshwar; Asset-III: Extension of Dehar 400/220 kV Sub-station (BBMB)-installation of 400 kV, 1X63 MVAR bus reactor-II through a single 400 kV hybrid GIS bay and Asset-IV: Replacement of 250 MVA ICT with 4x105 MVA, 1-phase ICT ad retrofitting of associated 400/220 kV bay equipment and protection relays at Dehar under Strengthening Scheme in Northern Region. 19.12.2020
470/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for Transmission System associated with Uri Hydro-electric Project (4*120 MW) in Northern Region. 07.12.2020
134/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for Transmission System associated with Common System associated with East Coast Energy Private Limited and NCC power projects limited LTOA generation projects in Srikakulam Area, Part-A. 24.11.2020
115/TT/2020
Revision of transmission tariff of the 2004-09, 2009-14 tariff blocks, truing up of transmission tariff of the 2014-19 tariff block and determination of transmission tariff of the 2019-24 tariff block for the assets under “Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” in Southern Region and Eastern Region 24.11.2020
318/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for transmission assets under Transmission System associated with Common System associated with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA generation projects in Tuticorin area- Part-B in Southern Region. 24.11.2020
358/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for transmission assets under “Transmission System for development of Pooling Station in Northern Part of West Bengal and transfer of power from Bhutan to NR/WR”. 24.11.2020
360/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission assets under “Transmission System for Ultra Mega Solar Park in Anantpur District, Andhra Pradesh - Part A (Phase-I)” 24.11.2020
461/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for transmission assets NLC-Karaikal 230 kV D/C Line (through LILO of the 230 kV Neyveli-Bahour S/C line at Karaikal) under NLC-Karaikal 230 kV D/C line in Southern Region. 24.11.2020
378/TT/2020
Truing up of transmission tariff of the 2014-19 tariff block and determination of transmission tariff of the 2019-24 tariff block for Asset-I: LILO of both circuits of 400 kV D/C Kishenpur Wagoora T/L along with bays at New Wanpoh & 1 No. 315 MVA, 400/220 kV ICT-I along with associated bays at New Wanpoh and 03 No. 220 kV Line Bays, Asset-II: 400/220 kV 315 MVA ICT-II along with associated bays at New Wanpoh Sub-station, Asset-III: 400 kV 125 MVAR Bus Reactor along with associated bays, Asset-IV: 400 kV D/C Kishenpur- New Wanpoh Line alongwith associated bays at both ends) associated with Northern Region System Strengthening Scheme-XVI” 24.11.2020
350/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for 11 no. of assets under “Installation of Reactors (Part-II) in Western Region”. 17.11.2020
359/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff period and (ii) determination of transmission tariff of the 2019-24 tariff period for 9 no. of assets under “Northern Region System Strengthening Scheme-XIX ” in Northern Region. 17.11.2020
375/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for assets under “East Coast Energy Pvt. Ltd. and NCC Power Projects Ltd. LTOA Generation Projects in Srikakulam Area Part-B” in Eastern and Western Region. 17.11.2020
404/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff of the 2019-24 tariff block for 3 no. of assets under “Augmentation of Transformers in Northern Region-Part B” in Northern Region. 17.11.2020
468/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff of the 2019-24 tariff block for 3 no. of assets under “Static VAR Compensator (SVCs)” in Northern Region. 17.11.2020
403/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for the assets of “Transmission System associated with Mundra Ultra Mega Power Project (UMPP)” (a) Covered in order dated 1.12.2014 in Petition No. 72/TT/2012; (b) Covered in order dated 15.10.2015 in Petition No. 296/TT/2013; (c) Covered in order dated 31.12.2015 in Petition No. 101/TT/2014; and (d) Covered in order dated 15.3.2016 in Petition No. 57/TT/2013. 16.11.2020
449/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period in respect of Asset-I: LILO of Patiala-Hissar line at Kaithal Sub-Station along with associated bays Asset-II: 400kV D/C Patiala-Ludhiana line along with associated bays at Patiala and Ludhiana Sub-station Asset-III: LILO of 1st Circuit of 400 kV D/C Nathpa Jhakri- Nalagarh (Triple Snowbird) Line at Rampur Asset IV: LILO of 2nd ckt. of 400 kV Natpha Jhakri-Nalagarh (Triple Snowbird) line at Rampur covered under “Transmission System associated with Rampur HEP” in the Northern Region 16.11.2020
121/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400 kV S/C Singrauli-Vindhyachal Transmission Link alongwith (2x250 MW) HVDC Back to Back at Vindhyachal between the Northern Region and the Western Region. 13.11.2020
208/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission assets under Transmission system associated with System strengthening-XVII in the Southern Region 13.11.2020
328/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for assets under Common Transmission Scheme associated with ISGS in Nagapattinam Cuddalore area of Tamil Nadu part A1(a) in the Southern Region. 13.11.2020
348/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission assets associated with Northern Region System Strengthening Scheme- XXVII. 13.11.2020
349/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for assets under Transmission System for IPP Generation Projects in Madhya Pradesh and Chhattisgarh. 13.11.2020
355/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Asset consisting of various assets as described in the petition under “Supplementary Transmission System associated with DVC and Maithon Right Bank Project” in the Eastern and Northern Regions 13.11.2020
356/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset 1: Combined Assets of WRSS - II Set A (Part 1), Asset 2: Combined Assets of WRSS - II Set A (Part 2), Asset 3: Combined Assets of WRSS - II Set B, Asset 4: Combined Assets of WRSS - II Set C, Asset 5: Combined Assets of WRSS - II Set D (Part 1) and Asset 6: Combined Assets of WRSS - II Set D (Part 2) under “Western Regional System Strengthening Scheme II” 13.11.2020
357/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission assets under Transmission System for Ultra mega Solar Power Park at Tumkur (Pavagada), Karnataka-Phase-I in the Southern Region 13.11.2020
370/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset 1: Combined Assets at Raigarh substation comprising of 1a) 765KV D/C Raigarh PS (Kotra)-Raigarh PS (Tamnar) Transmission line alongwith accociated bays 1b) 765/400kV, 1500MVA, ICT-1 at Raigarh pooling station (near Tamnar) along with associated bays, 1c) 765 KV, 240MVAr, Bus reactor at Raigarh pooling station (near Tamnar) along with associated bays, 1d) 765/400KV, 1500MVA ICT-2 at Raigarh pooling station (near Tamnar) along with assocatied bays, 1e) 765/400KV, 1500MVA ICT-3 at Raigarh pooling station (near Tamnar) along with assocatied bays, Asset 2a: 765KV D/C Champa Pooling Station- Raipur Pooling Station Transmission Line alongwith associated bays at Raipur PS only, Asset 2b: Bay Extension, at 765kV Raipur Pooling Station with Line shunt reactor for 765kV Champa-1 Line Bay - Charged as Bus Reactor, Asset 3a: 765KV S/C Champa Pooling Station-Dharamjaygarh SS TL & Bays at Dharamjaygarh SS Only, Asset 3b: Raigarh PS (near Kotra) - Champa PS 765 kV S/C T/L along with associated bays & One no. bay at Champa PS for One ckt. of Champa PS - Raipur PS 765 kV D/C T/L, Asset 3c: 765/400 kV 1500 MVA ICT-1 along with associated bays at Champa PS, Asset 3d: 1500 MVA, 765/400 kV Auto Transformer-2 alongwith associated bays at Champa, Asset 3e: 765 kV, 3 x 80 MVAr Bus Reactor alongwith associated bays at Champa PS, Asset 3f : 400 kV, 80 MVAr Bus Reactors alongwith associated bays at Champa PS, Asset 3g: 765/400 kV 1500 MVA ICT-3 & ICT4 along with associated bays at Champa PS, Asset 3h: 765/400 kV 1500 MVA ICT-5 along with associated bays at Champa PS, Asset 3i: 765/400 kV 1500 MVA ICT-6 along with associated bays at Champa PS, Asset 3j: one no. 765 kV Dharamjaygarh line bay for 765 kV S/C Champa PS - Dharamjaygarh S/S T/L at 765/400 kV Champa PS and Asset 3k: One no. 765 kV bay at Champa for one ckt. of Champa PS - Raipur PS 765 kV D/C T/L under “Establishment of pooling stations at Champa and Raigarh (near Tamnar) for IPP Generation projects in Chattisgarh (IPP-B)” 13.11.2020
383/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Assets of Transmission System associated with Augmentation of Transformation capacity (Part-I) in Northern & Eastern Region. 13.11.2020
405/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-A1: 765 kV Line bay & 3x80 MVAR line reactor at 765 kV Vadodara GIS for Vadodara-Dhule transmission line (IPTC) and Asset-B1: 765 kV line Bays & 3*80 MVAR Switchable line Reactor at 765 kV Jabalpur Pooling Substation (for 765 kV S/C Jabalpur-Bhopal line), Asset-B2: 765 kV Line BAYS & 3*80 MVAR line reactor at 765 kV Indore S/S(for 765 kV S/C Bhopal-Indore line) and Asset-B3: Extension of 765 kV Aurangabad substation for 765 kV S/C line bay under “Line bays and Reactor Provisions at POWERGRID Sub-stations associated with System Strengthening in the Western Region. 13.11.2020
458/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400/220 kV, 500 MVA ICT III along with 400 kV AIS bay & 220 kV GIS bay at Gaya Substation under Eastern Region Strengthening Scheme XVII Part B in the Eastern Region 13.11.2020
459/TT/2020
Approval for transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of Asset-I: Replacement of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT at 400/220 kV Lucknow Sub-station under Transmission System for “Northern Region System Strengthening Scheme-XL” in the Northern Region 13.11.2020
460/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission assets under Transmission system for connectivity of Thermal Powertech Corporation India Ltd in the Southern Region 13.11.2020
464/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of Combined Assets consisting of Asset-1: 400 kV D/C Koteshwar HEP – Koteshwar Pooling Station Circuit – I&II alongwith associated bays; Asset-2: LILO of Circuit-I of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays; Asset-3: LILO of Circuit-II of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays and Asset-4: 50% series compensation at Meerut (Extension) on Tehri Pooling point (Koteshwar) – Meerut 765 kV 2* S/C Lines (Charged at 400 kV) covered under “Transmission system associated with Koteshwar HEP” in the Northern Region. 13.11.2020
471/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of 220 kV Kishanganga - Amargarh D/C line on M/C tower under the scheme “Transmission system associated with Kishenganga HEP” in the Northern Region. 13.11.2020
475/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 400 kV D/C (Quard) Circuit-I of Dehradun- Abdullahpur transmission line along with associated bays at Dehradun and Abdullahpur Substation (DOCO 31.3.2018), Asset-II: 400 kV D/C (Quard) Circuit-II of Dehradun- Abdullahpur transmission line along with associated bays at Dehradun and Abdullahpur Sub-station (DOCO 1.4.2018), Asset-III: 400 kV D/C (Quard) Dulhasti-Kishenpur single circuit strung along with associated bays at Kishenpur (DOCO 23.1.2018), Asset-IV: Two nos. of 63 MVAR 400kV Line Reactor Balia (PG) Sub-station (Extn) (DOCO 1.2.2014) under “Northern region system strengthening scheme-XXIV” in the Northern Region 13.11.2020
476/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission System Associated with "Green Energy Corridors: Inter State Transmission Scheme (ISTS)- Part A” in Northern Region. 13.11.2020
86/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for Revision of Transmission Tariff for the 2004-09 tariff period, 2009-14 tariff period, Truing up of Transmission tariff for the 2014-19 tariff period and Determination of Transmission tariff for the 2019-24 tariff period for Kahalgaon Stage-II, Phase-I Transmission system in the Eastern, Northern Region & Inter - regional link between Northern & Western Region 03.11.2020
495/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for 2001-04 tariff period, 2004-09 tariff period, 2009-14 tariff period and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-I: 220 kV D/C Unchahar-Kanpur transmission line-I with associated bays, Asset-II: 220 kV D/C Unchahar-Kanpur transmission line-II with associated bays, and Asset-III: LILO of one circuit of 220 kV D/C Panki-Mainpuri line-II of transmission system associated with Unchahar Stage-II in the Northern Region. 03.11.2020
85/TT/2019
Approval under Regulation-86 of CERC (Conduct of Business)Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset-I: +/-200MVAR STATCOM at 400/220 kV Nalagarh S/s (DOCO: 31.03.2019) under "Provision of STATCOM at Nalagarh & Lucknow in Northern Region". 02.11.2020
104/TT/2019
Petition for determination of Transmission Tariff from DOCO to 31.3.2019 for Asset-I: Extension of Kota 400/220 kV Substation (POWERGRID) Shifting of 400 kV, 50 MVAR line reactor from Merta to Kota Substation for its use as Bus Reactor and 400 kV Bus reactor bay; Asset-II: Extension of Koteshwar 400/220kV Substation (THDC) installation of 400 kV, 125 MVAR bus reactor along with associated bay at Koteshwar; Asset-III: Extension of Dehar 400/220kV Substation (BBMB)- installation of 400kV, 1x63 MVAR bus Reactor-II through a single 400kV hybrid GIS bay and Asset-IV: Replacement of 250MVA ICT with 4x105MVA, 1-phase ICT & retrofitting of associated 400/220kV bay equipment and protection relays at Dehar. under Strengthening Scheme in Region 02.11.2020
105/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations ’2014 for determination of Transmission Tariff from DOCOs to 31.03.2019 for Asset I: LILO of Agra-Bharatpur 220 kV S/c Line at Agra (POWERGRID) S/s alongwith line bays, Asset II: 1X315 MVA 400/220 kV ICT (Shifted from Ballabhgarh S/s) alongwith ICT bays at Agra (POWERGRID) Substation, Asset-III: 01X 315 MVA, 400/220 kV ICT along with associated bays at Kaithal sub-station (Spare ICT from Ballabhgarh), Asset-IV: 02 nos 220 kV bays at Kaithal S/s under Northern Region system Strengthening Scheme XXXIV in Northern Region. 02.11.2020
121/TT/2019
Approval of transmission tariff from proposed COD to 31.3.2019 for 400kV D/C Kameng-Balipara Transmission Line along with associated bays at Balipara Sub-station under "North East-Northern / Western Interconnector-I" in North-Eastern Region 02.11.2020
269/TT/2020
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for Chukka Transmission System in Eastern Region. 02.11.2020
485/TT/2019
Approval under regulation-86 of CERC (Conduct of Business)Regulations"1999 and CERC (Terms and Conditions of Tariff) Regulations "2014 for determination of Transmission Tariff from anticipated DOCOs to 31.03.2019 for Asset-I: 315 MVA,400/220 kV ICT along with associated bays at Fatehabad Substation under Augmentation of Transformation capacity at Fatehabad (PG) in Northern Region. 02.11.2020
486/TT/2019
Approval under regulation-86 of CERC (Conduct of Business) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset-1: PHASE-I "UNIFIED REAL TIME DYNAMIC STATE MEASUREMENT (URTDSM)" for NRLDC & SLDCs of Northern Region under "Phase-I- Unified Real Time Dynamic State Measurement (URTDSM)" in Northern Region. 02.11.2020
14/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for revision of transmission tariff for 2004-09 and 2009-14 period , truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-a: 50 MVAR Bus reactor at Hisar Sub-station, Asset-b: LILO of 400 kV Moga-Hissar line, ICT-I at Fatehabad Sub-station, 4 nos. 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAR bus reactor bay along with associated bays at Fatehabad Sub-station, Asset-c: Total upstream system including Malerkotla-Ludhiana-Jalandhar transmission line along with associated bays at Ludhiana Sub-station Malerkotla Sub-station, Asset-d: ICT-I along with associated bays at Ludhiana Sub-station, Asset-e: ICT-II along with associated bays at Ludhiana Sub-station, Asset-f: 315 MVA, 400/220 kV ICT-II along with associated bays at 400/220 kV Fatehabad Sub-station under Northern Region System Strengthening Scheme-III in Northern Region. 02.11.2020
100/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 08 nos. of assets under Eastern Region Strengthening Scheme- VIII in Eastern Region. 02.11.2020
509/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for Asset-I: 2 Nos. of 400 kV GIS line bays at Nizamabad (PG) for termination of Nizamabad-Yeddumailaram (Shankarpalli) 400 kV D/C line and Asset-II: 2 Nos. of 400 kV GIS line bays at Maheswaram (PG) for termination of Maheswaram (PG)–Mehboob Nagar 400 kV D/C Transmission Line under "Provision of line bays for the Scheme-Connectivity lines for Maheshwaram (Hyderabad) 765/400 kV Pooling Station” in the Southern Region. 02.11.2020
38/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for Transmission System associated with Common Transmission scheme associated with ISGS projects in Nagapattinam / Cuddalore area of Tamil Nadu- Part-A1 (b) in the Southern Region. 15.10.2020
2/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for Asset I: Spare Converter Transformer at Rihand (COD: 01.12.2011) for Rihand - Dadri HVDC Bi-pole Terminal in the Northern Region. 15.10.2020
100/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 08 nos. of Assets under the Eastern Region Strengthening scheme VIII in Eastern Region. 13.10.2020
194/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 5 nos. of assets under Transmission System associated with Krishnapatnam UMPP Part C1. 08.10.2020
7/TT/2020
Revision of Transmission Tariff of the 2001-04, 2004-09 and 2009-14 blocks, truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 tariff block for Stage- 1 of 400 kV Thyristor controlled series compensation project (Fact Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region. 23.09.2020
155/TT/2020
Revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of 2014-19 tariff period and determination of transmission tariff of 2019-24 tariff period for NLC-II Transmission system in Southern Region. 23.09.2020
75/TT/2020
Approval of transmission tariff from COD to 31.3.2019 for Asset: 400 kV Transmission Line for reconfiguration of Biharsharif Ckt III and IV from present location to the Stage II side of Kahalgaon Switchyard of NTPC under Split Bus arrangement for various substations in Eastern Region. 16.09.2020
193/TT/2019
Approval for determination of transmission tariff from COD to 31.3.2019 for Asset-I: 400 kV D/C Alipurduar-Punatsangchun alongwith associated bays at Alipurduar substation, Asset-II: 02 nos of 220 kV bays at Alipurduar Substation under the transmission system associated with “Transmission system for development of pooling station in Northern part of West Bengal and transfer of power from Bhutan to NR/WR”. 16.09.2020
9/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for asset under “Split Bus Arrangement and Reconfiguration/Shifting of Terminating Lines at Raipur 400 kV S/S” in Western Region. 15.09.2020
61/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for asset under “Provision of 400 kV bays at Fatehpur for ATS under Unchahar TPS” in Northern Region. 15.09.2020
78/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff of the 2019-24 tariff block for 5 assets under “System Strengthening –XXIII” in Southern Region. 15.09.2020
81/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff blocks, (ii) truing up of transmission tariff of the 2014-19 tariff block and (iii) determination of transmission tariff of the 2019-24 tariff block for the assets covered under “Ramagundam Stage-III” in Southern Region. 15.09.2020
93/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 period and (ii) determination of transmission tariff of the 2019-24 period for 3 no. of assets under Transmission system associated with System Strengthening-XII in Southern Region. 15.09.2020
119/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) revision of transmission tariff of the 2004-09 2009-14 tariff blocks, (ii) truing up of transmission tariff of the 2014-19 tariff block and (iii) determination of transmission tariff of the 2019-24 tariff block for the assets covered under “Unchahar-III Transmission System” in Northern Region. 15.09.2020
132/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff of the 2019-24 tariff block for two assets under Northern Region System Strengthening Scheme-XX in Northern Region 15.09.2020
172/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of the 2014-19 tariff block and (ii) determination of transmission tariff of the 2019-24 tariff block for the assets covered under conversion of fixed line reactors to switchable line reactors in Southern Region. 15.09.2020
223/TT/2020
Truing up of transmission tariff of the 2014-19 period and determination of transmission tariff of the 2019-24 period for transmission assets under “Installation of Transformer and Procurement of Spare convertor Transformer at Bhadrawati Back to Back Station” in Western Region. 03.09.2020
143/TT/2019
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. 11.09.2020
4/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Start-up Power to DVC and Maithon Right Bank Generation Projects in the Eastern Region 07.09.2020
13/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Salal-I Transmission System associated with Northern Region. 07.09.2020
33/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Solapur STPP-Solapur (POWERGRID) 400 kV D/C (Quad) 2nd Transmission Line along with associated bays at Solapur (POWERGRID) Sub-Station under "Transmission System associated with Solapur STPP (2x660 MW) Part-A" in Western Region. 07.09.2020
100/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 08 nos. of Assets under Eastern Region Strengthening scheme VIII in Eastern Region. 07.09.2020
131/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Revision of transmission tariff for 2004-09 tariff block, 2009-14 tariff block, truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Asset-I: 400 kV D/C Kota-Merta Transmission line (ckt-I and II) along with associated bays under system strengthening I South West part of Northern Grid (Part-A) Transmission System in Northern Region. 07.09.2020
147/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 period and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 400 kV S/C Jalandhar-Amritsar line along with associated bays at Amritsar & Jalandhar, ICT-I along with associated bays at Amritsar Sub-station & 220 kV Verpal feeder bays I &II at Amritsar Sub-station, Asset-II 315 MVA 400/220 kV ICT-II at Gorakhpur S/S along with associated bays (includes 2 No. 220 kV line Bays) and Asset-III LILO of Bawana-Bhiwani line along with associated bays at Bahadurgarh, 315 MVA ICT-I along with associated bays at Bahadurgarh Sub-station & 220 kV Nuna Majra Feeder Bays at Bahadurgarh S/S under Transmission System associated with System Strengthening Scheme (Formerly Tala Supplementary Scheme) in Northern Region. 07.09.2020
150/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: LILO of existing Neyveli TS-II – Pondicherry 400 kV S/c at NNTPS generation switchyard under “Transmission system for evacuation of power from 2X500 MW Neyveli Lignite Corporation Ltd. TS-1 (Replacement) (NNTPS)” in Southern Region. 07.09.2020
154/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for Revision of Tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Transmission System associated with 400 kV Central Transmission Project-I in Southern Region. 07.09.2020
166/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Tanakpur Transmission System in Northern Region. 07.09.2020
193/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for combined assets consist of Asset-I: 400 kV, 125 MVAR Bus-Reactor with associated bays at Abdullapur, Asset-II: 400 kV D/C Abdullapur-Sonepat T/L along with 400 kV associated bays at Abdullapur and Sonepat Sub-Station associated with “System Strengthening in Northern Region Grid for Karcham Wangtoo HEP” in Northern Region. 07.09.2020
209/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: Singrauli Transmission System in Northern Region. 07.09.2020
210/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 315 MVA, 440/220 KV ICT-IV at Ballabgarh Substation with associated bay equipments in the Northern Region. 07.09.2020
218/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations’ 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for procurement of 3 No.’s spare converter transformers (234 MVA, 1-ph, 3 winding) at Bhadrawati HVDC back to back station under “Installation of Transformer and Procurement of Spare Converter Transformer at Bhadrawati HVDC Back to Back Station” in Western Region 07.09.2020
508/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 765 kV D/C Darlipalli TPS (NTPC)-Jharsuguda (Sundergarh) Pooling Station transmission line along with 02 Nos. of 765 kV line Bays at Jharsuguda (Sundergarh) PS in the Eastern Region. 07.09.2020
511/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for transmission assets under transmission System for Eastern Strengthening Scheme-X in Eastern Region. 07.09.2020
50/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: Combined Assets under system strengthening scheme for the Eastern Region (Formerly part of Tala Supplementary Scheme) and Asset-II: Conversion of 50 MVAr Line reactor into Switchable line reactor at Subhashgram end of 400 kV S/C Sagardighi-Subhasgram Transmission Line under ERSS XV now tariff is being claimed under system strengthening scheme for the Eastern Region (Formerly part of Tala Supplementary Scheme) as per CERC order dated 12.09.2018 in Petition No. 259/TT/2018 in the Eastern region. 26.08.2020
312/TT/2019
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of Transmission Tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for transmission system associated with LOKTAK HEP in North Eastern Region 26.08.2020
350/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Special energy meters in the Southern Region. 26.08.2020
480/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 tariff period for 2 Nos. of 400 kV line bays at Srikakulam for termination of Srikakulam Pooling Station-Garividi 400 kV Quad D/C line under “Sub-station works associated with strengthening of Transmission System beyond Vemagiri” in the Southern Region 26.08.2020
516/TT/2019
Approval under Regulation 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 tariff block, Truing up of transmission tariff for 2014-19 tariff period and Determination of Transmission Tariff for 2019-24 tariff period for Asset-I: Additional bays at Kolar and Hosur for second circuit of Kolar-Hosur 400 kV D/C line and Asset-II: 400 kV Hiryur sub-station, including 315 MVA auto transformer & LILO of Davangere-Hoody 400 kV D/C line at Hiryur with associated bays under SRSS II in the Southern Region. 26.08.2020
194/TT/2020
Petition for truing up of transmission tariff of the 2014-19 period and determination of tariff of the 2019-24 period of the Transmission System associated with Krishnapatnam UMPP part C1. 21.07.2020
1/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400 kV D/C Vijayawada-Nellore Transmission line, 400 kV D/C Nellore-Sriperumbudur line, New 400 kV Switching station at Nellore, extension of Vijayawada and Sriperumbudur sub-station with associated bays under System strengthening in the Southern Region. 17.07.2020
302/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) Revision of transmission tariff for the 2001-04 period, 2004-09 period, 2009-14 period (ii) Truing up of transmission tariff for the 2014-19 period and (iii) Determination of transmission tariff for the 2019-24 period for Hathidah River Crossing Section of 220 kV Biharsharif – Begusarai Transmission Line in the Eastern Region. 17.07.2020
326/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2004-09 and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for combined Assets (i) Tala – Siliguri Transmission System and (ii) Remaining part of Tala -Siliguri transmission System in the Eastern Region. 17.07.2020
338/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for 400 kV D/C Kaiga-Sirsi transmission line in the Southern Region. 17.07.2020
354/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2004-09 and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for LILO of both the circuit of Patratu-Hatia-Chandil 220 kV D/C line at Ranchi Sub-station associated with 220kV Interconnection with Jharkhand State Electricity Board (JSEB) system at Ranchi Sub-station in the Eastern Region. 17.07.2020
356/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 132 kV D/C Siliguri- Rangit (Gangtok) Transmission Line in the Eastern Region. 17.07.2020
386/TT/2019
Approval under regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Fixed and Thyristor Controlled Series Compensation for 400 kV D/C Raipur-Rourkela Transmission Line at Raipur in the Western Region. 17.07.2020
389/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Asset: (1) 400/220 kV Damoh Sub-station along with bays and 400kV, 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh Sub-station (2) 400/220 kV, 315MVA ICT-I at Damoh Sub-station along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh Sub-station under WRSS-IV Transmission System in the Western Region. 17.07.2020
390/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: Bihar Grid Strengthening Scheme in the Eastern Region. 17.07.2020
413/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Combined Assets of Tarapur Transmission System associated with Tarapur Atomic Station Stages- 3 and 4 in the Western Region. 17.07.2020
415/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400 kV D/C Raipur- Chandrapur (Bhadrawathi) Transmission Line including bay extensions at Raipur and Bhadrawati Substations in the Western Region. 17.07.2020
472/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2001-04 period, 2004-09 period and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for LILO of 400 kV Bongaigaon- Malda transmission line at Siliguri and Sub-station at Siliguri (New) in the Eastern Region. 17.07.2020
487/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Rangit Transmission System in the Eastern Region. 17.07.2020
246/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) Revision of transmission tariff of 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for LILO of Purnea-Dalkola 132 kV S/C line and extension at Purnea Sub-station in Eastern Region 14.07.2020
256/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of tariff of 2014-19 tariff block and (iii) determination of tariff of 2019-24 tariff block for 400 kV Jamshedpur-Rourkela S/C (Ckt-II) transmission line in Eastern Region. 14.07.2020
263/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of tariff of 2014-19 tariff block and (iii) determination of tariff of 2019-24 tariff block for 315 MVA transformer at Jeypore Sub-station along with associated bays in Eastern Region. 14.07.2020
264/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of tariff of 2014-19 tariff block and (iii) determination of tariff of 2019-24 tariff block for 400 kV D/C Talcher-Meramundali transmission line in Eastern Region. 14.07.2020
325/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for 2 no. of assets under System Strengthening-IV in Southern Region. 14.07.2020
332/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2001-04, 2004-09 block, 2009-14 tariff block (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for the assets LILO of Siliguri-Gangtok section of 132 kV Rangit-Siliguri transmission line at Melli under Integration of Sikkim Transmission System in Eastern Region. 14.07.2020
348/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 period and (ii) determination of transmission tariff of 2019-24 period for the assets under WRSS VII in Western Region. 14.07.2020
355/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff for 2004-09 and 2009-14, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for 2nd 315 (3 x 105) MVA, 400/220 kV transformer at Indravati (OHPC) Switchyard in Eastern Region. 14.07.2020
357/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2004-09 and 2009-14, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 period for 2nd 400 kV D/C Kahalgaon-Biharshariff transmission line in Eastern Region. 14.07.2020
387/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 period, 2009-14 period, (ii) truing up of transmission tariff of 2014-19 period and (ii) determination of transmission tariff of 2019-24 tariff block for transmission line at Khandwa in Western Region. 14.07.2020
395/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 tariff period and 2009-14 tariff period, (ii) truing up of transmission tariff of 2014-19 period and (iii) determination of tariff of 2019-24 period for assets covered under “Vindhyachal STPS Stage-III Transmission System” in Western Region. 14.07.2020
414/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for combined asset under WRSS-I Transmission System in Western Region. 14.07.2020
417/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 period and (ii) determination of transmission tariff of 2019-24 period for combined asset under Western Region System Strengthening Scheme XV. 14.07.2020
422/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 period for assets under “Common System associated with East Coast Energy Private Limited and NCC Power Projects Limited LTOA Generation Projects in Srikakulam Area -part-C” in Southern Region and Eastern Region. 14.07.2020
469/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of tariff of 2004-09 and 2009-14, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff block for 400 kV S/C Meramundali-Jeypore transmission line along with extension of Meramundali and Jeypore Sub-stations in Eastern Region. 14.07.2020
498/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 tariff block, 2009-14 tariff block, (ii) truing up of transmission tariff of 2014-19 tariff block and (iii) determination of transmission tariff of 2019-24 tariff period of 132 kV S/C Ranganadi-Ziro Transmission System in North Eastern Region. 14.07.2020
7/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for Stage-1 of 400 kV Thyristor Controlled Series Compensation Project (Fact Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region. 02.07.2020
16/TT/2020
Revision of transmission tariff of 2001-04 tariff period, 2004-09 tariff period and 2009-14 tariff period, truing up of transmission tariff of 2014-19 period and determination of tariff of 2019-24 period for the assets covered under 230 kV Neyveli-Bahoor Transmission Line in Southern Region. 02.07.2020
51/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 period and (ii) determination of transmission tariff for 2019-24 period for System Strengthening Scheme for Western Region and Northern Region (Part-A). 02.07.2020
255/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for (i) revision of tariff for 2001-04, 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for Agra (Power Grid)- Agra (UPPCL) 400 kV D/C Inter-connection in Northern Region. 02.07.2020
314/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for: (i) truing up of tariff of 2014-19 tariff block and (ii) determination of tariff of 2019-24 tariff block for the transmission assets 400 kV S/C Chamera-I Kishenpur line with associated bays at Chamera-I and Kishenpur Sub-stations in Northern Region. 02.07.2020
316/TT/2019
Revision of tariff of 2004-09 tariff block and 2009-14 tariff block, truing up of tariff of 2014-19 tariff block and determination of tariff of 2019-24 tariff block for transmission assets of 400 kV D/C Dhauliganga HEP – Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region. 02.07.2020
339/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff for 2001-04 tariff period, 2004-09 tariff period and 2009-14 tariff period, (ii) truing up of transmission tariff of 2014-19 period and (iii) determination of tariff of 2019-24 period for 220 kV Jallandhar-Hamirpur D/C transmission line along with associated bays in Northern Region. 02.07.2020
359/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for 220 kV D/C Anta Transmission System in Northern Region. 02.07.2020
473/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff for 2001-04 tariff block, 2004-09 block, 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for Transmission System Associated with RAPP-B Project in Northern Region. 02.07.2020
477/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff for 2004-09 block, 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (ii) determination of transmission tariff for 2019-24 tariff block for augmentation of transformation capacity at Amritsar and Moga Sub-station in Northern Region. 02.07.2020
488/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) truing up of transmission tariff of 2014-19 tariff block and (ii) determination of transmission tariff of 2019-24 tariff block for Chamera Stage-I Transmission System in Northern Region. 02.07.2020
503/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for (i) revision of transmission tariff of 2004-09 period and 2009-14 period, (ii) truing up of transmission tariff of 2014-19 period and (iii) determination of tariff for 2019-24 period for assets under System Strengthening-III in Southern Region. 02.07.2020
2/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 for period for Asset I: Spare Converter Transformer at Rihand for Rihand - Dadri HVDC Bi-pole Terminal in the Northern Region. 02.07.2020
8/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 400 kV D/C Agra – Bassi Transmission Line with associated bays, Asset-II: 3x105 MVA 400/220/33 kV ICT-III along with associated bays at Wagoora Sub-Station, Asset-III: 220 kV Zainkot III & IV bays at Wagoora Sub-Station and Asset-IV: 40% FSC on Allahabad-Mainpuri 400kV D/C line at Mainpuri under Transmission System associated with Northern Region System Strengthening Scheme-II in the Northern Region. 02.07.2020
14/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-a: 50MVAR Bus reactor at Hisar Sub-station, Asset-b: LILO of 400 kV Moga-Hissar line, ICT-I at Fatehabad Sub-station, 4 nos. 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAR bus reactor bay along with associated bays at Fatehabad Sub-station, Asset-c: Total upstream system including Malerkotla-LudhianaJalandhar transmission line along with associated bays at Ludhiana Sub-station Malerkotla Sub-station, Asset-d: ICT-I along with associated bays at Ludhiana Sub-station, Asset-e: ICT-II along with associated bays at Ludhiana Sub-station, Asset-f: 315 MVA, 400/220 kV ICT-II along with associated bays at 400/220 kV Fatehabad Sub-station under Northern Region System Strengthening Scheme-III in the Northern Region 02.07.2020
38/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission System associated with Common Transmission scheme associated with ISGS projects in Nagapattinam/ Cuddalore area of Tamil Nadu-Part-A1 (b) in the Southern Region. 02.07.2020
41/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of Transmission tariff for the 2014-19 period and determination of Transmission tariff for the 2019-24 period for Transmission System associated with Common System associated with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area-Part-A in the Southern Region. 02.07.2020
315/TT/2020
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for revision of Transmission Tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block, truing up of Transmission tariff for 2014-19 tariff block and determination of Transmission tariff for 2019-24 tariff block for ATS of Kopili-Khandong (additional transmission Gohpur-Itanagar) in the North Eastern Region. 02.07.2020
337/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for LILO of 220 kV S/C Panki-Naubasta transmission line at Kanpur in the Northern Region. 02.07.2020
351/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 315 MVA ICT-III along with associated bay equipment at Nagarjunasagar Sub-station in the Southern Region. 02.07.2020
352/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 132 kV S/C Mau-Balia Transmission System in Northern Region. 02.07.2020
358/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-1: Series Compensation on Panki-Muradnagar 400 KV S/C line of UPPCL in the Northern Region 02.07.2020
361/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Special Protection Scheme for Rihand-Dadri HVDC Bi-pole and GorakhpurMuzzafarpur 400 kV line in the Northern Region 02.07.2020
420/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset1: LILO of Singrauli-Kanpur transmission line-I at Allahabad, Asset2: LILO of Singrauli-Kanpur transmission line-II at Allahabad, Asset-3: ICT-I at Allahabad along with associated bays and Asset4: ICT-II at Allahabad along with associated bays in the Northern Region. 02.07.2020
