S.No |
CERC Regulations On
|
Gazette No |
Gazette Date |
138. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) Regulations (5th Amendment), 2017. Notification. Statement of Reasons. |
- |
14.12.2017 |
137. |
Central Electricity Regulatory Commission (Payment of fees) (First Amendment, Regulations-2017. Notification. Statement of Reasons. |
- |
14.06.2017 |
136. |
Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017. Notification. Statement of Reasons. |
- |
15.05.2017 |
135. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016 were notified on 29.4.2016 in the Gazette of India, Extraordinary (Part-III, Section IV No. 162). Notification. |
- |
05.05.2017 |
134. |
- |
-- |
|
133. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017. Notification. Statement of Reasons. Related Orders. |
- |
18.04.2017 |
132. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017. Notification. CORRIGENDUM. |
148 |
12.04.2017 |
131. |
Central Electricity Regulatory Commission (Appointment of Consultants) (Third Amendment) Regulations, 2017. Gazette. |
46 |
10.04.2017 |
130. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2017 Notification. Statement of Reasons. |
98 |
17.02.2017 |
129. |
Central Electricity Regulatory Commission (Sharing of Inter-State Tranmission Charges and Losses) Regulations, 2010 (Principal Regulation). Gazette. |
280 |
05.07.2016 |
128. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fourth Amendment) Regulations, 2016. Gazette. Notification. Statement of Reasons. |
279 |
05.07.2016 |
127. |
The Central Electricity Regulatory Commission (Terms and Conditions for Dealing in Energy Savings Certificates) Regulations, 2016. Gazette. Notification. Statement of Reasons. Procedures for Transaction of Energy Savings Certificatess |
237 |
30.05.2016 |
126. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters)(Third Amendment) Regulations, 2016. Notification. Statement of Reasons. |
201 |
06-05-2016 |
125. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations,
2016. Notification. Statement of Reasons. DOP on Reserve Shutdown and Compensation Mechanism. |
06-04-2016 |
|
124. |
111 |
23-03-2016 |
|
123. |
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2016. Gazette. Notification. Statement of Reasons. |
112 |
30-03-2016 |
122. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fifth Amendment) Regulations, 2016. Gazette. Notification. Statement of Reasons. |
121 |
31-03-2016 |
120. |
Central Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff) (Third Amendment) Regulations, 2016. Gazette. |
1108/div> |
28-03-2016 |
119. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons. |
379 |
24-11-2015 |
118. |
Central Electricity Regulatory Commission (Indoor/outdoor Medical Facilities) (First Amendment) Regulation, 2015. Gazette. |
385 |
20.11.2015 |
117. |
Central Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff) (Second Amendment) Regulations, 2015. Gazette. |
384 |
20.11.2015 |
116. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons. |
355 |
07-10-2015 |
115. |
Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015. Gazette. Notification. Statement of Reasons. Detailed Procedure For Ancillary Services Operations. Revised Detailed Procedure For Ancillary Services Operations. Dated 21-11-2016 - Corrigendum |
281 |
19-08-2015 |
114. |
Procedure for implementation of the framework On Forecasting, scheduling and imbalance handling for renewable energy generating stations including power parks based on wind and solar At inter-state level: Procedure.
Framework on Forecasting, Scheduling and Imbalance Handling for Variable Renewable Energy Sources (Wind and Solar): Statement of Reasons.
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015.
