cerc-logo

Orders - 2020

Petition No. Subject Date of Order Date of posting Order on website Category


496/TT/2019

28.08.2020

28.08.2020 Transmission


615/MP/2020

28.08.2020

28.08.2020 Misc


186/MP/2020

28.08.2020

28.08.2020 Misc


478/TT/2019

27.08.2020

28.08.2020 Transmission


349/TT/2019

28.08.2020

28.08.2020 Transmission


13/RP/2020
along with IA No. 26/IA/2020

26.08.2020

27.08.2020 Review


12/MP/2019 with IA No/64/2019

26.08.2020

27.08.2020 Misc


310/TT/2019

26.08.2020

26.08.2020 Misc


47/MP/2019

24.08.2020

25.08.2020 Misc


259/GT/2019

24.08.2020

25.08.2020 Generation


346/TT/2019

22.08.2020

22.08.2020 Transmission


490/TT/2019

22.08.2020

22.08.2020 Transmission


327/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: 125 MVAR, 400 kV Bus Reactor at new Purnea Sub-station along with associated bays, Asset-II: Shifting of 1 no 63 MVAR Bus Reactor installed at new Purnea bus for installation as a fixed line reactor at new Purnea end of one ckt new Siliguri-new Purnea 400 kV D/C (quad) line, Asset-III: Installation of 1 no new 125 MVAR bus reactor at new Purnea 400 kV bus, Asset-IV: Durgapur-Maithon 400 kV D/C line with associated bays at Durgapur and Maithon Sub-station, Asset-V: Installation of 1 no new 125 MVAR bus reactor at Siliguri 400 kV bus, shifting of 3 no. 63 MVAR reactors at 400 kV Siliguri Sub-station, Asset-VI: Installation of new 125 MVAR bus reactor at new Siliguri Sub-station and Asset-VII: 220/132 kV, 160 MVA ICT at Baripada under ERSS-II in the Eastern Region. Power Grid Corporation of India Ltd

22.08.2020

22.08.2020 Transmission


184/MP/2020

21.08.2020

21.08.2020 Misc


529/MP/2020

21.08.2020

21.08.2020 Misc


95/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of the transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: Farakka–Baharampur 400 kV D/C transmission line with 01 No. 400 kV line bay at Baharampur Sub-station and 02 Nos 400 kV line bays at Farakka (Sub-station of NTPC); Asset-II: LILO of Farakka-Jeerat 400 kV S/C line at Sagardighi (WPDCL) Sub-station with associated line bays; Asset-III: 01 No. 125 MVAr Bus Reactor and 01 No. 400 kV line bay at Baharampur Sub-station under the Eastern Region Strengthening Scheme-XV (ERSS-XV) in the Eastern Region. Power Grid Corporation of India Ltd.

21.08.2020

21.08.2020 Transmission


217/MP/2016

21.08.2020

21.08.2020 Misc


268/GT/2019

20.08.2020

21.08.2020 Generation


557/TD/2020

21.08.2020

21.08.2020 Licensing


136/TT/2017

Petition for determination of transmission tariff from COD to 31.3.2019 for Asset-I: Loop Out of 1st Ckt. of 400 kV D/C Parbati-II-Koldam Transmission Line at Banala, Asset-II: Loop In of 1stCkt of 400 kV D/C Parbati-II-Koldam Transmission Line at Banala, Asset-III: LILO of 2nd Ckt. of Parbati-II Koldam Transmission Line at Pooling Station and LILO at Parbati-III (b-c portion) and Asset-IV: LILO of 2nd Ckt. of Parbati-II-Koldam Transmission Line at Pooling Station along with associated bays and LILO at Parbati-III associated with Parbati-III HEP (f-g portion) in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. Power Grid Corporation of India Limited

20.08.2020

21.08.2020 Transmission


170/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset A: LILO of one circuit of 400 kV D/C Kankroli-Zerda Line at Bhinmal along with 80 MVAr Bus Reactor at Bhinmal; Asset B: 315 MVA 400/220 kV ICT-I at Bhinmal along with associated bays; Asset C: 315 MVA 400/220 kV ICT-II at Bhinmal along with associated bays; Asset D: 315 MVA 400/220 kV ICT-III at Hissar along with associated bays at Hissar; Asset E: Two nos. 220 kV Bays at Hissar Sub-Station covered under “Northern Region System Strengthening Scheme-VIII” in the Northern Region. Power Grid Corporation of India Ltd.

19.08.2020

19.08.2020 Transmission


58/TT/2020

17.08.2020

18.08.2020 Transmission


37/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Modification of 132 kV Bus arrangement including switchgear to Double Main (DM) scheme with GIS at 220/132 kV Birpara Sub-station, Asset-II: 125 MVAR Bus Reactor at Banka Sub-station, Asset-III: 125 MVAR Bus Reactor at Chaibasa Sub-station, Asset-IV: 125 MVAR Bus Reactor at Lakhisarai Sub-station, Asset-V: 125 MVAR Bus Reactor at Durgapur Sub-station, Asset-VI: 125 MVAR Bus Reactor at Baripada Sub-station, Asset-VII: 125 MVAR Bus Reactor at Bolangir Sub-station and Asset-VIII: 125 MVAR Bus Reactor at Keonjhar Sub-station alongwith associated bays under “Eastern Region Strengthening scheme XIV” in Eastern Region. Power Grid Corporation of India Limited

17.08.2020

17.08.2020 Misc


15/SM/2020

17.08.2020

17.08.2020 Misc


107/TT/2017

17.08.2020

17.08.2020 Transmission


25/MP/2019

17.08.2020

17.08.2020 Misc


105/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999 and redetermination of transmission tariff from COD to 31.3.2019 for Tuticorin Pooling Station-Salem Pooling Station 765 kV D/C line (initially charged at 400 kV) along with Bay extensions at Salem Pooling Station and Tuticorin Pooling Station and 80 MVAR Line Reactors at each end of both circuits of Tuticorin Pooling Station-Salem Pooling Station 765 kV D/C line (initially charged at 400 kV) under “Common System Associated with Coastal Energen Private Limited & Ind-Bharat Power (Madras) Limited-LTOA Generation Projects in Tuticorin Area-Part-B ” in Southern Region under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 pursuant to directions of the Commission in order dated 6.11.2018 in Review Petition No. 40/RP/2017. Power Grid Corporation of India Limited