474/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-1: 400 kV Vindhyachal - Kanpur line at Singrauli along with bays at Singrauli end (Realignment of Vindhyachal - Kanpur S/C line at Singrauli and Singrauli-Vindhyachal 2nd 400 kV Ckt) and Bus coupler bay at Vindhyachal HVDC under System Strengthening Scheme in Singrauli-Vindhyachal corridor in the Northern Region. 02.07.2020
482/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 800 kV Kishenpur-Moga transmission line-I along with associated bays, Asset-II: 800 kV Kishenpur-Moga transmission line-II along with associated bays and Asset-III: 420 kV 63 MVAR Bus Reactor at Kishenpur sub-station with associated bays and 420/220 kV,250 MVA ICT III at Moga substation with associated bays for Transmission System associated with Kishenpur Moga transmission system in the Northern Region 02.07.2020
495/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for the 2001-04, 2004-09 and 2009-14 period, truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I: 220 kV D/C Unchahar-Kanpur transmission line-I with associated bays, Asset-II: 220 kV D/C Unchahar-Kanpur transmission line-II with associated bays, and Asset-III: LILO of one circuit of 220 kV D/C Panki-Mainpuri line-II of transmission system associated with Unchahar Stage-II in the Northern Region 02.07.2020
497/TT/2019
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for Extension of Kudankulam APP- Tirunelveli 400 kV (Quad) D/C line to Tuticorin pooling station along with associated bays at Tuticorin pooling station under Connectivity for Kudankulam 3 & 4 (2X1000 MW) with interstate transmission system” in the Southern Region. 02.07.2020
489/TT/2019
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tariff) Regulations, 2014 and CERC (Terms and conditions of Tariff) Regulations, 2019 for (i) revision of tariff for 2004-09 tariff block and 2009-14 tariff block, (ii) truing up of transmission tariff for 2014-19 tariff block and (iii) determination of transmission tariff for 2019-24 tariff block for LILO of Kolaghat - Rengali 400 kV S/C line at Baripada and establishment of new 400/220/132 kV Sub-Station at Baripada in Eastern Region. 13.06.2020
4/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of Assets under Transmission System for Start-up Power to DVC and Maithon Right Bank Generation Projects in Eastern Region. 19.05.2020
13/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Salal-I Transmission System associated with Northern Region. 19.05.2020
22/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset - 2 Nos 765 kV line Bays alongwith 2 nos. 330 MVAr Line reactor at Vindhyachal Pooling Station and 2 Nos 765 kV line Bays alongwith 2 nos. 330 MVAr Line reactor at Jabalpur Pooling Station for 765 kV D/C Vindhyachal Pooling Station-Jabalpur Pooling Station TL (TBCB) under “Substation Extensions for Transmission system associated with Vindhyachal-V Project of NTPC (Part-B)” in Western Region. 19.05.2020
33/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset: 400kV D/C (Quad) Solapur STPP 02 Transmission Line along with associated bays at Gaya Solapur Sub-Station under “Transmission System associated with Solapur STPP (2X660 MW) Part-A” in Western Region. 19.05.2020
100/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for Transmission assets under Eastern Region strengthening Scheme-V in Eastern Region Asset-I: 125 MVAR Bus Reactor — I Muzaffarpur Substation along with bays Asset-II: 125 MVAR Bus Reactor II replacing existing 63 MVAR Bus Reactor at Muzaffarpur along with bays Asset-III:1 no 125 MVAR Bus Reactor and associated bays at 400 kV Rourkela Sub-station Asset-IV: 01 No. of 1x125 MVAR Bus Reactor and associated bay at 400 kV Indravati Sub-station Asset-V: 01 No. of 1x125 MVAR Bus Reactor and associated bay at 400 kV Jeypore Sub-station Asset-VI: 01 No. 1X500 MVA ICT at 400/220 kV Subhasgram Substation along with associated bays Asset-VII: Shifting of 2x50 MVAR line Reactor from Patna end of 400 kV Kahalgaon/Barh-Patna DIC line to Balia end of 400 kV Patna-Balia D/C line Asset-V111:2X50 MVAR Line reactor at Ballia Substation 19.05.2020
135/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for combined asset associated with Western Region Strengthening Scheme VI in Western region. 19.05.2020
140/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block for AssetI: 315 MVA, 400/220/33kV 3-phase Spare ICT at Raipur S/S, (DOCO: 01.07.2012); Asset-II: 315 MVA, 400/220/33kV 3-Phase Spare ICT at Pune S/S, (DOCO: 01.07.2012); Asset-III: 420kV, 80 MVAR 3-Phase Shunt Reactor at Wardha S/S, (DOCO: 01.08.2012); Asset-IV: 315 MVA, 400/220/33 KV 3-Phase Spare Transformer at Dehgam S/S, (DOCO: 01.09.2012); Asset-V: 315 MVA, 400/220/33 KV 3-Phase Spare Transformer at Jabalpur, (DOCO: 01.09.2012)’, Asset-VI: 400 kV, 125 MVAR 3-Phase Spare Reactor at Itarsi (DOCO: 01.01.2013) under Provision of Spare ICTs and Reactors in Western Region. 19.05.2020
492/TT/2019
Approval for revision of transmission tariff for 2004-09 tariff block & 2009-14 tariff block; truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 201924 in respect of Combined Asset : (1) Extension of 400/220 kV Kolhapur (MSEB) substation (2) 220kV D/C Vapi-Magarwada Transmission Line along with associated bays (3) 220kV D/C VapiKhardpada Transmission Line along with associated bays under WRSS-III Transmission System in Western Region. (DOCO:01.07.2008). 19.05.2020
508/TT/2019
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of 765 kV D/C Darlipalli TPS (NTPC)-Jharsuguda (Sundergarh) Pooling Station transmission line along with 02 Nos. of 765 kV line Bays at Jharsuguda (Sundergarh) PS in Eastern Region. 19.05.2020
511/TT/2019
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 in respect of 400 kV D/C Sagardighi - Behrampur Transmission Line and associated bays at Sagardighi TPS (WBPDCL) and Behrampur Sub-station (POWERGRID) under Transmission System for “Eastern Strengthening Scheme-X” in Eastern Region. 19.05.2020
163/TT/2020
Truing up of tariff of 2014-19 tariff block and determination of tariff for 2019-24 tariff block for 765/400 kV ,1500 MVA ICT-1 & ICT-2 along with associated bays at Dharamjaygarh Sub-station under Supplementary Transmission Scheme of IPP Projects in Chattisgarh in Western Region 18.05.2020
196/TT/2020
Truing up of tariff of 2014-19 tariff block and determination of tariff of 2019-24 tariff block for Bachau-Varsana (GETCO) 400 kV D/C Transmission Line along with Extension of 400 kV Bachau Sub-station and Extension of 400 kV Varsana (GETCO) Sub-station under Western Region System Strengthening Scheme-XIII 18.05.2020
250/TT/2020
Truing up of tariff of 2014-19 tariff block and determination of tariff for 2019-24 tariff block for 765/400 kV ,1500 MVA ICT-1 & ICT-2 along with associated bays at Dharamjaygarh Sub-station under Supplementary Transmission Scheme of IPP Projects in Chattisgarh in Western Region 18.05.2020
303/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for 6 no. of assets under System Strengthening in North/West Part of WR for IPP Projects in Chhattisgarh (IPP-E). 18.05.2020
306/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff of 2019-24 period for Assets under “Eastern Region Strengthening Scheme – XVII Part A (ERSS-XVII Part-A)” in Eastern Region 18.05.2020
310/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period for assets under “Transmission System for Phase-1 Generation projects in Orissa Part-B. 18.05.2020
312/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period for assets under “Transmission System associated with Lara STPS-I (2X800MW) Generation project of NTPC” in Western Region. 18.05.2020
313/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period for assets under Transmission System Strengthening in Western region for IPPs in Chhattisgarh (IPP-D). 18.05.2020
327/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period for assets under “Augmentation of Transformer and Bays in Western Region”. 18.05.2020
290/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for
a) Revision of Tariff for 2004-09 tariff block and 2009-14 tariff block,
b) Truing up of transmission tariff for 2014-19 tariff block and c) Determination of transmission tariff for 2019-24 tariff block
for combined assets under Transmission System associated with TALA HEP EastNorth Inter connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region.
04.05.2020
149/TT/2020
Approval under Regulation 86 of the CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and conditions of Tarif) Regulations, 2014 and CERC (Terms and conditions of Tarif) Regulations, 2019 for
a) Revision of Tariff for 2001-04 tariff block, 2004-09 tariff block and 2009-14 tariff block,
b) Truing up of transmission tariff for 2014-19 tariff block and c) Determination of transmission tariff for 2019-24 tariff block
for combined assets of Transmission System Associated with Ranganadi HEP in North Eastern Region.
04.05.2020
128/TT/2020
Truing up of tariff of 2014-19 tariff block and determination of tariff for 2019-24 tariff blockfor Asset-I: 400 kV D/C Allahabad-Kanpur line along with associated bays at both ends including 2x50 MVAR line reactor at Kanpur end under “Northern Regional System strengthening Scheme- XXX”. 20.03.2020
138/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for assets under “Transmission System associated with Rapp 7 and 8 Part-A”. 20.03.2020
151/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 400 kV D/C (Quad) Kurukshetra-Jind TL along with associated bays under “Transmission System Strengthening in WR-NR transmission Corridor for IPP’s in Chhattisgarh in Northern Region. 20.03.2020
168/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Transmission System associated with Chamera – III HEP in Northern Region. 20.03.2020
249/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 201924 period for transmissionassets two in number under WardhaHyderabad 765 kV link in Southern Region. 20.03.2020
270/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period for 6nos. of assets under “Integration of Pooling Stations in Chhattisgarh with central part of WR for IPP generation projects in Chhattisgarh” in Western Region (IPP-C). 20.03.2020
18/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Neelamangala – Mysore 400kV D/C Transmission Line along with 2 X 315MVA, 400/220kV ICTs at Mysore Substation in Southern Region 20.03.2020
24/TT/2020
Approval for truing up transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period in respect of Combined Assets consisting of Asset I: Koldam Nalagarh 400kV D/C (Quad) line along with bays at Nalagarh S/S , Asset II: 400kV line bays at Ludhiana S/S (Combined DOCO: 01.04.2011) covered under “Transmission system associated with Koldam Hydro-electric project” in Northern Region 20.03.2020
136/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for transmission assets under spare ICT Scheme in Northern Region Asset-I: 315 MVA, 400/220 kV ICT at Mandola (COD: 1.11.2010); Asset-II: 315 MVA 400/220 kV ICT at Ludhiana (COD: 1.12.2011) 20.03.2020
148/TT/2020
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for revision of transmission tariff for 2004-09 and 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset-I (220 kV Dimapur-Misa TL, LILO 220 kV D/C KopiliSamaguri TL and LILO 132kV D/C Mariani-Dimapur TL) and Asset-Il (132 kV D/C Doyang-Dimapur TL, 132 kV S/C Dimapur-lmphal TL with associated bays) for transmission System associated with Doyang HEP in North Eastern Region 20.03.2020
152/TT/2020
Truing up of transmission tariff for 2009-14 period, truing up of transmission tariff for 2014-19 period and determination of Transmission tariff for 2019-24 tariff block For Transmission System associated with Northern Region System Strengthening Scheme IX in Northern Region. 20.03.2020
155/TT/2020
Revision of transmission tariff for 2001-04, 2004-09, 2009-14 periods, truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for NLC II Transmission system in Southern Region 20.03.2020
493/TT/2019
Truing up of Transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for transmission assets under “Northern Region System Strengthening Scheme-X” in Northern Region Asset-I: 400 kV D/c Gorakhpur-Lucknow Transmission Line along with its associated bays and Asset-II: 30% FSC on 400 kV D/C Gorakpur - Lucknow Transmission Line at Lucknow along with bays (COD: 01/04/2011) 20.03.2020
114/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period in respect of Asset I : Special Protection Scheme (SPS) for Northern Regional Grid Stage-II in Northern Region 20.03.2020
123/TT/2020
Revision of transmission tariff for 2004-09 & 2009-14 period and truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Madurai-Trivendrum 400kV D/C Transmission system in Southern Region 20.03.2020
142/TT/2020
Approval for Revision of transmission tariff for 2001-04, 2004-09, 2009-14 periods, truing up transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 in respect of Combined Assets consisting of (a) Combined elements of Talcher and Kolar (HVDC portion) (Notional COD: 01.03.2003) (Asset-I) and b) Combined elements of Talcher and Kolar (AC Portion) (Notional COD: 01.06.02003) (Asset-II) under Transmission System associated with Talcher II project inin Southern Region (Asset 1:Talcher-Kolar HVDC line (Pole-I), including the bipole line, HVDC terminal station (Pole-I) at Talcher and Kolar and the Earth electrode lines, Asset 2:LILO of 400 kV S/C Cuddapah-Bangalore line at Kolar, including associated bays and common facilities at Kolar and 400 kV S/C Kolar- Madras line, with associated bays Asset 3:400 kV S/C Hossur-Salem line, 315 MVA 400/220 kV Auto-transformer-I at Hossur, associated bays, and 220 kV switchyard at HossurAsset 4:315 MVA 400/220 Auto-transformer-2 at Hossur, with associated bays Asset 5:500 MVA 400/220 kV Auto-transformer (comprising of 4x167 MVA single phase units) associated bays and 220 kV switchyard at Kolar, and 400 kV D/C Kolar-Hoody line along with associated baysAsset 6:HVDC terminal station at Talcher and kolar with Pole IIAsset 7:400 KV D/C Kolar-Hosur line along with associated bays at Kolar and HosurAsset 8:400 KV S/C Salem-Udumalpet line along with associated bay extensions at Salem and Udumalpet) 20.03.2020
03/TT/2020
Approval under Regulation86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Nellore-Gooty 400kV D/C (Quad) line with associated bay extension at Nellore &Gooty Sub-station under Transmission System associated with SRSS XVIII-A (Formerly KUMPP Part A) 18.03.2020
5/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for one Asset under"Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part A1" in Eastern Region . 18.03.2020
15/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period For 400 kV D/C Kakrapar APPNavsariT/L along with associated bays at Navsari GIS & 400 kV D/C Kakrapar APP-Vapi T/L along with associated bays at Vapi S/S under Transmission System associated with Kakrapar Atomic Power Project 3&4 18.03.2020
21/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for1x1500 MVA, 765/400 kV ICT at Vindhyachal Pooling Station along with associated bays, under “Transmission System associated with Vindhyachal-V (500 MW) project of NTPC (Part- A)” in Western Region. 18.03.2020
39/TT/2020
Truing up transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24period for Asset:400kV D/C (Quad) Nabinagar-II-TPS – Gaya transmission line with 02 nos. associated bays at Gaya Sub-stationunder “Transmission System for Nabinagar-II TPS (3X660 MW)” in Eastern Region. 18.03.2020
43/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 periodfor transmission assets under Mauda Transmission system in Western RegionAsset-I: 400 kV D/C Mauda-Wardha line (CKT-I) along with bay at Wardha and Asset-II: 400 kV D/C Mauda-Wardha line (CKT-II) along with bays at Wardha 18.03.2020
58/TT/2020
Approval for truing up transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for Asset:Hassan- Mysore 400 kV D/C transmission line and extension of 400/220 kV Hassan & Mysore Sub-stationunder “System Strengthening-IX in Southern Region”. 18.03.2020
212/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 periodfor transmission assets under Eastern Region Strengthening Scheme-V in Eastern RegionAsset-I: Farraka-Gokarna Portion of 400kV D/C Rajarhat-Purnea Line including LILO at Farakka and Gokarna and associated line bays Asset-II: 1X80 MVAR busreactor alongwith associated bays atGokarna Sub-station and 1X80 MVAR Switchable line reactoralongwith associated bays at Farakka Sub-StationAsset-III: 02 Nos of 400kV Line bays for termination of LILO of 02nd Ckt of Jamshedpur Rourkela 400 kV Line at Chaibasa S/S 18.03.2020
478/TT/2019
Truing up of Transmission tarifffor 2014-19 period anddetermination of transmission tariff for 2019-24 periodfor transmission assets under ATS of Tuticorin JV TPS in Southern RegionAsset-1:Tuticorin JV – Madurai 400 kV D/C (Quad Conductor) Line and extension of 400/220 kV Madurai sub-station 18.03.2020
490/TT/2019
Approval under Regulation86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations 2019 for truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 125 MVAr Bus Reactor at 400/200 kV Rajgarh Sub-station alongwith associated bays at Rajgarh Sub-station in WR 18.03.2020
45/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of 02 nos. of assets under Transmission system for establishment of 400/220 KV GIS Sub-station at Kalal in UT of DNH. 18.03.2020
421/TT/2019
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of 01 no. of asset under Southern Region System Strengthening Scheme –XXII. 17.03.2020
27/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 01 no. of asset under WRSS X in Western Region 17.03.2020
26/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for765 kV Line bays at Jabalpur Pooling Station for 765 kV D/C Gadarwara STPS (NTPC)-Jabalpur Pooling Station TL under “Powergrid works associated with Part A of transmission system for Gadarwara STPS of NTPC” Western Region. 17.03.2020
504/TT/2019
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of2nos. of assets under Eastern Region Strengthening Scheme VI Project. 17.03.2020
55/TT/2020
Truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 tariff block for Combined Assets (02 Nos.) under Transmission Schemes for enabling import of NER/ER surplus power by NR in Eastern Region. 17.03.2020
481/TT/2019
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of 1 no. of asset under Transmission System for Connectivity for NCC Power projects Ltd. 17.03.2020
484/TT/2019
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period for 2nos. of assets under “Supplementary Transmission System associated with Vallur TPS” in Southern Region. 17.03.2020
171/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of01 no. of assetunder Interconnection between India and Bangladesh Electrical Grids for India portion in Eastern Region. 17.03.2020
194/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period of 5 nos. of assets Transmission System associated with Krishnapatnam UMPP part C1. 17.03.2020
120/TT/2020
Truing up of transmission of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under SRSS XIX in Southern Region Asset-1: LILO of existing Kolar- Sriperumbudur 400 kV S/C line at Thiruvalam along with associated bays; Asset-2:Kurnool-Thiruvalam 765 kV D/C line alongwith associated bays and equipments both at Kurnool andThiruvalam Substations (charged at 400 kV) and 2x240 MVAR, 765 kV line reactor at both Kurnool and Thiruvalam Sub-stations alongwith associated bays and equipment; Asset-3: Upgradation of 400 kV Sub-station at Thiruvalam to 765/400 kV with 2x1500 MVA, 765/400 kV transformers;Asset-4:765kV and 400kV ICT bays at Triruvalam 05.03.2020
44/TT/2020
Approval for truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for Asset I: 765 KV D/C Varanasi-Kanpur(new) line & associated bays including 240 MVAR Switchable L/R in both Ckt. at Varanasi GIS S/S and 330 MVAR nonswitchable L/R in both Ckt. at Kanpur GIS S/S, 765 KV S/C Kanpur (new) GIS- Jhatikra line & associated bays including 330 MVAR switchable L/R at Kanpur GIS S/S and 330 MVAR non-switchable L/R at Jhatikara S/S, 400 KV D/C (Quad) Kanpur(New) GIS -Kanpur(old) line & Associated bays, 2x1500 MVA 765/400 KV ICT-I & II & Associated bays at 765/400 KV Kanpur (new) GIS S/S, 240 MVAR, 765 KV Bus Reactor-1 & associated bay at Kanpur(new) GIS S/S, 240 MVAR, 765 KV Bus Reactor-2 and associated bay at Kanpur(new) GIS S/S, (Combined Assets- I,II,III,V,VI,VII as per petition No. 274/TT/2015) Asset-II: LILO of one Ckt. Of 400 KV D/C Sasaram-Allahabad line & Associated bays at Varanasi GIS S/S (earlier Asset- IV as per petition No. 274/TT/2015) Asset-III: 125 MVAR, 400 KV Bus Reactor & Associated bay at Kanpur (new) GIS S/S (earlier Asset: VIII as per petition No. 274/TT/2015) Asset-IV: 240 MVAR, 765 KV Bus Reactor & Associated bay at Jhatikara S/S (earlier Asset: IX as per petition No. 274/TT/2015) Asset-V: 125 MVAR, 400 KV Bus Reactor & associated bay at Varanasi GIS S/S (earlier Asset: X as per petition No. 274/TT/2015) Asset-VI: 400 kV D/C (Quard) Sarnath- Varanasi T/L along with associated bays at Varanasi GIS Substation under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part-B” in Northern Region. 05.03.2020
127/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under Sub-station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3*880 MW in Phase 1) of NTPC Limited in Southern Region”. 05.03.2020
83/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for Transmission assets under “Substation works associated with Hyderabad (Maheshwaram) Pooling Station” in Southern Region. 04.03.2020
512/TT/2019
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset-I:400kV Transmission Line for Swapping of Kahalgaon # 1 bay with Sasaram # 1 bay at Biharsharif Sub-station Asset-II: 400kV Transmission Line for Swapping of Purnea (1&2) Bays with Sasaram bays (3&4) at Biharsharif Sub-station Asset-III: Split Bus arrangement with tie line breaker for 400 kV Biharsharif S/SAsset-IV: Split Bus Arrangement at Durgapur Substation Asset-V: Split Bus Arrangement at Maithon Sub-station under “Split Bus arrangement for various substation in Eastern Region”. 03.03.2020
505/TT/2019
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block For Combined Assets under ERSS-XIII Project 03.03.2020
170/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Combined Asset-I consisting of Asset A: LILO of one circuit of 400 kV D/C Kankroli- Zerda Line at Bhinmal along with 80 MVAR Bus Reactor at Bhinmal, Asset B: 315 MVA 400/220 kV ICT-I at Bhinmal along with associated bays, Asset C: 315 MVA 400/220 kV ICT-II at Bhinmal along with associated bays, Asset D: 315 MVA 400/220 kV ICT-III at Hissar along with associated bays at Hissar, Asset E: Two Nos. 220 kV Bays at Hissar Sub-Station covered under “Northern Region System Strengthening Scheme- VIII” in Northern Region. 03.03.2020
167/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block For 400kV D/C Solapur (STPP) - Solapur (PG) T/L along with bay extension at Solapur (PG) S/S– Asset I & Extension of 400/220kV Solapur S/S - Augmentation of Substation by 1 x 315 MVA (3rd) Transformer (by Shifting of 500 MVA Transformer from Wardha to Solapur)– Asset II under “Transmission System for Solapur STPP (2x660 MW)” in Western Region. 03.03.2020
139/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of 2019-24 for transmission system associated with SEWA-II HEP in Northern Region Consisting of - Asset-I: One circuit of 132kV D/C SEWA-II Hiranagar line along with associated bays at Hiranagar Substation and one circuit of 132 kV D/C SEWA-II Mahanpur line and associated bays at Mahanpur ; Asset-II: Second circuit of 132 kV D/C SEWA-II Hiranagar line along with associated bays at Hiranagar Substation; Asset-III: 132 kV S/C SEWA-II Mahanpur-Kathua transmission line along with associated bays at Kathua and 132 kV S/C Mahanpur- Kathua transmission line along with bays at Mahanpur and Kathua; 03.03.2020
137/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset-1(i): LILO of 400 kV D/C Bina –Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur and new SS at Shujalpur, Asset-1(ii): Switchable Scheme for Reactor at Nagda S/S, Asset-1(iii): Switchable Scheme for Reactor at Bina S/S, Asset-2: 400kV, 63 MVAR Bus Reactor at Shujalpur alongwith associated bay, Asset-3: 400/220 kV ICT I at Shujalpur along with associated bays, Asset-4: ICT II at Shujalpur along with associated bays 03.03.2020
95/TT/2020
Approval for truing up transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for Assets (03 Nos) under “Eastern Region Strengthening Scheme – XV (ERSS-XV)” in Eastern Region. 03.03.2020
85/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under transmission system associated with “System Strengthening- XXIV in Southern Region.(Asset- A, Asset-B and Asset-C 03.03.2020
84/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for assets under Barh Transmission System in Northern, Eastern and Western Region 03.03.2020
82/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under System Strengthening - X in Southern Region Asset-I (A): LILO of Neelamangala -Somanhalli 400 kV D/C Line at Bidadi; Asset-I (B):1X63 MVAR Bus Reactor at Bidadi; Asset-II(A): 1X500 MVA ICTs with associated bays and equipments and downstream network at Bidadi GIS Sub-station; Asset-II(B):1X500 MVA ICTs with associated bays and equipments and downstream network at Bidadi GIS Substation 03.03.2020
48/TT/2020
Truing up of Transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period Asset A1 : Combined Asset – (1) 400 kV D/C Mauda II – Betul (Quad) T/L alongwith associated bays and 2*50 MVAr Line Reactors at Betul GIS, (2) 315 MVA, 400/220 kV ICT-I & ICT-II alongwith associated bays and 4 nos. 220 kV line bays & 125 MVAr, 420 kV Bus Reactor alongwith associated bays at Betul GIS & (3) 400 kV D/C Betul – Khandwa (Quad) line alongwith associated bays at both ends and 2*50 MVAr Switchable Line Reactors at Betul GIS & 2*50 MVAr line reactors at Khandwa S/S, Asset A2 Khandwa – Indore 400 kV D/C T/L alongwith associated bays under “Transmission System associated with Mauda Stage – II (2x660 MW) Generation Project” in Western Region 03.03.2020
17/TT/2020
Truing up transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission system associated with System Strengthening- XIII in Southern Region. 03.03.2020
36/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under Sub-station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3*880 MW in Phase 1) of NTPC Limited in Southern Region”. 03.03.2020
80/TT/2020
Truing up of tariff of 2014-19 tariff block and determination of tariff of 2019-24 period of combined Asset-A comprising of combined element-1 and combined element-2 under “Transmission System associated with RAPP 5 & 6 in Northern Region”. 03.03.2020
99/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period for Assets under “Transfer of Power from Generation Projects in Sikkim to NR / WR Part-A” in Eastern Region. 03.03.2020
126/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period fortransmission assets under “Establishment of 400/220 kV GIS at Magarwada in Union Territory of Daman & Diu” in Western Region”. 03.03.2020
54/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period of 03 nos. of assets under “Work Associated with Common Transmission System for Phase-II Generation Project in Odisha in Eastern Region”. 02.03.2020
34/TT/2020
Truing up of transmission tariff of 2014-19 period and determination oftransmission tariff for2019-24period fortransmission assets under “Provision of 400kV bays at Shujalpur for Part ATS of RAPP 7 and 8 in Western Region”. 02.03.2020
37/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period for 8 nos. of assets under Eastern Region Strengthening Scheme XIV in Eastern Region. 02.03.2020
117/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff of 2019-24 period of 07 nos. of assets for transmission assets under System Strengthening Scheme –VIII in Southern Region”. 02.03.2020
153/TT/2020
Truing up of transmission tariff of 2014-19 period and determination oftransmission tariff of 2019-24period fortransmission assets under “System Strengthening Scheme in Roorkee in Northern Region”. 02.03.2020
475/TT/2019
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period for Transmission System associated with immediate evacuation system for Nabinagar TPS in Eastern Region. 02.03.2020
515/TT/2019
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period of 03 nos. of assets under “Sub-Station Works Associated with System Strengthening in Southern Region for Import of Power from Eastern Region” in Southern Region. 02.03.2020
107/TT/2017
Petition for truing up of transmission tariff for 2009-14 period and determination of tariff for 2014-19 period in respect of four assets under transmission system associated with Parbati-III HEP in Northern Region.-Reg 20.02.2020
506/TT/2019
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for 02 nos. of assets under “Transmission System Strengthening in Wardha – Aurangabad corridor for IPP projects in Chhattisgarh (IPP-G) in Western Region” 19.02.2020
499/TT/2019
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period for transmission assets under “Provision of Spare Transformers and Reactors in North Eastern Region”. 19.02.2020
79/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period of 05 nos. of assets under “Southern Region System Strengthening Scheme – XVIII in the Southern Region”. 18.02.2020
20/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period of 04 nos. of assets under “Line Bays and Reactor Provisions at Powergrid Sub-stations associated with System Strengthening Common for Western Region and Northern Region in Western Region.” 18.02.2020
104/TT/2020
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period of 03 nos. of assets under “North Region Strengthening Scheme-XVIII in Northern Region”. 18.02.2020
35/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period of 05 nos. of assets under “Eastern Region Strengthening Scheme VII in Eastern Region”. 18.02.2020
11/TT/2020
Truing up of transmission tariff for 2014-19 period and determination of transmission tariff for 2019-24 period for 8 nos. of assets under “Establishment of Pooling Stations at Raigarh (Kotra) and Raipur for IPP Generation Projects in Chhattisgarh (Set A/DPR-1) in Western Region”. 18.02.2020
76/TT/2020
Truing up of transmission tariff of 2014-19 period and determination of tariff for 2019-24 period of assets under “Provision of Spare ICTs and Reactors for Eastern, Northern, Southern and Western Regions.” 18.02.2020
513/TT/2019
Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period of 03 nos. of assets under “North Eastern Region Strengthening Scheme-II (NERSS-II) Part – A.” 18.02.2020
87/TT/2020
Truing up of transmission tariff for 2014-19 tariff block and determination of transmission tariff for 2019-24 for Combined Assets under East-West Transmission Corridor Strengthening Scheme in Western Region. 18.02.2020
483/TT/2019
Truing up transmission tariff for 2014-19 tariff block and determination of tarifffor 2019-24 period for assets(i) 160 MVA, 220/132kV, 3-Phase Auto Transformer at Kopili, (ii) 132 kV S/C Kopili-Khandong Transmission Line along with associated bays, (iii) 100MVA, 220/132 kV, 3-Phase Auto Transformer and associated bays at Dimapur Sub- Station and (iv) LILO of 132 kV Dimapur-Kohima Transmission Line in North Eastern Region 18.02.2020
52/TT/2020
Truing up of Transmission tariff for 2014-19 tariff block and Determination of Transmission tariff for 2019-24 tariff block Asset A – 400 kV, 125 MVAR Bus Reactor along with associated bays at Patna Sub-station, (ii) Asset B : 400 kV, 125 MVAR Bus Reactor along with associated bays at Ranchi (iii) Asset C : 160 MVA Transformer (1st) and associated bays at Malda Sub-station, (iv) Asset D : 160MVA Transformer (2nd) and associated bays at Malda Sub-station, (v) Asset E : 01 no. 400 kV bay at Malda Substation, (vi) Asset F : 160 MVA Transformer and associated bays at 220/132 kV Birpara Sub-station, (vii) Asset G : 160 MVA Transformer and associated bays at 220/132 kV Siliguri Substation under ERSS-IV project in Eastern Region 18.02.2020
130/TT/2020
Approval for truing up transmission tariff for tariff period 2014-19 and determination of transmission tariff for tariff period 2019-24 for Asset-1: (a) Up gradation of existing 2X50 MVA, 132/33kV Imphal (POWERGRID) SS to 400 kV by installation of 400/132 kV, 2X315 MVA (7X105 MVA, 1-Ph) ICTs, 2 No. 400 kV line bays for termination of 400kV D/C Silchar-Imphal line and 80 MVAR, 420kV Bus Reactor along with associated bays at Imphal Substation (b) Extension of existing 400/132 kV Silchar (POWERGRID) SS with 2 Nos. of 400 kV GIS line bays for termination of Silchar-Imphal 400 kV D/C line Asset-2: Installation of 1X125 MVAR, 420 kV Bus Reactor along with GIS bays at Silchar S/s Asset-3: 1x125 MVAR, 420 kV Bus Reactor along with associated bay at Balipara (POWERGRID) Substation Asset-4: 1x125 MVAR, 420 kV Bus Reactor along with associated bay at Bongaigaon (POWERGRID) Substation Asset-5: Re-conductoring of Agartala GBPP - Agartala (State) 132 kV D/C line with High Capacity HTLS conductor along with necessary up gradation/ modification in bay equipment at both ends under “North Eastern Region Strengthening Scheme – IV (NERS-IV) in North Eastern Region”. 18.02.2020
327/TT/2019
Truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 periodfor Combined 7 Assets under ERSS-II project 18.02.2020
507/TT/2019
Truing up of tariff of 2014-19 tariff block and determination of tariff for 2019-24 tariff block of 03 nos. of assets under “Augmentation of Transformation Capacity and Reactive Compensation in Eastern Region”. 18.02.2020
F. No. L-1/249/2019/CERC
Details of transmission tariff petitions – reg. 03.12.2019
Petition No. 247/TT/2017
Petition for determination of transmission tariff from COD to 31.3.2019 for Asset-I: 1x500 MVA, 765/400 kV Transformer as spare ICT at Agra Sub-station, Asset-II: 1x500 MVA, 765/400 kV Transformer as spare ICT at Fatehpur Sub-station, Asset-III: 765/400 kV, 500 MVA, Single Phase Auto Transformer as spare ICT at Jhatikara Sub- station and Asset-IV 765/400 kV, 333 MVA, Single Phase Auto Transformer as Spare ICT at Bhiwani Sub-station under Spare Transformer for 765/400 kV ICTs in NR. 22.10.2019
Petition No. 247/TT/2017
Approval of transmission tariff from COD to 31.3.2019 for four assets under “Spare Transformer for 765/400KV ICTs in NR”-Reg. 17.09.2018
Petition No. 168/TT/2018
Approval under regulation-86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations 2014 for determination of Transmission Tariff from DOCO to 31-03-2019 for assets under Fiber Optic Communication system for central sector Sub-stations & Generating Stations in Southern Region. 04.09.2018
Petition No. 278/TT/2015
Determination of transmission tariff for Assets (11 nos) under “Eastern Region Strengthening Scheme-III (ERSS-III)” in Eastern Region for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Condition of Tariff) Regulations, 2014 and Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999. 20.06.2018
Petition Diary No. 389/2017
Determination of transmission tariff from DOCO to 31.3.2019 for 765 kV Line Bays and 240 MVAr Switchable Line Reactor at Raichur and Sholapur Sub-stations under Line bays and reactor at Power grid Sub-station for Raichur- Sholapur transmission line for synchronous interconnection between SR and WR. 17.09.2017
Petition No. 116/TT/2017
Determination of transmission tariff for 5 Nos. of Assets along with associated bays and 2 Nos. 220 kV bays under NRSS-XXXII in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.-Reg. 15.09.2017
Petition No. 55/TT/2017
Determination of transmission tariff for 2 Nos. of Assets at Dehradun along with associated bays under NRSS-XVIII in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.-Reg. 15.09.2017
Petition No. 69/TT/2017
Determination of transmission tariff for 400 KV D/C Sikar-Jaipur line with associated bays under “System Strengthening in Northern Region for Sasan and Mundra UMPP” In Northern Region -Reg. 07.09.2017
Petition No. 133/TT/2017
Approval of transmission tariff for +/-100 MVAR STATCOM at NP Kunta Pooling Station under "Transmission System for Ultra Mega Solar Park in Anantapur District, Andhra Pradesh - Part A (Phase-I)"-Reg. 05.09.2017
Lr. No. L-1/215/2017/CERC
Deficiencies in the Petitions filed before the Commission-Reg. 24.08.2017
113/TT/2016
Information pertaining to accelerated depreciation of SCADA/EMS matching with the commissioning of new SCADA systems. 11.08.2017
215/TT/2016
Petition for determination of transmission tariff from for 2 Assets under "Sub-station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3 X 800 MW in Phase -I) of NTPC Limited" in Southern Region under 2014 Tariff Regulations-Reg. 01.08.2017
45/TT/2017
Petition for determination of transmission tariff for 2014-19 tariff period transmission assets under “Sub-station works associated with System Strengthening in Southern Region for import of Power from Eastern Region - Reg. 01.08.2017
58/TT/2017
Petition for determination of transmission tariff for 2014-19 tariff period under System Strengthening-XXIII in Southern Region – Reg. 01.08.2017
-
Furnishing of GST Code for purpose of submission of filling fees and licence fees. 20.07.2017
Petition No. 44/TT/2017
Determination of transmission tariff for 9 Nos. of assets under Eastern Region Strengthening Scheme-V in Eastern Region under 2014 Tariff Regulations. 17.07.2017
Petition No. 71/TT/2017
Determination of transmission tariff for 400 kV Salem Pooling station (Dharmapuri)- Salem 400 kV D/C quad line along with new 765/400 kV Pooling Station at Salem (Dharmapuri) (initially charged at 400 kV) and bay extensions at Salem 400/220 kV existing Sub-station under transmission system associated with common system associated with Coastal Energen Private Limited and Ind-Bhrat Power (Madras) Limited LTOA generation projects in Tuticorin Area-Part-B in Southern Region – Reg. 12.07.2017
Petition No. 230/TT/2016
Petition for determination of transmission tariff for 765 kV D/C Srikakulam-Angul transmission line under "Common System associated with East Coast Energy Private limited and NCC power projects limited LTOA generation projects in Srikakulam area-Part-A" in Southern region and Eastern region for 2014-19 tariff period-Reg. 12.07.2017
Petition No. 57/TT/2017
Determination of transmission tariff from for 7 Nos. of Assets under “Bus Reactor Scheme in Northern Region, Phase-II” under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.-Reg. 07.07.2017
Petition No. 56/TT/2017
Determination of transmission tariff of Asset-I:400 kV D/C (Quad) Dehradun- Abdullapur transmission line along with associated bays at Dehradun and Abdullapur Substation and Asset-II:400 kV D/C (Quad) Dulhasti-Kishenpur - single circuit strung along with associated bays at Kishenpur end under “Northern Region Strengthening Scheme-XXIV” under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.-Reg. 07.07.2017
Petition No. 69/TT/2017
Determination of transmission tariff for 400 KV D/C Sikar-Jaipur line with associated bays under “System Strengthening in Northern Region for Sasan and Mundra UMPP” In Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014-Reg.PGCIL. 07.07.2017
Petition No. 48/TT/2017
Determination of transmission tariff for 2 Nos. 400 kV line bays at Fatehpur 400/220 kV sub-station under "Provision of 400 kV bays at Fatehpur for ATS under Unchahar TPS"-Reg.PGCIL. 04.07.2017
Petition No. 118/TT/2017
Determination of transmission tariff for 400 kV D/C Kakrapar APP-Navsari T/L along with associated bays at Navsari GIS & 400 kV D/C Kakrapar APP-Vapi T/L along with associated bays at Vapi Sub-station - Reg.PGCIL. 29.06.2017
Petition No. 231/TT/2016
Determination of transmission tariff for assets under "Common system associated with East Coast energy Private Limited and NCC power projects limited LTOA generation projects in Srikakulam Area –Part C" in Southern Region and Eastern Region - Reg.PGCIL. 28.06.2017
Petition No. 39/TT/2017
Determination of transmission tariff for 5 Assets under Wardha – Hyderabad 765 kV Link" in Southern Region(Petition No. 39/TT/2017)-Reg.PGCIL. 27.06.2017
Petition No. 5/RP/2017
Review of the Commission's order dated 29.7.2016 in Petition No. 68/TT/2016 –Reg.PGCIL. 28.06.2017
Petition No. 13/TT/2017
Determination of transmission tariff for tariff block 2014-19 for three assets under "WR-NR HVDC Interconnector for IPP Projects in Chattisgarh" in Northern and Western Region - Reg.PGCIL. 28.06.2017
Petition No. 183/TT/2016
Determination of transmission tariff for 2014-19 tariff period, for three assets under Sikkim Generation Projects - Part-B in Eastern Region.The HSA Advocates. 29.06.2017

