cerc-logo

Records of Proceedings(ROPs) - 2023

Petition No. Subject Date of Hearing Date of posting
ROP on website
Category


183/MP/2021

28.06.2023 11.01.2024 Misc.


157/MP/2021

Petitioner under Section 79(1)(f), (c) and (k) and other applicable provisions of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 along with Regulation 12 read with Regulation 32 and Regulation 33A of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open access in inter-state Transmission and related matters) Regulations, 2009, against the arbitrary acts and omissions of Power Grid Corporation of India Limited, Respondent inter-alia towards cancellation of the Agreement for Long Term Access dated 31.7.2020 and the encashment of Application Bank Guarantee No. 0479119BG0000167 dated 30.5.2019 of ₹2.8 crore furnished by Petitioner to the Respondent. Nuclear Power Corporation of India Ltd. (NPCIL)
28.06.2023 09.01.2024 Misc.


IA. No.88 of 2023
in
313/TT/2020

20.12.2023 30.12.2023 Misc.


249/MP/2023

20.12.2023 30.12.2023 Misc.


132/TT/2023

20.12.2023 30.12.2023 Transmission


326/TT/2023

20.12.2023 30.12.2023 Transmission


329/TT/2023

20.12.2023 30.12.2023 Transmission


327/TT/2023

20.12.2023 30.12.2023 Transmission


36/TT/2023

20.12.2023 30.12.2023 Transmission


52/TT/2023

20.12.2023 30.12.2023 Transmission


35/TT/2023

20.12.2023 30.12.2023 Transmission


34/TT/2023

Petition for determination of transmission tariff from COD to 31.3.2024 for Asset-1:(i) Installation of 12Ω, 420 kV fault limiting bus series reactors at Thiruvalam Sub-station between Bus Section-A and Bus Section-B, Bus Section-B and bus section-C along with 4 nos. 400 kV bays for 2 nos. series bus reactors + 1 no tie bay. 4 nos. of bays have been considered as main bays (2 main bays per bus series reactor) in the current scheme; (ii) Opening of one of the bus (other than on which fault limiting bus series reactors are being installed) between the above-mentioned bus sections through suitable arrangement and (iii) By-pass of Kolar-Thiruvalam and Thiruvalam-Sriperumbudur 400 kV S/C line to form Kolar- Sriperumbudur 400 kV S/C direct line under Transmission System for controlling high Short Circuit Current level at 400 kV Thiruvalam Sub-station in Southern Region. Power Grid Corporation of India Limited
20.12.2023 30.12.2023 Transmission


15/TT/2023

20.12.2023 30.12.2023 Transmission


5/TT/2023

Petition for truing up of transmission tariff for the 2014-19 period and determination of transmission tariff for the 2019-24 period for Asset-1 i.e. 02 number of 220 kV bays at Alipurduar Sub-station
And
Petition for determination of transmission tariff from COD to 31.3.2024 for transmission Asset-2: ±800 kV 3000 MW HVDC POLE-III and LILO of Bishwanath Chariali–Agra HVDC line for parallel operation of the HVDC station at Alipurduar and Earth electrode station and Earth Electrode line at Alipurduar and Agra end and ±800 kV 3000 MW HVDC POLE-IV at Alipurduar and Agra, Asset-3: LILO of Bongaigaon – Binaguri (Siliguri) 400 kV D/C line (quad), LILO of Birpara-Salakati 220 kV D/C line, 315 MVA 400/220 kV ICT-I&II and 125 MVAr 400 kV Bus Reactor-I & II alongwith associated bays at Alipurduar HVDC station and Asset-4: 400 kV D/C Alipurduar-Punatsangchung along with associated bays at Alipurduar Sub-station under “Transmission system for development of Pooling Station in Northern part of West Bengal and transfer of power from Bhutan to NR/WR” Power Grid Corporation of India Limited
20.12.2023 30.12.2023 Transmission


4/TT/2023

20.12.2023 30.12.2023 Transmission


151/MP/2021

18.12.2023 30.12.2023 Misc.


25/MP/2022

15.12.2023 30.12.2023 Misc.


209/TT/2023

15.12.2023 28.12.2023 Transmission


360/MP/2022

08.12.2023 27.12.2023 Misc.


372/MP/2022

05.12.2023 27.12.2023 Misc.


Corrigendum to 295/TT/2022

27.09.2023 26.12.2023 Transmission


45/TT/2023

20.12.2023 26.12.2023 Transmission


289/TT/2023

15.12.2023 26.12.2023 Transmission


325/TT/2023

15.12.2023 26.12.2023 Transmission


276/TT/2023

15.12.2023 26.12.2023 Transmission


73/TT/2023

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from DOCO to 31.3.2024 for Asset-1: 09 Nos. of Central Sector Communication Links (DOCO-30.6.2020), Asset-2: 01 Nos. of Central Sector Communication Links (DOCO-19.3.2021), Asset-3: -09 Nos. of State Sector Communication Links (DOCO-19.3.2021) Asset-4: 03 Nos. of State Sector Communication Links (DOCO-19.4.2021), Asset-5: 02 Nos. of State Sector Communication Links (DOCO-20.4.2021) and Asset-6: 05 Nos. of State Sector Communication Links (DOCO-11.5.2021) under Project- “Establishment of Fiber Optic Communication system under wide band Communication expansion plan in North Eastern region.” Power Grid Corporation of India Limited
20.12.2023 26.12.2023 Transmission


180/TT/2021

15.12.2023 26.12.2023 Transmission


330/TT/2022

15.12.2023 26.12.2023 Transmission


67/TT/2023

20.12.2023 26.12.2023 Transmission


63/TT/2023

20.12.2023 26.12.2023 Transmission


330/TT/2023

20.12.2023 26.12.2023 Transmission


55/TT/2023

20.12.2023 26.12.2023 Transmission


7/TT/2023

18.12.2023 26.12.2023 Transmission


275/TT/2023

15.12.2023 26.12.2023 Transmission


9/TT/2023

15.12.2023 26.12.2023 Transmission


7/TT/2018

15.12.2023 26.12.2023 Transmission


328/TT/2023

15.12.2023 26.12.2023 Transmission


58/GT/2022

06.12.2023 26.12.2023 Generation


384/MP/2023

20.12.2023 25.12.2023 Misc.


383/MP/2023

20.12.2023 25.12.2023 Misc.


271/MP/2023

20.12.2023 25.12.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 51/2023

20.12.2023 25.12.2023 Misc.


264/MP/2023

20.12.2023 25.12.2023 Misc.


179/MP/2023

15.12.2023 25.12.2023 Misc.


192/MP/2023

18.12.2023 21.12.2023 Misc.


291/MP/2023 along with IA No.75/2023 and 292/MP/2023 along with IA No.74/2023

18.12.2023 21.12.2023 Misc.


182/MP/2022

18.12.2023 21.12.2023 Misc.


87/MP/2022

18.12.2023 21.12.2023 Misc.


68/MP/2023 along with IA No.18/2023

18.12.2023 21.12.2023 Misc.


94/MP/2023, 277/MP/2022, 278/MP/2022, 282/MP/2022 and 265/MP/2022 along with IA No.63/2023

18.12.2023 21.12.2023 Misc.


432/MP/2019 with IA No. 82/2023

18.12.2023 21.12.2023 Misc.


IA No. 91/2023 in 242/TT/2021 and IA No. 92/2023 in 173/TT/2021

15.12.2023 20.12.2023 Misc.


321/TT/2023

15.12.2023 20.12.2023 Transmission


147/MP/2021

18.12.2023 20.12.2023 Misc.


109/MP/2023,
345/MP/2022

18.12.2023 20.12.2023 Misc.


201/MP/2023

18.12.2023 19.12.2023 Misc.


338/AT/2023

15.12.2023 19.12.2023 Adoption


205/MP/2023

18.12.2023 19.12.2023 Misc.


167/MP/2023, 267/MP/2023,258/MP/2023 and 53/MP/2023 along with IA No. 11/2023

18.12.2023 19.12.2023 Misc.


210/MP/2023

18.12.2023 19.12.2023 Misc.


247/MP/2023

18.12.2023 19.12.2023 Misc.


209/MP/2017

08.12.2023 18.12.2023 Misc


27/RP/2023

29.11.2023 18.12.2023 Review


230/MP/2023

15.12.2023 18.12.2023 Misc


236/MP/2023

15.12.2023 18.12.2023 Misc


313/TD/2023

08.12.2023 16.12.2023 Licence


399/GT/2020

06.12.2023 16.12.2023 Generation


339/MP/2022

13.12.2023 15.12.2023 Misc.


337/AT/2023

13.12.2023 15.12.2023 Adoption


334/AT/2023

13.12.2023 15.12.2023 Adoption


293/TL/2023

13.12.2023 15.12.2023 Licence (Transmission)


286/MP/2023

13.12.2023 15.12.2023 Misc.


262/TL/2023

13.12.2023 15.12.2023 Licence (Transmission)


262/MP/2022

13.12.2023 15.12.2023 Misc.


237/MP/2023

13.12.2023 15.12.2023 Misc.


235/MP/2021

13.12.2023 15.12.2023 Misc.


56/MP/2022 and 227/MP/2022 along with IA No. 55/2022

13.12.2023 15.12.2023 Misc.


223/MP/2023 along with IA No.53/2023

13.12.2023 15.12.2023 Misc.


126/MP/2022

13.12.2023 15.12.2023 Misc.


360/MP/2022

22.09.2023 15.12.2023 Misc.


67/MP/2021 Along with I.A. 84/IA/2021

13.12.2023 15.12.2023 Misc.


302/MP/2022 along with I.A. No. 49/2023

13.12.2023 15.12.2023 Misc.


74/MP/2023

08.12.2023 15.12.2023 Misc.


203/MP/2023

13.12.2023 15.12.2023 Misc.


172/MP/2023

13.12.2023 15.12.2023 Misc.


366/MP/2022 and 367/MP/2022

13.12.2023 15.12.2023 Misc.


116/MP/2019

08.12.2023 15.12.2023 Misc.


377/MP/2022

08.12.2023 13.12.2023 Misc.


244/TL/2023 and 246/TL/2023

08.12.2023 13.12.2023 Licence (Transmission)


204/MP/2023

08.12.2023 13.12.2023 Misc.


75/MP/2023

08.12.2023 13.12.2023 Misc.


343/AT/2023 and 344/TL/2023

06.12.2023 13.12.2023 Adoption


139/MP/2022

05.12.2023 13.12.2023 Misc.


164/MP/2023 and 166/MP/2023

08.12.2023 13.12.2023 Misc.


105/MP/2023

06.12.2023 13.12.2023 Misc.


54/MP/2019 and 140/MP/2019

06.12.2023 13.12.2023 Misc.


158/MP/2023

06.12.2023 13.12.2023 Misc.


83/MP/2023

06.12.2023 13.12.2023 Misc.


160/MP/2023

06.12.2023 13.12.2023 Misc.


263/MP/2022

05.12.2023 13.12.2023 Misc.


182/MP/2023

05.12.2023 13.12.2023 Misc.


117/MP/2023 With IA No. 79/2023

05.12.2023 13.12.2023 Misc.


308/MP/2023 with IAs No. 77/2023, 78/2023, 95/2023 & 96/2023 and 100/MP/2021 with IA No. 94/2023 and 102/MP/2021 with IA No. 97/2023

05.12.2023 13.12.2023 Misc.


29/RP/2023

29.11.2023 13.12.2023 Review


21/RP/2023

08.11.2023 13.12.2023 Review


318/MP/2022

08.12.2023 11.12.2023 Misc.


318/MP/2022

06.12.2023 11.12.2023 Misc.


347/MP/2022

05.12.2023 11.12.2023 Misc.


85/MP/2021 alongwith IA No. 26/2021

05.12.2023 08.12.2023 Misc.


331/AT/2023 and 332/TL/2023

06.12.2023 08.12.2023 Adoption


322/TL/2023

06.12.2023 08.12.2023 Licence (Transmission)


218/MP/2022

06.12.2023 08.12.2023 Misc.


17/MP/2023

Petition under Section 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 read with Article 13 and Article 17 of the Power Purchase Agreement dated 7.8.2008 (as amended vide amendment agreements dated 17.9.2008 and 27.5.2022) executed between the Petitioner and Uttar Haryana Bijli Vitran Nigam Limited & Dakshin Haryana Bijli Vitran Nigam Limited; as well as Article 13 and Article 17 of the Power Purchase Agreement dated 20.1.2009 (as amended vide amendment agreement dated 21.10.2010) between the Petitioner and Tata Power Trading Company Limited inter alia seeking approval of Change in Law event, i.e., enactment of the Integrated Goods and Services Tax Act, 2017, the Central Goods and Services Tax Act, 2017, the State Goods And Services Tax Act, 2017, and the Union Territory Goods and Services Tax Act 2017; and compensation for additional expenses incurred by the Petitioner with respect to operation and maintenance of the Project on account of the same along with carrying cost. Jhajjar Power Limited (JPL)
06.12.2023 08.12.2023 Misc.


699/MP/2020

05.12.2023 08.12.2023 Misc.


271/MP/2023

05.12.2023 08.12.2023 Misc.


197/MP/2023 and 206/MP/2023

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. whereby it has issued certain directions in terms of which all existing and future overhead low and high voltage power lines in the Priority and Potential habitats of Great-Indian Bustard are necessarily required to be laid under-ground, in terms of Article 12 of the Power Purchase Agreement dated 27.11.2019 between Azure Power Maple Private Limited and Solar Energy Corporation of India Limited. Azure Power Maple Private Limited (APMPL) and Azure Power Forty One Private Limited (APFOPL)
05.12.2023 08.12.2023 Misc.