16.08.2020

17.08.2020 Transmission


77/TT/2020

16.08.2020

16.08.2020 Misc


158/MP/2019

15.08.2020

15.08.2020 Misc


243/MP/2019

14.08.2020

15.08.2020 Misc


14/RP/2020
in Petition No. 305/MP/2015

14.08.2020

14.08.2020 Review


600/MP/2020

12.08.2020

12.08.2020 Misc


602/MP/2020

12.08.2020

12.08.2020 Misc


96/TT/2019

09.08.2020

09.08.2020 Transmission


426/MP/2019

06.08.2020

07.08.2020 Misc


266/MP/2020

07.08.2020

07.08.2020 Misc


587/MP/2020

07.08.2020

07.08.2020 Misc


48/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of the Combined Asset consisting of Asset A1:Combined Asset-(1) 400 kV D/C Mauda II-Betul (Quad) Transmission Line along with associated bays and 2X50 MVAr Line Reactors at Betul GIS, (2) 315 MVA, 400/220 kV ICT-I & ICT-II along with associated bays and 4 nos. 220 kV line bays & 125 MVAr, 420 kV Bus Reactor alongwith associated bays at Betul GIS & (3) 400 kV D/C Betul-Khandwa (Quad) line along with associated bays at both ends and 2X50 MVAr Switchable Line Reactors at Betul GIS & 2X50 MVAr line reactors at Khandwa Sub-station; Asset A2:Khandwa-Indore 400 kV D/C Transmission Line along with associated bays under “Transmission System associated with Mauda Stage-II (2x660 MW) Generation Project” in the Western Region. Power Grid Corporation of India Ltd.

05.08.2020

06.08.2020 Transmission


337/AT/2020

04.08.2020

04.08.2020 Misc


Review Petition No. 4/RP/2020
in Petition No. 24/TT/2018

03.08.2020

03.08.2020 Review


No.L-1/44/2010-CERC

01.08.2020

01.08.2020 Misc


287/MP/2018

31.07.2020

31.07.2020 Misc


288/TT/2019

31.07.2020

31.07.2020 Transmission


329/MP/2020

30.07.2020

31.07.2020 Misc


305/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of combined asset of (i) 1x500 MW HVDC back to back station at Sasaram and (ii) Associated AC Switchyard at Sasaram & Allahabad and auxiliary system including 400 kV Sarnath Allahabad line with associated bays etc. under Eastern Northern Inter-regional HVDC Transmission System in Eastern Region. Power Grid Corporation of India Limited
Corrigendum dated:- 24.02.2021

30.07.2020

30.07.2020 Transmission


14/SM/2020

30.07.2020

30.07.2020 Suo-Motu


101/MP/2019

29.07.2020

29.07.2020 Misc


382/MP/2018

27.07.2020

28.07.2020 Misc


27/TT/2020

27.07.2020

28.07.2020 Transmission


505/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset consisting of Asset-I: Re-conductoring of one circuit (Ckt-I) Farakka-Malda 400 kV D/C with HTLS conductor and upgradation/ replacement of associated bay equipment at Farakka and Malda Asset-II: Re-conductoring of one circuit (Ckt-II) Farakka-Malda 400 kV D/C with HTLS conductor and upgradation/ replacement of associated bay equipment at Farakka and Malda under Eastern Region Strengthening Scheme–XIII (ERSS-XIII) in the Eastern Region. Power Grid Corporation of India Ltd.

27.07.2020

27.07.2020 Transmission


130/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Assets consisting of Asset-1: (a) Upgradation of existing 2X50 MVA, 132/33 kV Imphal (POWERGRID) Sub-station to 400 kV by installation of 400/132 kV, 2X315 MVA (7X105 MVA, 1-Ph) ICTs, 2 Nos. 400 kV line bays for termination of 400 kV D/C Silchar-Imphal line and 80 MVAr, 420 kV Bus Reactor along with associated bays at Imphal Sub-station (b) Extension of existing 400/132 kV Silchar (POWERGRID) Sub-station with 2 Nos. of 400 kV GIS line bays for termination of Silchar-Imphal 400 kV D/C line Asset-2: Installation of 1X125 MVAr, 420 kV Bus Reactor along with GIS bays at Silchar Sub-station Asset-3: 1x125 MVAR, 420 kV Bus Reactor along with associated bay at Balipara (POWERGRID) Sub-station Asset-4: 1x125 MVAr, 420 kV Bus Reactor along with associated bay at Bongaigaon (POWERGRID) Sub-station Asset-5: Reconductoring of Agartala GBPP-Agartala (State) 132 kV D/C line with High Capacity HTLS conductor along with necessary up gradation/modification in bay equipment at both ends under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region. Power Grid Corporation of India Ltd.

25.07.2020

27.07.2020 Transmission


21/RP/2019
in Petition No. 150/TT/2018

27.07.2020

27.07.2020 Review


17/RP/2020 in Petition No. 368/TT/2018

24.07.2020

25.07.2020 Review


70/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisting of Asset-1: Conversion of 50 MVAr, 420 kV fixed line reactors in each circuit of Itarsi-Indore (MPPTCL) 400 kV 2XS/C lines into Switchable Line Reactors at Indore (MPPTCL) Sub-station; Asset-2: Conversion of 50 MVAr, 420 kV fixed line reactors in 400 kV D/C Bina (PG) Shujalpur transmission line into Switchable Line Reactors at Shujalpur Sub-station; Asset-3: Conversion of 63 MVAr, 420 kV fixed line reactors in Bhadrawati-Dhariwal 400 kV S/C line into Bus Reactor at Bhadrawati Sub-station; Asset-4: 1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Khandwa Sub-station; Asset-5: 2 No. 220 kV bays at Khandwa Sub-station; Asset-6: 1 No. 500 MVA 400/220 kV ICT¬4 along with associated bays at Boisar Sub-station; Asset-7: 1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Kala Sub-station; and Asset-8: 1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Dehgam Sub-station under the WRSS XVII in the Western Region. Power Grid Corporation of India Ltd.