Petition No. 233/TT/2016
Determination of transmission tariff from DOCO to 31.3.2019 for Assets (04 nos.) under ERSS XII Project in ER for tariff block 2014-19 period.-Reg. 16.06.2017

Petition No. 113/TT/2017
Information pertaining to accelerated depreciation of SCADA/EMS matching with the commissioning of new SCADA systems-Reg. 13.06.2017

Petition No. 48/TT/2017
Determination of transmission tariff of 2 No. 400 kV line bays at Fatehpur 400/220 kV Sub-station under "Provision of 400 kV bays at Fatehpur for ATS under Unchahar TPS" under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 - Reg. 31.05.2017

Petition No. 46/TT/2017
Determination of transmission tariff for 765 kV line bays and 240 MVAR Switchable Line Reactor at Raichur and Sholapur Sub-stations under "Line bays and reactor at Powergrid substation for Raichur-Sholapur transmission line for synchronous interconnection between SR and WR" for tariff block 2014-19 period. - Reg. 31.05.2017

Petition No. 204/TT/2016
Determination of transmission tariff for 400 kV line bays I and II (400 & 405) for D/C (Quad) Bassi-Jaipur (PhagiRVPNL) line at 765/400 kV Jaipur (Phagi-RVPNL) SubStation under Vindhyachal-IV (1000 MW)-Rihand-III (1000 MW) Generation Project in Western and Northern Region. –Reg. 31.05.2017

Petition No. 184/TT/2016
Determination of transmission tariff for Asset + 800 kV Biswanath Chariali-Agra HVDC POLE-II (1500MW HVDC Terminal at Biswanath Chariali and Agra) along with Earth Electrode line and Earth Electrode Station for both Biswanath Chariali and Agra under the transmission system associated with "North East-Northern/Western Interconnector-I Project".. 23.05.2017

Petition No. 233/TT/2016
Approval of transmission tariff from COD to 31.3.2019 for 4 assets under ERSS XII Project in Eastern Region under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014-Reg. 23.05.2017

Petition No. 47/TT/2017
Determination of (i) truing up transmission tariff for 2009-14 tariff block and (ii) transmission tariff for 2014-19 tariff block for assets associated with WRSS VI- Reg. 22.05.2017

Petition No. 218/TT/2016
Determination of transmission tariff for Asset I: Raipur Pooling Station-Wardha 765 kV D/C second line with bay extension and equipment at 765 kV Raipur Pooling Station & Wardha Sub-station under System Strengthening in Raipur-Wardha Corridor for IPP Projects in Chhattisgarh (IPP-F) for tariff block 2014-19 - Reg. 24.05.2017

Petition No. 205/TT/2016
Determination of transmission tariff for 400 kV D/C (Quad) Sarnath-Varanasi transmission line alongwith associated bays at Varanasi GIS Sub-station under “Transmision System for Phase-I Generation Projects in Jharkhand and West Bengal Part-B” for 2014-19 period –Reg. 19.05.2017

Petition No. 125/TT/2016
Determination of transmission tariff for fibre optic communication system in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave links being Asset-1: Central Sector portion (2186.339 km) and Asset-2: BBMB portion (208.438 km) totaling to 2394.777 km in Northern Region for tariff block 2014-19 - Reg. 19.05.2017

Petition No. 203/TT/2016
Determination of transmission tariff for 400 kV Meja-Allahabad transmission line alongwith associated bays at Allahabad under “Transmission System associated with Meja TPS” in Northern Region for 2014-19 period - Reg. 19.05.2017

Petition No. 113/TT/2016
Information pertaining to accelerated depreciation of SCADA/EMS matching with the commissioning of new SCADA systems. 01.05.2017

Petition No. 107/TT/2012
Petition No. 107/TT/2012 and APTEL's Judgment dated 15.3.2017 in Appeal No. 127 of 2015– Reg. 11.04.2017

Petition No. 107/TT/2012
Petition No. 107/TT/2012 and APTEL's Judgment dated 15.3.2017 in Appeal No. 127 of 2015. 28.03.2017

Petition No.84/MP/2016
Petition under Section 79 (1) (c), Section 38 (2) and other applicable provisions of the Electricity Act, 2003 and the regulations framed there under for termination of the Bulk Power Transmission Agreements dated 24.2.2010 and Transmission Service Agreement dated 7.12.2010 and Assignment and utilization of the Long Term Transmission capacity allocated for other purposes. 24.03.2017

Petition No. 206/TT/2016 – Reg.
Petition under Section 79 (1) (f) of the Electricity Act, 2003 read with Regulations 14 and 15 of the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010. 02.03.2017

Petition No. 223/TT/2016
Determination of transmission tariff for Asset-I: 765 kV, 3x80 MVAR Switchable line Reactor for 765 kV S/C Gaya-Varanasi Transmission Line as Bus Reactor alongwith associated bays at Gaya Sub-station and Asset II: 3x110 MVAR, 765 kV Bus Reactor-I at 765/400 kV Varanasi GIS (Reactor shifting from Sasaram Sub-station) under Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part-A2 for tariff block 2014-19-Reg 16.02.2017

Petition No. 143/MP/2016 With I.A. No. 56/2016
Grant of Regulatory Approval for execution of the Transmission System for Ultra Mega Solar Power Park at Banaskantha (Radhanesda) Gujarat. 22.12.2016

Petition No. 124/TT/2016
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 of 315 MVA, 400/220 kV ICT at Bhiwandi under provision of spare ICT's and reactors in Eastern, Northern, Southern and Western Regions. 07.10.2016

Petition No. 149/TT/2016
Determination of transmission tariff of 400/220 kV Ludhiana Sub-station: (+) 600 MVAR / (-) 400 MVAR under "Static VAR Compensator (SVCs) in Northern Region".. 07.10.2016

Petition No. 129/TT/2016
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Neelamangala-Mysore 400 kV D/C Transmission Line along with 2x315 MVA, 400/220 kV ICTs at Mysore Sub-station (1.5.2006) in Southern Region. 07.10.2016

No. L-1/44/2010-CERC
Submission of Point of Connection (PoC) Charges and Losses Results for 2016-17 (Q3) As per Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and subsequent amendments thereto – Reg. 19.08.2016

Petition No. 543/TT/2014
Determination of (i) Truing up transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block 400KV S/C Singrauli-Vindhyachal transmission link along with (2X250 MW) HVDV Back to Back at Vindhyachal between NR and WR-Reg. 02.08.2016

Petition No. 98/TT/2016
Revision of trued-up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of existing Banglore-Salem 400kV S/C at Hosur under system Strengthening –XVIII in Southern Regional Grid. 27.07.2016

Petition No. 108/TT/2016
Determination of transmission tariff for 400 kV D/C TEESTA III - RANGPO Section upto LILO point at Rangpo under Section 62 and 73(1)(d) of the Electricity Act 2003 read with Regulation 86 of CERC (Conduct of Business) Regulations and CERC (Terms and Conditions of Tariff) Regulations 2014 for Tariff period 2014-19. 15.07.2016

Petition No. 69/TT/2016
Determination of transmission tariff for 10 nos. of Assets under “Eastern Region Strengthening Scheme” in Eastern Region for tariff period 2014-19 from COD to 31.3.2019. 12.07.2016

Petition No. 92/TT/2016
Approval of tariff of LILO of Gladni-Hiranagar 220 kV S/C line at 400/220 kV Samba (POWERGRID) Sub-station (the lines are to be terminated at existing 220 kV line bays at samba Substation) under "Northern Region System Strengthening Scheme —XXXIV (NRSS-XXXIV). 12.07.2016

Petition No. 81/TT/2015
Determination of Fees and Charges for fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) microwave links in Eastern Region for the period 2009-14 block. 13.06.2016

Petition No. 61/TT/2015
Determination of tariff from COD to 31.3.2019 of assets under Transmission System associated with System Strengthening - XVII in Southern Regional Grid" in Southern Region. 11.04.2016

Petition No. 115/TT/2014
Determination of tariff from COD to 31.3.2019 for (A) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad- Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and (B) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-II to be charged as Bus Reactor at Aurangabad Sub-station under “System Strengthening in North/ West part of WR for IPP Projects in Chhattisgarh (IPP-E)” in Western Region. 11.04.2016

Petition No. 58/TT/2015
Determination of transmission tariff of assets covered under IPPs generation projects in Chhattisgarh (IPP D) in Western Region for 2014-19 tariff period. 11.04.2016

Petition No. 71/TT/2015
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 for six assets under Vindhyachal-IV & Rihand-III {1000 MW} Generation Project in Western & Northern Region. 11.04.2016

Petition No. 62/TT/2015
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 of assets Associated with Northern Region System Strengthening Scheme-XXVII in Northern Region. 11.04.2016

Petition No. 117/TT/2014
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 for Asset 1: 400 kV, 125 MVAR bus reactor at Raipur Sub-station, Asset 2: 400 kV, 125 MVAR bus reactor at Seoni Sub-station, Asset 3: 400 kV, 63 MVAR line reactor at Raipur Sub-station under “Installation of Reactors (Part-II) in Western Region”. 11.04.2016

Petition No. 33/TT/2015
Determination of transmission tariff from anticipated DOCO to 31.3.2019 for Asset-A: LILO of Ckt-II of 400 kV D/C Lucknow-Bareily TL at Shahjahanpur, Asset-B: 315 MVA 400/220 kV ICT-I with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-C: 315 MVA 400/220 kV ICT-II with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-D: Extn. of 400/220 kV GIS Gurgaon, Asset-E: 2x50 MVAR Bus Reactor at 400/220 kV Bareilly Sub-station along with associated bays (Existing Line Reactors retained and used as Bus Reactor), Asset-F: 125 MVAR Bus Reactor at Shahjahanpur under “Northern Regional Transmission Strengthening Scheme” in Northern Region. 11.04.2016

Petition No. 242/TT/2014
Determination of transmission tariff from anticipated CODs to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 kV Damoh Sub-station (B) 1*125 MVAR Bus Reactor at 400 kV Bachau Sub-station (C) 1*125 MVAR Bus Reactor at 400 kV Pirana Sub-station (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi Sub-station (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi Sub-station (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior Sub-station under Installation of Reactors (Part-II) in Western Region. 11.04.2016

Petition No. 506/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmisssion system associated with Farakka-III in Eastern Region. 11.04.2016

Petition No. 107/TT/2014
Determination of transmission tariff for tariff period 2014-19 for (A) 765 kV S/C Bareilly-Lucknow TL at 400 KV level, (B) one circuit of 400 kV D/C Bareilly (New)- Bareilly (Existing) TL under “Northern Region System Strengthening Scheme XXI” in Northern Region. 11.04.2016

Petition No. 208/TT/2015
Determination of transmission tariff for tariff period 2014-19 for Asset-1: Bhiwani-Hisar 400 kV D/C line along with associated bays at Bhiwani and Hisar, Asset-2: LILO of Moga-Bhiwadi 400 kV D/C line at Hisar along with associated bays at Hisar under “Northern Region System Strengthening Scheme XXV” in Northern Region. 11.04.2016

Petition No. 199/TT/2015
Determination of transmission tariff for tariff period 2014-19 for Asset-A: One ckt of 400 kV D/C Sikar-Ratangarh line with associated bays, Asset-B: Second ckt of 400 kV D/C Sikar-Ratangarh line with associated bays, and Asset-C: 125 MVAR bus reactor at Ratangarh S/S (RRVPNL) with associated bays under “System Strengthening in Northern Region for Sasan and Mundra UMPP”. 11.04.2016

Petition No. 399/TT/2014
Determination of transmission tariff for tariff period 2014-19 for Asset-I: 400kV,1*125 MVAR Bus Reactor at Parli Sub-station and Asset-II : Conversion of 50 MVAR Line Reactor (4 nos.) into switchable Line Reactors at 400/200kV Pune Sub-station under installation of reactors (Part-II) in western Region. 11.04.2016

Petition No. 191/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset -I:315 MVA, 400/220 kV ICT at Mandola, Asset-II: 315 MVA, 400/220 kV ICT at Ludhiana under Spare ICT scheme for Northern Region. 01.02.2016

Petition No. 565/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for asset i.e. Asset 1: LILO of Nalagarh-Kaithal Line at Patiala along with associated bays; Asset 2: 400/220 kV 500 MVA ICT-III at Patiala Sub-station; Asset 3: 400 kV 125 MVAR Bus Reactor at Patiala Sub-station along with associated bays at Patiala Sub-station; Asset 4: 400/220 kV 500 MVAICT-III at Malerkotla Sub-station under “Northern Region System Strengthening Scheme-XIV (NRSS-XIV). 01.02.2016

Petition No.484/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission system associated with immediate evacuation system for Nabinagar TPS in Eastern Region. 08.02.2016

Petition No.502/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forAsset-I: 400 kV D/C Mauda-Wardha line (CKT-I) along with bays at Wardha and Asset-II: 400 kV D/C Mauda-Wardha line (CKT-II) along with bays at Wardha under Mauda Transmission system in Western Region. 08.02.2016

Petition No.398/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 of Asset-I: 220 kV D/C Mariana (New)-Mokokchung (POWERGRID) Transmission line along with associated bays at Mariana and Mokokchung (POWERGRID) Substations, Asset-II: 132 kV D/C Mokokchung (POWERGRID)-Mokokchung (Nagaland) Transmission line along with associated bays, 7x10 MVA, 220/132 kV ICT-I & II and 220 kV& 132 kV GIS bays at Mokokchung (POWERGRID) S/S and Asset-III: 400 kV D/C Silchar-Imphal Transmission line along with associated bays at Silchar and Imphal Substations under “Transmission system associated with Pallatana GBPP and Bongaigaon TPS”. 08.02.2016

Petition No.400/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for the asset 125 MVAR Bus Reactor at 400/220 kV Rajgarh Sub-station along with associated bays at Rajgarh Sub-station under “Installation of 125 MVAR Bus Reactor at 400 kV Rajgarh Sub-station in Western Region. 08.02.2016

Petition No.30/TT/2015
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forCombined assets ofAsset-1:- LILO of 400 kV S/C Meramuundali-Jeypore line at Bolangir and associated bays alongwith 2 nos 50 MVAR Shunt reactors and 1 nos 315 MVA ICT (ICT-II) & associated bays and 2 nos of 220 kV line bays, Asset-2: Installation of 1 no 80 MVAR Bus reactor and associated bays at Bolangir, Asset3:- 1 no 315 MVA ICT-I and associated bays and 2 nos 220 kV line bays at Bolangir, Asset 4:- LILO of 400 kV S/C Baripada-Rengali line at Keonjhar and associated bays at Keonjhar, Asset 5:- Installation of 1 no of 400/220 kV, 315 MVA (1st) ICT alongwith associated bays and 2 nos. 220 kV line bays at Keonjhar Sub-station, Asset 6:-Installation of 1 no of 400/220 kV, 315 MVA (2nd) ICT alongwith associated bays and 2 nos. 220 kV line bays at Keonjhar Sub-station, Asset 7:-Installation of 1 no 80 MVAR, 420 kV Bus Reactor and associated bays at Keonjhar Sub-station,Asset 8:-LILO of Kahalgaon-Biharshariff 400 kV D/C transmission line (2nd line) along with associated bays at Banka, 400/132 kV, 200 MVA ICT-I with associated bays at Banka Sub-station and 2nos. of 132 kV line bays at Banka Sub-station, Asset 9:-400/132 kV, 200 MVA ICT-II with associated bays at Banka Sub-station, Asset 10:-2 x 50 MVAR switchable line reactor at Banka Sub-station and 400 kV, 1 x 80 MVAR Bus Reactor with associated bays at Banka Sub-station for the period from 1.9.2012 to 31.3.2014 under ERSS-III in Eastern Region. 08.02.2016

Petition No.7/TT/2015
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forAsset-1(i): LILO of 400 kV D/C Bina –Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur, Asset-1(ii): Switchable Scheme for Reactor at Nagda S/S, Asset-1(iii): Switchable Scheme for Reactor at Bina S/S, Asset-2: 400 kV, 63 MVAR Bus Reactor at Shujalpur along with associated bays of 400kV Asset-3: 400/220 kV ICT I at Shujalpur along with associated bays of 400 kV & 220 kV, Asset-4: ICT II at Shujalpur along with associated bays of 400 kV & 220 kV. 08.02.2016

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tirvalam (POWERGRID) – Chitoor (APTRANSCO 400 kV D/C (Quad) line along with associated bays and equipment under Supplementary Transmission system associated with Vallur TPS for the period from anticipated COD to 31.3.2014 in Southern Region for tariff block 2009-14. 01.02.2016

Petition No. 6/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for four assets under Sipat-II Supplementary Transmission System in Western Region. 08.02.2016

Petition No. 396/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined assets of 765/400 kV Bilaspur Pooling Station (near Sipat) along with LILO of Sipat-Seoni Ckt-I with 3X80 MVAR Switchable Line Reactor, 3X80 MVAR Bus Reactor and 765/400 kV, 1500 MVAICT 1 & 2 under WRSS-X Transmission System in Western Region. 08.02.2016

Petition No. 119/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset-I: 125 MVAR Bus Reactor at Lucknow (Existing) 400/220 kV Sub-station, Asset-II: 125 MVAR Bus Reactor at Ballia, Asset-III: Combined Asset of 765/400 kV, 1500 MVA ICT II at Lucknow Sub-station along with associated bays. 08.02.2016

Petition No. 102/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for (i) Asset I-400 KV, 125 MVAR Bus reactor along with associated bays at Patna Sub-station (ii) Asset II: 400 KV, 125 MVAR Bus reactor along with associated bays at Ranchi under ERSS-IV in ER. 08.02.2016

Petition No. 501/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset IA- 1x125 MVAR Bus Reactor at Khandwa along with associated bays ,Asset IB- 1x125 MVAR Bus Reactor at Dehgam along with associated bays under WRSS VII Transmission Scheme in Western Region. 08.02.2016

Petition No. 225/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period of assets under Sipat-II Transmission system in Western Region. 08.02.2016

Petition No. 200/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for (1): 315 MVA 400/220 kV Spare Inter Connecting Transformer at 400/220 kV Hisar Sub-station, (2): 315 MVA 400/220 kV Spare Inter Connecting Transformer at 400/220 kV Lucknow Sub-station under “Provision of Spare ICT’s and Reactors for Eastern, Northern, Southern and Western Region”. 08.02.2016

Petition No. 21/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for assets under East-West Transmission Corridor Strengthening Scheme in Western Region. 08.02.2016

Petition No. 489/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 125 MVAR Bus Reactor at Roorkee S/S under Northern Region System Strengthening Scheme XXI (NRSS-XXI). 08.02.2016

Petition No. 406/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Korba-Rajpur 400 kV D/C Transmission Line under Korba-III Transmission System in Western Region. 08.02.2016

Petition No. 34/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period of Transmission system in Western Region (POWERGRID portion) under Western Region Strengthening Scheme-II. 08.02.2016

Petition No. 564/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 315 MVA, 400/220/33 kV 3-phase Spare ICT at Raipur sub-station, Asset-II: 315 MVA, 400/220/33 kV 3-phase Spare ICT at Pune sub-station, Asset-III: 420 kV, 80 MVAR 3-phase shunt reactor at Wardha sub-station, Asset-IV: 315 MVA, 400/220/33 kV 3-phase Spare transformer at Dehgam sub-station, Asset-V: 315 MVA, 400/220/33 kV 3-phase Spare transformer at Jabalpur, Asset-VI: 400 kV, 125 MVAR 3-phase Spare Reactor at Itarsi under provision of Spare ICTs and Reactors in Western Region. 30.1.2016

Petition No. 559/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I:-765 kV S/C Moga-Bhiwani transmission line Asset-II:- 765 kV S/C Jattikalan-Bhiwani transmission line associated with 765 kV system for central part of the Northern Region. 30-01-2016

Petition No. 527/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I:-LILO of Patiala-Hissar line at Kaithal Sub-station along with associated bays, Asset-II:- 400 kV D/C Patiala-Ludhiana line along with associated bays at Patiala and Ludhiana Sub-station for transmission system associated with Rampur HEP. 30-01-2016

Petition No. 512/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under augmentation of 220/132 kV Transformation capacity at Raebareli by 1x100 MVA Transformer in Northern Region. 30-01-2016

Petition No. 503/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400/220 kV, 1*315 MVA Auto Transformer (ICT-III), at 400/220 kV Substation at Vapi under installation of 1*315 MVA, 400/220 KV Transformer at Vapi (POWERGRID) Substation in Western Region. 30-01-2016

Petition No. 426/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for assets under Vindhyachal Stage-II Transmission System in Western Region. 30-01-2016

Petition No. 313/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset I: LILO of both circuits of 400 kV D/C Bamnouli- Mundka/ Bawana at Jatikalan 765/400 kV Sub-station(COD: 1.10.2012), Asset-II: Agra-Jatikalan 765 kV S/C transmission line (COD: 1.5.2013), Asset-III: Agra- Meerut 765 kV S/C transmission line (COD: 1.6.2013) under 765 kV system for Central Part of Northern Grid Part-I in Northern Region. 30-01-2016

Petition No. 297/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-A:- LILO of one circuit (ckt-1) of 400 kV D/C Maithon-Jamshedpur line at Mejia “B” TPS including PLCC equipment (excluding wave trap) for the transmission line Asset-B:- 400 kV D/C Koderma TPS- Biharsharif transmission line and 2 nos. associated line bays at Biharsharif Sub-station and Asset C: 400 kV D/C Maithon RB- Maithon (PG) transmission line and associated bay Extension at Maithon Sub-station under transmission system for start-up power to DVC and Maithon Right Bank Generation projects in Eastern Region. 30-01-2016

Petition No.294/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 400 kV D/C Manesar-Neemrana Line along with associated bays, Asset- III(A): 500 MVA 400/220 kV ICT-1 at Neemrana, Asset-III(B): 315 MVA 400/220 400/220 kV ICT-2 at Neemrana under transmission system associated with Northern Region System Strengthening Scheme- XV. 30-01-2016

Petition No. 186/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Combined Asset-A& B: (Asset A: 315 MVA ICT-I at Sikar 400/200 kV new sub-station with 1 No. 220 kV Line bay and Asset-B: LILO of ckt-I of Sikar (RVPN)- Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), Asset-C: LILO of Ckt-II of Sikar(RVPN)-Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), Asset-D: 315 MVA ICT-II at Sikar 400/200 kV New sub-station with 1 No. 220 kV line bay, Combined Asset E& I (Asset E: LILO of 1st circuits of 400 kV Jhakri Abdulllapur transmission line at Panchkula, Asset F: LILO of 2nd circuits of 400 kV Jhakri Abdulllapur transmission line at Panchkula, Asset-G: 400/220 kV 315 MVA ICT-I along with associated bays at Panchkula sub-station, Asset H: 315 MVA ICT-II along with associated bays at Panchkula sub-station, Asset I: 125 MVAR bus reactor along with associated bays at Panchkula sub-station, Asset –J: 400 kV, 80 MVAR bus reactor along with associated bays at 400/220 kV Sikar sub-station under Sasan and Mundra Mega Power Project in Northern Region. 30-01-2016

