Sl.No. | Petition No. | Subject | Date of Order | Date of posting Order on website | Category |
---|---|---|---|---|---|
656 |
27/TT/2021 |
31.12.2021 | 31.12.2021 | Transmission | |
655 |
471/MP/2019 |
31.12.2021 | 31.12.2021 | Misc. | |
654 |
80/IA/2021 In Petition No. 405/MP/2019 |
31.12.2021 | 31.12.2021 | Adoption | |
653 |
317/MP/2019 |
31.12.2021 | 31.12.2021 | Misc. | |
652 |
679/TT/2020 |
31.12.2021 | 31.12.2021 | Transmission | |
651 |
150/MP/2021 |
31.12.2021 | 31.12.2021 | Misc. | |
650 |
40/TT/2021 |
31.12.2021 | 31.12.2021 | Transmission | |
649 |
6/TT/2021 |
31.12.2021 | 31.12.2021 | Transmission | |
648 |
75/TT/2020 |
27.12.2021 | 27.12.2021 | Transmission | |
647 |
135/TT/2020 |
24.12.2021 | 25.12.2021 | Transmission | |
646 |
72/GT/2021 |
24.12.20211 | 24.12.20211 | Generation | |
645 |
368/GT/2019 |
23.12.2021 | 24.12.2021 | Generation | |
644 |
211/TT/2020 |
23.12.2021 | 23.12.2021 | Misc. | |
643 |
171/MP/2021 |
23.12.2021 | 23.12.2021 | Misc. | |
642 |
148/MP/2021 with Interlocutory Application No.87/IA/2021 |
23.12.2021 | 23.12.2021 | Misc. | |
641 |
168/MP/2021 |
23.12.2021 | 23.12.2021 | Misc. | |
640 |
I.A. No. 66/IA/2021 in Petition No. 588/TT/2020 |
23.12.2021 | 23.12.2021 | Adoption | |
639 |
213/TT/2020 |
23.12.2021 | 23.12.2021 | Transmission | |
638 |
208/TD/2021 |
22.12.2021 | 22.12.2021 | Licence | |
637 |
533/MP/2020 and 538/MP/2020 |
Petition under Section 79(1)(d) and (f) of the Electricity Act, 2003 read with Regulation 5(3) of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010 seeking compensation/ relief for increased construction cost due to certain events of Change in Law as per the applicable provisions of Transmission Service Agreement dated 24.6.2015. Raipur-Rajnandgaon-Warora Transmission Limited Corrigendum date:- 23.03.2022 |
22.12.2021 | 22.12.2021 | Misc. |
636 |
Corrigendum to Petition No. 588/TT/2020 |
22.12.2021 | 22.12.2021 | Transmission | |
635 |
249/AT/2021 |
22.12.2021 | 22.12.2021 | Adoption | |
634 |
25/TT/2021 |
22.12.2021 | 22.12.2021 | Transmission | |
633 |
178/AT/2021 |
22.12.2021 | 22.12.2021 | Adoption | |
632 |
118/TT/2020 |
22.12.2021 | 22.12.2021 | Transmission | |
631 |
49/TT/2020 |
22.12.2021 | 22.12.2021 | Transmission | |
630 |
298/GT/2019 |
21.12.2021 | 21.12.2021 | Generation | |
629 |
179/AT/2021 |
21.12.2021 | 21.12.2021 | Adoption | |
628 |
210/AT/2021 |
21.12.2021 | 21.12.2021 | Adoption | |
627 |
199/MP/2020 |
20.12.2021 | 21.12.2021 | Misc. | |
626 |
226/MP/2021 and 227/MP/2021 |
16.12.2021 | 21.12.2021 | Misc. | |
625 |
157/MP/2015 along with IA No.53/2021 And Petition No: 121/MP/2017 along with IA No. 64/2021 |
20.12.2021 | 20.12.2021 | Misc. | |
624 |
448/TT/2020 |
20.12.2021 | 20.12.2021 | Transmission | |
623 |
214/MP/2021 |
17.12.2021 | 20.12.2021 | Misc. | |
622 |
18/RP/2021 in Petition No. 33/TT/2019 |
20.12.2021 | 20.12.2021 | Review | |
621 |
108/GT/2020 |
18.12.2021 | 19.12.2021 | Generation | |
620 |
15/RP/2020 in 281/GT/2018 |
16.12.2021 | 16.12.2021 | Review | |
619 |
333/MP/2018 |
15.12.2021 | 16.12.2021 | Misc. | |
618 |
626/MP/2020 with IA No. 20/2021 & IA No. 42/2021 and 156/MP/2021 with IA No. 59/2021 and 176/MP/2021 |
16.12.2021 | 16.12.2021 | Misc. | |
617 |
207/MP/2021 |
16.12.2021 | 16.12.2021 | Misc. | |
616 |
41/TT/2020 |