24.07.2020

25.07.2020 Transmission


22/RP/2019 in Petition No. 255/TT/2018 &
23/RP/2019 in Petition No. 171/TT/2018
23/RP/2019

24.07.2020

24.07.2020 Review


280/MP/2019

21.07.2020

23.07.2020 Misc


I.A. No.44/IA/2020
in
Suo Motu Petition No. 7/SM/2020

23.07.2020

23.07.2020 Misc


466/MP/2019

22.07.2020

23.07.2020 Misc


1/RP/2020
in
Petition No. 43/GT/2018

22.07.2020

22.07.2020 Review


13/SM/2020

21.07.2020

21.07.2020 Suo-Motu


16/RP/2020
In
Petition No. 97/MP/2019

21.07.2020

21.07.2020 Review


272/GT/2019

20.07.2020

21.07.2020 Generation


165/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset consisting of Asset-1:LILO of Nalagarh-Kaithal Line at Patiala along with associated bays, Asset-2:400/220 kV 500 MVA ICT-III at Patiala Sub-station, Asset-3:400 kV 125 MVAR Bus Reactor at Patiala Sub-station along with associated bays at Patiala Sub-station, Asset-4: 400/220 kV 500 MVA ICT-III at Malerkotla Sub-station under “Northern Region System Strengthening Scheme-XIV (NRSS-XIV)” in Northern Region. Power Grid Corporation of India Limited

21.07.2020

21.07.2020 Transmission


308/MP/2019

20.07.2020

20.07.2020 Misc


119/MP/2019

19.07.2020

19.07.2020 Misc


287/MP/2019

16.07.2020

18.07.2020 Misc


137/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff for the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisting of Asset-1(i): LILO of 400 kV D/C Bina-Nagda at Shujalpur Sub-station along with 50 MVAr Line Reactor at Shujalpur and new Sub-station at Shujalpur; Asset-1(ii): Switchable Scheme for Reactor at Nagda Sub-station; Asset-1(iii): Switchable Scheme for Reactor at Bina Sub-station; Asset-2: 400 kV, 63 MVAr Bus Reactor at Shujalpur along with associated bay; Asset-3: 400/220 kV ICT I at Shujalpur along with associated bays; Asset-4: ICT II at Shujalpur along with associated bays under the WRSS IX Transmission Scheme in the Western Region. Power Grid Corporation of India Ltd.

16.07.2020

16.07.2020 Transmission


139/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for transmission system associated with SEWA-II HEP in the Northern Region consisting of - Asset-I: One circuit of 132 kV D/C SEWA-II Hiranagar line along with associated bays at Hiranagar Sub-station and one circuit of 132 kV D/C SEWA-II Mahanpur line and associated bays at Mahanpur ; Asset-II: Second circuit of 132 kV D/C SEWA-II Hiranagar line along with associated bays at Hiranagar Sub-station; Asset-III: 132 kV S/C SEWA-II Mahanpur-Kathua transmission line along with associated bays at Kathua and 132 kV S/C Mahanpur-Kathua transmission line along with bays at Mahanpur and Kathua. Power Grid Corporation of India Ltd.

15.07.2020

15.07.2020 Transmission


270/GT/2019

13.07.2020

13.07.2020 Generation


300/TT/2019

12.07.2020

13.07.2020 Transmission


10/RP/2020
in
240/GT/2017 & 241/GT/2017

10.07.2020

11.07.2020 Review


12/RP/2020
in
249/GT/2016

10.07.2020

11.07.2020 Review


3/RP/2020
along with IA No.36/IA/2020
in
309/GT/2015

10.07.2020

11.07.2020 Review


15/RP/2020
in
281/GT/2018

09.07.2020

11.07.2020 Review


11/RP/2020
in
279/GT/2018

10.07.2020

10.07.2020 Review


26/TT/2020

06.07.2020

06.07.2020 Transmission


I.A.No.39/IA/2020 & 40/IA/2020
in
Suo Motu Petition No. 7/SM/2020

06.07.2020

06.07.2020 Misc


I.A.No.14/IA/2020
in
124/MP/2017

24.06.2020

24.06.2020 Misc


168/MP/2019

22.06.2020

23.06.2020 Misc


37/IA/2020
in
15/RP/2020
in
281/GT/2018

19.06.2020

20.06.2020 Misc


5/SM/2020

17.06.2020

18.06.2020 Suo-Motu


301/TT/2019

17.06.2020

17.06.2020 Transmission


527/MP/2020

17.06.2020

17.06.2020 Misc


362/TT/2019

15.06.2020

16.06.2020 Transmission


71/MP/2020
along with IA No.30/2020

15.06.2020

15.06.2020 Misc


12/SM/2020

14.06.2020

14.06.2020 Suo-Motu


507/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 400 kV, 125 MVAR Bus Reactor along with associated bay at Biharsharif Sub-station, Asset-II: 220 kV/132 kV, 160 MVA ICT-I along with associated bay at Purnea Sub-station, Asset-III: 220 kV/132 kV, 160 MVA ICT-II along with associated bay at Purnea Sub-station under “Part-II i.e. Augmentation of transformation capacity and reactive compensation” in Eastern Region. Power Grid Corporation of India Limited

12.06.2020

13.06.2020 Transmission


506/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 765 kV D/C Wardha-Aurangabad line-II alongwith 2 nos. 330 MVAR switchable line reactor at Wardha end and 1 no. 240 MVAR line reactor for Ckt.-III at Aurangabad end and associated bays and Asset-II: 1 no. 240 MVAR 765 kV line reactor for Wardha-Aurangabad Ckt.-IV at Aurangabad end under “Transmission System Strengthening in Wardha-Aurangabad corridor for IPP projects in Chhattisgarh (IPP-G)” in Western Region. Power Grid Corporation of India Limited

10.06.2020

10.06.2020 Transmission


IA No.69/2019
in
202/MP/2018

09.06.2020

09.06.2020 Misc


483/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of Combined Asset consisting of Asset-I: 160 MVA, 220/132 kV, 3-Phase Auto Transformer at Kopili, Asset-II: 132 kV S/C Kopili-Khandong Transmission Line along with associated bays, Asset-III: 100 MVA, 220/132 kV, 3-Phase Auto Transformer and associated bays at Dimapur Sub-station, Asset-IV: LILO of 132 kV Dimapur-Kohima Transmission Line in North Eastern Region. Power Grid Corporation of India Ltd.