Petition No. 114/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission assets (Group-1) associated with 765 kV system for Central part of Northern Grid Part-II, in Northern Region. 30-01-2016

Petition No. 63/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Combined Assets for Transmission System associated with NRSS-XV in Northern Region. 30-01-2016

Petition No. 024/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Neemrana-Sikar T/L along with its associated bays under NRSS-XVII. 30-01-2016

Petition No. 414/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for LILO of Alamathy-Siperumbudur 400 kV DC line at North Chennai TPS switchyard under transmission system associated with Chennai NTPC –TNEB JV TPS. 22-01-2016

Petition No. 34/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset I :LILO of both circuits of 400 kV D/C KishenpurWagoora T/L along with bays at New Wanpoh& 1 No. 315 MVA, 400/220 kV ICT-I along with associated bays at New Wanpoh and 03 No. 220kV Line Bays associated with NRSS XVI of Northern Region. 22-01-2016

Petition No. 32/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for ;Asset 1: 125 MVAR Bus reactor at Jaipur South, Asset 2: 400kV BhiwaniJind TL along with associated bays plus 01 nos. 500 MVA, 400/220 kV ICT-I and associated bays at Jind S/S , Asset 3: LILO of both Ckts of 400 kV D/C Lucknow- Bareily TL at Shahjahanpur, Asset 4: ICT- I at Shahjahanpur along with associated bays, Asset 5: ICT- II at Shahjahanpur along with associated bays for Northern Region Transmission Strengthening Scheme in NR. 22-01-2016

Petition No. 37/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-Il. 22-01-2016

Petition No. 113/TT/2013
Determination of tariff for 2009-14 period for 400kv 1x63 MVAR Bus Reactor along with associated 400kV bays at Satna sub-station (DOCO 1.4.2013) and 400kV D/C Quad Bassi-Jaipur (RPVNL) line associated with Vindhyachal IV and Rihand III (1000MW) Generation project in Western Region. 22-01-2016

Petition No. 447/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Spare Converter Transformer for Vizag back-to-back HVDC terminal in Southern Region. 22-01-2016

Petition No. 028/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Combined Assets associated with Northern Region System Strengthening Scheme -XII (NRSS-XII) in Northern Region. 22-01-2016

Petition No. 057/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for asset 02 Nos. of 220 kV Line Bays at Fatehabad S/Stn under Transmission System Associated with NRSS-XIII. 22-01-2016

Petition No. 551/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission assets under “System Strengthening-XI in Southern Regional Grid" in Southern Region”. 22-01-2016

Petition No. 362/TT/2014
Determination of tariff for 2009-14 period for for (A) 500MVA 400/220 kVSpare Transformer for Northern Region at Neemrana from DOCO (1.11.2013) to 31.3.2014 under Augmentation of Transformers in Northern Region Part – A of Northern Region. 22-01-2016

Petition No. 281/TT/2013
Determination of tariff for 2009-14 period for Augmentation of Houser S/S by 1X315 MVA 400/220 kV transformer and associated bays (DOCO: 01.03.2014) under System Strengthening - XIV in SR. 22-01-2016

Petition No. 120/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Thermal Powertech Corporation India Ltd. Switchyard to Nellore Pooling Station 400kV D/C (quad) Line along with associated bay extensions at Nellore Pooling Station under “Transmission System for connectivity of Thermal Powertech Corporation India Ltd.” 22-01-2016

Petition No. 528/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for for 400 kV s/c Chamera II pooling Station at Rajera with 400/220 kV 315 MVA ICT-1 and ICT-II under Chamera II GIS pooling station at Rajera with 80 MVAR Bus reactor at Pooling point under Chamera II System. 22-01-2016

Petition No. 151/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for asset under transmission system associated with Koteshwar HEP in Northern Region consisting of Asset-I: 50% series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar)-Meerut 765 kV 2 x S/C lines (charged at 400 kV). 20-01-2016

Petition No. 511/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 2nd spare converter transformer at Kolar (COD: 1.6.2011) and Talcher (COD: 1.10.2011) HVDC terminals (each one at Kolar and Talcher) in Southern Region. 20-01-2016

Petition No. 504/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for transmission assets under “System Strengthening-X in Southern Regional Grid” in Southern Region. 20-01-2016

Petition No. 478/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 80 MVAR Bus Reactor at Kaithal Sub-station under Northern Region system strengthening scheme-XIX of Northern Region. 20-01-2016

Petition No. 492/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Hassan-Mysore 400 kV D/C transmission line and extension of 400/220 kV Hassan & Mysore Sub-station under system strengthening-IX in Southern Region. 20-01-2016

Petition No. 5/TT/2015
Approval fortruing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for for transmission assets under “Northern Region System Strengthening Scheme- XXIII. 17-01-2016

Petition No. 131/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 1 x 80 MVAR, 420 kV, 3-Phase Bus Reactor at 400 kV Balipara Sub-station along with associated bay under transmission system associated with North East/Northern Western Interconnector-I and transmission system of Kameng HEP in North Eastern Region. 17-01-2016

Petition No. 480/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Nellore-Gooty 400 kV D/C (Quad) line with associated bay extension at Nellore & Gooty Sub-station under Transmission System associated with SRSS XVIII-A (Formerly KUMPP Part A). 17-01-2016

Petition No. 554/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (i) 400 kV, 125 MVAR Bus-Reactor with associated bays at Abdullapur and (ii) 400 kV D/C Abdullapur-Sonepat transmission line along with 400 kV associated bays at Abdullapur and Sonepat Sub-station under System Strengthening in Northern Region Grid for Karcham Wangtoo HEP in Northern Region-II. 17-01-2016

Petition No. 3/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets of Koldam Nalagarh 400 kV D/C (Quad) line along with bays at Nalagarh S/S (part of Powergrid portion) DOCO:1.4.2010 (Asset-I) and 400 kV line bays at Ludhiana S/S DOCO:1.4.2011 (Asset-II) under “Transmission system associated with Koldam Hydro-Electric Project” in Northern Region. 16-01-2016

Petition No. 10/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets associated with Northern Region System Strengthening Scheme – VI in Northern Region consisting of: Asset –I : LILO of 400 kV S/C Ballabhgarh – Bhiwandi Transmission Line at Gurgaon along with Associated bays, Asset –II: 315 MVA, 400/220kV ICT-I along with associated bays at GIS Sub-Station at gurgaon and Asset-III: 315 MVA, 400/220 kV ICT-II along with associated bays at GIS Sub-Station at Gurgaon. 16-01-2016

Petition No. 240/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Asset-I (220 kV Dimapur-Misa T L, LILO 220kV DIC Kopili-Samaguri TL and LILO 132kV D/C Mariani- Dimapur TL) and Asset-Il (132 kV DIC Doyang-Dimapur T IL, 132 kV SICDimapur- lmphal TIL with associated bays) for transmission system associated with Doyang HEP in North Eastern Region. 14-01-2016

Petition No. 13/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission system associated with enhancement of transmission capacity of East-West Corridor (Combined Assets) of Northern Region. 16-01-2016

Petition No. 14/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets associated with Northern Region System Strengthening Scheme-VIll (NRSS-VIII) (Effective DOCO 1.11.2009) in Northern Region consisting of: Asset-A: LILO of one Circuit of 400kV D/C Kankroli-Zerda Line at Bhinmal along with 80 MVAR Bus Reactor at Bhinmal (DOCO 1.9.2009), Asset-B: 315 MVA 400/220 ekV ICT-I at Bhinmal along with associated bays (DOCO 1.9.2009), Asset-C: 315 MVA 400/220 kV ICT-II at Bhinmal along with associated bays (DOCO 1.4.2010), Asset-D: 315 MVA 400/220 KV ICT-III at Hissar along with associated bays at Hissar (DOCO 1.4.2010), Asset-E: Two nos. 220 kV Bays at Hissar Sub-station (DOCO 1.8.2010). 16-01-2016

Petition No. 15/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets of 400 kV D/C Twin Conductor Kanpur- Ballabgarh Transmission Line along with its Associated Bays (Asset-1) (DOCO 01.11.2010) and 40% FSC at Ballabgarh on 400 kV D/C Kanpur- Ballabgarh Transmission Line (Asset-2) (DOCO 01.07.2011) under Northern Region System Strengthening Scheme—lX (NRSS-IX). 16-01-2016

Petition No. 70/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 125 MVAR Bus Reactor-I (Asset-IA) & 125 MVAR Bus Reactor-II (Asset-IB) at Fatehpur Sub-station along with associated bay; Asset-II: 125 MVAR Bus Reactor-II at Balia Sub-station; Asset-III: Combined Asset of 1500 MVA ICT-I at Agra Sub-station along with associated bays (Asset-IIIA), 125 MVAR 765/400 kV Bus Reactor-I at Sasaram along with associated bays (Asset-IIIB) and Associated line bays of 765 kV S/C Fatehpur-Agra T/L at Fatehpur and Agra Sub-station (Asset-IIIC); Asset-IV: 1500 MVA ICT-2 at Agra Sub-station along with associated bays; Asset-V: 125 MVAR Bus Reactor along with associated bays at Lucknow; Asset-VI: 125 MVAR 400 kV Bus Reactor-II at Sasaram along with associated bays (Asset-VI A) and 2 no. 50 MVAR Bus Reactor at 400 kV Maithon Sub-statoin and associated bays (Maithon-Gaya Line) (Asset-VI B); Asset-VII: 2 nos. of 400 kV bays at Maithon Sub-station for 400 kV D/C Maithon-Mejia Transmission Line; Asset-VIII: LILO of Barh-Balia 400 kV D/C Transmission Line at Patna 400 kV S/s along with associated bays; Asset-IX: 1500 MVA 765/400 kV ICT-I at Sasaram Sub-station along with associated bays. 19-01-2016

Petition No. 100/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets of Transmission System associated with North West Corridor Strengthening Scheme (effective COD 1.5.2009) in both Western and Northern region consisting of Asset-I: 765 kV S/C Gwalior-Agra transmission line Circuit-II along with 400 kV bays at Agra-Gwalior S/S (COD:1.4.2009) and Asset-II: 400 kV D/C Zerda-Kankroli line along with associated bays (COD:1.5.2009). 16-01-2016

Petition No. 101/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets for Transmission System Associated with NRSS-V in Northern Region consisting of Asset-I: LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi along with associated bays (DOCO 01.04.2009), Asset-II: 400 kV D/C Agra- Bhiwadi transmission line along with associated bays(DOCO 01.09.2009), Asset-III: 400 kV D/C Bhiwadi-Moga transmission line along with associated bays at Moga & Bhiwadi end including of 02 nos. 63 MVAR line reactor at Moga end (DOCO 01.04.2010) & Asset-IV:80 MVAR Bus Reactor at Bhiwadi Sub-station (DOCO 01.01.2011). 16-01-2016

Petition No. 391/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 315 MVA, 400/220kV ICT II at Misa Sub-station along with associated bays under “North East/Northern Western Interconnector-I and Transmission system of Kameng HEP” in North Eastern Region . 18-01-2016

Petition No. 431/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 400 kV Kankroli-Jodhpur Transmission line alongwith associated bays under System Strengthening Scheme in South-Western Part of Northern Grid (Part-B). 16-01-2016

Petition No. 495/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 400 KV D/C Meerut-Kaithal (Quad)TL along with associated bays under “Northern Region System strengthening scheme-XI”. 16-01-2016

Petition No. 529/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined Assets of (i)160 MVA,220/132kV,3 - Phase Auto Transformer at Kopili (ii) 132 kV S/C Kopili-Khandong Transmission Line along with associated bays (iii) 100MVA, 220/132 kV, 3-Phase Auto Transformer and associated bays at Dimapur Sub-Station and (iv)LILO of 132 kV Dimapur-Kohima Transmission Line under missing link transmission system in NER. 16-01-2016

Petition No. 544/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Gorakhpur-Lucknow transmission line along with its associated bays and 30% FSC on 400 kV D/C Gorakhpur-Lucknow transmission line at Lucknow along with bays under Northern Region System Strengthening Scheme-X. 18-01-2016

Petition No. 549/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Transmission Assets under System Strengthening–VII in Southern Regional Grid in Southern Region. 16-01-2016

Petition No. 553/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission Assets under "Pallatana GBPP and Bongaigaon T PS Project" in North Eastern Region. 16-01-2016

Petition No. 001/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for transmission system associated with SEWA-II HEP in Northern Region. 19-01-2016

Petition No. 147/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for LILO of existing Bangalore-Salem 400 kV S/C line at Hosur under system strengthening – XVIII in Southern Regional Grid. 18-01-2016

Petition No. 217/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 1x80 MVAR, 420kV 3-phase Bus-Reactor at 400kV Bongaigaon Sub-station along with associated bay under transmission system associated with North-East/Northern Western Interconnector-I and transmission system of Kameng HEP in North Eastern Region. 18-01-2016

Petition No. 417/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (A) LILO of 400 kV Simhapuri and Meenakshi-Nellore D/C Quad line (B) Associated bays and common systems at Nellore Pooling station for ISGS projects in Krishnapatnam area of Andhra Pradesh in Southern Region. 18-01-2016

Petition No. 546/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset I: LILO of 400kV Rishikesh- Muzaffarnagar Transmission line at Roorkee along with associated bays at Roorkee Sub-station(COD: 1.4.2009), Asset II: 315 MVA 400/200 kV ICT-I along with associated bays at Roorkee Sub-station(COD: 1.4.2009) Asset III: 315 MVA 400/220 kV ICT-II along with associated bays at Roorkee Sub-station (COD: 1.4.2010) associated with System Strengthening Scheme in Roorkee in Northern Region. 18-01-2016

Petition No. 490/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-1: 315 MVA ICT-III at Ludhiana Sub-station associated with Northern Region System Strengthening Scheme-VII. Asset-2: 4th 400/220 kV, 315 x04 MVA ICT at Wagoora Sub-station associated with Northern Region System Strengthening Scheme-VII for Northern Region system strengthening scheme-VII. 18-01-2016

Petition No. 240/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Asset-I (220 kV Dimapur-Misa T L, LILO 220kV DIC Kopili-Samaguri TL and LILO 132kV D/C Mariani-Dimapur TL) and Asset-Il (132 kV DIC Doyang-Dimapur T IL, 132 kV SIC-Dimapur-lmphal TIL with associated bays) for transmission system associated with Doyang HEP in North Eastern Region. 14-01-2016

Petition No.247/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block of 132 kV SIC Ranganadi-Ziro Transmission System in North Eastern Region. 14-01-2016

Petition No. 276/TT/2014
Truing up of transmission tariff for 2009-14 and tariff period and determination of tariff for 2014-19 period for ATS of Kopili-Khandong (additional transmission Gohpur-Itanagar) in North Eastern Region. 14-01-2016

Petition No. 278/TT/2014
Truing up transmission tariff for 2009-14 tariff period and determination of tariff for 2014-19 tariff period for Combined Assets of Transmission System associated with Ranganadi HEP in North Eastern Region. 14-01-2016

Petition No. 380/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block for Transmission System associated with Kathalguri Gas based Combined Cycle Project in North Eastern Region. 14-01-2016

Petition No. 428/TT/2014
Truing up of transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block of combined assets of (i) 220 kV S/C Unchahar- Raibareilly transmission line alongwith associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow T/L at Raibareilly and 100 MVA, 220/132 kV ICT-III at Raibareilly alongwith associated bays (ii) 100 MVA, 220/132 kV ICT-II at Raibareilly Sub-station alongwith associated bays under Unchahar-III Transmission System (Notional DOCO 1.11.2007) in Northern Region. 14-01-2016

Petition No.442/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block for 2nd 315(3X105) MVA, 400/220 kV Transformer at Indravati (OHPC) Switchyard in Eastern Region. 14-01-2016

Petition No.552/TT/2014
Truing up of transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block of Combined Asset (Part-I) (i) LILO of Korba – Raipur at Sipat, (ii) 765 kV Sipat – Seoni Ckt. I, (iii) 400/220 kV ICT I at Seoni, (iv) Ckt. II of 400 kV Nagda – Dehgam line, (v) Ckt. I of Nagda – Dehgam line, (vi) 400 kV D/C Seoni – Khandwa TL, 80 MVAR Bus Reactor, 765/400 kV ICT. II at Seoni S/S LILO of Sardar – Sarovar – Nagda line at Rajgarh, (vii) 765 kV Sipat – Seoni Ckt. II andCombined Asset (Part-2) (viii) 315 MVA 400/220 kV ICT II at Seoni S/S, 315 MVA 400/220 kV ICT I at Rajgarh and (ix) 315 MVA ICT II at Rajgarh. Under Sipat I Transmission System in Western Region. 14-01-2016

Petition No.395/TT/2014
Truing up transmission tariff for 2009-14 tariff period and determination of tariff for 2014-19 tariff period for Special Protection Scheme for Rihand- Dadri HVDC Bi-pole and Gorakhpur-Muzzafarpur 400 kV line in Northern Region. 14-01-2016

Petition No.232/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.3.2019 for replacement of 2 x 315 MVA, 400/220 kV ICT with 2 x 500 MVA, 400/220 kV ICTs at Purnea Sub-station under “Eastern Region Strengthening Scheme-XII” in Eastern Region. 28-12-2015

Petition No. 248/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset I: (765 kV D/C Solapur- Aurangabad TL along with 2 x 240 MVAR Switchable Line Reactor with associated bays at Solapur Sub-station) and Asset II: (2 x 240 MVAR Switchable Line Reactor along with associated bays at Aurangabad Sub-station) associated with Inter Regional system strengthening scheme for Western Region and Northern Region (Part-A). 22-12-2015

Petition No.257/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for Asset-I: 160 MVA 220/132 kV Transformer I at Purnea Sub-station along with associated bays; Asset- II: 160 MVA 220/132 kV transformer II at Purnea Sub-station along with associated bays “ Augmentation of Transformation Capacity and Reactive Compensation in Northern and Eastern Region”. 28-12-2015

Petition No. 259/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for Asset-I: 200 MVA, 400/132/33 kV ICT - 2 along with associated bays at Biswanath Chariali, Asset-II: 80 MVAR Bus Reactor-1 along with associated Bays at Biswanath Chariali, Asset-III: 80 MVAR Bus Reactor-2 along with associated Bays at Biswanath Chariali, Asset-IV: Augmentation of 400 kV Agra Sub-station by 1x315 MVA, 400/220/33 kV ICT along with associated Bays, Asset-V: 400kV D/C Balipara-Biswanath Chariali Transmission Line along with associated bays at Balipara and Biswanath Chariali PS from anticipated COD 15.11.2015 to 31.03.2019 under the transmission system associated with “NORTH EAST –NORTHERN/ WESTERN INTERCONNECTOR - I PROJECT” in North Eastern, Northern & Western Region. 23-12-2015

Petition No. 260/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Champa PS - Dharamjaygarh (Korba) 765 kV S/C line along with bays, Raigarh PS (near Kotra) - Champa PS 765 kV S/C line along with bays and establishment of 765/400 kV 6X1500 MVA Champa Pooling Station under “Establishment of Pooling Stations at Champa and Raigarh (near Tamnar) for IPP Generation Projects in Chattisgarh” in Western Region. 28-12-2015

Petition No. 262/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for 400kV (Quad) D/C line from NCC Generation Switchyard to Nellore Pooling Station and associated Bays under “Transmission System for Connectivity for NCC Power Projects Ltd. 28-12-2015

Petition No. 263/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 (A) Combined Assets of (A1) Associated bays of 765 kV S/C Lucknow Barielly transmission line including 3x80 MVAR switchable line reactor at Lucknow (New) and Line Reactor at Bareilly (New) Sub-station, (A2) 2nd circuit of 400 kV D/C (Quad) Bareilly(New)-Bareilly(Old)transmission line with associated bays (A3) 765/400 kV 1500 MVA ICT-I at Bareilly (New) Sub-station along with associated bays (B) 765 kV, 3x80 MVAR Bus reactors at Bareilly (New) Substation(C)Associated bays of 1st circuit of 400 kV D/C (Quard) Bareilly (New)- Bareilly (Old) Transmission Line (D) 765/400 kV 1500 MVA ICT-II at Bareilly (New) Sub-station along with associated bays. (E) 1st circuit of 400 kV D/C (Quard) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays (F) 2nd circuit of 400kV D/C (Quard) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays (G) 400kV Kashipur- Roorkee line along with associated bays (H) 400kV D/C Roorkee-Saharanpur line along with associated bays under “Northern Region System Strengthening SchemeXXI” in Northern Region. 23-12-2015

Petition No. 264/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for 765kV S/C Kurnool-Raichur transmission line along with associated bay extensions at 765/400 kV Kurnool Sub-station and 765/400 kV Raichur Substation under "Southern Region System strengthening Scheme -XXII. 28-12-2015

Petition No. 266/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for 765 kV D/C Dharamjaygarh-Jabalpur Pooling Station transmission line and 2x330 MVAR Switchable Line Reactors with associated bays at Dharamjaygarh Sub-station and line bays at Dharamjaygarh Sub-station only under “Transmission system for Phase-I Generation Projects in Orissa-Part B” in Western Region. 28-12-2015

Petition No. 274/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset-I: 765kV D/C Varanasi-Kanpur (new) line and associated bays including 240 MVAR Switchable Line Reactor in both Ckt. at Varanasi GIS Sub-station and 330 MVAR non-switchable Line Reactor in both Ckt. at Kanpur GIS Sub-station (Anticipated COD;31.01.2016) Asset- II: 765 kV S/C Kanpur (new) GIS – Jhatikra line & associated bays including 330 MVAR Switchable Line Reactor at Kanpur GIS Sub-station and 330 MVAR NonSwitchable Line Reactor at Jhatikara Sub-station (Anticipated COD:31.01.2016) Asset- III: 400kV D/C (Quad) Kanpur (New) GIS-Kanpur (old) line & associated bays (Anticipated COD: 31.01.2016) Asset- IV: LILO of one Ckt. of 400kV D/C Sasaram-Allahabad line & Associated bays at Varanasi GIS Sub-station (Anticipated COD: 31.12.2015) Asset- V: 2X1500 MVA 765/400 kV ICT-I&II associated bays at 765/400 kV Kanpur (new) GIS Substation (Anticipated COD;31.01.2016) Asset- VI: 240 MVAR, 765kV Bus Reactor-1 & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD:31.01.2016) Asset- VII: 240 MVAR, 765kV Bus Reactor & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD;31.01.2016) Asset- VIII: 125 MVAR, 400 kV Bus Reactor & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD;31.01.2016) Asset- IX: 240 MVAR, 765 kV Bus Reactor & associated bay at Jhatikara S/S (Anticipated COD;1.12.2015) Asset- X: 125 MVAR, 400 kV Bus Reactor & associated bay at Varanasi GIS Sub-station (Anticipated COD;31.1.2016) under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part-B” in Northern Region. 28-12-2015

Petition No. 275/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset:I 275.93 Km. OPGW Fiber Optic cable along with associated equipments which are under commercial operation w.e.f. 1.4.2014, Asset II: 291.124 Km. OPGW fiber optic cable along with associated equipments (inclding 88.63 KM under cost apportionment with POWERTEL ) which are under commercial operation w.e.f. 1.7.2014 and Asset III: 1717.112 Km. OPGW fiber optic cable along with associated equipments (includeds 966.63 KM under cost apportionment with POWERTEL) which are under commercial operation w.e.f. 30.3.2015 under “Fiber Optic Communication system for central sector substations & Generating stations “ in Southern Region. 28-12-2015

Petition No. 276/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Mysore-Kozhikode 400 kV D/C Line along with new 400/220 kV Sub-station with 2x315 MVA ICT’s and 2x50 MVAR Switchable Line Reactors at Kozhikode & extension of Mysore Sub-station” under transmission systems associated with Kaiga 3&4 (2x235 MW) Project” in Southern Region. 28-12-2015

Petition No. 280/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset-I: Balance portion of 400 kV D/C Maithan Gaya transmission line CKT II including multi circuit, Asset-II: Balance portion of 400 kV D/C Maithan Gaya transmission line CKT I including multi circuit, Asset-III: 1 no. 400 kV Line Bay at 765/400 kV Gaya Sub-station (Koderma II Bay) and Asset IV: 765 kV Line Bay at 765/400 kV Gaya Sub-station associated with 765 kV S/C Gaya Balia transmission line under common scheme for 765 kV pooling stations and network for NR, import by NR from ER and from NER/SR/WR via ER and common scheme for network for WR and import by WR from ER and from NER/SR/WR via ER in Eastern Region. 28-12-2015

Petition No. 232/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.3.2019 for replacement of 2 x 315 MVA, 400/220 kV ICT with 2 x 500 MVA, 400/220 kV ICTs at Purnea Sub-station under “Eastern Region Strengthening SchemeXII” in Eastern Region. 28-12-2015

Petition No. 275/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for combined elements of Asset-I: 315 MVA ICT-IV along with associated bays at Moga Sub-station, Asset-II: ICT-II along with associated bays and 2 nos. PSEB line bays at Moga Sub-station under Augmentation of transformation capacity at Amritsar and Moga Sub-station in Northern Region. 18-12-2015

Petition No. 356/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Bina-Nagda transmission line along with associated bay equipment at Nagda and Bina Sub-station under “Transmission System associated with 400 kV Bina-Nagda D/C line “ in Western Region. 18-12-2015

Petition No. 365/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for combined Asset-1 comprising 400/220 kV Damoh Sub-station along with bays and 400 kV 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh Sub-station and combined Asset-2 comprising 400/220 kV ICT-I at Damoh Sub-station along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh Sub-station under WRSS-IV Transmission Scheme in Western Region. 18-12-2015

Petition No. 388/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Combined Assets of (i) Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays; (ii) 400/220 kV, 315MVA ICT-II at Satna Sub-station; (iii) Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; (iv) LILO of 400 kV Satna-Bina Ckt- I & II at Bina (PowerGrid) Sub-station; (v) Circuit IV of 400 kV D/C Satna-Bina transmission line; (vi) Circuit III of 400 kV D/C Satna-Bina transmission line; (vii) LILO of 400 kV D/C Raipur-Rourkela transmission line along with associated bays; and (viii) 400/220 kV 315 MVA ICT-II alongwith associated bays equipment at Raigarh Sub-station under Vindhyachal Stage-III transmission system in Western Region. 18-12-2015

Petition No. 425/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Kawas Transmission System in Western Region. 18-12-2015

Petition No. 444/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for LILO of Vemagiri-Gajuwaka 4000 kV D/C Line at Simhadri –II TPS under transmission system associated with Simhadri-II Generation Project in Southern Region. 18-12-2015

Petition No. 481/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (Asset-I) 400 kV Vindhyachal- Korba S/C transmission line, (Asset-II) 400 kV Itarsi- Indore S/C transmission line-1(Asset-III) 400 kV Vindhyachal- Jabalpur D/C transmission line-1 (Asset-IV) 400 kV Jabalpur- Itarsi D/C transmission line-1 (Asset-V) 400 kV Indore- Asoj S/C transmission line-2 under “ Vindhyachal Stage-I transmission system” in Western Region. 18-12-2015

Petition No. 533/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for transmission assets under System Strengthening-VIII in Southern Regional Grid in Southern Region. 18-12-2015

Petition No. 12/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff period for 400 kV Transmission System associated with Farakka (I&II) STPS in Eastern Region. 27-11-2015

Petition No. 57/TT/2014
Misc. Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in Eastern Region for the period 2009-14 block. 27.11.2015

Petition No. 204/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff blocks Transmission System associated with NLC Stage-l in Southern Region. 27.11.2015

Petition No. 486/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for LILO of 400kV D/C Siliguri-Rangit Line at Gangtok in Eastern Region. 27.11.2015

Petition No. 556/TT/2014
Truing up of Transmission tariff for 2009-14 tariff period Transmission Tariff for 2014-19 tariff period for combined assets of Ckt-I (Asset-I), Ckt-II (Asset-II) of 400 kV Teesta (Stage-V) Siliguri transmission line; and 315 MVA, 400/220 kV ICT-II at Baripada Sub-station along with associated bays (Asset-III) of transmission system under Teesta (stage-V) HEP in Eastern Region. 27.11.2015

Petition No. 435/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for combined assets of (i) Tala – Siliguri Transmission System and (ii) Remaining part of Tala - -Siliguri transmission System in Eastern Region. 27.11.2015

Petition No. 216/TT/2014
Approval of truing up of transmission tariff for the tariff period 2009-14 and transmission tariff for the tariff period 2014-19 for Neelamangala - Mysore 400kV DIC Transmission Line along with 2 X 315MVA, 4001220kV lCTs at Mysore Substation (01.05.2006) in Southern Region. 27.11.2015

Petition No. 60/TT/2015
Truing up of Transmission tariff for 2009-14 tariff period and determination of Transmission Tariff for 2014-19 tariff period for 2014-19 Chukha Transmission System in Eastern Region. 27.11.2015

Petition No. 407/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff block for Madurai- Trivandrum 400 kV D/C Transmission System in Southern Region. 27.11.2015

Petition No. 74/TT/2015
Approval of truing up of transmission tariff for the tariff period 2009-14 and transmission tariff for the tariff period 2014-19 for Up-gradation of transfer capacity of Talcher-Kolar HVDC Bi-pole in Southern Region. 27.11.2015

Petition No. 212/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for combined elements of Kaiga - Narendra 400kV D/C transmission line (DOCO: 01.11.2005), 400/220kV Sub-station at Narendra with one 315MVA ICT (DOCO: 01 .11.2005) and 2nd 315MVA ICT at Narendra Sub-station (DOCO: 01.09.2006) under Kaiga- Narqndra Transmission System in Southern Region. 27.11.2015

Petition No. 435/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for combined assets of (i) Tala – Siliguri Transmission System and (ii) Remaining part of Tala - -Siliguri transmission System in Eastern Region. 27.11.2015

Petition No. 499/TT/2014
- Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for combined elements of Talcher and Kolar (HVDC portion) and combined elements of Talcher and Kolar (AC portion) under "Transmission System associated with Talcher -II Project" in Southern Region. 27.11.2015

Petition No. 535/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV Kahalgaon transmission system in Eastern Region. 27.11.2015

Petition No. 539/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission System associated with NLC Stage-II in Southern Region. 27.11.2015

Petition No. 545/TT/2014
Approval of truing up of charges for the tariff period 2009-14 and determination of fees and charges for the tariff period 2014-19 for Unified Load Dispatch & Communication Scheme (Power Grid Portion i.e. communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Southern Region. 27.11.2015

Petition No. 161/TT/2015
Determination transmission tariff for tariff block 2014-19, i.e., from COD (21.6.2014) to 31.3.2019, for (a) Kurnool-Raichur 2nd 765 kV S/C line (b)Extension of Kurnool 765/400 kV Sub-station and (c) Extension of Raichur765/400 kV Sub-station under “Common System associated with ISGS projects in Krishnapatnam area of Andhra Pradesh in Southern Region. 18.11.2015

Petition No. 27/TT/2014
Approval for determination of transmission tariff from DOCO to 31.3.2019 for (A) LILO of N`Sagar- Gooty 400kV S/C line at Kurnool (New) Sub-station, (B) Kurnool (New) – Kurnool (APTRANSCO) 400 kV D/C quad line, (C) Establishment of new 765/400 kV Sub-station at Kurnool with 2x1500 MVA transformers, (D) Extension of Kurnool (APTRANSCO) substation and (E) 1x240 MVAR bus reactor at Kurnool (new) Sub-station under “Transmission System associated with Krishnapatnam UMPP part C1” in Southern Region for tariff block 2014-19. 18.11.2015

Petition No.560/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Kahalgaon St-II, Ph - I transmission system in Eastern Region, Northern Region and Inter-regional link between Northern and Western Region. 16.11.2015

Petition No.488/TT/2014
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for (a) 400kV Ramagundam-Hyderabad D/C transmission line, (b) 400 kV S/C Hyderabad- Kurnool-Gooty transmission line, (c) 400 kV S/C Gooty-Neelmangla transmission line and (d) 400 kV S/C Khammam-Nagarjunasagar transmission line along with associated bays and equipment (Notional DOCO 1.5.2005) under Ramagundam Stage-III Transmission System in Southern Region. 16.11.2015

Petition No.485/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Combined asset of System Strengthening Scheme for Eastern Region (ERSS) (Formerly part of Tala Supplementary Scheme) in Eastern Region. (4(No.s) Assets). 16.11.2015

Petition No.364/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for 400 kV D/C Dhauliganga HEP Bareilly (UPPCL) Transmission Line along with its associated bays at Bareilly(UPPCL) in Northern Region. 16.11.2015

