cerc-logo



                                     Technical Validation - PGCIL

Pet. No.
Subject
Date

Petition No. 223/TT/2016
Determination of transmission tariff for Asset-I: 765 kV, 3x80 MVAR Switchable line Reactor for 765 kV S/C Gaya-Varanasi Transmission Line as Bus Reactor alongwith associated bays at Gaya Sub-station and Asset II: 3x110 MVAR, 765 kV Bus Reactor-I at 765/400 kV Varanasi GIS (Reactor shifting from Sasaram Sub-station) under Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part-A2 for tariff block 2014-19-Reg 16.02.2017

Petition No. 143/MP/2016 With I.A. No. 56/2016
Grant of Regulatory Approval for execution of the Transmission System for Ultra Mega Solar Power Park at Banaskantha (Radhanesda) Gujarat. 22.12.2016

Petition No. 124/TT/2016
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 of 315 MVA, 400/220 kV ICT at Bhiwandi under provision of spare ICT's and reactors in Eastern, Northern, Southern and Western Regions. 07.10.2016

Petition No. 149/TT/2016
Determination of transmission tariff of 400/220 kV Ludhiana Sub-station: (+) 600 MVAR / (-) 400 MVAR under "Static VAR Compensator (SVCs) in Northern Region".. 07.10.2016

Petition No. 129/TT/2016
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Neelamangala-Mysore 400 kV D/C Transmission Line along with 2x315 MVA, 400/220 kV ICTs at Mysore Sub-station (1.5.2006) in Southern Region. 07.10.2016

No. L-1/44/2010-CERC
Submission of Point of Connection (PoC) Charges and Losses Results for 2016-17 (Q3) As per Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 and subsequent amendments thereto – Reg. 19.08.2016

Petition No. 543/TT/2014
Determination of (i) Truing up transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block 400KV S/C Singrauli-Vindhyachal transmission link along with (2X250 MW) HVDV Back to Back at Vindhyachal between NR and WR-Reg. 02.08.2016

Petition No. 98/TT/2016
Revision of trued-up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of existing Banglore-Salem 400kV S/C at Hosur under system Strengthening –XVIII in Southern Regional Grid. 27.07.2016

Petition No. 108/TT/2016
Determination of transmission tariff for 400 kV D/C TEESTA III - RANGPO Section upto LILO point at Rangpo under Section 62 and 73(1)(d) of the Electricity Act 2003 read with Regulation 86 of CERC (Conduct of Business) Regulations and CERC (Terms and Conditions of Tariff) Regulations 2014 for Tariff period 2014-19. 15.07.2016

Petition No. 69/TT/2016
Determination of transmission tariff for 10 nos. of Assets under “Eastern Region Strengthening Scheme” in Eastern Region for tariff period 2014-19 from COD to 31.3.2019. 12.07.2016

Petition No. 92/TT/2016
Approval of tariff of LILO of Gladni-Hiranagar 220 kV S/C line at 400/220 kV Samba (POWERGRID) Sub-station (the lines are to be terminated at existing 220 kV line bays at samba Substation) under "Northern Region System Strengthening Scheme —XXXIV (NRSS-XXXIV). 12.07.2016

Petition No. 81/TT/2015
Determination of Fees and Charges for fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) microwave links in Eastern Region for the period 2009-14 block. 13.06.2016

Petition No. 61/TT/2015
Determination of tariff from COD to 31.3.2019 of assets under Transmission System associated with System Strengthening - XVII in Southern Regional Grid" in Southern Region. 11.04.2016

Petition No. 115/TT/2014
Determination of tariff from COD to 31.3.2019 for (A) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad- Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and (B) 765 kV, 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-II to be charged as Bus Reactor at Aurangabad Sub-station under “System Strengthening in North/ West part of WR for IPP Projects in Chhattisgarh (IPP-E)” in Western Region. 11.04.2016

Petition No. 58/TT/2015
Determination of transmission tariff of assets covered under IPPs generation projects in Chhattisgarh (IPP D) in Western Region for 2014-19 tariff period. 11.04.2016

Petition No. 71/TT/2015
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 for six assets under Vindhyachal-IV & Rihand-III {1000 MW} Generation Project in Western & Northern Region. 11.04.2016

Petition No. 62/TT/2015
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 of assets Associated with Northern Region System Strengthening Scheme-XXVII in Northern Region. 11.04.2016

Petition No. 117/TT/2014
Determination of transmission tariff from COD/anticipated COD to 31.3.2019 for Asset 1: 400 kV, 125 MVAR bus reactor at Raipur Sub-station, Asset 2: 400 kV, 125 MVAR bus reactor at Seoni Sub-station, Asset 3: 400 kV, 63 MVAR line reactor at Raipur Sub-station under “Installation of Reactors (Part-II) in Western Region”. 11.04.2016

Petition No. 33/TT/2015
Determination of transmission tariff from anticipated DOCO to 31.3.2019 for Asset-A: LILO of Ckt-II of 400 kV D/C Lucknow-Bareily TL at Shahjahanpur, Asset-B: 315 MVA 400/220 kV ICT-I with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-C: 315 MVA 400/220 kV ICT-II with 03 Nos. of 220 kV Line Bays at Shahjahanpur, Asset-D: Extn. of 400/220 kV GIS Gurgaon, Asset-E: 2x50 MVAR Bus Reactor at 400/220 kV Bareilly Sub-station along with associated bays (Existing Line Reactors retained and used as Bus Reactor), Asset-F: 125 MVAR Bus Reactor at Shahjahanpur under “Northern Regional Transmission Strengthening Scheme” in Northern Region. 11.04.2016

Petition No. 242/TT/2014
Determination of transmission tariff from anticipated CODs to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 kV Damoh Sub-station (B) 1*125 MVAR Bus Reactor at 400 kV Bachau Sub-station (C) 1*125 MVAR Bus Reactor at 400 kV Pirana Sub-station (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi Sub-station (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi Sub-station (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior Sub-station under Installation of Reactors (Part-II) in Western Region. 11.04.2016

Petition No. 506/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmisssion system associated with Farakka-III in Eastern Region. 11.04.2016

Petition No. 107/TT/2014
Determination of transmission tariff for tariff period 2014-19 for (A) 765 kV S/C Bareilly-Lucknow TL at 400 KV level, (B) one circuit of 400 kV D/C Bareilly (New)- Bareilly (Existing) TL under “Northern Region System Strengthening Scheme XXI” in Northern Region. 11.04.2016

Petition No. 208/TT/2015
Determination of transmission tariff for tariff period 2014-19 for Asset-1: Bhiwani-Hisar 400 kV D/C line along with associated bays at Bhiwani and Hisar, Asset-2: LILO of Moga-Bhiwadi 400 kV D/C line at Hisar along with associated bays at Hisar under “Northern Region System Strengthening Scheme XXV” in Northern Region. 11.04.2016

Petition No. 199/TT/2015
Determination of transmission tariff for tariff period 2014-19 for Asset-A: One ckt of 400 kV D/C Sikar-Ratangarh line with associated bays, Asset-B: Second ckt of 400 kV D/C Sikar-Ratangarh line with associated bays, and Asset-C: 125 MVAR bus reactor at Ratangarh S/S (RRVPNL) with associated bays under “System Strengthening in Northern Region for Sasan and Mundra UMPP”. 11.04.2016

Petition No. 399/TT/2014
Determination of transmission tariff for tariff period 2014-19 for Asset-I: 400kV,1*125 MVAR Bus Reactor at Parli Sub-station and Asset-II : Conversion of 50 MVAR Line Reactor (4 nos.) into switchable Line Reactors at 400/200kV Pune Sub-station under installation of reactors (Part-II) in western Region. 11.04.2016

Petition No. 191/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset -I:315 MVA, 400/220 kV ICT at Mandola, Asset-II: 315 MVA, 400/220 kV ICT at Ludhiana under Spare ICT scheme for Northern Region. 01.02.2016

Petition No. 565/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for asset i.e. Asset 1: LILO of Nalagarh-Kaithal Line at Patiala along with associated bays; Asset 2: 400/220 kV 500 MVA ICT-III at Patiala Sub-station; Asset 3: 400 kV 125 MVAR Bus Reactor at Patiala Sub-station along with associated bays at Patiala Sub-station; Asset 4: 400/220 kV 500 MVAICT-III at Malerkotla Sub-station under “Northern Region System Strengthening Scheme-XIV (NRSS-XIV). 01.02.2016

Petition No.484/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission system associated with immediate evacuation system for Nabinagar TPS in Eastern Region. 08.02.2016

Petition No.502/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forAsset-I: 400 kV D/C Mauda-Wardha line (CKT-I) along with bays at Wardha and Asset-II: 400 kV D/C Mauda-Wardha line (CKT-II) along with bays at Wardha under Mauda Transmission system in Western Region. 08.02.2016

Petition No.398/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 of Asset-I: 220 kV D/C Mariana (New)-Mokokchung (POWERGRID) Transmission line along with associated bays at Mariana and Mokokchung (POWERGRID) Substations, Asset-II: 132 kV D/C Mokokchung (POWERGRID)-Mokokchung (Nagaland) Transmission line along with associated bays, 7x10 MVA, 220/132 kV ICT-I & II and 220 kV& 132 kV GIS bays at Mokokchung (POWERGRID) S/S and Asset-III: 400 kV D/C Silchar-Imphal Transmission line along with associated bays at Silchar and Imphal Substations under “Transmission system associated with Pallatana GBPP and Bongaigaon TPS”. 08.02.2016

Petition No.400/TT/2014
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for the asset 125 MVAR Bus Reactor at 400/220 kV Rajgarh Sub-station along with associated bays at Rajgarh Sub-station under “Installation of 125 MVAR Bus Reactor at 400 kV Rajgarh Sub-station in Western Region. 08.02.2016

Petition No.30/TT/2015
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forCombined assets ofAsset-1:- LILO of 400 kV S/C Meramuundali-Jeypore line at Bolangir and associated bays alongwith 2 nos 50 MVAR Shunt reactors and 1 nos 315 MVA ICT (ICT-II) & associated bays and 2 nos of 220 kV line bays, Asset-2: Installation of 1 no 80 MVAR Bus reactor and associated bays at Bolangir, Asset3:- 1 no 315 MVA ICT-I and associated bays and 2 nos 220 kV line bays at Bolangir, Asset 4:- LILO of 400 kV S/C Baripada-Rengali line at Keonjhar and associated bays at Keonjhar, Asset 5:- Installation of 1 no of 400/220 kV, 315 MVA (1st) ICT alongwith associated bays and 2 nos. 220 kV line bays at Keonjhar Sub-station, Asset 6:-Installation of 1 no of 400/220 kV, 315 MVA (2nd) ICT alongwith associated bays and 2 nos. 220 kV line bays at Keonjhar Sub-station, Asset 7:-Installation of 1 no 80 MVAR, 420 kV Bus Reactor and associated bays at Keonjhar Sub-station,Asset 8:-LILO of Kahalgaon-Biharshariff 400 kV D/C transmission line (2nd line) along with associated bays at Banka, 400/132 kV, 200 MVA ICT-I with associated bays at Banka Sub-station and 2nos. of 132 kV line bays at Banka Sub-station, Asset 9:-400/132 kV, 200 MVA ICT-II with associated bays at Banka Sub-station, Asset 10:-2 x 50 MVAR switchable line reactor at Banka Sub-station and 400 kV, 1 x 80 MVAR Bus Reactor with associated bays at Banka Sub-station for the period from 1.9.2012 to 31.3.2014 under ERSS-III in Eastern Region. 08.02.2016

Petition No.7/TT/2015
Truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 forAsset-1(i): LILO of 400 kV D/C Bina –Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur, Asset-1(ii): Switchable Scheme for Reactor at Nagda S/S, Asset-1(iii): Switchable Scheme for Reactor at Bina S/S, Asset-2: 400 kV, 63 MVAR Bus Reactor at Shujalpur along with associated bays of 400kV Asset-3: 400/220 kV ICT I at Shujalpur along with associated bays of 400 kV & 220 kV, Asset-4: ICT II at Shujalpur along with associated bays of 400 kV & 220 kV. 08.02.2016

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tirvalam (POWERGRID) – Chitoor (APTRANSCO 400 kV D/C (Quad) line along with associated bays and equipment under Supplementary Transmission system associated with Vallur TPS for the period from anticipated COD to 31.3.2014 in Southern Region for tariff block 2009-14. 01.02.2016

Petition No. 6/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for four assets under Sipat-II Supplementary Transmission System in Western Region. 08.02.2016

Petition No. 396/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined assets of 765/400 kV Bilaspur Pooling Station (near Sipat) along with LILO of Sipat-Seoni Ckt-I with 3X80 MVAR Switchable Line Reactor, 3X80 MVAR Bus Reactor and 765/400 kV, 1500 MVAICT 1 & 2 under WRSS-X Transmission System in Western Region. 08.02.2016

Petition No. 119/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset-I: 125 MVAR Bus Reactor at Lucknow (Existing) 400/220 kV Sub-station, Asset-II: 125 MVAR Bus Reactor at Ballia, Asset-III: Combined Asset of 765/400 kV, 1500 MVA ICT II at Lucknow Sub-station along with associated bays. 08.02.2016

Petition No. 102/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for (i) Asset I-400 KV, 125 MVAR Bus reactor along with associated bays at Patna Sub-station (ii) Asset II: 400 KV, 125 MVAR Bus reactor along with associated bays at Ranchi under ERSS-IV in ER. 08.02.2016

Petition No. 501/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset IA- 1x125 MVAR Bus Reactor at Khandwa along with associated bays ,Asset IB- 1x125 MVAR Bus Reactor at Dehgam along with associated bays under WRSS VII Transmission Scheme in Western Region. 08.02.2016

Petition No. 225/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period of assets under Sipat-II Transmission system in Western Region. 08.02.2016

Petition No. 200/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for (1): 315 MVA 400/220 kV Spare Inter Connecting Transformer at 400/220 kV Hisar Sub-station, (2): 315 MVA 400/220 kV Spare Inter Connecting Transformer at 400/220 kV Lucknow Sub-station under “Provision of Spare ICT’s and Reactors for Eastern, Northern, Southern and Western Region”. 08.02.2016

Petition No. 21/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for assets under East-West Transmission Corridor Strengthening Scheme in Western Region. 08.02.2016

Petition No. 489/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 125 MVAR Bus Reactor at Roorkee S/S under Northern Region System Strengthening Scheme XXI (NRSS-XXI). 08.02.2016

Petition No. 406/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Korba-Rajpur 400 kV D/C Transmission Line under Korba-III Transmission System in Western Region. 08.02.2016

Petition No. 34/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period of Transmission system in Western Region (POWERGRID portion) under Western Region Strengthening Scheme-II. 08.02.2016

Petition No. 564/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 315 MVA, 400/220/33 kV 3-phase Spare ICT at Raipur sub-station, Asset-II: 315 MVA, 400/220/33 kV 3-phase Spare ICT at Pune sub-station, Asset-III: 420 kV, 80 MVAR 3-phase shunt reactor at Wardha sub-station, Asset-IV: 315 MVA, 400/220/33 kV 3-phase Spare transformer at Dehgam sub-station, Asset-V: 315 MVA, 400/220/33 kV 3-phase Spare transformer at Jabalpur, Asset-VI: 400 kV, 125 MVAR 3-phase Spare Reactor at Itarsi under provision of Spare ICTs and Reactors in Western Region. 30.1.2016

Petition No. 559/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I:-765 kV S/C Moga-Bhiwani transmission line Asset-II:- 765 kV S/C Jattikalan-Bhiwani transmission line associated with 765 kV system for central part of the Northern Region. 30-01-2016

Petition No. 527/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I:-LILO of Patiala-Hissar line at Kaithal Sub-station along with associated bays, Asset-II:- 400 kV D/C Patiala-Ludhiana line along with associated bays at Patiala and Ludhiana Sub-station for transmission system associated with Rampur HEP. 30-01-2016

Petition No. 512/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under augmentation of 220/132 kV Transformation capacity at Raebareli by 1x100 MVA Transformer in Northern Region. 30-01-2016

Petition No. 503/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400/220 kV, 1*315 MVA Auto Transformer (ICT-III), at 400/220 kV Substation at Vapi under installation of 1*315 MVA, 400/220 KV Transformer at Vapi (POWERGRID) Substation in Western Region. 30-01-2016

Petition No. 426/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for assets under Vindhyachal Stage-II Transmission System in Western Region. 30-01-2016

Petition No. 313/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset I: LILO of both circuits of 400 kV D/C Bamnouli- Mundka/ Bawana at Jatikalan 765/400 kV Sub-station(COD: 1.10.2012), Asset-II: Agra-Jatikalan 765 kV S/C transmission line (COD: 1.5.2013), Asset-III: Agra- Meerut 765 kV S/C transmission line (COD: 1.6.2013) under 765 kV system for Central Part of Northern Grid Part-I in Northern Region. 30-01-2016

Petition No. 297/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-A:- LILO of one circuit (ckt-1) of 400 kV D/C Maithon-Jamshedpur line at Mejia “B” TPS including PLCC equipment (excluding wave trap) for the transmission line Asset-B:- 400 kV D/C Koderma TPS- Biharsharif transmission line and 2 nos. associated line bays at Biharsharif Sub-station and Asset C: 400 kV D/C Maithon RB- Maithon (PG) transmission line and associated bay Extension at Maithon Sub-station under transmission system for start-up power to DVC and Maithon Right Bank Generation projects in Eastern Region. 30-01-2016

Petition No.294/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 400 kV D/C Manesar-Neemrana Line along with associated bays, Asset- III(A): 500 MVA 400/220 kV ICT-1 at Neemrana, Asset-III(B): 315 MVA 400/220 400/220 kV ICT-2 at Neemrana under transmission system associated with Northern Region System Strengthening Scheme- XV. 30-01-2016

Petition No. 186/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Combined Asset-A& B: (Asset A: 315 MVA ICT-I at Sikar 400/200 kV new sub-station with 1 No. 220 kV Line bay and Asset-B: LILO of ckt-I of Sikar (RVPN)- Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), Asset-C: LILO of Ckt-II of Sikar(RVPN)-Ratangarh (RVPN) 220 kV D/C line at Sikar(PG), Asset-D: 315 MVA ICT-II at Sikar 400/200 kV New sub-station with 1 No. 220 kV line bay, Combined Asset E& I (Asset E: LILO of 1st circuits of 400 kV Jhakri Abdulllapur transmission line at Panchkula, Asset F: LILO of 2nd circuits of 400 kV Jhakri Abdulllapur transmission line at Panchkula, Asset-G: 400/220 kV 315 MVA ICT-I along with associated bays at Panchkula sub-station, Asset H: 315 MVA ICT-II along with associated bays at Panchkula sub-station, Asset I: 125 MVAR bus reactor along with associated bays at Panchkula sub-station, Asset –J: 400 kV, 80 MVAR bus reactor along with associated bays at 400/220 kV Sikar sub-station under Sasan and Mundra Mega Power Project in Northern Region. 30-01-2016

Petition No. 114/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission assets (Group-1) associated with 765 kV system for Central part of Northern Grid Part-II, in Northern Region. 30-01-2016

Petition No. 63/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Combined Assets for Transmission System associated with NRSS-XV in Northern Region. 30-01-2016

Petition No. 024/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Neemrana-Sikar T/L along with its associated bays under NRSS-XVII. 30-01-2016

Petition No. 414/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for LILO of Alamathy-Siperumbudur 400 kV DC line at North Chennai TPS switchyard under transmission system associated with Chennai NTPC –TNEB JV TPS. 22-01-2016

Petition No. 34/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Asset I :LILO of both circuits of 400 kV D/C KishenpurWagoora T/L along with bays at New Wanpoh& 1 No. 315 MVA, 400/220 kV ICT-I along with associated bays at New Wanpoh and 03 No. 220kV Line Bays associated with NRSS XVI of Northern Region. 22-01-2016

Petition No. 32/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for ;Asset 1: 125 MVAR Bus reactor at Jaipur South, Asset 2: 400kV BhiwaniJind TL along with associated bays plus 01 nos. 500 MVA, 400/220 kV ICT-I and associated bays at Jind S/S , Asset 3: LILO of both Ckts of 400 kV D/C Lucknow- Bareily TL at Shahjahanpur, Asset 4: ICT- I at Shahjahanpur along with associated bays, Asset 5: ICT- II at Shahjahanpur along with associated bays for Northern Region Transmission Strengthening Scheme in NR. 22-01-2016

Petition No. 37/TT/2013
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-Il. 22-01-2016

Petition No. 113/TT/2013
Determination of tariff for 2009-14 period for 400kv 1x63 MVAR Bus Reactor along with associated 400kV bays at Satna sub-station (DOCO 1.4.2013) and 400kV D/C Quad Bassi-Jaipur (RPVNL) line associated with Vindhyachal IV and Rihand III (1000MW) Generation project in Western Region. 22-01-2016

Petition No. 447/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Spare Converter Transformer for Vizag back-to-back HVDC terminal in Southern Region. 22-01-2016

Petition No. 028/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Combined Assets associated with Northern Region System Strengthening Scheme -XII (NRSS-XII) in Northern Region. 22-01-2016

Petition No. 057/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for asset 02 Nos. of 220 kV Line Bays at Fatehabad S/Stn under Transmission System Associated with NRSS-XIII. 22-01-2016

Petition No. 551/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission assets under “System Strengthening-XI in Southern Regional Grid" in Southern Region”. 22-01-2016

Petition No. 362/TT/2014
Determination of tariff for 2009-14 period for for (A) 500MVA 400/220 kVSpare Transformer for Northern Region at Neemrana from DOCO (1.11.2013) to 31.3.2014 under Augmentation of Transformers in Northern Region Part – A of Northern Region. 22-01-2016

Petition No. 281/TT/2013
Determination of tariff for 2009-14 period for Augmentation of Houser S/S by 1X315 MVA 400/220 kV transformer and associated bays (DOCO: 01.03.2014) under System Strengthening - XIV in SR. 22-01-2016

Petition No. 120/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Thermal Powertech Corporation India Ltd. Switchyard to Nellore Pooling Station 400kV D/C (quad) Line along with associated bay extensions at Nellore Pooling Station under “Transmission System for connectivity of Thermal Powertech Corporation India Ltd.” 22-01-2016

Petition No. 528/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for for 400 kV s/c Chamera II pooling Station at Rajera with 400/220 kV 315 MVA ICT-1 and ICT-II under Chamera II GIS pooling station at Rajera with 80 MVAR Bus reactor at Pooling point under Chamera II System. 22-01-2016

Petition No. 151/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for asset under transmission system associated with Koteshwar HEP in Northern Region consisting of Asset-I: 50% series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar)-Meerut 765 kV 2 x S/C lines (charged at 400 kV). 20-01-2016

Petition No. 511/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 2nd spare converter transformer at Kolar (COD: 1.6.2011) and Talcher (COD: 1.10.2011) HVDC terminals (each one at Kolar and Talcher) in Southern Region. 20-01-2016

Petition No. 504/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for transmission assets under “System Strengthening-X in Southern Regional Grid” in Southern Region. 20-01-2016

Petition No. 478/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 80 MVAR Bus Reactor at Kaithal Sub-station under Northern Region system strengthening scheme-XIX of Northern Region. 20-01-2016

Petition No. 492/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Hassan-Mysore 400 kV D/C transmission line and extension of 400/220 kV Hassan & Mysore Sub-station under system strengthening-IX in Southern Region. 20-01-2016

Petition No. 5/TT/2015
Approval fortruing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for for transmission assets under “Northern Region System Strengthening Scheme- XXIII. 17-01-2016