05.06.2020

05.06.2020 Transmission


87/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations1999 and truing up of transmission tariff for 2014-19 periodunder Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 periodunder Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 ofcombined assets associated with East-West Transmission Corridor Strengthening Scheme in Western Region consisting of Asset-1: 400 kV D/C Raigarh-Raipur Transmission Line along with associated bays; Asset-2: 400 kV D/C Ranchi-Rourkela Transmission Line and extension of Ranchi Sub-station; Asset-3: Provision of 40% fixed series compensation package at Raipur Sub-station; Asset-4: 400 kV D/C Rourkela-Raigarh Transmission Line and associated bays at Raigarh and Rourkela. Power Grid Corporation of India Ltd.

05.06.2020

05.06.2020 Transmission


74/MP/2019 With IA No. 57/2019

05.06.2020

05.06.2020 Misc


52/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of transmission assets associated under System Strengthening-IV in Eastern Region consisting of Asset-A: 400 kV, 125 MVAR Bus Reactor along with associated bays at Patna Sub-station; Asset B: 400 kV, 125 MVAR Bus Reactor along with associated bays at Ranchi; Asset C: 160 MVA Transformer (1st) and associated bays at Malda Sub-station; Asset D: 160MVA Transformer (2nd) and associated bays at Malda Sub-station; Asset E: 01 no. 400 kV bay at Malda Sub-station; Asset F: 160 MVA Transformer and associated bays at 220/132 kV Birpara Sub-station; Asset G: 160 MVA Transformer and associated bays at 220/132 kV Siliguri Sub-station under ERSS-IV project in Eastern Region. Power Grid Corporation of India Ltd.

04.06.2020

04.06.2020 Transmission


373/MP/2020 along with I.A. 27 of 2020

03.06.2020

03.06.2020 Misc


35/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset I: 2 Nos. of 400 kV bays along with 1 X 63 MVAR (fixed) line reactor at Chaibasa Sub-station, Asset II: 1 X 63 MVAR (fixed) line reactor at Chaibasa Sub-station, Asset III: 2 Nos. of 400 kV line bays along with 2 X 50 MVAR (fixed) line reactor at Ranchi 765/400 kV Sub-station, Asset IV: 2 Nos. of 400 kV line bays at Kharagpur Sub-station, Asset V: 2 Nos. of 400 kV line bays at Purulia Sub-station under “Eastern Region Strengthening Scheme VII” in Eastern Region. Power Grid Corporation of India Ltd.

03.06.2020

03.06.2020 Transmission


11/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset A: 400 kV D/C Raipur (existing) - Raipur Pooling Station (Durg) Transmission Line along with associated bays, Asset B: 400 kV D/C Raigarh Pooling Station (Near Kotra)-Raigarh (existing) Sub-Station Transmission Line along associated bays, Asset C: 765 kV D/C Raigarh Pooling Station (Near Kotra) - Raipur Pooling Station (Durg) Transmission Line along with associated bays, Asset D: 765/400 kV, 1500 MVA, ICT I with spare unit and 765 kV, 240 MVAr Bus Reactor with Spare unit at Raigarh Pooling Station (near Kotra) along with associated bays, Asset E: 765/400 kV, 1500 MVA, ICT II and 400 kV, 80 MVAr Bus Reactor at Raigarh Pooling Station (near Kotra) along with associated Bays and 765 kV, 3X80 MVAR, Shunt Reactor for 765 kV, D/C Raigarh Pooling Station (near Kotra) - Raipur Pooling Station (Durg) ckt.-1 charged as Bus Reactor along with associated bays, Asset F: 765/400 kV, 1500 MVA, ICT with Spare unit and 765 kV, 240 MVAr Bus Reactor with Spare unit at Raipur Pooling Station (Durg) along with associated bays, Asset G: 765/400 kV, 1500 MVA, ICT III at Raigarh Pooling Station (near Kotra) along with associated bays and Asset H: 765/400 kV, 1500 MVA, ICT IV at Raigarh Pooling Station (near Kotra) along with associated Bays & 765 kV, 3X80 MVAR, Shunt Reactor for 765 kV, D/C Raigarh Pooling Station (near Kotra)-Raipur Pooling Station (Durg) ckt.-II charged as Bus Reactor along with associated bays (hereinafter referred to as “Transmission Assets / Combined Asset”) under establishment of Pooling Stations at Raigarh (Kotra) and Raipur for IPP Generation Projects in Chhattisgarh (Set A/ DPR -1) in Western Region (hereinafter referred to as “Transmission Project”) Power Grid Corporation of India Ltd.

01.06.2020

01.06.2020 Transmission


60/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 oftransmissionassets associated under System Strengthening - XI in Southern Region consistingof Asset-1: LILO of Circuit-II of Udumalpet- Madakathara (North Trichur) 400 kV D/C Line at Chulliar / Palakkad Sub-station; Asset-2: LILO of Circuit-1 of Udumalpet- Madakathara (North Trichur) 400 kV D/C Line at Chulliar (Palakkad); Asset-3: 63 MVAR Bus Reactors at Palakkad (Chulliar); Asset-4: 1X315 MVA 400/220 kV ICTs with associated bays and 220 kV Downstream System at Palakkad (Chulliar); Asset-5: 1X315 MVA 400/220 kV ICTs with associated bays and equipment at Chulliar (Palakkad). Power Grid Corporation of India Ltd.

