cerc-logo

Records of Proceedings(ROP) - 2020

Petition No. Subject Date of Hearing Date of posting
ROP on website
Category


339/TT/2019

24.08.2020

28.08.2020 Transmission


316/TT/2019

24.08.2020

28.08.2020 Transmission


314/TT/2019

24.08.2020

28.08.2020 Transmission


255/TT/2019

24.08.2020

28.08.2020 Transmission


51/TT/2020

24.08.2020

28.08.2020 Transmission


596/AT/2020

27.08.2020

28.08.2020 Misc


579/AT/2020

27.08.2020

28.08.2020 Misc


561/AT/2020

27.08.2020

28.08.2020 Misc


334/MP/2020

25.08.2020

28.08.2020 Misc


493/MP/2020

25.08.2020

28.08.2020 Misc


457/MP/2020

25.08.2020

28.08.2020 Misc


456/MP/2020

25.08.2020

28.08.2020 Misc


488/TT/2019

24.08.2020

28.08.2020 Transmission


395/TT/2019

24.08.2020

28.08.2020 Transmission


113/MP/2020

25.08.2020

28.08.2020 Misc


30/GT/2020

13.08.2020

28.08.2020 Generation


25/MP/2020

25.08.2020

28.08.2020 Misc


264/MP/2020
265/MP/2020

25.08.2020

28.08.2020 Misc


473/TT/2019

24.08.2020

28.08.2020 Transmission


477/TT/2019

24.08.2020

28.08.2020 Transmission


250/TT/2020

10.08.2020

27.08.2020 Transmission


298/MP/2018

25.08.2020

27.08.2020 Misc


595/MP/2020

25.08.2020

27.08.2020 Misc


346/MP/2020

25.08.2020

27.08.2020 Misc


343/MP/2020

25.08.2020

27.08.2020 Misc


307/MP/2018

25.08.2020

27.08.2020 Misc


151/MP/2019

25.08.2020

27.08.2020 Misc


389/GT/2020

27.07.2020

27.08.2020 Generation


152/TT/2020

28.07.2020

26.08.2020 Transmission


275/MP/2019
along with I.A No. 9/2020

21.08.2020

26.08.2020 Misc


496/MP/2020
515/MP/2020
516/MP/2020
517/MP/2020
519/MP/2020
520/MP/2020

21.08.2020

26.08.2020 Misc


86/TT/2019

19.08.2020

25.08.2020 Transmission


85/TT/2019

19.08.2020

25.08.2020 Transmission


53/TT/2020

19.08.2020

25.08.2020 Transmission


105/TT/2020

19.08.2020

25.08.2020 Transmission


491/MP/2020 and IA No.61/2020

20.08.2020

25.08.2020 Misc


329/GT/2019
390/GT/2020

13.08.2020

25.08.2020 Generation


434/GT/2020
410/GT/2020

13.08.2020

25.08.2020 Generation


31/GT/2020

13.08.2020

24.08.2020 Generation


170/TT/2019

19.08.2020

24.08.2020 Transmission


117/TT/2020

10.08.2020

24.08.2020 Transmission


260/MP/2019

20.08.2020

24.08.2020 Misc


331/MP/2020

20.08.2020

24.08.2020 Misc


292/MP/2019

20.08.2020

24.08.2020 Misc


211/MP/2019

20.08.2020

24.08.2020 Misc


155/MP/2019

20.08.2020

24.08.2020 Misc


119/MP/2017
275/MP/2020

20.08.2020

24.08.2020 Misc


544/MP/2020
along with IA No.54/2020

20.08.2020

24.08.2020 Misc


71/MP/2019

20.08.2020

24.08.2020 Misc


213/MP/2019

20.08.2020

24.08.2020 Misc


497/MP/2020

20.08.2020

24.08.2020 Misc


155/TT/2020

10.08.2020

22.08.2020 Transmission


341/MP/2020

20.08.2020

22.08.2020 Misc


330/MP/2020

20.08.2020

22.08.2020 Misc


605/MP/2020
alongwith IA Nos.57/2020 and 58/2020

20.08.2020

22.08.2020 Misc


510/TT/2019

31.07.2020

22.08.2020 Transmission


472/GT/2014
474/GT/2014

13.08.2020

21.08.2020 Generation


220/GT/2020
444/GT/2020

13.08.2020

21.08.2020 Generation


300/GT/2020
438/GT/2020

13.08.2020

21.08.2020 Generation


327/GT/2014

13.08.2020

20.08.2020 Generation


196/TT/2020

10.08.2020

19.08.2020 Transmission


85/TT/2020

10.08.2020

19.08.2020 Transmission


303/TT/2020

10.08.2020

19.08.2020 Transmission


249/TT/2020

10.08.2020

19.08.2020 Transmission


421/TT/2019

10.08.2020

19.08.2020 Transmission


475/TT/2019

10.08.2020

19.08.2020 Transmission


142/TT/2020

10.08.2020

19.08.2020 Transmission


83/TT/2020

10.08.2020

19.08.2020 Transmission


82/TT/2020

10.08.2020

19.08.2020 Transmission


478/TT/2020

31.07.2020

17.08.2020 Transmission


310/TT/2020

10.08.2020

17.08.2020 Transmission


327/TT/2020

10.08.2020

17.08.2020 Transmission


138/TT/2020

28.07.2020

17.08.2020 Transmission


525/MP/2020
Along with IA No. 38/2020

Petition under Section 79 read with Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 read with Regulation 33A and 33B of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission and related matters) Regulations, 2009 and Regulations 111 and 112 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 invoking the jurisdiction of the Commission for inter-alia resolving discrepancies arising on account of conflict between the SCOD under the PPA and the date of operationalisation of connectivity and long term access, for seeking recognition of Change in Law and Force Majeure events impacting the implementation of the Project by the Petitioner and seeking appropriate reliefs with regard to exemption from payment of transmission charges, opening a Letter of Credit for PoC charges and quashing of Default Notice issued by CTU. Sprng Renewable Energy Private Limited (SREPL)