Petition No. 131/TT/2015
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 1 x 80 MVAR, 420 kV, 3-Phase Bus Reactor at 400 kV Balipara Sub-station along with associated bay under transmission system associated with North East/Northern Western Interconnector-I and transmission system of Kameng HEP in North Eastern Region. 17-01-2016

Petition No. 480/TT/2014
Approval for truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Nellore-Gooty 400 kV D/C (Quad) line with associated bay extension at Nellore & Gooty Sub-station under Transmission System associated with SRSS XVIII-A (Formerly KUMPP Part A). 17-01-2016

Petition No. 554/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (i) 400 kV, 125 MVAR Bus-Reactor with associated bays at Abdullapur and (ii) 400 kV D/C Abdullapur-Sonepat transmission line along with 400 kV associated bays at Abdullapur and Sonepat Sub-station under System Strengthening in Northern Region Grid for Karcham Wangtoo HEP in Northern Region-II. 17-01-2016

Petition No. 3/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets of Koldam Nalagarh 400 kV D/C (Quad) line along with bays at Nalagarh S/S (part of Powergrid portion) DOCO:1.4.2010 (Asset-I) and 400 kV line bays at Ludhiana S/S DOCO:1.4.2011 (Asset-II) under “Transmission system associated with Koldam Hydro-Electric Project” in Northern Region. 16-01-2016

Petition No. 10/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets associated with Northern Region System Strengthening Scheme – VI in Northern Region consisting of: Asset –I : LILO of 400 kV S/C Ballabhgarh – Bhiwandi Transmission Line at Gurgaon along with Associated bays, Asset –II: 315 MVA, 400/220kV ICT-I along with associated bays at GIS Sub-Station at gurgaon and Asset-III: 315 MVA, 400/220 kV ICT-II along with associated bays at GIS Sub-Station at Gurgaon. 16-01-2016

Petition No. 240/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Asset-I (220 kV Dimapur-Misa T L, LILO 220kV DIC Kopili-Samaguri TL and LILO 132kV D/C Mariani- Dimapur TL) and Asset-Il (132 kV DIC Doyang-Dimapur T IL, 132 kV SICDimapur- lmphal TIL with associated bays) for transmission system associated with Doyang HEP in North Eastern Region. 14-01-2016

Petition No. 13/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission system associated with enhancement of transmission capacity of East-West Corridor (Combined Assets) of Northern Region. 16-01-2016

Petition No. 14/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets associated with Northern Region System Strengthening Scheme-VIll (NRSS-VIII) (Effective DOCO 1.11.2009) in Northern Region consisting of: Asset-A: LILO of one Circuit of 400kV D/C Kankroli-Zerda Line at Bhinmal along with 80 MVAR Bus Reactor at Bhinmal (DOCO 1.9.2009), Asset-B: 315 MVA 400/220 ekV ICT-I at Bhinmal along with associated bays (DOCO 1.9.2009), Asset-C: 315 MVA 400/220 kV ICT-II at Bhinmal along with associated bays (DOCO 1.4.2010), Asset-D: 315 MVA 400/220 KV ICT-III at Hissar along with associated bays at Hissar (DOCO 1.4.2010), Asset-E: Two nos. 220 kV Bays at Hissar Sub-station (DOCO 1.8.2010). 16-01-2016

Petition No. 15/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets of 400 kV D/C Twin Conductor Kanpur- Ballabgarh Transmission Line along with its Associated Bays (Asset-1) (DOCO 01.11.2010) and 40% FSC at Ballabgarh on 400 kV D/C Kanpur- Ballabgarh Transmission Line (Asset-2) (DOCO 01.07.2011) under Northern Region System Strengthening Scheme—lX (NRSS-IX). 16-01-2016

Petition No. 70/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-I: 125 MVAR Bus Reactor-I (Asset-IA) & 125 MVAR Bus Reactor-II (Asset-IB) at Fatehpur Sub-station along with associated bay; Asset-II: 125 MVAR Bus Reactor-II at Balia Sub-station; Asset-III: Combined Asset of 1500 MVA ICT-I at Agra Sub-station along with associated bays (Asset-IIIA), 125 MVAR 765/400 kV Bus Reactor-I at Sasaram along with associated bays (Asset-IIIB) and Associated line bays of 765 kV S/C Fatehpur-Agra T/L at Fatehpur and Agra Sub-station (Asset-IIIC); Asset-IV: 1500 MVA ICT-2 at Agra Sub-station along with associated bays; Asset-V: 125 MVAR Bus Reactor along with associated bays at Lucknow; Asset-VI: 125 MVAR 400 kV Bus Reactor-II at Sasaram along with associated bays (Asset-VI A) and 2 no. 50 MVAR Bus Reactor at 400 kV Maithon Sub-statoin and associated bays (Maithon-Gaya Line) (Asset-VI B); Asset-VII: 2 nos. of 400 kV bays at Maithon Sub-station for 400 kV D/C Maithon-Mejia Transmission Line; Asset-VIII: LILO of Barh-Balia 400 kV D/C Transmission Line at Patna 400 kV S/s along with associated bays; Asset-IX: 1500 MVA 765/400 kV ICT-I at Sasaram Sub-station along with associated bays. 19-01-2016

Petition No. 100/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets of Transmission System associated with North West Corridor Strengthening Scheme (effective COD 1.5.2009) in both Western and Northern region consisting of Asset-I: 765 kV S/C Gwalior-Agra transmission line Circuit-II along with 400 kV bays at Agra-Gwalior S/S (COD:1.4.2009) and Asset-II: 400 kV D/C Zerda-Kankroli line along with associated bays (COD:1.5.2009). 16-01-2016

Petition No. 101/TT/2015
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Combined Assets for Transmission System Associated with NRSS-V in Northern Region consisting of Asset-I: LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi along with associated bays (DOCO 01.04.2009), Asset-II: 400 kV D/C Agra- Bhiwadi transmission line along with associated bays(DOCO 01.09.2009), Asset-III: 400 kV D/C Bhiwadi-Moga transmission line along with associated bays at Moga & Bhiwadi end including of 02 nos. 63 MVAR line reactor at Moga end (DOCO 01.04.2010) & Asset-IV:80 MVAR Bus Reactor at Bhiwadi Sub-station (DOCO 01.01.2011). 16-01-2016

Petition No. 391/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 315 MVA, 400/220kV ICT II at Misa Sub-station along with associated bays under “North East/Northern Western Interconnector-I and Transmission system of Kameng HEP” in North Eastern Region . 18-01-2016

Petition No. 431/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 400 kV Kankroli-Jodhpur Transmission line alongwith associated bays under System Strengthening Scheme in South-Western Part of Northern Grid (Part-B). 16-01-2016

Petition No. 495/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for 400 KV D/C Meerut-Kaithal (Quad)TL along with associated bays under “Northern Region System strengthening scheme-XI”. 16-01-2016

Petition No. 529/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined Assets of (i)160 MVA,220/132kV,3 - Phase Auto Transformer at Kopili (ii) 132 kV S/C Kopili-Khandong Transmission Line along with associated bays (iii) 100MVA, 220/132 kV, 3-Phase Auto Transformer and associated bays at Dimapur Sub-Station and (iv)LILO of 132 kV Dimapur-Kohima Transmission Line under missing link transmission system in NER. 16-01-2016

Petition No. 544/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Gorakhpur-Lucknow transmission line along with its associated bays and 30% FSC on 400 kV D/C Gorakhpur-Lucknow transmission line at Lucknow along with bays under Northern Region System Strengthening Scheme-X. 18-01-2016

Petition No. 549/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for Transmission Assets under System Strengthening–VII in Southern Regional Grid in Southern Region. 16-01-2016

Petition No. 553/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for transmission Assets under "Pallatana GBPP and Bongaigaon T PS Project" in North Eastern Region. 16-01-2016

Petition No. 001/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for transmission system associated with SEWA-II HEP in Northern Region. 19-01-2016

Petition No. 147/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for LILO of existing Bangalore-Salem 400 kV S/C line at Hosur under system strengthening – XVIII in Southern Regional Grid. 18-01-2016

Petition No. 217/TT/2015
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 1x80 MVAR, 420kV 3-phase Bus-Reactor at 400kV Bongaigaon Sub-station along with associated bay under transmission system associated with North-East/Northern Western Interconnector-I and transmission system of Kameng HEP in North Eastern Region. 18-01-2016

Petition No. 417/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (A) LILO of 400 kV Simhapuri and Meenakshi-Nellore D/C Quad line (B) Associated bays and common systems at Nellore Pooling station for ISGS projects in Krishnapatnam area of Andhra Pradesh in Southern Region. 18-01-2016

Petition No. 546/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset I: LILO of 400kV Rishikesh- Muzaffarnagar Transmission line at Roorkee along with associated bays at Roorkee Sub-station(COD: 1.4.2009), Asset II: 315 MVA 400/200 kV ICT-I along with associated bays at Roorkee Sub-station(COD: 1.4.2009) Asset III: 315 MVA 400/220 kV ICT-II along with associated bays at Roorkee Sub-station (COD: 1.4.2010) associated with System Strengthening Scheme in Roorkee in Northern Region. 18-01-2016

Petition No. 490/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Asset-1: 315 MVA ICT-III at Ludhiana Sub-station associated with Northern Region System Strengthening Scheme-VII. Asset-2: 4th 400/220 kV, 315 x04 MVA ICT at Wagoora Sub-station associated with Northern Region System Strengthening Scheme-VII for Northern Region system strengthening scheme-VII. 18-01-2016

Petition No. 240/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 period for combined assets i.e. Asset-I (220 kV Dimapur-Misa T L, LILO 220kV DIC Kopili-Samaguri TL and LILO 132kV D/C Mariani-Dimapur TL) and Asset-Il (132 kV DIC Doyang-Dimapur T IL, 132 kV SIC-Dimapur-lmphal TIL with associated bays) for transmission system associated with Doyang HEP in North Eastern Region. 14-01-2016

Petition No.247/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block of 132 kV SIC Ranganadi-Ziro Transmission System in North Eastern Region. 14-01-2016

Petition No. 276/TT/2014
Truing up of transmission tariff for 2009-14 and tariff period and determination of tariff for 2014-19 period for ATS of Kopili-Khandong (additional transmission Gohpur-Itanagar) in North Eastern Region. 14-01-2016

Petition No. 278/TT/2014
Truing up transmission tariff for 2009-14 tariff period and determination of tariff for 2014-19 tariff period for Combined Assets of Transmission System associated with Ranganadi HEP in North Eastern Region. 14-01-2016

Petition No. 380/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block for Transmission System associated with Kathalguri Gas based Combined Cycle Project in North Eastern Region. 14-01-2016

Petition No. 428/TT/2014
Truing up of transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block of combined assets of (i) 220 kV S/C Unchahar- Raibareilly transmission line alongwith associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow T/L at Raibareilly and 100 MVA, 220/132 kV ICT-III at Raibareilly alongwith associated bays (ii) 100 MVA, 220/132 kV ICT-II at Raibareilly Sub-station alongwith associated bays under Unchahar-III Transmission System (Notional DOCO 1.11.2007) in Northern Region. 14-01-2016

Petition No.442/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block for 2nd 315(3X105) MVA, 400/220 kV Transformer at Indravati (OHPC) Switchyard in Eastern Region. 14-01-2016

Petition No.552/TT/2014
Truing up of transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block of Combined Asset (Part-I) (i) LILO of Korba – Raipur at Sipat, (ii) 765 kV Sipat – Seoni Ckt. I, (iii) 400/220 kV ICT I at Seoni, (iv) Ckt. II of 400 kV Nagda – Dehgam line, (v) Ckt. I of Nagda – Dehgam line, (vi) 400 kV D/C Seoni – Khandwa TL, 80 MVAR Bus Reactor, 765/400 kV ICT. II at Seoni S/S LILO of Sardar – Sarovar – Nagda line at Rajgarh, (vii) 765 kV Sipat – Seoni Ckt. II andCombined Asset (Part-2) (viii) 315 MVA 400/220 kV ICT II at Seoni S/S, 315 MVA 400/220 kV ICT I at Rajgarh and (ix) 315 MVA ICT II at Rajgarh. Under Sipat I Transmission System in Western Region. 14-01-2016

Petition No.395/TT/2014
Truing up transmission tariff for 2009-14 tariff period and determination of tariff for 2014-19 tariff period for Special Protection Scheme for Rihand- Dadri HVDC Bi-pole and Gorakhpur-Muzzafarpur 400 kV line in Northern Region. 14-01-2016

Petition No.232/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.3.2019 for replacement of 2 x 315 MVA, 400/220 kV ICT with 2 x 500 MVA, 400/220 kV ICTs at Purnea Sub-station under “Eastern Region Strengthening Scheme-XII” in Eastern Region. 28-12-2015

Petition No. 248/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset I: (765 kV D/C Solapur- Aurangabad TL along with 2 x 240 MVAR Switchable Line Reactor with associated bays at Solapur Sub-station) and Asset II: (2 x 240 MVAR Switchable Line Reactor along with associated bays at Aurangabad Sub-station) associated with Inter Regional system strengthening scheme for Western Region and Northern Region (Part-A). 22-12-2015

Petition No.257/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for Asset-I: 160 MVA 220/132 kV Transformer I at Purnea Sub-station along with associated bays; Asset- II: 160 MVA 220/132 kV transformer II at Purnea Sub-station along with associated bays “ Augmentation of Transformation Capacity and Reactive Compensation in Northern and Eastern Region”. 28-12-2015

Petition No. 259/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for Asset-I: 200 MVA, 400/132/33 kV ICT - 2 along with associated bays at Biswanath Chariali, Asset-II: 80 MVAR Bus Reactor-1 along with associated Bays at Biswanath Chariali, Asset-III: 80 MVAR Bus Reactor-2 along with associated Bays at Biswanath Chariali, Asset-IV: Augmentation of 400 kV Agra Sub-station by 1x315 MVA, 400/220/33 kV ICT along with associated Bays, Asset-V: 400kV D/C Balipara-Biswanath Chariali Transmission Line along with associated bays at Balipara and Biswanath Chariali PS from anticipated COD 15.11.2015 to 31.03.2019 under the transmission system associated with “NORTH EAST –NORTHERN/ WESTERN INTERCONNECTOR - I PROJECT” in North Eastern, Northern & Western Region. 23-12-2015

Petition No. 260/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Champa PS - Dharamjaygarh (Korba) 765 kV S/C line along with bays, Raigarh PS (near Kotra) - Champa PS 765 kV S/C line along with bays and establishment of 765/400 kV 6X1500 MVA Champa Pooling Station under “Establishment of Pooling Stations at Champa and Raigarh (near Tamnar) for IPP Generation Projects in Chattisgarh” in Western Region. 28-12-2015

Petition No. 262/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for 400kV (Quad) D/C line from NCC Generation Switchyard to Nellore Pooling Station and associated Bays under “Transmission System for Connectivity for NCC Power Projects Ltd. 28-12-2015

Petition No. 263/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 (A) Combined Assets of (A1) Associated bays of 765 kV S/C Lucknow Barielly transmission line including 3x80 MVAR switchable line reactor at Lucknow (New) and Line Reactor at Bareilly (New) Sub-station, (A2) 2nd circuit of 400 kV D/C (Quad) Bareilly(New)-Bareilly(Old)transmission line with associated bays (A3) 765/400 kV 1500 MVA ICT-I at Bareilly (New) Sub-station along with associated bays (B) 765 kV, 3x80 MVAR Bus reactors at Bareilly (New) Substation(C)Associated bays of 1st circuit of 400 kV D/C (Quard) Bareilly (New)- Bareilly (Old) Transmission Line (D) 765/400 kV 1500 MVA ICT-II at Bareilly (New) Sub-station along with associated bays. (E) 1st circuit of 400 kV D/C (Quard) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays (F) 2nd circuit of 400kV D/C (Quard) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays (G) 400kV Kashipur- Roorkee line along with associated bays (H) 400kV D/C Roorkee-Saharanpur line along with associated bays under “Northern Region System Strengthening SchemeXXI” in Northern Region. 23-12-2015

Petition No. 264/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for 765kV S/C Kurnool-Raichur transmission line along with associated bay extensions at 765/400 kV Kurnool Sub-station and 765/400 kV Raichur Substation under "Southern Region System strengthening Scheme -XXII. 28-12-2015

Petition No. 266/TT/2015
Determination of transmission tariff from anticipated/ actual COD to 31.3.2019 for 765 kV D/C Dharamjaygarh-Jabalpur Pooling Station transmission line and 2x330 MVAR Switchable Line Reactors with associated bays at Dharamjaygarh Sub-station and line bays at Dharamjaygarh Sub-station only under “Transmission system for Phase-I Generation Projects in Orissa-Part B” in Western Region. 28-12-2015

Petition No. 274/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset-I: 765kV D/C Varanasi-Kanpur (new) line and associated bays including 240 MVAR Switchable Line Reactor in both Ckt. at Varanasi GIS Sub-station and 330 MVAR non-switchable Line Reactor in both Ckt. at Kanpur GIS Sub-station (Anticipated COD;31.01.2016) Asset- II: 765 kV S/C Kanpur (new) GIS – Jhatikra line & associated bays including 330 MVAR Switchable Line Reactor at Kanpur GIS Sub-station and 330 MVAR NonSwitchable Line Reactor at Jhatikara Sub-station (Anticipated COD:31.01.2016) Asset- III: 400kV D/C (Quad) Kanpur (New) GIS-Kanpur (old) line & associated bays (Anticipated COD: 31.01.2016) Asset- IV: LILO of one Ckt. of 400kV D/C Sasaram-Allahabad line & Associated bays at Varanasi GIS Sub-station (Anticipated COD: 31.12.2015) Asset- V: 2X1500 MVA 765/400 kV ICT-I&II associated bays at 765/400 kV Kanpur (new) GIS Substation (Anticipated COD;31.01.2016) Asset- VI: 240 MVAR, 765kV Bus Reactor-1 & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD:31.01.2016) Asset- VII: 240 MVAR, 765kV Bus Reactor & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD;31.01.2016) Asset- VIII: 125 MVAR, 400 kV Bus Reactor & associated bay at Kanpur(new) GIS Sub-station (Anticipated COD;31.01.2016) Asset- IX: 240 MVAR, 765 kV Bus Reactor & associated bay at Jhatikara S/S (Anticipated COD;1.12.2015) Asset- X: 125 MVAR, 400 kV Bus Reactor & associated bay at Varanasi GIS Sub-station (Anticipated COD;31.1.2016) under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part-B” in Northern Region. 28-12-2015

Petition No. 275/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset:I 275.93 Km. OPGW Fiber Optic cable along with associated equipments which are under commercial operation w.e.f. 1.4.2014, Asset II: 291.124 Km. OPGW fiber optic cable along with associated equipments (inclding 88.63 KM under cost apportionment with POWERTEL ) which are under commercial operation w.e.f. 1.7.2014 and Asset III: 1717.112 Km. OPGW fiber optic cable along with associated equipments (includeds 966.63 KM under cost apportionment with POWERTEL) which are under commercial operation w.e.f. 30.3.2015 under “Fiber Optic Communication system for central sector substations & Generating stations “ in Southern Region. 28-12-2015

Petition No. 276/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Mysore-Kozhikode 400 kV D/C Line along with new 400/220 kV Sub-station with 2x315 MVA ICT’s and 2x50 MVAR Switchable Line Reactors at Kozhikode & extension of Mysore Sub-station” under transmission systems associated with Kaiga 3&4 (2x235 MW) Project” in Southern Region. 28-12-2015

Petition No. 280/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.03.2019 for Asset-I: Balance portion of 400 kV D/C Maithan Gaya transmission line CKT II including multi circuit, Asset-II: Balance portion of 400 kV D/C Maithan Gaya transmission line CKT I including multi circuit, Asset-III: 1 no. 400 kV Line Bay at 765/400 kV Gaya Sub-station (Koderma II Bay) and Asset IV: 765 kV Line Bay at 765/400 kV Gaya Sub-station associated with 765 kV S/C Gaya Balia transmission line under common scheme for 765 kV pooling stations and network for NR, import by NR from ER and from NER/SR/WR via ER and common scheme for network for WR and import by WR from ER and from NER/SR/WR via ER in Eastern Region. 28-12-2015

Petition No. 232/TT/2015
Determination of transmission tariff from anticipated/actual COD to 31.3.2019 for replacement of 2 x 315 MVA, 400/220 kV ICT with 2 x 500 MVA, 400/220 kV ICTs at Purnea Sub-station under “Eastern Region Strengthening SchemeXII” in Eastern Region. 28-12-2015

Petition No. 275/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for combined elements of Asset-I: 315 MVA ICT-IV along with associated bays at Moga Sub-station, Asset-II: ICT-II along with associated bays and 2 nos. PSEB line bays at Moga Sub-station under Augmentation of transformation capacity at Amritsar and Moga Sub-station in Northern Region. 18-12-2015

Petition No. 356/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV D/C Bina-Nagda transmission line along with associated bay equipment at Nagda and Bina Sub-station under “Transmission System associated with 400 kV Bina-Nagda D/C line “ in Western Region. 18-12-2015

Petition No. 365/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for combined Asset-1 comprising 400/220 kV Damoh Sub-station along with bays and 400 kV 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh Sub-station and combined Asset-2 comprising 400/220 kV ICT-I at Damoh Sub-station along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh Sub-station under WRSS-IV Transmission Scheme in Western Region. 18-12-2015

Petition No. 388/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Combined Assets of (i) Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays; (ii) 400/220 kV, 315MVA ICT-II at Satna Sub-station; (iii) Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; (iv) LILO of 400 kV Satna-Bina Ckt- I & II at Bina (PowerGrid) Sub-station; (v) Circuit IV of 400 kV D/C Satna-Bina transmission line; (vi) Circuit III of 400 kV D/C Satna-Bina transmission line; (vii) LILO of 400 kV D/C Raipur-Rourkela transmission line along with associated bays; and (viii) 400/220 kV 315 MVA ICT-II alongwith associated bays equipment at Raigarh Sub-station under Vindhyachal Stage-III transmission system in Western Region. 18-12-2015

Petition No. 425/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Kawas Transmission System in Western Region. 18-12-2015

Petition No. 444/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for LILO of Vemagiri-Gajuwaka 4000 kV D/C Line at Simhadri –II TPS under transmission system associated with Simhadri-II Generation Project in Southern Region. 18-12-2015

Petition No. 481/TT/2014
Truing up transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for (Asset-I) 400 kV Vindhyachal- Korba S/C transmission line, (Asset-II) 400 kV Itarsi- Indore S/C transmission line-1(Asset-III) 400 kV Vindhyachal- Jabalpur D/C transmission line-1 (Asset-IV) 400 kV Jabalpur- Itarsi D/C transmission line-1 (Asset-V) 400 kV Indore- Asoj S/C transmission line-2 under “ Vindhyachal Stage-I transmission system” in Western Region. 18-12-2015

Petition No. 533/TT/2014
Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for transmission assets under System Strengthening-VIII in Southern Regional Grid in Southern Region. 18-12-2015

Petition No. 12/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff period for 400 kV Transmission System associated with Farakka (I&II) STPS in Eastern Region. 27-11-2015

Petition No. 57/TT/2014
Misc. Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in Eastern Region for the period 2009-14 block. 27.11.2015

Petition No. 204/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff blocks Transmission System associated with NLC Stage-l in Southern Region. 27.11.2015

Petition No. 486/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for LILO of 400kV D/C Siliguri-Rangit Line at Gangtok in Eastern Region. 27.11.2015