01.06.2020

01.06.2020 Transmission


11/SM/2020

29.05.2020

29.05.2020 Suo-Motu


225/RC/2020

29.05.2020

29.05.2020 Misc


304/MP/2020

29.05.2020

29.05.2020 Misc


388/TT/2019

28.05.2020

29.05.2020 Transmission


10/SM/2020

28.05.2020

28.05.2020 Suo-Motu


141/TT/2019

27.05.2020

28.05.2020 Transmission


9/TT/2019

27.05.2020

28.05.2020 Transmission


169/MP/2019

25.05.2020

25.05.2020 Misc


307/AT/2020

21.05.2020

21.05.2020 Misc


210/MP/2019

18.05.2020

18.05.2020 Misc


187/MP/2020

15.05.2020

15.05.2020 Misc


269/MP/2019

12.05.2020

12.05.2020 Misc


19/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff for 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of combined assets associated with Northern Region System Strengthening Scheme-VI in Northern Region consisting of Asset-1: LILO of 400 kV S/C Ballabhgarh-Bhiwadi Transmission Line at Gurgaon along with associated bays, Asset-2: 315 MVA, 400/220 kV ICT-I alongwith associated bays at GIS Substation at Gurgaon and Asset-3: 315 MVA, 400/220 kV ICT-II alongwith associated bays at GIS Sub-station at Gurgaon. Power Grid Corporation of India Limited

09.05.2020

10.05.2020 Transmission


16/TT/2019

10.05.2020

10.05.2020 Transmission


IA No. 91/2019 in
108/MP/2019
&
I.A. No. 92/2019 in
109/MP/2019

09.05.2020

09.05.2020 Misc


253/MP/2019 along with IA No. 90/2019

07.05.2020

07.05.2020 Misc


209/MP/2019

06.05.2020

06.05.2020 Misc


513/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 132/33 kV, 50MVA, 3-Ph ICT-I at 132/33 kV Nirjuli Sub-station (POWERGRID), Asset-II: 132/33 kV, 50MVA, 3-Ph ICT-II at 132/33 kV Nirjuli Sub-station (POWERGRID) and Asset-III: 400/220 kV, 315 MVA, 3-Ph ICT-II (2nd ICT) along with associated bays at 400/220 kV Balipura Sub-station (POWERGRID) under “North Eastern Region Strengthening Scheme-II (NERSS-II) Part-A” in North-Eastern Region. Power Grid Corporation of India Limited

06.05.2020

06.05.2020 Transmission


244/TT/2019

02.05.2020

03.05.2020 Transmission


249/TT/2019

01.05.2020

01.05.2020 Transmission


35/TT/2019

30.04.2020

01.05.2020 Transmission


499/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 1x100 MVA, 220/132 kV, 3-Phase Spare ICT at Dimapur Sub-Station, Asset-II: 1 x 5 MVA, 132/33 kV, 1-Phase at Ziro Sub-station, Asset-III: 1X16 MVA, 132/33 kV ICT at Nirjuli Sub-station, Asset-IV: 1X63 MVAR, 420 kV Bus Reactor at Balipara Sub-station under “Provision of Spare Transformers and Reactors” in North Eastern Region. Power Grid Corporation of India Limited

29.04.2020

30.04.2020 Transmission


49/TT/2019

28.04.2020

29.04.2020 Transmission


274/TT/2019

27.04.2020

27.04.2020 Transmission


9/SM/2020

27.04.2020

27.04.2020 Suo-Motu


245/TT/2019

23.04.2020

24.04.2020 Transmission


446/MP/2019

23.04.2020

24.04.2020 Misc


L-1/44/2010-CERC

23.04.2020

23.04.2020 Misc


247/TT/2019

18.04.2020

19.04.2020 Transmission


8/SM/2020

18.04.2020

18.04.2020 Suo-Motu


307/TT/2019

16.04.2020

16.04.2020 Transmission


32/TT/2019

14.04.2020

14.04.2020 Transmission


34/TT/2019

14.04.2020

14.04.2020 Transmission


224/MP/2020 along with IA No.15/2020

08.04.2020

08.04.2020 Misc


Addendum 7/SM/2020

07.04.2020

07.04.2020 Suo-Motu


7/SM/2020

06.04.2020

06.04.2020 Suo-Motu


299/MP/2019
360/MP/2019

02.04.2020

04.04.2020 Misc


6/SM/2020

03.04.2020

03.04.2020 Suo-Motu


5/SM/2020

31.03.2020

01.04.2020 Suo-Motu


272/TT/2018

Approval of transmission tariff for Asset I - STATCOM System (+/-) 300 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor), cooling system & STATCOM protection/ controller etc. at Ranchi Substation and Asset II - STATCOM System (+/-) 200 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor and 2x125 MVAR Capacitor), cooling system & STATCOM protection/ controller etc. at Kishanganj Substation under “Eastern Region Strengthening Scheme –XI (ERSS-XI)” in Eastern Region from COD to 31.3.2019 under Regulation 86 of Central Electricity Regulatory Commission (Conduct of business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. Power Grid Corporation of India Limited

29.03.2020

29.03.2020 Transmission


147/TT/2019

29.03.2020

29.03.2020 Transmission


295/TT/2018

29.03.2020

29.03.2020 Transmission


327/MP/2018
along with IA No.87/2018

29.03.2020

29.03.2020 Misc


388/MP/2018
395/MP/2018

27.03.2020

28.03.2020 Misc


4/SM/2020
Suo-Motu

27.03.2020

27.03.2020 Suo-Motu


IA No. 79 of 2019
In
Petition No. 155/MP/2019

26.03.2020

26.03.2020 Misc


127/MP/2019
135/MP/2019
129/MP/2019
130/MP/2019
134/MP/2019

26.03.2020

26.03.2020 Misc


3/SM/2020
(Suo-Motu)