11.08.2020

17.08.2020 Misc


226/MP/2020

11.08.2020

17.08.2020 Misc


313/TT/2019

31.07.2020

16.08.2020 Transmission


153/MP/2018
154/MP/2018

11.08.2020

14.08.2020 Misc


178/MP/2020

11.08.2020

14.08.2020 Misc


81/MP/2019

11.08.2020

14.08.2020 Misc


432/MP/2019

11.08.2020

14.08.2020 Misc


296/MP/2019

06.08.2020

14.08.2020 Misc


200/MP/2019

06.08.2020

14.08.2020 Misc


128/TT/2020

28.07.2020

13.08.2020 Transmission


530/MP/2020
along with IA No.45/2020

11.08.2020

13.08.2020 Misc


598/MP/2020

11.08.2020

13.08.2020 Misc


558/MP/2020

11.08.2020

13.08.2020 Misc


450/MP/2019

11.08.2020

13.08.2020 Misc


427/MP/2019

11.08.2020

13.08.2020 Misc


351/MP/2018 and IA No. 4/2020
380/MP/2018 and IA No. 8/2020

11.08.2020

13.08.2020 Misc


319/MP/2020

11.08.2020

13.08.2020 Misc


463/TT/2020

31.07.2020

11.08.2020 Transmission


580/MP/2020
and IA No. 55/2020

06.08.2020

09.08.2020 Misc


551/MP/2020
and IA No.46/2020

06.08.2020

09.08.2020 Misc


536/MP/2020

06.08.2020

09.08.2020 Misc


529/MP/2020

06.08.2020

09.08.2020 Misc


367/MP/2019

06.08.2020

09.08.2020 Misc


336/MP/2020

06.08.2020

09.08.2020 Misc


261/MP/2020

06.08.2020

09.08.2020 Misc


260/MP/2020

06.08.2020

09.08.2020 Misc


212/MP/2019

06.08.2020

09.08.2020 Misc


180/MP/2020

06.08.2020

09.08.2020 Misc


65/MP/2020
455/MP/2019

06.08.2020

09.08.2020 Misc


98/GT/2020

27.07.2020

08.08.2020 Generation


496/TT/2019

31.07.2020

07.08.2020 Transmission


349/TT/2019

31.07.2020

07.08.2020 Transmission


324/TT/2019

31.07.2020

07.08.2020 Transmission


23/TT/2020

31.07.2020

07.08.2020 Transmission


311/TT/2019

30.07.2020

06.08.2020 Transmission


310/TT/2019

31.07.2020

05.08.2020 Transmission


206/MP/2020

Petition under Section 79(1)(c) of the Electricity Act, 2003 read with Section 79(1)(k) of the Electricity Act, 2003 along with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking appropriate direction(s) and/or order(s) from the Commission in relation to the provisions of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium Term Open Access in Inter-State Transmission and related matters) Regulations, 2009 which are preventing the Petitioner from exercising its rights under certain provisions of the Power Purchase Agreement entered pursuant to Competitive Bidding Guidelines 2017 with Solar Energy Corporation of India Limited and seeking the Commission to give effect to the detailed procedure as approved by the Commission to issue consequential directions to Power Grid Corporation of India Limited in terms of the relief sought in the Petition. ReNew Sun Waves Private Limited (RSWPL)

30.07.2020

05.08.2020 Misc


313/TT/2020

28.07.2020

05.08.2020 Transmission


290/TT/2020

28.07.2020

04.08.2020 Transmission


270/TT/2020

28.07.2020

04.08.2020 Transmission


312/TT/2020

28.07.2020

04.08.2020 Transmission


549/AT/2020

30.07.2020

04.08.2020 Misc


492/MP/2020

Petition under Section 79(1)(c), 79(1)(d), 79(1)(f) and 79 (1)(k) of the Electricity Act, 2003 for adjudication of dispute arising out of the action of Power Grid Corporation of India in relation to Bill-3 raised in contravention of Regulation 11 of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010 read with Billing, Collection, Disbursement (BCD) Procedure and inter-alia, seeking declaration that the Petitioner is entitled for complete offset of charges billed in Bill-1 as well as Bill-3, in the event the quantum of transmission corridor availed by the Petitioner in any region, is for corresponding period, equal to or more than the target region LTA quantum and for refund of monthly POC charges paid under Bill-3. DB Power Limited (DBPL)

30.07.2020

04.08.2020 Misc


513/MP/2020

30.07.2020

04.08.2020 Misc


298/GT/2019

27.07.2020

04.08.2020 Generation


21/TT/2020

28.07.2020

03.08.2020 Transmission


15/TT/2020

28.07.2020

03.08.2020 Transmission


275/MP/2019 with I.A No.9/2020

20.07.2020

03.08.2020 Misc


262/MP/2020

30.07.2020

03.08.2020 Misc


548/GT/2020

27.07.2020

03.08.2020 Generation


268/MP/2020

30.07.2020

03.08.2020 Misc


557/TD/2020

30.07.2020

03.08.2020 Trading


579/AT/2020

30.07.2020

03.08.2020 Misc


337/AT/2020

30.07.2020

03.08.2020 Misc


305/TT/2020

13.07.2020

03.08.2020 Transmission


407/GT/2020

27.07.2020

03.08.2020 Generation


277/MP/2020

30.07.2020

03.08.2020 Misc


266/TT/2019

13.07.2020

03.08.2020 Transmission


151/TT/2020

28.07.2020

03.08.2020 Transmission


490/TT/2019

28.07.2020

03.08.2020 Transmission


126/TT/2020

28.07.2020

03.08.2020 Transmission


136/TT/2020

28.07.2020

03.08.2020 Transmission


114/TT/2020

28.07.2020

03.08.2020 Transmission


34/TT/2020

28.07.2020

03.08.2020 Transmission


293/GT/2019

27.07.2020

02.08.2020 Generation


162/MP/2020

30.07.2020

02.08.2020 Misc


202/MP/2020

30.07.2020

02.08.2020 Misc


203/MP/2020

30.07.2020

02.08.2020 Misc


332/MP/2020

30.07.2020

02.08.2020 Misc


17/TT/2020

22.07.2020

01.08.2020 Transmission


200/MP/2020

21.07.2020

31.07.2020 Misc


414/MP/2020

21.07.2020

31.07.2020 Misc


5/RP/2020 in Petition No. 361/TT/2018

16.07.2020

30.07.2020 Review


13/RP/2020 along with IA 26/IA/2020

16.07.2020

30.07.2020 Review


183/MP/2020
267/MP/2020
333/MP/2020
335/MP/2020
338/MP/2020
339/MP/2020
342/MP/2020
499/MP/2020
501/MP/2020
508/MP/2020
509/MP/2020
510/MP/2020
512/MP/2020