188/MP/2021

05.12.2023 08.12.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 51/2023

05.12.2023 08.12.2023 Misc.


102/MP/2023

05.12.2023 08.12.2023 Misc.


79/MP/2023 and 92/MP/2023 along with IA No.24/2023

05.12.2023 08.12.2023 Misc.


61/MP/2023

05.12.2023 08.12.2023 Misc.


33/RP/2023

29.11.2023 08.12.2023 Review


394/MP/2019

05.12.2023 08.12.2023 Misc.


310/TL/2023

05.12.2023 08.12.2023 Licence (Transmission)


299/MP/2023

05.12.2023 07.12.2023 Misc.


214/AT/2023

05.12.2023 07.12.2023 Adoption


257/MP/2022

05.12.2023 06.12.2023 Misc.


306/MP/2023

28.11.2023 06.12.2023 Misc.


28/RP/2023

29.11.2023 06.12.2023 Review


Diary No. 514/2023 in Diary No.512/2023

29.11.2023 06.12.2023 Misc.


370/MP/2022

22.09.2023 05.12.2023 Misc.


20/RP/2023

29.11.2023 04.12.2023 Review


269/MP/2018

28.11.2023 04.12.2023 Misc.


IA No. 42/2023 in Petition No.109/MP/2022

25.10.2023 04.12.2023 Misc.


352/TL/2023 along with IA No.89/2023

28.11.2023 04.12.2023 Licence (Transmission)


222/AT/2023 and 233/AT/2023

29.11.2023 04.12.2023 Adoption


358/MP/2023 along with IA No. 90/2023

29.11.2023 04.12.2023 Misc.


161/MP/2023

29.11.2023 04.12.2023 Misc.


339/AT/2023 and 340/TL/2023

28.11.2023 04.12.2023 Adoption


307/MP/2023

28.11.2023 04.12.2023 Misc.


291/MP/2023 along with IA No.75/2023 and 292/MP/2023 along with IA No.74/2023

28.11.2023 04.12.2023 Misc.


252/AT/2023 and 253/TL/2023

28.11.2023 04.12.2023 Adoption


248/MP/2023

28.11.2023 04.12.2023 Misc.


181/TL/2023

28.11.2023 04.12.2023 Licence (Transmission)


26/RP/2023

28.11.2023 04.12.2023 Review


16/RP/2023 and 24/RP/2023

28.11.2023 04.12.2023 Review


25/MP/2020

28.11.2023 04.12.2023 Misc.


15/RP/2023

28.11.2023 04.12.2023 Review


11/RP/2023

29.11.2023 04.12.2023 Review


338/AT/2023

28.11.2023 30.11.2023 Adoption


305/TD/2023

28.11.2023 30.11.2023 Licence


249/MP/2023

28.11.2023 30.11.2023 Misc.


30/MP/2023

28.11.2023 30.11.2023 Misc.


138/MP/2023

28.11.2023 30.11.2023 Misc.


122/MP/2022

28.11.2023 30.11.2023 Misc.


78/MP/2023

28.11.2023 30.11.2023 Misc.


71/MP/2021

28.11.2023 30.11.2023 Misc.


361/GT/2020
376/GT/2020

08.11.2023 29.11.2023 Misc.


112/MP/2023

10.11.2023 24.11.2023 Misc.


373/MP/2022

10.11.2023 22.11.2023 Misc.


Diary No.487/2023

Petition under Section 79 of the Electricity Act, 2003 read with applicable provisions of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-state transmission system) Regulations, 2022 and its amendment thereto, and the Detailed Procedure dated 14.10.2022 issued thereunder inter alia seeking issuance of directions to Respondent No. 1 on very immediate and urgent basis to take further steps for ensuring expeditious grant of connectivity for a quantum of 450 MW to Petitioner’s Solar Projects allowed to be connected at Bhadla-II Pooling Station pursuant to the unequivocal decision taken and communicated during the 23rd CMETS-NR meeting dated 29.08.2023 for which the minutes of meeting were issued on 30.09.2023. Project Nine Renewable Power Private Limited (PNRPPL)
09.11.2023 22.11.2023 Misc.


17/RP/2023

09.11.2023 22.11.2023 Review


78/2023 In 308/MP/2023, 100/MP/2021 and 102/MP/2021

08.11.2023 22.11.2023 Misc.


25/RP/2023 in 296/TT/2022

10.11.2023 22.11.2023 Review


268/MP/2023 and 269/MP/2023

09.11.2023 22.11.2023 Misc.


7/TT/2018

08.11.2023 22.11.2023 Transmission


348/GT/2022

08.11.2023 22.11.2023 Generation


171/MP/2023

09.10.2023 22.11.2023 Misc.


65/MP/2023

Petition under Section 79 of the Electricity Act, 2003 read with Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021 before the Central Electricity Regulatory Commission for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of increase in rate of goods and services tax from 5% to 12% by way of Notification No.8/2021 – Central Tax (Rate) dated 30.9.2021 and on account of increase in the rate of goods and services tax paid (impact) at the rate of 4.9% (70% of 7% GST increase) as per the Notification No. 24/2018-Central Tax (Rate) dated 31.12.2018, in terms of Article 12 of the Power Purchase Agreement dated 11.02.2020 between GRT Jewellers (India) Private Limited and Solar Energy Corporation of India Limited. GRT Jewellers (India) Private Limited (GRTJIPL)
10.11.2023 21.11.2023 Misc.


91/GT/2023

30.10.2023 21.11.2023 Generation


IA No. 62/2023 In 149/MP/2015 and IA No. 61/2023 In 17/RP/2022

08.11.2023 21.11.2023 Misc.


82/TT/2022

10.11.2023 20.11.2023 Transmission


227/MP/2023

09.11.2023 20.11.2023 Misc.


12/RP/2023

08.11.2023 20.11.2023 Review


14/RP/2023

08.11.2023 20.11.2023 Review


13/RP/2023

08.11.2023 17.11.2023 Review


51/RP/2022 in 30/TT/2021

08.11.2023 17.11.2023 Review


338/MP/2022

10.11.2023 17.11.2023 Misc.


160/MP/2023

09.11.2023 17.11.2023 Misc.


119/GT/2023

30.10.2023 16.11.2023 Generation


290/MP/2023

18.10.2023 16.11.2023 Misc.


163/MP/2022

10.11.2023 16.11.2023 Misc.


162/MP/2023

09.11.2023 16.11.2023 Misc.


Diary No.488/2023

10.11.2023 15.11.2023 Misc.


340/MP/2020 along with IA No.1/2021

10.11.2023 15.11.2023 Misc.


314/MP/2022

10.11.2023 15.11.2023 Misc.


312/TD/2023

10.11.2023 15.11.2023 Licence


310/TL/2023

10.11.2023 15.11.2023 licence (Transmission)


306/MP/2022 along with IA No. 20/2023

10.11.2023 15.11.2023 Misc.


282/MP/2021 and 141/MP/2022

10.11.2023 15.11.2023 Misc.


262/TL/2023

10.11.2023 15.11.2023 Licence (Transmission)


244/MP/2021 along with IA No.30/2023

10.11.2023 15.11.2023 Misc.


226/MP/2021 and 227/MP/2021

10.11.2023 15.11.2023 Misc.


188/MP/2019 along with IA No. 66/2019

10.11.2023 15.11.2023 Misc.


40/MP/2023 and 31/MP/2023

10.11.2023 15.11.2023 Misc.


48/MP/2023

10.11.2023 15.11.2023 Misc.


19/MP/2023

10.11.2023 15.11.2023 Misc.


342/MP/2023 along with IA (Diary) No. 481/2023

09.11.2023 15.11.2023 Misc.


324/MP/2022

09.11.2023 15.11.2023 Misc.


291/MP/2023 along with IA No.75/2023 and 292/MP/2023 along with IA No.74/2023

09.11.2023 15.11.2023 Misc.


284/MP/2023 along with IA No.72/2023

09.11.2023 15.11.2023 Misc.


196/MP/2023

09.11.2023 15.11.2023 Misc.


113/MP/2023

09.11.2023 15.11.2023 Misc.


68/MP/2023 along with IA No.18/2023

09.11.2023 15.11.2023 Misc.


186/MP/2021

09.11.2023 15.11.2023 Misc.


227/MP/2022 along with IA No. 55/2022 and 56/MP/2022

09.11.2023 15.11.2023 Misc.


16/MP/2023

09.11.2023 15.11.2023 Misc.


214/AT/2023

08.11.2023 13.11.2023 Adoption


32/RP/2023

08.11.2023 13.11.2023 Review


15/RP/2023

08.11.2023 13.11.2023 Review


11/RP/2023

08.11.2023 13.11.2023 Review


20/RP/2023

08.11.2023 13.11.2023 Review


205/MP/2023

09.10.2023 10.11.2023 Misc.


263/MP/2023

20.10.2023 10.11.2023 Misc.


30/RP/2023 in 18/MP/2023

08.11.2023 10.11.2023 Review


120/GT/2023

30.10.2023 10.11.2023 Generation


133/TT/2023

30.10.2023 08.11.2023 Transmission


191/TT/2023

30.10.2023 06.11.2023 Transmission


52/TT/2023

30.10.2023 06.11.2023 Transmission


193/TT/2023

30.10.2023 06.11.2023 Transmission


194/TT/2023

30.10.2023 06.11.2023 Transmission


209/TT/2023

30.10.2023 06.11.2023 Transmission


15/TT/2023

Petition for determination of transmission tariff for 2019-24 period in respect of Asset 1: Bypassing of 400 kV D/C Farakka-Kahalgaon (Ckt-3 & Ckt-4) and 400 kV S/C Farakka-Durgapur (Ckt-1 & Ckt-2) existing transmission line from NTPC, Farakka so as to form 400 kV D/C Kahalgaon - Durgapur along with upgraded bays at Durgapur Sub-station and Kahalgaon Sub-station (COD:2.1.2022), Asset 2: 01 number 500 MVA, 400/220 kV Transformer (4th ICT) along with 01 number 400 kV ICT bay (AIS) & 01 number 220 kV ICT bay (GIS) along with 220 kV Cable from ICT to GIS bay at Muzaffarpur (POWERGRID) 400/220 kV Sub-station (COD:8.4.2022) and Asset 3: LILO of both circuits of Kishanganj (POWERGRID)- Darbhanga (DMTCL) 400 kV D/C (Quad) Line at Saharsa New (POWERGRID) Sub-station along with associated 04 nos 400 kV Line Bays at Saharsa New (POWERGRID) Sub-station (COD:28.4.2022) under “Eastern Region Strengthening Scheme-XXIII" in Eastern Region. Power Grid Corporation of India Limited (PGCIL)
30.10.2023 06.11.2023 Transmission


154/GT/2023

30.10.2023 06.11.2023 Generation


8/TT/2023

30.10.2023 03.11.2023 Transmission


33/TT/2023

30.10.2023 03.11.2023 Transmission


32/TT/2023

30.10.2023 03.11.2023 Transmission


132/TT/2023

30.10.2023 03.11.2023 Transmission


9/TT/2023

30.10.2023 03.11.2023 Transmission


4/TT/2023

30.10.2023 03.11.2023 Transmission


7/TT/2023

30.10.2023 03.11.2023 Transmission


6/TT/2023

30.10.2023 03.11.2023 Transmission


89/GT/2023

30.10.2023 03.11.2023 Generation


90/GT/2023

30.10.2023 03.11.2023 Generation


75/MP/2022

25.10.2023 03.11.2023 Misc.


57/TT/2023

30.10.2023 02.11.2023 Transmission


23/TT/2023

30.10.2023 02.11.2023 Transmission


343/MP/2020

18.10.2023 02.11.2023 Misc.


617/MP/2020

25.10.2023 01.11.2023 Misc.


269/MP/2018

25.10.2023 01.11.2023 Misc.


140/MP/2022

25.10.2023 01.11.2023 Misc.


225/MP/2023

25.10.2023 31.10.2023 Misc.


268/MP/2023 and 269/MP/2023

25.10.2023 31.10.2023 Misc.


249/MP/2022, 250/MP/2022, 251/MP/2022 and 252/MP/2022

25.10.2023 31.10.2023 Misc.


265/MP/2021

25.10.2023 31.10.2023 Misc.


180/MP/2019 along with IA No. 32/2023

25.10.2023 31.10.2023 Misc.


155/MP/2022 and 194/MP/2022 along with IA No. 22/2023

25.10.2023 31.10.2023 Misc.


136/MP/2023

25.10.2023 30.10.2023 Misc.


85/MP/2021 alongwith IA No. 26/2021

20.10.2023 30.10.2023 Misc.


319/MP/2022 alongwith IA No. 63/IA/2022

18.10.2023 30.10.2023 Misc.


286/MP/2023

25.10.2023 30.10.2023 Misc.


293/TL/2023

25.10.2023 30.10.2023 Licence


245/AT/2023 and 246/TL/2023

25.10.2023 30.10.2023 Adoption


96/MP/2022

25.10.2023 30.10.2023 Misc.


243/AT/2023 and 244/TL/2023

25.10.2023 27.10.2023 Adoption


109/MP/2023

25.10.2023 27.10.2023 Misc.


61/MP/2022

18.10.2023 26.10.2023 Misc.


344/MP/2020

18.10.2023 26.10.2023 Misc.


79/MP/2022 alongwith I.A. No. 34/IA/2023

18.10.2023 26.10.2023 Misc.