24.03.2020

24.03.2020 Suo-Motu


47/AT/2020

24.03.2020

24.03.2020 Misc


46/TL/2020

24.03.2020

24.03.2020 Licensing


01/SM/2020 (Suo-Motu)

23.03.2020

23.03.2020 Suo-Motu


157/TD/2019

23.03.2020

23.03.2020 Licensing


258/MP/2020

20.03.2020

20.03.2020 Misc


242/MP/2020

20.03.2020

20.03.2020 Misc


Corrigendum to 8/RP/2019 in Petition No. 238/MP/2017

20.03.2020

20.03.2020 Misc


Corrigendum to 286/ADP/2015

19.03.2020

19.03.2020 Misc


362/TT/2018

19.03.2020

19.03.2020 Transmission


385/MP/2019 With I.A. No. 1/2020

18.03.2020

18.03.2020 Misc


188/AT/2020

18.03.2020

18.03.2020 Misc


I.A. No. 17 of 2020 in Petition No. 226/MP/2020

12.03.2020

12.03.2020 Misc


456/MP/2019

11.03.2020

11.03.2020 Misc


164/TD/2020

09.03.2020

11.03.2020 Licensing


No. L-1/44/2010-CERC

06.03.2020

06.03.2020 Misc


441/AT/2019

05.03.2020

06.03.2020 Misc


444/AT/2019

05.03.2020

06.03.2020 Misc


448/AT/2019

05.03.2020

05.03.2020 Misc


443/AT/2019

05.03.2020

05.03.2020 Misc


445/TL/2019

04.03.2020

05.03.2020 Licensing


398/AT/2019

04.03.2020

04.03.2020 Misc


425/TL/2019

04.03.2020

04.03.2020 Licensing


40/TD/2020

04.03.2020

04.03.2020 Trading


397/TL/2019

04.03.2020

04.03.2020 Licensing


222/MP/2020

02.03.2020

03.03.2020 Misc


55/MP/2015

03.03.2020

03.03.2020 Misc


442/TL/2019

03.03.2020

03.03.2020 Licensing


447/TL/2019

03.03.2020

03.03.2020 Licensing


382/AT/2019

28.02.2020

28.02.2020 Misc


161/AT/2019 and IA No. 85/2019

28.02.2020

28.02.2020 Misc


56/AT/2020

28.02.2020

28.02.2020 Misc


187/AT/2019 and IA No.86/2019

28.02.2020

28.02.2020 Misc


396/AT/2019

26.02.2020

26.02.2020 Misc


57/AT/2020

24.02.2020

25.02.2020 Misc


46/TL/2020

24.02.2020

25.02.2020 Licensing


Corrigendum of 19/MP/2019 & 46/MP/2019

19.02.2020

21.02.2020 Misc


162/AT/2019 and IA No.84/2019

19.02.2020

19.02.2020 Misc


Suo Motu Petition No. 12/SM/2019

18.02.2020

19.02.2020 Suo Motu


38/MP/2016
With
I.A Nos. 6/2018 and 36/2019

Petition under Section 79 (a) (c ) read with Section 79 (1) (f) of the Electricity Act, 2003, inter alia, seeking a declaration that the factors/events, namely delay in forest clearance of land for main plant, cancellation of allocated coal block to the Petitioner, non-signing of Fuel Supply Agreement, delay in acquisition/procurement of land for main plant, delay in approval of land for Ash Pond by State of Odisha, delay in clearance of railway line from Eastern Coast Railway, Odisha, delay in clearance for construction of dedicated transmission line from Ministry of Power in the construction of the 2x660 MW coal based thermal power plant located in Dhenkenal District, Odisha as force majeure events under BPTA dated 24.2.2010, seeking extension of time period for achieving the Commercial Operation Date of project and other consequential reliefs under the BPTA dated 24.2.2010. Lanco Babandh Power Ltd.

14.02.2020

14.02.2020 Misc


303/MP/2015
&
3/MP/2016

05.02.2020

07.02.2020 Misc


137/MP/2016

05.02.2020

06.02.2020 Misc


91/TT/2012

05.02.2020

06.02.2020 Transmission


164/MP/2017

05.02.2020

06.02.2020 Misc


129/MP/2017

05.02.2020

06.02.2020 Misc


246/MP/2016

05.02.2020

06.02.2020 Misc


11/MP/2017

05.02.2020

06.02.2020 Misc


169/MP/2017
&
253/MP/2017

05.02.2020

06.02.2020 Misc


42/MP/2019

Petition under Section 79(1)(f) of the Electricity Act, 2003 read with Regulations 8(5) and 8(6) of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010, read with Clause 4 of the Bulk Power Transmission Agreement dated 8.1.2010; read with Clause 12 of the Bulk Power Transmission Agreement entered into between PGCIL and various Electricity Boards for the Western Region dated 31.3.1999; Clause 14 of the Bulk Power Transmission Agreement entered into between PGCIL and various State Electricity Boards for the Eastern Region dated 16.9.2004; and Clause 13 of the Bulk Power Transmission Agreement entered into between PGCIL and Haryana Vidyut Prasaran Nigam Limited for the Northern Region dated 16.10.2003 challenging the levy of Transmission Charges on East Central Railway by PGCIL. East Central Railway