21.07.2020

29.07.2020 Misc


171/TT/2020

22.07.2020

29.07.2020 Transmission


24/TT/2020

22.07.2020

28.07.2020 Transmission


481/TT/2019

22.07.2020

28.07.2020 Transmission


482/TT/2020

13.07.2020

28.07.2020 Transmission


484/TT/2019

22.07.2020

28.07.2020 Transmission


504/TT/2019

22.07.2020

28.07.2020 Transmission


145/TT/2018 alongwith
I.A. bearing Dy.No.321/2020)

23.07.2020

27.07.2020 Misc


530/MP/2020
along with IA No. 45/2020

23.07.2020

27.07.2020 Misc


478/TT/2019

17.07.2020

27.07.2020 Transmission


58/TT/2020

17.07.2020

27.07.2020 Transmission


39/TT/2020

17.07.2020

27.07.2020 Transmission


03/TT/2020

17.07.2020

27.07.2020 Transmission


276/TT/2020

13.07.2020

27.07.2020 Transmission


211/MP/2011

23.07.2020

27.07.2020 Misc


250/MP/2019

23.07.2020

27.07.2020 Misc


293/MP/2018
294/MP/2018

21.07.2020

26.07.2020 Misc


404/MP/2019

21.07.2020

26.07.2020 Misc


69/TT/2020

13.07.2020

26.07.2020 Transmission


2/RP/2020 in Petition No. 182/TT/2018

16.07.2020

24.07.2020 Review


199/MP/2020

21.07.2020

23.07.2020 Misc


366/MP/2019

21.07.2020

23.07.2020 Misc


14/RP/2020
in
Petition No. 305/MP/2015

16.07.2020

22.07.2020 Review


9/RP/2020
in
Petition No. 245/MP/2018

16.07.2020

22.07.2020 Review


265/TT/2019

13.07.2020

21.07.2020 Transmission


17/TT/2020
171/TT/2020
504/TT/2019
484/TT/2019
481/TT/2019

17.07.2020

21.07.2020 Transmission


24/TT/2020

17.07.2020

21.07.2020 Transmission


55/TT/2020

17.07.2020

21.07.2020 Transmission


155/TT/2020
142/TT/2020

17.07.2020

21.07.2020 Transmission


194/TT/2020

17.07.2020

21.07.2020 Transmission


475/TT/2019

17.07.2020

21.07.2020 Transmission


156/TT/2020

13.07.2020

21.07.2020 Transmission


247/TT/2020

13.07.2020

21.07.2020 Transmission


383/TT/2019

13.07.2020

21.07.2020 Transmission


462/TT/2020

13.07.2020

21.07.2020 Transmission


466/TT/2020

13.07.2020

21.07.2020 Transmission


505/TT/2020

13.07.2020

21.07.2020 Transmission


518/MP/2020

14.07.2020

21.07.2020 Misc


495/MP/2020

14.07.2020

20.07.2020 Misc


7/RP/2020
in
Petition No. 222/MP/2017

16.07.2020

20.07.2020 Review


6/RP/2020
along with IA No. 11/2020

16.07.2020

19.07.2020 Review


204/MP/2020

14.07.2020

19.07.2020 Misc


494/MP/2020

14.07.2020

19.07.2020 Misc


173/MP/2020

14.07.2020

17.07.2020 Misc


198/MP/2020
259/MP/2020

Petition for providing protection systems having reliability, selectivity, speed and sensitivity and keeping them functional in terms of Regulation 5.2(l) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 read along with Regulation 3(e) of the Central Electricity Authority (Grid Standards) Regulations, 2010, ensuring proper inspection & patrolling and maintenance of substation and lines in terms of Regulation 5 read along with Regulation 23 and 24 of Central Electricity Authority (Grid Standards) Regulations, 2010 for ensuring security of North Eastern Grid as well as the interconnected Indian Grid and reliable operation as per Clause 6.2 of the Central Electricity Authority Manual on Transmission Planning Criteria, 2013. North Eastern Regional Load Despatch Centre (NERLDC)

14.07.2020

17.07.2020 Misc


175/MP/2020

14.07.2020

17.07.2020 Misc


197/MP/2020
201/MP/2020
263/MP/2020

14.07.2020

17.07.2020 Misc


174/MP/2020

14.7.2020

15.07.2020 Misc


176/MP/2020

14.7.2020

15.07.2020 Misc


177/MP/2020

14.7.2020

15.07.2020 Misc


287/MP/2018

09.07.2020

14.07.2020 Misc


71/MP/2020

09.07.2020

14.07.2020 Misc


143/TT/2019

29.06.2020

13.07.2020 Transmission


103/TT/2019

29.06.2020

13.07.2020 Transmission


281/MP/2019

07.07.2020

13.07.2020 Misc


365/MP/2019

07.07.2020

13.07.2020 Misc


275/MP/2019 along with I.A No. 9/2020

09.07.2020

12.07.2020 Misc


IA No. 64/2019 in Petition No.12/MP/2019

09.07.2020

12.07.2020 Misc


373/MP/2019

07.07.2020

10.07.2020 Misc


64/MP/2019

07.07.2020

09.07.2020 Misc


157/MP/2018
and IA No. 2 of 2019

07.07.2020

09.07.2020 Misc


161/MP/2020

07.07.2020

09.07.2020 Misc


177/MP/2019
178/MP/2019

07.07.2020

09.07.2020 Misc


295/MP/2019
320/MP/2019

07.07.2020

09.07.2020 Misc


317/MP/2019

07.07.2020

09.07.2020 Misc


291/MP/2019

07.07.2020

09.07.2020 Misc


374/MP/2020

07.07.2020

09.07.2020 Misc


454/MP/2019 and IA No.19/2020
457/MP/2019 and IA No.18/2020
500/MP/2019 and IA No.20/2020