107/MP/2021 alongwith IA No. 36/IA/2021

20.10.2023 26.10.2023 Misc.


104/MP/2022

18.10.2023 26.10.2023 Misc.


165/MP/2023

18.10.2023 26.10.2023 Misc.


192/MP/2021

10.10.2023 25.10.2023 Misc.


223/MP/2023 along with IA No. 53/2023

11.10.2023 23.10.2023 Misc.


458/2023

18.10.2023 23.10.2023 Misc.


221/MP/2023

20.10.2023 22.10.2023 Misc.


220/MP/2023

20.10.2023 22.10.2023 Misc.


215/MP/2021

20.10.2023 22.10.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 51/2023

20.10.2023 22.10.2023 Misc.


102/MP/2023

20.10.2023 22.10.2023 Misc.


94/MP/2023,
277/MP/2022,
278/MP/2022,
282/MP/2022,
265/MP/2022 Along With I.A. No. 462/2022

20.10.2023 22.10.2023 Misc.


85/MP/2022 alongwith IA No. 70/2022,
123/MP/2022,
246/MP/2022 alongwith IA Nos. 8/2023 & 35/2023,
107/MP/2023,
56/MP/2023,
185/MP/2023

20.10.2023 22.10.2023 Misc.


43/MP/2021 along with IA No.9/2021

20.10.2023 22.10.2023 Misc.


155/MP/2023

20.10.2023 22.10.2023 Misc.


366/MP/2022 and 367/MP/2022

18.10.2023 22.10.2023 Misc.


I.A Nos. 77/2023 & 78/2023 in 308/MP/2023, 100/MP/2021 and 102/MP/2021

Petition under Section 79 (1) (f) of the Electricity Act, 2003 for adjudication of disputes between the Petitioner and the Respondent and for directions to desist from uploading bills relating of differential AFC on the PRAAPTI Portal.
Petition under Section 142 of the Electricity Act, 2003 read with Regulations 111, 113 and 119 of the Conduct of Business Regulations, 1999 for execution of Order dated 13.01.2020 passed by this Hon’ble Commission and directions and initiation of appropriate action against the Respondent for non- compliance of the directions issued under Order dated 13.01.2020 in Petition No. 78/MP/2018.
Petition under Section 142 of the Electricity Act, 2003 read with Regulations 111, 113 and 119 of the Conduct of Business Regulations, 1999 for execution of Order dated 10.01.2020 passed by this Hon’ble Commission and directions and initiation of appropriate action against the Respondent for non-compliance of the directions issued under Order dated 10.01.2020 in Petition No. 236/MP/2017. MPPMCL and DVC
18.10.2023 20.10.2023 Misc.


562/MP/2020 along with IA No.15/2023

18.10.2023 20.10.2023 Misc.


353/AT/2022

18.10.2023 20.10.2023 Adoption


306/MP/2022 along with IA No. 20/2023

18.10.2023 20.10.2023 Misc.


283/MP/2023

18.10.2023 20.10.2023 Misc.


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and 4 Ors.
18.10.2023 20.10.2023 Misc.


229/MP/2016

18.10.2023 20.10.2023 Misc.


224/AT/2023

18.10.2023 20.10.2023 Adoption


179/MP/2023

18.10.2023 20.10.2023 Misc.


114/MP/2019

11.10.2023 19.10.2023 Misc.


Corrigendum to 320/MP/2022

10.10.2023 19.10.2023 Misc.


144/MP/2021

10.10.2023 19.10.2023 Misc.


330/TT/2022

10.10.2023 19.10.2023 Transmission


25/MP/2022

10.10.2023 19.10.2023 Misc.


116/MP/2019

10.10.2023 19.10.2023 Misc.


117/MP/2023

11.10.2023 18.10.2023 Misc.


111/MP/2021 along with I.A.No.38/2021

10.10.2023 18.10.2023 Misc.


I.A Nos. 77/2023 & 78/2023 in 308/MP/2023 (Dy. No. 436/2023)

11.10.2023 16.10.2023 Misc.


98/MP/2023

11.10.2023 16.10.2023 Misc.


245/MP/2021

09.10.2023 16.10.2023 Misc.


137/MP/2023

09.10.2023 16.10.2023 Misc.


5/MP/2022

10.10.2023 16.10.2023 Misc.


66/MP/2023

11.10.2023 16.10.2023 Misc.


374/MP/2022

10.10.2023 16.10.2023 Misc.


187/MP/2023

11.10.2023 16.10.2023 Misc.


313/TT/2020

09.10.2023 16.10.2023 Transmission


47/MP/2021

11.10.2023 16.10.2023 Misc.


329/TT/2022

10.10.2023 16.10.2023 Transmission


235/MP/2023

10.10.2023 16.10.2023 Misc.


Diary No.453/2023

11.10.2023 16.10.2023 Misc.


315/MP/2022

Petition under Section 38 read with Section 79(1)(c), Section 79(1)(f), Section 79(1)(k) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2010, Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2020 and Clause 10.3 (g) of the Billing, Collection and Disbursement Procedure issued by CTUIL under CERC Sharing Regulations 2020 dated 01.01.2021 for recovery of interest from Central Transmission Utility of India on delay in reimbursement of excess Transmission Charges paid by Sembcorp Energy India Limited towards Bill of Supply for PoC Bill-1 for the month of October 2020 and November 2020 raised by CTUIL. Sembcorp Energy India Limited (SEIL).
11.10.2023 16.10.2023 Misc.


306/MP/2022 along with IA No.20/2023

11.10.2023 16.10.2023 Misc.


281/MP/2023 along with IA No.71/2023

11.10.2023 16.10.2023 Misc.


181/MP/2021 and 205/MP/2022

Petition seeking issuance of appropriate directions to the Respondent to declare that the Letter of Credit opened by the Respondent is in contravention of the provisions of the PTC-PPA and Procurer-PPA and to direct the Respondent to pay compensation towards such breach of the PPA and also to impost penalty under Regulation 14C for violation of Regulation 7(c) of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2009; and to direct the Respondent to refund the excess trading margin and excess rebate charged by the Respondent for the period w.e.f 31.1.2020 till opening of Payment Security Mechanism as per the Procurer-PPA, PTC-PPA and the provisions of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2020 issued by this Commission along with Late Payment Surcharge; and to direct that the Respondent shall not be eligible to charge trading margin exceeding 2 paise/kWh till such time the Respondent opens Payment Security Mechanism in conformity with the PTC-PPA, Procurer- PPA and the applicable Regulations of this Commission. Maruti Clean Coal and Power Limited (MCCPL)
11.10.2023 16.10.2023 Misc.


92/MP/2023 along with IA No.24/2023

11.10.2023 16.10.2023 Misc.


79/MP/2023

11.10.2023 16.10.2023 Misc.


73/MP/2022

11.10.2023 16.10.2023 Misc.


22/MP/2023

11.10.2023 16.10.2023 Misc.


432/MP/2019

10.10.2023 16.10.2023 Misc.


320/MP/2022

10.10.2023 16.10.2023 Misc.


54/MP/2019 and 140/MP/2019

10.10.2023 16.10.2023 Misc.


91/MP/2018, 53/MP/2021 Along with IA No. 26/2023, 61/MP/2021 along with IA. 28/2021 & 42/2022 and 149/MP/2021

09.10.2023 16.10.2023 Misc.


345/MP/2022

11.10.2023 16.10.2023 Misc.


239/MP/2021 along with IA No.47/2023

11.10.2023 16.10.2023 Misc.


186/MP/2021

11.10.2023 16.10.2023 Misc.


87/MP/2022

11.10.2023 16.10.2023 Misc.


190/MP/2022

10.10.2023 16.10.2023 Misc.


377/MP/2022

10.10.2023 12.10.2023 Misc.


217/TL/2023

09.10.2023 12.10.2023 Licence


262/MP/2022

10.10.2023 11.10.2023 Misc.


124/MP/2022

09.10.2023 11.10.2023 Misc.


151/MP/2021

27.09.2023 11.10.2023 Misc.


2/TT/2023

27.09.2023 11.10.2023 Transmission


303/TT/2022

27.09.2023 11.10.2023 Transmission


Diary No.420/2023

09.10.2023 11.10.2023 Misc.


227/MP/2022 along with IA No. 55/2022 and 56/MP/2022

09.10.2023 11.10.2023 Misc.


224/AT/2023

09.10.2023 11.10.2023 Adoption


182/MP/2022

09.10.2023 11.10.2023 Misc.


163/MP/2022

09.10.2023 11.10.2023 Misc.


147/MP/2021

09.10.2023 11.10.2023 Misc.


92/MP/2023 along with IA No. 24/2023

09.10.2023 11.10.2023 Misc.


214/AT/2023

20.09.2023 11.10.2023 Adoption


54/MP/2023

09.10.2023 11.10.2023 Misc.


71/MP/2023

09.10.2023 11.10.2023 Misc.


233/AT/2023

20.09.2023 09.10.2023 Adoption


Diary No.404/2023 and Diary (IA) No.412/2023

27.09.2023 09.10.2023 Misc.


685/TT/2020

04.10.2023 06.10.2023 Transmission


180/TT/2021

27.09.2023 05.10.2023 Transmission


133/TT/2023

27.09.2023 05.10.2023 Transmission


33/TT/2023

27.09.2023 05.10.2023 Transmission


32/TT/2023

27.09.2023 05.10.2023 Transmission


7/TT/2023

27.09.2023 05.10.2023 Transmission


6/TT/2023

27.09.2023 05.10.2023 Transmission


115/TT/2023

27.09.2023 05.10.2023 Transmission


25/TT/2023

27.09.2023 05.10.2023 Transmission


159/TT/2023

27.09.2023 05.10.2023 Transmission


13/TT/2023

27.09.2023 05.10.2023 Transmission


293/TT/2022

27.09.2023 05.10.2023 Transmission


116/TT/2023

27.09.2023 05.10.2023 Transmission


333/TT/2022

27.09.2023 05.10.2023 Transmission


295/TT/2022

27.09.2023 05.10.2023 Transmission


177/TT/2023

27.09.2023 05.10.2023 Transmission


Diary No.380/2023 along with Diary (IA) No. 381/2023

29.09.2023 04.10.2023 Misc.


78/MP/2023

20.09.2023 04.10.2023 Misc.


685/TT/2020

27.09.2023 01.10.2023 Transmission


286/MP/2023 along with IA No.73/2023

29.09.2023 30.09.2023 Misc.


192/MP/2023 along with Diary (IA) No. 427/2023

29.09.2023 30.09.2023 Misc.


279/MP/2023

29.09.2023 30.09.2023 Misc.


60/MP/2022 along with IA No. 1/2023

06.09.2023 29.09.2023 Misc.


218/MP/2022 and 105/MP/2023

22.09.2023 29.09.2023 Misc.


727/MP/2020

Petition under Sections 79(1)(c) & section 79(1)(f) of the Electricity Act, 2003 read with regulations 32 and 33a Central Electricity Regulatory Commission (Grant of connectivity, long term and medium term open access in inter-State transmission and related matters) Regulations, 2009 along with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking inter alia relaxation of clause 11.2 of the Detailed procedure issued by the Central Electricity Regulatory Commission for “Grant of connectivity to projects based on renewable sources to the inter-State transmission system” dated 15.5.2018 and adjudicating the dispute that has arisen in relation to the agreements entered between Central Transmission Utility and the Petitioner herein. Mytrah Energy (India) Private Limited (MEIPL)
22.09.2023 29.09.2023 Misc.


39/MP/2023 alongwith IA No. 5/2023

22.09.2023 29.09.2023 Misc.


455/MP/2019 along with IA No. 44/2023 and 65/MP/2020 along with IA Nos. 46/2023 & 54/2023 and 618/MP/2020

22.09.2023 28.09.2023 Misc.


Diary No.416/2023

27.09.2023 28.09.2023 Misc.


223/MP/2022

22.09.2023 28.09.2023 Misc.


220/MP/2022 and 378/MP/2022

20.09.2023 28.09.2023 Misc.


169/MP/2022

15.09.2023 28.09.2023 Misc.


245/MP/2021

13.09.2023 27.09.2023 Misc.


(Diary) No. 403/2023 along with IA (Diary) No. 406/2023 and (Diary) No. 405/2023 along with IA (Diary) No. 407/2023

22.09.2023 26.09.2023 Misc.


308/MP/2022

Petition under Section 79 of Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 8.6.2020 seeking declaration that change in Goods and Services Tax from 5% to 12% w.e.f. 1.10.2021 on account of amendment to Notification Nos. 1/2017- Central Tax (Rate), 1/2017- Integrated Tax (Rate) dated 28.6.2017 and Finance Department (Govt. of Rajasthan) Notification No. F.12(56)FD/Tax/2017-Pt- I-40 dated 29.6.2017 by way of Notification No. 8/2021- Central Tax (Rate), Notification No. 8/2021- Integrated Tax (Rate) dated 30.9.2021 and Finance Department (Govt. of Rajasthan) Notification No. F.12(1)FD/Tax/2021-60 dated 30.9.2021 as a Change in Law event and to direct Solar Energy Corporation of India Limited to compensate along with applicable carrying cost towards additional expenditure incurred on account of increase in rate of Goods and Services tax, paid by the Petitioner and to restitute Avaada Sustainable RJ Project Private Limited to the same economic position as it would have been prior to the Notifications dated 30.9.2021. Avaada Sustainable RJ Project Private Ltd. (ASRJPPL)
22.09.2023 26.09.2023 Misc.


