Interim Orders 2008
Pet. No. |
Subject |
Date of Hearing |
Date of Order |
140/2008
|
Approval of revised capacity charges of Faridabad Gas Power Station after accounting for the capital cost of switchyard transferred to NTPC from Power Grid Corporation of India Ltd. NTPC Ltd, New Delhi |
04-12-2008 |
04-12-2008 |
139/2008
|
Approval of revised capacity charges of Rajiv Gandhi Combined Cycle Power Project (RGCCPP) situated at Kayamkulam after accounting for the capital cost of switchyard transferred to NTPC from Power Grid Corporation of India Ltd. NTPC Ltd, New Delhi |
- |
04-12-2008 |
25/2008
|
Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW). NTPC Limited, New Delhi |
13-05-2008 |
15-05-2008 |
53/2008
I.A. No. 4/2008
|
Approval of provisional tariff for Mejia Thermal Power Generating Station Unit No. 5 of 250 MW Damodar Valley Corporation, Kolkata |
- |
30-04-2008 |
24/2008
31/2008
|
1. Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 for Ramagundam Super Thermal Power Station, Stage-III (500 MW).
2.Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Talcher Thermal Power Station, Stage-I (460 MW) NTPC Limited, New Delhi |
22-04-2008 |
28-04-2008 |
125/2007
In
126/2007
|
1.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (600 MW).Neyveli Lignite Corporation Limited, Chennai.Tamil Nadu Electricity Board, Chennai.
2.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise pooled lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (Expansion) (2x210 MW).Neyveli Lignite Corporation Limited, Chennai. |
22-11-2007 |
14-01-2008 |
|
|
Pet. No. |
Subject |
Date of Hearing |
Date of Order |
160/2008
|
Reimbursement of additional expenditure towards deployment of special security forces (CISF) at Bongaigaon sub-station and Tripura State Rifles (TSR) for transmission line patrolling for the year 2007-08 in North-eastern Region. Power Grid Corporation of India Limited, Gurgaon |
- |
22-12-2008 |
I.A.No.
35/2008
In
87/2007
|
Determination of final charges for sub-load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon |
- |
17-11-2008 |
104/2008
along with
I.A.No. 26/2008
|
Approval of incentive based on availability of transmission system of Southern Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon |
- |
29-09-2008 |
91/2008
along with I.A.
18/2008
|
Approval of incentive based on availability of transmission system of Western Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon |
- |
11-08-2008 |
I.A.
15/2008
In
87/2007
|
Determination of final charges for sub-load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon |
- |
01-08-2008 |
I.A.
14/2008
143/2005
|
Approval of tariff for Unified Load Despatch & Communication (ULDC) Scheme in Southern Region for the period from 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2001 to 2004. Power Grid Corporation of India Limited, Gurgaon |
- |
30-07-2008 |
I.A.
13/2008
74/2006
|
Approval of charges for Unified Load Despatch and Communication (ULDC) Scheme in Eastern Region for the period from 1.9.2005 to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon |
- |
30-07-2008 |
I.A.