Petition No.173/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for LILO of 1stCkt. (Asset-I) and 2ndCkt. (Asset-II) of Patratu-Hatia-Chandil 220 kV D/C line at Ranchi Sub-Station (Notional DOCO-01.09.2007) associated with 220 kV Interconnection with Jharkhand State Electricity Board (JSEB) system at Ranchi Sub-Station in Eastern Region. 16.11.2015

Petition No.38/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 of Transmission System associated with TALA HEP East-North Inter-connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region . 16.11.2015

Petition No.35/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Transmission System associated with Ramagundam STPP including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region. 16.11.2015

Petition No. 433/TT/2014
Truing up Transmission tariff for 2009-14 tariff block (ii) Transmission tariff for 2014-19 tariff block for 2nd 400 kV D/C Kahalgaon – Biharsharif Transmission Line in Eastern Region. 16.11.2015

Petition No. 411/TT/2014
Transmission tariff for 2014-19 tariff block, i.e., from DOCO (1.4.2014) to 31.3.2019, for LILO of 1st ckt of 400 kV D/C Parbati-II-Koldam Transmission Line at Parbati Pooling Station (Banala) under Transmission System associated with Parbati-III HEP in Northern Region. 16.11.2015

Petition No. 429/TT/2014
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation-6 of Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations, 2009 and CERC (Terms & Conditions of tariff) Regulations, 2014 for determination of (i) Truing up Transmission Tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand-Dadri HVDC Bipole Terminal in NR. 16.11.2015

Petition No.102/TT/2014
Determination transmission tariff for LILO of existing Kolar-Sriperumbudur 400 kV S/C line at Thiruvalam along with associated bays under “SYSTEM STRENGHENING- XIX” in Southern Region from DOCO to 31.3.2019 for tariff block 2014-19. 16.11.2015

Petition No.78/TT/2015
Approval of transmission tariff for (A) 80 MVAR line reactor of Barh-I (charged as bus reactor) at Gorakhpur Extn. and (B) 80 MVAR line reactor of Barh-II (charged as bus reactor) at Gorakhpur Extn. under “BARH-TPS II” in Northern Region. 16.11.2015

Petition No.34/TT/2014
Determination Transmission tariff for (a) Asset I:Balance portion of 400 kV D/C Jamshedpur-Bariprada Transmission Line and associated bays at Jamshedpur, (b) Asset II: 02 Nos. 400 kV bays at Durgapur S/s under ERSS-I in Eastern Region for tariff block 2009-14. 16.11.2015

Petition No.9/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of transmission tariff for the tariff block 2014-19 for Transmission System associated with 400 kV Central Transmission Project-I in Southern Region. 16.11.2015

Petition No.359/TT/2014
Truing up of transmission tariff for the tariff block 2009-14 and transmission tariff for the tariff block 2014-19 for combined elements of (a) 220 kV D/C RAPP-B-Chittorgarh Transmission Line (b) 220 kV S/C RAPP-B-Udaipur Transmission Line along with associated bays at Udaipur end and LILO of 220 kV D/C RAPP-KOTA Line at RAPP-B including PLCC system (c) 220 kV S/C RAPP-B-Anta Transmission Line with associated bays at Anta end for Transmission System associated with RAPP-B Project in Northern Region. 16.11.2015

Petition No.509/TT/2014
Truing up of transmission tariff for 2009-14 tariff block transmission tariff for 2014-19 tariff blocks for 500 MW HVDC back to back station at Gazuwaka (Asset-I), Vijaywada- Gazuwaka 400 kV D/C Line and 50% FSC Jeypore-Gazuwaka 400 kV S/C T/L at Jeypore (Asset-II) and (a) 40% FSC on Rengali- Indravati 400 kV S/C T/L & (b) 40% FSC on Meramundali- Jeypore 400 kV S/C T/L at Jeypore (Asset-III) under “Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” in Southern Region and Eastern Region. 14.11.2015

Petition No. 537/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Transmission System associated with Auraiya Gas Power Project in Northern Region. 06.11.2015

Petition No. 531/TT/2014
Determination of Transmission tariff of Shifting of 50 MVAR Line reactor from Rengali to Baripada end under Transmission System associated with Teesta (Stage –V) HEP in Eastern Region for 2009-14 and 2014-19. 06.11.2015

Petition No. 513/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Singrauli Transmission System in Northern Region. 06.11.2015

Petition No. 446/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for: (A) Stage-I Combined Assets (Notional DOCO: 1.10.2003): consisting of (a) 400 kV Meerut-Mandolackt-I along with associated bays at Meerut and Mandola Substations (DOCO: 1.10.2003), (b) 400 kV Meerut-MandolaCkt-II along with associated bays at Meerut and Mandola Sub-stations (DOCO: 1.4.2003) (c) ICT-II along with associated bays at Meerut Sub-station (DOCO: 1.4.2003), (d) ICT-III along with associated bays at Meerut sub-station (DOCO: 1.7.2003) and (B) Stage-II Combined Assets (Notional DOCO: 1.2.2007): consisting of (e) ICT-I along with associated bays at Meerut Sub-station (DOCO: 1.8.2005), (f) 800 kV Tehri-Meerut ckt-I along with associated bays (DOCO: 1.4.2006), (g) 800 kV Tehri-Meerut ckt-II and 400 kV S/C Meerut- Muzaffarpur transmission line (DOCO: 1.6.2006) and (h) ICT at Muzaffarnagar along with one No. 400 kV and one No. 220 kV bay (DOCO: 1.2.2007) under Tehri Transmission System in Northern Region . 06.11.2015

Petition No. 369/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and Transmission Tariff for the tariff block 2014-19 for (a) Neelamangala-Somanahalli 400 kV D/C line along with bays; and (b) Gooty-Raichur 400 kV D/C transmission line with bays under system strengthening-III for the period from 1.4.2009 to 31.3.104 in Southern Region. 06.11.2015

Petition No. 429/TT/2014
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation-6 of Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations, 2009 and CERC (Terms & Conditions of tariff) Regulations, 2014 for determination of (i) Truing up Transmission Tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand-Dadri HVDC Bipole Terminal in NR. 06.11.2015

Petition No. 248/TT/2013
Approval of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 06.11.2015

Petition No. 133/TT/2015
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Condition of Tariff) Regulations, 2014 for determination of (i) Truing up of Transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand Transmission System (DOCO 1.4.1992) in North Region. 06.11.2015

Petition No.Petition No. 106/TT/2014
Approval for determination of transmission Tariff of Asset 1: 400 KV D/C (Quad) ranchi (New)-Ranchi(old)I CKT I Transmission line and associated 400 KV line bays at Ranchi (New) S/S & Ranchi (old) Sub-station (DOCO: 01.02.2014), Asset 2: 765/415 KV, 3X500 MVA ICT-II at Ranchi alongwith asssociated bays at 765 KV Ranchi (New) SS (DOCO: 01.02.2014) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western region for tariff block 2009-14 period. 06.11.2015

Petition No. 213/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Farakka-Malda Transmission Link and Additional 315 MVA Transformer at Malda in Eastern Region. 09.10.2015

Petition No. 215/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for 400 kV Talcher-Meramundali Transmission System in Eastern Region. 09.10.2015

Petition No. 239/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for 50 MVA Auto Transformer at Malda Sub-station in Eastern Region. 09.10.2015

Petition No. 222/TT/2014
Truing up transmission tariff for 2009-14 tariff block and dtermination of transmission tariff for 2014-19 tariff for 2014-19 tariff block for 63 MVAR Line Reactor on 400 kV Kolaghat-Rengali Line at Rengali Sub-station in Eastern Region. 09.10.2015

Petition No. 223/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission Tariff for 2014-19 tariff for 2014-19 tariff block for 400/220 kV 315 MVA Transformer at Jeypore along with associated Bays in Eastern Region. 09.10.2015

Petition No. 224/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff for 2014-19 tariffblock for Rangit Transmission System in Eastern Region. 09.10.2015

Petition No. 175/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for 400 KV S/C Jamshedpur – Rourkela (Ckt. II) transmission line along with associated bays in Eastern Region. 28.09.2015

Petition No. 176/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for Hathidah River Crossing section of 220 kV D/C Biharshariff- Begusarai Transmission Line in Eastern Region. 28.09.2015

Petition No. 183/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for 400 kV Biharshariff- Sasaram- Sarnath Transmission Lines along with bays etc under Eastern-Northern inter-regional HVDC Transmission System in Eastern Region. 28.09.2015

Petition No. 200/TT/2014
Petition for Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of 400 kV D/C Bongaigaon-Malda Line at Purnea & sub-station at Purnea (New) in Eastern Region. 28.09.2015

Petition No. 173/TT/2014
Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of 1st Ckt. (Asset-1) and 2nd Ckt. (Asset-II) of Patratu-Hatia-Chandil 220 kV D/C Line at Ranchi Sub-Station (Notional DOCO – 01.09.2007) associated with 220kV Interconnection with Jharkhand State Electricity Board (JSEB) system at Ranchi Sub-Station in Eastern Region. 28.09.2015

Petition No. 182/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Dehri – Karamnasa transmission System in Eastern Region. 28.09.2015

Petition No. 198/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for LILO of Purnia -Dalkola 132 kV S/C line and extension at Purnia Sub-station in Eastern Region. 28.09.2015

Petition No. 199/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Bihar grid strengthening scheme in Eastern Region. 28.09.2015

Petition No.142/TT/2015
Petition for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset I: 1 No of 125 MVAR Reactor at Rourkela & associated bay under Transmission System for Eastern Region Strengthening Scheme-VIII in ER. 09.09.2015

Petition No.136/TT/2015
Determination of Transmission Tariff from anticipated DOCOs to 31/03/2019 for Asset I: Split Bus Arrangement at Durgpaur Sub-station, and Asset II: Split Bus Arrangement at Maithon Sub-station under Split Bus arrangement for various substations in Eastern Region. 09.09.2015

Petition No.106/TT/2014
Approval for determination of transmission Tariff of Asset 1: 400 KV D/C (Quad) ranchi (New)-Ranchi(old)I CKT I Transmission line and associated 400 KV line bays at Ranchi (New) S/S & Ranchi (old) Sub-station (DOCO: 01.02.2014), Asset 2: 765/415 KV, 3X500 MVA ICT-II at Ranchi alongwith asssociated bays at 765 KV Ranchi (New) SS (DOCO: 01.02.2014) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via in Western region for tariff block 2009-14 period. 07.09.2015

Petition No.105/TT/2014
Approval for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset: Combined assets of Ranchi (i) 400 KV D/C (Quad) Ranchi (old)- Ranchi (New)-I Ckt II transmission line along with associated bays at Ranchi (old) and Ranchi (New);(ii) 400 KV D/C (quad) Ranchi (old)- Ranchi (New)-II transmission line along with associated bays at Ranchi (old) and Ranchi(New);(iii) 765/400KV, 3x500 MVA ICTI at along with associated bays at 765 KV Ranchi(New) S/s under Common Scheme for 765 KV Pooling Stations and Network for NR (Common for Sasan UMPP+ NKP+Maithon/Koderma/Mejia/Bokaro/Raghunathpur/Durgapur+ Import by NR from ER and from NER/SR/WR via ER) and common scheme for network for WR (Common for NKP+ Maithon/Koderma/Mejia/Bokaro+ Raghunathpur/Durgapur+ Import by WR from ER and from NER/SR/WR via ER in Western Region. 07.09.2015

Petition No.62/TT/2015
Approval of transmission tariff for assets associated with nrsss xxvii in northern region for tariff block 2014-19. 07.09.2015

Petition No.127/TT/2014
Determination of Transmission Tariff for LILO of both circuits of Tuticorin JV- Madurai 400 kV D/C (Quad) line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin (initially charged at 400 KV) including 1X 80 MVAR, 400 KV Bus Reactor under Transmission System associated with Common System Associated with Costal Energen Private Limited & Ind- Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area- PART-A in SR. 01.09.2015

Petition No. 405/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for Vijayawada-Nellore 400 kV D/C line along with the extension of 400/220 kV substations at Vijayawada & Nellore AP and 1x63 MVAR line reactor at both ends of each circuit of Vijayawada-Nellore 400 kV D/C line under Transmission system associated with System strengthening –XVIII in southern regional grid. 11.09.2015

Petition No. 117/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for Asset-I: 400 kV, 125 MVAR Bus Reactor at Raipur sub-station, Asset:2: 400KV, 125MVAR Bus Reactor at Seoni sub-station, Asset-3: 400 kV, 63 MVAR Line Reactor at Raipur Substation under Installation of Reactors (Part-II) in WR. 11.09.2015

Petition No.137/TT/2015
Approval of transmission tariff for LILO of 2nd circuit of 400 kV Nathpa Jhakri-Nalagarh (Triple Snowbird) Line at Rampur under Transmission System associated with Rampur HEP in Northern Region. 01.09.2015

Petition No.132/TT/2015
Approval of transmission tariff for Asset I: Balance portion of 400 kV D/C KodarmaGaya T/L CKT-II including multi circuit portion, Asset II: Balance portion of 400 kV D/C Kodarma-Gaya T/L CKT-I including multi circuit, and Asset III: 400 kV D/C Bokaro TPS Extension- Kodarma TPS Line and PLCC Equipment for Kodarma TPS- Bokaro TPS line associated with Supplementary Transmission System under DVC and Maithon Right Bank Project in Eastern Region for tariff block 2014-19. 01.09.2015

Petition No.245/TT/2014
Determination of Transmission tariff for assets under Common System associated with ISGS projects in Krishnapatnam area of AP”” for tariff block 2014-19. 24.08.2015

Petition No.307/TT/2013
Transmission Tariff for Asset-I 765/400 kV 3*500MVA ICT-2 at Raigarh PS (Near Tamnar) alongwith with associated bays, Asset-II 765/400 kV 3*500 MVA ICT-3 at Raigarh PS (Near Tamnar) alongwith with associated bays and Asset-III 765 kV S/C Champa Pooling Station -Dharamjaygarh S/s T/L & Bays at Dharmjaygarh S/s only under Establishment of Pooling station at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/WR1-IPPB) in Western Region for tariff block 2009-14. 25.08.2015

Petition No.32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for Tariff Block 2009-2014. 25.08.2015

Petition No.38/TT/2014 & 141/TT/2015
Determination of transmission tariff for assets associated with Transmission System for connectivity of M.B. Power (M.P.) Limited in Western Region (Petition No. 38/TT/2014) and Determination of transmission tariff for MB TPS (Anuppur)- Janalpur Pooling Station 400 kV D/C (Triple Snowbird) Line under “Transmission System for connectivity of MB Power Ltd.” in Western Region for tariff block 2014-19 24.08.2015

Petition No.242/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 Damoh S/S (anticipated DOCO 15.8.2014), (B) 1*125 MVAR Bus Reactor at 400 kV Bachau S/S (anticipated DOCO 1.9.2014) (C) 1*125 MVAR Bus Reactor at 400 kV Pirana S/S (anticipated DOCO 1.9.2014) (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi S/S (anticipated DOCO 15.7.2014) (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi S/S (anticipated DOCO 15.9.2014) (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior S/S (anticipated DOCO 1.7.2014) under Installation of Reactors (Part-II) in Western Region. 20.08.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Western Region. 20.08.2015

Petition No.110/TT/2014
Determination of transmission tariff from DOCO to 31.03.2019 for Establishment of 2x315 400/220 kV GIS S/S at Kala in UT of D&NH & LILO on one circuit of 400 kV D/C Vapi – Navi Mumbai Transmission Line at Kala S/S (Multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220 kV GIS Substation at Kala in UT D&NH in Western Region. 20.08.2015

Petition No.287/TT/2013
Determination of transmission tariff for 400 kV D/C (Quad) Vadodara-Asoj Transmission Line along with associated bays at Asoj (GETCO Sub-station) under System Strengthening Scheme in North/West Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 kV D/C Vadodara-Pirana Tr. Line) by passing Vadodara Pooling Sub-station under interim arrangement in Western Region for tariff block 2009-14. 20.08.2015

Petition No.166/TT/2013
Determination of transmission tariff (i) Raighar pooling station (Near Kotra)-Raipur pooling station (near Tamnar) 765 kV D/C T/L with associated bays, (ii) 765/400 kV 1500 MVA Auto-Transformer and 765 kV 4*80 MVAR Bus Reactor at Raighar (near Tamnar) with associated bays under “Establishment of pooling stations at Raighar (near Kotra) and Raighar (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/ WRI-IPPB)” in Western Region for tariff block 2009-14. 20.08.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Western Region. 20.08.2015

Petition No.100/TT/2014
) Approval under regulation-4(3(ii) of CERC (Terms and conditions of Tariff) Regulations' 2104 and Regulation-24 of CERC (Conduct of Buisness) Regulations' 1999 for commissioning date. 20.08.2015

Petition No. 99/TT/2014
Approval under regulation-86 of CERC (Conduct of Buisness) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of transmission tariff from DOCO to 31.3.2019 for 400/220 kV, 315 MVA ICT-II along with associated bays at Hamirpur S/S in Northern Region. 20.08.2015

Petition No.29/TT/2014
Determination of transmission tariff from DOCO to 31.3.2014 for "400 kV Dharampuri (Salem New) – Simanahalli 400 kV D/C Quad Line along with Bay Extensions at Dharamapuri (Salem New) and Somanahalli Substation" under Transmission System associated with "System Strengthening in Southern Region – XIV" in Southern Region for tariff block 2009-14. 20.08.2015

Petition No. 25/TT/2014
Determination of transmission tariff for 400 kV Salem Pooling Station-Salem 400 kV D/C Quad Line along with new 765/400 kV Pooling Station at Salem (initially charged at 400 kV) and Bay Extension at Salem 400/220 kV existing Sub-station(Asset I) under Transmission System associated with Common System Associated with Costal Energen Private Limited & Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area-part-B in Southern Region. 18.08.2015

Petition No. 109/TT/2014
Determination of transmission tariff for Asset-I: 400/220 kV 1X500 MVA Transformer at Navasari Sub-station, Asset-II: 2 nos 400 kV line bays at 765/400 kV Indore Sub-station, Asset III: 2 nos 220 kV line bays at 400/220 kV Pirana Sub-station under “Augmentation of Transformer and Bays” in Western Region. 19.08.2015

Petition No.34/TT/2013
Transmission Tariff for D/C Kisenpur Wagoora T/L alongwith bays at New Wanpoh and other elements in NRSS-XVI. 19.08.2015

Petition No.101/TT/2014
Determination of Transmission Tariff from DOCO to 31.3.2014 for 3X110 MVAR Line reactor for 2 Nos. 80 MVAR Line reactor for 400 kV D/C Wardha – Aurangabad TL Ckt#1 & 2 charged as bus reactor 1 & 2 at 400/220 kV Aurangabad S/S under Mundra UMPP in Western Region. 19.08.2015

Petition No.301/TT/2013
Determination of transmission tariff for (A) 400 kV 125 MVAR bus reactor at 765 kV Indore sub-station along with associated bays (B) 400 kV 125 MVAR bus reactor-I and bus reactor-II at 765 kV Gwalior sub-station along with associated bays (C)765 kV D/C Jabalpur pooling station-Bina ckt-I with 240 MVAR switchable line reactors and associated bays (D) 765 kV D/C Jabalpur Pooling station-Bina Ckt-II with 240 MVAR switchable line reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 19.08.2015

Petition No.241/TT/2013
Determination of transmission tariff for 220 kV D/C Vapi-Khadoli transmission line along with its associated bays under WRSS-V Transmission System in Western Region. 17.8.2015

Petition No.116/TT/2014
Approval for determination of Transmission Tariff from DOCO to 31.03.2019 for (A) 420KV, 125MVAR Bus Reactor at Jabalpur sub-station (DOCO: 01.04.2014)(C)420KV, 125MVAR Bus Reactor at Bhatapara Substation(Ant DOCO:01.07.2014)(D) 420KV, 125MVAR Bus Reactor at Raighar Substation (Ant DOCO:01.07.2014)(E) 420KV, 80MVAR Switchable Line Reactor at Solapur Substation(Ant. DOCO:01.07.2014)(F) 420KV, 125MVAR Bus Reactor at Aurangabad Substation(DOCO30.04.2014) under “Installation of Reactors” in Western Region. 17.8.2015

Petition No.115/TT/2014
Determination of transmission tariff for Asset-I: 765 kV 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and Asset-II: 765 kV, 240 MVAR Switchable line reactor of 765 kV D/C Aurangabad-Padghe line Ckt-II to be charged as bus reactor at Aurangabad Sub-station under “System Strengthening in North/West part of WR for IPP Projects in Chhatisgarh (IPP-E)” in Western Region. 17.8.2015

Petition No.108/TT/2014
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for Tariff block 2009-14 period in Northern Region. 17.8.2015

Petition No. 37/TT/2013
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for Tariff block 2009-14 period in Northern Region. 17.8.2015

Petition No. 106/TT/2014
Determination of transmission tariff for assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region. 07.08.2015

Petition No.422/TT/2014
Determination of transmission tariff for assets under “Transmission System for Phase-I Generation Projects in Orissa Part-C” for tariff block 2014-19. 06.08.2015

Petition No.303/TT/2013
DeterminationDetermination of transmission tariff for Asset-I: 765/400 kV, 1500 MVA ICT-1 along with associated bays at Jabalpur pooling sub-station (New) and Asset-II: 400 KV D/C (Quad) Jabalpur pooling sub-station (New)-Jabalpur (existing) sub-station T/L along with associated bays under “Transmission System for Phase-1 Generation projects in Orissa-part B” in Western Region for tariff block 2009-14 period. 05.08.2015

Petition No.40/TT/2014
Determination of Transmission tariff for 765/400 kV, 1X1500 MVA, ICT-1 at Dharmjaygarh Sub-station along with associated bays under “Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 04.08.2015

Petition No.305/TT/2013
Determination of Transmission tariff for 765/400 kV, 1X1500 MVA, ICT-2 at Dharmjaygarh Sub-station along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh. 03.08.2015

Petition No. 107/TT/2014
Determination of Transmission Tariff from 01.04.2014 to 31/03/2019 for (A) 765 kV S/C Bareilly- Lucknow Transmission Line at 400 KV Level, (B) One Circuit of 400 kV D/C Bareilly (New) - Bareilly (Existing) Transmission Line under "Northern Region System Strengthening Scheme XXI" in Northern Region. 03.08.2015

Petition No. 281/TT/2013
Determination of transmission tariff from DOCO to 31.3.2014 for augmentation of Hosur sub-station by 1x315 MVA 400/220 kV transformer and associated bays (Ant. DOCO: 1.2.2014) under System Strengthening – XIV in Southern Region. 03.08.2015

Petition No. 124/TT/2014
Approval for determination of Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for (a) LILO of Nagarjunsagar –Raichur 400 kV S/C Line at Mehboobnagar and (b) LILO of both the Circuits of Nellor – Sriperumbudur 400 kV D/C line at Almathi along with associated bays under system Strengthening Scheme-IV in Southern Region. 29.07.2015

Petition No. 102/TT/2014
Determination of transmission tariff for LILO of existing Kolar – Sriperumbudur 400 kV S/C line at Thiruvalam along with the associated bays under "System Strengthening – XIX" in Southern Region for tariff block 2014-19 . 30.07.2015

Petition No. 48/TT/2013
Determination of transmission tariff for Vallur TPS- Melakottaiyur 400 kV D/C Line under supplementary Transmission System associated with Vallur TPS for the period from COD to 31.3.2014 in Southern Region for tariff block 2009-14. 03.08.2015

Petition No. 105/TT/2014
Approval for transmission tariff of Combined Assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for Network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2014-19. 29.07.2015

Petition No. 291/TT/2013
Determination of transmission tariff for Line Bays and Rectors at 765/400 kV Raichur and Solapur Powergrid S/S for Raichur-Solapur Transmission Line under Transmission System associated with Synchronous Inter- Connection between SR and WR in SR & WR. 29.07.2015

Petition No. 227/TT/2014
Determination of transmission Tariff for assets under Line bays and reactor provision at Powergrid Sub-station associated with system strengthening for Western Region. 20.07.2015

Petition No. 185/TT/2014
Determination of transmission tariff of assets under Transmission System associated with Mundra Ultra Mega Power Project (UMPP) in Western Region from COD to 31.3.2014. 15.07.2015

Petition No. 436/TT/2014
Determination of transmission tariff for 400 kV D/C Sagardighi-Behrampur transmission line and associated bays at Sagardighi TPS (WBPDCL) and Behrampur Sub-station (Powergrid) under Transmission System for ‘’Eastern Region Strengthening Scheme-X in Eastern Region from COD to 31.3.2019. 15.07.2015

Petition No.258/TT/2013
Determination of transmission tariff for Tiruvalam (Powergrid)-Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipment under Supplementary Transmission system associated with Vallur TPS in Southern Region from COD to 31.3.2014 17.7.2015

Petition No. 141/TT/2015
Determination of Transmission Tariff from DOCO to 31.3.2019 for MB TPS (Annuppur)-Jabalpur Pooling Station 400 kV D/C (Triple Snowbird) Line only under "Transmission System for connectivity of MB Power (M.P.) Ltd." in Western Region for tariff block 2014-19. 16.7.2015

Petition No.487/TT/2014
Determination of Fees and Charges for Fibre Optic Communication System in lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links (Part-II) in Southern Region for the period 2009-14. 13.7.2015

Petition No. 28/TT/2014
Determination of transmission tariff for “Loop-out of 220 kV Jalandhar-Hamirpur line at Hamirpur (to be used as LILO of 1st Ckt of 220 kV Hamirpur-Jalandhar T/L)” (COD: 1.1.2014) under Strengthening Scheme in Northern Region, for the tariff block 2009-14 period in Northern Region. 10.7.2015

Petition No. 337/2010
Order dated 18.05.2015 in pettition no. 337/2010 on TDS reg. 07.7.2015

Petition No. 29/TT/2014
Determination of transmission tariff from DOCO to 31.3.2014 for "400 kV Dharampuri (Salem New) – Simanahalli 400 kV D/C Quad Line along with Bay Extensions at Dharamapuri (Salem New) and Somanahalli Substation" under Transmission System associated with "System Strengthening in Southern Region – XIV" in Southern Region for tariff block 2009-14. 29.6.2015

Petition No. 242/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 Damoh S/S (anticipated DOCO 15.8.2014), (B) 1*125 MVAR Bus Reactor at 400 kV Bachau S/S (anticipated DOCO 1.9.2014) (C) 1*125 MVAR Bus Reactor at 400 kV Pirana S/S (anticipated DOCO 1.9.2014) (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi S/S (anticipated DOCO 15.7.2014) (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi S/S (anticipated DOCO 15.9.2014) (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior S/S (anticipated DOCO 1.7.2014) under Installation of Reactors (Part-II) in Western Region. 29.6.2015

Petition No.298/TT/2013
Determination of transmission tariff for 02 Nos 400 kV Line Bays at 400 kV Ranchi Sub-station for Raghunathpur TPS-Ranchi Transmission Line under “Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER” in Eastern Region for tariff block 2009-14 period. 10.6.2015

Petition No.142/TT/2014
Determination of transmission tariff for extension of bays at 765/400 kV Indore Sub-station including Switchable Line Reactor (3*80 MVAR, 765 kV) at Indore (initially charged as bus reactor under Interim Contingency Scheme till readiness of 765 kV S/C Indore-Vadodara T/L) & 765 kV Indore-Vadodara T/L (for direct inter-connection with 400 kV D/C Vadodara-Asoj T/L) by- passing Vadodara Pooling S/S under Interim Contingency Scheme under IPP projects in MP & Chhatisgarh in Western Region. 10.6.2015

Petition No.243/TT/2014
Determination of transmission tariff for Special Protection Scheme (SPS) for Northern Regional Grid Stage-II for tariff block 2014-19 in Northern Region. 27.5.2015

Petition No.115/TT/2014
Determination of transmission tariff for Asset-I: 765 kV 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and Asset-II: 765 kV, 240 MVAR Switchable line reactor of 765 kV D/C Aurangabad-Padghe line Ckt-II to be charged as bus reactor at Aurangabad Sub-station under “System Strengthening in North/West part of WR for IPP Projects in Chhatisgarh (IPP-E)” in Western Region. 26.5.2015

Petition No.109/TT/2014
Determination of transmission tariff for Asset-I: 400/220 kV 1X500 MVA Transformer at Navasari Sub-station, Asset-II: 2 nos 400 kV line bays at 765/400 kV Indore Sub-station, Asset III: 2 nos 220 kV line bays at 400/220 kV Pirana Sub-station under “Augmentation of Transformer and Bays” in Western Region. 25.5.2015

Petition No. 110/TT/2014
Determination of transmission tariff from DOCO to 31.03.2019 for Establishment of 2x315 400/220 kV GIS S/S at Kala in UT of D&NH & LILO on one circuit of 400 kV D/C Vapi – Navi Mumbai Transmission Line at Kala S/S (Multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220 kV GIS Substation at Kala in UT D&NH in Western Region 20.5.2015

Petition No. 163/TT/2013
Determination of transmission tariff for 500 MVA 400/220 KV ICT at Moga (DOCO: 1.7.2013) under the Augmentation of Transformation capacity in NR- Part A for Tariff Block 2009-14 in NR 18.5.2015

Petition No. 60/TT/2013
Approval of Transmission tariff for Asset-I: Part of 400 kV D/C Vapi-Navi Mumbai transmission line (from Vapi Gantry till 1st M/C point at Loc. AP-18) along with bay at Vapi under “WRSS-V Transmission System (executed in contingency arrangement to make it Vapi-Navsari TL)” in Western Region for the period from COD to 31.3.2014. 14.05.2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014 20-03-2015

Petition No. 47/TT/2014
Determination of transmission tariff for Assets under "Transmission system strengthens in Western part of WR for IPPs generation projects in Chhattisgarh (IPP D)" in Western Region for the period from COD to 31.3.2014. 14.05.2015

Petition No.44/TT/2014
Determination of transmission tariff for (a) 3x80 MVAR line reactor with associated bays at Gwalior Sub-station used as bus reactor till commissioning of 765 kV Bina-Gwalior Ckt-3, (b) 3x80 MVAR line reactor with associated bays at Bina Sub-station to be used as bus reactor till commissioning of 765 kV Bina-Gwalior Ckt-3, (c) 765 kV S/c Bina-Gwalior Ckt-3 under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for tariff block 2009-14. 08.05.2015

Petition No. 91/MP/2014
Non-submission of the details of backing down instructions issued by SLDC, Tamil Nadu to wind energy sources and conventional energy sources generators as per the specified format. 07.05.2015

Petition No.450/TT/2014
Determination of transmission tariff for Asset-I:3x80 MVAR switchable line reactor for 765 kV S/C Gaya-Balia transmission line at Gaya Sub-station, Asset- II:3x80 MVAR switchable line reactor for 765 kV S/C Ranchi-Dharamjaygarh transmission line along with associated bays at Ranchi Sub-station as bus reactor and Asset-III:3x80 MVAR switchable line reactor for 765 kV S/C Gaya-Varanasi transmission line along with associated bays at Gaya Sub-station as Bus Reactor under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part -A2. 08.05.2015

Petition No. 41/TT/2013
Approval of transmission tariff for Asset-I:765 kV 240 MVAR Switchable Line Reactor under Bus Reactor at Balia Sub-station and Asset-II: 765 kV Line bays at Sasaram Sub-station (for 765 kV Sasaram-Fatehpur TL under SASAN Project) from DOCO to 31.3.2014. 07.05.2015

Petition No. 362/TT/2014
Approval of transmission tariff for 500 MVA 400/220 kV spare transformer for Northern Region at Neemrana under Augmentation of Transformers in Northern region part-A of Northern region, for tariff block 2009-14 in Northern Region. 06.05.2015

Petition No. 98/TT/2013
Determination of transmission tariff for spare ICT at Bhiwadi under Provision of Spare interconnecting transformers (ICTs) and Reactors for Northern, Eastern, Southern and Western Region for tariff block 2009-14. 06.05.2015

Petition No.35/TT/2013
Approval of transmission tariff for 400 kV D/C Kishenpur-Samba transmission line along with bays at both ends, 01 no. 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 3 nos. 220 kV line bays under Northern Region System Strengthening scheme-XXII in Northern Region for tariff block 2014-19. 01.05.2015

Petition No.77/TT/2015
Approval of transmission tariff for Asset: 2 nos. 400 kV line bays at Bhiwani (POWERGRID) Sub-station under “Construction of 2 nos. 400 kV line bays at Bhiwani” in Northern Region. 01.05.2015