268/MP/2023 and 269/MP/2023

22.09.2023 26.09.2023 Misc.


249/MP/2023

22.09.2023 26.09.2023 Misc.


216/MP/2023

22.09.2023 26.09.2023 Misc.


116/MP/2022

22.09.2023 26.09.2023 Misc.


96/MP/2023

22.09.2023 26.09.2023 Misc.


75/MP/2023

22.09.2023 26.09.2023 Misc.


58/MP/2023

22.09.2023 26.09.2023 Misc.


304/MP/2022

13.09.2023 26.09.2023 Misc.


198/MP/2023 along with IA No.43/2023

15.09.2023 25.09.2023 Misc.


122/MP/2022

20.09.2023 25.09.2023 Misc.


28/MP/2022

20.09.2023 25.09.2023 Misc.


215/MP/2023

22.09.2023 25.09.2023 Misc.


219/MP/2023

22.09.2023 25.09.2023 Misc.


194/MP/2021

22.09.2023 25.09.2023 Misc.


155/MP/2022 and 194/MP/2022 along with IA No. 22/2023

22.09.2023 25.09.2023 Misc.


67/MP/2021 Along with I.A. 17/IA/2021

22.09.2023 25.09.2023 Misc.


203/MP/2023

20.09.2023 25.09.2023 Misc.


202/MP/2023

20.09.2023 23.09.2023 Misc.


68/MP/2023 along with IA No.18/2023

20.09.2023 23.09.2023 Misc.


372/MP/2022

20.09.2023 23.09.2023 Misc.


244/MP/2021 along with IA No.30/2023

20.09.2023 23.09.2023 Misc.


204/MP/2023

20.09.2023 23.09.2023 Misc.


101/MP/2017

20.09.2023 23.09.2023 Misc.


90/MP/2020 along with IA Nos. 40/2023 & 41/2023

15.09.2023 23.09.2023 Misc.


339/MP/2022

20.09.2023 22.09.2023 Misc.


49/MP/2023

20.09.2023 22.09.2023 Misc.


40/MP/2023

20.09.2023 22.09.2023 Misc.


19/MP/2023

20.09.2023 22.09.2023 Misc.


17/MP/2023

Petition under Section 79(1)(b) and Section 79(1)(f) of the Electricity Act, 2003 read with Article 13 and Article 17 of the Power Purchase Agreement dated 7.8.2008 (as amended vide amendment agreements dated 17.9.2008 and 27.5.2022) executed between the Petitioner and Uttar Haryana Bijli Vitran Nigam Limited & Dakshin Haryana Bijli Vitran Nigam Limited; as well as Article 13 and Article 17 of the Power Purchase Agreement dated 20.1.2009 (as amended vide amendment agreement dated 21.10.2010) between the Petitioner and Tata Power Trading Company Limited inter alia seeking approval of Change in Law event, i.e., enactment of the Integrated Goods and Services Tax Act, 2017, the Central Goods and Services Tax Act, 2017, the State Goods And Services Tax Act, 2017, and the Union Territory Goods and Services Tax Act 2017; and compensation for additional expenses incurred by the Petitioner with respect to operation and maintenance of the Project on account of the same along with carrying cost. Jhajjar Power Limited (JPL)
20.09.2023 22.09.2023 Misc.


201/MP/2023

20.09.2023 22.09.2023 Misc.


62/IA/2023 in Petition No. 149/MP/2015

15.09.2023 22.09.2023 Misc.


24/RP/2023

30.08.2023 22.09.2023 Review


685/TT/2020 along with IA No. 66/IA/2023

20.09.2023 21.09.2023 Transmission


163/MP/2022

13.09.2023 21.09.2023 Misc.


123/TL/2023

12.09.2023 21.09.2023 Licence (Transmission)


108/MP/2022

18.08.2023 20.09.2023 Misc.


1/TT/2023

06.09.2023 20.09.2023 Transmission


182/MP/2023

13.09.2023 20.09.2023 Misc.


I.A No. 61/IA/2023 in 17/RP/2022

15.09.2023 20.09.2023 Misc.


399/GT/2020

15.09.2023 20.09.2023 Generation


58/GT/2022

15.09.2023 20.09.2023 Generation


217/TL/2023

15.09.2023 20.09.2023 Licence (Transmission)


240/MP/2021

13.09.2023 20.09.2023 Misc.


184/MP/2023

15.09.2023 19.09.2023 Misc.


106/MP/2023

13.09.2023 19.09.2023 Misc.


88/TT/2017 and 112/TT/2017 and 215/TT/2017

06.09.2023 19.09.2023 Transmission


189/TL/2023

15.09.2023 18.09.2023 Licence (Transmission)


268/MP/2023 and 269/MP/2023

15.09.2023 18.09.2023 Misc.


176/MP/2022

15.09.2023 18.09.2023 Misc.


173/MP/2023

13.09.2023 18.09.2023 Misc.


38/MP/2023

13.09.2023 18.09.2023 Misc.


180/MP/2023

13.09.2023 18.09.2023 Misc.


85/MP/2021 alongwith IA No. 26/IA/2021

13.09.2023 18.09.2023 Misc.


118/MP/2023 along with I.A.No. 31/2023

12.09.2023 18.09.2023 Misc.


172/MP/2023

13.09.2023 18.09.2023 Misc.


65/MP/2023

Petition under Section 79 of the Electricity Act, 2003 read with Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021 before the Central Electricity Regulatory Commission for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of increase in rate of goods and services tax from 5% to 12% by way of Notification No.8/2021 – Central Tax (Rate) dated 30.9.2021 and on account of increase in the rate of goods and services tax paid (impact) at the rate of 4.9% (70% of 7% GST increase) as per the Notification No. 24/2018 – Central Tax (Rate) dated 31.12.2018, in terms of Article 12 of the Power Purchase Agreement dated 11.02.2020 between GRT Jewellers (India) Private Limited and Solar Energy Corporation of India Limited. GRT Jewellers (India) Private Limited (GRTJIPL)
15.09.2023 17.09.2023 Misc.


73/MP/2022

15.09.2023 17.09.2023 Misc.


87/MP/2022

15.09.2023 17.09.2023 Misc.


139/MP/2022

15.09.2023 17.09.2023 Misc.


192/MP/2023

15.09.2023 17.09.2023 Misc.


210/MP/2023

15.09.2023 17.09.2023 Misc.


223/MP/2023 along with IA No. 53/2023

15.09.2023 17.09.2023 Misc.


224/AT/2023

15.09.2023 17.09.2023 Adoption


229/TL/2023

15.09.2023 17.09.2023 Licence (Transmission)


242/MP/2023

15.09.2023 17.09.2023 Misc.


259/MP/2023

15.09.2023 17.09.2023 Misc.


338/MP/2022

15.09.2023 17.09.2023 Misc.


356/MP/2022 along with IA No.64/2023

15.09.2023 17.09.2023 Misc.


269/MP/2018

13.09.2023 17.09.2023 Misc.


54/MP/2023

13.09.2023 17.09.2023 Misc.


140/MP/2022

12.09.2023 17.09.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 51/2023

12.09.2023 17.09.2023 Misc.


302/MP/2022 along with I.A.No. 49/2023

13.09.2023 15.09.2023 Misc.


102/MP/2023

13.09.2023 15.09.2023 Misc.


61/MP/2023

13.09.2023 15.09.2023 Misc.


48/MP/2023

13.09.2023 15.09.2023 Misc.


314/MP/2022

13.09.2023 15.09.2023 Misc.


182/MP/2022

13.09.2023 15.09.2023 Misc.


227/MP/2022 along with IA No. 55/2022 and 56/MP/2022

13.09.2023 15.09.2023 Misc.


188/MP/2021

13.09.2023 15.09.2023 Misc.


235/MP/2021

13.09.2023 15.09.2023 Misc.


699/MP/2020

13.09.2023 15.09.2023 Misc.


188/MP/2019 along with IA No. 66/2019

13.09.2023 15.09.2023 Misc.


71/MP/2023

13.09.2023 14.09.2023 Misc.


685/TT/2020 with IA No. 60/IA/2023

13.09.2023 14.09.2023 Transmission


47/MP/2021

13.09.2023 14.09.2023 Misc.


366/MP/2022 and 367/MP/2022

12.09.2023 14.09.2023 Misc.


356/MP/2022

12.09.2023 14.09.2023 Misc.


335/MP/2022

12.09.2023 14.09.2023 Misc.


265/MP/2021

12.09.2023 14.09.2023 Misc.


247/MP/2023

12.09.2023 14.09.2023 Misc.


226/MP/2021 and 227/MP/2021

12.09.2023 14.09.2023 Misc.


207/MP/2023 and 208/MP/2023

12.09.2023 14.09.2023 Misc.


167/MP/2021

12.09.2023 14.09.2023 Misc.


147/MP/2021

12.09.2023 14.09.2023 Misc.


92/MP/2023 along with IA No.24/2023

12.09.2023 14.09.2023 Misc.


31/MP/2023

12.09.2023 14.09.2023 Misc.


373/MP/2022

06.09.2023 12.09.2023 Misc.


41/RP/2022 in 159/TT/2021

30.08.2023 12.09.2023 Review


83/MP/2023

06.09.2023 12.09.2023 Misc.


318/MP/2022

06.09.2023 12.09.2023 Misc.


82/TT/2022

06.09.2023 12.09.2023 Transmission


39/RP/2022 in 482/TT/2020

30.08.2023 12.09.2023 Review


126/MP/2022

06.09.2023 12.09.2023 Misc.


236/GT/2021

18.08.2023 11.09.2023 Generation


340/MP/2020 along with IA No.1/2021

06.09.2023 11.09.2023 Misc.


167/MP/2023

06.09.2023 11.09.2023 Misc.


165/MP/2023

06.09.2023 11.09.2023 Misc.


164/MP/2023 and 166/MP/2023

06.09.2023 10.09.2023 Misc.


59/GT/2022

18.08.2023 08.09.2023 Generation


23/TT/2023

30.08.2023 06.09.2023 Transmission


161/TT/2021 and 212/TT/2022

30.08.2023 05.09.2023 Transmission


227/MP/2023

30.08.2023 04.09.2023 Misc.


1/RP/2023

30.08.2023 04.09.2023 Review


222/AT/2023

30.08.2023 04.09.2023 Adoption


685/TT/2020 with IA No. 60/IA/2023

30.08.2023 01.09.2023 Transmission


Diary No.361/2023 and Diary No.362/2023

30.08.2023 01.09.2023 Misc.


107/MP/2021 with IA No. 36/2021

30.08.2023 01.09.2023 Misc.


51/RP/2022 in 30/TT/2021

30.08.2023 01.09.2023 Review


26/RP/2022 in 719/TT/2020

30.08.2023 01.09.2023 Review


I.A. No. 56 of 2021 in 313/TT/2020

30.08.2023 01.09.2023 Misc.


43/MP/2021 along with IA No. 9/2021

21.08.2023 31.08.2023 Misc.


200/MP/2020

11.08.2023 31.08.2023 Misc.


122/MP/2022

18.08.2023 31.08.2023 Misc.


117/MP/2023

19.07.2023 30.08.2023 Misc.


54/MP/2019
140/MP/2019

21.08.2023 30.08.2023 Misc.


83/MP/2023

23.08.2023 30.08.2023 Misc.


105/MP/2023

10.08.2023 30.08.2023 Misc.


187/MP/2023

18.08.2023 29.08.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 29/2023

21.08.2023 29.08.2023 Misc.


370/MP/2022

31.07.2023 29.08.2023 Misc.


223/MP/2023 along with IA No. 53/2023

23.08.2023 28.08.2023 Misc.


186/MP/2021

21.08.2023 28.08.2023 Misc.


21/MP/2023

18.08.2023 28.08.2023 Misc.


138/MP/2023

23.08.2023 28.08.2023 Misc.


161/MP/2023

23.08.2023 28.08.2023 Misc.


204/MP/2022 along with IA No. 16/2023

23.08.2023 28.08.2023 Misc.


255/MP/2022

23.08.2023 28.08.2023 Misc.


257/MP/2022

23.08.2023 28.08.2023 Misc.


353/AT/2022

23.08.2023 28.08.2023 Adoption


562/MP/2020 along with IA No. 15/2023

23.08.2023 28.08.2023 Misc.


74/MP/2023

23.08.2023 28.08.2023 Misc.


75/MP/2022

16.08.2023 28.08.2023 Misc.


121/RC/2023

18.08.2023 28.08.2023 Misc.


617/MP/2020

23.08.2023 28.08.2023 Misc.


163/RC/2021

23.08.2023 28.08.2023 Misc.


206/MP/2021

23.08.2023 28.08.2023 Misc.


171/MP/2023

21.08.2023 28.08.2023 Misc.


4/MP/2022
54/MP/2022
63/MP/2022
66/MP/2022
70/MP/2022

18.08.2023 28.08.2023 Misc.


100/MP/2021
102/MP/2021

21.08.2023 28.08.2023 Misc.


160/MP/2023

21.08.2023 28.08.2023 Misc.


104/MP/2022

21.08.2023 28.08.2023 Misc.


727/MP/2020 (With I.A. Nos. 29/2022 & 19/2023)

Petition under section 79(1)(c) & section 79(1)(f) of the Electricity Act, 2003 read with regulation 32 and 33a Central Electricity Regulatory Commission (Grant of connectivity, long term and medium term open access in inter-State transmission and related matters) regulations, 2009 along with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking inter alia relaxation of clause 11.2 of the Detailed procedure issued by the Central Electricity Regulatory Commission for “Grant of connectivity to projects based on renewable sources to the inter-State transmission system” dated 15.5.2018 and adjudicating the dispute that has arisen in relation to the agreements entered between central transmission utility and the petitioner herein. Mytrah Energy (India) Private Limited (MEIPL)
23.08.2023 28.08.2023 Misc.