Petition No. 556/TT/2014
Truing up of Transmission tariff for 2009-14 tariff period Transmission Tariff for 2014-19 tariff period for combined assets of Ckt-I (Asset-I), Ckt-II (Asset-II) of 400 kV Teesta (Stage-V) Siliguri transmission line; and 315 MVA, 400/220 kV ICT-II at Baripada Sub-station along with associated bays (Asset-III) of transmission system under Teesta (stage-V) HEP in Eastern Region. 27.11.2015

Petition No. 435/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for combined assets of (i) Tala – Siliguri Transmission System and (ii) Remaining part of Tala - -Siliguri transmission System in Eastern Region. 27.11.2015

Petition No. 216/TT/2014
Approval of truing up of transmission tariff for the tariff period 2009-14 and transmission tariff for the tariff period 2014-19 for Neelamangala - Mysore 400kV DIC Transmission Line along with 2 X 315MVA, 4001220kV lCTs at Mysore Substation (01.05.2006) in Southern Region. 27.11.2015

Petition No. 60/TT/2015
Truing up of Transmission tariff for 2009-14 tariff period and determination of Transmission Tariff for 2014-19 tariff period for 2014-19 Chukha Transmission System in Eastern Region. 27.11.2015

Petition No. 407/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for 2014-19 tariff block for Madurai- Trivandrum 400 kV D/C Transmission System in Southern Region. 27.11.2015

Petition No. 74/TT/2015
Approval of truing up of transmission tariff for the tariff period 2009-14 and transmission tariff for the tariff period 2014-19 for Up-gradation of transfer capacity of Talcher-Kolar HVDC Bi-pole in Southern Region. 27.11.2015

Petition No. 212/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for combined elements of Kaiga - Narendra 400kV D/C transmission line (DOCO: 01.11.2005), 400/220kV Sub-station at Narendra with one 315MVA ICT (DOCO: 01 .11.2005) and 2nd 315MVA ICT at Narendra Sub-station (DOCO: 01.09.2006) under Kaiga- Narqndra Transmission System in Southern Region. 27.11.2015

Petition No. 435/TT/2014
Truing up of Transmission tariff for 2009-14 tariff block and determination of Transmission Tariff for combined assets of (i) Tala – Siliguri Transmission System and (ii) Remaining part of Tala - -Siliguri transmission System in Eastern Region. 27.11.2015

Petition No. 499/TT/2014
- Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for combined elements of Talcher and Kolar (HVDC portion) and combined elements of Talcher and Kolar (AC portion) under "Transmission System associated with Talcher -II Project" in Southern Region. 27.11.2015

Petition No. 535/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for 400 kV Kahalgaon transmission system in Eastern Region. 27.11.2015

Petition No. 539/TT/2014
Approval for truing up of transmission tariff for tariff period 2009-14 and determination of transmission tariff for tariff period 2014-19 for Transmission System associated with NLC Stage-II in Southern Region. 27.11.2015

Petition No. 545/TT/2014
Approval of truing up of charges for the tariff period 2009-14 and determination of fees and charges for the tariff period 2014-19 for Unified Load Dispatch & Communication Scheme (Power Grid Portion i.e. communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Southern Region. 27.11.2015

Petition No. 161/TT/2015
Determination transmission tariff for tariff block 2014-19, i.e., from COD (21.6.2014) to 31.3.2019, for (a) Kurnool-Raichur 2nd 765 kV S/C line (b)Extension of Kurnool 765/400 kV Sub-station and (c) Extension of Raichur765/400 kV Sub-station under “Common System associated with ISGS projects in Krishnapatnam area of Andhra Pradesh in Southern Region. 18.11.2015

Petition No. 27/TT/2014
Approval for determination of transmission tariff from DOCO to 31.3.2019 for (A) LILO of N`Sagar- Gooty 400kV S/C line at Kurnool (New) Sub-station, (B) Kurnool (New) – Kurnool (APTRANSCO) 400 kV D/C quad line, (C) Establishment of new 765/400 kV Sub-station at Kurnool with 2x1500 MVA transformers, (D) Extension of Kurnool (APTRANSCO) substation and (E) 1x240 MVAR bus reactor at Kurnool (new) Sub-station under “Transmission System associated with Krishnapatnam UMPP part C1” in Southern Region for tariff block 2014-19. 18.11.2015

Petition No.560/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Kahalgaon St-II, Ph - I transmission system in Eastern Region, Northern Region and Inter-regional link between Northern and Western Region. 16.11.2015

Petition No.488/TT/2014
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for (a) 400kV Ramagundam-Hyderabad D/C transmission line, (b) 400 kV S/C Hyderabad- Kurnool-Gooty transmission line, (c) 400 kV S/C Gooty-Neelmangla transmission line and (d) 400 kV S/C Khammam-Nagarjunasagar transmission line along with associated bays and equipment (Notional DOCO 1.5.2005) under Ramagundam Stage-III Transmission System in Southern Region. 16.11.2015

Petition No.485/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Combined asset of System Strengthening Scheme for Eastern Region (ERSS) (Formerly part of Tala Supplementary Scheme) in Eastern Region. (4(No.s) Assets). 16.11.2015

Petition No.364/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for 400 kV D/C Dhauliganga HEP Bareilly (UPPCL) Transmission Line along with its associated bays at Bareilly(UPPCL) in Northern Region. 16.11.2015

Petition No.173/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for LILO of 1stCkt. (Asset-I) and 2ndCkt. (Asset-II) of Patratu-Hatia-Chandil 220 kV D/C line at Ranchi Sub-Station (Notional DOCO-01.09.2007) associated with 220 kV Interconnection with Jharkhand State Electricity Board (JSEB) system at Ranchi Sub-Station in Eastern Region. 16.11.2015

Petition No.38/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 of Transmission System associated with TALA HEP East-North Inter-connector and Northern Region Transmission System, an inter-regional asset between Northern Region and Eastern Region . 16.11.2015

Petition No.35/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Transmission System associated with Ramagundam STPP including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region. 16.11.2015

Petition No. 433/TT/2014
Truing up Transmission tariff for 2009-14 tariff block (ii) Transmission tariff for 2014-19 tariff block for 2nd 400 kV D/C Kahalgaon – Biharsharif Transmission Line in Eastern Region. 16.11.2015

Petition No. 411/TT/2014
Transmission tariff for 2014-19 tariff block, i.e., from DOCO (1.4.2014) to 31.3.2019, for LILO of 1st ckt of 400 kV D/C Parbati-II-Koldam Transmission Line at Parbati Pooling Station (Banala) under Transmission System associated with Parbati-III HEP in Northern Region. 16.11.2015

Petition No. 429/TT/2014
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation-6 of Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations, 2009 and CERC (Terms & Conditions of tariff) Regulations, 2014 for determination of (i) Truing up Transmission Tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand-Dadri HVDC Bipole Terminal in NR. 16.11.2015

Petition No.102/TT/2014
Determination transmission tariff for LILO of existing Kolar-Sriperumbudur 400 kV S/C line at Thiruvalam along with associated bays under “SYSTEM STRENGHENING- XIX” in Southern Region from DOCO to 31.3.2019 for tariff block 2014-19. 16.11.2015

Petition No.78/TT/2015
Approval of transmission tariff for (A) 80 MVAR line reactor of Barh-I (charged as bus reactor) at Gorakhpur Extn. and (B) 80 MVAR line reactor of Barh-II (charged as bus reactor) at Gorakhpur Extn. under “BARH-TPS II” in Northern Region. 16.11.2015

Petition No.34/TT/2014
Determination Transmission tariff for (a) Asset I:Balance portion of 400 kV D/C Jamshedpur-Bariprada Transmission Line and associated bays at Jamshedpur, (b) Asset II: 02 Nos. 400 kV bays at Durgapur S/s under ERSS-I in Eastern Region for tariff block 2009-14. 16.11.2015

Petition No.9/TT/2015
Truing up of transmission tariff for the tariff block 2009-14 and determination of transmission tariff for the tariff block 2014-19 for Transmission System associated with 400 kV Central Transmission Project-I in Southern Region. 16.11.2015

Petition No.359/TT/2014
Truing up of transmission tariff for the tariff block 2009-14 and transmission tariff for the tariff block 2014-19 for combined elements of (a) 220 kV D/C RAPP-B-Chittorgarh Transmission Line (b) 220 kV S/C RAPP-B-Udaipur Transmission Line along with associated bays at Udaipur end and LILO of 220 kV D/C RAPP-KOTA Line at RAPP-B including PLCC system (c) 220 kV S/C RAPP-B-Anta Transmission Line with associated bays at Anta end for Transmission System associated with RAPP-B Project in Northern Region. 16.11.2015

Petition No.509/TT/2014
Truing up of transmission tariff for 2009-14 tariff block transmission tariff for 2014-19 tariff blocks for 500 MW HVDC back to back station at Gazuwaka (Asset-I), Vijaywada- Gazuwaka 400 kV D/C Line and 50% FSC Jeypore-Gazuwaka 400 kV S/C T/L at Jeypore (Asset-II) and (a) 40% FSC on Rengali- Indravati 400 kV S/C T/L & (b) 40% FSC on Meramundali- Jeypore 400 kV S/C T/L at Jeypore (Asset-III) under “Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” in Southern Region and Eastern Region. 14.11.2015

Petition No. 537/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Transmission System associated with Auraiya Gas Power Project in Northern Region. 06.11.2015

Petition No. 531/TT/2014
Determination of Transmission tariff of Shifting of 50 MVAR Line reactor from Rengali to Baripada end under Transmission System associated with Teesta (Stage –V) HEP in Eastern Region for 2009-14 and 2014-19. 06.11.2015

Petition No. 513/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for Singrauli Transmission System in Northern Region. 06.11.2015

Petition No. 446/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and determination of Transmission Tariff for the tariff block 2014-19 for: (A) Stage-I Combined Assets (Notional DOCO: 1.10.2003): consisting of (a) 400 kV Meerut-Mandolackt-I along with associated bays at Meerut and Mandola Substations (DOCO: 1.10.2003), (b) 400 kV Meerut-MandolaCkt-II along with associated bays at Meerut and Mandola Sub-stations (DOCO: 1.4.2003) (c) ICT-II along with associated bays at Meerut Sub-station (DOCO: 1.4.2003), (d) ICT-III along with associated bays at Meerut sub-station (DOCO: 1.7.2003) and (B) Stage-II Combined Assets (Notional DOCO: 1.2.2007): consisting of (e) ICT-I along with associated bays at Meerut Sub-station (DOCO: 1.8.2005), (f) 800 kV Tehri-Meerut ckt-I along with associated bays (DOCO: 1.4.2006), (g) 800 kV Tehri-Meerut ckt-II and 400 kV S/C Meerut- Muzaffarpur transmission line (DOCO: 1.6.2006) and (h) ICT at Muzaffarnagar along with one No. 400 kV and one No. 220 kV bay (DOCO: 1.2.2007) under Tehri Transmission System in Northern Region . 06.11.2015

Petition No. 369/TT/2014
Truing up of Transmission tariff for the tariff block 2009-14 and Transmission Tariff for the tariff block 2014-19 for (a) Neelamangala-Somanahalli 400 kV D/C line along with bays; and (b) Gooty-Raichur 400 kV D/C transmission line with bays under system strengthening-III for the period from 1.4.2009 to 31.3.104 in Southern Region. 06.11.2015

Petition No. 429/TT/2014
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation-6 of Central Electricity Regulatory Commission (Terms & Conditions of tariff) Regulations, 2009 and CERC (Terms & Conditions of tariff) Regulations, 2014 for determination of (i) Truing up Transmission Tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand-Dadri HVDC Bipole Terminal in NR. 06.11.2015

Petition No. 248/TT/2013
Approval of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 06.11.2015

Petition No. 133/TT/2015
Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2009 and CERC (Terms and Condition of Tariff) Regulations, 2014 for determination of (i) Truing up of Transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block for Rihand Transmission System (DOCO 1.4.1992) in North Region. 06.11.2015

Petition No.Petition No. 106/TT/2014
Approval for determination of transmission Tariff of Asset 1: 400 KV D/C (Quad) ranchi (New)-Ranchi(old)I CKT I Transmission line and associated 400 KV line bays at Ranchi (New) S/S & Ranchi (old) Sub-station (DOCO: 01.02.2014), Asset 2: 765/415 KV, 3X500 MVA ICT-II at Ranchi alongwith asssociated bays at 765 KV Ranchi (New) SS (DOCO: 01.02.2014) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western region for tariff block 2009-14 period. 06.11.2015

Petition No. 213/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Farakka-Malda Transmission Link and Additional 315 MVA Transformer at Malda in Eastern Region. 09.10.2015

Petition No. 215/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for 400 kV Talcher-Meramundali Transmission System in Eastern Region. 09.10.2015

Petition No. 239/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for 50 MVA Auto Transformer at Malda Sub-station in Eastern Region. 09.10.2015

Petition No. 222/TT/2014
Truing up transmission tariff for 2009-14 tariff block and dtermination of transmission tariff for 2014-19 tariff for 2014-19 tariff block for 63 MVAR Line Reactor on 400 kV Kolaghat-Rengali Line at Rengali Sub-station in Eastern Region. 09.10.2015

Petition No. 223/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission Tariff for 2014-19 tariff for 2014-19 tariff block for 400/220 kV 315 MVA Transformer at Jeypore along with associated Bays in Eastern Region. 09.10.2015

Petition No. 224/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff for 2014-19 tariffblock for Rangit Transmission System in Eastern Region. 09.10.2015

Petition No. 175/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for 400 KV S/C Jamshedpur – Rourkela (Ckt. II) transmission line along with associated bays in Eastern Region. 28.09.2015

Petition No. 176/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for Hathidah River Crossing section of 220 kV D/C Biharshariff- Begusarai Transmission Line in Eastern Region. 28.09.2015

Petition No. 183/TT/2014
Petition for determination of Truing up transmission tariff for 2009-14 tariff block and of transmission tariff for 2014-19 tariff block for 400 kV Biharshariff- Sasaram- Sarnath Transmission Lines along with bays etc under Eastern-Northern inter-regional HVDC Transmission System in Eastern Region. 28.09.2015

Petition No. 200/TT/2014
Petition for Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of 400 kV D/C Bongaigaon-Malda Line at Purnea & sub-station at Purnea (New) in Eastern Region. 28.09.2015

Petition No. 173/TT/2014
Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for LILO of 1st Ckt. (Asset-1) and 2nd Ckt. (Asset-II) of Patratu-Hatia-Chandil 220 kV D/C Line at Ranchi Sub-Station (Notional DOCO – 01.09.2007) associated with 220kV Interconnection with Jharkhand State Electricity Board (JSEB) system at Ranchi Sub-Station in Eastern Region. 28.09.2015

Petition No. 182/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Dehri – Karamnasa transmission System in Eastern Region. 28.09.2015

Petition No. 198/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for LILO of Purnia -Dalkola 132 kV S/C line and extension at Purnia Sub-station in Eastern Region. 28.09.2015

Petition No. 199/TT/2014
Truing up transmission tariff for 2009-14 tariff block and determination of transmission tariff for 2014-19 tariff block for Bihar grid strengthening scheme in Eastern Region. 28.09.2015

Petition No.142/TT/2015
Petition for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset I: 1 No of 125 MVAR Reactor at Rourkela & associated bay under Transmission System for Eastern Region Strengthening Scheme-VIII in ER. 09.09.2015

Petition No.136/TT/2015
Determination of Transmission Tariff from anticipated DOCOs to 31/03/2019 for Asset I: Split Bus Arrangement at Durgpaur Sub-station, and Asset II: Split Bus Arrangement at Maithon Sub-station under Split Bus arrangement for various substations in Eastern Region. 09.09.2015

Petition No.106/TT/2014
Approval for determination of transmission Tariff of Asset 1: 400 KV D/C (Quad) ranchi (New)-Ranchi(old)I CKT I Transmission line and associated 400 KV line bays at Ranchi (New) S/S & Ranchi (old) Sub-station (DOCO: 01.02.2014), Asset 2: 765/415 KV, 3X500 MVA ICT-II at Ranchi alongwith asssociated bays at 765 KV Ranchi (New) SS (DOCO: 01.02.2014) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via in Western region for tariff block 2009-14 period. 07.09.2015

Petition No.105/TT/2014
Approval for determination of Transmission Tariff from DOCO to 31.03.2019 for Asset: Combined assets of Ranchi (i) 400 KV D/C (Quad) Ranchi (old)- Ranchi (New)-I Ckt II transmission line along with associated bays at Ranchi (old) and Ranchi (New);(ii) 400 KV D/C (quad) Ranchi (old)- Ranchi (New)-II transmission line along with associated bays at Ranchi (old) and Ranchi(New);(iii) 765/400KV, 3x500 MVA ICTI at along with associated bays at 765 KV Ranchi(New) S/s under Common Scheme for 765 KV Pooling Stations and Network for NR (Common for Sasan UMPP+ NKP+Maithon/Koderma/Mejia/Bokaro/Raghunathpur/Durgapur+ Import by NR from ER and from NER/SR/WR via ER) and common scheme for network for WR (Common for NKP+ Maithon/Koderma/Mejia/Bokaro+ Raghunathpur/Durgapur+ Import by WR from ER and from NER/SR/WR via ER in Western Region. 07.09.2015

Petition No.62/TT/2015
Approval of transmission tariff for assets associated with nrsss xxvii in northern region for tariff block 2014-19. 07.09.2015

Petition No.127/TT/2014
Determination of Transmission Tariff for LILO of both circuits of Tuticorin JV- Madurai 400 kV D/C (Quad) line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin (initially charged at 400 KV) including 1X 80 MVAR, 400 KV Bus Reactor under Transmission System associated with Common System Associated with Costal Energen Private Limited & Ind- Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area- PART-A in SR. 01.09.2015

Petition No. 405/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for Vijayawada-Nellore 400 kV D/C line along with the extension of 400/220 kV substations at Vijayawada & Nellore AP and 1x63 MVAR line reactor at both ends of each circuit of Vijayawada-Nellore 400 kV D/C line under Transmission system associated with System strengthening –XVIII in southern regional grid. 11.09.2015

Petition No. 117/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for Asset-I: 400 kV, 125 MVAR Bus Reactor at Raipur sub-station, Asset:2: 400KV, 125MVAR Bus Reactor at Seoni sub-station, Asset-3: 400 kV, 63 MVAR Line Reactor at Raipur Substation under Installation of Reactors (Part-II) in WR. 11.09.2015

Petition No.137/TT/2015
Approval of transmission tariff for LILO of 2nd circuit of 400 kV Nathpa Jhakri-Nalagarh (Triple Snowbird) Line at Rampur under Transmission System associated with Rampur HEP in Northern Region. 01.09.2015

Petition No.132/TT/2015
Approval of transmission tariff for Asset I: Balance portion of 400 kV D/C KodarmaGaya T/L CKT-II including multi circuit portion, Asset II: Balance portion of 400 kV D/C Kodarma-Gaya T/L CKT-I including multi circuit, and Asset III: 400 kV D/C Bokaro TPS Extension- Kodarma TPS Line and PLCC Equipment for Kodarma TPS- Bokaro TPS line associated with Supplementary Transmission System under DVC and Maithon Right Bank Project in Eastern Region for tariff block 2014-19. 01.09.2015

Petition No.245/TT/2014
Determination of Transmission tariff for assets under Common System associated with ISGS projects in Krishnapatnam area of AP”” for tariff block 2014-19. 24.08.2015

Petition No.307/TT/2013
Transmission Tariff for Asset-I 765/400 kV 3*500MVA ICT-2 at Raigarh PS (Near Tamnar) alongwith with associated bays, Asset-II 765/400 kV 3*500 MVA ICT-3 at Raigarh PS (Near Tamnar) alongwith with associated bays and Asset-III 765 kV S/C Champa Pooling Station -Dharamjaygarh S/s T/L & Bays at Dharmjaygarh S/s only under Establishment of Pooling station at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/WR1-IPPB) in Western Region for tariff block 2009-14. 25.08.2015

Petition No.32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for Tariff Block 2009-2014. 25.08.2015

Petition No.38/TT/2014 & 141/TT/2015
Determination of transmission tariff for assets associated with Transmission System for connectivity of M.B. Power (M.P.) Limited in Western Region (Petition No. 38/TT/2014) and Determination of transmission tariff for MB TPS (Anuppur)- Janalpur Pooling Station 400 kV D/C (Triple Snowbird) Line under “Transmission System for connectivity of MB Power Ltd.” in Western Region for tariff block 2014-19 24.08.2015

Petition No.242/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 Damoh S/S (anticipated DOCO 15.8.2014), (B) 1*125 MVAR Bus Reactor at 400 kV Bachau S/S (anticipated DOCO 1.9.2014) (C) 1*125 MVAR Bus Reactor at 400 kV Pirana S/S (anticipated DOCO 1.9.2014) (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi S/S (anticipated DOCO 15.7.2014) (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi S/S (anticipated DOCO 15.9.2014) (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior S/S (anticipated DOCO 1.7.2014) under Installation of Reactors (Part-II) in Western Region. 20.08.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Western Region. 20.08.2015

Petition No.110/TT/2014
Determination of transmission tariff from DOCO to 31.03.2019 for Establishment of 2x315 400/220 kV GIS S/S at Kala in UT of D&NH & LILO on one circuit of 400 kV D/C Vapi – Navi Mumbai Transmission Line at Kala S/S (Multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220 kV GIS Substation at Kala in UT D&NH in Western Region. 20.08.2015

Petition No.287/TT/2013
Determination of transmission tariff for 400 kV D/C (Quad) Vadodara-Asoj Transmission Line along with associated bays at Asoj (GETCO Sub-station) under System Strengthening Scheme in North/West Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 kV D/C Vadodara-Pirana Tr. Line) by passing Vadodara Pooling Sub-station under interim arrangement in Western Region for tariff block 2009-14. 20.08.2015

Petition No.166/TT/2013
Determination of transmission tariff (i) Raighar pooling station (Near Kotra)-Raipur pooling station (near Tamnar) 765 kV D/C T/L with associated bays, (ii) 765/400 kV 1500 MVA Auto-Transformer and 765 kV 4*80 MVAR Bus Reactor at Raighar (near Tamnar) with associated bays under “Establishment of pooling stations at Raighar (near Kotra) and Raighar (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/ WRI-IPPB)” in Western Region for tariff block 2009-14. 20.08.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Western Region. 20.08.2015

Petition No.100/TT/2014
) Approval under regulation-4(3(ii) of CERC (Terms and conditions of Tariff) Regulations' 2104 and Regulation-24 of CERC (Conduct of Buisness) Regulations' 1999 for commissioning date. 20.08.2015

Petition No. 99/TT/2014
Approval under regulation-86 of CERC (Conduct of Buisness) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of transmission tariff from DOCO to 31.3.2019 for 400/220 kV, 315 MVA ICT-II along with associated bays at Hamirpur S/S in Northern Region. 20.08.2015

Petition No.29/TT/2014
Determination of transmission tariff from DOCO to 31.3.2014 for "400 kV Dharampuri (Salem New) – Simanahalli 400 kV D/C Quad Line along with Bay Extensions at Dharamapuri (Salem New) and Somanahalli Substation" under Transmission System associated with "System Strengthening in Southern Region – XIV" in Southern Region for tariff block 2009-14. 20.08.2015

Petition No. 25/TT/2014
Determination of transmission tariff for 400 kV Salem Pooling Station-Salem 400 kV D/C Quad Line along with new 765/400 kV Pooling Station at Salem (initially charged at 400 kV) and Bay Extension at Salem 400/220 kV existing Sub-station(Asset I) under Transmission System associated with Common System Associated with Costal Energen Private Limited & Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area-part-B in Southern Region. 18.08.2015