07.07.2020

09.07.2020 Misc


308/MP/2019

30.06.2020

09.07.2020 Misc


47/MP/2019

30.06.2020

07.07.2020 Misc


87/TT/2019

29.06.2020

06.07.2020 Transmission


248/TT/2019

29.06.2020

06.07.2020 Transmission


367/MP/2019

30.06.2020

06.07.2020 Misc


113/TT/2019

29.06.2020

06.07.2020 Transmission


171/TT/2019

29.06.2020

05.07.2020 Transmission


217/MP/2016

30.06.2020

05.07.2020 Misc


172/TT/2019

29.06.2020

04.07.2020 Transmission


353/TT/2019

29.06.2020

04.07.2020 Transmission


191/MP/2019

30.06.2020

04.07.2020 Misc


470/MP/2019

30.06.2020

04.07.2020 Misc


345/MP/2020

30.06.2020

04.07.2020 Misc


463/MP/2014
along with IA Nos. 39/2019 and 40/2019

30.06.2020

04.07.2020 Misc


254/TT/2019

29.06.2020

03.07.2020 Transmission


494/TT/2019

29.06.2020

03.07.2020 Transmission


36/TT/2020

24.06.2020

03.07.2020 Transmission


479/TT/2019

24.06.2020

03.07.2020 Transmission


515/TT/2019

24.06.2020

03.07.2020 Transmission


183/MP/2015

30.06.2020

02.07.2020 Misc


62/MP/2020

30.06.2020

02.07.2020 Misc


71/MP/2019

30.06.2020

02.07.2020 Misc


104/TT/2020

24.06.2020

29.06.2020 Transmission


117/TT/2020

24.06.2020

29.06.2020 Transmission


149/TT/2020

24.06.2020

29.06.2020 Transmission


82/TT/2020

24.06.2020

28.06.2020 Transmission


83/TT/2020

24.06.2020

28.06.2020 Transmission


84/TT/2020

24.06.2020

28.06.2020 Transmission


120/TT/2020

Truing up transmission tariff for tariff period 2014-19 and determination of tariff of 2019-24 tariff period for transmission assets consisting of Asset 1: LILO of existing Kolar-Sriperumbudur 400 kV S/C line at Thiruvalam along with associated bays; Asset 2: Kurnool-Thiruvalam 765 kV D/C line along with associated bays and equipment both at Kurnool and Thiruvalam Sub-stations (charged at 400 kV) and 2x240 MVAR, 765 kV line reactor at both Kurnool and Thiruvalam Sub-stations along with associated bays and equipment; Asset 3: Upgradation of 400 kV Sub-station at Thiruvalam to 765/400 kV with 2x1500 MVA, 765/400 kV transformers; Asset 4: 765 kV and 400 kV ICT bays at Triruvalamunder the Southern Region System Strengthening Scheme (SRSS) XIX in the Southern Region Power Grid Corporation of India Ltd. (PGCIL)

24.06.2020

28.06.2020 Transmission


212/TT/2020

24.06.2020

28.06.2020 Transmission


158/MP/2020 and IA No. 35/2020

23.06.2020

28.06.2020 Misc


13/TT/2020

09.06.2020

27.06.2020 Transmission


60/MP/2019

23.06.2020

27.06.2020 Misc


119/MP/2017
275/MP/2020

23.06.2020

27.06.2020 Misc


428/MP/2019

23.06.2020

26.06.2020 Misc


465/MP/2019

23.06.2020

26.06.2020 Misc


477/MP/2020

23.06.2020

26.06.2020 Misc


182/MP/2020

23.06.2020

26.06.2020 Misc


298/MP/2018

23.06.2020

25.06.2020 Misc


498/MP/2020

23.06.2020

25.06.2020 Misc


294/MP/2019

23.06.2020

25.06.2020 Misc


80/TT/2016
81/TT/2016

16.06.2020

24.06.2020 Transmission


458/MP/2019
464/MP/2019

18.06.2020

23.06.2020 Misc


328/MP/2018
329/MP/2018
348/MP/2018
369/MP/2018

18.06.2020

22.06.2020 Misc


6/TT/2020

16.06.2020

21.06.2020 Transmission


346/TT/2019

16.06.2020

21.06.2020 Transmission


365/TT/2018

16.06.2020

21.06.2020 Transmission


406/TT/2020

16.06.2020

21.06.2020 Transmission


243/MP/2019

18.06.2020

21.06.2020 Misc


330/MP/2018

18.06.2020

21.06.2020 Misc


411/MP/2019
412/MP/2019

18.06.2020

21.06.2020 Misc


426/MP/2019

18.06.2020

20.06.2020 Misc


106/MP/2019

Petition under Section 79 (1) (c) and 79 (1) (f) of the Electricity Act, 2003 read with the regulatory framework under the Central Electricity Regulatory Commission (Grant of Connectivity, Long-Term and Medium Term Open Access to the Inter-State Transmission and related matters), Regulations, 2009, as amended from time to time, seeking issuance of appropriate directions to the generators to execute the revised Implementation Agreements with fresh timelines for the expedient and efficient execution of the generation plants and the associated transmission system, which is being implemented by the Petitioner under the Uttarakhand Integrated Transmission Project (UITP) as deemed inter-State Transmission System (ISTS), that is required for providing Long Term Open Access (LTA) for evacuation of power from the said generation plants and to also enter into tripartite Long Term Access Agreements (LTA Agreements) with the Petitioner and the Central Transmission Utility. Power Transmission Corporation of Uttarakhand Limited (PTCUL)

16.06.2020

20.06.2020 Misc


261/TT/2015

16.06.2020

20.06.2020 Transmission


449/MP/2019

18.06.2020

20.06.2020 Misc


05/TT/2020

09.06.2020

17.06.2020 Transmission


44/TT/2020

Truing up of tariff of 2014-19 period and determination of tariff of 2019-24 period for Asset-I: 765 kV D/C Varanasi-Kanpur (new) line and associated bays including 240 MVAR Switchable L/R in both Ckt. at Varanasi GIS Sub-station and 330 MVAR non-switchable L/R in both Ckt. at Kanpur GIS Sub-station; 765 kV S/C Kanpur (new) GIS-Jhatikra line & associated bays including 330 MVAR switchable L/R at Kanpur GIS Sub-station and 330 MVAR non-switchable L/R at Jhatikara Sub-station; 400kV D/C (Quad) Kanpur (New) GIS-Kanpur (old) line & Associated bays; 2X1500 MVA 765/400 kV ICT-I&II Associated bays at 765/400 kV Kanpur (new) GIS Sub-station; 240 MVAR, 765 kV Bus Reactor-1 & associated bay at Kanpur(new) GIS Sub-station; 240 MVAR, 765 kV Bus Reactor-2 & associated bay at Kanpur (new) GIS Sub-station; Asset-II: LILO of one Ckt of 400 kV D/C Sasaram-Allahabad line & Associated bays at Varanasi GIS Sub-station; Asset-III: 125 MVAR, 400 kV Bus Reactor & associated bay at Kanpur (new) GIS Sub-station; Asset-IV: 240 MVAR, 765 kV Bus Reactor & associated bay at Jhatikara Sub-station; Asset-V: 125 MVAR, 400 kV Bus Reactor & associated bay at Varanasi GIS Sub-station; Asset-VI: 400 kV D/C (Quard) Sarnath- Varanasi Transmission Line along with associated bays at Varanasi GIS Sub-station under “Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal- Part-B” in the Northern Region. Power Grid Corporation of India Ltd. (PGCIL)