539/MP/2020

Petition for providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of Regulation 5.2(l) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 3(e) of the Central Electricity Authority (Grid Standards) Regulations, 2010, ensuring proper inspection & patrolling and maintenance of Sub-station and lines in terms of Regulation 5 read along with Regulations 23 and 24 of the Central Electricity Authority (Grid Standards) Regulations, 2010 for ensuring security of North Eastern Grid as well as the interconnected Indian Grid and reliable operation as per Clause No. 6.2 of the Central Electricity Authority (Manual on Transmission Planning Criteria), 2013. North Eastern Regional Load Despatch Centre (NERLDC)
23.08.2023 28.08.2023 Misc.


344/MP/2020

11.08.2023 28.08.2023 Misc.


136/MP/2023

18.08.2023 28.08.2023 Misc.


170/MP/2023

23.08.2023 28.08.2023 Misc.


71/MP/2021

23.08.2023 28.08.2023 Misc.


179/MP/2023

18.08.2023 28.08.2023 Misc.


205/MP/2023

23.08.2023 28.08.2023 Misc.


163/MP/2023

23.08.2023 28.08.2023 Misc.


52/MP/2022

18.08.2023 28.08.2023 Misc.


432/MP/2019

16.08.2023 28.08.2023 Misc.


155/MP/2023

23.08.2023 28.08.2023 Misc.


137/MP/2023

18.08.2023 28.08.2023 Misc.


315/MP/2022

Petition under Section 38 read with Section 79(1)(c), Section 79(1)(f), Section 79(1)(k) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2010, Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2020 and Clause 10.3 (g) of the Billing, Collection and Disbursement Procedure issued by CTUIL under CERC Sharing Regulations 2020 dated 01.01.2021 for recovery of interest from Central Transmission Utility of India on delay in reimbursement of excess Transmission Charges paid by Sembcorp Energy India Limited towards Bill of Supply for PoC Bill-1 for the month of October 2020 and November 2020 raised by CTUIL. Sembcorp Energy India Limited (SEIL).
23.08.2023 26.08.2023 Misc.


241/MP/2023

21.08.2023 26.08.2023 Misc.


Diary No.303/2023

16.08.2023 26.08.2023 Misc.


361/GT/2020 and 376/GT/2020

14.08.2023 25.08.2023 Generation


61/MP/2022

21.08.2023 23.08.2023 Misc.


95/MP/2022

18.08.2023 23.08.2023 Misc.


87/MP/2022

21.08.2023 23.08.2023 Misc.


345/MP/2022

21.08.2023 23.08.2023 Misc.


265/MP/2018

10.08.2023 23.08.2023 Misc.


584/MP/2020

21.08.2023 22.08.2023 Misc.


319/MP/2020

21.08.2023 22.08.2023 Misc.


242/MP/2023

21.08.2023 22.08.2023 Misc.


181/MP/2021

Petition seeking issuance of appropriate directions to the Respondent to declare that the Letter of Credit opened by the Respondent is in contravention of the provisions of the PTC-PPA and Procurer-PPA and to direct the Respondent to pay compensation towards such breach of the PPA and also to impost penalty under Regulation 14C for violation of Regulation 7(c) of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2009; and to direct the Respondent to refund the excess trading margin and excess rebate charged by the Respondent for the period w.e.f 31.1.2020 till opening of Payment Security Mechanism as per the Procurer-PPA, PTC-PPA and the provisions of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2020 issued by this Commission along with Late Payment Surcharge; and to direct that the Respondent shall not be eligible to charge trading margin exceeding 2 paise/kWh till such time the Respondent opens Payment Security Mechanism in conformity with the PTC-PPA, Procurer- PPA and the applicable Regulations of this Commission. Maruti Clean Coal and Power Limited (MCCPL)
21.08.2023 22.08.2023 Misc.


85/MP/2022 alongwith IA No. 70/2022 and 123/MP/2022 and 246/MP/2022 alongwith IA Nos. 8/2023 & 35/2023 and 107/MP/2023

16.08.2023 22.08.2023 Misc.


124/MP/2022

18.08.2023 22.08.2023 Misc.


97/MP/2022

18.08.2023 22.08.2023 Misc.


151/MP/2021

21.08.2023 22.08.2023 Misc.


373/MP/2022

18.08.2023 22.08.2023 Misc.


343/MP/2020

11.08.2023 22.08.2023 Misc.


163/MP/2022

16.08.2023 22.08.2023 Misc.


306/MP/2022 along with IA No. 20/2023

16.08.2023 22.08.2023 Misc.


282/MP/2021 and 141/MP/2022

16.08.2023 22.08.2023 Misc.


187/MP/2022 along with IA No. 70/2022

16.08.2023 22.08.2023 Misc.


374/MP/2022

16.08.2023 22.08.2023 Misc.


112/MP/2023

16.08.2023 22.08.2023 Misc.


79/MP/2022 alongwith I.A. No. 34/2023

16.08.2023 22.08.2023 Misc.


215/MP/2021

11.08.2023 22.08.2023 Misc.


144/MP/2021

10.08.2023 22.08.2023 Misc.


96/MP/2023

03.08.2023 22.08.2023 Misc.


111/MP/2021

11.08.2023 21.08.2023 Misc.


261/MP/2022

11.08.2023 21.08.2023 Misc.


158/MP/2023

11.08.2023 21.08.2023 Misc.


211/MP/2023 alongwith IA No. 48 of 2023

11.08.2023 21.08.2023 Misc.


268/MP/2020

18.08.2023 21.08.2023 Misc.


205/MP/2023

11.08.2023 21.08.2023 Misc.


97/AT/2023

16.08.2023 21.08.2023 Adoption


98/MP/2023

10.08.2023 21.08.2023 Misc.


113/MP/2023

16.08.2023 17.08.2023 Misc.


262/MP/2022

16.08.2023 17.08.2023 Misc.


27/MP/2022

16.08.2023 17.08.2023 Misc.


232/MP/2021

16.08.2023 17.08.2023 Misc.


685/TT/2020

11.08.2023 17.08.2023 Transmission


214/AT/2023

11.08.2023 16.08.2023 Adoption


365/MP/2022

10.08.2023 16.08.2023 Misc.


171/MP/2023

10.08.2023 16.08.2023 Misc.


320/MP/2022

10.08.2023 16.08.2023 Misc.


331/MP/2022

31.07.2023 16.08.2023 Misc.


212/MP/2023

11.08.2023 15.08.2023 Misc.


114/MP/2019

10.08.2023 14.08.2023 Misc.


66/MP/2023 along with IA No.17/2023

10.08.2023 14.08.2023 Misc.


109/MP/2023

10.08.2023 13.08.2023 Misc


340/MP/2022 341/MP/2022

11.08.2023 13.08.2023 Misc


213/AT/2023

10.08.2023 13.08.2023 Licence


190/MP/2022

11.08.2023 13.08.2023 Misc


324/MP/2022

10.08.2023 13.08.2023 Misc


64/MP/2022

10.08.2023 13.08.2023 Misc


310/MP/2022 362/MP/2022

10.08.2023 13.08.2023 Misc


194/MP/2021

11.08.2023 13.08.2023 Misc


53/MP/2023 along with IA No. 11/2023

11.08.2023 13.08.2023 Misc


218/MP/2023

11.08.2023 13.08.2023 Misc


377/MP/2022

11.08.2023 13.08.2023 Misc


168/MP/2023

10.08.2023 13.08.2023 Review


19/MP/2023

11.08.2023 13.08.2023 Misc


116/MP/2022

11.08.2023 13.08.2023 Misc


10/RP/2023 in 393/GT/2020

28.07.2023 09.08.2023 Review


7/RP/2023 in 157/GT/2020

28.07.2023 09.08.2023 Review


5/RP/2023 in 287/GT/2020

28.07.2023 09.08.2023 Review


4/RP/2023 in 302/GT/2020

28.07.2023 09.08.2023 Review


5/MP/2022

03.08.2023 09.08.2023 Misc.


264/MP/2022

19.07.2023 08.08.2023 Misc.


20/MP/2023

03.08.2023 08.08.2023 Misc.


192/MP/2021

03.08.2023 08.08.2023 Misc.


258/MP/2022

03.08.2023 08.08.2023 Misc.


263/MP/2022

03.08.2023 08.08.2023 Misc.


24/TT/2023

26.07.2023 08.08.2023 Transmission


356/MP/2022

03.08.2023 07.08.2023 Misc.


196/MP/2023

03.08.2023 07.08.2023 Misc.


92/MP/2023 along with IA No.24/2023

03.08.2023 07.08.2023 Misc.


79/MP/2023

03.08.2023 07.08.2023 Misc.


28/MP/2022

03.08.2023 07.08.2023 Misc.


455/MP/2019
65/MP/2020
618/MP/2020

03.08.2023 07.08.2023 Misc.


52/MP/2022

03.08.2023 07.08.2023 Misc.


163/MP/2022

03.08.2023 07.08.2023 Misc.


199/MP/2023

03.08.2023 07.08.2023 Misc.


197/MP/2023

03.08.2023 04.08.2023 Misc.


160/MP/2022

31.07.2023 04.08.2023 Misc.


180/MP/2019

31.07.2023 04.08.2023 Misc.


181/TL/2023

31.07.2023 04.08.2023 Licence (Transmission)


189/TL/2023 and 190/AT/2023

31.07.2023 04.08.2023 Licence (Transmission)


282/MP/2019

31.07.2023 04.08.2023 Misc.


339/MP/2022

31.07.2023 04.08.2023 Misc.


340/MP/2020 along with IA No.1/2021

31.07.2023 04.08.2023 Misc.


206/MP/2023

03.08.2023 04.08.2023 Misc.


2/RP/2023 in 79/TT/2020

28.07.2023 02.08.2023 Review


16/RP/2023

05.07.2023 02.08.2023 Review


11/RP/2023

05.07.2023 02.08.2023 Review


6/RP/2023 in 378TT/2020

28.07.2023 02.08.2023 Review


330/TT/2022

26.07.2023 02.08.2023 Transmission


20/MP/2023

31.07.2023 01.08.2023 Misc.


205/MP/2022

31.07.2023 01.08.2023 Misc.


223/MP/2022

31.07.2023 01.08.2023 Misc.


53/MP/2022

31.07.2023 01.08.2023 Misc.


303/TT/2022

26.07.2023 01.08.2023 Transmission


25/RP/2022
In
88/TT/2020

28.07.2023 01.08.2023 Review


124/TL/2023

26.07.2023 31.07.2023 Licence (Transmission)


80/MP/2023, 99/MP/2023, 100/MP/2023, 101/MP/2023, 110/MP/2023 and 111/MP/2023

26.07.2023 31.07.2023 Misc.


51/RP/2022
In
30/TT/2021

28.07.2023 31.07.2023 Review


25/MP/2022

26.07.2023 31.07.2023 Misc.


9/TT/2021

Determination of transmission tariff for 2019-24 tariff block for Asset-1: Combined Asset of a) 400 kV D/C Bhadla (Powergrid) - Bhadla (RVPNL) Ckt-1 & 2 along with associated bays; b) 1 no. of 400 kV, 125 MVAR Bus Reactor along with associated bays at Bhadla (Powergrid) Sub-station; c) 400 kV, 500 MVA ICT-2 along with associated bays at Bhadla (Powergrid) Sub-station; d) 220 kV, Adani Bhadla (Pooling Station) line-1 bay at Bhadla (Powergrid) Sub-station; Asset-2: 220 kV Sourya Urja line-2 Bay at Bhadla (Powergrid) Sub-station; Asset-3: 500 MVA ICT-3 along with associated bays at Bhadla (Powergrid) Sub-station; Asset-4: 500 MVA ICT-1 along with associated bays at Bhadla (Powergrid) Sub-station; Asset-5: 2 nos. 220 kV line bays (205 & 206) at Bhadla (Powergrid) Sub-station; Asset-6: 2 No. 400 kV line bays at Bhadla (Powergrid) Sub-station; Asset-7: Combined Asset of a) 765 kV D/C Bhadla (Powergrid)-Bikaner (Powergrid) along with 2 nos. 240 MVAR Switchable Line Reactors along with associated bays at Bhadla (Powergrid) Sub-station and 2 nos. 240 MVAR Switchable Line Reactors along with associated bays at Bikaner (Powergrid) Sub-station; b) 765/400 kV, 1500 MVA ICT-1, 2 and 3 alongwith associated bays at Bhadla (Powergrid) Sub-station; c) 1 no. of 240 MVAR Bus Reactor alongwith associated bays at Bhadla (Powergrid) Sub-station under "Transmission System for Solar Power Park at Bhadla" in the Northern Region. Power Grid Corporation of India Ltd.
26.07.2023 31.07.2023 Transmission


240/TT/2013

26.07.2023 31.07.2023 Transmission


329/TT/2022

26.07.2023 31.07.2023 Transmission


8/RP/2023

28.07.2023 31.07.2023 Review


46/RP/2022

28.07.2023 31.07.2023 Review


223/MP/2023 along with IA No. 53/2023

28.07.2023 31.07.2023 Misc.


123/TL/2023

26.07.2023 31.07.2023 Licence (Transmission)


179/MP/2016

19.07.2023 31.07.2023 Misc.