12/2008
147/2005
|
Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04. Power Grid Corporation of India Limited, Gurgaon |
- |
29-07-2008 |
81/2008
In
9/2008
|
Approval of incentive based on availability of 400 kV D/C Gorakhpur-Lucknow transmission line, 400 kV D/C Barielly-Mandola transmission line and 400 kV D/C Muzaffarpur-Gorakhpur transmission line (50% share), associated with Tala Hydro Electric Power Project, East-North inter-connector and Northern Region Transmission System for the year 2007-08. Powerlinks Transmission Limited, New Delhi |
- |
29-07-2008 |
82/2008
In
10/2008
|
Approval for incentive for the year 2007-08 in respect of 400 kV D/C Siliguri Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)- Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorakhpur (50%) transmission line associated with Tala Hydro Electric project, East-North interconnector and Northern Region transmission system. Powerlinks Transmission Limited, New Delhi |
- |
29-07-2008 |
162/2005
|
Approval of incentive based on availability of transmission system for the year 2004-05 for Northern Region Power Grid Corporation of India Ltd., Gurgaon |
17-06-2008 |
23-06-2008 |
48/2000
|
Transmission tariff for 400 kV Bongaigaon-Malda transmission line between Eastern and North-eastern Regions. Power Grid Corporation of India Ltd., Gurgaon |
15-05-2008 |
09-06-2008 |
51/2008
|
Determination of provisional transmission tariff for LILO of 400 kV Lucknow (UPPCL)-Sultanpur (UPPCL) Transmission line at Lucknow (Power Grid) along with associated bays under Northern Region System Strengthening Scheme-I for the period 1.1.2008 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
22-05-2008 |
26-05-2008 |
43/2008
|
Determination of provisional transmission tariff for (i) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays (ii) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II, Phase-I Transmission System in Northern Region for the period 2004-09. Power Grid Corporation of India Ltd., Gurgaon |
15-05-2008 |
16-05-2008 |
44/2008
|
Determination of provisional transmission tariff for (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220/132 kV ICT III at Raibareilly along with associated bays and (ii) 100 MVA, 220/132 kV ICT II at Raibareilly sub-station along with associated bays for the period from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
15-05-2008 |
16-05-2008 |
63/2008
|
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2004 for determination of transmission tariff due to additional capitalization incurred during 2005-06 and 2006-07 for Hiriyur sub-station (including 315 MVA Auto Transformer) LILO of Davangere-Hoody 400 kV D/C transmission line at Hiriyur and additional bays at Kolar and Hosur sub-stations for second circuit of Kolar-Hosur 400 kV D/C transmission line under system strengthening Scheme-II in the Southern Region for the period 1.4.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
- |
06-05-2008 |
23/2008
|
Determination of provisional transmission tariff for 765 kV Sipat-Seoni Ckt -I, 765/400 kV ICT-I at Seoni ( New sub-station) and LILO of 400 kV Bhilai-Satpura transmission line at Seoni & 400/220 kV ICT-I at Seoni sub-station along with two 220 kV transmission line bays commissioned under Sipat-I Transmission System in Western Region. Power Grid Corporation of India Limited, Gurgaon |
22-04-2008 |
30-04-2008 |
160/2007
I.A. No. 45/2007
|
Determination of final transmission tariff for (i) LILO of one circuit of 400 kV D/C Farakka-Jeerat line at Subhashgram and establishment of 400/220 kV Sub-station (New) at Subhashgram including 1 x 315 MVA, ICT-II for the period 1.3.2007 to 31.3.2009. (ii) 315 MVA, 400/220 kV, ICT-I at Subhashgram sub-station (New) for the period from 1.4.2007 to 31.3.2009 under strengthening scheme for Eastern Region (formerly part of Tala supplementary Scheme) in Eastern Region Power Grid Corporation of India Ltd., Gurgaon |
21-02-2008 |
28-02-2008 |