05.02.2020

06.02.2020 Misc


322/GT/2018

05.02.2020

06.02.2020 Generation


308/GT/2018

05.02.2020

06.02.2020 Generation


28/TT/2019

05.02.2020

05.02.2020 Transmission


Corrigendum in 67/MP/2019 & 68/MP/2019

05.02.2020

05.02.2020 Misc


262/TT/2019

05.02.2020

05.02.2020 Transmission


334/TT/2018

05.02.2020

05.02.2020 Transmission


335/TT/2018

05.02.2020

05.02.2020 Transmission


283/TT/2018

05.02.2020

05.02.2020 Transmission


183/TT/2016

05.02.2020

05.02.2020 Transmission


176/MP/2019

05.02.2020

05.02.2020 Misc


281/GT/2018

05.02.2020

05.02.2020 Generation


279/GT/2018

05.02.2020

05.02.2020 Generation


195/MP/2019
along with I.A. No. 65/IA/2019 and 88/IA/2019

05.02.2020

05.02.2020 Misc


10/TT/2019

05.02.2020

05.02.2020 Transmission


Corrigendum to 266/TT/2018

04.02.2020

05.02.2020 Transmission


184/MP/2019

04.02.2020

04.02.2020 Misc


1/TT/2019

04.02.2020

04.02.2020 Transmission


114/MP/2018

04.02.2020

04.02.2020 Misc


115/MP/2019

04.02.2020

04.02.2020 Misc


L-1/44/2010-CERC

04.02.2020

04.02.2020 Misc


356/MP/2018
&
51/MP/2019

03.02.2020

03.02.2020 Misc


321/GT/2018

29.01.2020

30.01.2020 Generation


384/MP/2019

29.01.2020

30.01.2020 Misc


194/MP/2019

29.01.2020

29.01.2020 Misc


219/GT/2019

29.01.2020

29.01.2020 Generation


305/MP/2015
With I.A. No. 24/2019

29.01.2020

29.01.2020 Misc


323/MP/2019

29.01.2020

29.01.2020 Misc


299/MP/2018

29.01.2020

29.01.2020 Misc


322/TT/2019

29.01.2020

29.01.2020 Transmission


118/MP/2015
&
153/MP/2015

28.01.2020

29.01.2020 Misc


336/AT/2019

28.01.2020

29.01.2020 Misc


282/GT/2018

28.01.2020

28.01.2020 Generation


29/TT/2019

Approval under regulation-86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from anticipated COD to 31.03.2019 for Asset-I: 1X125 MVAR 400 kV Bus reactor along with associated bays at Cuddapah Substation, 1X240 MVAR 765 kV Bus reactor along with associated bays at Kurnool Sub-station, 1X240 MVAR 765 kV Bus reactor along with associated bays at Nellore PS Sub-station, 1X240 MVAR 765 kV Bus reactor along with associated bays at Raichur Sub-station, Asset II: 2X240 MVAR 765 kV Bus Reactors along with associated bays at Thiruvalam Substation under “Installation of Bus reactors at Cuddapah, Nellore PS , Kurnool, Raichur and Thiruvalam” in Southern Region. Power Grid Corporation of India Limited

28.01.2020

28.01.2020 Transmission


107/MP/2019

28.01.2020

28.01.2020 Misc


242/MP/2019

28.01.2020

28.01.2020 Misc


111/MP/2019

28.01.2020

28.01.2020 Misc


67/MP/2019
&
68/MP/2019

28.01.2020

28.01.2020 Misc


138/MP/2019

28.01.2020

28.01.2020 Misc


30/TT/2019

28.01.2020

28.01.2020 Transmission


149/GT/2018

28.01.2020

28.01.2020 Generation


Review Petition No. 35/RP/2018
in Petition No. 261/TT/2015
and Petition No. 232/MP/2018

28.01.2020

28.01.2020 Review


266/TT/2018

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from COD to 31.3.2019 for Asset-1: 2 nos. 500 MVA, 400/220 kV ICTs along with associated bays at Parli (Powergrid) switching station and 4 nos. 220 kV line bays (for LILO of Parli - Harangul 220 kV lines and Parli Osmanabad 220 kV S/C line), Asset-2: 2 nos. 220 kV line bays at Mapusa (Colvale) (Powergrid Substation (for Mapusa (Colvale) (Powergrid)-Tuem 220 kV D/C line) and Asset-3: 2 nos. 400 kV line bays for 400 kV D/C Indore (POWERGRID)-Ujjain Transmission Line at 765/400 kV Indore (Powergrid) Substation under WRSS-XVI for tariff block 2014-19 period. Power Grid Corporation of India Limited
Corrigendum

27.01.2020

27.01.2020 Transmission

61/MP/2019

27.01.2020

27.01.2020 Misc


I.A.No.3/2020
in
Petition No. 392/MP/2019

27.01.2020

27.01.2020 Misc


408/AT/2019

27.01.2020

27.01.2020 Misc


11/RP/2019
in
74/GT/2017

27.01.2020

27.01.2020 Misc


Corrigendum in 213/MP/2018
208/MP/2018

27.01.2020

27.01.2020 Misc


207/MP/2019

27.01.2020

27.01.2020 Misc


394/MP/2019

24.01.2020

27.01.2020 Misc


384/MP/2018

22.01.2020

24.01.2020 Misc


409/TL/2019

24.01.2020

24.01.2020 Licensing


447/TL/2019

24.01.2020

24.01.2020 Licensing


335/TL/2019

24.01.2020

24.01.2020 Licensing


425/TL/2019

24.01.2020

24.01.2020 Licensing


397/TL/2019

24.01.2020

24.01.2020 Licensing


445/TL/2019

23.01.2020

24.01.2020 Licensing


442/TL/2019

23.01.2020

23.01.2020 Licensing


375/TT/2018

Approval under regulation-86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from anticipated COD to 31.03.2019 for Asset-I: 1x63MVAR, 400kV Bus Reactor-I at 400/220kV Sohawal Sub-station, Asset-II: 1x63 MVAR, 400kV Bus Reactor-II at 400/220kV Sohawal Sub-station, Asset-III: 2 nos. 220kV bays of 220kV (PG)-Sohawal(UP) TL at 400/220kV Sohawal (PG) Substation, Asset-IV: 2 nos. 220kV bays No. 208 & 209 (Barabanki-I &II of UPPTCL) at 400/220kV Sohawal (PG) Substation, Asset-V: 2 nos. 220 kV Line Bays of Sohawal (PG)-Tanda (UP) TL at 400/220kV Sohawal (PG) Substation, Asset-VI: 2 nos. 220kV bays No. 206 & 207 of Shahjahanpur (PG) –Shahjahanpur (UPPTCL) at 400/220kV Shahjahanpur Sub-Station, Asset-VII:1 No, 220kV line bays No. 210 of Shahjahanpur (PG) –Shahjahanpur (UPPTCL) at 400/220kV Shahjahanpur SubStation, Asset-VIII: 1 No, 220kV line bays No. 211 of Shahjahanpur(PG)Shahjahanpur (UPPTCL) at 400/220kV Shahjahanpur Sub-Station, Asset-IX: 2 Nos. 220kV Line bays (Vatika-I and Vatika-II) at 400/220kV Jaipur (South) Substation, Asset-X: 2 Nos. 220kV line bays(211 and 212) at 400/220kV Jaipur (South) Substation under “Northern Regional Transmission Strengthening Scheme” in Northern Region. Power Grid Corporation of India Limited