Diary (Petition) No.294/2023 & Diary (IA) No. 295/2023

26.07.2023 27.07.2023 Misc.


302/MP/2022 along with IA No. 49/2023

19.07.2023 27.07.2023 Misc.


249/MP/2022
250/MP/2022
251/MP/2022
252/MP/2022

21.07.2023 26.07.2023 Misc.


363/MP/2022 and 368/MP/2022

21.07.2023 26.07.2023 Misc.


262/MP/2020

14.07.2023 26.07.2023 Misc.


20/MP/2023

19.07.2023 25.07.2023 Misc.


140/MP/2022

21.07.2023 25.07.2023 Misc.


94/MP/2023 and 277/MP/2022 and 278/MP/2022 and 282/MP/2022 and 265/MP/2022 Along With I.A. No. 462/2022

21.07.2023 25.07.2023 Misc.


244/MP/2021 along with IA No. 30/2023

21.07.2023 24.07.2023 Misc.


188/MP/2019 along with IA No. 66/2019

21.07.2023 24.07.2023 Misc.


46/MP/2021

21.07.2023 24.07.2023 Misc.


338/MP/2022

19.07.2023 24.07.2023 Misc.


26/MP/2023

19.07.2023 24.07.2023 Misc.


75/MP/2023 and 360/MP/2022

21.07.2023 24.07.2023 Misc.


54/MP/2019 and 140/MP/2019

19.07.2023 24.07.2023 Misc.


180/MP/2019

19.07.2023 21.07.2023 Misc.


371/MP/2022

14.07.2023 21.07.2023 Misc.


163/MP/2022

19.07.2023 21.07.2023 Misc.


20/RP/2023

05.07.2023 21.07.2023 Review


319/MP/2022 alongwith IA No.63/IA/2022

19.07.2023 21.07.2023 Misc.


11/MP/2023

14.07.2023 21.07.2023 Misc.


347/MP/2022

12.07.2023 21.07.2023 Misc.


30/MP/2023

19.07.2023 21.07.2023 Misc.


340/MP/2020 along with IA No.1/2021

19.07.2023 21.07.2023 Misc.


321/MP/2022

19.07.2023 21.07.2023 Misc.


211/MP/2023 along with IA No. 48/2023 and Diary No. 267/2023

19.07.2023 21.07.2023 Misc.


162/MP/2023

19.07.2023 21.07.2023 Misc.


160/MP/2022

19.07.2023 21.07.2023 Misc.


122/MP/2022

19.07.2023 21.07.2023 Misc.


70/MP/2023

19.07.2023 21.07.2023 Misc.


64/MP/2023

19.07.2023 21.07.2023 Misc.


58/MP/2023

19.07.2023 21.07.2023 Misc.


1/RP/2023

05.07.2023 21.07.2023 Review


14/RP/2023

05.07.2023 20.07.2023 Review


114/MP/2023 along with IA Nos.28/2023, 29/2023 & 51/2023

14.07.2023 20.07.2023 Misc.


21/RP/2023

05.07.2023 18.07.2023 Review


268/MP/2020

12.07.2023 18.07.2023 Misc.


15/RP/2023

05.07.2023 18.07.2023 Review.


270/MP/2022

12.07.2023 18.07.2023 Misc.


353/AT/2022

12.07.2023 18.07.2023 Adoption.


314/MP/2022

14.07.2023 18.07.2023 Misc.


16/MP/2023

12.07.2023 17.07.2023 Misc.


77/MP/2023

12.07.2023 17.07.2023 Misc.


147/MP/2021

14.07.2023 17.07.2023 Misc.


182/MP/2022

14.07.2023 17.07.2023 Misc.


265/MP/2021

12.07.2023 17.07.2023 Misc.


85/MP/2021

12.07.2023 17.07.2023 Misc.


399/GT/2020

30.06.2023 17.07.2023 Generation.


157/MP/2023

14.07.2023 16.07.2023 Misc.


174/MP/2023

Petition under Sections 17(3) and 17(4) of the Electricity Act, 2003 for assignment of licence granted to Gadag II-A Transmission Limited pursuant to order dated 26.2.2023 bearing licence No. 86/Transmission/2023/CERC by way of hypothecation/ assignment by way security in favour of Catalyst Trusteeship Limited acting as the security trustee for the benefit of YES Bank Limited and other secured parties and creation of other security by way of mortgage/ hypothecation/ assignment of rights, title, interest, claims, demands, benefits of Gadag II-A Transmission Limited in the project under “Transmission Scheme for Solar Energy Zone in Gadag (1500 MW), Karnataka: Part A- Phase II” on build, own, operate and transfer basis as detailed in the schedule to the Transmission Licence, Project assets, clearances, project documents, agreements, approvals and rights, accounts, receivables of Gadag II-A Transmission Limited. Gadag II-A Transmission Limited .
12.07.2023 16.07.2023 Misc.


302/MP/2022 along with IA No. 49/2023

14.07.2023 16.07.2023 Misc.


304/MP/2022

12.07.2023 16.07.2023 Misc.


188/MP/2023

12.07.2023 14.07.2023 Misc.


153/MP/2023

12.07.2023 14.07.2023 Misc.


308/MP/2022

Petition under Section 79 of Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 8.6.2020 seeking declaration that change in Goods and Services Tax from 5% to 12% w.e.f. 1.10.2021 on account of amendment to Notification Nos. 1/2017- Central Tax (Rate), 1/2017- Integrated Tax (Rate) dated 28.6.2017 and Finance Department (Govt. of Rajasthan) Notification No. F.12(56)FD/Tax/2017-Pt- I-40 dated 29.6.2017 by way of Notification No. 8/2021- Central Tax (Rate), Notification No. 8/2021- Integrated Tax (Rate) dated 30.9.2021 and Finance Department (Govt. of Rajasthan) Notification No. F.12(1)FD/Tax/2021-60 dated 30.9.2021 as a Change in Law event and to direct Solar Energy Corporation of India Limited to compensate along with applicable carrying cost towards additional expenditure incurred on account of increase in rate of Goods and Services tax, paid by the Petitioner and to restitute Avaada Sustainable RJ Project Private Limited to the same economic position as it would have been prior to the Notifications dated 30.9.2021. Avaada Sustainable RJ Project Private Limited (ASRJPPL)
12.07.2023 14.07.2023 Misc.


218/MP/2022

12.07.2023 14.07.2023 Misc.


155/MP/2022 and 194/MP/2022 along with IA No. 22/2023

12.07.2023 14.07.2023 Misc.


199/MP/2023 along with IA No. 45/2023

12.07.2023 14.07.2023 Misc.


332/MP/2020 alongwith I.A. Nos. 18 & 65/2022

12.07.2023 14.07.2023 Misc.


47/MP/2021

12.07.2023 14.07.2023 Misc.


67/MP/2021 Along with I.A. 17/2021

12.07.2023 13.07.2023 Misc.


17/RP/2023

05.07.2023 13.07.2023 Review


18/RP/2023 along with diary (IA) No. 212/2023 in 473/TT/2020 and 19/RP/2023 along with diary (IA) No. 211/2023 in 12/TT/2022

05.07.2023 12.07.2023 Review


13/RP/2023

05.07.2023 11.07.2023 Review


12/RP/2023

05.07.2023 10.07.2023 Review


348/GT/2022

30.06.2023 09.07.2023 Generation


220/MP/2021

30.06.2023 07.07.2023 Misc.


245/MP/2021

30.06.2023 06.07.2023 Misc.


239/MP/2021 along with IA (Diary) No.268/2023

05.07.2023 06.07.2023 Misc.


282/MP/2019

05.07.2023 06.07.2023 Misc.


269/MP/2018

30.06.2023 04.07.2023 Misc.


39/MP/2023 and 108/MP/2023 alongwith I.A.No.27/2023

30.06.2023 04.07.2023 Misc.


147/TL/2023 and 148/AT/2023

30.06.2023 04.07.2023 Licence (Transmission)


106/MP/2023

20.06.2023 04.07.2023 Misc.


240/MP/2021

30.06.2023 03.07.2023 Misc.


156/TD/2023

30.06.2023 03.07.2023 Licence


149/TL/2023 and 150/AT/2023

30.06.2023 03.07.2023 Licence (Transmission)


145/TL/2023 and 146/AT/2023

30.06.2023 03.07.2023 Licence (Transmission)


143/TL/2023 and 144/AT/2023

30.06.2023 03.07.2023 Licence (Transmission)


141/TL/2023 and 142/AT/2023

30.06.2023 03.07.2023 Licence (Transmission)


26/MP/2022

30.06.2023 03.07.2023 Misc.


90/MP/2020 along with IA (Diary) Nos. 237/2023 & 255/2023

28.06.2023 03.07.2023 Misc.


193/MP/2021

28.06.2023 03.07.2023 Misc.


23/TT/2023 with I.A. 13/IA/2023

20.06.2023 30.06.2023 Transmission


584/MP/2020

28.06.2023 30.06.2023 Misc.


232/MP/2021

28.06.2023 30.06.2023 Misc.


226/MP/2021 and 227/MP/2021

28.06.2023 30.06.2023 Misc.


188/MP/2021

28.06.2023 30.06.2023 Misc.


186/MP/2021

28.06.2023 30.06.2023 Misc.


167/MP/2021

28.06.2023 30.06.2023 Misc.


31/MP/2023

28.06.2023 30.06.2023 Misc.


539/MP/2020

Petition for providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of Regulation 5.2(l) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 3(e) of the Central Electricity Authority (Grid Standards) Regulations, 2010, ensuring proper inspection & patrolling and maintenance of substation and lines in terms of Regulation 5 read along with Regulations 23 and 24 of Central Electricity Authority (Grid Standards) Regulations, 2010 for ensuring security of North Eastern Grid as well as the interconnected Indian Grid and reliable operation as per Clause No. 6.2 of the Central Electricity Authority (Manual on Transmission Planning Criteria), 2013. North Eastern Regional Load Despatch Centre (NERLDC)
20.06.2023 23.06.2023 Misc.


535/MP/2020 and 540/MP/2020

Petition for providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of Regulation 5.2(l) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 3(e) of the Central Electricity Authority (Grid Standards) Regulations, 2010, providing adequate load shedding through automatic under frequency relays (UFRs) in Tripura Power System, keeping them functional in terms of Regulation 5.2(n) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 9 of the Central Electricity Authority (Grid Standards) Regulations, 2010 and ensuring proper inspection & patrolling and maintenance of substation and lines in terms of Regulation 5 read along with Regulations 23 and 24 of Central Electricity Authority (Grid Standards) Regulations, 2010 for ensuring security of North Eastern Grid as well as the interconnected Indian Grid. North Eastern Regional Load Despatch Centre (NERLDC)
20.06.2023 23.06.2023 Misc.


139/TL/2023 and 140/AT/2023

20.06.2023 22.06.2023 Licence (Transmission)


130/TL/2023 and 131/AT/2023

20.06.2023 22.06.2023 Licence (Transmission)


128/TL/2023 and 129/AT/2023

20.06.2023 22.06.2023 Licence (Transmission)


126/TL/2023 and 127/AT/2023

20.06.2023 22.06.2023 Licence (Transmission)


124/TL/2023 and 125/AT/2023

20.06.2023 22.06.2023 Licence (Transmission)


123/TL/2023

20.06.2023 22.06.2023 Licence (Transmission)


53/MP/2022

20.06.2023 21.06.2023 Misc.


131/MP/2021

13.06.2023 19.06.2023 Misc.


95/MP/2023

13.06.2023 19.06.2023 Misc.


306/MP/2022 along with IA No. 20/2023

13.06.2023 15.06.2023 Misc.


315/MP/2022

Petition under Section 38 read with Section 79(1)(c), Section 79(1)(f), Section 79(1)(k) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2010, Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2020 and Clause 10.3 (g) of the Billing, Collection and Disbursement Procedure issued by CTUIL under CERC Sharing Regulations 2020 dated 01.01.2021 for recovery of interest from Central Transmission Utility of India on delay in reimbursement of excess Transmission Charges paid by Sembcorp Energy India Limited towards Bill of Supply for PoC Bill-1 for the month of October 2020 and November 2020 raised by CTUIL. Sembcorp Energy India Limited (SEIL)
13.06.2023 15.06.2023 Misc.


267/MP/2022 and 268/MP/2022 and 269/MP/2022

13.06.2023 15.06.2023 Misc.


125/MP/2021

13.06.2023 15.06.2023 Misc.


331/MP/2022

08.06.2023 14.06.2023 Misc.


13/TT/2023

06.06.2023 13.06.2023 Transmission


201/MP/2020

08.06.2023 13.06.2023 Misc.


43/RP/2022 in 282/GT/2020

31.05.2023 13.06.2023 Review


42/RP/2022 in 284/GT/2020

31.05.2023 13.06.2023 Review


10/RP/2023 in 393/GT/2020

31.05.2023 13.06.2023 Review


7/RP/2023 in 157/GT/2020

31.05.2023 13.06.2023 Review


335/MP/2022

08.06.2023 12.06.2023 Misc.


170/MP/2023

08.06.2023 12.06.2023 Misc.


44/RP/2022 in 143/GT/2020

31.05.2023 12.06.2023 Review


9/RP/2023 in 420/GT/2020

31.05.2023 12.06.2023 Review


53/MP/2023 along with IA No. 11/2023

08.06.2023 11.06.2023 Misc.


163/RC/2021

08.06.2023 09.06.2023 Misc.


209/MP/2022

08.06.2023 09.06.2023 Misc.


122/MP/2023

06.06.2023 09.06.2023 Misc.