09.06.2020

17.06.2020 Transmission


139/TT/2020

09.06.2020

17.06.2020 Transmission


170/TT/2020

09.06.2020

17.06.2020 Transmission


IA No. 34/2020 in Petition No. 155/MP/2019

11.06.2020

16.06.2020 Misc


90/MP/2020

11.06.2020

16.06.2020 Misc


200/MP/2019

11.06.2020

16.06.2020 Misc


287/MP/2018

11.06.2020

16.06.2020 Misc


80/TT/2020

09.06.2020

14.06.2020 Transmission


153/TT/2020

09.06.2020

14.06.2020 Transmission


165/TT/2020

09.06.2020

14.06.2020 Transmission


168/TT/2020

09.06.2020

14.06.2020 Transmission


127/TT/2020

09.06.2020

14.06.2020 Transmission


126/MP/2017

11.06.2020

14.06.2020 Misc


40/MP/2019
41/MP/2019

11.06.2020

14.06.2020 Misc


54/MP/2019

11.06.2020

14.06.2020 Misc


337/AT/2020

11.06.2020

13.06.2020 Misc


375/MP/2019
376/MP/2019
378/MP/2019
399/MP/2019
430/MP/2019
433/MP/2019
435/MP/2019
437/MP/2019
68/MP/2020
159/MP/2020
184/MP/2020
186/MP/2020

25.05.2020

12.06.2020 Misc


271/GT/2019

02.06.2020

11.06.2020 Generation


273/GT/2019

02.06.2020

11.06.2020 Generation


179/MP/2020

04.06.2020

11.06.2020 Misc


130/GT/2014

02.06.2020

11.06.2020 Misc


333/MP/2019

26.05.2020

10.06.2020 Misc


243/GT/2017

02.06.2020

10.06.2020 Generation


75/MP/2019

04.06.2020

09.06.2020 Misc


181/MP/2020

04.06.2020

09.06.2020 Misc


45/MP/2019

04.06.2020

09.06.2020 Misc


52/MP/2019

04.06.2020

09.06.2020 Misc


70/MP/2019

04.06.2020

09.06.2020 Misc


471/MP/2019

04.06.2020

09.06.2020 Misc


31/GT/2020

02.06.2020

09.06.2020 Generation


408/GT/2020

02.06.2020

08.06.2020 Generation


29/GT/2020

02.06.2020

08.06.2020 Generation


6/RP/2020 along with IA No.11/2020

04.06.2020

08.06.2020 Misc


72/MP/2020
73/MP/2020

Petition under Section 79(1)(b) read with Section 79(1)(f) of the Electricity Act, 2003 for (i) approval of 'Change in Law'; and (ii) consequential relief(s) to compensate for the increase in capital cost and associated costs due to (a) introduction of the Central Goods and Services Tax Act, 2017, the Integrated Goods and Service Tax Act, 2017 and the State Goods and Services Acts enacted by respective States and (b) imposition and introduction of Safe Guard Duty on the import of solar cells (whether or not assembled in modules or panels) by way of Notification No.01/2018- Customs SG dated 30.7.2018 issued by the Department of Revenue, Ministry of Finance, in terms of Article 12 read with Article 16.3.1 of the Power Purchase Agreements dated 6.10.2017 between SB Energy Three Private Limited and Solar Energy Corporation of India Limited. SB Energy Three Private Limited (SBETPL

04.06.2020

08.06.2020 Misc


45/TT/2020

22.05.2020

04.06.2020 Transmission


265/MP/2020

26.05.2020

02.06.2020 Misc


264/MP/2020

26.05.2020

02.06.2020 Misc


I.A. No. 33/2020
in Petition No. 214/MP/2019

29.05.2020

31.05.2020 Misc


250/MP/2019
275/MP/2019 along with IA No. 9/2020

28.05.2020

31.05.2020 Misc


79/TT/2020

22.05.2020

30.05.2020 Transmission


26/TT/2020

22.05.2020

29.05.2020 Transmission


27/TT/2020

22.05.2020

29.05.2020 Transmission


48/TT/2020

Truing up of transmission tariff for 2014-19 tariff block and determination of tariff for 2019-24 tariff block for Asset A1 : Combined Asset-(1) 400 kV D/C Mauda II-Betul (Quad) Transmission Line along with associated bays and 2X50 MVAr Line Reactors at Betul GIS, (2) 315 MVA, 400/220 kV ICT-I & ICT-II along with associated bays and 4 nos. 220 kV line bays and 125 MVAr, 420 kV Bus Reactor along with associated bays at Betul GIS and (3) 400 kV D/C Betul-Khandwa (Quad) line along with associated bays at both ends and 2X50 MVAr Switchable Line Reactors at Betul GIS and 2X50 MVAr line reactors at Khandwa Sub-station; Asset A2 : Khandwa- Indore 400 kV D/C Transmission Line along with associated bays under “Transmission System associated with Mauda Stage-II (2x660 MW) Generation Project” in Western Region Power Grid Corporation of India Limited

22.05.2020

29.05.2020 Transmission


70/TT/2020

Truing up of tariff of 2014-19 period and determination of tariff for 2019-24 period for Asset 1-Conversion of 50 MVAr, 420 kV fixed line reactors in each circuit of Itarsi-Indore (MPPTCL) 400 kV 2xS/C lines into Switchable Line Reactors at Indore (MPPTCL) Sub-station; Asset 2-Conversion of 50 MVAr, 420 kV fixed line reactors in 400 kV D/C Bina (PG) Shujalpur transmission line into Switchable Line Reactors at Shujalpur Sub-station; Asset 3-Conversion of 63 MVAr, 420 kV fixed line reactors in Bhadrawati-Dhariwal 400 kV S/C line into Bus Reactor at Bhadrawati Sub-station Asset 4-1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Khandwa Sub-station; Asset 5-2 Nos. 220 kV bays at Khandwa Sub-station; Asset 6-1 No. 500 MVA 400/220 kV ICT-4 along with associated bays at Boisar Sub-station; Asset 7-1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Kala GIS; Asset 8-1 No. 500 MVA 400/220 kV ICT-3 along with associated bays at Dehgam Sub-station under WRSS XVII. Power Grid Corporation of India Limited