Petition No.26/TT/2014
Determination of Transmission Tariff for "500 MVA, 400/220/33 kV ICT-II along with associated bays at Moga sub-station" and "500 MVA 400/220/33 kV ICT-II along with associated bays at Ludihana sub-station" under the "Augementation of transformation capacity in Northern Region- Part-A" for tariff block 2009-14 period in Northern Region 28.4.2015

Petition No.477/TT/2014
Approval of transmission tariff for 80 MVAR Bus Reactor at Kotputli Sub-station under Northern Region System Strengthening Scheme-XV in Northern Region (Actual COD: 10.9.2014) for tariff block 2014-19. 29.4.2015

Petition No.410/TT/2014
Approval of transmission tariff for six assets (A) ICT 500 MVA 400/220 kV Bassi Extension Sub-station, (B) ICT 315 MVA 400/220 kV Allahabad Extension Sub-station, (C) ICT 500 MVA 400/220 kV Meerut Extension Sub-station, (D) 400/220 kV, 105 MVA ICT along with associated bays at Wagoora Sub-station, (anticipated DOCO for assets from (A) to (D)- 1.11.2014), (E) 500 MVA, 400/220/33 kV ICT along with associated bays at Ludhiana Sub-station (actual DOCO-1.4.2014) and (F) 2 no. of 220 kV bays at Ludhiana Sub-station (anticipated DOCO-1.11.2014) under the “Augmentation of Transformers in Northern Region-Part-A. 28.4.2015

Petition No.202/TT/2014
Approval of transmission tariff from COD 31.3.2019 for Asset-1 – Splitting of 400KV Raipur Bus through Bus Sectionaliser into two sections at a point between existing Line Bays of Chandrapur – 1 and Chandrapur – 2 and shifting of Chandrapur – 2 and Chandrapur – 3 Line Bays from section Raipur B to Raipur A under “Split Bus arrangement and Reconfiguration/Shifting of terminating lines at Raipur 400KV S/S” in western region. 22.4.2015

Petition No.192/TT/2014
Approval of transmission tariff for 3*80 MVAR, 765KV Line Reactor along with associated bays at Gwalior S/S only (to be used as Bus Reactor under interim contingency scheme, till readiness of 765 S/C Gwalior-Jaipur Transmission Line) (DOCO: 1.3.2014) associated with Vindhyachal IV & Rihand III (I000 MW) Generation Project (under interim /contingency arrangement for power evacuation) in Western region for tariff block 2009-14. 23.4.2015

Petition No.301/TT/2013
Determination of transmission tariff for (A) 400 kV 125 MVAR bus reactor at 765 kV Indore sub-station along with associated bays (B) 400 kV 125 MVAR bus reactor-I and bus reactor-II at 765 kV Gwalior sub-station along with associated bays (C)765 kV D/C Jabalpur pooling station-Bina ckt-I with 240 MVAR switchable line reactors and associated bays (D) 765 kV D/C Jabalpur Pooling station-Bina Ckt-II with 240 MVAR switchable line reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 15.4.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Westermn Region. 15.4.2015

Petition No.36/TT/2013
Determination of transmission tariff for for LILO of one circuit of Neyveli-Trichy 400 kV line at Nagapattinam pooling station for initial arrangement which later shall be bypassed under “Transmission System associated with Common Transmission Scheme associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu Part-A1(a)” in Southern Region for tariff block 2009-14. 10.4.2015

Petition No. 101/TT/2014
Determination of Transmission Tariff from DOCO to 31.03.2014 for 3X110 MVAR Line reactor for 2 Nos. 80 MVAR Line reactor for 400 kV D/C Wardha – Aurangabad TL Ckt#1 & 2 charged as bus reactor 1 & 2 at 400/220 kV Aurangabad S/S under Mundra UMPP in Western Region. 10.4.2015

Petition No. 36/TT/2013
Determination of transmission tariff of Asset I: Northern Region System Strengthening Scheme-XX (NRSSS-XX) of Northern Region from Anticipated DOCO (1.3.2013) to 31.3.2014 for tariff block 2009-14. 10.4.2015

Petition No. 17/TT/2014
Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 10.4.2015

Petition No. 248/TT/2013
Determination of Transmission Tariff of 765 kV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s (DOCO: 1.3.2013) under Common Scheme for 765 kV Pooling Stations and Network for NR , Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR 10.4.2015

Petition No. 37/TT/2013
Determination of transmission tariff for transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for tariff block 2009-14 in Northern Region. 10.4.2015

Petition No. 22/TT/2014
Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in Northern Region for the period 2009-14 block. 10.4.2015

Petition No. 96/TT/2014
Determination of Transmission Tariff from DOCO to 31.03.2014 for 240 MVAR, 765 kV Line reactor for 765 kV S/C Solapur – Pune TL charged as Bus reactor at Solapur SS under Transmission system associated with Krishnapatnam UMPP Part B in Western Region. 10.4.2015

Petition No. 258/TT/2013
Determination of transmission tariff for Tiruvalam (POWERGRID)-Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under supplementary transmission system associated with Vallur TPS in Southern Region for tariff block 2009-14. 25-03-2015

Petition No. 100/TT/2014
Approval under regulation-4(3(ii) of CERC (Terms and conditions of Tariff) Regulations' 2104 and Regulation-24 of CERC (Conduct of Buisness) Regulations' 1999 for commissioning date. 09-04-2015

Petition No. 99/TT/2014
Approval under regulation-86 of CERC (Conduct of Buisness) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of transmission tariff from DOCO to 31.3.2019 for 400/220 kV, 315 MVA ICT-II along with associated bays at Hamirpur S/S in Northern Region. 09-04-2015

Petition No. 107/TT/2014
Approval of transmission charges for Asset I: 765 KV S/C Bareilly-Lucknow Transmission Line at 400 kV level and Asset II: One Circuit of 400 kV D/C Bareilly (New) Bareilly (New) Bareilly (Existing) Transmission Line in Northern Region under "Northern Region System Strengthening Scheme XXI" for tariff block 2014-19. 27-03-2015

Petition No.281/TT/2013
Determination of transmission tariff for Augmentation of Hosur Sub-station by 1x315 MVA 400/220 kV transformer and associated bays under System Strengthening - XIV in Southern Region. 24-03-2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014. 20-03-2015

Petition No. 91/TT/2012
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulation, 2009 for determination of transmission tariff from DOCO to 31.3.2014 for Combined Assets for transmission system associated with PARBATI-III-HEP in Northern Region for tariff block 2009-14 period. 10-03-2015

Petition No. 22/TT/2014
Approval under sub-section (4) of Section 28 and Section 79 (1) (d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave links (Part-II) in Northern Region of for the period 2009-14. 02-03-2015

Petition No. 450/TT/2014
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset I : 3X80 MVAR Switchable line reactor for 765 KV S/C Gaya-Balia Transmission line at Gaya Sub-station, Asset II: 3X80 MVAR Switchable line Reactor for 765 KV S/C Ranchi-Dharamjaygarh Transmission Line along with associated bays at Ranchi Sub-station as Bus Reactor and Asset III: 3X80 MVAR Switchable line Reactor for 765 KV S/C Gaya -Varanasi Transmission Line along with associated bays at Gaya Sub-station as Bus Reactor under "Transmission System for Phase I Generation Projects in Jharkhand and West Bengal Part A 2". 27-02-2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014. 27-02-2015

Petition No.45/TT/2014
Determination of Transmission Tariff for 765 KV D/C Champa Pooling Station-Raipur Pooling Station Transmission Line with associated bays at Raipur PS under Establishment of Pooling stations at Champa & Raigarh (near Tamnar (for IPP Generation Projects in Chhattisgarh (Set B/WR1-IPPB) in Western Region. 27-02-2015

Petition No.40/TT/2014
Determination of Transmission Tariff for 765/400 kV, 1X1500MVA, ICT-1 at Dharmjaygarh Sub-station along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 23-02-2015

Petition No. 29/MP/2014
Petition under Section 38 (2) of the Electricity Act, 2003 read with Section 79 (1) (c) and (k) of the Act, along with- (i) Central Electricity Regulatory Commission (Grant of Regulatory approval for execution of inter-State transmission scheme to Central Transmission Utility) Regulations, 2010; (ii) Regulations 111 and 114 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999; (iii) Central Electricity Regulatory Commission (Sharing of inter-State Transmission charges and losses) Regulations, 2010; and Grant of Regulatory Approval for execution of the transmission system for Ultra Mega Solar Power Park (UMSPP) having capacity of 1000 MW in Anantpur district, Andhra Pradesh. 24-02-2015

Petition No. 53/TT/2013
Transmission tariff for 400 KV D/C Raipur Wardha TL alongwith FSC at Wardha under WRSS-II Set A Scheme of WR. 11-02-2015

Petition No 307/TT/2013
Transmission Tariff for Asset-I 765/400 kV 3*500MVA ICT-2 at Raigarh PS (Near Tamnar) alongwith with associated bays, Asset-II 765/400 kV 3*500 MVA ICT-3 at Raigarh PS (Near Tamnar) alongwith with associated bays and Asset-III 765 kV S/C Champa Pooling Station -Dharamjaygarh S/s T/L & Bays at Dharmjaygarh S/s only under Establishment of Pooling station at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/WR1-IPPB) in Western Region for tariff block 2009-14. 19-02-2015

Petition No. 91/TT/2012
Determination of Transmission Tariff from DOCO to 31.3.2014 for combined assets for transmission system associated with Parbati-III-HEP in Northern Region for tariff block 2009-14. 01-01-2015

Petition No. 415/TT/2014
Approval of Transmission Tariff for Solapur STPP (2x660 MW)" in Western Region. 10-12-2014

Petition No. 422/TT/2014
Determination of transmission tariff for assets under transmission system for phase-1 Generation Projects in Odisha - Part-C . 08-12-2014

Petition No. 404/TT/2014
Determination of transmission tariff for 400/220 kV, 2x315 MVA GIS and LILO of 400 kV D/C Navsari-Boisar TL at 400/220 kV GIS S/S (New) at Magarwada in UT of D&D along with associated bays and 80 MVAR Bus Reactor under "Establishment of 400/220 kV GIS at Magarwada in UT of D&D" in Western Region. 08-12-2014

Petition No. 118/TT/2014
Transmission System for assets under Transmission System for "Transfer of Power from Generation Projects in Sikkim to NR/WR-Part-B" in Eastern Region. 04-12-2014

Petition No.405/TT/2014
Approval Transmission Tariff for Vijaywada-Nellore 400 kV D/C line along with the extension of 400/220 kV substation at Vijaywada & Nellore AP and 1X63 MVAR line reactor at both ends of each circuit of Vijaywada-Nellore 400kV D/C line under “Transmission System associated with system strengthening-XVIII in southern grid”. 18-11-2014

Petition No. 409/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: 400 kV, 125 MVAR (3 Ph) Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling S/s, Asset-II: 765 kV, 3x80+1x80 (Spare) MVAR Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling S/s, and Asset-III: 765 kV bay for Dharamjaygarh ckt-#2 and 3x80 MVAR Line Reactor at 765/400 kV Jabalpur Pooling S/s (Interim Contingency as Bus Reactor) at Jabalpur Pooling S/s under "Transmission System for Phase-I Generation Projects in Orissa (Part-B)" in Western Region. 05-12-2014

Petition No.100/TT/2012
Transmission Tariff for Transmission assets (Group-2) associated with 765 kV system for Central Part of Northern Grid Part-II. 13-11-2014

Petition No. 32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for Tariff block 2009-2014. 26-09-2014

Petition No. 53/TT/2013
Approval of transmission tariff for 400 kV D/C Raipur – Wardha T/L alongwith FSC at Wardha under WRSS-II Set-A Scheme of Western Region for tariff block 2009-14. 15-09-2014

Petition No. TT/222/2014
Approval of transmission tariff for 63 MVAR Line Reactor on 400 kV Kolaghat- Rengali Line at Rengali Sub-station in ER. 03-09-2014

Petition No. TT/239/2014
Approval of transmission tariff for 50 MVA Auto Transformer at Malda Sub-station in ER . 03-09-2014

Petition No. 105/TT/2012
Approval of Transmission Tariff for (a) Kalpakkam PFBR-Sirucheri, D/C 230 kV Line (b) Kalpakkam PFBR-Arani, D/C 230 kV Line (c) Kalpakkam PFBR-Kanchipuram D/C 230 kV Lines under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 10-07-2014

Petition No. 87/TT/2012
Assets under Common Scheme for 765 KV Pooling Stations and Network for NR and Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 03-09-2014

Petition No. 67/TT/2012
Transmission Tariff for 400 KV D/C (Quad) Koderma -Gaya Transmission Line and associated bays at Gaya Sub-station associated with supplementary transmission System under DVC and Maithon right bank project in ER. 02-09-2014

Petition No. TT/122/2014
Approval of Transmission tariff for combined elements of (i) Additional bays at Kolar and Hosur for second circuit of Kolar- Hosur 400 kV D/C line, and (ii) 400 kV Hiryur sub-station, including 315 MVA auto transformer & LILO of Davangere- Hoody 400 kV D/C line at Hiryur with associated bays under System Strengthening Scheme-II in Southern Region. 27-08-2014

Petition No. TT/124/2014
Approval of transmission tariff for combined elements (a) LILO of Nagarjunasagar- Raichur 400 kV S/C Line at Mehboobnagar, and (b) LILO of both the Circuits of Nellore-Sriperumbudur 400kV D/C line at Almathi under System Strengthening Scheme-IV in Southern Region. 27-08-2014

Petition No. TT/123/2014
Approval of Transmission tariff for Special Energy Meters in Southern Region. 25-08-2014

Petition No. TT/127/2014
Approval of transmission tariff of LILO of both circuits of Tuticorin JV - Madurai 400 kV D/C (Quad) line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin (initially charged at 400 kV) including 1 x 80 MVAR, 400 kV Bus Reactor under Transmission System associated with Common System Associated with Coastal Energen Private Limited & Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area - PART-A in Southern Region. 27-08-2014

Petition No. TT/100/2014
Approval of Transmission Tariff for (A) LILO of 400 kV S/C Bhiwadi-Bassi T/L at Kotputli S/S, (B) 315 MVA 400/220 kV ICT-I & 2 with 6 nos. 220kV Line Bays at Kotputli S/S under "NRSSS XV" in Northern Region. 27-08-2014

Petition No. 116/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for (A) 420 kV, 125MVAR Bus Reactor at Jabalpur sub-station and (B) 420 kV, 125 MVAR Bus Reactor at Khandawa sub-station (C) 420 kV,125 MVAR Bus Reactor at Bhatapara Substation (D) 420kV,125MVAR Bus Reactor at Raigarh Substation (E) 420kV, 80MVAR Switchable Line Reactor at Solapur Sub-station (F) 420 kV,125 MVAR Bus Reactor at Aurangabad Sub-station under “Installation of Reactors in Western Region. 19-08-2014

Petition No. 97/TT/2014
Determination of Transmission Tariff for 3x110 MVAR Line Reactor for 765 kV D/C Raipur PS - Wardha Line 1 Ckt#2 to be charged as Bus reactor at Wardha S/S under Integration of Pooling stations in Chhattisgarh with central part of WR for IPP generation projects in Chhattisgarh (IPP C) for tariff block 2009-14 period. 13-08-2014

Petition No. 89/TT/2012
Approval of Transmission Tariff for for ICTs at Jaipur-South & LILO of 400 KV D/C Balia-Lucknow Line at Sohawal- under NRSS. 28-07-2014

Petition No. 164/TT/2013
Determination of transmission tariff for combined Assets for transmission system associated with Augmentation of Transmission Capacity (Part-1) in Northern & Eastern Region for tariff block 2009-14. 10-07-2014

Petition No. 28/TT/2014
Approval of Transmission Tariff for “Loop-out of 220 kV Jalandhar-Hamirpur Line at Hamirpur (to be used as LILO of 1st circuit of 220 kV Hamirpur- Jalandhar T/L)” (DOCO: 1.1.2014) under the “strengthening scheme in Northern Region" for 2009-14 period in Northern Region. 10-07-2014

Petition No. 31/TT/2014
Approval of Transmission Tariff for Establishment of 2x315 MVA, 400/220 kV GIS S/S at Kala in UT of D&NH & Determination of Transmission Tariff for Asset (A)-Two nos. 63 MVAR 400 kV Line Reactor at 400 kV Balia (PG) substation (Extension) from DOCO (1.2.2014) to 31.03.2014 under Northern Region System Strengthening Scheme XXIV (NRSS-XXIV), for tariff block 2009-2014 in Northern Region. 10-07-2014

Petition No. 110/TT/2014
Approval of Transmission Tariff for Establishment of 2x315 MVA, 400/220 kV GIS S/S at Kala in UT of D&NH & LILO of one circuit of 400 kV D/C Vapi - Navi Mumbai Transmission Line at Kala S/S (multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220kV GIS Substation at Kala in UT of D&NH in Western Region. 08-07-2014

Petition No. 115/TT/2014
Approval of Transmission Tariff for (A) 765kV, 240MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad substation and (B) 765 kV, 240MVAR Switchable Line Reactor of 765kV D/C Aurangabad-Padghe Line Ckt-II to be charged as Bus Reactor at Aurangabad substation under “System Strengthening in North/West part of WR for IPP Projects in Chhattisgarh(IPP-E)” in Western Region. 07-07-2014

Petition No. 97/TT/2014
Approval of Transmission Tariff for 3x110 MVAR Line reactor for 765 kV D/C Raipur PS – Wardha Line 1 Ckt#2 to be charged as Bus reactor at Wardha SS under Integration of Pooling Stations in Chhattisgarh with central part of WR of IPP generation projects in Chhattisgarh (IPP-C) for tariff block 2009-14 period. 07-07-2014

Petition No. 44/TT//2014
Approval of transmission tariff for assets under "Transmission System for Phase-I Generation Projects, in Orissa Part-C" in Western Region. 01-07-2014

Petition No. 33/TT/2014
Approval of Transmission Tariff for Sasan UMPP TS (Group 1) in Northern Region for tariff block 2009-14 . 27-06-2014

Petition No. 17/TT/2014
Petition for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 11-06-2014

Petition No. 107/TT/2013
Approval of transmission tariff for Up-gradation of Transfer capacity of Talchar-Kolar HVDC Bipole for the period from 1.4.2009 to 31.3.2014. 11-06-2014

Petition No. 48/TT/2014
Approval of transmission tariff for assets under "Transmission System for Phase-I Generation projects in Orissa-Part B" in Western Region. 09-06-2014

Petition No. 47/TT/2014
Approval of Transmission Tariff for assets under “Transmission system strengthening in western part of WR for IPPs generation projects in Chhattisgarh (IPP D)" in Western Region. 11-06-2014

Petition No. 81/TT/2012
Transmission tariff for 1 no. 400 kV 63 MVAR Line Reactor at Cochin under Kudankulam ATS in SR. 10-06-2014

Petition No. 38/TT/2014
Transmission Tariff for assets associated with Transmission System for connectivity of M.B. Power (M.P.) Limited in Western Region. 09-06-2014

Petition No. 303/TT/2013
Transmission Tariff for (I) 765/400KV, 1500 MVA ICT-1 along with associated bays at Jabalpur Pooling S/S (New) and (2) 400 KV D/C (Quad) Jabalpur Pooling S/S (New)-Jabalpur (Existing) S/S T/L along with associated bays under Transmission System for Phase-1 Generation projects in Orissa-part B in Western Region. 06-06-2014

Petition No. 162/TT/2014
Transmission Tariff for (i) 400 KV D/C Raipur (Existing)- Raipur PS (Durg) T/L with associated bays, (2) 400 KV D/C Raighar PS (Near Kotra)- Raighar (existing) S/S T/L with associated bays, & (3) ICTSs & Reactors at Raighar (Kotra) and Raipur (Durg) with associated bays under Establishment of pooling stations at Raighar (Kotra) and Raipur for IPP Generation Projects in Chhatisgarh (Set A/ DPR-1) in WR for tariff block 2009-14. 06-06-2014

Petition No. 113/TT/2013
Approval of transmission tariff for 400 kV 1* 63 MVAR Bus Reactor along with associated 400 kV bays at Satna SS and 400 KV D/C QUAD BASSI-JAIPUR(RPVNL) LINE associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project in Western Region for tariff block 2009-14 period. 06-06-2014

Petition No. 91/TT/2012
Approval of Transmission Tariff for Combined Assets for Transmission System associated with Parbati-III-HEP in Northern Region for Tariff block 2009-14 period. 06-06-2014

Petition No. 61/TT/2013
Approval of Transmission Tariff of 400 kV 80 MVAR Bus Reactor along with associated bays at 400/220 kV Sikar Sub-station under System Strengthening scheme in Northern Region for Sasan & Mundra UMPPs for Tariff block 2009-2014 period. 03-06-2014

Petition No. 34/TT/2014
Approval of Transmission Tariff for Asset-I: Balance Portion of 400 kV D/C Jamshedpur-Baripada Tr. Line and associated bays at Jamshedpur (DOCO: 01.10.2013), Asset-II: 02 nos 400kV Bays at Durgapur S/s (DOCO: 01.02.2014) under ERSS-I in Eastern Region for tariff block 2009-14 period. 03-06-2014

Petition No. 26/TT/2014
Determination of transmission tariff for “500 MVA, 400/220/33 KV ICT-II along with associated bays at Moga S/s” and “500MVA, 400/220/33 KV ICT along with associated bays at Ludhiana S/s” under the “Augmentation of Transformation capacity in Northern Region-Part A” for Tariff block 2009-14 period in Northern Region. 06-06-2014

Petition No. 32/TT/2013
Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period . 29-05-2014

Petition No. 249/TT/2013
Transmission Tariff of Asset1: LILO of 400KV D/C Kahalgaon- Biharshariff T/L (1st Line) and associated bays at Lakhisarai S/s; Asset II: 400/132 KV, 200 MVA ICT-I along with associated bays at Lakhisarai S/s; Asset III: 400/132 KV, 200 MVA ICT-II along with associated bays at Lakhisarai S/s; Asset IV: 400 KV, 80 MVAR, Bus Reactor with associated bays at Lakhisarai S/s associated with ERSS-III . 29-05-2014

Petition No. 111/TT/2013
Transmission tariff for New Wanpoh, associated with NRSS-XVI . 29-05-2014

Petition No. 181/TT/2013
Determination of Fees and Charges for Fibre Optic Communication System in Lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links in Southern Region for the period 2009-14 block. 19-05-2014

Petition No. 181/TT/2013
Determination of Fees and Charges for Fibre Optic Communication System in Lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links in Southern Region for the period 2009-14 block. 19-05-2014

Petition No. 247/TT/2014
Transmission Tariff of Assets (07 Nos) under transmission System for Transfer of Power from Generation Projects in Sikkim to NR/WR Part-B in ER for tariff block 2009-14. 26-05-2014

Petition No. 61/TT/2013
Transmission Tariff of 400 kV 80 MVAR Bus Reactor along with associated bays at 400/220 kV Sikar Sub-station under System Strengthening scheme in Northern Region for Sasan & Mundra UMPPs. 04-10-2013

Petition No. 57/TT/2013
Approval of transmission tariff for 400KV D/C Navasari-New Mumbai (Boisar) {cut off point of WRTS-II portion only} {part of 400 KV Navasari-Boisar TL} along with respective bays at Navsari GIS SS associated with Regional System of MUNDRA UMPP (Interconnection with Vapi-Navi Mumbai line along with associated bays at Vapi SS interim contingency arrangement for the period from DOCO to 31.03.2014. 26-07-2013

Petition No. 113/TT//2013
Approval of transmission tariff for assets associated with Vindhyachal IV & Rihand III (1000MW) Generation Project in Western Region for tariff block 2009-14 period. 23-05-2014

Petition No. 241/TT/2013
Transmission tariff for 220 KV D/C Vapi- Khadoli Transmission line. 23-05-2014

Petition No. 37/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2014 for (A) Kurnool-Raichur 2nd 765 KV S/C line and extension of Kurnool 765 KV/400 KV & Raichur 765/400 KV Substations, (B) 1500 MVA, 765/400 KV ICT#2 and 240 MVAR reactor along with associated bays at 765/400 KV Nellore Pooling Station, (C) 1500 MVA, 765/400 KV ICT #3 and 240 MVAR bus reactor along with associated bays at 765/400 KV Nellore PS under “Common system associated with ISGS projects in Krishnapatnam area of Andhra Pradesh” in Southern Region. 23-05-2014

Petition No. 108/TT//2013
Approval of transmission tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 19-05-2014

Petition No. 295/TT/2014
Approval of Transmission Tariff for Assets associated with Vindhyachal IV and Rihand III (1000MW) Generation Project (group-3) in Western & Northern Region for tariff block 2009-14 period . 15-05-2014

Petition No. 22/TT/2014
Approval of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links (Part- II) in Eastern Region for the period 2009-14 block. 13-05-2014

Petition No. 37/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2014 for (A) Kurnool-Raichur 2nd 765 KV S/C line and extension of Kurnool 765 KV/400 KV & Raichur 765/400 KV Substations, (B) 1500 MVA, 765/400 KV ICT#2 and 240 MVAR reactor along with associated bays at 765/400 KV Nellore Pooling Station, (C) 1500 MVA, 765/400 KV ICT #3 and 240 MVAR bus reactor along with associated bays at 765/400 KV Nellore PS under “Common system associated with ISGS projects in Krishnapatnam area of Andhra Pradesh” in Southern Region. 13-05-2014

Petition No. 46/TT/2014
Approval of Transmission Tariff (05 nos) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period. 13-05-2014

Petition No. 298/TT/2013
Determination of transmission tariff of 2 Nos. 400 KV Line Bays at 400 KV Ranchi S/s for Raghunathpur TPS- Ranchi Transmission Line under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period. 13-05-2014

Petition No. 110/TT/2013
Transmission Tariff for 400/220 KV 500MVA ICT-II along with associated 400/ 220 KV bays at Jind S/s and other assets under Northern Regional Transmission Strengthening Scheme for 2009-14 period. 24-04-2014

Petition No. 45/TT/2013
Transmission Tariff for 400 KV D/C Balipara- Bongaigaon (Quad) Transmission Line and other assets under Transmission System associated with Kameng Hydro-Electric Project for NE Region for 2009-14 period. 29-04-2014

Petition No. 32/TT/2013
Transmission Tariff for Northern Regional Transmission Strengthening Scheme for tariff block 2009-14 period. 29-04-2014

Petition No. 17/TT/2014
Approval of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 29-04-2014

Petition No. 111/TT/2013
Determination of Transmission Tariff of from anticipated DOCO (01.01.2012) to 31.03.2014 for 400 KV D/C Neemrana- Sikar line alongwith associated bays under Northern Region System Strengthening Scheme-XVII, for tariff block 2009-14 period in Northern Region. 29-04-2014

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 01-01-2014

Petition No. 112/TT/2013
Determination of Transmission Tariff of Assets (09 Nos.) under Transmission System for Phase-I Generation projects in Orissa –Part-A in Eastern Region for tariff block 2009-14 period. 25-10-2013

Petition No. 292/TT/2013
Transmission Tariff of 125 MVAR 400 KV Bus Reactor along with associated bays at Patna S/S under Transmission System for "Transfer of Power from Generation Projects in Sikkim to NR/WR Part-B in Eastern Region for tariff block 2009-14. 21-04-2014

Petition No. 44/TT/2013
Transmission Tariff for LILO of 220KV Misa- Kathalguri Transmission Line at Mariani alongwith Switching Station and other assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14. 21-04-2014

Petition No. 28/TT/2014
Approval of transmission tariff for Loop-out of 220 kV Jalandhar- Hamirpur line at Hamirpur (To be used as LILO of 1st Ckt. Of 220KV Hamirpur- Jalandhar T/L under the Strengthening Scheme in NR for the tariff block 2009-14 period. 15-04-2014

Petition No. 26/TT/2014
Determination of Transmission tariff for 500 MVA, 400/220/33 KV ICT-II along with associated bays at Moga S/S and 500MVA, 400/220/33KV ICT along with associated bays at Ludhiana S/S under "Augmentation of Transformation capacity in Northern Region-part-A for Tariff block 2009-14 period. 28-03-2014

Petition No. 300/TT/2013
Approval of Transmission Tariff of 400 KV D/C Agra-Sikar line alongwith bays under System strengthening scheme in Northern Region for Sasan & Mundra UMPPs for tariff block 2009-14 period. 10-03-2014

Petition No. 53/TT/2013
Transmission tariff for 400 KV D/C Raipur Wardha TL alongwith FSC at Wardha under WRSS-II Set A Scheme of WR. 11-02-2014

Petition No. 36/TT/2013
Approval of transmission tariff for assets under NRSS XX. 26-08-2013

Petition No. 198/TT/2012
Determination of tariff of assets under Common scheme for 765 kV pooling Stations and Network for NR, Import by NR from ER and from MER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 24-01-2014

Petition No. 111/TT/2013
Transmission tariff for New Wanpoh associated with NRSSXVI. 24-01-2014

Petition No. 240/TT/2013
Determination of Fees and Charges for Fibre optic communication system in lieu of existing ULDC Microwave links in Northern Region. 21-01-2014

Petition No. 290/TT/2013
Approval of Transmission Tariff for 400 kV D/C Chamera Pooling station-Jalandhar T/L along-with bays and Line Reactor at Jalandhar under Transmission System associated with Chamera-III HEP for tariff block 2009-14 period in Northern Region. 08-01-2014

Petition No. 217/TT/2012
3X 110 MVAR, 1-phase 765 KV shunt Reactor including Surge Arrestor and NGR at Sasaram sub-station under Sasan UMPP TS in NR. 06-01-2014

Petition No. 287/TT/2013
Approval of Transmission Tariff for (1) 400 kV D/C (Quad) Vadodra-Asoj Transmission line along with associated bays at Asoj (GETCO S/S) under System Strengthening Scheme in North/West Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 kV D/C Vadodra-Pirana Tr. line) by passing Vadodra Pooling S/S under interim arrangement in Western Region for 2009-14. 08-01-2014

Petition No. 288/TT/2013
Approval under Regulation 3 (12)(c) of CERC (Terms & Conditions of Tariff) Regulations 2009 and Regulation 24 of CERC ( Conduct of Business) Regulations 1999 for commissioning date and approval of Transmission Tariff from DOCO TO 31.03.2014 for tariff block 2009-14 for LILO of 400 kV D/C Nathpa Jhakri- Nallagarh(Triple Snowbird) line at Rampur under transmission system associated with Rampur HEP in Northern Region. 08-01-2014

Petition No. 305/TT/2013
Approval of transmission tariff for 765/400 kV, 1x1500 MVA, ICT-2 at Dharmjaygarh S/S along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 08-01-2014

Petition No. 240/TT/2013
Determination of Fees and Charges for Fibre optic communication system in lieu of existing ULDC Microwave links in Northern Region. 30-12-2013

Petition No. 300/TT/2013
Approval of transmission tariff of 400 kV D/C Agra- Sikar line along with bays under System Strengthening Scheme in Northern Region for Sasan and Mundra UMPPs for tariff block 2009-14. 02-01-2014

Petition No. 308/TT/2013
Approval of transmission tariff for Sipat-LiLo Point (at Dharmjaigarh) portion of 765KV S/C Ranch- Sipat TL along with associated bays at Sipat end under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR Via ER in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 01-01-2014

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 18-11-2013

Petition No. TT/281/2013
Approval of transmission tariff for ""Augmentation of Hosur S/S by 1x315 MVA 400/220 kV transformer and associated bays under system Strengthening-XIV in SR". 18-12-2013

Petition No. 299/TT/2013
Approval of transmission tariff for Elements under Transmission System associated with Krishnapatnam UMPP- Part-B in Southern and Western Region. 18-12-2013

Petition No. 303/TT/2013
Approval of transmission tariff for assets under Transmission System for Phase-I Generation projects in Orissa-Part B in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 308/TT/2013
Approval of ttransmission tariff for Sipat-LiLo Point (at Dharmjaigarh) portion of 765KV S/C Ranch- Sipat TL along with associated bays at Sipat end under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR Via ER in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 287/TT/2013
Approval of transmission tariff of (1) 400 kv D/C (Quad) Vadodara- Asoj Transmission Line along Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 KV D/c Vadodara- Pirana T/L) by passing Vadodara Pooling SS under interim arrangement in Western Region for tariff block 2009-14 period. 13-12-2013

Petition No. 288/TT/2013
Approval of transmission tariff for LILO of 400 kv D/C Nathpa Jhakri- Nallagarh (Triple Snowbird) line at Rampur under Transmission System associated with Rampur HEP in Northern Region. 13-12-2013

Petition No. 290/TT/2013
Approval of transmission tariff of 400 kV D/C Chamera Pooling Station- Jalandhar T/L along with bays and Line Reactor at Jalandhar under Transmission System associated with Chamera-III HEP for tariff block 2009-14 in NR. 10-12-2013