16.12.2021 | 16.12.2021 | Transmission | |
615 |
251/TT/2020 |
14.12.2021 | 14.12.2021 | Transmission | |
614 |
217/TT/2020 |
14.12.2021 | 14.12.2021 | Transmission | |
613 |
214/TT/2020 |
14.12.2021 | 14.12.2021 | Transmission | |
612 |
44/TT/2021 |
13.12.2021 | 14.12.2021 | Transmission | |
611 |
438/GT/2020 |
12.12.2021 | 13.12.2021 | Generation | |
610 |
175/MP/2021 |
13.12.2021 | 13.12.2021 | Misc. | |
609 |
174/AT/2021 |
13.12.2021 | 13.12.2021 | Adoption | |
608 |
215/MP/2021 |
13.12.2021 | 13.12.2021 | Misc. | |
607 |
167/MP/2021 |
13.12.2021 | 13.12.2021 | Misc. | |
606 |
20/RP/2021 in IA No. 64/IA/2020 in Petition No.614/MP/2020 along with IA No. 63/IA/2021 in IA No. 64/IA/2020 in Petition No. 614/MP/2020 |
13.12.2021 | 13.12.2021 | Review | |
605 |
12/TT/2020 |
13.12.2021 | 13.12.2021 | Transmission | |
604 |
646/TT/2020 |
13.12.2021 | 13.12.2021 | Transmission | |
603 |
15/TT/2021 |
13.12.2021 | 13.12.2021 | Transmission | |
602 |
668/TT/2020 |
13.12.2021 | 13.12.2021 | Transmission | |
601 |
180/MP/2020 |
08.12.2021 | 08.12.2021 | Misc. | |
600 |
475/TT/2020 |
08.12.2021 | 08.12.2021 | Transmission | |
599 |
I.A No.15/IA/2018 in Petition No. 92/MP/2018 |
08.12.2021 | 08.12.2021 | Adoption | |
598 |
228/MP/2021 |
06.12.2021 | 06.12.2021 | Misc. | |
597 |
19/RP/2020 in Petition No.284/RC/2019 |
06.12.2021 | 06.12.2021 | Review | |
596 |
222/MP/2021 |
06.12.2021 | 06.12.2021 | Misc. | |
595 |
165/TD/2021 |
06.12.2021 | 06.12.2021 | Licence | |
594 |
218/MP/2021 |
06.12.2021 | 06.12.2021 | Misc. | |
593 |
514/TT/2019 |
06.12.2021 | 06.12.2021 | Transmission | |
592 |
195/TT/2020 |
03.12.2021 | 03.12.2021 | Transmission | |
591 |
134/TT/2020 |
03.12.2021 | 03.12.2021 | Transmission | |
590 |
188/MP/2021 |
02.12.2021 | 02.12.2021 | Misc. | |
589 |
122/TT/2020 |
01.12.2021 | 01.12.2021 | Transmission | |
588 |
211/MP/2018 |
30.11.2021 | 30.11.2021 | Misc. | |
587 |
691/TT/2020 |
30.11.2021 | 30.11.2021 | Transmission | |
586 |
661/TT/2020 |
30.11.2021 | 30.11.2021 | Transmission | |
585 |
324/TT/2020 |
30.11.2021 | 30.11.2021 | Transmission | |
584 |
289/TT/2020 |
29.11.2021 | 29.11.2021 | Transmission | |
583 |
712/TT/2020 |
29.11.2021 | 29.11.2021 | Transmission | |
582 |
667/TT/2020 |
29.11.2021 | 29.11.2021 | Transmission | |
581 |
75/MP/2019 |
28.11.2021 | 28.11.2021 | Misc. | |
580 |
198/TD/2021 |
28.11.2021 | 28.11.2021 | Licence | |
579 |
328/TT/2020 |
26.11.2021 | 26.11.2021 | Transmission | |
578 |
200/MP/2019 |
26.11.2021 | 26.11.2021 | Misc. | |
577 |
719/TT/2020 |
25.11.2021 | 26.11.2021 | Transmission | |
576 |
463/TT/2020 |
25.11.2021 | 25.11.2021 | Transmission | |
575 |
598/MP/2020 |
24.11.2021 | 24.11.2021 | Misc. | |
574 |
321/TT/2020 |
22.11.2021 | 22.11.2021 | Transmission | |
573 |
235/MP/2019 |
22.11.2021 | 22.11.2021 | Misc. | |
572 |
Corrigendum to Petition No. 704/TT/2020 |
22.11.2021 | 22.11.2021 | Transmission | |
571 |
162/MP/2021 |
21.11.2021 | 21.11.2021 | Misc. | |
570 |
196/TT/2021 |
21.11.2021 | 21.11.2021 | Transmission | |
569 |
50/TT/2020 |
21.11.2021 | 21.11.2021 | Transmission | |
568 |
208/TD/2021 |
21.11.2021 | 21.11.2021 | Licence | |
567 |
215/TT/2020 |
20.11.2021 | 20.11.2021 | Transmission | |
566 |
241/MP/2021 |
19.11.2021 | 19.11.2021 | Misc. | |
565 |
714/TT/2020 |