22.05.2020

29.05.2020 Transmission


76/TT/2020

22.05.2020

29.05.2020 Transmission


104/TT/2020

22.05.2020

29.05.2020 Transmission


137/TT/2020

22.05.2020

29.05.2020 Transmission


167/TT/2020

22.05.2020

29.05.2020 Transmission


453/MP/2019

26.05.2020

28.05.2020 Misc


468/MP/2019

26.05.2020

28.05.2020 Misc


113/MP/2020

26.05.2020

28.05.2020 Misc


452/MP/2019

26.05.2020

28.05.2020 Misc


466/MP/2019

26.05.2020

28.05.2020 Misc


439/MP/2019

26.05.2020

28.05.2020 Misc


158/MP/2019

21.05.2020

27.05.2020 Misc


382/MP/2018

14.05.2020

26.05.2020 Misc


304/MP/2020

20.05.2020

25.05.2020 Misc


202/MP/2018 along with IA No. 69/2019

21.05.2020

25.05.2020 Misc


374/MP/2019
400/MP/2019
431/MP/2019
434/MP/2019
160/MP/2020
185/MP/2020

20.05.2020

25.05.2020 Misc


119/MP/2019

21.05.2020

24.05.2020 Misc


260/MP/2019

21.05.2020

24.05.2020 Misc


367/MP/2019

21.05.2020

24.05.2020 Misc


37/TT/2020

19.05.2020

24.05.2020 Transmission


54/TT/2020

19.05.2020

24.05.2020 Transmission


99/TT/2020

19.05.2020

24.05.2020 Transmission


95/TT/2020

19.05.2020

24.05.2020 transmission


512/TT/2019

19.05.2020

24.05.2020 Transmission


505/TT/2019

19.05.2020

24.05.2020 Transmission


225/RC/2020

20.05.2020

22.05.2020 Misc


483/MP/2020 and IA No.31/2020
484/MP/2020 and IA No. 32/2020

Petition under Section 79 of the Electricity Act, 2003 along with statutory framework governing procurement of power through competitive bidding and Articles 11 and 13 of the Power Purchase Agreements dated 07.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India, and, ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corp. of India Ltd. and the Tripartite Transmission Agreement dated 28.10.2018 executed between Power Grid Corporation of India Limited, ACME Solar Holdings Ltd and Fatehgarh-Bhadla Transmission Ltd., the Transmission Service Agreement dated 28.01.2019 executed between ACME Solar Holdings Ltd. and Power Grid Corporation of India Ltd. and the Long-Term Access Agreement dated 03.06.2019 executed between Power Grid Corporation of India Ltd. and ACME Solar Holdings Ltd. seeking directions to restrain SECI and Power Grid Corporation of India Limited from invoking bank guarantees and letters of comfort and for return the bank guarantees and letters of Comfort 1. ACME Deoghar Solar Power Pvt. Ltd.
2. ACME Dhaulpur Powertech Pvt. Ltd.
3. ACME Solar Holdings Ltd.

14.05.2020

18.05.2020 Misc


71/MP/2020 along with IA No.30/2020

12.05.2020

17.05.2020 Misc


340/MP/2020
with IA No. 24/2020 and IA No. 25/2020

14.05.2020

17.05.2020 Misc


I.A. No. 14/2020
in Petition No. 124/MP/2017

14.05.2020

17.05.2020 Misc


217/MP/2016

14.05.2020

17.05.2020 Misc


160/AT/2020 and IA No. 81/2019

12.05.2020

14.05.2020 Misc


186/MP/2018

12.05.2020

14.05.2020 Misc


307/AT/2020

12.05.2020

14.05.2020 Misc


373/MP/2020 and IA No.27/2020

08.05.2020

11.05.2020 Misc


329/MP/2020

08.05.2020

10.05.2020 Misc


319/MP/2019

08.05.2020

09.05.2020 Misc


283/MP/2019

05.05.2020

07.05.2020 Misc


258/MP/2019

05.05.2020

06.05.2020 Misc


287/MP/2019

05.05.2020

06.05.2020 Misc


Diary No.386/2020

19.03.2020

19.03.2020 Misc


275/MP/2019 along with I.A No. 9/2020

12.03.2020

16.03.2020 Misc


385/MP/2019 alongwith I.A. No.87/2019

12.03.2020

16.03.2020 Misc


228/MP/2020

12.03.2020

16.03.2020 Misc


224/MP/2020 Alongwith I.A 15/2020

12.03.2020

16.03.2020 Misc


158/MP/2020

12.03.2020

16.03.2020 Misc


287/MP/2018

12.03.2020

16.03.2020 Misc


25/MP/2019

12.03.2020

16.03.2020 Misc


250/MP/2019

12.03.2020

13.03.2020 Misc


225/RC/2020

12.03.2020

13.03.2020 Misc


21/MP/2017
Alongwith IA No. 9/2017

12.03.2020

13.03.2020 Misc


188/AT/2020

12.03.2020

13.03.2020 Misc


IA No. 79/2019 in Petition No. 155/MP/2019

12.03.2020

13.03.2020 Misc


41/MP/2019

12.03.2020

12.03.2020 Misc


210/MP/2017
135/MP/2018

05.03.2020

09.03.2020 Misc


227/MP/2020 and IA No.16/2020

05.03.2020

09.03.2020 Misc


4/MP/2017
5/MP/2017

05.03.2020

09.03.2020 Misc


455/MP/2019

05.03.2020

09.03.2020 Misc


65/MP/2020

05.03.2020

09.03.2020 Misc


108/MP/2019 and IA Nos. 91/2019 and 12/2020
109/MP/2019 and IA Nos.92/2019 and 13/2020