165/2007
|
Determination of provisional transmission tariff for LILO of 400 kV S/C Lucknow -Moradabad transmission line at Bareilly (Power Grid) along with associated bays under Northern Region system strengthening scheme-I in Northern Region for tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaon |
20-02-2008 |
20-02-2008 |
158/2007
|
Determination of provisional transmission tariff for Ckts IV & III of 400 kV D/C Satna-Bina transmission line under Vindhyachal Stage-III transmission system in Western Region for the period up to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon |
22-01-2008 |
23-01-2008 |
133/2007
135/2007
IN
136/2007
137/2007
|
1.Determination of final transmission tariff up to DOCO and additional capitalization from DOCO to 31.3.2007 for system strengthening scheme in Northern Region (formerly part of Tala Supplementary Scheme) for the period 2004-09.2.Determination of final transmission tariff for 400 kV D/C Agra-Bassi transmission line (CKT-III and II) along with associated bays under Northern Region System Strengthening Scheme-II in Northern Region for the tariff period 2004-09.3.Determination of final transmission tariff for Tala-Siliguri Transmission System in Eastern Region for period 1.10.2005 to 31.3.2009 and remaining transmission system for the period 1.5.2006 to 31.3.2009.4.Determination of final transmission tariff of 2nd 315 (3x105 MVA), 400/220 kV transformer at Indravati (OHPC) switchyard in Eastern Region for the period 1.5.2006 to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon, |
17-01-2008 |
18-01-2008 |
141/2007
|
Determination of final transmission tariff of (i) 400 kV Siliguri sub-station (extension) (relevant portion), 400 kV Purnea sub-station (extension) (relevant portion) (excluding 400/220 kV, 315 MVA ICT at Purnea sub-station), 40% Fixed Series Compensation (FSC) and 5% to 15% Thyristor Controlled Series Compensation (TCSC) on each Ckt of Purnea-Muzaffarpur 400 kV D/C line at Purnea (DOCO 1.5.2006), (ii) 400/220 kV, 315 MVA ICT at Purnea sub-station (DOCO 1.6.2006) , (iii) 400/220 kV Muzaffarpur sub-station (New) (Excluding 2no, 400 kV bays at Muzaffarpur with line reactors for Muzaffarpur Gorkhpur line and ICT-II at Muzaffapur sub-station), 220 kV Muzaffarpur sub-station (BSEB Kanti) Extension (DOCO 1.9.2006) and provisional transmission tariff of 400/220 kV, 315 MVA ICT-II at Muzaffarpur sub-station (DOCO 1.6.2007) associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from DOCO to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon. |
10-01-2008 |
16-01-2008 |
105/2007
68/2007
|
Review of the order dated 18.6.2007 in Petition No.68/2007- Direction to CTU for grant of long-term open access on the existing ER-WR corridor, i.e. 400 kV Raipur-Rourekela transmission line including 220 kV Korba Budhipadar transmission line for transfer of 400 MW power from DVC stations at Mejia and Chandrapur.Power Grid Corporation of India Ltd., Gurgaon. |
13-09-2007 |
14-01-2008 |
147/2007
148/2007
in149/2007
|
1.Approval of final transmission tariff for 400 kV D/C Muzaffarpur-Gorkhpur transmission line in Eastern-Northern inter-connector, associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi.
2.Approval of final transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi
3.Approval of final transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line and 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009 and 1.5.2006 to 31.3.2009 respectively.Powerlinks Transmission Ltd., New Delhi |
10-01-2008 |
14-01-2008 |
168/2007
I.A.No. 47/2007
|
Approval of incentive based on availability of 400 kV D/C Silliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), in Eastern Region associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi. |
- |
02-01-2008 |
169/2007
I.A. No. 48/2007
|
Approval of incentive based on availability of 400 kV D/C Gorkhpur- Lucknow transmission line , 400 kV D/C Bareilly-Mandola line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi. |