Petition No. 109/TT/2014
Determination of transmission tariff for Asset-I: 400/220 kV 1X500 MVA Transformer at Navasari Sub-station, Asset-II: 2 nos 400 kV line bays at 765/400 kV Indore Sub-station, Asset III: 2 nos 220 kV line bays at 400/220 kV Pirana Sub-station under “Augmentation of Transformer and Bays” in Western Region. 19.08.2015

Petition No.34/TT/2013
Transmission Tariff for D/C Kisenpur Wagoora T/L alongwith bays at New Wanpoh and other elements in NRSS-XVI. 19.08.2015

Petition No.101/TT/2014
Determination of Transmission Tariff from DOCO to 31.3.2014 for 3X110 MVAR Line reactor for 2 Nos. 80 MVAR Line reactor for 400 kV D/C Wardha – Aurangabad TL Ckt#1 & 2 charged as bus reactor 1 & 2 at 400/220 kV Aurangabad S/S under Mundra UMPP in Western Region. 19.08.2015

Petition No.301/TT/2013
Determination of transmission tariff for (A) 400 kV 125 MVAR bus reactor at 765 kV Indore sub-station along with associated bays (B) 400 kV 125 MVAR bus reactor-I and bus reactor-II at 765 kV Gwalior sub-station along with associated bays (C)765 kV D/C Jabalpur pooling station-Bina ckt-I with 240 MVAR switchable line reactors and associated bays (D) 765 kV D/C Jabalpur Pooling station-Bina Ckt-II with 240 MVAR switchable line reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 19.08.2015

Petition No.241/TT/2013
Determination of transmission tariff for 220 kV D/C Vapi-Khadoli transmission line along with its associated bays under WRSS-V Transmission System in Western Region. 17.8.2015

Petition No.116/TT/2014
Approval for determination of Transmission Tariff from DOCO to 31.03.2019 for (A) 420KV, 125MVAR Bus Reactor at Jabalpur sub-station (DOCO: 01.04.2014)(C)420KV, 125MVAR Bus Reactor at Bhatapara Substation(Ant DOCO:01.07.2014)(D) 420KV, 125MVAR Bus Reactor at Raighar Substation (Ant DOCO:01.07.2014)(E) 420KV, 80MVAR Switchable Line Reactor at Solapur Substation(Ant. DOCO:01.07.2014)(F) 420KV, 125MVAR Bus Reactor at Aurangabad Substation(DOCO30.04.2014) under “Installation of Reactors” in Western Region. 17.8.2015

Petition No.115/TT/2014
Determination of transmission tariff for Asset-I: 765 kV 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and Asset-II: 765 kV, 240 MVAR Switchable line reactor of 765 kV D/C Aurangabad-Padghe line Ckt-II to be charged as bus reactor at Aurangabad Sub-station under “System Strengthening in North/West part of WR for IPP Projects in Chhatisgarh (IPP-E)” in Western Region. 17.8.2015

Petition No.108/TT/2014
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for Tariff block 2009-14 period in Northern Region. 17.8.2015

Petition No. 37/TT/2013
Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for Tariff block 2009-14 period in Northern Region. 17.8.2015

Petition No. 106/TT/2014
Determination of transmission tariff for assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region. 07.08.2015

Petition No.422/TT/2014
Determination of transmission tariff for assets under “Transmission System for Phase-I Generation Projects in Orissa Part-C” for tariff block 2014-19. 06.08.2015

Petition No.303/TT/2013
DeterminationDetermination of transmission tariff for Asset-I: 765/400 kV, 1500 MVA ICT-1 along with associated bays at Jabalpur pooling sub-station (New) and Asset-II: 400 KV D/C (Quad) Jabalpur pooling sub-station (New)-Jabalpur (existing) sub-station T/L along with associated bays under “Transmission System for Phase-1 Generation projects in Orissa-part B” in Western Region for tariff block 2009-14 period. 05.08.2015

Petition No.40/TT/2014
Determination of Transmission tariff for 765/400 kV, 1X1500 MVA, ICT-1 at Dharmjaygarh Sub-station along with associated bays under “Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 04.08.2015

Petition No.305/TT/2013
Determination of Transmission tariff for 765/400 kV, 1X1500 MVA, ICT-2 at Dharmjaygarh Sub-station along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh. 03.08.2015

Petition No. 107/TT/2014
Determination of Transmission Tariff from 01.04.2014 to 31/03/2019 for (A) 765 kV S/C Bareilly- Lucknow Transmission Line at 400 KV Level, (B) One Circuit of 400 kV D/C Bareilly (New) - Bareilly (Existing) Transmission Line under "Northern Region System Strengthening Scheme XXI" in Northern Region. 03.08.2015

Petition No. 281/TT/2013
Determination of transmission tariff from DOCO to 31.3.2014 for augmentation of Hosur sub-station by 1x315 MVA 400/220 kV transformer and associated bays (Ant. DOCO: 1.2.2014) under System Strengthening – XIV in Southern Region. 03.08.2015

Petition No. 124/TT/2014
Approval for determination of Truing up transmission tariff for 2009-14 tariff block and transmission tariff for 2014-19 tariff block for (a) LILO of Nagarjunsagar –Raichur 400 kV S/C Line at Mehboobnagar and (b) LILO of both the Circuits of Nellor – Sriperumbudur 400 kV D/C line at Almathi along with associated bays under system Strengthening Scheme-IV in Southern Region. 29.07.2015

Petition No. 102/TT/2014
Determination of transmission tariff for LILO of existing Kolar – Sriperumbudur 400 kV S/C line at Thiruvalam along with the associated bays under "System Strengthening – XIX" in Southern Region for tariff block 2014-19 . 30.07.2015

Petition No. 48/TT/2013
Determination of transmission tariff for Vallur TPS- Melakottaiyur 400 kV D/C Line under supplementary Transmission System associated with Vallur TPS for the period from COD to 31.3.2014 in Southern Region for tariff block 2009-14. 03.08.2015

Petition No. 105/TT/2014
Approval for transmission tariff of Combined Assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for Network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2014-19. 29.07.2015

Petition No. 291/TT/2013
Determination of transmission tariff for Line Bays and Rectors at 765/400 kV Raichur and Solapur Powergrid S/S for Raichur-Solapur Transmission Line under Transmission System associated with Synchronous Inter- Connection between SR and WR in SR & WR. 29.07.2015

Petition No. 227/TT/2014
Determination of transmission Tariff for assets under Line bays and reactor provision at Powergrid Sub-station associated with system strengthening for Western Region. 20.07.2015

Petition No. 185/TT/2014
Determination of transmission tariff of assets under Transmission System associated with Mundra Ultra Mega Power Project (UMPP) in Western Region from COD to 31.3.2014. 15.07.2015

Petition No. 436/TT/2014
Determination of transmission tariff for 400 kV D/C Sagardighi-Behrampur transmission line and associated bays at Sagardighi TPS (WBPDCL) and Behrampur Sub-station (Powergrid) under Transmission System for ‘’Eastern Region Strengthening Scheme-X in Eastern Region from COD to 31.3.2019. 15.07.2015

Petition No.258/TT/2013
Determination of transmission tariff for Tiruvalam (Powergrid)-Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipment under Supplementary Transmission system associated with Vallur TPS in Southern Region from COD to 31.3.2014 17.7.2015

Petition No. 141/TT/2015
Determination of Transmission Tariff from DOCO to 31.3.2019 for MB TPS (Annuppur)-Jabalpur Pooling Station 400 kV D/C (Triple Snowbird) Line only under "Transmission System for connectivity of MB Power (M.P.) Ltd." in Western Region for tariff block 2014-19. 16.7.2015

Petition No.487/TT/2014
Determination of Fees and Charges for Fibre Optic Communication System in lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links (Part-II) in Southern Region for the period 2009-14. 13.7.2015

Petition No. 28/TT/2014
Determination of transmission tariff for “Loop-out of 220 kV Jalandhar-Hamirpur line at Hamirpur (to be used as LILO of 1st Ckt of 220 kV Hamirpur-Jalandhar T/L)” (COD: 1.1.2014) under Strengthening Scheme in Northern Region, for the tariff block 2009-14 period in Northern Region. 10.7.2015

Petition No. 337/2010
Order dated 18.05.2015 in pettition no. 337/2010 on TDS reg. 07.7.2015

Petition No. 29/TT/2014
Determination of transmission tariff from DOCO to 31.3.2014 for "400 kV Dharampuri (Salem New) – Simanahalli 400 kV D/C Quad Line along with Bay Extensions at Dharamapuri (Salem New) and Somanahalli Substation" under Transmission System associated with "System Strengthening in Southern Region – XIV" in Southern Region for tariff block 2009-14. 29.6.2015

Petition No. 242/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for (A) 1*125 MVAR Bus Reactor at 400 Damoh S/S (anticipated DOCO 15.8.2014), (B) 1*125 MVAR Bus Reactor at 400 kV Bachau S/S (anticipated DOCO 1.9.2014) (C) 1*125 MVAR Bus Reactor at 400 kV Pirana S/S (anticipated DOCO 1.9.2014) (D) 1*125 MVAR Bus Reactor-1 at 400 kV Itarsi S/S (anticipated DOCO 15.7.2014) (E) 1*125 MVAR Bus Reactor-2 at 400 kV Itarsi S/S (anticipated DOCO 15.9.2014) (F) 1*125 MVAR Bus Reactor at 400 kV Gwalior S/S (anticipated DOCO 1.7.2014) under Installation of Reactors (Part-II) in Western Region. 29.6.2015

Petition No.298/TT/2013
Determination of transmission tariff for 02 Nos 400 kV Line Bays at 400 kV Ranchi Sub-station for Raghunathpur TPS-Ranchi Transmission Line under “Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER” in Eastern Region for tariff block 2009-14 period. 10.6.2015

Petition No.142/TT/2014
Determination of transmission tariff for extension of bays at 765/400 kV Indore Sub-station including Switchable Line Reactor (3*80 MVAR, 765 kV) at Indore (initially charged as bus reactor under Interim Contingency Scheme till readiness of 765 kV S/C Indore-Vadodara T/L) & 765 kV Indore-Vadodara T/L (for direct inter-connection with 400 kV D/C Vadodara-Asoj T/L) by- passing Vadodara Pooling S/S under Interim Contingency Scheme under IPP projects in MP & Chhatisgarh in Western Region. 10.6.2015

Petition No.243/TT/2014
Determination of transmission tariff for Special Protection Scheme (SPS) for Northern Regional Grid Stage-II for tariff block 2014-19 in Northern Region. 27.5.2015

Petition No.115/TT/2014
Determination of transmission tariff for Asset-I: 765 kV 240 MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad Sub-station and Asset-II: 765 kV, 240 MVAR Switchable line reactor of 765 kV D/C Aurangabad-Padghe line Ckt-II to be charged as bus reactor at Aurangabad Sub-station under “System Strengthening in North/West part of WR for IPP Projects in Chhatisgarh (IPP-E)” in Western Region. 26.5.2015

Petition No.109/TT/2014
Determination of transmission tariff for Asset-I: 400/220 kV 1X500 MVA Transformer at Navasari Sub-station, Asset-II: 2 nos 400 kV line bays at 765/400 kV Indore Sub-station, Asset III: 2 nos 220 kV line bays at 400/220 kV Pirana Sub-station under “Augmentation of Transformer and Bays” in Western Region. 25.5.2015

Petition No. 110/TT/2014
Determination of transmission tariff from DOCO to 31.03.2019 for Establishment of 2x315 400/220 kV GIS S/S at Kala in UT of D&NH & LILO on one circuit of 400 kV D/C Vapi – Navi Mumbai Transmission Line at Kala S/S (Multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220 kV GIS Substation at Kala in UT D&NH in Western Region 20.5.2015

Petition No. 163/TT/2013
Determination of transmission tariff for 500 MVA 400/220 KV ICT at Moga (DOCO: 1.7.2013) under the Augmentation of Transformation capacity in NR- Part A for Tariff Block 2009-14 in NR 18.5.2015

Petition No. 60/TT/2013
Approval of Transmission tariff for Asset-I: Part of 400 kV D/C Vapi-Navi Mumbai transmission line (from Vapi Gantry till 1st M/C point at Loc. AP-18) along with bay at Vapi under “WRSS-V Transmission System (executed in contingency arrangement to make it Vapi-Navsari TL)” in Western Region for the period from COD to 31.3.2014. 14.05.2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014 20-03-2015

Petition No. 47/TT/2014
Determination of transmission tariff for Assets under "Transmission system strengthens in Western part of WR for IPPs generation projects in Chhattisgarh (IPP D)" in Western Region for the period from COD to 31.3.2014. 14.05.2015

Petition No.44/TT/2014
Determination of transmission tariff for (a) 3x80 MVAR line reactor with associated bays at Gwalior Sub-station used as bus reactor till commissioning of 765 kV Bina-Gwalior Ckt-3, (b) 3x80 MVAR line reactor with associated bays at Bina Sub-station to be used as bus reactor till commissioning of 765 kV Bina-Gwalior Ckt-3, (c) 765 kV S/c Bina-Gwalior Ckt-3 under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for tariff block 2009-14. 08.05.2015

Petition No. 91/MP/2014
Non-submission of the details of backing down instructions issued by SLDC, Tamil Nadu to wind energy sources and conventional energy sources generators as per the specified format. 07.05.2015

Petition No.450/TT/2014
Determination of transmission tariff for Asset-I:3x80 MVAR switchable line reactor for 765 kV S/C Gaya-Balia transmission line at Gaya Sub-station, Asset- II:3x80 MVAR switchable line reactor for 765 kV S/C Ranchi-Dharamjaygarh transmission line along with associated bays at Ranchi Sub-station as bus reactor and Asset-III:3x80 MVAR switchable line reactor for 765 kV S/C Gaya-Varanasi transmission line along with associated bays at Gaya Sub-station as Bus Reactor under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal Part -A2. 08.05.2015

Petition No. 41/TT/2013
Approval of transmission tariff for Asset-I:765 kV 240 MVAR Switchable Line Reactor under Bus Reactor at Balia Sub-station and Asset-II: 765 kV Line bays at Sasaram Sub-station (for 765 kV Sasaram-Fatehpur TL under SASAN Project) from DOCO to 31.3.2014. 07.05.2015

Petition No. 362/TT/2014
Approval of transmission tariff for 500 MVA 400/220 kV spare transformer for Northern Region at Neemrana under Augmentation of Transformers in Northern region part-A of Northern region, for tariff block 2009-14 in Northern Region. 06.05.2015

Petition No. 98/TT/2013
Determination of transmission tariff for spare ICT at Bhiwadi under Provision of Spare interconnecting transformers (ICTs) and Reactors for Northern, Eastern, Southern and Western Region for tariff block 2009-14. 06.05.2015

Petition No.35/TT/2013
Approval of transmission tariff for 400 kV D/C Kishenpur-Samba transmission line along with bays at both ends, 01 no. 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 3 nos. 220 kV line bays under Northern Region System Strengthening scheme-XXII in Northern Region for tariff block 2014-19. 01.05.2015

Petition No.77/TT/2015
Approval of transmission tariff for Asset: 2 nos. 400 kV line bays at Bhiwani (POWERGRID) Sub-station under “Construction of 2 nos. 400 kV line bays at Bhiwani” in Northern Region. 01.05.2015

Petition No.26/TT/2014
Determination of Transmission Tariff for "500 MVA, 400/220/33 kV ICT-II along with associated bays at Moga sub-station" and "500 MVA 400/220/33 kV ICT-II along with associated bays at Ludihana sub-station" under the "Augementation of transformation capacity in Northern Region- Part-A" for tariff block 2009-14 period in Northern Region 28.4.2015

Petition No.477/TT/2014
Approval of transmission tariff for 80 MVAR Bus Reactor at Kotputli Sub-station under Northern Region System Strengthening Scheme-XV in Northern Region (Actual COD: 10.9.2014) for tariff block 2014-19. 29.4.2015

Petition No.410/TT/2014
Approval of transmission tariff for six assets (A) ICT 500 MVA 400/220 kV Bassi Extension Sub-station, (B) ICT 315 MVA 400/220 kV Allahabad Extension Sub-station, (C) ICT 500 MVA 400/220 kV Meerut Extension Sub-station, (D) 400/220 kV, 105 MVA ICT along with associated bays at Wagoora Sub-station, (anticipated DOCO for assets from (A) to (D)- 1.11.2014), (E) 500 MVA, 400/220/33 kV ICT along with associated bays at Ludhiana Sub-station (actual DOCO-1.4.2014) and (F) 2 no. of 220 kV bays at Ludhiana Sub-station (anticipated DOCO-1.11.2014) under the “Augmentation of Transformers in Northern Region-Part-A. 28.4.2015

Petition No.202/TT/2014
Approval of transmission tariff from COD 31.3.2019 for Asset-1 – Splitting of 400KV Raipur Bus through Bus Sectionaliser into two sections at a point between existing Line Bays of Chandrapur – 1 and Chandrapur – 2 and shifting of Chandrapur – 2 and Chandrapur – 3 Line Bays from section Raipur B to Raipur A under “Split Bus arrangement and Reconfiguration/Shifting of terminating lines at Raipur 400KV S/S” in western region. 22.4.2015

Petition No.192/TT/2014
Approval of transmission tariff for 3*80 MVAR, 765KV Line Reactor along with associated bays at Gwalior S/S only (to be used as Bus Reactor under interim contingency scheme, till readiness of 765 S/C Gwalior-Jaipur Transmission Line) (DOCO: 1.3.2014) associated with Vindhyachal IV & Rihand III (I000 MW) Generation Project (under interim /contingency arrangement for power evacuation) in Western region for tariff block 2009-14. 23.4.2015

Petition No.301/TT/2013
Determination of transmission tariff for (A) 400 kV 125 MVAR bus reactor at 765 kV Indore sub-station along with associated bays (B) 400 kV 125 MVAR bus reactor-I and bus reactor-II at 765 kV Gwalior sub-station along with associated bays (C)765 kV D/C Jabalpur pooling station-Bina ckt-I with 240 MVAR switchable line reactors and associated bays (D) 765 kV D/C Jabalpur Pooling station-Bina Ckt-II with 240 MVAR switchable line reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 15.4.2015

Petition No.165/TT/2014
Determination of transmission tariff for 420 kV 125 MVAR bus reactor at Shujalpur sub-station under “Installation of Reactors” in Westermn Region. 15.4.2015

Petition No.36/TT/2013
Determination of transmission tariff for for LILO of one circuit of Neyveli-Trichy 400 kV line at Nagapattinam pooling station for initial arrangement which later shall be bypassed under “Transmission System associated with Common Transmission Scheme associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu Part-A1(a)” in Southern Region for tariff block 2009-14. 10.4.2015

Petition No. 101/TT/2014
Determination of Transmission Tariff from DOCO to 31.03.2014 for 3X110 MVAR Line reactor for 2 Nos. 80 MVAR Line reactor for 400 kV D/C Wardha – Aurangabad TL Ckt#1 & 2 charged as bus reactor 1 & 2 at 400/220 kV Aurangabad S/S under Mundra UMPP in Western Region. 10.4.2015

Petition No. 36/TT/2013
Determination of transmission tariff of Asset I: Northern Region System Strengthening Scheme-XX (NRSSS-XX) of Northern Region from Anticipated DOCO (1.3.2013) to 31.3.2014 for tariff block 2009-14. 10.4.2015

Petition No. 17/TT/2014
Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 10.4.2015

Petition No. 248/TT/2013
Determination of Transmission Tariff of 765 kV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s (DOCO: 1.3.2013) under Common Scheme for 765 kV Pooling Stations and Network for NR , Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR 10.4.2015

Petition No. 37/TT/2013
Determination of transmission tariff for transmission assets (Group-4) associated with 765 kV system for Central Part of Northern Grid Part-II, for tariff block 2009-14 in Northern Region. 10.4.2015

Petition No. 22/TT/2014
Petition for approval under sub-section(4) of Section 28 and Section-79(1)(d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in Northern Region for the period 2009-14 block. 10.4.2015

Petition No. 96/TT/2014
Determination of Transmission Tariff from DOCO to 31.03.2014 for 240 MVAR, 765 kV Line reactor for 765 kV S/C Solapur – Pune TL charged as Bus reactor at Solapur SS under Transmission system associated with Krishnapatnam UMPP Part B in Western Region. 10.4.2015

Petition No. 258/TT/2013
Determination of transmission tariff for Tiruvalam (POWERGRID)-Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under supplementary transmission system associated with Vallur TPS in Southern Region for tariff block 2009-14. 25-03-2015

Petition No. 100/TT/2014
Approval under regulation-4(3(ii) of CERC (Terms and conditions of Tariff) Regulations' 2104 and Regulation-24 of CERC (Conduct of Buisness) Regulations' 1999 for commissioning date. 09-04-2015

Petition No. 99/TT/2014
Approval under regulation-86 of CERC (Conduct of Buisness) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations '2014 for determination of transmission tariff from DOCO to 31.3.2019 for 400/220 kV, 315 MVA ICT-II along with associated bays at Hamirpur S/S in Northern Region. 09-04-2015

Petition No. 107/TT/2014
Approval of transmission charges for Asset I: 765 KV S/C Bareilly-Lucknow Transmission Line at 400 kV level and Asset II: One Circuit of 400 kV D/C Bareilly (New) Bareilly (New) Bareilly (Existing) Transmission Line in Northern Region under "Northern Region System Strengthening Scheme XXI" for tariff block 2014-19. 27-03-2015

Petition No.281/TT/2013
Determination of transmission tariff for Augmentation of Hosur Sub-station by 1x315 MVA 400/220 kV transformer and associated bays under System Strengthening - XIV in Southern Region. 24-03-2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014. 20-03-2015

Petition No. 91/TT/2012
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulation, 2009 for determination of transmission tariff from DOCO to 31.3.2014 for Combined Assets for transmission system associated with PARBATI-III-HEP in Northern Region for tariff block 2009-14 period. 10-03-2015

Petition No. 22/TT/2014
Approval under sub-section (4) of Section 28 and Section 79 (1) (d) of Electricity Act 2003 for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave links (Part-II) in Northern Region of for the period 2009-14. 02-03-2015

Petition No. 450/TT/2014
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2014 for determination of transmission tariff from DOCO to 31.3.2019 for Asset I : 3X80 MVAR Switchable line reactor for 765 KV S/C Gaya-Balia Transmission line at Gaya Sub-station, Asset II: 3X80 MVAR Switchable line Reactor for 765 KV S/C Ranchi-Dharamjaygarh Transmission Line along with associated bays at Ranchi Sub-station as Bus Reactor and Asset III: 3X80 MVAR Switchable line Reactor for 765 KV S/C Gaya -Varanasi Transmission Line along with associated bays at Gaya Sub-station as Bus Reactor under "Transmission System for Phase I Generation Projects in Jharkhand and West Bengal Part A 2". 27-02-2015

Petition No. 104/TT/2013
Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulation' 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff for Asset-I: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line; Asset II: Reconductoring Ckt-II of 400 kV D/C Siliguri- Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated DOCO (1.6.2013) to 31.3.2014. 27-02-2015

Petition No.45/TT/2014
Determination of Transmission Tariff for 765 KV D/C Champa Pooling Station-Raipur Pooling Station Transmission Line with associated bays at Raipur PS under Establishment of Pooling stations at Champa & Raigarh (near Tamnar (for IPP Generation Projects in Chhattisgarh (Set B/WR1-IPPB) in Western Region. 27-02-2015

Petition No.40/TT/2014
Determination of Transmission Tariff for 765/400 kV, 1X1500MVA, ICT-1 at Dharmjaygarh Sub-station along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 23-02-2015