22.01.2020

23.01.2020 Transmission


318/MP/2019

Petition under Section 79(1)(c), Section 18 and Section 17(3) of the Electricity Act, 2003, read with Regulation 19 of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009, and invoking all other enabling powers of the Central Electricity Regulatory Commission permitting the amendment of the Transmission Licence dated 23.5.2017 granted to the NER-II Transmission Limited for establishing Transmission System for NER System Strengthening Scheme-II (Part-B) and V, (NER-II B & V) on Build, Own, Operate and Maintain basis and accordingly allowing carving out of Silchar-Misa 400 kV D/C (quad) transmission line from the purview of the aforesaid Transmission Licence and to vest the same in the favour of a separate entity i.e. Sterlite Grid 12 Limited (Respondent No. 1/ SGL12). NER-II Transmission Limited

22.01.2020

23.01.2020 Misc


368/TT/2018

22.01.2020

22.01.2020 Transmission


267/TT/2018

22.01.2020

22.01.2020 Transmission


241/GT/2017
&
240/GT/2017

22.01.2020

22.01.2020 Generation


251/GT/2017

22.01.2020

22.01.2020 Generation


74/MP/2020

22.01.2020

22.01.2020 Misc


8/MP/2019

21.01.2020

21.01.2020 Misc


124/MP/2019

21.01.2020

21.01.2020 Misc


43/MP/2019

21.01.2020

21.01.2020 Misc


132/MP/2018

21.01.2020

21.01.2020 Misc


311/TT/2018

21.01.2020

21.01.2020 Transmission


68/MP/2017

21.01.2020

21.01.2020 Misc


Corrigendum in 125/MP/2019 Alongwith I.A. 63 of 2019

16.01.2020

16.01.2020 Misc


63/MP/2019

15.01.2020

16.01.2020 Misc


11/SM/2019

15.01.2020

16.01.2020 Misc


Review Petition No. 7/RP/2019 in
Petition No. 195/MP/2017

15.01.2020

15.01.2020 Review


11/RC/2019

14.01.2020

14.01.2020 Misc


125/MP/2019
Alongwith I.A. 63 of 2019

13.01.2020

13.01.2020 Misc


20/MP/2019
along with IA No.35/2019

13.01.2020

13.01.2020 Misc


56/MP/2019
57/MP/2019
58/MP/2019

13.01.2020

13.01.2020 Misc


78/MP/2018

13.01.2020

13.01.2020 Misc


8/RP/2019
in Petition No. 238/MP/2017

13.01.2020

13.01.2020 Review


2/TT/2019

13.01.2020

13.01.2020 Transmission


387/TT/2018

13.01.2020

13.01.2020 Transmission


100/MP/2018

10.01.2020

10.01.2020 Misc


236/MP/2017

10.01.2020

10.01.2020 Misc


175/MP/2019

10.01.2020

10.01.2020 Misc


247/TT/2017

10.01.2020

10.01.2020 Transmission


249/GT/2016

09.01.2020

10.01.2020 Generation


320/GT/2018

09.01.2020

10.01.2020 Generation


229/MP/2018

09.01.2020

09.01.2020 Misc


Review Petition Nos. 38/RP/2018 in Petition No. 116/TT/2017

09.01.2020

09.01.2020 Review


97/MP/2019

09.01.2020

09.01.2020 Misc


199/GT/2017

08.01.2020

09.01.2020 Generation


245/MP/2018

08.01.2020

08.01.2020 Misc


22/MP/2019

08.01.2020

08.01.2020 Misc


48/MP/2019

08.01.2020

08.01.2020 Misc


Review Petition No. 19/RP/2018
in
Petition No. 62/MP/2017

08.01.2020

08.01.2020 Review


Review Petition No. 44/RP/2018
in
Petition No. 235/MP/2015

08.01.2020

08.01.2020 Review


126/MP/2019

08.01.2020

08.01.2020 Misc


364/TT/2018

Approval under Regulation-86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from anticipated COD to 31.03.2019 for Asset-I: 400 kV D/C Silchar-Melriat transmission line (Charged at 132 kV) alongwith associated bays, Asset-II: LILO of 132 kV S/C Aizawl-Zemabawk Transmission Line along with associated bays at Melriat Sub-station (New), Asset-III: 132 kV D/C Melriat (New)– Sihhmui Transmission Line alongwith associated bays, Asset-IV: 4x5 MVAR (including 01 no hot spare), 132 kV, 1-ph, Bus Reactor at Melriat S/S alongwith Melriat (PG) GIS Sub-station under the transmission system associated with “Transmission system associated with Pallatana GBPP and Bongaigaon TPS” in North Eastern Region. Power Grid Corporation of India Limited

07.01.2020

07.01.2020 Transmission


159/MP/2019

07.01.2020

07.01.2020 Misc


61/TT/2018

07.01.2020

07.01.2020 Transmission


178/GT/2017

06.01.2020

07.01.2020 Generation


I.A. No. 29/2019
in
Petition No. 4/MP/2017

06.01.2020

07.01.2020 Misc


208/MP/2018

06.01.2020

06.01.2020 Misc


Review Petition No. 10/RP/2019
in Petition No. 168/TT/2018

06.01.2020

06.01.2020 Review