118/MP/2023 along with IA No. 31/2023

16.05.2023 09.06.2023 Misc.


12/TT/2023

06.06.2023 08.06.2023 Transmission


91/MP/2018 and 53/MP/2021 and 61/MP/2021 along with IA. 28/2021 & 42/2022 and 149/MP/2021

29.05.2023 07.06.2023 Misc.


80/MP/2023
99/MP/2023
100/MP/2023
101/MP/2023
110/MP/2023
111/MP/2023

06.06.2023 07.06.2023 Misc.


151/TD/2023

06.06.2023 07.06.2023 Licence


57/MP/2021 and 120/MP/2021 and 121/MP/2021 and 130/MP/2021

06.06.2023 07.06.2023 Misc.


627/MP/2020

25.05.2023 07.06.2023 Misc.


82/TT/2022

06.06.2023 07.06.2023 Transmission


175/MP/2020

29.05.2023 07.06.2023 Misc.


31/RP/2022 in 241/GT/2020

30.05.2023 07.06.2023 Review


33/RP/2022 in 367/GT/2020

27.04.2023 03.06.2023 Misc.


8/RP/2023

31.05.2023 02.06.2023 Review


356/MP/2022

26.05.2023 02.06.2023 Misc.


83/MP/2023

25.05.2023 01.06.2023 Misc.


59/GT/2022

30.05.2023 01.06.2023 Generation


53/MP/2023 along with IA No. 11/2023

30.05.2023 01.06.2023 Misc.


46/RP/2022

30.05.2023 01.06.2023 Misc.


264/MP/2022

31.05.2023 31.05.2023 Misc.


727/MP/2020 along with IA Nos. 29/2022 & 19/2023

Petition under Section 79(1)(c) of the Electricity Act, 2003 read with Regulation 32 and 33A of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium Term Open Access in inter-State Transmission and related matters) Regulations, 2009 along with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking, inter alia, relaxation of Clause 11.2 of the Detailed Procedure issued by the Central Electricity Regulatory Commission for “Grant of Connectivity to Projects based on Renewable Sources to the Inter-State Transmission System” dated 15.5.2018 and adjudicating the dispute that has arisen in relation to the agreements entered between Central Transmission Utility and the Petitioner herein. Mytrah Energy (India) Private Limited (MEIPL)
30.05.2023 31.05.2023 Misc.


176/MP/2019

30.05.2023 31.05.2023 Misc.


699/MP/2020

29.05.2023 31.05.2023 Misc.


617/MP/2020

29.05.2023 31.05.2023 Misc.


235/MP/2021

29.05.2023 31.05.2023 Misc.


227/MP/2020 along with IA No. 7/2022

30.05.2023 31.05.2023 Misc.


85/MP/2022 alongwith IA No. 24/2022 and 123/MP/2022 and 246/MP/2022 alongwith IA No. 8/2023 & 35/2023 and 107/MP/2023

29.05.2023 31.05.2023 Misc.


Diary (Petition) No.225/2023

30.05.2023 31.05.2023 Misc.


26/RP/2022 in 719/TT/2020

30.05.2023 31.05.2023 Review


38/MP/2023

29.05.2023 31.05.2023 Misc.


21/MP/2023

29.05.2023 31.05.2023 Misc.


22/MP/2023

29.05.2023 30.05.2023 Misc.


306/MP/2022 along with IA No.20/2023

29.05.2023 30.05.2023 Misc.


455/MP/2019 and 65/MP/2020 and 618/MP/2020

25.05.2023 30.05.2023 Misc.


41/TT/2022

22.05.2023 30.05.2023 Transmission


134/MP/2021

22.05.2023 30.05.2023 Misc.


262/MP/2022

25.05.2023 29.05.2023 Misc.


167/TT/2022

22.05.2023 29.05.2023 Transmission


113/MP/2020

25.05.2023 29.05.2023 Misc.


373/MP/2022

25.05.2023 29.05.2023 Misc.


85/MP/2021 alongwith IA No.26/IA/2021

25.05.2023 29.05.2023 Misc.


187/MP/2022 along with IA No.70/2022

25.05.2023 28.05.2023 Misc.


95/MP/2023

25.05.2023 28.05.2023 Misc.


74/MP/2023

25.05.2023 28.05.2023 Misc.


53/MP/2023 alongwith IA No. 11/2023

25.05.2023 28.05.2023 Misc.


541/MP/2020

25.05.2023 27.05.2023 Misc.


340/MP/2020 along with IA No. 1/2021

25.05.2023 27.05.2023 Misc.


255/MP/2022

25.05.2023 27.05.2023 Misc.


204/MP/2020

25.05.2023 27.05.2023 Misc.


176/MP/2019

25.05.2023 27.05.2023 Misc.


117/MP/2021

25.05.2023 27.05.2023 Misc.


71/MP/2021

25.05.2023 27.05.2023 Misc.


330/TT/2022

22.05.2023 26.05.2023 Transmission


329/TT/2022

22.05.2023 25.05.2023 Transmission


9/TT/2021 (On remand)

Determination of Transmission tariff for 2019-24 tariff block for Asset-1: Combined Asset of a) 400 kV D/C Bhadla (POWERGRID)- Bhadla (RVPNL) Ckt-1 & 2 along with associated bays; b) 1 no. of 400KV, 125 MVAR Bus Reactor along with associated bays at Bhadla (POWERGRID) Sub-station; c) 400KV, 500 MVA ICT-2 along with associated bays at Bhadla (POWERGRID) Sub-station; d) 220KV, Adani Bhadla (Pooling station) line-1 bay at Bhadla (POWERGRID) Sub-station; Asset-2: 220 KV Sourya Urja line-2 Bay at Bhadla (POWERGRID) Sub-station; Asset-3: 500 MVA ICT-3 along with associated bays at Bhadla (POWERGRID) Sub-station; Asset-4: 500 MVA ICT-1 along with associated bays at Bhadla (POWERGRID) Sub-station; Asset-5: 2 nos. 220 kV line bays (205 & 206) at badhla (POWERGRID) Sub-station; Asset-6: 2 No. 400 kV line bays at Bhadla (POWERGRID) Sub-station; Asset-7: Combined Asset of a) 765KV D/C Bhadla (POWERGRID)-Bikaner (POWERGRID) along with 2 nos. 240 MVAR Switchable Line Reactors along with associated bays at Bhadla (POWERGRID) Sub-station and 2 nos. 240MVAR Switchable Line Reactors along with associated bays at Bikaner (POWERGRID) Sub-station; b) 765/400KV, 1500MVA ICT-1, 2 and 3 along with associated bays at Bhadla (POWERGRID) Sub-station; c) 1 no. of 240MVAR Bus Reactor along with associated bays at Bhadla (POWERGRID) Sub-station under "Transmission System for Solar Power Park at Bhadla" in the Northern Region. Power Grid Corporation of India Ltd.
22.05.2023 25.05.2023 Transmission


215/MP/2022

16.05.2023 25.05.2023 Misc.


66/MP/2021

10.05.2023 25.05.2023 Misc.


244/MP/2021 along with IA No. 30/2023

15.05.2023 24.05.2023 Misc.


20/MP/2023

02.05.2023 24.05.2023 Misc.


701/MP/2020 Along with I.A 72/2020

15.05.2023 23.05.2023 Misc.


223/MP/2022

16.05.2023 23.05.2023 Misc.


31/RP/2022
in
241/GT/2020

27.04.2023 23.05.2023 Review


369/MP/2022

16.05.2023 23.05.2023 Misc.


332/MP/2020 alongwith I.A. Nos.18 & 65/2022

16.05.2023 23.05.2023 Misc.


3/RP/2023 in 145/GT/2020

27.04.2023 22.05.2023 Review


37/RP/2022 in 362/GT/2020

27.04.2023 20.05.2023 Review


227/MP/2020 along with IA No.7/2022 727/MP/2020 along with IA Nos. 7/2020 and 19/2023

16.05.2023 19.05.2023 Misc.


258/MP/2022

16.05.2023 19.05.2023 Misc.


5/RP/2023 In 287/GT/2020

27.04.2023 19.05.2023 Review.


20/MP/2021

15.05.2023 19.05.2023 Misc.


54/MP/2023

16.05.2023 19.05.2023 Misc.


204/MP/2022 along with IA No. 16/2023

15.05.2023 19.05.2023 Misc.


318/MP/2022

16.05.2023 19.05.2023 Misc.


283/MP/2022 and 286/MP/2022

16.05.2023 19.05.2023 Misc.


116/MP/2022

16.05.2023 19.05.2023 Misc.


278/MP/2019

16.05.2023 19.05.2023 Misc.


370/MP/2022

15.05.2023 19.05.2023 Misc.


179/MP/2016

15.05.2023 19.05.2023 Misc.


107/MP/2021 along with I.A No. 36/2021

16.05.2023 18.05.2023 Misc.


71/MP/2023

16.05.2023 18.05.2023 Misc.


49/MP/2023

16.05.2023 18.05.2023 Misc.


40/MP/2023

16.05.2023 18.05.2023 Misc.


17/MP/2023

Petition under Section 79(1)(b) and Section 79(1)(f) of the Electricity Act, 2003 read with Article 13 and Article 17 of the Power Purchase Agreement dated 7.8.2008 (as amended vide amendment agreements dated 17.9.2008 and 27.5.2022) executed between the Petitioner and Uttar Haryana Bijli Vitran Nigam Limited & Dakshin Haryana Bijli Vitran Nigam Limited; as well as Article 13 and Article 17 of the Power Purchase Agreement dated 20.1.2009 (as amended vide amendment agreement dated 21.10.2010) between the Petitioner and Tata Power Trading Company Limited inter alia seeking approval of Change in Law event, i.e., enactment of the Integrated Goods and Services Tax Act, 2017, the Central Goods and Services Tax Act, 2017, the State Goods And Services Tax Act, 2017, and the Union Territory Goods and Services Tax Act 2017; and compensation for additional expenses incurred by the Petitioner with respect to operation and maintenance of the Project on account of the same along with carrying cost. Jhajjar Power Limited (JPL)
16.05.2023 18.05.2023 Misc.


310/MP/2022 and 362/MP/2022

16.05.2023 18.05.2023 Misc.


102/MP/2023

16.05.2023 18.05.2023 Misc.


78/MP/2023

16.05.2023 18.05.2023 Misc.


377/MP/2022

15.05.2023 18.05.2023 Misc.


372/MP/2022

15.05.2023 18.05.2023 Misc.


68/MP/2023 along with IA No. 18/2023

15.05.2023 18.05.2023 Misc.


309/MP/2022

15.05.2023 18.05.2023 Misc.


25/MP/2022

15.05.2023 18.05.2023 Misc.


374/MP/2022

15.05.2023 18.05.2023 Misc.


45/MP/2021

10.05.2023 18.05.2023 Misc.


94/MP/2021

15.05.2023 18.05.2023 Misc.


366/MP/2022 and
367/MP/2022

15.05.2023 18.05.2023 Misc.


19/MP/2021

10.05.2023 17.05.2023 Misc.


61/MP/2023

10.05.2023 16.05.2023 Misc.


131/MP/2022

25.04.2023 16.05.2023 Misc.


67/MP/2021

10.05.2023 15.05.2023 Misc.


360/MP/2022

10.05.2023 14.05.2023 Misc.


34/RP/2022
In
426/GT/2020

27.04.2023 14.05.2023 Review


47/MP/2021

10.05.2023 12.05.2023 Misc.


56/MP/2021

10.05.2023 12.05.2023 Misc.


340/MP/2022
341/MP/2022

10.05.2023 12.05.2023 Misc.


265/MP/2021

10.05.2023 12.05.2023 Misc.


147/MP/2021

10.05.2023 12.05.2023 Misc.


97/AT/2023

10.05.2023 12.05.2023 Adoption


75/MP/2023

10.05.2023 12.05.2023 Misc.


65/MP/2023

Petition under Section 79 of the Electricity Act, 2003 read with Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021 before the Central Electricity Regulatory Commission for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of increase in rate of goods and services tax from 5% to 12% by way of Notification No.8/2021 – Central Tax (Rate) dated 30.9.2021 and on account of increase in the rate of goods and services tax paid (impact) at the rate of 4.9% (70% of 7% GST increase) as per the Notification No. 24/2018 – Central Tax (Rate) dated 31.12.2018, in terms of Article 12 of the Power Purchase Agreement dated 11.02.2020 between GRT Jewellers (India) Private Limited and Solar Energy Corporation of India Limited. GRT Jewellers (India) Private Limited (GRTJIPL)
10.05.2023 12.05.2023 Misc.


46/MP/2021

10.05.2023 12.05.2023 Misc.


4/RP/2023 In
302/GT/2020

27.04.2023 11.05.2023 Review


1/RP/2023 In
190/GT/2020

27.04.2023 11.05.2023 Review


49/RP/2022 in
365/GT/2020

27.04.2023 11.05.2023 Review


45/RP/2022 in
279/GT/2020

27.04.2023 11.05.2023 Review


38/RP/2022 in
112/GT/2020

27.04.2023 11.05.2023 Review


32/RP/2022 In
301/GT/2020

27.04.2023 11.05.2023 Review


225/MP/2022

02.05.2023 11.05.2023 Misc.


192/MP/2021 Along with I.A No.3/IA/2023

02.05.2023 11.05.2023 Misc.


48/MP/2023

10.05.2023 11.05.2023 Misc.


43/MP/2021 along with IA No.9/2021

10.05.2023 11.05.2023 Misc.