Petition No. 29/MP/2014
Petition under Section 38 (2) of the Electricity Act, 2003 read with Section 79 (1) (c) and (k) of the Act, along with- (i) Central Electricity Regulatory Commission (Grant of Regulatory approval for execution of inter-State transmission scheme to Central Transmission Utility) Regulations, 2010; (ii) Regulations 111 and 114 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999; (iii) Central Electricity Regulatory Commission (Sharing of inter-State Transmission charges and losses) Regulations, 2010; and Grant of Regulatory Approval for execution of the transmission system for Ultra Mega Solar Power Park (UMSPP) having capacity of 1000 MW in Anantpur district, Andhra Pradesh. 24-02-2015

Petition No. 53/TT/2013
Transmission tariff for 400 KV D/C Raipur Wardha TL alongwith FSC at Wardha under WRSS-II Set A Scheme of WR. 11-02-2015

Petition No 307/TT/2013
Transmission Tariff for Asset-I 765/400 kV 3*500MVA ICT-2 at Raigarh PS (Near Tamnar) alongwith with associated bays, Asset-II 765/400 kV 3*500 MVA ICT-3 at Raigarh PS (Near Tamnar) alongwith with associated bays and Asset-III 765 kV S/C Champa Pooling Station -Dharamjaygarh S/s T/L & Bays at Dharmjaygarh S/s only under Establishment of Pooling station at Champa & Raigarh (near Tamnar) for IPP Generation Projects in Chhatisgarh (Set B/WR1-IPPB) in Western Region for tariff block 2009-14. 19-02-2015

Petition No. 91/TT/2012
Determination of Transmission Tariff from DOCO to 31.3.2014 for combined assets for transmission system associated with Parbati-III-HEP in Northern Region for tariff block 2009-14. 01-01-2015

Petition No. 415/TT/2014
Approval of Transmission Tariff for Solapur STPP (2x660 MW)" in Western Region. 10-12-2014

Petition No. 422/TT/2014
Determination of transmission tariff for assets under transmission system for phase-1 Generation Projects in Odisha - Part-C . 08-12-2014

Petition No. 404/TT/2014
Determination of transmission tariff for 400/220 kV, 2x315 MVA GIS and LILO of 400 kV D/C Navsari-Boisar TL at 400/220 kV GIS S/S (New) at Magarwada in UT of D&D along with associated bays and 80 MVAR Bus Reactor under "Establishment of 400/220 kV GIS at Magarwada in UT of D&D" in Western Region. 08-12-2014

Petition No. 118/TT/2014
Transmission System for assets under Transmission System for "Transfer of Power from Generation Projects in Sikkim to NR/WR-Part-B" in Eastern Region. 04-12-2014

Petition No.405/TT/2014
Approval Transmission Tariff for Vijaywada-Nellore 400 kV D/C line along with the extension of 400/220 kV substation at Vijaywada & Nellore AP and 1X63 MVAR line reactor at both ends of each circuit of Vijaywada-Nellore 400kV D/C line under “Transmission System associated with system strengthening-XVIII in southern grid”. 18-11-2014

Petition No. 409/TT/2014
Determination of transmission tariff from DOCO to 31.3.2019 for Asset-I: 400 kV, 125 MVAR (3 Ph) Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling S/s, Asset-II: 765 kV, 3x80+1x80 (Spare) MVAR Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling S/s, and Asset-III: 765 kV bay for Dharamjaygarh ckt-#2 and 3x80 MVAR Line Reactor at 765/400 kV Jabalpur Pooling S/s (Interim Contingency as Bus Reactor) at Jabalpur Pooling S/s under "Transmission System for Phase-I Generation Projects in Orissa (Part-B)" in Western Region. 05-12-2014

Petition No.100/TT/2012
Transmission Tariff for Transmission assets (Group-2) associated with 765 kV system for Central Part of Northern Grid Part-II. 13-11-2014

Petition No. 32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for Tariff block 2009-2014. 26-09-2014

Petition No. 53/TT/2013
Approval of transmission tariff for 400 kV D/C Raipur – Wardha T/L alongwith FSC at Wardha under WRSS-II Set-A Scheme of Western Region for tariff block 2009-14. 15-09-2014

Petition No. TT/222/2014
Approval of transmission tariff for 63 MVAR Line Reactor on 400 kV Kolaghat- Rengali Line at Rengali Sub-station in ER. 03-09-2014

Petition No. TT/239/2014
Approval of transmission tariff for 50 MVA Auto Transformer at Malda Sub-station in ER . 03-09-2014

Petition No. 105/TT/2012
Approval of Transmission Tariff for (a) Kalpakkam PFBR-Sirucheri, D/C 230 kV Line (b) Kalpakkam PFBR-Arani, D/C 230 kV Line (c) Kalpakkam PFBR-Kanchipuram D/C 230 kV Lines under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 10-07-2014

Petition No. 87/TT/2012
Assets under Common Scheme for 765 KV Pooling Stations and Network for NR and Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 03-09-2014

Petition No. 67/TT/2012
Transmission Tariff for 400 KV D/C (Quad) Koderma -Gaya Transmission Line and associated bays at Gaya Sub-station associated with supplementary transmission System under DVC and Maithon right bank project in ER. 02-09-2014

Petition No. TT/122/2014
Approval of Transmission tariff for combined elements of (i) Additional bays at Kolar and Hosur for second circuit of Kolar- Hosur 400 kV D/C line, and (ii) 400 kV Hiryur sub-station, including 315 MVA auto transformer & LILO of Davangere- Hoody 400 kV D/C line at Hiryur with associated bays under System Strengthening Scheme-II in Southern Region. 27-08-2014

Petition No. TT/124/2014
Approval of transmission tariff for combined elements (a) LILO of Nagarjunasagar- Raichur 400 kV S/C Line at Mehboobnagar, and (b) LILO of both the Circuits of Nellore-Sriperumbudur 400kV D/C line at Almathi under System Strengthening Scheme-IV in Southern Region. 27-08-2014

Petition No. TT/123/2014
Approval of Transmission tariff for Special Energy Meters in Southern Region. 25-08-2014

Petition No. TT/127/2014
Approval of transmission tariff of LILO of both circuits of Tuticorin JV - Madurai 400 kV D/C (Quad) line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin (initially charged at 400 kV) including 1 x 80 MVAR, 400 kV Bus Reactor under Transmission System associated with Common System Associated with Coastal Energen Private Limited & Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area - PART-A in Southern Region. 27-08-2014

Petition No. TT/100/2014
Approval of Transmission Tariff for (A) LILO of 400 kV S/C Bhiwadi-Bassi T/L at Kotputli S/S, (B) 315 MVA 400/220 kV ICT-I & 2 with 6 nos. 220kV Line Bays at Kotputli S/S under "NRSSS XV" in Northern Region. 27-08-2014

Petition No. 116/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2019 for (A) 420 kV, 125MVAR Bus Reactor at Jabalpur sub-station and (B) 420 kV, 125 MVAR Bus Reactor at Khandawa sub-station (C) 420 kV,125 MVAR Bus Reactor at Bhatapara Substation (D) 420kV,125MVAR Bus Reactor at Raigarh Substation (E) 420kV, 80MVAR Switchable Line Reactor at Solapur Sub-station (F) 420 kV,125 MVAR Bus Reactor at Aurangabad Sub-station under “Installation of Reactors in Western Region. 19-08-2014

Petition No. 97/TT/2014
Determination of Transmission Tariff for 3x110 MVAR Line Reactor for 765 kV D/C Raipur PS - Wardha Line 1 Ckt#2 to be charged as Bus reactor at Wardha S/S under Integration of Pooling stations in Chhattisgarh with central part of WR for IPP generation projects in Chhattisgarh (IPP C) for tariff block 2009-14 period. 13-08-2014

Petition No. 89/TT/2012
Approval of Transmission Tariff for for ICTs at Jaipur-South & LILO of 400 KV D/C Balia-Lucknow Line at Sohawal- under NRSS. 28-07-2014

Petition No. 164/TT/2013
Determination of transmission tariff for combined Assets for transmission system associated with Augmentation of Transmission Capacity (Part-1) in Northern & Eastern Region for tariff block 2009-14. 10-07-2014

Petition No. 28/TT/2014
Approval of Transmission Tariff for “Loop-out of 220 kV Jalandhar-Hamirpur Line at Hamirpur (to be used as LILO of 1st circuit of 220 kV Hamirpur- Jalandhar T/L)” (DOCO: 1.1.2014) under the “strengthening scheme in Northern Region" for 2009-14 period in Northern Region. 10-07-2014

Petition No. 31/TT/2014
Approval of Transmission Tariff for Establishment of 2x315 MVA, 400/220 kV GIS S/S at Kala in UT of D&NH & Determination of Transmission Tariff for Asset (A)-Two nos. 63 MVAR 400 kV Line Reactor at 400 kV Balia (PG) substation (Extension) from DOCO (1.2.2014) to 31.03.2014 under Northern Region System Strengthening Scheme XXIV (NRSS-XXIV), for tariff block 2009-2014 in Northern Region. 10-07-2014

Petition No. 110/TT/2014
Approval of Transmission Tariff for Establishment of 2x315 MVA, 400/220 kV GIS S/S at Kala in UT of D&NH & LILO of one circuit of 400 kV D/C Vapi - Navi Mumbai Transmission Line at Kala S/S (multi-circuit tower) (Interim Contingency Arrangement), under Transmission System for establishment of 400/220kV GIS Substation at Kala in UT of D&NH in Western Region. 08-07-2014

Petition No. 115/TT/2014
Approval of Transmission Tariff for (A) 765kV, 240MVAR Switchable Line Reactor of 765 kV D/C Aurangabad-Padghe Line Ckt-I to be charged as Bus Reactor at Aurangabad substation and (B) 765 kV, 240MVAR Switchable Line Reactor of 765kV D/C Aurangabad-Padghe Line Ckt-II to be charged as Bus Reactor at Aurangabad substation under “System Strengthening in North/West part of WR for IPP Projects in Chhattisgarh(IPP-E)” in Western Region. 07-07-2014

Petition No. 97/TT/2014
Approval of Transmission Tariff for 3x110 MVAR Line reactor for 765 kV D/C Raipur PS – Wardha Line 1 Ckt#2 to be charged as Bus reactor at Wardha SS under Integration of Pooling Stations in Chhattisgarh with central part of WR of IPP generation projects in Chhattisgarh (IPP-C) for tariff block 2009-14 period. 07-07-2014

Petition No. 44/TT//2014
Approval of transmission tariff for assets under "Transmission System for Phase-I Generation Projects, in Orissa Part-C" in Western Region. 01-07-2014

Petition No. 33/TT/2014
Approval of Transmission Tariff for Sasan UMPP TS (Group 1) in Northern Region for tariff block 2009-14 . 27-06-2014

Petition No. 17/TT/2014
Petition for determination of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 11-06-2014

Petition No. 107/TT/2013
Approval of transmission tariff for Up-gradation of Transfer capacity of Talchar-Kolar HVDC Bipole for the period from 1.4.2009 to 31.3.2014. 11-06-2014

Petition No. 48/TT/2014
Approval of transmission tariff for assets under "Transmission System for Phase-I Generation projects in Orissa-Part B" in Western Region. 09-06-2014

Petition No. 47/TT/2014
Approval of Transmission Tariff for assets under “Transmission system strengthening in western part of WR for IPPs generation projects in Chhattisgarh (IPP D)" in Western Region. 11-06-2014

Petition No. 81/TT/2012
Transmission tariff for 1 no. 400 kV 63 MVAR Line Reactor at Cochin under Kudankulam ATS in SR. 10-06-2014

Petition No. 38/TT/2014
Transmission Tariff for assets associated with Transmission System for connectivity of M.B. Power (M.P.) Limited in Western Region. 09-06-2014

Petition No. 303/TT/2013
Transmission Tariff for (I) 765/400KV, 1500 MVA ICT-1 along with associated bays at Jabalpur Pooling S/S (New) and (2) 400 KV D/C (Quad) Jabalpur Pooling S/S (New)-Jabalpur (Existing) S/S T/L along with associated bays under Transmission System for Phase-1 Generation projects in Orissa-part B in Western Region. 06-06-2014

Petition No. 162/TT/2014
Transmission Tariff for (i) 400 KV D/C Raipur (Existing)- Raipur PS (Durg) T/L with associated bays, (2) 400 KV D/C Raighar PS (Near Kotra)- Raighar (existing) S/S T/L with associated bays, & (3) ICTSs & Reactors at Raighar (Kotra) and Raipur (Durg) with associated bays under Establishment of pooling stations at Raighar (Kotra) and Raipur for IPP Generation Projects in Chhatisgarh (Set A/ DPR-1) in WR for tariff block 2009-14. 06-06-2014

Petition No. 113/TT/2013
Approval of transmission tariff for 400 kV 1* 63 MVAR Bus Reactor along with associated 400 kV bays at Satna SS and 400 KV D/C QUAD BASSI-JAIPUR(RPVNL) LINE associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project in Western Region for tariff block 2009-14 period. 06-06-2014

Petition No. 91/TT/2012
Approval of Transmission Tariff for Combined Assets for Transmission System associated with Parbati-III-HEP in Northern Region for Tariff block 2009-14 period. 06-06-2014

Petition No. 61/TT/2013
Approval of Transmission Tariff of 400 kV 80 MVAR Bus Reactor along with associated bays at 400/220 kV Sikar Sub-station under System Strengthening scheme in Northern Region for Sasan & Mundra UMPPs for Tariff block 2009-2014 period. 03-06-2014

Petition No. 34/TT/2014
Approval of Transmission Tariff for Asset-I: Balance Portion of 400 kV D/C Jamshedpur-Baripada Tr. Line and associated bays at Jamshedpur (DOCO: 01.10.2013), Asset-II: 02 nos 400kV Bays at Durgapur S/s (DOCO: 01.02.2014) under ERSS-I in Eastern Region for tariff block 2009-14 period. 03-06-2014

Petition No. 26/TT/2014
Determination of transmission tariff for “500 MVA, 400/220/33 KV ICT-II along with associated bays at Moga S/s” and “500MVA, 400/220/33 KV ICT along with associated bays at Ludhiana S/s” under the “Augmentation of Transformation capacity in Northern Region-Part A” for Tariff block 2009-14 period in Northern Region. 06-06-2014

Petition No. 32/TT/2013
Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period . 29-05-2014

Petition No. 249/TT/2013
Transmission Tariff of Asset1: LILO of 400KV D/C Kahalgaon- Biharshariff T/L (1st Line) and associated bays at Lakhisarai S/s; Asset II: 400/132 KV, 200 MVA ICT-I along with associated bays at Lakhisarai S/s; Asset III: 400/132 KV, 200 MVA ICT-II along with associated bays at Lakhisarai S/s; Asset IV: 400 KV, 80 MVAR, Bus Reactor with associated bays at Lakhisarai S/s associated with ERSS-III . 29-05-2014

Petition No. 111/TT/2013
Transmission tariff for New Wanpoh, associated with NRSS-XVI . 29-05-2014

Petition No. 181/TT/2013
Determination of Fees and Charges for Fibre Optic Communication System in Lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links in Southern Region for the period 2009-14 block. 19-05-2014

Petition No. 181/TT/2013
Determination of Fees and Charges for Fibre Optic Communication System in Lieu of existing Unified Load Despatch & Communication (ULDC) Microwave Links in Southern Region for the period 2009-14 block. 19-05-2014

Petition No. 247/TT/2014
Transmission Tariff of Assets (07 Nos) under transmission System for Transfer of Power from Generation Projects in Sikkim to NR/WR Part-B in ER for tariff block 2009-14. 26-05-2014

Petition No. 61/TT/2013
Transmission Tariff of 400 kV 80 MVAR Bus Reactor along with associated bays at 400/220 kV Sikar Sub-station under System Strengthening scheme in Northern Region for Sasan & Mundra UMPPs. 04-10-2013

Petition No. 57/TT/2013
Approval of transmission tariff for 400KV D/C Navasari-New Mumbai (Boisar) {cut off point of WRTS-II portion only} {part of 400 KV Navasari-Boisar TL} along with respective bays at Navsari GIS SS associated with Regional System of MUNDRA UMPP (Interconnection with Vapi-Navi Mumbai line along with associated bays at Vapi SS interim contingency arrangement for the period from DOCO to 31.03.2014. 26-07-2013

Petition No. 113/TT//2013
Approval of transmission tariff for assets associated with Vindhyachal IV & Rihand III (1000MW) Generation Project in Western Region for tariff block 2009-14 period. 23-05-2014

Petition No. 241/TT/2013
Transmission tariff for 220 KV D/C Vapi- Khadoli Transmission line. 23-05-2014

Petition No. 37/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2014 for (A) Kurnool-Raichur 2nd 765 KV S/C line and extension of Kurnool 765 KV/400 KV & Raichur 765/400 KV Substations, (B) 1500 MVA, 765/400 KV ICT#2 and 240 MVAR reactor along with associated bays at 765/400 KV Nellore Pooling Station, (C) 1500 MVA, 765/400 KV ICT #3 and 240 MVAR bus reactor along with associated bays at 765/400 KV Nellore PS under “Common system associated with ISGS projects in Krishnapatnam area of Andhra Pradesh” in Southern Region. 23-05-2014

Petition No. 108/TT//2013
Approval of transmission tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 19-05-2014

Petition No. 295/TT/2014
Approval of Transmission Tariff for Assets associated with Vindhyachal IV and Rihand III (1000MW) Generation Project (group-3) in Western & Northern Region for tariff block 2009-14 period . 15-05-2014

Petition No. 22/TT/2014
Approval of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links (Part- II) in Eastern Region for the period 2009-14 block. 13-05-2014

Petition No. 37/TT/2014
Approval of Transmission Tariff from DOCO to 31.03.2014 for (A) Kurnool-Raichur 2nd 765 KV S/C line and extension of Kurnool 765 KV/400 KV & Raichur 765/400 KV Substations, (B) 1500 MVA, 765/400 KV ICT#2 and 240 MVAR reactor along with associated bays at 765/400 KV Nellore Pooling Station, (C) 1500 MVA, 765/400 KV ICT #3 and 240 MVAR bus reactor along with associated bays at 765/400 KV Nellore PS under “Common system associated with ISGS projects in Krishnapatnam area of Andhra Pradesh” in Southern Region. 13-05-2014

Petition No. 46/TT/2014
Approval of Transmission Tariff (05 nos) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period. 13-05-2014

Petition No. 298/TT/2013
Determination of transmission tariff of 2 Nos. 400 KV Line Bays at 400 KV Ranchi S/s for Raghunathpur TPS- Ranchi Transmission Line under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period. 13-05-2014

Petition No. 110/TT/2013
Transmission Tariff for 400/220 KV 500MVA ICT-II along with associated 400/ 220 KV bays at Jind S/s and other assets under Northern Regional Transmission Strengthening Scheme for 2009-14 period. 24-04-2014

Petition No. 45/TT/2013
Transmission Tariff for 400 KV D/C Balipara- Bongaigaon (Quad) Transmission Line and other assets under Transmission System associated with Kameng Hydro-Electric Project for NE Region for 2009-14 period. 29-04-2014

Petition No. 32/TT/2013
Transmission Tariff for Northern Regional Transmission Strengthening Scheme for tariff block 2009-14 period. 29-04-2014

Petition No. 17/TT/2014
Approval of Fees and Charges for Fibre optic communication system in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in North Eastern Region for the period 2009-14 block. 29-04-2014

Petition No. 111/TT/2013
Determination of Transmission Tariff of from anticipated DOCO (01.01.2012) to 31.03.2014 for 400 KV D/C Neemrana- Sikar line alongwith associated bays under Northern Region System Strengthening Scheme-XVII, for tariff block 2009-14 period in Northern Region. 29-04-2014

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 01-01-2014

Petition No. 112/TT/2013
Determination of Transmission Tariff of Assets (09 Nos.) under Transmission System for Phase-I Generation projects in Orissa –Part-A in Eastern Region for tariff block 2009-14 period. 25-10-2013

Petition No. 292/TT/2013
Transmission Tariff of 125 MVAR 400 KV Bus Reactor along with associated bays at Patna S/S under Transmission System for "Transfer of Power from Generation Projects in Sikkim to NR/WR Part-B in Eastern Region for tariff block 2009-14. 21-04-2014

Petition No. 44/TT/2013
Transmission Tariff for LILO of 220KV Misa- Kathalguri Transmission Line at Mariani alongwith Switching Station and other assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14. 21-04-2014

Petition No. 28/TT/2014
Approval of transmission tariff for Loop-out of 220 kV Jalandhar- Hamirpur line at Hamirpur (To be used as LILO of 1st Ckt. Of 220KV Hamirpur- Jalandhar T/L under the Strengthening Scheme in NR for the tariff block 2009-14 period. 15-04-2014

Petition No. 26/TT/2014
Determination of Transmission tariff for 500 MVA, 400/220/33 KV ICT-II along with associated bays at Moga S/S and 500MVA, 400/220/33KV ICT along with associated bays at Ludhiana S/S under "Augmentation of Transformation capacity in Northern Region-part-A for Tariff block 2009-14 period. 28-03-2014

Petition No. 300/TT/2013
Approval of Transmission Tariff of 400 KV D/C Agra-Sikar line alongwith bays under System strengthening scheme in Northern Region for Sasan & Mundra UMPPs for tariff block 2009-14 period. 10-03-2014

Petition No. 53/TT/2013
Transmission tariff for 400 KV D/C Raipur Wardha TL alongwith FSC at Wardha under WRSS-II Set A Scheme of WR. 11-02-2014

Petition No. 36/TT/2013
Approval of transmission tariff for assets under NRSS XX. 26-08-2013

Petition No. 198/TT/2012
Determination of tariff of assets under Common scheme for 765 kV pooling Stations and Network for NR, Import by NR from ER and from MER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 24-01-2014

Petition No. 111/TT/2013
Transmission tariff for New Wanpoh associated with NRSSXVI. 24-01-2014

Petition No. 240/TT/2013
Determination of Fees and Charges for Fibre optic communication system in lieu of existing ULDC Microwave links in Northern Region. 21-01-2014

Petition No. 290/TT/2013
Approval of Transmission Tariff for 400 kV D/C Chamera Pooling station-Jalandhar T/L along-with bays and Line Reactor at Jalandhar under Transmission System associated with Chamera-III HEP for tariff block 2009-14 period in Northern Region. 08-01-2014

Petition No. 217/TT/2012
3X 110 MVAR, 1-phase 765 KV shunt Reactor including Surge Arrestor and NGR at Sasaram sub-station under Sasan UMPP TS in NR. 06-01-2014

Petition No. 287/TT/2013
Approval of Transmission Tariff for (1) 400 kV D/C (Quad) Vadodra-Asoj Transmission line along with associated bays at Asoj (GETCO S/S) under System Strengthening Scheme in North/West Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 kV D/C Vadodra-Pirana Tr. line) by passing Vadodra Pooling S/S under interim arrangement in Western Region for 2009-14. 08-01-2014

Petition No. 288/TT/2013
Approval under Regulation 3 (12)(c) of CERC (Terms & Conditions of Tariff) Regulations 2009 and Regulation 24 of CERC ( Conduct of Business) Regulations 1999 for commissioning date and approval of Transmission Tariff from DOCO TO 31.03.2014 for tariff block 2009-14 for LILO of 400 kV D/C Nathpa Jhakri- Nallagarh(Triple Snowbird) line at Rampur under transmission system associated with Rampur HEP in Northern Region. 08-01-2014

Petition No. 305/TT/2013
Approval of transmission tariff for 765/400 kV, 1x1500 MVA, ICT-2 at Dharmjaygarh S/S along with associated bays under Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh in Western Region. 08-01-2014

Petition No. 240/TT/2013
Determination of Fees and Charges for Fibre optic communication system in lieu of existing ULDC Microwave links in Northern Region. 30-12-2013

