FINAL ORDERS 2007

Pet. No.
Subject
Date of Hearing
Date of Order


156/2007

Non approval of Open Access communicated by Southern Regional Load Despatch Centre on ground of non- receipt of consent from SLDC-OPTCL for transmission of power generated by Nava Bharat Ventures Ltd through M/s. Reliance Energy Trading Ltd, to the distribution utilities in Andhra Pradesh. Nava Bharat Ventrues Ltd, Hyderabad.

11-12-2007

31-12-2007


154/2007

Maintaining grid security of the entire North East West (NEW) grid through curbing over-drawals by Northern region constituents and other measures to facilitate harnessing of all latent generation and induce Demand Side Management (DSM). Northern Regional Load Despatch Centre, New Delhi

-

04-12-2007


132/2007(Suo-motu)

Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule Power Development Department, Government of J & K

-

28-11-2007


82/2007

Issuing direction to NRLDC to refund the sum of Rs. 50,91,511/= along with interest to PTC India Ltd. PTC India Ltd, New Delhi

21-08-2007

12-10-2007


I.A.No.35/2007

Clarification regarding declaration of commercial operation.

-

14-08-2007


1. 4/2006
2. 22/2006
& 3. 145/2006

1. Review of the frequency linked Unscheduled Interchange (UI) price vector and implementation of a payment security mechanism for UI charges.
2. Ensuring secure and reliable operation of Northern Regional Grid by maintaining the regional grid frequency above 49.0 Hz.
& 3. Ensuring secure and reliable operation of Southern Regional Grid by maintaining the regional grid frequency above 49.0 Hz.

-

03-07-2007

15/2007
(Suo motu)

Revision of UI vector - Power Grid Corporation of India Ltd.

-

09-07-2007

68/2007

1. Direction to CTU for grant of long-term open access on the existing ER-WR corridor, i.e. 400 kV Raipur-Rourekela transmission line including 220 kV Korba Budhipadar transmission line for transfer of 400 MW power from DVC stations at Mejia and Chandrapur.

2. Application under provision of clause 35 (Redressal Mechanism of the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2004.

29-05-2007

15-06-2007

15/2007
(Suo motu)

Order dated June 6-2007 on applicable UI rates and accounts

-

6-06-2007

14/2007
(Suo motu)

Ensuring secure and reliable operation of Regional Grid by maintaining the grid frequency above 49.0 Hz.

-

23-05-2007

24/2007

Refusal No 131 of 25.1.2007 by the Western Regional Load Despatch Centre of the open access application filed by Tata Power Trading Company Limited for transmission of 27 MW power through Eastern Regional Load Despatch Centre and Orissa State Load Despatch Centre from Nava Bharat Ventures Ltd, on the ground of "No consent from OPTCL".

06-03-2007

07-03-2007

15/2007

CERC Order proposing revision of UI Rates(Pet No:-15/2007).

-

05-04-2007

I.A.No.67/2006
in
67/2003
(SUO MOTU)

Bringing generating stations of Central Public Sector Undertakings (CPSU's) supplying power to single beneficiary State under provisions of Availability Based Tariff (ABT).

13-02-2007

15-03-2007

-

Statement of Reasons for Notification of Revised UI Rates.

-

-