Petition No. 299/TT/2013
Approval of transmission tariff for Elements under Transmission System associated with Krishnapatnam UMPP- Part-B in Southern and Western Region. 13-12-2013

Petition No. 296/2013
Approval of transmission tariff for (i) Aurangabad– Aurangabad (MSETCL) 400 kV D/C (Quad) Line and Shifting of 400 kV D/C Akola - Aurangabad (MSETCL) line to Aurangabad along with associated bays at both ends, (ii) 400/220 kV 315 MVA ICT-I along with associated bays at Aurangabad S/S & (iii) 400/220 kV 315 MVA ICT-II along with associated bays at Aurangabad S/S under Transmission system associated with MUNDRA UMPP in Western Region. 16-12-2013

Petition No. 301/2013
Approval of Transmission Tariff for (1) 400kV 125 MVAR Bus Reactor at 765kV Indore S/S along with associated bays; (2) 400kV 125MVAR Bus Reactor-I and Bus Reactor-II at 765kV Gwalior S/S along with associated bays; (3) 765 kV D/C Jabalpur Pooling Station-Bina Ckt-I with 240 MVAR Switchable Line Reactors and associated bays; and (4) 765 kV D/C Jabalpur Pooling Station - Bina Ckt-II with 240 MVAR Switchable Line Reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 09-12-2013

Petition No. 289/TT/2013
Approval of Transmission Tariff for 400 kV Vadodara-Pirana T/L alongwith associated bays at Pirana S/S (for direct inter-connection with 400 kV D/C Vadodara Asoj T/L under interim contingency scheme) under Transmission System for IPP Generation projects in Madhya Pradesh & Chhattisgarh in Western Region for tariff block 2009-14 period. 10-12-2013

Petition No. 298/2013
Approval under regulation-86 of the CERC (Conduct of Business) Regulations' 1999 and CERC (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff of 02 Nos 400kV Line Bays at 400kV Ranchi S/s for Raghunathpur TPS- Ranchi Transmission line (DOCO:01.04.2013) under Common Scheme for 765kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period.. 09-12-2013

Petition No. 295/ 2013
Approval of transmission tariff for assets associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project(group-3) in Western & Northern Region for tariff block 2009-14 period. 02-12-2013

Petition No. 296/2013
Approval of transmission tariff for (i) Aurangabad– Aurangabad (MSETCL) 400 kV D/C (Quad) Line and Shifting of 400 kV D/C Akola - Aurangabad (MSETCL) line to Aurangabad alongwith associated bays at both ends, (ii) 400/220 kV 315 MVA ICT-I alongwith associated bays at Aurangabad S/S & (iii) 400/220 kV 315 MVA ICT-II alongwith associated bays at Aurangabad S/S under Transmission system associated with MUNDRA UMPP in Western Region . 02-12-2013

Petition No. 247/TT/2013
Approval for “Transfer of power from generation projects in Sikkim to NR/WR Part-B” in Eastern Region for tariff block 2009-14 period. 18-11-2013

Petition No. TT/281/2013
Approval of Transmission Tariff for Augmentation of Hosur S/S by 1X315 MVA 400/220 kV transformer and associated bays under System Strengthening - XIV in SR. 05-11-2013

Petition No. 206/TT/2012
Determination of Transmission Tariff of assets under ERSS-IV in Eastern Region. 01-11-2013

Petition No. 44/TT/2013
Approval of transmission tariff for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for 2009-14. 31-10-2013

Petition No. 256/TT/2013
Determination of tariff in respect of Maharashtra State Electricity Transmission Company Limited (MSETCL) owned Transmission Lines/System with other States in terms of CERC order dated 14.3.2012 in Petition No. 15/SM/2012. 28-10-2013

Petition No. 91/TT/2012
Determination of Transmission Tariff for Combined Assets under Transmission System associated with Parbati-III-HEP in Northern Region for Tariff block 2009-14 period. 28-10-2013

Petition No. 108/TT/2013
Determination of Transmission Tariff for assets under SASAN UMPP TS in Western Region for tariff block 2009-14 period. 28-10-2013

Petition No. 120/TT/2013
Determination of Transmission Tariff for 240 MVAR Switchable line Reactor along with associated bays at Bilaspur Pooling station under common scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for WR and import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period. 23-10-2013

Petition No. 82/TT/2012
Determination of transmission tariff for Asset I: 765 kV Moga-Bhiwani T/L and Asset II: 765 kV Jattikalan- Bhiwani T/L associated with 765 kV system for Central Part of Northern Grid Part-I for tariff block 2009-14 in NR . 22-10-2013

Petition No. 255/TT/2013
Determination of Transmission Tariff for installation of 400/220kV, 1*315 MVA transformer at Mapusa (ICT-III) sub-station alongwith 2 Nos of 220 kV line bays under augmentation of transformer and bays in Western Region. 22-10-2013

Petition No. 41/TT/2013
Determination of Transmission Tariff of Asset I: 765 kV, 240 MVAR Switchable Line Reactor under Bus Reactor at Ballia S/s. (DOCO: 01.10.2012); Asset II: 765 kV Line bays at Sasaram S/s (for 765 kV Sasaram- Fatehpur TL under SASAN Project) under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common schemes for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern region for tariff block 2009-14 period. 05-09-2013

Petition No.31/TT/2013
Determination of transmission tariff for Combined Assets for transmission system associated with Northern Region Bus Reactor Scheme (Group-II) in NR. 18-10-2013

Petition No.248/TT/2013
Approval of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 18-10-2013

Petition No.97/TT/2013
Determination of Transmission Tariff of 125 MVAR Bus Reactor alongwith associated bays at Roorkee Substation under NRSS-XXI. 18-10-2013

Petition No. 166/TT/2013
Determination of Transmission Tariff for (1) Raigarh PS (Near Kotra) – Raigarh PS (near Tamnar) 765 kV D/C T/L with associated bays, (2) 765/400 kV 1500 MVA Auto-Transformer and 765 kV 4*80 MVar Bus Reactor at Raigarh (near Tamnar) with associated bays under Establishment of Pooling stations at Raigarh (near Kotra) and Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh (Set “B”/ WR1-IPPB) in Western Region. . 17-10-2013

Petition No. 40/TT/2013
Determination of Transmission Tariff of Asset I: 400kV, 125 MVAR Bus Reactor along with associated bays at Patna S/s; Asset II: 400kV, 125 MVAR Bus Reactor along with associated bays at Ranchi S/s under ERSS-IV in Eastern Region. 15-10-2013

Petition No. 109/TT/2013
Determination of Transmission Tariff of Elements for 240 MVAR Bus Reactor in Agra, under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region. . 15-10-2013

Petition No. 109/TT/2013
Determination of Transmission Tariff of Elements for 240 MVAR Bus Reactor in Agra, under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region. . 15-10-2013

Petition No.35/TT/2013
Determination of transmission tariff of 400 kV D/C Kishenpur-Samba T/L alongwith bays at both and other assets under the NRSSS-XXII. . 11-10-2013

Petition No. 163/TT/2013 (Earlier Docket No.94/TT/2013)
Determination of transmission tariff for 500 MVA 400/220 KV ICT at Moga under the Augmentation of Transformation capacity in NR- Part A for Tariff Block 2009-14 in NR. . 11-10-2013

Petition No.33/TT/2013
Determination of transmission tariff of Sasan UMPP TS(Group 1) in Northern Region for tariff block 2009-14 period. . 11-10-2013

Petition No.107/TT/2013
Determination of transmission tariff for upgradation of transfer capacity of Talcher-Kolar HVDC Bipole. 08-10-2013

Petition No.227/TT/2013
Approval of Revised transmission tariff for Barh- Balia 400 KV D/C (Quad) line along with associated bays at Balia S/s after approval of RCE under transmission System associated with Barh Generation Project (3X660MW) in ER. 09-10-2013

Petition No.107/TT/2013
Determination of transmission tariff for upgradation of transfer capacity of Talcher-Kolar HVDC Bipole. 08-10-2013

Petition No.164/TT/2013
Determination of transmission tariff for Combined Assets for transmission system associated with Augmentation of Transformation capacity (part-1) in Northern & Eastern Region for tariff block 2009-14. 07-10-2013

Docket No.108/2013
Determination of transmission tariff for Installation of 400/220KV, I*315MVA Transformer at Mapusa (ICT-III) S/S along with 2 nos. 220 KV line bays under Augmentation of Transformer and Bays in WR. 07-10-2013

Petition No.165/TT/2013
Approval of transmission tariff for LILO of existing Bangalore-Salem 400 KV S/C at Hosur under System Strengthening-XVIII in SR Grid. 23-09-2013

Petition No.166/TT/2013
Approval of Transmission tariff for (i) Raigarh PS (Near Kotra)-Raigarh PS (near Tamnar) 765 KV D/C T/L with associated bays, (2) 765/400 KV 1500 MVA Auto- transformer and 765 KV 4*80 MVAR Bus Reactor at Raigarh (near Tamnar) with associated bays under establishment of Pooling stations at Raigarh (near Kotra) and Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh (Set B/ WR1-IPPB) in Western Region for tariff block 2009-14. 23-09-2013

Petition No.162/TT/2013
Transmission Tariff for (1) 400 KV D/C Raipur (Existing)- Raipur PS (Durg) T/L with associated bays, (2) 400 KV D/C Raighar PS (Near Kotra)- Raighar (existing) S/S T/L with associated bays, & (3) ICTs & Reactors at Raighar (Kotra) and Raipur (Durg) with associated bays under Establishment of pooling stations at Raighar (Kotra) and Raipur for IPP Generation Projects in Chhatisgarh (Set A/ DPR-1) in WR. 20-09-2013

Petition No. 39/TT/2013
Determination of Transmission Tariff for spare ICT at Hissar and Spare ICT at Lucknow under Provision of Spare interconnecting transformers (ICTs). 18-09-2013

Petition No.98/TT/2013
Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14 period. 19-09-2013

Docket No.92/2013
Determination of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region. 20-09-2013

Petition No. 51/TT/2013
Approval of transmission tariff for (i) 765/400 KV 3x500 MVA ICT-II and other assets under Sasan UMPP TS in Western Region for Tariff block 2009-14. 16-09-2013

Docket No.96/2013
Determination of transmission tariff of Asset1: LILO of 400KV D/C Kahalgaon- Biharshariff T/L (1st Line) and associated bays at Lakhisarai S/s; Asset II: 400/132 KV, 200 MVA ICT-I along with associated bays at Lakhisarai S/s; Asset III: 400/132 KV, 200 MVA ICT-II along with associated bays at Lakhisarai S/s; Asset IV: 400 KV, 80 MVAR, Bus Reactor with associated bays at Lakhisarai S/s asssociated with ERSS-III in Eastern Region. 16-09-2013

Petition No.207/TT/2012
Determination of transmission tariff of assets under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in NR. 16-09-2013

Petition No. 214/TT/2012
Approval of Transmission Tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 16-09-2013

Petition No. 110/TT/2013
Approval of transmission tariff for (a) 400/220kV 500MVA ICT-II along with associated 400/220 kV bays at Jind S/s and 1 no. of 220kV Line Bays Anticipated DOCO (01.06.2013) (b) 01 no. of 400 kV, 125MVAR Bus Reactor at Jind S/s along with associated bays under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14. 05-09-2013

Petition No. 187/TT/2011
Approval of transmission tariff for combined elements under common scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common Scheme for Network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14. 03-09-2013

Docket No. 45/TT/2011
Approval under regulation 86 of CERC terms and conditions of tariff Regulations2009 for determination of Transmission Tariff from anticipated DOCO 01.01.2012 to 31.03.2014 for 400KV D/C Neemrana-Sikar line along with associated bays under Northern Region System Strengthening Scheme-XVII, for tariff block 2009-14 period in Northern Region. 30-12-2011

Petition No. 70/TT/2012
Approval of transmission tariff for assets associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern Region. 23-08-2013

Petition No. 58/TT/2013
Approval of transmission tariff for Extension of 400/220 kV Ballabhgarh S/S (Realignment Work) under 765 kV System for Central Part of Northern Grid Part-III for tariff block 2009-14 in Northern Region. 22-08-2013

Petition No. 36/TT/2013 (Earlier Docket No. 9/TT/2013)
Approval of transmission tariff for assets under NRSS XX. 20-08-2013

Petition No. 214/TT/2012
Approval of Transmission Tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 19-08-2013

Petition No. 104/TT/2013
Approval of transmission tariff of Asset 1: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line and Asset 2: Reconductoring Ckt-II of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region. 07-08-2013

Petition No. 99/TT/2013
Approval of tariff of Asset- I: 400kV Line Bays at Biharshariff S/s along with 80MVAR Switchable Line Reactors for the 400kV D/C Purnea-Biharshariff T/L; Asset-II: 400kV Line Bays at Purnea S/s for the 400kV D/C Purnea-Biharshariff T/L under Transmission schemes for enabling import of NER/ER Surplus power by NR in Eastern Region.- 07-08-2013

Petition No. 101/TT/2013
Approval of transmission tariff of 400 kV D/C Baharampur-Bheramara T/L, LILO of 400 kV S/C Farakka-Jeerat T/L at Baharampur, 1 no. 80 MVAR bus reactor and associated line bays and Reactor bay at Baharampur associated with interconnection of electrical grids of India and Bangladesh (Indian portion) for tariff block 2009-14 period. 07-08-2013

Docket No. 95/TT/2012
Approval of Transmission Tariff for (i) 765 KV S/C Satna-Bina Ckt-2 TL along with associated bays at Satna & Bina S/S (ii) 765 KV, 3*80 MVAR Bus Reactor at Santa (iii) 765 KV, 4*333 MVA ICT-1 at Santa along with associated bays of 765 KV & 400 KV, (iv) Upgradation of existing Seoni-Bina TL at 765 KV level along with associated bays at Seoni SS & Bina SS under Sasan UMPP TS in Western region for tariff block 2009-14 period. 09-11-2012

Petition No. 54/TT/2013
Approval of Transmission Tariff for Asset: 125 MVAR at Bus Reactor associated with NRSS-XIII, for tariff block 2009-14. 05-08-2013

Petition No. 100/TT/2013
Approval of transmission tariff for Asset-I: "400/220kV, 315MVA ICT-II at Samba S/s along with associated bays and 3 nos. 220kV Line bays" and Asset-II: 1 no. 400kV, 80MVAR Bus Reactor at Samba S/s along with associated bays under NRSS-XXII for Tariff block 2009-14 period in Northern Region. 05-08-2013

Petition No. 102/TT/2013
Approval of transmission tariff for Thermal Powertech Corporation India limited-Nellore Pooling station TL with associated bay extensions for the period in Southern region for tariff block 2009-14. 05-08-2013

Petition No. 111/TT/2013
Approval of transmission tariff of elements for Asset-I: 400/220KV, 315MVA ICT-II along with 3 Nos. 220 kV Line bays at New Wanpoh, Asset-II: 400KV, 125MVAR Bus Reactor alongwith associated bays at New Wanpoh associated with Northern region Strengthening Scheme-XVI (NRSS-XVI), for tariff block 2009-14 period in NR. 01-08-2013

Petition No. 101/TT/2012
Approval of Transmission Tariff of Asset-I: 400kV D/C (Quad) LILO of Barh-Balia line at Patna alongwith associated bays at Patna S/S, Asset-II: 765/415kV, 3x500 MVA ICT-I Ranchi alongwith associated bays at 765kV Ranchi S/S , Asset-III: Combined Assets of 400kV D/C (Quad) Ranchi (New)-Ranchi (Old)-I T/L and associated 400kV line bays at Ranchi (New) S/S and Ranchi (Old) S/S and 400 kV D/C (Quad) Ranchi (New) S/S and Ranchi (Old) S/S, and 765/415kV, 3x500 MVA ICT-II at Ranchi alongwith associated bays at 765kV Ranchi S/S, Asset-IV: 765/415kV, 3x500 MVA ICT at Sasaram alongwith associated bays under Common Scheme for 765kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 01-08-2013

Petition No. 102/TT/2013
Approval of transmission tariff for Thermal Powertech Corporation India Limited – Nellore Pooling Station TL with associated bays extension for the period from DOCO to 31.3.2014 in Southern Region for Tariff block 2009-14. 16-07-2013

Petition No. 217/TT/2012
Approval of Transmission Tariff for 3x110 MVAR, 1-Phase 765 kV Shunt Reactor including Surge Arrestor and NGR (Neutral Grounding Reactor) at Sasaram sub-station under Sasan UMPP TS in Northern Region for tariff block 2009-14 period.. 30-07-2013

Petition No. 101/TT/2013
Approval of Transmission Tariff of 400 kV D/C Baharampur-Bheramara T/L, LILO of 400kV S/C Farakka-Jeerat T/L at Baharampur, 01 no 80 MVAR Bus Reactor and associated line bays and Reactor Bay at Baharampur associated with Interconnection of Electrical Grids of India and Bangladesh (Indian Portion).. 16-07-2013

Petition No. 120/TT/2013
Approval of Transmission Tariff for 240 MVAR Switchable Line Reactor along with associated bays at Bilaspur Pooling Station under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period.. 17-07-2013

Petition No. 99/TT/2013
Approval of tariff of Asset-1 400kV line Bays at Biharshariff S/S along with 80 MVAR Switchable line Reactors for the 400kV D/C Purnea- Biharshariff T/L; Asset-2 400kV Bays at Purnea S/S for the 400 kV D/C Purnea- Biharshariff T/L under transmission schemes for enabling import of NER/ER surplus power by NR in Eastern Region.. 17-07-2013

Petition No. 105/TT/2012
Approval of Transmission Tariff of assets under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 12-07-2013

Petition No. 111/TT/2013
Approval of Transmission Tariff for Asset 1: 400/220kV, 315MVA ICT-II along with 03 No. 220kV Line bays at New Wanpoh. Asset 2:400kV, 125MVAR Bus Reactor along with associated bays at New Wanpoh associated with NRSSXVI, for tariff block 2009-14. 09-07-2013

Petition No. 105/TT/2012
Approval of Transmission Tariff of assets under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 08-07-2013

Petition No. 113/2013
Approval of transmission tariff for 400 KV 1*63 MVAR Bus Reactor along with associated 400 KV bays at Satna S/S and 400 KV D/C QUAD BASSI-JAIPUR (RPVNL) LINE associated with Vindhyachal IV & Rihand III (1000MW) Generation Project in Western Region for tariff block 2009-14 24-06-2013

Petition No. 109/TT/2013
Approval of transmission tariff for 125 MVAR Bus Reactor Agra under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14. 20-06-2013

Petition No. 100/TT/2013
Approval of transmission tariff of assets under NRSS-XXII for Tariff block 2009-14 in Northern Region. 17-06-2013

105/TT/2013
Approval for 1X80 MVAR, 420 KV, 3 Phase Bus Reactor at 400 KV Balipara S/S under Transmission System associated with North East/Northern Western Interconnector- I and Transmission System of Kameng HEP in North Eastern Region for tariff block 2009-14 period 18-06-2013

Petition No. 108/TT/2013
Approval of Transmission tariff for assets under Sasan UMPP transmission system in Western Region for tariff block 2009-14. 17-06-2013

Petition No. 110/TT/2013
Approval of Transmission Tariff for (a) 400/220 KV 500MVA ICT-II alongwith associated 400/220 KV bays at Jind S/s and 01 no of 220 KV Line bays (b) 1 no of 400 KV, 125 MVAR Bus Reactor at Jind S/s alongwith associated bays under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14. 17-06-2013

Petition No. 104/TT/2013 Docket No. 76/2013
Approval under regulation-86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of Transmission tariff for Asset 1: Reconductoring Ckt- I of 400 KV D/C Siliguri – Purnea (HTLS Cond.) Transmission Line and Asset 2: Reconductoring Ckt- II of 400 KV D/C Siliguri – Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated date of commercial operation (1.6.2013) to 31.3.2014. 06-06-2013

Petition No. 101/TT/2013 Docket No. 62/2013
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff of 400kV D/C Baharampur-BheramaraT/L, LILO of 400kV S/C Farakka-Jeerat T/L at Baharampur, 01 no 80 MVAR Bus Reactor and associated line bays and Reactor Bay at Baharampur associated with Interconnection of Electrical Grids of India and Bangladesh (Indian Portion) from Anticipated DOCO (01.05.2013) to 31.03.2014 for tariff block 2009-14 period. 05-06-2013

Petition No. 108/TT/2012
Approval of Transmission Tariff for 2 No. of 220 KV Bays at Trivandrum under Transmission system associated with Kudankulam in Southern Region for tariff Block 2009-14. 29-04-2013

Petition No. 86/TT/2012
Approval for determination of transmission tariff for (i) Vindhyachal IV- Vindhyachal Pooling Station 400 KV D/C (QUAD) (Bypassing Vindhyachal Pooling Station) TL and (ii) 400 kV D/C Sasan- Vindhyachal Pooling Transmission Line associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project (under interim contingency arrangement for power evacuation) in Western Region for tariff block 2009-14 period 29-04-2013

Petition No. 95/TT/2012
Approval of Transmission Tariff for (under contingency plan for power evacuation of NTPC -VSTPP#4 Generation Project) associated with Sasan UMPP TS in Western Region for tariff block 2009-14 period. 14-11-2012

Petition No. 32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period. 10-04-2013

Petition No. 43/TT/2013
Approval of transmission tariff for Spare ICTs and Reactors under Provision of Spare ICTs and Reactors for Eastern Region from DOCO to 31.03.2014. 05-04-2013

Petition No. 205/2009
Approval of incentive based on availability of transmission system for the year 2008-09 for Western Region. 05-04-2013

Petition No. 196/2009
Approval of incentive based on availability of transmission system for the year 2008-09 for Eastern Region. 05-04-2013

Petition No. 200/TT/2012
Approval of transmission tariff for 765 KV S/C Fatehpur-Agra TL associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern Region. 05-04-2013

Petition No. 45/TT/2013
Approval of date of commercial operation and approval of transmission tariff from date of commercial operation to 31.3.2014 for transmission system associated with Kameng Hydro-Electric Project for tariff block 2009-14 period in North Eastern Region 05-04-2013

Docket No.19/TT/2013

Approval of transmission Tariff from provision of Bus Reactors in Northern Region (Group-II), for tariff block 2009-14 period in Northern Region.
21-03-2013

Docket No. 20/TT/2013

Approval of transmission tariff for transmission assets (Group-4) associated with 765 kV system for Central part of Northern Grid, Part-II, for tariff block 2009-14.
19-03-2013

Petition No.99/TT/2013

Approval of transmission tariff for assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 period in Northern Region.
19-03-2013
Docket No. 25/TT/2013

Approval of transmission tariff for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for 2009-14.
15-03-2013

Docket No. 13/TT/2013

Approval of transmission tariff for assets under NRSSS-XIII for 2009-14 period.
15-03-2013

Petition No. 51/TT/2013

Approval of transmission tariff for assets under Sasan UMPP TS in Western Region for Tariff block 2009-14.
13-03-2013

Petition No.69/TT/2012

Approval of Transmission Tariff for Combined Assets-I+II: (I) 400KV D/C Manesar-Neemrana Line along with associated bays and (II) 400KV D/C Bhiwadi-Neemrana Line and Asset-III: 2X315MVA 400/220KV ICTs at Neemrana under the Transmission System associated with NRSS-XV, for tariff block 2009-14 period in Northern Region.
11-03-2013

Docket No.14/TT/2013

Approval of transmission tariff for NRSS- XVI for the tariff period 2009-14.
06-03-2013

Docket No.16/TT/2013

Approval under Regulation 86 for determination of transmission tariff for provision of Spare ICTs and Reactors for Eastern Region.
05-03-2013

Docket No.21/TT/2013

Approval of Transmission Tariff of 2 nos. 400 KV line bays along with 2 nos. 80 MVAR switchable line reactors at 400 KV Silliguri S/S and 2 nos. 400 KV line bays at Bongaigaon S/s under Transmission schemes for enabling import of NER/ER surplus power by NR in Eastern Region for tariff block 2009-14 period.
27-02-2013

Docket No.32/TT/2013

Approval of transmission Tariff of Assets: 765 KV, 240 MVAR Switchable Line Reactor under Bus Reactor at Ballia S/s; Assets II: 765 KV Line bays at Sasaram S/s (for 765 KV Sasaram-Fatehpur TL under SASAN Project) under Common Scheme for 765 KV Pooling Station and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14.
26-02-2013

Docket No.9/TT/2013

Approval of Transmission Tariff for Northern Region System Strengthening Scheme (NRSSS) -XX for Tariff block 2009-14.
28-02-2013

Docket No.24/TT/2013

Approval of transmission tariff for 315 MVA, 400/220/33 KV 3-phase Spare Transformer at Madurai SS & 400, 80 MVAR Spare reactor at Gooty SS under provision of Spare ICTs and Reactors for Southern Region.
22-02-2013

Docket No.11/TT/2013

Approval of transmission tariff for 315MWA, 400/220/33 KV 3-phase Spare Transformer at Dehgam SS, 315 MWA, 400/220/33 KV 3-Phase Spare Transformer at Jabalpur SS, 400, 125 MVAR 3ph Spare reactor at Itarsi SS under Provision of Spare ICTs and Reactor for Western Region.
22-02-2013

Docket No.19/TT/2013

Approval of transmission Tariff for provision of Bus Reactors in Northern Region (Group-II), for tariff block 2009-14 period in Northern Region.
21-02-2013

Docket No.3/TT/2013

Approval of the Transmission Tariff for installation of 400/220 kV, 1x315 MVA Auto Transformer at 400/220 kV Sub Station at Vapi under Western Region.
21-02-2013

Docket No.6/TT/2013

Approval of Transmission Tariff for 400 kV D/C Kishenpur-Samba T/L along with bays at both ends, 1 no. 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 3 nos. 220 kV Line bays under the Northern Region System Strengthening Scheme-XXII for Tariff block 2009-14 in Northern Region.
20-02-2013

Docket No.4/TT/2013

Approval of transmission tariff for Vallur TPS- Melakottaiyur 400 kV D/C Line under supplementary Transmission System associated with Vallur TPS for the period from DOCO to 31.3.2014 in Southern Region for tariff block 2009-14.
20-02-2013

Docket No.14/TT/2013

Approval of transmission tariff for Northern Region System Strengthening Scheme-XVI for Tariff block 2009-14 period in Northern Region.
20-02-2013

Docket No.18/TT/2013

Approval of Transmission Tariff for (A) LILO of 400 kV Simhapuri & Meenakshi-Nellore 400 kV D/C (quad) line, (B) Associated bays and common systems at Nellore Pooling station for ISGS projects in Krishnapattanam Area of Andhra Pradesh for the period from anticipated DOCO to 31.3.2014 in Southern Region.
20-02-2013

Docket No.12/TT/2013

Approval of Transmission Tariff for Nellore – Gooty 400 kV D/C (quad) line under ATS of Krishnapattanam UMPP Part-A for the period from anticipated DOCO to 31.03.2014 in Southern Region for tariff block 2009-14.
19-02-2013

Docket No.10/TT/2013

Approval of transmission tariff for 400 kV D/C Raipur – Wardha TL alongwith FSC at Wardha under WRSS-II Set-A Scheme of Western Region from DOCO to 31.3.2014.
18-02-2013

Petition No.113/TT/2012

Petition for approval of Transmission Tariff from anticipated DOCO to 31.03.2014 for "Spare interconnecting transformers (ICTs) for Northern Region" for tariff block 2009-14.
31-01-2013

Petition No.
202/TT/2012

Approval of transmission Tariff of Assets associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO to 31.03.2014.
28-01-2013

Docket No.
9/TT/2013

Approval of Transmission Tariff for Northern Region System Strengthening Scheme (NRSSS) -XX for Tariff block 2009-14.
28-01-2013

Petition No.
74/TT/2012

Approval under sub-section(4) of Section 28 of Electricity Act 2003 for determination of Fees and charges for National Load Despatch Centre- NLDC (POWERGRID portion) for the tariff block 2009-14 .
03-12-2012

Petition No.
68/TT/2012

Approval of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets (part-II) under Common Scheme for 765 KV Pooling Stations and Network for NR, Important by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 .
03-12-2012

207/TT/2012

Approval of Transmission tariff of Elements of assets (6 nos. Bus Reactors-part-IV) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period .
25-10-2012

92/TT/2012

Approval for determination of transmission Tariff for LILO of 400 KV S/C Meramundali-Jeypore Transmission Line and associated bays at Bolangir Sub-station alongwith 02 Nos 50 MVAR Shunt Reactor ,01 No 80 MVAR Bus Reactor and 02 Nos 315 MVA associated with Eastern Region Strengthening Scheme-III in Eastern Region .
25-10-2012

213/TT/2012

Approval of Transmission Tariff for Transmission Assets under Eastern Region Strengthening Scheme – III in Eastern Region .
03-10-2012

198/TT/2012

Approval of transmission tariff of assets under Common scheme for 765 KV pooling Stations and Network for NR, Import by NR from ER and NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from ER and from NER/SR/WR via in Eastern Region for tariff block 2009-14 period .
05-10-2012

215/TT/2012

Approval of Transmission Tariff for (i) 765 KV S/C Satna-Bina Ckt-2 TL along with associated bays at Satna & Bina S/S (ii) 765 KV, 3*80 MVAR Bus Reactor at Santa (iii) 765 KV, 4*333 MVA ICT-1 at Santa along with associated bays of 765 KV & 400 KV, (iv) Upgradation of existing Seoni-Bina TL at 765 KV level along with associated bays at Seoni SS & Bina SS under Sasan UMPP TS in Western region for tariff block 2009-14 period .
03-10-2012

199/TT/2012

Approval of Transmission Tariff for Assets under 765 KV system for Central part of Northern Grid part-I, for Tariff block 2009-14 period in Northern region .
03-10-2012

213/TT/2012

Approval of Transmission Tariff for Transmission Assets under Eastern Region Strengthening Scheme – III in Eastern Region .
03-10-2012

202/TT/2012

Approval of transmission Tariff of Assetsunder Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO to 31.03.2014 .
03-10-2012

224/TT/2012

Approval of transmission Tariff for assets associated with Gas Based Combined Cycle Power Project (GBCCPP) of ONGC Tripura Power Company Limited, New Delhi .
01-10-2012

206/TT/2012

Approval of Transmission Tariff of Asset I: 160 MVA Transformer (Ist) and associated bays at Malda S/s; Asset II: 160 MVA Transformer (2nd) and associated bays at Malda S/s; Asset III: 01 No. 400KV bay at Malda S/s; Asset IV: 160 MVA Transformer and associated bays at 220/132 KV Birpara S/s; Asset V: 160 MVA Transformer and associated bays at 220/132 KV Siliguri S/s under ERSS-IV in Eastern Region .
01-10-2012

195/TT/2012

Approval of transmission tariff for 1 no .400 KV 63 MVAR Line Reactor at Cochin for the period from DOCO to 31.03.2014 under Kudankulam ATS in SR for Tariff block 2009-14 .
01-10-2012

204/TT/2012

Approval of Transmission tariff for 315 MVA, 400/220/33 KV 3-Phase Spare ICT at Raipur SS, 315 MVA, 440/220/33 KV 3- phase Spare ICT at Pune SS & 420, 80MVAR 3 phase Spare shunt reactor at Wardha SS under Provision of Spare ICTs and Reactor for Westren Region from DOCO to 31.3.2014 .
25-09-2012

196/TT/2012

Approval for determination of Transmission Tariff from DOCO to 31.03.2014 for 15.5 Km Loop in portion of the line section to provide arrangement for evacuating ROJA power out of the LILO of both Ckts of 400 KV D/C Bareilly-Lucknow line under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
27-09-2012

203/TT/2012

Approval for 400 KV 80 MVAR Bus Reactor at Neemrana S/S under the Transmission System associated with Northern Region System Strengthening Scheme-XV (NRSS-XV), for tarrif block 2009-14 period in Northern Region .
25-09-2012

188/TT/2011

Determination of transmission tariff for (a) Combined elements of Talcher and Kolar (HVDC- portion) and (b) Combined elements of Talcher and Kolar (AC portion) from 01.04.2009 to 31.3.2014 in Southern Region .
25-09-2012

201/TT/2012

Approval of Transmission Tariff for Transmission assets (Group - 3) associated with 765 kV system for Central Part of Northern Grid Part – II, for Tariff Block 2009-14 period in Northern Region .
24-09-2012

216/TT/2012

Approval of transmission Tariff for 400 KV Line bays at Silchar S/S and Bongaigaon line of NETC along with 2 Nos. of Switchable line reactors at Silchar and Bongaigaon S/S each under Transmission System associated with Pallatana GBPP and Bongaigaon TPS, for 2009-14 period in North Eastern Region .
24-09-2012

194/TT/2012

Approval for determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for Associated line bays for 765 kV for Fatehpur- Agra T/L at Fatehpur and Agra S/S under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period .
24-09-2012