Petition No. 300/TT/2013
Approval of transmission tariff of 400 kV D/C Agra- Sikar line along with bays under System Strengthening Scheme in Northern Region for Sasan and Mundra UMPPs for tariff block 2009-14. 02-01-2014

Petition No. 308/TT/2013
Approval of transmission tariff for Sipat-LiLo Point (at Dharmjaigarh) portion of 765KV S/C Ranch- Sipat TL along with associated bays at Sipat end under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR Via ER in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 01-01-2014

Petition No. 258/TT/2013
Determination of Transmission Tariff for Tiruvalam (POWERGRID) - Chitoor (APTRANSCO) 400 kV D/C (Quad) line along with associated bays and equipments under Supplementary Transmission System associated with Vallur TPS in SR. 18-11-2013

Petition No. TT/281/2013
Approval of transmission tariff for ""Augmentation of Hosur S/S by 1x315 MVA 400/220 kV transformer and associated bays under system Strengthening-XIV in SR". 18-12-2013

Petition No. 299/TT/2013
Approval of transmission tariff for Elements under Transmission System associated with Krishnapatnam UMPP- Part-B in Southern and Western Region. 18-12-2013

Petition No. 303/TT/2013
Approval of transmission tariff for assets under Transmission System for Phase-I Generation projects in Orissa-Part B in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 308/TT/2013
Approval of ttransmission tariff for Sipat-LiLo Point (at Dharmjaigarh) portion of 765KV S/C Ranch- Sipat TL along with associated bays at Sipat end under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR Via ER in Western Region for tariff block 2009-14. 18-12-2013

Petition No. 287/TT/2013
Approval of transmission tariff of (1) 400 kv D/C (Quad) Vadodara- Asoj Transmission Line along Part of IPP Projects in Chhattisgarh (for direct interconnection with 400 KV D/c Vadodara- Pirana T/L) by passing Vadodara Pooling SS under interim arrangement in Western Region for tariff block 2009-14 period. 13-12-2013

Petition No. 288/TT/2013
Approval of transmission tariff for LILO of 400 kv D/C Nathpa Jhakri- Nallagarh (Triple Snowbird) line at Rampur under Transmission System associated with Rampur HEP in Northern Region. 13-12-2013

Petition No. 290/TT/2013
Approval of transmission tariff of 400 kV D/C Chamera Pooling Station- Jalandhar T/L along with bays and Line Reactor at Jalandhar under Transmission System associated with Chamera-III HEP for tariff block 2009-14 in NR. 10-12-2013

Petition No. 299/TT/2013
Approval of transmission tariff for Elements under Transmission System associated with Krishnapatnam UMPP- Part-B in Southern and Western Region. 13-12-2013

Petition No. 296/2013
Approval of transmission tariff for (i) Aurangabad– Aurangabad (MSETCL) 400 kV D/C (Quad) Line and Shifting of 400 kV D/C Akola - Aurangabad (MSETCL) line to Aurangabad along with associated bays at both ends, (ii) 400/220 kV 315 MVA ICT-I along with associated bays at Aurangabad S/S & (iii) 400/220 kV 315 MVA ICT-II along with associated bays at Aurangabad S/S under Transmission system associated with MUNDRA UMPP in Western Region. 16-12-2013

Petition No. 301/2013
Approval of Transmission Tariff for (1) 400kV 125 MVAR Bus Reactor at 765kV Indore S/S along with associated bays; (2) 400kV 125MVAR Bus Reactor-I and Bus Reactor-II at 765kV Gwalior S/S along with associated bays; (3) 765 kV D/C Jabalpur Pooling Station-Bina Ckt-I with 240 MVAR Switchable Line Reactors and associated bays; and (4) 765 kV D/C Jabalpur Pooling Station - Bina Ckt-II with 240 MVAR Switchable Line Reactors and associated bays under “Transmission System for Phase-I Generation Projects in Orissa Part-C” in Western Region for 2009-14. 09-12-2013

Petition No. 289/TT/2013
Approval of Transmission Tariff for 400 kV Vadodara-Pirana T/L alongwith associated bays at Pirana S/S (for direct inter-connection with 400 kV D/C Vadodara Asoj T/L under interim contingency scheme) under Transmission System for IPP Generation projects in Madhya Pradesh & Chhattisgarh in Western Region for tariff block 2009-14 period. 10-12-2013

Petition No. 298/2013
Approval under regulation-86 of the CERC (Conduct of Business) Regulations' 1999 and CERC (Terms and Conditions of Tariff) Regulations' 2009 for determination of Transmission Tariff of 02 Nos 400kV Line Bays at 400kV Ranchi S/s for Raghunathpur TPS- Ranchi Transmission line (DOCO:01.04.2013) under Common Scheme for 765kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period.. 09-12-2013

Petition No. 295/ 2013
Approval of transmission tariff for assets associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project(group-3) in Western & Northern Region for tariff block 2009-14 period. 02-12-2013

Petition No. 296/2013
Approval of transmission tariff for (i) Aurangabad– Aurangabad (MSETCL) 400 kV D/C (Quad) Line and Shifting of 400 kV D/C Akola - Aurangabad (MSETCL) line to Aurangabad alongwith associated bays at both ends, (ii) 400/220 kV 315 MVA ICT-I alongwith associated bays at Aurangabad S/S & (iii) 400/220 kV 315 MVA ICT-II alongwith associated bays at Aurangabad S/S under Transmission system associated with MUNDRA UMPP in Western Region . 02-12-2013

Petition No. 247/TT/2013
Approval for “Transfer of power from generation projects in Sikkim to NR/WR Part-B” in Eastern Region for tariff block 2009-14 period. 18-11-2013

Petition No. TT/281/2013
Approval of Transmission Tariff for Augmentation of Hosur S/S by 1X315 MVA 400/220 kV transformer and associated bays under System Strengthening - XIV in SR. 05-11-2013

Petition No. 206/TT/2012
Determination of Transmission Tariff of assets under ERSS-IV in Eastern Region. 01-11-2013

Petition No. 44/TT/2013
Approval of transmission tariff for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for 2009-14. 31-10-2013

Petition No. 256/TT/2013
Determination of tariff in respect of Maharashtra State Electricity Transmission Company Limited (MSETCL) owned Transmission Lines/System with other States in terms of CERC order dated 14.3.2012 in Petition No. 15/SM/2012. 28-10-2013

Petition No. 91/TT/2012
Determination of Transmission Tariff for Combined Assets under Transmission System associated with Parbati-III-HEP in Northern Region for Tariff block 2009-14 period. 28-10-2013

Petition No. 108/TT/2013
Determination of Transmission Tariff for assets under SASAN UMPP TS in Western Region for tariff block 2009-14 period. 28-10-2013

Petition No. 120/TT/2013
Determination of Transmission Tariff for 240 MVAR Switchable line Reactor along with associated bays at Bilaspur Pooling station under common scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for WR and import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period. 23-10-2013

Petition No. 82/TT/2012
Determination of transmission tariff for Asset I: 765 kV Moga-Bhiwani T/L and Asset II: 765 kV Jattikalan- Bhiwani T/L associated with 765 kV system for Central Part of Northern Grid Part-I for tariff block 2009-14 in NR . 22-10-2013

Petition No. 255/TT/2013
Determination of Transmission Tariff for installation of 400/220kV, 1*315 MVA transformer at Mapusa (ICT-III) sub-station alongwith 2 Nos of 220 kV line bays under augmentation of transformer and bays in Western Region. 22-10-2013

Petition No. 41/TT/2013
Determination of Transmission Tariff of Asset I: 765 kV, 240 MVAR Switchable Line Reactor under Bus Reactor at Ballia S/s. (DOCO: 01.10.2012); Asset II: 765 kV Line bays at Sasaram S/s (for 765 kV Sasaram- Fatehpur TL under SASAN Project) under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common schemes for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern region for tariff block 2009-14 period. 05-09-2013

Petition No.31/TT/2013
Determination of transmission tariff for Combined Assets for transmission system associated with Northern Region Bus Reactor Scheme (Group-II) in NR. 18-10-2013

Petition No.248/TT/2013
Approval of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 18-10-2013

Petition No.97/TT/2013
Determination of Transmission Tariff of 125 MVAR Bus Reactor alongwith associated bays at Roorkee Substation under NRSS-XXI. 18-10-2013

Petition No. 166/TT/2013
Determination of Transmission Tariff for (1) Raigarh PS (Near Kotra) – Raigarh PS (near Tamnar) 765 kV D/C T/L with associated bays, (2) 765/400 kV 1500 MVA Auto-Transformer and 765 kV 4*80 MVar Bus Reactor at Raigarh (near Tamnar) with associated bays under Establishment of Pooling stations at Raigarh (near Kotra) and Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh (Set “B”/ WR1-IPPB) in Western Region. . 17-10-2013

Petition No. 40/TT/2013
Determination of Transmission Tariff of Asset I: 400kV, 125 MVAR Bus Reactor along with associated bays at Patna S/s; Asset II: 400kV, 125 MVAR Bus Reactor along with associated bays at Ranchi S/s under ERSS-IV in Eastern Region. 15-10-2013

Petition No. 109/TT/2013
Determination of Transmission Tariff of Elements for 240 MVAR Bus Reactor in Agra, under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region. . 15-10-2013

Petition No. 109/TT/2013
Determination of Transmission Tariff of Elements for 240 MVAR Bus Reactor in Agra, under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region. . 15-10-2013

Petition No.35/TT/2013
Determination of transmission tariff of 400 kV D/C Kishenpur-Samba T/L alongwith bays at both and other assets under the NRSSS-XXII. . 11-10-2013

Petition No. 163/TT/2013 (Earlier Docket No.94/TT/2013)
Determination of transmission tariff for 500 MVA 400/220 KV ICT at Moga under the Augmentation of Transformation capacity in NR- Part A for Tariff Block 2009-14 in NR. . 11-10-2013

Petition No.33/TT/2013
Determination of transmission tariff of Sasan UMPP TS(Group 1) in Northern Region for tariff block 2009-14 period. . 11-10-2013

Petition No.107/TT/2013
Determination of transmission tariff for upgradation of transfer capacity of Talcher-Kolar HVDC Bipole. 08-10-2013

Petition No.227/TT/2013
Approval of Revised transmission tariff for Barh- Balia 400 KV D/C (Quad) line along with associated bays at Balia S/s after approval of RCE under transmission System associated with Barh Generation Project (3X660MW) in ER. 09-10-2013

Petition No.107/TT/2013
Determination of transmission tariff for upgradation of transfer capacity of Talcher-Kolar HVDC Bipole. 08-10-2013

Petition No.164/TT/2013
Determination of transmission tariff for Combined Assets for transmission system associated with Augmentation of Transformation capacity (part-1) in Northern & Eastern Region for tariff block 2009-14. 07-10-2013

Docket No.108/2013
Determination of transmission tariff for Installation of 400/220KV, I*315MVA Transformer at Mapusa (ICT-III) S/S along with 2 nos. 220 KV line bays under Augmentation of Transformer and Bays in WR. 07-10-2013

Petition No.165/TT/2013
Approval of transmission tariff for LILO of existing Bangalore-Salem 400 KV S/C at Hosur under System Strengthening-XVIII in SR Grid. 23-09-2013

Petition No.166/TT/2013
Approval of Transmission tariff for (i) Raigarh PS (Near Kotra)-Raigarh PS (near Tamnar) 765 KV D/C T/L with associated bays, (2) 765/400 KV 1500 MVA Auto- transformer and 765 KV 4*80 MVAR Bus Reactor at Raigarh (near Tamnar) with associated bays under establishment of Pooling stations at Raigarh (near Kotra) and Raigarh (near Tamnar) for IPP Generation Projects in Chhattisgarh (Set B/ WR1-IPPB) in Western Region for tariff block 2009-14. 23-09-2013

Petition No.162/TT/2013
Transmission Tariff for (1) 400 KV D/C Raipur (Existing)- Raipur PS (Durg) T/L with associated bays, (2) 400 KV D/C Raighar PS (Near Kotra)- Raighar (existing) S/S T/L with associated bays, & (3) ICTs & Reactors at Raighar (Kotra) and Raipur (Durg) with associated bays under Establishment of pooling stations at Raighar (Kotra) and Raipur for IPP Generation Projects in Chhatisgarh (Set A/ DPR-1) in WR. 20-09-2013

Petition No. 39/TT/2013
Determination of Transmission Tariff for spare ICT at Hissar and Spare ICT at Lucknow under Provision of Spare interconnecting transformers (ICTs). 18-09-2013

Petition No.98/TT/2013
Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14 period. 19-09-2013

Docket No.92/2013
Determination of transmission tariff of 765 KV, 3X110 MVAR Bus Reactor along with associated bays at Sasaram S/s under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR form ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region. 20-09-2013

Petition No. 51/TT/2013
Approval of transmission tariff for (i) 765/400 KV 3x500 MVA ICT-II and other assets under Sasan UMPP TS in Western Region for Tariff block 2009-14. 16-09-2013

Docket No.96/2013
Determination of transmission tariff of Asset1: LILO of 400KV D/C Kahalgaon- Biharshariff T/L (1st Line) and associated bays at Lakhisarai S/s; Asset II: 400/132 KV, 200 MVA ICT-I along with associated bays at Lakhisarai S/s; Asset III: 400/132 KV, 200 MVA ICT-II along with associated bays at Lakhisarai S/s; Asset IV: 400 KV, 80 MVAR, Bus Reactor with associated bays at Lakhisarai S/s asssociated with ERSS-III in Eastern Region. 16-09-2013

Petition No.207/TT/2012
Determination of transmission tariff of assets under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in NR. 16-09-2013

Petition No. 214/TT/2012
Approval of Transmission Tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 16-09-2013

Petition No. 110/TT/2013
Approval of transmission tariff for (a) 400/220kV 500MVA ICT-II along with associated 400/220 kV bays at Jind S/s and 1 no. of 220kV Line Bays Anticipated DOCO (01.06.2013) (b) 01 no. of 400 kV, 125MVAR Bus Reactor at Jind S/s along with associated bays under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14. 05-09-2013

Petition No. 187/TT/2011
Approval of transmission tariff for combined elements under common scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common Scheme for Network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14. 03-09-2013

Docket No. 45/TT/2011
Approval under regulation 86 of CERC terms and conditions of tariff Regulations2009 for determination of Transmission Tariff from anticipated DOCO 01.01.2012 to 31.03.2014 for 400KV D/C Neemrana-Sikar line along with associated bays under Northern Region System Strengthening Scheme-XVII, for tariff block 2009-14 period in Northern Region. 30-12-2011

Petition No. 70/TT/2012
Approval of transmission tariff for assets associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern Region. 23-08-2013

Petition No. 58/TT/2013
Approval of transmission tariff for Extension of 400/220 kV Ballabhgarh S/S (Realignment Work) under 765 kV System for Central Part of Northern Grid Part-III for tariff block 2009-14 in Northern Region. 22-08-2013

Petition No. 36/TT/2013 (Earlier Docket No. 9/TT/2013)
Approval of transmission tariff for assets under NRSS XX. 20-08-2013

Petition No. 214/TT/2012
Approval of Transmission Tariff for assets under Sasan UMPP Transmission System in Western Region for tariff block 2009-14. 19-08-2013

Petition No. 104/TT/2013
Approval of transmission tariff of Asset 1: Reconductoring Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line and Asset 2: Reconductoring Ckt-II of 400 kV D/C Siliguri-Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region. 07-08-2013

Petition No. 99/TT/2013
Approval of tariff of Asset- I: 400kV Line Bays at Biharshariff S/s along with 80MVAR Switchable Line Reactors for the 400kV D/C Purnea-Biharshariff T/L; Asset-II: 400kV Line Bays at Purnea S/s for the 400kV D/C Purnea-Biharshariff T/L under Transmission schemes for enabling import of NER/ER Surplus power by NR in Eastern Region.- 07-08-2013

Petition No. 101/TT/2013
Approval of transmission tariff of 400 kV D/C Baharampur-Bheramara T/L, LILO of 400 kV S/C Farakka-Jeerat T/L at Baharampur, 1 no. 80 MVAR bus reactor and associated line bays and Reactor bay at Baharampur associated with interconnection of electrical grids of India and Bangladesh (Indian portion) for tariff block 2009-14 period. 07-08-2013

Docket No. 95/TT/2012
Approval of Transmission Tariff for (i) 765 KV S/C Satna-Bina Ckt-2 TL along with associated bays at Satna & Bina S/S (ii) 765 KV, 3*80 MVAR Bus Reactor at Santa (iii) 765 KV, 4*333 MVA ICT-1 at Santa along with associated bays of 765 KV & 400 KV, (iv) Upgradation of existing Seoni-Bina TL at 765 KV level along with associated bays at Seoni SS & Bina SS under Sasan UMPP TS in Western region for tariff block 2009-14 period. 09-11-2012

Petition No. 54/TT/2013
Approval of Transmission Tariff for Asset: 125 MVAR at Bus Reactor associated with NRSS-XIII, for tariff block 2009-14. 05-08-2013

Petition No. 100/TT/2013
Approval of transmission tariff for Asset-I: "400/220kV, 315MVA ICT-II at Samba S/s along with associated bays and 3 nos. 220kV Line bays" and Asset-II: 1 no. 400kV, 80MVAR Bus Reactor at Samba S/s along with associated bays under NRSS-XXII for Tariff block 2009-14 period in Northern Region. 05-08-2013

Petition No. 102/TT/2013
Approval of transmission tariff for Thermal Powertech Corporation India limited-Nellore Pooling station TL with associated bay extensions for the period in Southern region for tariff block 2009-14. 05-08-2013

Petition No. 111/TT/2013
Approval of transmission tariff of elements for Asset-I: 400/220KV, 315MVA ICT-II along with 3 Nos. 220 kV Line bays at New Wanpoh, Asset-II: 400KV, 125MVAR Bus Reactor alongwith associated bays at New Wanpoh associated with Northern region Strengthening Scheme-XVI (NRSS-XVI), for tariff block 2009-14 period in NR. 01-08-2013

Petition No. 101/TT/2012
Approval of Transmission Tariff of Asset-I: 400kV D/C (Quad) LILO of Barh-Balia line at Patna alongwith associated bays at Patna S/S, Asset-II: 765/415kV, 3x500 MVA ICT-I Ranchi alongwith associated bays at 765kV Ranchi S/S , Asset-III: Combined Assets of 400kV D/C (Quad) Ranchi (New)-Ranchi (Old)-I T/L and associated 400kV line bays at Ranchi (New) S/S and Ranchi (Old) S/S and 400 kV D/C (Quad) Ranchi (New) S/S and Ranchi (Old) S/S, and 765/415kV, 3x500 MVA ICT-II at Ranchi alongwith associated bays at 765kV Ranchi S/S, Asset-IV: 765/415kV, 3x500 MVA ICT at Sasaram alongwith associated bays under Common Scheme for 765kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER from NER/SR/WR via ER in Eastern Region for tariff block 2009-14. 01-08-2013

Petition No. 102/TT/2013
Approval of transmission tariff for Thermal Powertech Corporation India Limited – Nellore Pooling Station TL with associated bays extension for the period from DOCO to 31.3.2014 in Southern Region for Tariff block 2009-14. 16-07-2013

Petition No. 217/TT/2012
Approval of Transmission Tariff for 3x110 MVAR, 1-Phase 765 kV Shunt Reactor including Surge Arrestor and NGR (Neutral Grounding Reactor) at Sasaram sub-station under Sasan UMPP TS in Northern Region for tariff block 2009-14 period.. 30-07-2013

Petition No. 101/TT/2013
Approval of Transmission Tariff of 400 kV D/C Baharampur-Bheramara T/L, LILO of 400kV S/C Farakka-Jeerat T/L at Baharampur, 01 no 80 MVAR Bus Reactor and associated line bays and Reactor Bay at Baharampur associated with Interconnection of Electrical Grids of India and Bangladesh (Indian Portion).. 16-07-2013

Petition No. 120/TT/2013
Approval of Transmission Tariff for 240 MVAR Switchable Line Reactor along with associated bays at Bilaspur Pooling Station under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Western Region for tariff block 2009-14 period.. 17-07-2013

Petition No. 99/TT/2013
Approval of tariff of Asset-1 400kV line Bays at Biharshariff S/S along with 80 MVAR Switchable line Reactors for the 400kV D/C Purnea- Biharshariff T/L; Asset-2 400kV Bays at Purnea S/S for the 400 kV D/C Purnea- Biharshariff T/L under transmission schemes for enabling import of NER/ER surplus power by NR in Eastern Region.. 17-07-2013

Petition No. 105/TT/2012
Approval of Transmission Tariff of assets under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 12-07-2013

Petition No. 111/TT/2013
Approval of Transmission Tariff for Asset 1: 400/220kV, 315MVA ICT-II along with 03 No. 220kV Line bays at New Wanpoh. Asset 2:400kV, 125MVAR Bus Reactor along with associated bays at New Wanpoh associated with NRSSXVI, for tariff block 2009-14. 09-07-2013

Petition No. 105/TT/2012
Approval of Transmission Tariff of assets under Transmission System associated with Kalpakkam PFBR (500 MW) in Southern Region. 08-07-2013

Petition No. 113/2013
Approval of transmission tariff for 400 KV 1*63 MVAR Bus Reactor along with associated 400 KV bays at Satna S/S and 400 KV D/C QUAD BASSI-JAIPUR (RPVNL) LINE associated with Vindhyachal IV & Rihand III (1000MW) Generation Project in Western Region for tariff block 2009-14 24-06-2013

Petition No. 109/TT/2013
Approval of transmission tariff for 125 MVAR Bus Reactor Agra under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14. 20-06-2013

Petition No. 100/TT/2013
Approval of transmission tariff of assets under NRSS-XXII for Tariff block 2009-14 in Northern Region. 17-06-2013

105/TT/2013
Approval for 1X80 MVAR, 420 KV, 3 Phase Bus Reactor at 400 KV Balipara S/S under Transmission System associated with North East/Northern Western Interconnector- I and Transmission System of Kameng HEP in North Eastern Region for tariff block 2009-14 period 18-06-2013

Petition No. 108/TT/2013
Approval of Transmission tariff for assets under Sasan UMPP transmission system in Western Region for tariff block 2009-14. 17-06-2013

Petition No. 110/TT/2013
Approval of Transmission Tariff for (a) 400/220 KV 500MVA ICT-II alongwith associated 400/220 KV bays at Jind S/s and 01 no of 220 KV Line bays (b) 1 no of 400 KV, 125 MVAR Bus Reactor at Jind S/s alongwith associated bays under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14. 17-06-2013

Petition No. 104/TT/2013 Docket No. 76/2013
Approval under regulation-86 of CERC (Conduct of Business) Regulation, 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of Transmission tariff for Asset 1: Reconductoring Ckt- I of 400 KV D/C Siliguri – Purnea (HTLS Cond.) Transmission Line and Asset 2: Reconductoring Ckt- II of 400 KV D/C Siliguri – Purnea (HTLS Cond.) Transmission Line under ERSS-I in Eastern Region from anticipated date of commercial operation (1.6.2013) to 31.3.2014. 06-06-2013

Petition No. 101/TT/2013 Docket No. 62/2013
Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff of 400kV D/C Baharampur-BheramaraT/L, LILO of 400kV S/C Farakka-Jeerat T/L at Baharampur, 01 no 80 MVAR Bus Reactor and associated line bays and Reactor Bay at Baharampur associated with Interconnection of Electrical Grids of India and Bangladesh (Indian Portion) from Anticipated DOCO (01.05.2013) to 31.03.2014 for tariff block 2009-14 period. 05-06-2013