25/RP/2022 in 88/TT/2020

27.04.2023 11.05.2023 Review


35/RP/2022 in 625/TT/2020

27.04.2023 11.05.2023 Review


47/RP/2022 in 676/TT/2020

27.04.2023 11.05.2023 Review


207/MP/2021

Petition under Section 79(1)(b), Section 79(1)(f) and Section 79(1)(k) of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement(s) dated 25.06.2019 seeking issuance of appropriate order(s) / direction(s) / declaration from this Commission that the imposition of safeguard duty on the import of solar cells, whether or not assembled in modules or panels, vide Notification No. 2/2020-Customs (SG) dated 29.07.2020 issued by the Department of Revenue, Ministry of Finance (Government of India) is an event of Change in Law and for seeking approval to the quantum and mechanism of compensation (along with interest) as submitted along with the present Petition in line with the methodology as settled by this Commission vide its order dated 20.08.2021 in Petition No. 536/MP/2020. Eden Renewable Cite Private Limited (ERCPL)
02.05.2023 10.05.2023 Misc.


39/RP/2022

27.04.2023 08.05.2023 Review


6/RP/2023 in
378/TT/2020

27.04.2023 08.05.2023 Review


2/RP/2023 in
79/TT/2020

27.04.2023 08.05.2023 Review


51/RP/2022 in
30/TT/2021

27.04.2023 08.05.2023 Review


190/MP/2022

02.05.2023 07.05.2023 Misc.


562/MP/2020 along with IA No.15/2023

02.05.2023 07.05.2023 Misc.


13/MP/2019

02.05.2023 07.05.2023 Misc.


257/MP/2022

02.05.2023 06.05.2023 Misc.


249/MP/2022
250/MP/2022
251/MP/2022
252/MP/2022

02.05.2023 05.05.2023 Misc.


114/MP/2023 along with IA Nos.28/2023 & 29/2023

02.05.2023 05.05.2023 Misc.


347/MP/2022

02.05.2023 04.05.2023 Misc.


180/MP/2019

02.05.2023 04.05.2023 Misc.


122/MP/2023

02.05.2023 04.05.2023 Misc.


160/MP/2022

25.04.2023 04.05.2023 Misc.


41/RP/2022

27.04.2023 04.05.2023 Review


368/MP/2022

02.05.2023 04.05.2023 Misc.


363/MP/2022

02.05.2023 04.05.2023 Misc.


151/MP/2021

24.04.2023 04.05.2023 Misc.


344/MP/2020

20.04.2023 02.05.2023 Misc.


71/MP/2019
46/MP/2023

25.04.2023 02.05.2023 Misc.


343/MP/2020

20.04.2023 02.05.2023 Misc.


364/TD/2022

25.04.2023 01.05.2023 Licence


77/MP/2023

25.04.2023 30.04.2023 Misc.


277/MP/2022
278/MP/2022
282/MP/2022

25.04.2023 28.04.2023 Misc.


140/MP/2022

25.04.2023 28.04.2023 Misc.


109/MP/2022 along with IA No.17/2022

Petition under Sections 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 seeking for quashing of the communications containing letters dated 16.12.2020 and 11.02.2022, issued by the Respondents thereby misinterpreting the provision of “Misdeclaration” provided under the Article 11 of the Pilot Agreement for Procurement of Power (PAPP)/ Pilot Power Supply Agreement (PPSA), and accordingly seeking directions upon the said Respondent to refund the amount of Rs. 46.16 Lakhs already deducted & to not deduct any amount (including Rs. 25.35 crores as indicated in PTC letter dated 11.02.2022) on this account from the monthly energy bills issued / to be issued by the Petitioner alongwith interest/ carrying cost, and consequent directions to adhere to the provisions of the PAPP/ PPSA in their letter and spirit. Jindal India Thermal Power Limited (JITPL)
25.04.2023 28.04.2023 Misc.


41/MP/2023

25.04.2023 28.04.2023 Misc.


282/MP/2019

25.04.2023 28.04.2023 Misc.


30/MP/2023

24.04.2023 28.04.2023 Misc.


18/MP/2023

25.04.2023 28.04.2023 Misc.


198/MP/2020
259/MP/2020

Petition for providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of Regulation 5.2(l) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 3(e) of the Central Electricity Authority (Grid Standards) Regulations, 2010, ensuring proper inspection & patrolling and maintenance of substation and lines in terms of Regulation 5 read along with Regulation 23 and 24 of Central Electricity Authority (Grid Standards) Regulations, 2010 for ensuring security of North Eastern Grid as well as the interconnected Indian Grid and reliable operation as per Clause 6.2 of the Central Electricity Authority Manual on Transmission Planning Criteria, 2013. North Eastern Regional Load Despatch Centre (NERLDC)
25.04.2023 28.04.2023 Misc.


197/MP/2020
263/MP/2020
556/MP/2020

25.04.2023 28.04.2023 Misc.


185/MP/2021

25.04.2023 28.04.2023 Misc.


365/MP/2022

24.04.2023 28.04.2023 Misc.


70/MP/2023

20.04.2023 28.04.2023 Misc.


154/MP/2021

24.04.2023 27.04.2023 Misc.


54/MP/2019
140/MP/2019

24.04.2023 27.04.2023 Misc.


118/MP/2023
along with IA No. 31/2023

24.04.2023 27.04.2023 Misc.


201/MP/2020

25.04.2023 27.04.2023 Misc.


319/MP/2022 alongwith IA No.63/IA/2022

24.04.2023 27.04.2023 Misc.


319/MP/2019

20.04.2023 26.04.2023 Misc.


339/MP/2022

20.04.2023 26.04.2023 Misc.


627/MP/2020

24.04.2023 26.04.2023 Misc.


619/MP/2020

24.04.2023 26.04.2023 Misc.


532/MP/2020

24.04.2023 26.04.2023 Misc.


497/MP/2020

24.04.2023 26.04.2023 Misc.


357/MP/2022

24.04.2023 26.04.2023 Misc.


314/MP/2022

24.04.2023 26.04.2023 Misc.


188/MP/2019 along with IA No. 66/2019

24.04.2023 26.04.2023 Misc.


76/MP/2023

24.04.2023 26.04.2023 Misc.


59/MP/2023

24.04.2023 26.04.2023 Misc.


324/MP/2022

24.04.2023 26.04.2023 Misc.


117/MP/2023

20.04.2023 26.04.2023 Misc.


82/MP/2023
81/RC/2023
88/RC/2023

20.04.2023 25.04.2023 Misc.


380/MP/2022

20.04.2023 25.04.2023 Misc.


224/MP/2022

13.04.2023 25.04.2023 Misc.


39/MP/2023 alongwith IA No. 5/2023
108/MP/2023 alongwith I.A.No.27/2023

13.04.2023 24.04.2023 Misc.


262/MP/2020

20.04.2023 23.04.2023 Misc.


268/MP/2020

20.04.2023 23.04.2023 Misc.


265/MP/2018

20.04.2023 23.04.2023 Misc.


87/MP/2022

20.04.2023 23.04.2023 Misc.


64/MP/2023

20.04.2023 23.04.2023 Misc.


63/MP/2020

20.04.2023 23.04.2023 Misc.


26/MP/2023

20.04.2023 23.04.2023 Misc.


11/MP/2023

20.04.2023 23.04.2023 Misc.


118/MP/2023
along with IA No. 31/2023

20.04.2023 23.04.2023 Misc.


261/MP/2022

20.04.2023 21.04.2023 Misc.


200/MP/2020

20.04.2023 21.04.2023 Misc.


79/MP/2022

20.04.2023 21.04.2023 Misc.


163/MP/2022

20.04.2023 21.04.2023 Misc.


104/MP/2022

20.04.2023 21.04.2023 Misc.


145/GT/2019

06.04.2023 21.04.2023 Generation


24/TT/2023

06.04.2023 21.04.2023 Transmission


280/MP/2022

13.04.2023 21.04.2023 Misc.


28/TL/2023

13.04.2023 20.04.2023 Licence (Transmission)


321/MP/2022

13.04.2023 20.04.2023 Misc.


270/MP/2022

13.04.2023 20.04.2023 Misc.


209/MP/2017

13.04.2023 20.04.2023 Misc.


58/MP/2023 along with IA No.21/2023

13.04.2023 20.04.2023 Misc.


75/MP/2022

13.04.2023 18.04.2023 Misc.


258/MP/2022

13.04.2023 17.04.2023 Misc.


729/MP/2020

13.04.2023 16.04.2023 Misc.


356/MP/2022

13.04.2023 16.04.2023 Misc.


338/MP/2022

13.04.2023 16.04.2023 Misc.


211/MP/2022

13.04.2023 16.04.2023 Misc.


205/MP/2022

13.04.2023 16.04.2023 Misc.


187/MP/2022 along with IA No. 70/2022

11.04.2023 16.04.2023 Misc.


72/TD/2023

13.04.2023 16.04.2023 Licence


214/MP/2021

11.04.2023 16.04.2023 Misc.


27/MP/2022

11.04.2023 16.04.2023 Misc.


304/MP/2022

13.04.2023 16.04.2023 Misc.


242/MP/2022

13.04.2023 16.04.2023 Misc.


371/MP/2022

11.04.2023 16.04.2023 Misc.


320/MP/2022

13.04.2023 15.04.2023 Misc.


104/MP/2023

13.04.2023 15.04.2023 Misc.


13/TT/2023

06.04.2023 13.04.2023 Misc.


281/GT/2020

06.04.2023 13.04.2023 Generation


183/GT/2022

06.04.2023 13.04.2023 Generation


378/MP/2022
220/MP/2022

11.04.2023 13.04.2023 Misc.


131/MP/2022

11.04.2023 13.04.2023 Misc.


332/MP/2020
alongwith I.A. Nos. 18 & 65/2022

11.04.2023 13.04.2023 Misc.


117/MP/2021

11.04.2023 13.04.2023 Misc.


90/MP/2020

11.04.2023 13.04.2023 Misc.


308/MP/2022

Petition under Section 79 of Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 8.6.2020 seeking declaration that change in Goods and Services Tax from 5% to 12% w.e.f. 1.10.2021 on account of amendment to Notification Nos. 1/2017- Central Tax (Rate), 1/2017- Integrated Tax (Rate) dated 28.6.2017 and Finance Department (Govt. of Rajasthan) Notification No. F.12(56)FD/Tax/2017-Pt- I-40 dated 29.6.2017 by way of Notification No. 8/2021- Central Tax (Rate), Notification No. 8/2021- Integrated Tax (Rate) dated 30.9.2021 and Finance Department (Govt. of Rajasthan) Notification No. F.12(1)FD/Tax/2021-60 dated 30.9.2021 as a Change in Law event and to direct Solar Energy Corporation of India Limited to compensate along with applicable carrying cost towards additional expenditure incurred on account of increase in rate of Goods and Services tax, paid by the Petitioner and to restitute Avaada Sustainable RJ Project Private Limited to the same economic position as it would have been prior to the Notifications dated 30.9.2021. Avaada Sustainable RJ Project Pvt. Ltd. (ASRJPPL)
11.04.2023 12.04.2023 Misc.


235/MP/2021

11.04.2023 12.04.2023 Misc.


218/MP/2022

11.04.2023 12.04.2023 Misc.


176/MP/2019

11.04.2023 12.04.2023 Misc.


171/MP/2021

11.04.2023 12.04.2023 Misc.


155/MP/2022
194/MP/2022 along with IA No.22/2023

11.04.2023 12.04.2023 Misc.


19/MP/2023

11.04.2023 12.04.2023 Misc.


12/TT/2023

06.04.2023 11.04.2023 Transmission


1/TT/2023

06.04.2023 11.04.2023 Transmission


23/TT/2023

28.03.2023 11.04.2023 Transmission


82/TT/2022
Along with I.A No. 13/2022

06.04.2023 11.04.2023 Transmission


330/TT/2022

28.03.2023 11.04.2023 Transmission


113/MP/2020

28.03.2023 10.04.2023 Misc.


26/RP/2022

28.03.2023 05.04.2023 Review


92/MP/2021

28.03.2023 05.04.2023 Misc.


42/MP/2023

27.03.2023 05.04.2023 Misc.


424/GT/2020

16.03.2023 03.04.2023 Generation


51/GT/2021

16.02.2023 31.03.2023 Generation.


309/MP/2022

27.03.2023 31.03.2023 Misc.


701/MP/2020along with I.A 72/2020

27.03.2023 31.03.2023 Misc.


318/MP/2022

28.03.2023 31.03.2023 Misc.


379/MP/2022

21.03.2023 31.03.2023 Misc.


371/MP/2022

28.03.2023 31.03.2023 Misc.


373/MP/2022

28.03.2023 31.03.2023 Misc.


47/RP/2022

28.03.2023 31.03.2023 Review.


35/RP/2022

28.03.2023 31.03.2023 Review.


14/MP/2023

28.03.2023 31.03.2023 Misc.


556/MP/2020

27.03.2023 31.03.2023 Misc.


638/MP/2020

23.03.2023 31.03.2023 Misc.


20/MP/2023

27.03.2023 31.03.2023 Misc.


31/MP/2023

28.03.2023 31.03.2023 Misc.


25/RP/2022 in Petition No. 88/TT/2020

28.03.2023 31.03.2023 Review.


47/MP/2023

28.03.2023 31.03.2023 Misc.


53/MP/2023 along with I.A. No. 11/2023

28.03.2023 31.03.2023 Misc.


209/MP/2017

21.03.2023 29.03.2023 Misc.


173/MP/2022