05.03.2020

09.03.2020 Misc


91/MP/2018 along with IA Nos. 68/2018 and 72/2018

05.03.2020

09.03.2020 Misc


93/MP/2019

05.03.2020

09.03.2020 Misc


427/MP/2019

05.03.2020

09.03.2020 Misc


153/MP/2018
154/MP/2018

05.03.2020

09.03.2020 Misc


226/MP/2020

05.03.2020

06.03.2020 Misc


281/MP/2019

05.03.2020

06.03.2020 Misc


239/MP/2019

05.03.2020

06.03.2020 Misc


187/MP/2020

05.03.2020

06.03.2020 Misc


467/MP/2019
501/MP/2019
502/MP/2019
64/MP/2020
66/MP/2020
67/MP/2020

27.02.2020

03.03.2020 Misc


506/TT/2019

26.02.2020

03.03.2020 Transmission


513/TT/2019

26.02.2020

03.03.2020 Transmission


52/TT/2020

26.02.2020

03.03.2020 Transmission


20/TT/2020

26.02.2020

03.03.2020 Transmission


60/TT/2020

26.02.2020

03.03.2020 Transmission


130/TT/2020

26.02.2020

03.03.2020 Transmission


19/TT/2020

26.02.2020

03.03.2020 Transmission


35/TT/2020

26.02.2020

03.03.2020 Transmission


101/MP/2019

27.02.2020

03.03.2020 Misc


275/MP/2019 along with I.A No. 9/2020

12.02.2020

03.03.2020 Misc


209/MP/2019
210/MP/2019

27.02.2020

03.03.2020 Misc


94/MP/2019

27.02.2020

03.03.2020 Misc


459/MP/2019
460/MP/2019
461/MP/2019
462/MP/2019
463/MP/2019

27.02.2020

03.03.2020 Misc


272/GT/2019
268/GT/2019

27.02.2020

03.03.2020 Generation


366/MP/2019
377/MP/2019

27.02.2020

03.03.2020 Misc


446/MP/2019

27.02.2020

03.03.2020 Misc


393/MP/2019

27.02.2020

03.03.2020 Misc


77/TT/2020

26.02.2020

03.03.2020 Transmission


70/TT/2020

26.02.2020

03.03.2020 Transmission


300/MP/2018 along with I.A No. 6/2020
301/MP/2018 along with I.A No. 7/2020

25.02.2020

02.03.2020 Misc


292/MP/2019

27.02.2020

02.03.2020 Misc


327/TT/2019

26.02.2020

02.03.2020 Transmission


104/TT/2020

26.02.2020

02.03.2020 Transmission


79/TT/2020

26.02.2020

02.03.2020 Transmission


11/TT/2020

26.02.2020

02.03.2020 Transmission


270/GT/2019
259/GT/2019

27.02.2020

28.02.2020 Generation


280/MP/2019

25.02.2020

28.02.2020 Misc


486/TT/2019

13.02.2020

28.02.2020 Transmission


276/TT/2019

13.02.2020

28.02.2020 Transmission


254/TT/2019

13.02.2020

28.02.2020 Transmission


87/TT/2020

26.02.2020

28.02.2020 Transmission


483/TT/2019

26.02.2020

28.02.2020 Transmission


53/TT/2020

13.02.2020

28.02.2020 Transmission


87/TT/2019

11.02.2020

28.02.2020 Transmission


499/TT/2019

26.02.2020

28.02.2020 Transmission


299/MP/2019
360/MP/2019

25.02.2020

28.02.2020 Misc


374/MP/2019
375/MP/2019
376/MP/2019
378/MP/2019
399/MP/2019
400/MP/2019

25.02.2020

28.02.2020 Misc


68/MP/2020
159/MP/2020
160/MP/2020
184/MP/2020
185/MP/2020
186/MP/2020

25.02.2020

28.02.2020 Misc


430/MP/2019
431/MP/2019
433/MP/2019
434/MP/2019
435/MP/2019
437/MP/2019

25.02.2020

28.02.2020 Misc


485/TT/2019

13.02.2020

28.02.2020 Transmission


76/TT/2020

26.02.2020

28.02.2020 Transmission


507/TT/2019

26.02.2020

28.02.2020 Transmission


307/TT/2019

11.02.2020

28.02.2020 Transmission


346/TT/2019

13.02.2020

28.02.2020 Transmission


327/MP/2018
and IA No.87 of 2018

25.02.2020

28.02.2020 Misc


127/MP/2019
129/MP/2019
130/MP/2019
134/MP/2019
135/MP/2019

25.02.2020

28.02.2020 Misc


91/MP/2020

25.02.2020

28.02.2020 Misc


169/MP/2019

25.02.2020

28.02.2020 Misc


71/MP/2019

25.02.2020

28.02.2020 Misc


25/MP/2019

25.02.2020

28.02.2020 Misc


494/TT/2019

13.02.2020

28.02.2020 Transmission


105/TT/2019

13.02.2020

28.02.2020 Transmission


6/TT/2020

13.02.2020

28.02.2020 Transmission


113/TT/2019

11.02.2020

28.02.2020 Transmission


49/TT/2019

11.02.2020

28.02.2020 Transmission


388/TT/2019

13.02.2020

26.02.2020 Transmission


141/TT/2019

13.02.2020

26.02.2020 Transmission


432/MP/2019

25.02.2020

26.02.2020 Misc


63/MP/2020

25.02.2020

26.02.2020 Misc


288/TT/2019
300/TT/2019
301/TT/2019
305/TT/2019

13.02.2020

26.02.2020 Transmission


32/TT/2019

11.02.2020

26.02.2020 Transmission


92/MP/2020 along with IA No. 5/2020

25.02.2020

26.02.2020 Misc


40/MP/2019

25.02.2020

26.02.2020 Misc


362/TT/2019

13.02.2020

26.02.2020 Transmission


156/TT/2015

13.02.2020

26.02.2020 Transmission


248/TT/2019

13.02.2020

26.02.2020 Transmission


16/TT/2019

11.02.2020

26.02.2020 Transmission


104/TT/2019

11.02.2020

26.02.2020 Transmission


9/TT/2019

11.02.2020

26.02.2020 Transmission


103/TT/2019

11.02.2020

26.02.2020 Transmission


247/TT/2019

11.02.2020

26.02.2020 Transmission


86/TT/2019

11.02.2020

26.02.2020 Transmission


272/TT/2018

11.02.2020

26.02.2020 Transmission


172/TT/2019

13.02.2020

26.02.2020 Transmission


366/TT/2018

13.02.2020

26.02.2020 Transmission


85/TT/2019

11.02.2020