187/TT/2011

Approval of Transmission Tariff of Combined Elements from DOCO to 31.4.2014 for combined assets (part) for Asset -I 400kV D/C Lucknow (NEW)- Lucknow (Old) line with associated bays at both end, Asset - 2 765 kV S/C Balia S/S alongwith associated bays at both ends , Assets -3 765/400 kV , 1500 MVA ICT I at Ballia S/S alongwith associated bays and Asset -4 765/400 kV , 1500 MVA ICT I at Lucknow S/S alongwith associated bays 5 Associated bays at Biharshariff and Sasaram end ( for Biharshariff -Sasaram 400 kV quad T/L under Supplementary transmission system for DVC Maithon Right Bank Project) Under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common Scheme for Network for WR and Import by WR from ER and from NER /SR/ WR via ER in Northern Region for tariff block 2009-14 .
24-09-2012

85/TT/2012

Approval of Transmission Tariff for 400/220 kV New GIS Sub-station at Navi Mumbai along with LILO of Lonikhand – Kalwa T/L (Ant. DOCO: 01.04.2012) under WRSS – V Transmission System in Western Region .
24-09-2012

200/TT/2012

Approval for determination of transmission tariff for 765 KV S/C Fatehpur-Agra TL associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern region .
11-09-2012

92/TT/2012

Approval for determination of transmission Tariff for LILO of 400 KV S/C Meramundali-Jeypore Transmission Line and associated bays at Bolangir Sub-station alongwith 02 Nos 50 MVAR Shunt Reactor ,01 No 80 MVAR Bus Reactor and 02 Nos 315 MVA associated with Eastern Region Strengthening Scheme-III in Eastern Region .
11-09-2012

89/TT/2012

Approval for determination of Transmission Tariff for (a) 2X500MVA ICTs At Jaipur-South, (b) 2X315 MVA ICTs AT Sohawal and (c) Combined tariff of LILO of 400 KV D/C Agra Jaipur line at Jaipur-South, & LILO of 400 KV D/C Balia Lucknow Line at Sohawal under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
11-09-2012

84/TT/2012

Approval for determination of transmission tariff for (i) 400/220KV, 315 MVA ICT-I along associated bays at Bhiwani S/S and (ii) 400/220 KV, 315 MVA ICT-II alongwith associated bays at Bhiwani S/S under 765 KV system for Central Part of Northern Grid Part III for Tariff block 2009-14 period in Northern Region .
04-09-2012

82/TT/2012

Approval of transmission tariff for 400 KV 80 MVAR Bus Reactor at Neemrana S/S under the Transmission System associated with Northern Region System Strengthening Scheme-XV, for tariff block 2009-14 in Northern Region .
03-09-2012

78/TT/2012

Determination of transmission tariff for Asset-I: LILO of both circuits of 400 kV D/C Bamnouli- Mundka/ Bawana at Jatikalan 765/400 kV S/S, Asset-II: Agra- Jatikalan 765 kV S/C T/L and Asset-III: Agra- Meerut 765 kV S/C T/L under 765 kV system for Central Part of Northern Grid Part-I, for tariff block 2009-14 period in Northern Region. .
31-08-2012

77/TT/2012

Determination of transmission tariff of Asset-1: 400 kV, 125 MVAR Bus Reactor –I at Sasaram Substation alongwith associated bays, Asset-II: 400 kV, 125 MVAR Bus Reactor –II at Sasaram Substation alongwith associated bays; Asset-III: 2 Nos. 50 MVAR switchable Line Reactors at Maithon substation under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period .
29-08-2012

184/TT/2011

Approval for determination of Combined Transmission System from anticipated DOCO: 1.1.2012 to 31.3.2014 for assets .
30-08-2012

112/TT/2012

Approval for determination of Transmission tariff for Northern Region System Strengthening Scheme-V, for tariff block 2009-14 period in Northern Region .
30-08-2012

Docket
72/TT/2012

Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Condition of Tariff) Regulations, 2009 for determination of transmission tariff for 1 no. 400 kV 63 MVAR line reactor at Cochin (DOCO: 1.6.2012) for the period from DOCO to 31.3.2014 under Kudankulam ATS in Southern Region for tariff block 2009-14 period .
07-08-2012

98/TT/2012

: Approval under Regulation-86 for transmission tariff for (I) 132 kV Silchar-Hailakadni (AEGCL) line alongwith associated bays (anticipated DOCO:1.4.2012), (II) 200 MVA, 400/132 kV ICT-II at Silchar along with associated bays (anticipated DOCO: 1.4.2012), (III) 400 kV D/C Pallatana-Surajmaninagar line (charged at 132 kV) along with associated bays (anticipated DOCO: 1.7.2012), (IV) 400 kV Silchar-Purbakanchanbari line (charged at 132 kV) along with associated bays (anticipated DOCO :1.7.2012) and (V) 080 MVAR, 420 kV Bus reactor at Bongaigaon along with associated bays (anticipated DOCO :1.7.2012), under transmission system associate with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for Tariff block 2009-14 period .
02-08-2012

88/2011

Approval under Regulation-86 for transmission tariff for Asset I : (a) LILO of 400 kV D/C Bina-Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur & Switchable shame for Reactor at Bina & Nagda S/S (b) New 400/220 kV S/S at Shujalpur (Ant. DOCO : 1.4.2011), Asset II: Combined asset of (a) LILO of 400 kV D/C Bina-Nagda at Shujalpur S/s alongwith 50 MVAR Line Reactor at Shujalpur & Switchable scheme for Reactor at Bina & Nagda S/S (b) New 400/220 kV S/S at Shujalpur (Ant. DOCO : 4.4.2011) and 400 kV, 63 MVAR Bus Reactor at Shujalpur along with associated bays of 400 kV (Ant DOCO : 1.8.2011) (Notional DOCO: 1.8.2011) Asset III: 400/220 kV ICT I at Shujalpur laong with associated bays of 400kV & 220 kV (Ant. DOCO: 1.6.2011) Asset IV : Combined asset of 400/220 kV ICT I (Ant. DOCO: 1.6.2011) & ICT II at Shujalpur along with associated bays of 400 & 220 kV (Ant. DOCO: 1.8.2011) (Notional DOCO: 1.8.2011) under WRSS IX Transmission Scheme in WR for the period from DOCO to 31.3.2014 .
30-07-2012

65/TT/2012

Approval under Regulation 86 of CERC (Conduct of Business) Regulations' 1999, and CERC (Terms and Conditions of Tariff) Regulations' 2009, for determination of Transmission Tariff from anticipated DOCO to 31.3.2014 for a) LILO of Neelamangala-Somanhalli 400 kV D/C Line at Bidadi with IX 63 MVAR Bus Reactor (anticipated DOCO 1.1.2012), and b) 2X 500 MVA ICTs with associated bay and equipment along with downstream network at Bidadi GIS S/S (anticipated DOCO 1.1.2012) under System strengthening-X in Southern Region Grid. .
30-07-2012

107/TT/2012
in Docket No.
39/TT/2012

Approval under regulation-86 for transmission tariff for (i) One Ckt of part of 400 KV korba- Birsinghpur D/C line (from Korba Gantry to LILO point) Loc.- 179/2 of Balco TPS (Ant. DOCO: 01.08.2011), (ii) Combined Assetsof (i) & One Ckt of Part of 400kv Korba- Birsinghpur D/C line (from korba Gantry to LILO point) Loc.-179/2) along with bay at Korba and D/C line from Loc 179/2 to 176/0 of Vandana TPS (Notional DOCO: 01.12.2011) & (iii) Combined Assets of (ii) & Bal;ance portion of 400Kv D/C Korba- Birsinghpur Tl (from LILO point 176/0 (take off for Vandana Vidyut) to Birsinghpur (MP) (Notional DOCO: 01.03.2012) under WRSS-II, set D Scheme of Western Region for tariff block 2009-14 period .
24-07-2012

60/TT/2012

Approved under Regulation-86 of CERC (Conduct of Business) Regulations' 1999 and CERC (Terms and Conditions of Tariff) Regulation' 2009 for determination of Transmission Tariff for 765 kV S/C Fatehpur-Agra Transmission Line (DOCO: 1.6.2012) associated with supplementary Transmission System under DVC and Maithon right bank project in Eastern Region from DOCO to 31.3.2014.
20-07-2012

70/TT/2012

Approval under Regulation-86 of CERC (Conduct and Business) Regulation’ 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of transmission tariff of Elements from DOCO to 31.3.2014 for assets (Part-III) under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period..
12-07-2012

75/TT/2012

Approval under Regulation-86 for determination of transmission tariff for Spare Convertor Transformer at Rihand (DOCO: 01.12.2011) for Rihand- Dadri HVDC Bipole Terminal from anticipated DOCO to 31.03.2014 in NR for tariff block 2009-14 period.
06-07-2012

77/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-I) associated with 765 kV system for Central Part of Northern Grid Part-II for tariff block 2009-14 period in Northern Region.
06-07-2012

80/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 from anticipated DOCO to 31.03.2014 for 50 % series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar) – Meerut 765 kV 2*S/C lines (charged at 400 kV) under Transmission System associated with Koteshwar HEP, for tariff block 2009-14 period in Northern Region.
06-07-2012

82/TT/2012

Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Asset-I: 765 kV Moga- Bhiwani T/L (Anticipated DOCO: 01.04.2012) and Asset-II: 765 kV Jattikalan- Bhiwani T/L (Anticipated DOCO: 01.07.2012) associated with 765 kV system for Central Part of Northern Grid Part-I, for tariff block 2009-14 period in Northern Region
06-07-2012

99/TT/2012

Approval under Regulation 86 of CERC (Conduct of Business) Regulation,1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of Transmission Tariff for Transmission assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 period in Northern Region
06-07-2012

90/TT/2012

Approval under Regulation-86 of CERC (Conduct and Business) Regulation’ 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of transmission tariff of Elements from DOCO to 31.3.2014 for assets (Part-III) under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period
12-07-2012

91/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff from DOCO: 31.03.2014 for Combined Assets for transmission system associated with PARABATI-III- HEP in Northern Region for tariff block 2009-14 period
04-07-2012

87/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff from DOCO: 31.03.2014 for Assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period
04-07-2012

86/2012

Approval for determination of transmission tariff for (i) Vindhyachal IV- Vindhyachal Pooling Station 400 KV D/C (QUAD) (Bypassing Vindhyachal Pooling Station) TL and (ii) 400 kV D/C Sasan- Vindhyachal Pooling Transmission Line associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project (under interim contingency arrangement for power evacuation) in Western Region for tariff block 2009-14 period
18-05-2012

185/2011

Determination for transmission tariff for 400 kV D/C Andal (DVC) Jamshedpur Section of Durgapur-Jamshedpur Transmission line and associated bays at Jamshedpur S/S under ERSS -I in Eastern Region from Ant. DOCO (01.01.2012) to 31.03.2014
18-05-2012

96/TT/2012

Approval for determination of transmission tariff for Pole-II of +/- 500 kV, 2500 MW Balia- Bhiwadi HVDC Bipole associated with Barh Generation Project (3x660 MW) in Northern Region from anticipated date of commercial operation (1.7.2012) to 31.3.2014
15-05-2012

65/TT/2012

Approval for determination of transmission tariff for (a) LILO of Neelamangala-Somanhalli 400 KV D/C Line at Bidadi with 1X63 Bus Reactor and (b) 2X500 MVA ICTs with associated bay and equipments along with downstream network at Bidadi GIS S/S under System strengthening -X MVAR in Southern Regional Grid
15-05-2012

63/TT/2012

Approval for determination of Transmission tariff for Tuticorin JV-Madurai 400KV D/C (Quad Conductor) Line and extension of 400/220 KV Madurai S/S under ATS of Tuticorin JV PPS in Southern Region.
14-05-2012

102/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulation 1999 and CERC (Terms and Conditions of Tariff) Regulations 2009 for determination of Transmission Tariff from DOCO to 31.03.2014 for Combined Assets for transmission system associated with Northern Region Bus Reactor Scheme in Northern Region for tariff block 2009-14 .
15-05-2012

127/2012

Application under Section 63 of the Electricity Act,2003 for adaptation of transmission charges with respect to the transmission system being established by the Vemagiri transmission system Limited (a 100% wholly subsidiary of PGCIL) .
10-05-2012

97/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff of Elements from date of commercial operation to 31.3.2014 for assets(part) under System strengthening scheme in Northern region for Sasan & Mundra UMPPs for tariff block 2009-14 period .
14-05-2012

95/TT/2011

Approval under Regulation-86 of CERC (conduct of Business) Regulations'1999 and CERC (Terms and Condition) Regulations'2009 for determination of Transmission Tariff (i) LILO of 400 kV D/C Vindhyachal-Jabalpur ckt 3&4 TL at Sasan (Anticipated DOCO 01.03.2012) (ii) 765 kV S/C Sasan-Satna Ckt-1 TL (initially charged at 400 kV level) along with associated bays at Satna (under contingency plan for power evacuation of NTPC-VSTPP#4 Generation Project) (Anticipated DOCO 01.03.2012), (iii) 765 kV S/C Satna-Bina Ckt#1 TL (initially charged at 400 kV level) along with associated bays at Satna& Bina S/S (under contingency plan evacuation of NTPC-VSTPP#4 Generation Project) (Anticipated DOCO 01.03.2012), (iv) 765 kV S/C Bina-Indore TL (initially charged at 400 kV level) along with associated bays at Bina S/S (Bypassing Indore (new-POWRGRID) SS{under contingency plan for evacuation of NTPC-VSTPP#4 Generation Project}) (Anticipated DOCO 01.04.2012) & (v) 400 D/C (quad) Indore (new)-Indore (MPPTCL) TL along with associated bays at Indore (MPPTCL) SS Bypassing Indore (New POWERGRID) SS for interconnection with Bina- Indore Line {under contingency plan for power evacuation of NTPC-VSTPP#4 Generation Project} associated with Sasan UMPP TS in western Region for tariff block 2009-14 period .
7-05-2012

99/TT/2012

Approval for determination of Transmission Tariff for assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 in Northern Region .
27-04-2012

98/TT/2012

Approval of Transmission Tariff from anticipated notional DOCO to 31.3.2014 for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14 .
27-04-2012

100/TT/2012

Approval for determination of transmission tariff for transmission assets (Group-2) associated with 765 kV System for Central Part of Northern Grid Part-II for tariff block 2009-14 in Northern Region .
16-04-2012

72/TT/2012

Approval for transmission tariff for (I) Combined assets of Establishment of 765/400 KV 1500 MVA ICT 3 with bays at Wardha SS, 400/220 KV Bachchau Substation (Gujrat) and 1*63 MVAR Bus Reactor at Bachchau Substation (New) along with associated bays, 400 KV Gandhar (NTPC)- Navsari line along with associated bays at Gandhar (NTPC) and Navsari (GIS) S/S, Navsari GiS S/S (New) & (II) Combined assets of (I) & 765/400 KV 1500 MVA ICT 2 at Wardha SS with bays & Bay Extension at 765 KV Seoni SS & Wardha SS for 765 Seoni- Wardha Ckt-I alongwith switchable Line Reactor at Seoni and under ATS for Mundra (4000MW) UMPP for the period from DOCO to 31.03.2014 .
16-04-2012

103/TT/2012

Approval for determination of transmission tariff for 400 kV D/C (QUAD) Mauda-Wardha TL with associated bays at Wardha S/S under Mauda TS in Western Region .
13-04-2012

89/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations2009 for determination of Transmission Tariff from anticipated DOCO to 31.03.2014 for (a) 2X500MVA ICTs At Jaipur-South (anticipated DOCO- 01.06.2012), (b) 2X315 MVA ICTs AT Sohawal (anticipated DOCO- 01.07.2012) and (c) Combined tariff of LILO of 400 KV D/C Agra Jaipur line at Jaipur-South (anticipated DOCO-01.07.2012), & LILO of 400 KV D/C Balia Lucknow Line at Sohawal- (anticipated DOCO- 01.07.2012) under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
11-04-2012

87/2012

Approval for determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 .
12-04-2012

94/TT/2012

Approval under Regulations-86 for transmission tariff for 125 MVAR Bus Reactor at 400/220 kV Rajgarh S/S with associated bays at Rajgarh S/S (Ant. DOCO: 1.5.2012) under 125 MVAR Bus Reactor at 400/220 kV Rajgarh S/S Scheme of Western Region from DOCO to 31.3.2012 .
12-04-2012

78/TT/2012

Approval under Regulations-86 for transmission tariff for 765 kV S/C Seoni-Wardha T/L (Anticipated DOCO: 1.3.2012) under WRSS-II, Set A Scheme of Western Region from DOCO to 31.3.2014 .
12-04-2012

71/TT/2012

Approval under regulation-86 of CERC (conduct of Business) regulations 1999 and CERC (terms and Conditions of tariff) Regulations 2009 for determination of Transmission Tariff from anticipated DOCO (01.01.2012) to 31.03.2014 for 315 MVA, 400/220 KV ICT at Bhiwadi under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
12-04-2012

91/TT/2012

Approval for determination of Transmission Tariff from DOCO to 31.03.2014 for Combined Assets for transmission system associated with PARABATI- III HEP in Northern Region for tariff block 2009-14 .
16-04-2012

85/TT/2012

Approval for transmission tariff for 400/220 KV New GIS S/S at Navi Mumbai along with LILO of Lonikhand-Kalwa TL (Ant. DOCO: 01.04.2012) under WRSS-V Transmission System in WR Region for the period from DOCO to 31.03.2014.. .
16-04-2012

76/TT/2012

Approval of Transmission charges for Additional Special Energy Meters in Northern Region for the Tariff Block 2009-14. .
13-04-2012

82/TT/2012

Approval for determination of Transmission Tariff for Assets I: 765 KV Moga- Bhiwani T/L (anticipated DOCO: 01.04.2012) and Assets II: 765 KV Jattikalan-Bhiwani T/L (anticipated DOCO: 01.07.2012) associated with 765 KV system for Central part of Northern Grid Part-I, for Tariff block 2009-14 period in Northern Region .
11-04-2012

79/TT/2012

Petition for determination of Transmission Tariff for Assets under Northern Region System Strengthening XIII (NRSS XIII) of Northern Region, for tariff block 2009-14 period .
11-04-2012

101/TT/2012

Petition for determination of transmission tariff for Assets I: 400 DC (Quad) LILO of Barh-Balia Line at Patna alongwith associated bays at Patna S.S; Asset II: 765-415 KV, 3x500 MVA ICT I Ranchi alongwith associated bays at 765 KV Ranchi S.S; Assets III: Combined Assets of 400 KV DC (Quad) Ranchi (New) - Ranchi (Old) - I T.L. and associated 400 KV line bays at Ranchi (New) S.S & Ranchi (Old) S.S; and 400 KV DC (Quad) Ranchi (New) - Ranchi (Old) - II TL and associated 400 kV line bays at Ranchi (New) SS & Ranchi (Old) SS; and 765-415 KV, 3x500 MVA ICT II at Ranchi alongwith associated bays at 765KV determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER-SR-WR via ER and Common scheme for network for WR and Import by WR from ER and from NER-SR-WR via ER in Eastern Region for tariff block 2009-14 .
10-04-2012

84/TT/2012

Petition for determination of Transmission tariff for LILO of one ckt. of 400 KV D/C Baripada- Mendhasal Transmission line at Dubri and associated bays at Dubri alongwith one no. Bus Reactor at Dubri associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO (01.04.2012) to 31.03.2014. .
10-04-2012

81/TT/2012

Petition for determination of transmission tariff for 1 no. 400 KV, 63 MVAR Line Reactor at Cochin (DOCO-01.01.2012) for the period from 1.1.2012 to 31.3.2014 under Kudankulam ATS in SR for tariff block 2009-14 .
10-04-2012

80/TT/2012

Petition for determination of Transmission Tariff from anticipated DOCO to 31.03.2014 for 50% series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar)- Meerut 765 KV 2*S/C lines (charged at 400 KV) under Transmission system associated with Koteshwar HEP, for tariff block 2009-14 period in NR .
10-04-2012

77/TT/2012

Petition for determination of Transmission Tariff for Transmission assets (Group-1) associated with 765 KV for Central Part of Northern Grid part-II, for Tariff block 2009-14 period in Northern Region .
10-04-2012

75/TT/2012

Petition for determination of transmission Tariff for Spare Converter Transformer at Rihand for Rihand- Dadri HVDC Bipole Terminal from anticipated DOCO to 31.03.2014 in NR for tariff block 2009-14 period .
10-04-2012

37/TT/2011

Petition for determination of tariff for transmission system associated with evacuation of power from Karcham Wangtoo Hydro Electric Project located in the State of Himachal Pradesh to Abdullapur sub-station located in the State of Haryana .
30-03-2012

88/2011

Approval for determination of transmission tariff for assets under WRSS IX in WR for the Tariff Block 2009-14 .
19-03-2012

150/2011

Petition for determination of transmission tariff for Combined elements of Baripada - Chandaka (Mendhasal) (Gridco) 400 kV D/C Line and 400 kV D/C Jamshedpur - Baripada Line associated bays under ERSS-I in Eastern Region .
12-03-2012

Docket No.
4/TT/2012

Approval under sub-section(4) of Section 28 of Electricity Act 2003 for determination of Fees and Charges for Unified Load Despatch and Communication Scheme (POWER GRID) portion i.e Communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Northern Region for the period 2009-14.
12-03-2012

Docket No.
7/TT/2012

Approval for determination of transmission tariff for Extension of 765/400 kV Bilaspur Pooling station (near Sipat) alongwith LILO of Sipat- Seoni ckt-2 with 3x80 MVAR switchable line Reactor and 765/400 kV, 1500 MVA Auto-transformer 3 (Ant. DOCO 01.03.2012) under WRSS XI Scheme in WR for Tariff Block 2009-14 period
12-03-2012

Docket No.
12/TT/2012

Approval for determination of transmission tariff for 400 KV D/C (Quad) Koderma -Gaya Transmission Line and associated bays at Gaya Sub-station associated with supplementary transmission System under DVC and Maithon right bank project in ER
06-03-2012

Docket No.
3/TT/2012

Approval for determination of transmission Tariff for 765/400 Bilaspur pooling Station (near Sipat) alongwith LILO of Sipat-Seoni Ckt-1 with 3X80 MVAR Switchable Line Reactor, 3X80 MVAR Bus Reactor and 765/400 KV, 1500 MVA Auto- transformer 1 & 2 (ant. DOCO: 01.03.2012) under WRSS X Scheme in Western Region for tariff block 2009-14 Period
.
06-03-2012

Docket No.
9/TT/2012

Approval for transmission tariff for Combined assets under ATS for Mundra (4000 MW) UMPP for the period from date of commercial operation to 31.3.2014.
06-03-2012

Docket No.
10/TT/2012

Approval for determination of transmission tariff for (a) LILO of Neelamangala- Somanhalli 400 KV D/C Line at Bidadi with 1X63 Bus Reactor and (b) 2X500 MVA ICTs with associated bay and equipments along with downstream network at Bidadi GIS S/S under System strengthening -X MVAR in Southern Regional Grid
.
06-03-2012

Docket No.
14/TT/2012

Approval for determination of Transmission Tariff for Combined Assets-I+II: (I) 400KV D/C Manesar-Neemrana Line along with associated bays and (II) 400KV D/C Bhiwadi-Neemrana Line and Asset-III: 2X315MVA 400/220KV ICTs (ICT-I &ICT-II) at Neemrana under the Transmission System associated with Northern Region System Strengthening Scheme-XV (NRSS-XV), for tariff block 2009-14 period in Northern Region
.
06-03-2012

Docket No.
15/TT/2012

Approval for determination of Transmission tariff for assets associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern region from anticipated DOCOs to 31.03.2014
05-03-2012

111/2011

Approval under regulation - 86 for determination of transmission tariff for 2nd Spare Converter Transformer at Kolar (Ant. DOCO - 01.05.2011) and Talcher (Ant. DOCO - 01.09.2011) HVDC Terminals (One each at Talcher and Kolar ) from anticipated DOCO to 31.03.2014 in SR for tariff block 2009-14 period
27-02-2012

147/TT/2011

Approval for determination of Transmission Tariff for assets under Transmission System associated with Northern Region System Strengthening Scheme-VI (NRSS-VI) for tariff block 2009-14 period in Northern Region
27-02-2012

Docket No.
7/TT/2012

Approval for determination of transmission tariff for Extension of 765/400 kV Bilaspur Pooling station (near Sipat) alongwith LILO of Sipat- Seoni ckt-2 with 3x80 MVAR switchable line Reactor and 765/400 kV, 1500 MVA Auto-transformer 3 (Ant. DOCO 01.03.2012) under WRSS XI Scheme in WR for Tariff Block 2009-14 period
15-02-2012

Docket No.
9/2012

Approval for transmission tariff for assets/ combined assets under ATS for Mundra (4000 MW) UMPP
13-02-2012

Docket No.
48/TT/2011

Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of tariff) Regulations 2009 for determination of transmission tariff for Northern Region System Strengthening Scheme-V , for tariff block 2009-14 period in Northern Region
06-02-2012

72/2011

Approval of transmission tariff for spare converter transformer for Vizag back to back HVDC Terminal in Southern Region for Tariff Block 2009-14 Period
23-01-2012

Docket No.
43/TT/2011

Approval for determination of Transmission Tariff for (i) ICT III at 400/220 Pune S/S along with associated bays, and (ii) Combined assets of ICT III at 400/220 Pune S/S along with associated bays and ICT III at Wardha S/S along with associated bays under WRSS VI Scheme in Western Region for tariff block 2009-14 period
12-01-2012

88/2011

Approval for transmission tariff for Assets under under WRSS IX
02-01-2012

86/2011

Approval for determination of transmission tariff for Transmission System associated with Farakka-III in Eastern Region for tariff block 2009-14 period
02-01-2012

186/2011

Determination of transmission tariff from projected DOCO : 01.01.2012 to 31.03.2014 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under the Augmentation of 220/132 kV transformation capacity at Raebareli (POWERGRID) by 1 x 100 MVA transformer, for tariff block 2009-14 period in Northern Region
02-01-2012

Docket No.
44/TT/2011

Approval for determination of Transmission Tariff for (a) LILO of both Circuits of Udumalpet - Madakathara (North Trichur) 400 kV D/C Line at Chulliar (Palakkad) 400 kV Sub-Station (New) and 1X63 MVAR Bus Reactor along with associated bays (Anticipated DOCO: 01.03.2012), and (b) 2X315 MVA 400/220 kV ICTs at Chulliar (Palakkad) S/S along with associated Bays and 220 kV downstream system (Anticipated DOCO: 01.03.2012) under System Strengthening-XI in Southern Regional Grid
13-12-2011

Docket No.
41/TT/2011

Approval for determination of transmission tariff for 2 nos. 220 kV Bays at Trivandrum under Transmission System associated with Kudunkulum in Southern Region for tariff block 2009-14 period
28-11-2011

150/2011

Approval for determination of Transmission Tariff for combined elements of (i) Baripada-Chandaka (Mendhasal) (GRIDCO) 400kV D/C Line and (ii) 400kV D/C Jamshedpur- Baripada line and associated bays under ERSS-I in Eastern Region from Notional Anticipated DOCO (1.8.2011) to 31.3.2014
28-11-2011

85/TT/2011

Approval for determination of transmission tariff for assets under Transmission System associated with Koteshwar HEP, for tariff block 2009-14 period in Northern Region
03-11-2011

07/TT/2011

Approval for determination Transmission Tariff for the tariff block 2009-14 for (i) Combined assets of (ASSET-I) 220/132 kV, 100 MVA ICT-II at Sitarganj and (ASSET-II) 220/132 kV, 100 MVA ICT-I at Pithoragarh and (ASSET-III) 220/132 kV, 100 MVA ICT-II at Pithoragarh and (ii) (ASSET-IV) LILO of one ckt. of Dhauliganga- Bareilly at Pithoragarh under System Strengthening Scheme in Uttaranchal in Northern Region
21-10-2011

152/TT/2011

Approval for transmission tariff for Assets under WRSS- II, Set-B Scheme of Western Region for 2009-14.
11-10-2011

326/2010

Approval for Transmission Tariff for Rihand Transmission System in Northern Region for the period from 01.04.2009 to 31.03.2014.
10-10-2011

37/MP/2011

Petition under Section 79(1) (c) and (d) read with Section 2(36) (ii) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
05-10-2011

26/TT/2011

Approval for transmission tariff for Combined assets for (1) 400 kV D/C Mundra- Bachchau (Triple Snowbird) Transmission Line along with associated bays at Bachchau Sub-Station (Extension) and 400 kV D/C Bachau- Ranchodpura T/L with associated bays at Bachau and Ranchodpura S/S, 400 kV D/C Mundra- Limbdi T/L (Triple Snowbird) with associated bays at Limbdi S/S, under ATS for Mundra (4000 MW) UMPP for the period from DOCO to 31.03.2014.
30-09-2011

136/TT/2011

Approval for determination of Transmission Tariff for ICT III at Raipur S/S along with bay extension WRSS VI Scheme in Western Region for tariff block 2009-2014 period
15-09-2011

145/2011

A pproval for determination of Transmission Tariff of Combined Element of 400 kV S/C URI 1- URI - 2 Inter- connector Transmission Line along with bays at NHPC end (Anticipated DOCO: 01.07.2011) and 400 kV S/C URI 2- Wagoora Transmission Line along with bays at Wagoora Sub-Station (Anticipated DOCO: 01.10.2011) associated with URI - 2 Transmission System for tariff block 2009-14 period in Northern Region
12-09-2011

316/2010

Approval under regulation-86 for transmission tariff for Singrauli Transmission System in Northern Region for the period from 01.04.2009 to 31.03.2014.
30-08-2011

16/2011

Approval for determination of Transmission Tariff from projected DOCO 01.01.2012 to 31.03.2014 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under the augmentation of 220/132 kV transformer capacity at Raebarali (Powergrid) by 1x100MVA Transformer, for tariff 2009-2014 period in Northern Region .
24-08-2011

160/2011
Approval for determination of Transmission Tariff for assets under “ERSS-II” in Eastern Region for 2009-14 period 24-08-2011

94/TT/2011

Approval for determination of transmission of 400 kV S/C Chamera-II Pooling Station transmission line, 400/220 kV GIS Pooling Station at Rajera with 400/220 kV 315 MVA ICT-I & ICT-II and 80 MVAR Bus Reactor at pooling point under Establishment of 400/220 kV GIS Pooling Station near Chamera-II HEP for tariff block 2009-14 period in Northern Region
18-08-2011

Docket No.
08/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Up-gradation of transfer capacity of Talcher-Kolar HVDC Bi-pole from 1.8.2007 to 31.3.2009 in Southern Region
16-08-2011

Docket No.
011/2011

Approval for determination of transmission tariff for a-Combined Assets of
• Tirunelvi-Edmon 400 kV D/C line (DOCO:01.07.2010) • 2 nos. switchable line reactors at Udumaplet S/S (DOCO:01.12.2010 & 01.03.2011) and Cochin (Muvattapuzha)-Trichur 400kV D/C Quad line (anticipated DOCO: 01.01.2012) and b-Combined assets of • 315 MVA, 400,200kV ICT-I along with downstream system &I CT along with downstream system at Cochin (anticipated DOCO:01.01.2012) for the time period from 01.01.2012 to 23.03.2012 to 31..03.2014 under Kundakulam in SR for tariff block 2009-1r)
08-08-2011

30/TT/2011

Approval under regulation-86 of CERC (Conduct of Business) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations'2009 for determination of Transmission Tariff for LILO Connectivity to DVC's ANDAL TPS through 400 kV D/C Durgapur- Jamshedpur T/Line associated with transmission system for ERSS-I in Eastern Region from DOCO(01.02.2011) to 31.03.2014
08-08-2011

323/2010

Approval under regulation-86 of CER (Conduct of Business) Regulations,2009 and CERC ( Terms and Conditions of Tariff) Regulations,2009 for transmission tariff for Transmission System associated with Farakka ( I&II) STPS in Eastern Region for the period from 01.04.2009 to 31.03.2014
23-06-2011


103/TT/2011

Approval under Regulation 86 CERC for Combined transmission tariff for: Asset-I(400 kV D/C Raigarh-Raipur TL along with associated bays,Asset-II(400 kV D/C Ranchi-Rourkela TL along with associated bays, Asset-III(400 kV D/C Rourkela-Raigarh TL along with associated bays and 40 % FSC along with 5-15% Thyristor Controller Series Capacitor (TCSC) on both the circuits of Raigarh-Raipur 400 kV D/C line at Raipur end under East-West Transmission Corridor Strengthening Scheme for tariff block 2009-14