Petition No. 108/TT/2012
Approval of Transmission Tariff for 2 No. of 220 KV Bays at Trivandrum under Transmission system associated with Kudankulam in Southern Region for tariff Block 2009-14. 29-04-2013

Petition No. 86/TT/2012
Approval for determination of transmission tariff for (i) Vindhyachal IV- Vindhyachal Pooling Station 400 KV D/C (QUAD) (Bypassing Vindhyachal Pooling Station) TL and (ii) 400 kV D/C Sasan- Vindhyachal Pooling Transmission Line associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project (under interim contingency arrangement for power evacuation) in Western Region for tariff block 2009-14 period 29-04-2013

Petition No. 95/TT/2012
Approval of Transmission Tariff for (under contingency plan for power evacuation of NTPC -VSTPP#4 Generation Project) associated with Sasan UMPP TS in Western Region for tariff block 2009-14 period. 14-11-2012

Petition No. 32/TT/2013
Approval of Transmission Tariff for Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period. 10-04-2013

Petition No. 43/TT/2013
Approval of transmission tariff for Spare ICTs and Reactors under Provision of Spare ICTs and Reactors for Eastern Region from DOCO to 31.03.2014. 05-04-2013

Petition No. 205/2009
Approval of incentive based on availability of transmission system for the year 2008-09 for Western Region. 05-04-2013

Petition No. 196/2009
Approval of incentive based on availability of transmission system for the year 2008-09 for Eastern Region. 05-04-2013

Petition No. 200/TT/2012
Approval of transmission tariff for 765 KV S/C Fatehpur-Agra TL associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern Region. 05-04-2013

Petition No. 45/TT/2013
Approval of date of commercial operation and approval of transmission tariff from date of commercial operation to 31.3.2014 for transmission system associated with Kameng Hydro-Electric Project for tariff block 2009-14 period in North Eastern Region 05-04-2013

Docket No.19/TT/2013

Approval of transmission Tariff from provision of Bus Reactors in Northern Region (Group-II), for tariff block 2009-14 period in Northern Region.
21-03-2013

Docket No. 20/TT/2013

Approval of transmission tariff for transmission assets (Group-4) associated with 765 kV system for Central part of Northern Grid, Part-II, for tariff block 2009-14.
19-03-2013

Petition No.99/TT/2013

Approval of transmission tariff for assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 period in Northern Region.
19-03-2013
Docket No. 25/TT/2013

Approval of transmission tariff for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for 2009-14.
15-03-2013

Docket No. 13/TT/2013

Approval of transmission tariff for assets under NRSSS-XIII for 2009-14 period.
15-03-2013

Petition No. 51/TT/2013

Approval of transmission tariff for assets under Sasan UMPP TS in Western Region for Tariff block 2009-14.
13-03-2013

Petition No.69/TT/2012

Approval of Transmission Tariff for Combined Assets-I+II: (I) 400KV D/C Manesar-Neemrana Line along with associated bays and (II) 400KV D/C Bhiwadi-Neemrana Line and Asset-III: 2X315MVA 400/220KV ICTs at Neemrana under the Transmission System associated with NRSS-XV, for tariff block 2009-14 period in Northern Region.
11-03-2013

Docket No.14/TT/2013

Approval of transmission tariff for NRSS- XVI for the tariff period 2009-14.
06-03-2013

Docket No.16/TT/2013

Approval under Regulation 86 for determination of transmission tariff for provision of Spare ICTs and Reactors for Eastern Region.
05-03-2013

Docket No.21/TT/2013

Approval of Transmission Tariff of 2 nos. 400 KV line bays along with 2 nos. 80 MVAR switchable line reactors at 400 KV Silliguri S/S and 2 nos. 400 KV line bays at Bongaigaon S/s under Transmission schemes for enabling import of NER/ER surplus power by NR in Eastern Region for tariff block 2009-14 period.
27-02-2013

Docket No.32/TT/2013

Approval of transmission Tariff of Assets: 765 KV, 240 MVAR Switchable Line Reactor under Bus Reactor at Ballia S/s; Assets II: 765 KV Line bays at Sasaram S/s (for 765 KV Sasaram-Fatehpur TL under SASAN Project) under Common Scheme for 765 KV Pooling Station and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14.
26-02-2013

Docket No.9/TT/2013

Approval of Transmission Tariff for Northern Region System Strengthening Scheme (NRSSS) -XX for Tariff block 2009-14.
28-02-2013

Docket No.24/TT/2013

Approval of transmission tariff for 315 MVA, 400/220/33 KV 3-phase Spare Transformer at Madurai SS & 400, 80 MVAR Spare reactor at Gooty SS under provision of Spare ICTs and Reactors for Southern Region.
22-02-2013

Docket No.11/TT/2013

Approval of transmission tariff for 315MWA, 400/220/33 KV 3-phase Spare Transformer at Dehgam SS, 315 MWA, 400/220/33 KV 3-Phase Spare Transformer at Jabalpur SS, 400, 125 MVAR 3ph Spare reactor at Itarsi SS under Provision of Spare ICTs and Reactor for Western Region.
22-02-2013

Docket No.19/TT/2013

Approval of transmission Tariff for provision of Bus Reactors in Northern Region (Group-II), for tariff block 2009-14 period in Northern Region.
21-02-2013

Docket No.3/TT/2013

Approval of the Transmission Tariff for installation of 400/220 kV, 1x315 MVA Auto Transformer at 400/220 kV Sub Station at Vapi under Western Region.
21-02-2013

Docket No.6/TT/2013

Approval of Transmission Tariff for 400 kV D/C Kishenpur-Samba T/L along with bays at both ends, 1 no. 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 3 nos. 220 kV Line bays under the Northern Region System Strengthening Scheme-XXII for Tariff block 2009-14 in Northern Region.
20-02-2013

Docket No.4/TT/2013

Approval of transmission tariff for Vallur TPS- Melakottaiyur 400 kV D/C Line under supplementary Transmission System associated with Vallur TPS for the period from DOCO to 31.3.2014 in Southern Region for tariff block 2009-14.
20-02-2013

Docket No.14/TT/2013

Approval of transmission tariff for Northern Region System Strengthening Scheme-XVI for Tariff block 2009-14 period in Northern Region.
20-02-2013

Docket No.18/TT/2013

Approval of Transmission Tariff for (A) LILO of 400 kV Simhapuri & Meenakshi-Nellore 400 kV D/C (quad) line, (B) Associated bays and common systems at Nellore Pooling station for ISGS projects in Krishnapattanam Area of Andhra Pradesh for the period from anticipated DOCO to 31.3.2014 in Southern Region.
20-02-2013

Docket No.12/TT/2013

Approval of Transmission Tariff for Nellore – Gooty 400 kV D/C (quad) line under ATS of Krishnapattanam UMPP Part-A for the period from anticipated DOCO to 31.03.2014 in Southern Region for tariff block 2009-14.
19-02-2013

Docket No.10/TT/2013

Approval of transmission tariff for 400 kV D/C Raipur – Wardha TL alongwith FSC at Wardha under WRSS-II Set-A Scheme of Western Region from DOCO to 31.3.2014.
18-02-2013

Petition No.113/TT/2012

Petition for approval of Transmission Tariff from anticipated DOCO to 31.03.2014 for "Spare interconnecting transformers (ICTs) for Northern Region" for tariff block 2009-14.
31-01-2013

Petition No.
202/TT/2012

Approval of transmission Tariff of Assets associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO to 31.03.2014.
28-01-2013

Docket No.
9/TT/2013

Approval of Transmission Tariff for Northern Region System Strengthening Scheme (NRSSS) -XX for Tariff block 2009-14.
28-01-2013

Petition No.
74/TT/2012

Approval under sub-section(4) of Section 28 of Electricity Act 2003 for determination of Fees and charges for National Load Despatch Centre- NLDC (POWERGRID portion) for the tariff block 2009-14 .
03-12-2012

Petition No.
68/TT/2012

Approval of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets (part-II) under Common Scheme for 765 KV Pooling Stations and Network for NR, Important by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 .
03-12-2012

207/TT/2012

Approval of Transmission tariff of Elements of assets (6 nos. Bus Reactors-part-IV) under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period .
25-10-2012

92/TT/2012

Approval for determination of transmission Tariff for LILO of 400 KV S/C Meramundali-Jeypore Transmission Line and associated bays at Bolangir Sub-station alongwith 02 Nos 50 MVAR Shunt Reactor ,01 No 80 MVAR Bus Reactor and 02 Nos 315 MVA associated with Eastern Region Strengthening Scheme-III in Eastern Region .
25-10-2012

213/TT/2012

Approval of Transmission Tariff for Transmission Assets under Eastern Region Strengthening Scheme – III in Eastern Region .
03-10-2012

198/TT/2012

Approval of transmission tariff of assets under Common scheme for 765 KV pooling Stations and Network for NR, Import by NR from ER and NER/SR/WR via ER and Common scheme for network for WR and Import by WR from ER and from ER and from NER/SR/WR via in Eastern Region for tariff block 2009-14 period .
05-10-2012

215/TT/2012

Approval of Transmission Tariff for (i) 765 KV S/C Satna-Bina Ckt-2 TL along with associated bays at Satna & Bina S/S (ii) 765 KV, 3*80 MVAR Bus Reactor at Santa (iii) 765 KV, 4*333 MVA ICT-1 at Santa along with associated bays of 765 KV & 400 KV, (iv) Upgradation of existing Seoni-Bina TL at 765 KV level along with associated bays at Seoni SS & Bina SS under Sasan UMPP TS in Western region for tariff block 2009-14 period .
03-10-2012

199/TT/2012

Approval of Transmission Tariff for Assets under 765 KV system for Central part of Northern Grid part-I, for Tariff block 2009-14 period in Northern region .
03-10-2012

213/TT/2012

Approval of Transmission Tariff for Transmission Assets under Eastern Region Strengthening Scheme – III in Eastern Region .
03-10-2012

202/TT/2012

Approval of transmission Tariff of Assetsunder Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO to 31.03.2014 .
03-10-2012

224/TT/2012

Approval of transmission Tariff for assets associated with Gas Based Combined Cycle Power Project (GBCCPP) of ONGC Tripura Power Company Limited, New Delhi .
01-10-2012

206/TT/2012

Approval of Transmission Tariff of Asset I: 160 MVA Transformer (Ist) and associated bays at Malda S/s; Asset II: 160 MVA Transformer (2nd) and associated bays at Malda S/s; Asset III: 01 No. 400KV bay at Malda S/s; Asset IV: 160 MVA Transformer and associated bays at 220/132 KV Birpara S/s; Asset V: 160 MVA Transformer and associated bays at 220/132 KV Siliguri S/s under ERSS-IV in Eastern Region .
01-10-2012

195/TT/2012

Approval of transmission tariff for 1 no .400 KV 63 MVAR Line Reactor at Cochin for the period from DOCO to 31.03.2014 under Kudankulam ATS in SR for Tariff block 2009-14 .
01-10-2012

204/TT/2012

Approval of Transmission tariff for 315 MVA, 400/220/33 KV 3-Phase Spare ICT at Raipur SS, 315 MVA, 440/220/33 KV 3- phase Spare ICT at Pune SS & 420, 80MVAR 3 phase Spare shunt reactor at Wardha SS under Provision of Spare ICTs and Reactor for Westren Region from DOCO to 31.3.2014 .
25-09-2012

196/TT/2012

Approval for determination of Transmission Tariff from DOCO to 31.03.2014 for 15.5 Km Loop in portion of the line section to provide arrangement for evacuating ROJA power out of the LILO of both Ckts of 400 KV D/C Bareilly-Lucknow line under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
27-09-2012

203/TT/2012

Approval for 400 KV 80 MVAR Bus Reactor at Neemrana S/S under the Transmission System associated with Northern Region System Strengthening Scheme-XV (NRSS-XV), for tarrif block 2009-14 period in Northern Region .
25-09-2012

188/TT/2011

Determination of transmission tariff for (a) Combined elements of Talcher and Kolar (HVDC- portion) and (b) Combined elements of Talcher and Kolar (AC portion) from 01.04.2009 to 31.3.2014 in Southern Region .
25-09-2012

201/TT/2012

Approval of Transmission Tariff for Transmission assets (Group - 3) associated with 765 kV system for Central Part of Northern Grid Part – II, for Tariff Block 2009-14 period in Northern Region .
24-09-2012

216/TT/2012

Approval of transmission Tariff for 400 KV Line bays at Silchar S/S and Bongaigaon line of NETC along with 2 Nos. of Switchable line reactors at Silchar and Bongaigaon S/S each under Transmission System associated with Pallatana GBPP and Bongaigaon TPS, for 2009-14 period in North Eastern Region .
24-09-2012

194/TT/2012

Approval for determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for Associated line bays for 765 kV for Fatehpur- Agra T/L at Fatehpur and Agra S/S under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period .
24-09-2012

187/TT/2011

Approval of Transmission Tariff of Combined Elements from DOCO to 31.4.2014 for combined assets (part) for Asset -I 400kV D/C Lucknow (NEW)- Lucknow (Old) line with associated bays at both end, Asset - 2 765 kV S/C Balia S/S alongwith associated bays at both ends , Assets -3 765/400 kV , 1500 MVA ICT I at Ballia S/S alongwith associated bays and Asset -4 765/400 kV , 1500 MVA ICT I at Lucknow S/S alongwith associated bays 5 Associated bays at Biharshariff and Sasaram end ( for Biharshariff -Sasaram 400 kV quad T/L under Supplementary transmission system for DVC Maithon Right Bank Project) Under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and Common Scheme for Network for WR and Import by WR from ER and from NER /SR/ WR via ER in Northern Region for tariff block 2009-14 .
24-09-2012

85/TT/2012

Approval of Transmission Tariff for 400/220 kV New GIS Sub-station at Navi Mumbai along with LILO of Lonikhand – Kalwa T/L (Ant. DOCO: 01.04.2012) under WRSS – V Transmission System in Western Region .
24-09-2012

200/TT/2012

Approval for determination of transmission tariff for 765 KV S/C Fatehpur-Agra TL associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern region .
11-09-2012

92/TT/2012

Approval for determination of transmission Tariff for LILO of 400 KV S/C Meramundali-Jeypore Transmission Line and associated bays at Bolangir Sub-station alongwith 02 Nos 50 MVAR Shunt Reactor ,01 No 80 MVAR Bus Reactor and 02 Nos 315 MVA associated with Eastern Region Strengthening Scheme-III in Eastern Region .
11-09-2012

89/TT/2012

Approval for determination of Transmission Tariff for (a) 2X500MVA ICTs At Jaipur-South, (b) 2X315 MVA ICTs AT Sohawal and (c) Combined tariff of LILO of 400 KV D/C Agra Jaipur line at Jaipur-South, & LILO of 400 KV D/C Balia Lucknow Line at Sohawal under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
11-09-2012

84/TT/2012

Approval for determination of transmission tariff for (i) 400/220KV, 315 MVA ICT-I along associated bays at Bhiwani S/S and (ii) 400/220 KV, 315 MVA ICT-II alongwith associated bays at Bhiwani S/S under 765 KV system for Central Part of Northern Grid Part III for Tariff block 2009-14 period in Northern Region .
04-09-2012

82/TT/2012

Approval of transmission tariff for 400 KV 80 MVAR Bus Reactor at Neemrana S/S under the Transmission System associated with Northern Region System Strengthening Scheme-XV, for tariff block 2009-14 in Northern Region .
03-09-2012

78/TT/2012

Determination of transmission tariff for Asset-I: LILO of both circuits of 400 kV D/C Bamnouli- Mundka/ Bawana at Jatikalan 765/400 kV S/S, Asset-II: Agra- Jatikalan 765 kV S/C T/L and Asset-III: Agra- Meerut 765 kV S/C T/L under 765 kV system for Central Part of Northern Grid Part-I, for tariff block 2009-14 period in Northern Region. .
31-08-2012

77/TT/2012

Determination of transmission tariff of Asset-1: 400 kV, 125 MVAR Bus Reactor –I at Sasaram Substation alongwith associated bays, Asset-II: 400 kV, 125 MVAR Bus Reactor –II at Sasaram Substation alongwith associated bays; Asset-III: 2 Nos. 50 MVAR switchable Line Reactors at Maithon substation under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period .
29-08-2012

184/TT/2011

Approval for determination of Combined Transmission System from anticipated DOCO: 1.1.2012 to 31.3.2014 for assets .
30-08-2012

112/TT/2012

Approval for determination of Transmission tariff for Northern Region System Strengthening Scheme-V, for tariff block 2009-14 period in Northern Region .
30-08-2012

Docket
72/TT/2012

Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Condition of Tariff) Regulations, 2009 for determination of transmission tariff for 1 no. 400 kV 63 MVAR line reactor at Cochin (DOCO: 1.6.2012) for the period from DOCO to 31.3.2014 under Kudankulam ATS in Southern Region for tariff block 2009-14 period .
07-08-2012

98/TT/2012

: Approval under Regulation-86 for transmission tariff for (I) 132 kV Silchar-Hailakadni (AEGCL) line alongwith associated bays (anticipated DOCO:1.4.2012), (II) 200 MVA, 400/132 kV ICT-II at Silchar along with associated bays (anticipated DOCO: 1.4.2012), (III) 400 kV D/C Pallatana-Surajmaninagar line (charged at 132 kV) along with associated bays (anticipated DOCO: 1.7.2012), (IV) 400 kV Silchar-Purbakanchanbari line (charged at 132 kV) along with associated bays (anticipated DOCO :1.7.2012) and (V) 080 MVAR, 420 kV Bus reactor at Bongaigaon along with associated bays (anticipated DOCO :1.7.2012), under transmission system associate with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for Tariff block 2009-14 period .
02-08-2012

88/2011

Approval under Regulation-86 for transmission tariff for Asset I : (a) LILO of 400 kV D/C Bina-Nagda at Shujalpur S/S along with 50 MVAR Line Reactor at Shujalpur & Switchable shame for Reactor at Bina & Nagda S/S (b) New 400/220 kV S/S at Shujalpur (Ant. DOCO : 1.4.2011), Asset II: Combined asset of (a) LILO of 400 kV D/C Bina-Nagda at Shujalpur S/s alongwith 50 MVAR Line Reactor at Shujalpur & Switchable scheme for Reactor at Bina & Nagda S/S (b) New 400/220 kV S/S at Shujalpur (Ant. DOCO : 4.4.2011) and 400 kV, 63 MVAR Bus Reactor at Shujalpur along with associated bays of 400 kV (Ant DOCO : 1.8.2011) (Notional DOCO: 1.8.2011) Asset III: 400/220 kV ICT I at Shujalpur laong with associated bays of 400kV & 220 kV (Ant. DOCO: 1.6.2011) Asset IV : Combined asset of 400/220 kV ICT I (Ant. DOCO: 1.6.2011) & ICT II at Shujalpur along with associated bays of 400 & 220 kV (Ant. DOCO: 1.8.2011) (Notional DOCO: 1.8.2011) under WRSS IX Transmission Scheme in WR for the period from DOCO to 31.3.2014 .
30-07-2012

65/TT/2012

Approval under Regulation 86 of CERC (Conduct of Business) Regulations' 1999, and CERC (Terms and Conditions of Tariff) Regulations' 2009, for determination of Transmission Tariff from anticipated DOCO to 31.3.2014 for a) LILO of Neelamangala-Somanhalli 400 kV D/C Line at Bidadi with IX 63 MVAR Bus Reactor (anticipated DOCO 1.1.2012), and b) 2X 500 MVA ICTs with associated bay and equipment along with downstream network at Bidadi GIS S/S (anticipated DOCO 1.1.2012) under System strengthening-X in Southern Region Grid. .
30-07-2012

107/TT/2012
in Docket No.
39/TT/2012

Approval under regulation-86 for transmission tariff for (i) One Ckt of part of 400 KV korba- Birsinghpur D/C line (from Korba Gantry to LILO point) Loc.- 179/2 of Balco TPS (Ant. DOCO: 01.08.2011), (ii) Combined Assetsof (i) & One Ckt of Part of 400kv Korba- Birsinghpur D/C line (from korba Gantry to LILO point) Loc.-179/2) along with bay at Korba and D/C line from Loc 179/2 to 176/0 of Vandana TPS (Notional DOCO: 01.12.2011) & (iii) Combined Assets of (ii) & Bal;ance portion of 400Kv D/C Korba- Birsinghpur Tl (from LILO point 176/0 (take off for Vandana Vidyut) to Birsinghpur (MP) (Notional DOCO: 01.03.2012) under WRSS-II, set D Scheme of Western Region for tariff block 2009-14 period .
24-07-2012

60/TT/2012

Approved under Regulation-86 of CERC (Conduct of Business) Regulations' 1999 and CERC (Terms and Conditions of Tariff) Regulation' 2009 for determination of Transmission Tariff for 765 kV S/C Fatehpur-Agra Transmission Line (DOCO: 1.6.2012) associated with supplementary Transmission System under DVC and Maithon right bank project in Eastern Region from DOCO to 31.3.2014.
20-07-2012

70/TT/2012

Approval under Regulation-86 of CERC (Conduct and Business) Regulation’ 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of transmission tariff of Elements from DOCO to 31.3.2014 for assets (Part-III) under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period..
12-07-2012

75/TT/2012

Approval under Regulation-86 for determination of transmission tariff for Spare Convertor Transformer at Rihand (DOCO: 01.12.2011) for Rihand- Dadri HVDC Bipole Terminal from anticipated DOCO to 31.03.2014 in NR for tariff block 2009-14 period.
06-07-2012

77/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Transmission assets (Group-I) associated with 765 kV system for Central Part of Northern Grid Part-II for tariff block 2009-14 period in Northern Region.
06-07-2012

80/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 from anticipated DOCO to 31.03.2014 for 50 % series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar) – Meerut 765 kV 2*S/C lines (charged at 400 kV) under Transmission System associated with Koteshwar HEP, for tariff block 2009-14 period in Northern Region.
06-07-2012

82/TT/2012

Approval under Regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff for Asset-I: 765 kV Moga- Bhiwani T/L (Anticipated DOCO: 01.04.2012) and Asset-II: 765 kV Jattikalan- Bhiwani T/L (Anticipated DOCO: 01.07.2012) associated with 765 kV system for Central Part of Northern Grid Part-I, for tariff block 2009-14 period in Northern Region
06-07-2012

99/TT/2012

Approval under Regulation 86 of CERC (Conduct of Business) Regulation,1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of Transmission Tariff for Transmission assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 period in Northern Region
06-07-2012

90/TT/2012

Approval under Regulation-86 of CERC (Conduct and Business) Regulation’ 1999 and CERC (Terms and Conditions of Tariff) Regulations’ 2009 for determination of transmission tariff of Elements from DOCO to 31.3.2014 for assets (Part-III) under Common Scheme for 765 kV Pooling Station and Network for NR, Import by NR from ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Northern Region for tariff block 2009-14 period
12-07-2012

91/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff from DOCO: 31.03.2014 for Combined Assets for transmission system associated with PARABATI-III- HEP in Northern Region for tariff block 2009-14 period
04-07-2012

87/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff from DOCO: 31.03.2014 for Assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER/SR/WR via ER and Common Scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 period
04-07-2012

86/2012

Approval for determination of transmission tariff for (i) Vindhyachal IV- Vindhyachal Pooling Station 400 KV D/C (QUAD) (Bypassing Vindhyachal Pooling Station) TL and (ii) 400 kV D/C Sasan- Vindhyachal Pooling Transmission Line associated with Vindhyachal IV & Rihand III (1000 MW) Generation Project (under interim contingency arrangement for power evacuation) in Western Region for tariff block 2009-14 period
18-05-2012