Gazette. Notification. Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015. Notification. |
271 |
07-08-2015 |
113. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Third Amendment) Regulations, 2015. Notification. Statement of Reasons. |
250 |
10-07-2015 |
112. |
Central Electricity Regulatory Commission (Power System Development Fund) (First Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons. |
238 |
03-07-2015 |
111. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons. |
239 |
03-07-2015 |
110. |
- |
05-06-2015 |
|
109. |
Central Electricity Regulatory Commission (Miscellaneous Provisions) Order, 2015. Gazette. Notification. |
- |
25-05-2015 |
108. |
Central Electricity Regulatory Commission (Fees and Charges of Regional Load
Despatch Centre and other related matters) Regulations, 2015. Gazette. Notification. |
269 |
18-05-2015 |
107. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fifth Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons . |
171 |
15-05-2015 |
106. |
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) (First Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons . |
170 |
15-05-2015 |
105. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2015. Gazette. Notification. Statement of Reasons . |
165 |
12-05-2015 |
104. |
The Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2015. Notification. Statement of Reasons. Appendix-I. Appendix-II. |
- |
- |
103. |
The Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Second Amendment) Regulations, 2014. Gazette. Notification. Statement of Reasons . |
06 |
05.01.2015 |
102. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2014. . Gazette. Notification. Statement of Reasons. |
381 |
- |
101. |
The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014. . Corrigendum. Order. Gazette. Notification. Statement of Reasons. REC Procedures. |
380 |
31.12.2014 |
100. |
Central Electricity Regulatory Commission (Appointment of Consultants) (Second Amendment) Regulations, 2014. Notification. |
286 |
07.10.2014 |
99. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014. . Gazette. Notification. Detailed Procedure. Statement of Reasons. |
245 |
12-08-14 |
98. |
Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 . Gazette. Notification. |
171 |
09-06-14 |
97. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
Annexure-I Thermal. Notification. Statement of Reasons. Annexure-I Hydro. Annexure-I Transmission. |
83 |
12-03-14 |
96. |
Central Electricity Regulatory Commission (Power Market) (First Amendment) Regulations, 2014.
Notification. Statement of Reasons. |
110 |
09-04-14 |
95. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2014.
Gazette. Notification. Statement of Reasons. |
92 |
21-03-14 |
94. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2014.
Gazette. Notification. Corrigendum. |
08 |
06-01-14 |
93. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014.
Corrigendum.
Gazette. Gazette. Notification |
06 |
07-01-14 |
92. |
Central Electricity Regulatory Commission (Conduct of Business) (Amendment) Regulations, 2013.
Statement of Reasons.
Gazette. Notification |
291 |
14-11-13 |
91. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission)(Second Amendment) Regulations, 2013.
Gazette. Notification |
237 |
11-09-13 |
90. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) (Second Amendment) Regulations, 2013.
Statement of Reasons.
Gazette. Notification |
230 |
29-08-13 |
89. |
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2013. .Notification Statement of Reasons |
192 |
11-07-13 |
88. |
- |
- |
|
87. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Third Amendment) Regulations, 2013.
Statement of Reasons.
Gazette. Notification |
86 |
26-03-13 |
86. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2012.. Gazette. .Notification Statement of Reasons. |
01 |
01-01-13 |
85. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) (First Amendment) Regulations, 2012.. 1. Gazette. .Notification .Statement of Reasons. |
224 |
11-10-12 |
84. |
The Central Electricity Regulatory Commission (Standards of Performance of inter-State transmission licensees) Regulations, 2012. Gazette. .Notification .Statement of Reasons |
204 |
21-09-12 |
83. |
Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012. Gazette. .Notification .Statement of Reasons .Corrigendum to Second Amendments .Writ Petition No. 8509/2012 filed by TANGEDCO Challenging the above Regulation dismissed by Honble High Court of Madras vide judgment dated 14/09/2012. |
59 |
05-03-12 |
82. |
Central Electricity Regulatory Commission (Payment of Fees) Regulations, 2012. Gazette. Notification Statement of Reasons. |
79 |
30-03-12 |
81. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2012 Gazette. Notification .Statement of Reasons. |
76 |
29-03-12 |
80. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-Term Access and Medium-Term Open Access in Inter-State Transmission and related matters) (Second Amendment) Regulations, 2012 Gazette. Notification Statement of Reasons (14-03-2012) |
72 |
22-03-12 |
79. |
CERC(Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. Gazette. Notification Statement of Reasons (06-02-2012) |
20 |
07-02-12 |
78 |
CERC (Sharing of inter-State Transmission Charges and Losses)(First Amendment) Regulations, 2011 Gazette. Notification Statement of Reasons (21-11-2011) |
229 |
25-11-11 |
77. |
Corrigendum of CERC (Regulation of Power Supply) Regulations, 2010 Gazette. |
185 |
06-09-11 |
76. |
CERC (Terms and Conditions of Tariff) (Second Amendment) Regulation, 2011 Gazette. Notification Statement of Reasons (21-06-2011) |
129 |
21-06-11 |
75. |
CERC (Terms and Conditions of Tariff) (First Amendment) Regulation, 2011 Gazette. Notification |
92 |
02-05-11 |
74. |
Fees and charges of Regional Load Despatch Centre and other related matters (First Amendment) Regulations, 2011 Notification Statement of Reasons (22-03-2011) |
62 |
28-03-11 |
73. |
Extension of the date of operation of Clauses 5 and 7 of Annexure-I of the CERC (Indian Electricity Grid Code) Regulations, 2010 1. Gazette. 2. Notification |
10 |
14-01-11 |
72. |
CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010. 1. Notification 2. Order |
349 |
30-12-10 |
71. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation (First Amendment) Regulations, 2010 Gazette. 1. Notification 2. Statement of Reasons(27-09-2010) |
249 |
01-10-10 |
70. |
CERC (Regulation of Power Supply) Regulations, 2010 Gazette. Notification Statement of Reasons (17-09-2010) Corrigendum (05-09-2011) |
248 |
30-09-10 |
69. |
CERC Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters(Amendment) Regulations, 2010 Notification |
225 |
07-09-10 |
68. |
CERC (Appointment of Consultants) (Amendment) Regulation, 2010 Gazette. Notification |
225 |
06-09-10 |
67. |
Guidelines for vetting of capital cost of hydro electric projects by Designated Independent Agencies/Experts. 1. Notification 2. Statement of Reasons |
200 |
07-08-10 |
66. |
"Procedure for the Implementation of the Mechanism of Renewable Regulatory Fund under Regulation 6.1 (d) of CERC (Indian Electricity Grid Code), Regulation 2010. Gazette. |
168 |
03-07-10 |
65. |
CERC (Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities) Regulations, 2010 Notification Statement of Reasons (September-2010) |
245 |
24-09-10 |
64. |
CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010. 1. Gazette. 2. Notification 3. Statement of Reasons (11-06-2010) |
162 |
16-06-10 |
63. |
Procedure, Terms and Conditions for grant of trading licence and other related matters (First Amendment) Regulations, 2010. 1. Gazette. 2. Notification 3. Statment of Reasons |
152 |
07-06-10 |
62. |
CERC Payment of Fees (Amendment) Regulations, 2010. Notification |
153 |
07-06-10 |
61. |
Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010 1. Gazette. 2. Notification 3. Statement of Objects and Reasons (31-05-2010) |
154 |
07-06-10 |
60. |
Central Electricity Regulatory Commission (Power system Development Fund) Regulations, 2010. 1. Gazette. 2. Notification 3. Statement of Reasons |
155 |
07-06-10 |
59. |
Procedure, Terms and Conditions for grant of Transmission Licence and other related matters (Amendment) Regulations, 2010 1. Gazette. 2. Regulations 3. Statement of Reasons |
145 |
26-05-10 |
58. |
Indian Electricity Grid Code Regulations, 2010 1. Gazette. 2. Notification 3. Order (26-04-2010) 4. Statement of Reasons (18-06-2010) 5. Corrigendum (28-06-2010) 6. Addendum (28-06-2010) [Gazette No. 168] Dt.03-07-2009] 7. Detailed Procedure (18-02-2011) |
115 |
28-04-10 |
57. |