26.02.2020 Transmission


274/TT/2019

11.02.2020

26.02.2020 Transmission


35/TT/2019

11.02.2020

26.02.2020 Transmission


121/TT/2019

11.02.2020

26.02.2020 Transmission


33/TT/2019

11.02.2020

26.02.2020 Transmission


170/TT/2019

13.02.2020

26.02.2020 Transmission


75/TT/2020

13.02.2020

26.02.2020 Transmission


136/TT/2017

13.02.2020

26.02.2020 Transmission


171/TT/2019

13.02.2020

26.02.2020 Transmission


84/TT/2019

11.02.2020

25.02.2020 Transmission


245/TT/2019

13.02.2020

25.02.2020 Transmission


193/TT/2019

13.02.2020

24.02.2020 Transmission


147/TT/2019

13.02.2020

24.02.2020 Transmission


244/TT/2019

13.02.2020

24.02.2020 Transmission


249/TT/2019

11.02.2020

24.02.2020 Transmission


148/TT/2019

11.02.2020

24.02.2020 Transmission


96/TT/2019

11.02.2020

24.02.2020 Transmission


362/TT/2018

11.02.2020

24.02.2020 Transmission


107/TT/2017

13.02.2020

19.02.2020 Transmission


365/TT/2018

11.02.2020

19.02.2020 Transmission


295/TT/2018

11.02.2020

19.02.2020 Transmission


143/TT/2019

11.02.2020

19.02.2020 Transmission


34/TT/2019

11.02.2020

19.02.2020 Transmission


218/GT/2019

13.02.2020

17.02.2020 Misc


200/MP/2019

12.02.2020

17.02.2020 Misc


124/MP/2017

12.02.2020

17.02.2020 Misc


269/MP/2019

12.02.2020

17.02.2020 Misc


81/MP/2019

12.02.2020

17.02.2020 Misc


250/MP/2019

12.02.2020

17.02.2020 Misc


91/MP/2018 along with IA Nos. 68/2018 and 72/2018

12.02.2020

17.02.2020 Misc


47/AT/2020

12.02.2020

17.02.2020 Misc


25/MP/2020

12.02.2020

17.02.2020 Misc


354/GT/2018

11.02.2020

17.02.2020 Generation


260/MP/2019

12.02.2020

14.02.2020 Misc


57/AT/2020

12.02.2020

14.02.2020 Misc


56/AT/2020

12.02.2020

14.02.2020 Misc


456/MP/2019

12.02.2020

14.02.2020 Misc


158/MP/2019

12.02.2020

14.02.2020 Misc


40/TD/2020

12.02.2020

14.02.2020 Trading


367/MP/2019

12.02.2020

13.02.2020 Misc


188/AT/2020

12.02.2020

13.02.2020 Misc


173/MP/2019

12.02.2020

13.02.2020 Misc


174/MP/2019

12.02.2020

13.02.2020 Misc


165/MP/2019

12.02.2020

13.02.2020 Misc


168/MP/2019

21.01.2020

28.01.2020 Misc


351/MP/2018 and IA No. 4/2020
380/MP/2018

21.01.2020

24.01.2020 Misc


388/MP/2018
395/MP/2018

21.01.2020

24.01.2020 Misc


55/MP/2015

21.01.2020

24.01.2020 Misc


246/MP/2018

21.01.2020

24.01.2020 Misc


92/MP/2018 and IA No. 15/2018

21.01.2020

24.01.2020 Misc


81/MP/2019

21.01.2020

24.01.2020 Misc


21/MP/2019 and IA No. 14 of 2019

21.01.2020

24.01.2020 Misc


287/MP/2018

21.01.2020

24.01.2020 Misc


342/MP/2019

21.01.2020

24.01.2020 Misc


90/MP/2019

21.01.2020

24.01.2020 Misc


113/MP/2020

21.01.2020

23.01.2020 Misc


38/MP/2016 along with IAs No. 6/2018 and 36/2019

Petition under Sections 79(1)(c) read with 79(1)(f) and 79(1)(k) of the Electricity Act, 2003, inter alia, seeking a declaration that the factors/events, namely, delay in forest clearance of land for main plant, cancellation of allocated coal block, non-signing of Fuel Supply Agreement, delay in acquisition/procurement of land for main plant, delay in approval of land for Ash Pond by State of Odisha, delay in clearance of railway line from Eastern Coast Railway, Odisha, delay in clearance for construction of dedicated transmission line from Ministry of Power in construction of the 2×660 MW coal based Thermal Power Plant located in Dhenkenal, District Odisha as Force majeure events under BPTA dated 24.2.2010 and seeking extension of time period for achieving the Commercial Operation Date of project and other consequential reliefs under the BPTA dated 24.2.2010. Lanco Babandh Power Limited

21.01.2020

23.01.2020 Misc


450/MP/2019

14.01.2020

22.01.2020 Misc


280/MP/2019

14.01.2020

21.01.2020 Misc


456/MP/2019

14.01.2020

17.01.2020 Misc


454/MP/2019
457/MP/2019
500/MP/2019

14.01.2020

17.01.2020 Misc


424/MP/2019

14.01.2020

17.01.2020 Misc


451/MP/2019 along with IA 93 of 2019

14.01.2020

17.01.2020 Misc


410/MP/2019

14.01.2020

17.01.2020 Misc


449/MP/2019

14.01.2020

17.01.2020 Misc


405/MP/2019

14.01.2020

17.01.2020 Misc


250/MP/2019

14.01.2020

17.01.2020 Misc


444/AT/2019

10.01.2020

14.01.2020 Misc


443/AT/2019

10.01.2020

14.01.2020 Misc


398/AT/2019

10.01.2020

14.01.2020 Misc


441/AT/2019

10.01.2020

14.01.2020 Misc


382/AT/2019

10.01.2020

14.01.2020 Misc


448/AT/2019

10.01.2020

14.01.2020 Misc


187/AT/2019 and IA No.86/2019
160/AT/2019 and IA No.81/2019
161/AT/2019 and IA No. 85/2019
162/AT/2019 and IA No.84/2019

10.01.2020

14.01.2020 Misc


396/AT/2019

10.01.2020

14.01.2020 Misc


327/MP/2018
and IA No.87 of 2018

10.01.2020

13.01.2020 Misc