185/2011

Determination for transmission tariff for 400 kV D/C Andal (DVC) Jamshedpur Section of Durgapur-Jamshedpur Transmission line and associated bays at Jamshedpur S/S under ERSS -I in Eastern Region from Ant. DOCO (01.01.2012) to 31.03.2014
18-05-2012

96/TT/2012

Approval for determination of transmission tariff for Pole-II of +/- 500 kV, 2500 MW Balia- Bhiwadi HVDC Bipole associated with Barh Generation Project (3x660 MW) in Northern Region from anticipated date of commercial operation (1.7.2012) to 31.3.2014
15-05-2012

65/TT/2012

Approval for determination of transmission tariff for (a) LILO of Neelamangala-Somanhalli 400 KV D/C Line at Bidadi with 1X63 Bus Reactor and (b) 2X500 MVA ICTs with associated bay and equipments along with downstream network at Bidadi GIS S/S under System strengthening -X MVAR in Southern Regional Grid
15-05-2012

63/TT/2012

Approval for determination of Transmission tariff for Tuticorin JV-Madurai 400KV D/C (Quad Conductor) Line and extension of 400/220 KV Madurai S/S under ATS of Tuticorin JV PPS in Southern Region.
14-05-2012

102/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulation 1999 and CERC (Terms and Conditions of Tariff) Regulations 2009 for determination of Transmission Tariff from DOCO to 31.03.2014 for Combined Assets for transmission system associated with Northern Region Bus Reactor Scheme in Northern Region for tariff block 2009-14 .
15-05-2012

127/2012

Application under Section 63 of the Electricity Act,2003 for adaptation of transmission charges with respect to the transmission system being established by the Vemagiri transmission system Limited (a 100% wholly subsidiary of PGCIL) .
10-05-2012

97/TT/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations’1999 and CERC (Terms and Conditions of Tariff) Regulations’2009 for determination of Transmission Tariff of Elements from date of commercial operation to 31.3.2014 for assets(part) under System strengthening scheme in Northern region for Sasan & Mundra UMPPs for tariff block 2009-14 period .
14-05-2012

95/TT/2011

Approval under Regulation-86 of CERC (conduct of Business) Regulations'1999 and CERC (Terms and Condition) Regulations'2009 for determination of Transmission Tariff (i) LILO of 400 kV D/C Vindhyachal-Jabalpur ckt 3&4 TL at Sasan (Anticipated DOCO 01.03.2012) (ii) 765 kV S/C Sasan-Satna Ckt-1 TL (initially charged at 400 kV level) along with associated bays at Satna (under contingency plan for power evacuation of NTPC-VSTPP#4 Generation Project) (Anticipated DOCO 01.03.2012), (iii) 765 kV S/C Satna-Bina Ckt#1 TL (initially charged at 400 kV level) along with associated bays at Satna& Bina S/S (under contingency plan evacuation of NTPC-VSTPP#4 Generation Project) (Anticipated DOCO 01.03.2012), (iv) 765 kV S/C Bina-Indore TL (initially charged at 400 kV level) along with associated bays at Bina S/S (Bypassing Indore (new-POWRGRID) SS{under contingency plan for evacuation of NTPC-VSTPP#4 Generation Project}) (Anticipated DOCO 01.04.2012) & (v) 400 D/C (quad) Indore (new)-Indore (MPPTCL) TL along with associated bays at Indore (MPPTCL) SS Bypassing Indore (New POWERGRID) SS for interconnection with Bina- Indore Line {under contingency plan for power evacuation of NTPC-VSTPP#4 Generation Project} associated with Sasan UMPP TS in western Region for tariff block 2009-14 period .
7-05-2012

99/TT/2012

Approval for determination of Transmission Tariff for assets associated with 765 kV system for Central Part of Northern Grid Part-III, for Tariff block 2009-14 in Northern Region .
27-04-2012

98/TT/2012

Approval of Transmission Tariff from anticipated notional DOCO to 31.3.2014 for assets under Transmission System associated with Pallatana Gas Based Power Project and Bongaigaon Thermal Power Station in NER for tariff block 2009-14 .
27-04-2012

100/TT/2012

Approval for determination of transmission tariff for transmission assets (Group-2) associated with 765 kV System for Central Part of Northern Grid Part-II for tariff block 2009-14 in Northern Region .
16-04-2012

72/TT/2012

Approval for transmission tariff for (I) Combined assets of Establishment of 765/400 KV 1500 MVA ICT 3 with bays at Wardha SS, 400/220 KV Bachchau Substation (Gujrat) and 1*63 MVAR Bus Reactor at Bachchau Substation (New) along with associated bays, 400 KV Gandhar (NTPC)- Navsari line along with associated bays at Gandhar (NTPC) and Navsari (GIS) S/S, Navsari GiS S/S (New) & (II) Combined assets of (I) & 765/400 KV 1500 MVA ICT 2 at Wardha SS with bays & Bay Extension at 765 KV Seoni SS & Wardha SS for 765 Seoni- Wardha Ckt-I alongwith switchable Line Reactor at Seoni and under ATS for Mundra (4000MW) UMPP for the period from DOCO to 31.03.2014 .
16-04-2012

103/TT/2012

Approval for determination of transmission tariff for 400 kV D/C (QUAD) Mauda-Wardha TL with associated bays at Wardha S/S under Mauda TS in Western Region .
13-04-2012

89/2012

Approval under regulation-86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations2009 for determination of Transmission Tariff from anticipated DOCO to 31.03.2014 for (a) 2X500MVA ICTs At Jaipur-South (anticipated DOCO- 01.06.2012), (b) 2X315 MVA ICTs AT Sohawal (anticipated DOCO- 01.07.2012) and (c) Combined tariff of LILO of 400 KV D/C Agra Jaipur line at Jaipur-South (anticipated DOCO-01.07.2012), & LILO of 400 KV D/C Balia Lucknow Line at Sohawal- (anticipated DOCO- 01.07.2012) under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
11-04-2012

87/2012

Approval for determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets under Common Scheme for 765 KV Pooling Stations and Network for NR, Import by NR from ER and Common scheme for network for WR and Import by WR from ER and from NER/SR/WR via ER in Eastern Region for tariff block 2009-14 .
12-04-2012

94/TT/2012

Approval under Regulations-86 for transmission tariff for 125 MVAR Bus Reactor at 400/220 kV Rajgarh S/S with associated bays at Rajgarh S/S (Ant. DOCO: 1.5.2012) under 125 MVAR Bus Reactor at 400/220 kV Rajgarh S/S Scheme of Western Region from DOCO to 31.3.2012 .
12-04-2012

78/TT/2012

Approval under Regulations-86 for transmission tariff for 765 kV S/C Seoni-Wardha T/L (Anticipated DOCO: 1.3.2012) under WRSS-II, Set A Scheme of Western Region from DOCO to 31.3.2014 .
12-04-2012

71/TT/2012

Approval under regulation-86 of CERC (conduct of Business) regulations 1999 and CERC (terms and Conditions of tariff) Regulations 2009 for determination of Transmission Tariff from anticipated DOCO (01.01.2012) to 31.03.2014 for 315 MVA, 400/220 KV ICT at Bhiwadi under Northern Regional Transmission Strengthening Scheme in NR for tariff block 2009-14 period .
12-04-2012

91/TT/2012

Approval for determination of Transmission Tariff from DOCO to 31.03.2014 for Combined Assets for transmission system associated with PARABATI- III HEP in Northern Region for tariff block 2009-14 .
16-04-2012

85/TT/2012

Approval for transmission tariff for 400/220 KV New GIS S/S at Navi Mumbai along with LILO of Lonikhand-Kalwa TL (Ant. DOCO: 01.04.2012) under WRSS-V Transmission System in WR Region for the period from DOCO to 31.03.2014.. .
16-04-2012

76/TT/2012

Approval of Transmission charges for Additional Special Energy Meters in Northern Region for the Tariff Block 2009-14. .
13-04-2012

82/TT/2012

Approval for determination of Transmission Tariff for Assets I: 765 KV Moga- Bhiwani T/L (anticipated DOCO: 01.04.2012) and Assets II: 765 KV Jattikalan-Bhiwani T/L (anticipated DOCO: 01.07.2012) associated with 765 KV system for Central part of Northern Grid Part-I, for Tariff block 2009-14 period in Northern Region .
11-04-2012

79/TT/2012

Petition for determination of Transmission Tariff for Assets under Northern Region System Strengthening XIII (NRSS XIII) of Northern Region, for tariff block 2009-14 period .
11-04-2012

101/TT/2012

Petition for determination of transmission tariff for Assets I: 400 DC (Quad) LILO of Barh-Balia Line at Patna alongwith associated bays at Patna S.S; Asset II: 765-415 KV, 3x500 MVA ICT I Ranchi alongwith associated bays at 765 KV Ranchi S.S; Assets III: Combined Assets of 400 KV DC (Quad) Ranchi (New) - Ranchi (Old) - I T.L. and associated 400 KV line bays at Ranchi (New) S.S & Ranchi (Old) S.S; and 400 KV DC (Quad) Ranchi (New) - Ranchi (Old) - II TL and associated 400 kV line bays at Ranchi (New) SS & Ranchi (Old) SS; and 765-415 KV, 3x500 MVA ICT II at Ranchi alongwith associated bays at 765KV determination of Transmission Tariff of Elements from DOCO to 31.03.2014 for assets under Common Scheme for 765 kV Pooling Stations and Network for NR, Import by NR from ER and from NER-SR-WR via ER and Common scheme for network for WR and Import by WR from ER and from NER-SR-WR via ER in Eastern Region for tariff block 2009-14 .
10-04-2012

84/TT/2012

Petition for determination of Transmission tariff for LILO of one ckt. of 400 KV D/C Baripada- Mendhasal Transmission line at Dubri and associated bays at Dubri alongwith one no. Bus Reactor at Dubri associated with Eastern Region Strengthening Scheme-III in Eastern Region from anticipated DOCO (01.04.2012) to 31.03.2014. .
10-04-2012

81/TT/2012

Petition for determination of transmission tariff for 1 no. 400 KV, 63 MVAR Line Reactor at Cochin (DOCO-01.01.2012) for the period from 1.1.2012 to 31.3.2014 under Kudankulam ATS in SR for tariff block 2009-14 .
10-04-2012

80/TT/2012

Petition for determination of Transmission Tariff from anticipated DOCO to 31.03.2014 for 50% series compensation at Meerut (Extension) on Tehri Pooling Point (Koteshwar)- Meerut 765 KV 2*S/C lines (charged at 400 KV) under Transmission system associated with Koteshwar HEP, for tariff block 2009-14 period in NR .
10-04-2012

77/TT/2012

Petition for determination of Transmission Tariff for Transmission assets (Group-1) associated with 765 KV for Central Part of Northern Grid part-II, for Tariff block 2009-14 period in Northern Region .
10-04-2012

75/TT/2012

Petition for determination of transmission Tariff for Spare Converter Transformer at Rihand for Rihand- Dadri HVDC Bipole Terminal from anticipated DOCO to 31.03.2014 in NR for tariff block 2009-14 period .
10-04-2012

37/TT/2011

Petition for determination of tariff for transmission system associated with evacuation of power from Karcham Wangtoo Hydro Electric Project located in the State of Himachal Pradesh to Abdullapur sub-station located in the State of Haryana .
30-03-2012

88/2011

Approval for determination of transmission tariff for assets under WRSS IX in WR for the Tariff Block 2009-14 .
19-03-2012

150/2011

Petition for determination of transmission tariff for Combined elements of Baripada - Chandaka (Mendhasal) (Gridco) 400 kV D/C Line and 400 kV D/C Jamshedpur - Baripada Line associated bays under ERSS-I in Eastern Region .
12-03-2012

Docket No.
4/TT/2012

Approval under sub-section(4) of Section 28 of Electricity Act 2003 for determination of Fees and Charges for Unified Load Despatch and Communication Scheme (POWER GRID) portion i.e Communication system portion and SLDC system retained by the petitioner after formation of POSOCO) in Northern Region for the period 2009-14.
12-03-2012

Docket No.
7/TT/2012

Approval for determination of transmission tariff for Extension of 765/400 kV Bilaspur Pooling station (near Sipat) alongwith LILO of Sipat- Seoni ckt-2 with 3x80 MVAR switchable line Reactor and 765/400 kV, 1500 MVA Auto-transformer 3 (Ant. DOCO 01.03.2012) under WRSS XI Scheme in WR for Tariff Block 2009-14 period
12-03-2012

Docket No.
12/TT/2012

Approval for determination of transmission tariff for 400 KV D/C (Quad) Koderma -Gaya Transmission Line and associated bays at Gaya Sub-station associated with supplementary transmission System under DVC and Maithon right bank project in ER
06-03-2012

Docket No.
3/TT/2012

Approval for determination of transmission Tariff for 765/400 Bilaspur pooling Station (near Sipat) alongwith LILO of Sipat-Seoni Ckt-1 with 3X80 MVAR Switchable Line Reactor, 3X80 MVAR Bus Reactor and 765/400 KV, 1500 MVA Auto- transformer 1 & 2 (ant. DOCO: 01.03.2012) under WRSS X Scheme in Western Region for tariff block 2009-14 Period
.
06-03-2012

Docket No.
9/TT/2012

Approval for transmission tariff for Combined assets under ATS for Mundra (4000 MW) UMPP for the period from date of commercial operation to 31.3.2014.
06-03-2012

Docket No.
10/TT/2012

Approval for determination of transmission tariff for (a) LILO of Neelamangala- Somanhalli 400 KV D/C Line at Bidadi with 1X63 Bus Reactor and (b) 2X500 MVA ICTs with associated bay and equipments along with downstream network at Bidadi GIS S/S under System strengthening -X MVAR in Southern Regional Grid
.
06-03-2012

Docket No.
14/TT/2012

Approval for determination of Transmission Tariff for Combined Assets-I+II: (I) 400KV D/C Manesar-Neemrana Line along with associated bays and (II) 400KV D/C Bhiwadi-Neemrana Line and Asset-III: 2X315MVA 400/220KV ICTs (ICT-I &ICT-II) at Neemrana under the Transmission System associated with Northern Region System Strengthening Scheme-XV (NRSS-XV), for tariff block 2009-14 period in Northern Region
.
06-03-2012

Docket No.
15/TT/2012

Approval for determination of Transmission tariff for assets associated with Supplementary Transmission System under DVC and Maithon right bank project in Northern region from anticipated DOCOs to 31.03.2014
05-03-2012

111/2011

Approval under regulation - 86 for determination of transmission tariff for 2nd Spare Converter Transformer at Kolar (Ant. DOCO - 01.05.2011) and Talcher (Ant. DOCO - 01.09.2011) HVDC Terminals (One each at Talcher and Kolar ) from anticipated DOCO to 31.03.2014 in SR for tariff block 2009-14 period
27-02-2012

147/TT/2011

Approval for determination of Transmission Tariff for assets under Transmission System associated with Northern Region System Strengthening Scheme-VI (NRSS-VI) for tariff block 2009-14 period in Northern Region
27-02-2012

Docket No.
7/TT/2012

Approval for determination of transmission tariff for Extension of 765/400 kV Bilaspur Pooling station (near Sipat) alongwith LILO of Sipat- Seoni ckt-2 with 3x80 MVAR switchable line Reactor and 765/400 kV, 1500 MVA Auto-transformer 3 (Ant. DOCO 01.03.2012) under WRSS XI Scheme in WR for Tariff Block 2009-14 period
15-02-2012

Docket No.
9/2012

Approval for transmission tariff for assets/ combined assets under ATS for Mundra (4000 MW) UMPP
13-02-2012

Docket No.
48/TT/2011

Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of tariff) Regulations 2009 for determination of transmission tariff for Northern Region System Strengthening Scheme-V , for tariff block 2009-14 period in Northern Region
06-02-2012

72/2011

Approval of transmission tariff for spare converter transformer for Vizag back to back HVDC Terminal in Southern Region for Tariff Block 2009-14 Period
23-01-2012

Docket No.
43/TT/2011

Approval for determination of Transmission Tariff for (i) ICT III at 400/220 Pune S/S along with associated bays, and (ii) Combined assets of ICT III at 400/220 Pune S/S along with associated bays and ICT III at Wardha S/S along with associated bays under WRSS VI Scheme in Western Region for tariff block 2009-14 period
12-01-2012

88/2011

Approval for transmission tariff for Assets under under WRSS IX
02-01-2012

86/2011

Approval for determination of transmission tariff for Transmission System associated with Farakka-III in Eastern Region for tariff block 2009-14 period
02-01-2012

186/2011

Determination of transmission tariff from projected DOCO : 01.01.2012 to 31.03.2014 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under the Augmentation of 220/132 kV transformation capacity at Raebareli (POWERGRID) by 1 x 100 MVA transformer, for tariff block 2009-14 period in Northern Region
02-01-2012

Docket No.
44/TT/2011

Approval for determination of Transmission Tariff for (a) LILO of both Circuits of Udumalpet - Madakathara (North Trichur) 400 kV D/C Line at Chulliar (Palakkad) 400 kV Sub-Station (New) and 1X63 MVAR Bus Reactor along with associated bays (Anticipated DOCO: 01.03.2012), and (b) 2X315 MVA 400/220 kV ICTs at Chulliar (Palakkad) S/S along with associated Bays and 220 kV downstream system (Anticipated DOCO: 01.03.2012) under System Strengthening-XI in Southern Regional Grid
13-12-2011

Docket No.
41/TT/2011

Approval for determination of transmission tariff for 2 nos. 220 kV Bays at Trivandrum under Transmission System associated with Kudunkulum in Southern Region for tariff block 2009-14 period
28-11-2011

150/2011

Approval for determination of Transmission Tariff for combined elements of (i) Baripada-Chandaka (Mendhasal) (GRIDCO) 400kV D/C Line and (ii) 400kV D/C Jamshedpur- Baripada line and associated bays under ERSS-I in Eastern Region from Notional Anticipated DOCO (1.8.2011) to 31.3.2014
28-11-2011

85/TT/2011

Approval for determination of transmission tariff for assets under Transmission System associated with Koteshwar HEP, for tariff block 2009-14 period in Northern Region
03-11-2011

07/TT/2011

Approval for determination Transmission Tariff for the tariff block 2009-14 for (i) Combined assets of (ASSET-I) 220/132 kV, 100 MVA ICT-II at Sitarganj and (ASSET-II) 220/132 kV, 100 MVA ICT-I at Pithoragarh and (ASSET-III) 220/132 kV, 100 MVA ICT-II at Pithoragarh and (ii) (ASSET-IV) LILO of one ckt. of Dhauliganga- Bareilly at Pithoragarh under System Strengthening Scheme in Uttaranchal in Northern Region
21-10-2011

152/TT/2011

Approval for transmission tariff for Assets under WRSS- II, Set-B Scheme of Western Region for 2009-14.
11-10-2011

326/2010

Approval for Transmission Tariff for Rihand Transmission System in Northern Region for the period from 01.04.2009 to 31.03.2014.
10-10-2011

37/MP/2011

Petition under Section 79(1) (c) and (d) read with Section 2(36) (ii) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999.
05-10-2011

26/TT/2011

Approval for transmission tariff for Combined assets for (1) 400 kV D/C Mundra- Bachchau (Triple Snowbird) Transmission Line along with associated bays at Bachchau Sub-Station (Extension) and 400 kV D/C Bachau- Ranchodpura T/L with associated bays at Bachau and Ranchodpura S/S, 400 kV D/C Mundra- Limbdi T/L (Triple Snowbird) with associated bays at Limbdi S/S, under ATS for Mundra (4000 MW) UMPP for the period from DOCO to 31.03.2014.
30-09-2011

136/TT/2011

Approval for determination of Transmission Tariff for ICT III at Raipur S/S along with bay extension WRSS VI Scheme in Western Region for tariff block 2009-2014 period
15-09-2011

145/2011

A pproval for determination of Transmission Tariff of Combined Element of 400 kV S/C URI 1- URI - 2 Inter- connector Transmission Line along with bays at NHPC end (Anticipated DOCO: 01.07.2011) and 400 kV S/C URI 2- Wagoora Transmission Line along with bays at Wagoora Sub-Station (Anticipated DOCO: 01.10.2011) associated with URI - 2 Transmission System for tariff block 2009-14 period in Northern Region
12-09-2011

316/2010

Approval under regulation-86 for transmission tariff for Singrauli Transmission System in Northern Region for the period from 01.04.2009 to 31.03.2014.
30-08-2011

16/2011

Approval for determination of Transmission Tariff from projected DOCO 01.01.2012 to 31.03.2014 for 220/132 kV 100 MVA ICT and associated bays at Raebareli under the augmentation of 220/132 kV transformer capacity at Raebarali (Powergrid) by 1x100MVA Transformer, for tariff 2009-2014 period in Northern Region .
24-08-2011

160/2011
Approval for determination of Transmission Tariff for assets under “ERSS-II” in Eastern Region for 2009-14 period 24-08-2011

94/TT/2011

Approval for determination of transmission of 400 kV S/C Chamera-II Pooling Station transmission line, 400/220 kV GIS Pooling Station at Rajera with 400/220 kV 315 MVA ICT-I & ICT-II and 80 MVAR Bus Reactor at pooling point under Establishment of 400/220 kV GIS Pooling Station near Chamera-II HEP for tariff block 2009-14 period in Northern Region
18-08-2011

Docket No.
08/2010

Revision of transmission tariff due to additional capital expenditure incurred during 2008-09 for Up-gradation of transfer capacity of Talcher-Kolar HVDC Bi-pole from 1.8.2007 to 31.3.2009 in Southern Region
16-08-2011

Docket No.
011/2011

Approval for determination of transmission tariff for a-Combined Assets of
•  Tirunelvi-Edmon 400 kV D/C line (DOCO:01.07.2010) •  2 nos. switchable line reactors at Udumaplet S/S (DOCO:01.12.2010 & 01.03.2011) and Cochin (Muvattapuzha)-Trichur 400kV D/C Quad line (anticipated DOCO: 01.01.2012) and b-Combined assets of •  315 MVA, 400,200kV ICT-I along with downstream system &I CT along with downstream system at Cochin (anticipated DOCO:01.01.2012) for the time period from 01.01.2012 to 23.03.2012 to 31..03.2014 under Kundakulam in SR for tariff block 2009-1r)
08-08-2011

30/TT/2011

Approval under regulation-86 of CERC (Conduct of Business) Regulations'1999 and CERC (Terms and Conditions of Tariff) Regulations'2009 for determination of Transmission Tariff for LILO Connectivity to DVC's ANDAL TPS through 400 kV D/C Durgapur- Jamshedpur T/Line associated with transmission system for ERSS-I in Eastern Region from DOCO(01.02.2011) to 31.03.2014
08-08-2011

323/2010

Approval under regulation-86 of CER (Conduct of Business) Regulations,2009 and CERC ( Terms and Conditions of Tariff) Regulations,2009 for transmission tariff for Transmission System associated with Farakka ( I&II) STPS in Eastern Region for the period from 01.04.2009 to 31.03.2014
23-06-2011


103/TT/2011

Approval under Regulation 86 CERC for Combined transmission tariff for: Asset-I(400 kV D/C Raigarh-Raipur TL along with associated bays,Asset-II(400 kV D/C Ranchi-Rourkela TL along with associated bays, Asset-III(400 kV D/C Rourkela-Raigarh TL along with associated bays and 40 % FSC along with 5-15% Thyristor Controller Series Capacitor (TCSC) on both the circuits of Raigarh-Raipur 400 kV D/C line at Raipur end under East-West Transmission Corridor Strengthening Scheme for tariff block 2009-14
26-05-2011