- |
02-01-2008 |
|
Pet. No. |
Subject |
Date of Hearing |
Date of Order |
111/2008
|
Application for grant of inter-State trading licence in electricity to Knowledge Infrastructure Systems Pvt. Ltd. Knowledge Infrastructure Systems Pvt. Ltd., New Delhi |
18-11-2008 |
24-11-2008 |
86/2008
|
Application for grant of inter-State trading licence to Shyam Indus Power Solutions Pvt. Ltd. Shyam Indus Power Solutions Pvt. Ltd., New Delhi |
07-10-2008 |
07-10-2008 |
71/2008
|
Application for grant of inter-State trading licence to Righill Electrics Private Limited. Righill Electrics Private Limited, Bhopal |
08-07-2008 |
29-09-2008 |
3/2008
|
Application for grant of inter-State trading licence to Jain Energy Limited. Jain Energy Limited, Kolkata |
16-09-2008 |
16-09-2008 |
78/2008
|
Application for grant of licence for inter-State trading in electricity to GMR Energy Trading Ltd. GMR Energy Trading Ltd, Bangalore |
11-09-2008 |
16-09-2008 |
5/2008
|
Application for grant of inter-State trading licence to Basis Point Commodities Private Limited (BPCPL) Basis Point Commodities Private Limited, Mumbai |
07-08-2008 |
10-09-2008 |
14/2008
|
Application for grant of inter-State trading licence in electricity to Chhattisgarh Energy Trading Company (P) Ltd. Chhattisgarh Energy Trading Company (P) Ltd, New Delhi |
15-07-2008 |
07-08-2008 |
73/2008
In
15/2008
|
Review of order dated 28.4.2008 dismissing the application for grant of category 'A' licence for inter-State trading in electricity made by Bala Techno synthetics Ltd. Bala Techno Industries Ltd. Kolkota |
29-07-2008 |
01-08-2008 |
16/2008
|
Application for grant of inter-State trading licence in electricity to Indiabulls Power Generation Limited. Indiabulls Power Generation Limited, Gurgaon |
22-07-2008 |
23-07-2008 |
13/2008
|
Application for grant of inter-State trading licence in electricity to Indiabulls Power Trading Limited. Indiabulls Power Trading Limited, Gurgaon |
22-07-2008 |
23-07-2008 |
32/2008
|
Application for grant of transmission licence to Parbati Koldam Transmission Company Limited. Parbati Koldam Transmission Company Limited |
24-06-2008 |
11-07-2008 |
28/2008
|
Application for grant of transmission licence for Western Region System Strengthening Scheme-II (Project-C) to Western Region Transmission (Gujarat) Pvt. Ltd. Western Region Transmission (Gujarat) Pvt. Ltd., Mumbai |
08-05-2008 |
27-06-2008 |
27/2008
|
Application for grant of transmission licence for Western Region System Strengthening Scheme-II (Project-B) to Western Region Transmission (Maharashtra) Pvt. Ltd. Western Region Transmission (Maharashtra) Pvt. Ltd.,Mumbai |
08-05-2008 |
27-06-2008 |
29/2008
|
Application for grant of inter-State trading licence in electricity to Adhunik Alloys & Power Limited. |
13-05-2008 |
13-05-2008 |
32/2008
|
Application for grant of transmission licence to Parbati Koldam Transmission Company Limited. Parbati Koldam Transmission Company Limited |
08-05-2008 |
09-05-2008 |
3/2008
|
Application for grant of inter-State trading licence in electricity to Jain Energy Limited. Jain Energy Limited, Kolkata |
18-03-2008 |
18-03-2008 |
157/2007
|
Application for grant of transmission licence to Essar Power Transmission Company Limited. Essar Power Transmission Company Limited. |
12-02-2008 |
29-02-2008 |
3/2008
|
Application for grant of inter-State trading licence in electricity to Jain Energy Limited. Jain Energy Limited, Kolkata |
20-02-2008 |
20-02-2008 |
58/2007
|
Application for grant of an Inter-State Trading Licence to Maharashtra Industrial Development Corporation (MIDC).Maharashtra Industrial Development Corporation |
22-01-2007 |
22-01-2008 |
124/2007
|
Application for grant of inter-State trading licence in electricity to Vandana Global Limited.Vandana Global Limited, Raipur |
11-12-2007 |
21-01-2008 |
112/2007
|
Application for grant of inter-State trading licence in electricity to Indrajit Power Technology Pvt. Ltd.