CERC Unscheduled Interchange charges and related matters (Amendment) Regulations, 2010 1. Notification 2. Order (26-04-2010) 3. Statement of Reason (26-05-2010) 4. Corrigendum (28-06-2010) [Gazette No. 167] Dt.03-07-2009] |
114 |
28-04-10 |
56. |
Procedures for calculating the expected revenue from tariffs and charges Regulations, 2010 1. Gazette. 2. Notification 3. Statement of Reasons (12-04-2010) |
96 |
16-04-10 |
55. |
Central Electricity Regulatory Commission (Salary, Allowances and other Condition of Service of Chairperson and Members) Amendment Rules, 2004 Notification |
- |
19-03-10 |
54. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2012. 1. Gazette. .Notification .Statement of Reasons .Writ Petition No. 8510/2012 filed by TANGEDCO Challenging the above Regulation dismissed by Honble High Court of Madras vide judgment dated 14/09/2012. |
60 |
06-03-10 |
53. |
CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2010 1. Notification 2. Order 3. Statement of Reasons (27-04-2010) |
58 |
25-02-10 |
52. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 1. Notification 2. Order |
40 |
29-01-10 |
51. |
Power Market Regulations, 2010 Gazette. 1. Notification 2. Order 3. Statement of Objects and Reasons (28-01-2010) |
33 |
21-01-10 |
50. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010. Gazette. 1. Notification 2. Statement of Reasons(14-01-2010) |
26 |
18-01-10 |
49. |
Fixation of Trading Margin Regulations, 2010. 1. Notification 2. Statement of Reasons (11-01-2010) |
19 |
12-01-10 |
48. |
Measures to relieve congestion in real time operation Regulations, 2009 1. Gazette. 2. Notification 3. Corrigendum (04-02-2010) |
252 |
24-12-09 |
47. |
Procedure, Terms and Conditions for grant of trading licence and other related matters (Second Amendment) Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (16-10-2009) |
197 |
23-10-09 |
46. |
Furnishing of Technical Details by the Generating Companies Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (14-10-2009) |
198 |
23-10-09 |
45. |
Fees and charges of Regional Load Despatch Centre and other related matters Regulations, 2009 1. Notification 2. Statement of Reasons (27-11-2009) |
186 |
26-09-09 |
44. |
CERC Tariff Regulations for Renewable Energy Sources Regulations, 2009 1. Notification 2. Statement of Reasons (07-10-2009) |
176 |
17-09-09 |
43. |
CERC Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (07-08-2009) 4. Statement of Reasons (30-10-2009) 5. Procedure for making application for Grant of connectivity in ISTS |
140 |
10-08-09 |
42. |
CERC Payment of fees (Amendment) Regulations, 2009 Notification |
128 |
24-07-09 |
41. |
CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009. 1. Gazette. 2. Notification 3. Statement of Reasons (26-05-2009) |
94 |
26-05-09 |
40. |
CERC (Conduct of Business) (Amendment) Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (26-05-2009) |
93 |
28-05-09 |
39. |
CERC Notification re.CERC (Open Access in inter-state Transmission) (Amendment) Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (01-07-2009) 4. Corrigendum (10-07-2009) |
86 |
29-05-09 |
38. |
CERC Unscheduled Interchange charges and related matters Regulations, 2009 1. Gazette. 2. Notification 3. Statement of Reasons (08-06-2009) 4. Corrigendum (03-07-2009) [Gazette No. 127] Dt.24-07-2009] |
43 |
30-03-09 |
37. |
Procedure, Terms and Conditions for grant of trading licence and other related matters Regulations, 2009 1. Notification 2. Statement of Reasons (25-05-2009) 3. Gazette. |
28 |
24-02-09 |
36. |
Terms and Conditions of Tariff, Regulations for 2009-14 1. Notification 2. Appendix-I 3. Appendix-II 4. Appendix-III 5. Appendix-IV 6. Statement of Reasons (03-02-2009) 7. Corrigendum (10-06-2009) [Gazette No. 100] Dt.17-06-2009] 8. Addendum (10-06-2009) [Gazette No. 101] Dt.17-06-2009] |
11 |
20-01-09 |
35. |
CERC revises payment of fees Regulations, 2008 1. Regulations 2. Statement of Reasons (13-10-2008) |
174 |
27-10-08 |
34. |
CERC Notification re. (Appointment of Consultants) Regulations, 2008 Notification |
160 |
14-10-08 |
33. |
CERC (Leased Accommodation) (First Amendment) Regulations, 2008 Notification |
59 |
04-04-08 |
32. |
CERC Notification re.CERC (Open Access in inter-State Transmission) Regulations, 2008 Gazette. Notification Statement of Reasons (04-03-2008) |
10 |
07-02-08 |
31. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Fourth Amendment) Regulations, 2007 Notification |
235 |
31-12-07 |
30. |
Sharing of revenue derived from utilisation of transmission assets for other business, 2007 Gazette. Notification |
236 |
31-12-07 |
29. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Third Amendment) Regulations, 2007 Notification |
196 |
07-09-07 |
28. |
CERC (Leased Accommodation)Regulations, 2007 Notification |
236 |
16-08-07 |
27. |
CERC (Recruitment, Control and Service Conditions of Staff) Regulations, 2007 Amendment |
156 |
31-07-07 |
26. |
CERC (Recruitment, Control and Service Conditions of Staff) Regulations, 2007 Notification Amendment |
156 |
30-07-07 |
25. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Second Amendment) Regulations, 2007 Notification |
98 |
26-04-07 |
24. |
CERC Notification re.CERC(Terms and Conditions of Tariff) (Amendment) Regulations, 2007 Notification |
60 |
13-03-07 |
23. |
CERC Notification re.CERC(Procedure for making of Application for Determination of Tariff, Publication of the Application and Other Related Matters)(Amendment)Regulations, 2006 Notification |
135 |
13-12-06 |
22. |
CERC Notification re.CERC (Open Access in inter-state Transmission)(Amendment) Regulations, 2006 Notification |
23 |
13-12-06 |
21. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(First Amendment) Regulations, 2006 Notification |
27 |
01-06-06 |
20. |
CERC Medical Regulations - Nov 2005 1. Notification 2. List of Authorised Medical Practitioners (AMPs)/Hospitals 3. Old list of Empanelled Hospitals 4. CERC Empanelled Diagnostic Centres. 5. Current list of Empanelled Hospitals |
149 |
17-11-05 |
19. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(first Amendment) Regulations, 2005 1. Notification 2. Statement of Reasons (11-08-2005) |
28 |
11-08-05 |
18. |
CERC Notification re.CERC (Open Access in inter-state Transmission)(First Amendment) Regulations, 2005 Notification |
23 |
23-02-05 |
17. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(First Amendment) Regulations, 2004 Notification |
28 |
09-09-04 |
16. |
CERC Notification re.CERC(Procedure for making of Application for Determination of Tariff, Publication of the Application and Other Related Matters) Regulations, 2004 Notification |
- |
03-08-04 |
15. |
CERC Notification re.CERC (Terms and Conditions of Tariff) Regulations, 2004 1. Notification 2. Appendix-I Part-I(Thermal) 3. Appendix-I Part-II(Hydro) 4. Appendix-I Part-III(Transmission) 5. Appendix-II 6. Appendix-III |
68 |
29-03-04 |
14. |
Central Electricity Regulatory Commission (Salary, Allowances and other Condition of Service of Chairperson and Members) Rules, 2004. Notification |
135 |
08-03-04 |
13. |
CERC Notification re.CERC (Open Access in Inter-State Transmission)Regulations, 2004 Notification |
27 |
06-02-04 |
12. |
Terms and Conditions of Tariff (Second Amendment) Regulation-2003 Notification |
87 |
02-06-03 |
11. |
CERC (Terms & Conditions of Tariff) (First Amendment) Regulations, 2003 Notification |
65 |
01-05-03 |
10. |
Terms and Condition of tariff Regulation - First Amendment- 2002 Notification |
140 |
11-07-02 |
09. |
Terms and conditions of Tariff L-25(1)/2001-CERC dt.21-09-01 Notification |
252 |
24-09-01 |
08. |
Terms and conditions of Tariff L-25(1)/2001-CERC dt.26-03-01 Notification |
75 |
26-03-01 |
08. |
Filing of Annual Report by Transmission Utility L-7/20(1)/99-CERC dt.10-07-00 Notification |
91 |
15-07-00 |
07. |
Filing of Annual Report by Thermal Generating Companies L-7/20(1)/99-CERC dt.28-04-00 Notification |
63 |
25-05-00 |
06. |
Conduct of Business Regulation (First Amendment) 8/1(1)/99-CERC dt 28-04-00 Gazette. Notification |
55 |
10-05-00 |
05. |
Appointment of Consultants -1999 1/18(28)/99-CERC dt.29-12-99 Notification |
114 |
31-12-99 |
04. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 24-11-99 Notification |
100 |
26-11-99 |
03. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 27-08-99 Notification |
70 |
30-08-99 |
02. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 31-05-99 Gazette. Notification |
48 |
31-05-99 |
01. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 12-05-99 Notification |
35 |
13-05-99 |
00 |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 23-04-99 Gazette. Notification |
27 |
26-04-99 |