Indrajit Power Technology Pvt. Ltd.,Mumbai |
18-12-2007 |
17-01-2008 |
|
Pet. No. |
Subject |
Date of Hearing |
Date of Order |
56/2008
(Suo-motu)
|
|
- |
15-12-2008 |
Adjudication
1/2008
|
|
- |
10-12-2008 |
147/2008
|
|
28-11-2008 |
28-11-2008 |
137/2008
(suo motu)
|
|
- |
24-11-2008 |
131/2007
(suo motu)
|
|
- |
24-11-2008 |
131/2007
(suo motu)
|
|
- |
19-11-2008 |
137/2008
(suo motu)
|
|
- |
18-11-2008 |
132/2007
(suo motu)
|
|
07-10-2008 |
10-10-2008 |
132/2007
(suo motu)
|
|
- |
10-09-2008 |
89/2008
|
|
12-08-2008 |
04-09-2008 |
55/2008 (Suo motu)
|
|
12-08-2008 |
14-08-2008 |
55/2008
along with I.A.
8/2008
|
|
31-07-2008 |
05-08-2008 |
60/2008
|
|
26-06-2008 |
08-07-2008 |
55/2008
(Suo motu)
|
|
- |
04-07-2008 |
12/2008
(Suo motu)
|
|
- |
04-07-2008 |
74/2006
|
|
26-06-2008 |
03-07-2008 |
87/2007
|
|
26-06-2008 |
03-07-2008 |
143/2005
147/2005
|
|
10-06-2008 |
18-06-2008 |
33/2008
|
|
- |
19-03-2008 |
11/2008
(Suo Motu)
|
|
28-02-2008 |
28-02-2008 |
04/2008
|
|
21-02-08 |
22-02-2008 |
117/2007
|
|
- |
15-02-2008 |
10/2008
|
|
- |
30-01-2008 |
|
Pet. No. |
Subject |
Date of Hearing |
Date of Order |
159/2008 |
|
- |
24-12-2008 |
88/2008
(Suo-motu)
|
|
11-11-2008 |
19-12-2008 |
143/2006
|
|
14-10-2008 |
15-12-2008 |
157/2008
|
|
- |
12-12-2008 |
153/2008
|
|
04-12-2008 |
04-12-2008 |
120/2008
(Suo motu)
|
|
18-11-2008 |
27-11-2008 |
152/2008
(Suo motu)
|
|
- |
27-11-2008 |
121/2008
|
|
- |
24-11-2008 |
60/2008
|
|
30-09-2008 |
30-09-2008 |
88/2008
(suo motu)
|
|
- |
09-07-2008 |
77/2008
I.A.
7/2008
|
|
- |
09-07-2008 |
50/2008
|
|
24-06-2008 |
25-06-2008 |
33/2008
|
|
24-04-2008 |
17-06-2008 |
64/2008
67/2008
|
|
27-05-2008 |
04-06-2008 |
68/2008
|
|
22-05-2008 |
04-06-2008 |
107/2007
|
|
13-05-2008 |
16-05-2008 |
119/2006
|
|
13-05-2008 |
15-05-2008 |
19/2008
|
|
18-03-2008 |
13-05-2008 |
46/2008
|
|
13-05-2008 |
13-05-2008 |
10/2000
|
|
08-05-2008 |
08-05-2008 |
143/2006
|
|
08-05-2008 |
08-05-2008 |
58/2008 (Suo motu)
|
|
- |
07-05-2008 |
41/2008
|
|
- |
24-04-2008 |
107/2007
|
|
03-04-2008 |
03-04-2008 |
10/2000
|
|
11-03-2008 |
13-03-2008 |
11/2008 (Suo Motu)
|
|
28-02-2008 |
28-02-2008 |
107/2007
|
|
22-01-2008 |
27-02-2008 |
24/2007
|
|
12-02-2008 |
13-02-2008 |
16/2006
IN
152/2007
153/2007
|
|
29-01-2008 |
30-01-2008 |
143/2006
|
|
29-01-2008 |
29-01-2008 |
-
|
|
- |
31-01-2008 |
|
|
|
|