18.11.2021 | 19.11.2021 | Transmission | |
564 |
05/SM/2020 |
18.11.2021 | 18.11.2021 | Suo-Motu | |
563 |
444/GT/2020 |
17.11.2021 | 17.11.2021 | Generation | |
562 |
501/MP/2019 502/MP/2019 66/MP/2020 267/MP/2020 414/MP/2020 496/MP/2020 499/MP/2020 501/MP/2020 510/MP/2020 545/MP/2020 and 553/MP/2020 |
17.11.2021 | 17.11.2021 | Misc. | |
561 |
400/GT/2020 |
13.11.2021 | 15.11.2021 | Generation | |
560 |
452/MP/2019 & 173/MP/2020 |
13.11.2021 | 15.11.2021 | Misc. | |
559 |
221/MP/2019 |
13.11.2021 | 14.11.2021 | Misc. | |
558 |
224/MP/2021 225/MP/2021 233/MP/2021 |
13.11.2021 | 13.11.2021 | Misc. | |
557 |
468/MP/2019 |
12.11.2021 | 13.11.2021 | Misc. | |
556 |
Corrigendum to 06/SM/2021 (Suo-Motu) |
11.11.2021 | 12.11.2021 | Suo-Motu | |
555 |
231/MP/2021 |
12.11.2021 | 12.11.2021 | Misc. | |
554 |
197/MP/2018 |
11.11.2021 | 11.11.2021 | Misc. | |
553 |
92/MP/2020 along with IA No. 5 of 2020 and IA No. 66 of 2020 |
11.11.2021 | 11.11.2021 | Misc. | |
552 |
214/MP/2019 |
09.11.2021 | 10.11.2021 | Misc. | |
551 |
80/TT/2016 |
09.11.2021 | 09.11.2021 | Transmission | |
550 |
265/TT/2019 |
07.11.2021 | 08.11.2021 | Transmission | |
549 |
616/MP/2020 |
08.11.2021 | 08.11.2021 | Misc. | |
548 |
288/GT/2020 |
07.11.2021 | 08.11.2021 | Generation | |
547 |
141/TT/2020 |
08.11.2021 | 08.11.2021 | Transmission | |
546 |
533/MP/2020 |
07.11.2021 | 07.11.2021 | Misc. | |
545 |
8/SM/2021 |
03.11.2021 | 03.11.2021 | Suo-Motu | |
544 |
9/SM/2021 |
03.11.2021 | 03.11.2021 | Suo-Motu | |
543 |
588/TT/2020 |
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset A-1: Siliguri-Purnea 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-2: Purnea-Muzaffarpur (New) 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-3: Muzaffarpur (New)-Gorakhpur 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-4: Gorakhpur-Lucknow 400 kV D/C (Twin Conductor) Transmission Line, Asset A-5: Bareily-Mandola 400 kV D/C (Twin Conductor) Transmission Line and Asset A-6: Muzaffarpur (New)-Muzaffarpur (BSEB) 220 kV (Twin Conductor) transmission line under Tala inter-State Transmission System associated with Tala Hydro Electric Project in Eastern Region, Eastern-Northern Inter-Region and Northern Region. Powerlinks Transmission Limited Corrigendum date:- 22.12.2021 |
02.11.2021 | 02.11.2021 | Transmission |
542 |
95/MP/2021 |
31.10.2021 | 01.11.2021 | Misc. | |
541 |
183/MP/2020 333/MP/2020 342/MP/2020 508/MP/2020 517/MP/2020 and 522/MP/2020 |
31.10.2021 | 31.10.2021 | Misc. | |
540 |
669/TT/2020 |
31.10.2021 | 31.10.2021 | Transmission | |
539 |
708/TT/2020 |
31.10.2021 | 31.10.2021 | Transmission | |
538 |
131/TT/2020 |
31.10.2021 | 31.10.2021 | Transmission | |
537 |
610/MP/2020 |
28.10.2021 | 28.10.2021 | Misc. | |
536 |
133/TT/2020 |
28.10.2021 | 28.10.2021 | Transmission | |
535 |
391/MP/2018 & 100/MP/2019 |
27.10.2021 | 27.10.2021 | Misc. | |
534 |
380/TT/2020 |
27.10.2021 | 27.10.2021 | Transmission | |
533 |
128/MP/2021 |
27.10.2021 | 27.10.2021 | Misc. | |
532 |
410/GT/2020 |
25.10.2021 | 26.10.2021 | Generation | |
531 |
704/TT/2020 |
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of Asset A1: 02 Numbers Line bays along with 02 Numbers 50 MVAR Line Reactors (charged as Bus Reactor) at Jabalpur Pooling Station and Asset B1: 400 kV D/C (Triple Snowbird) MB TPS (Anuppur)-Jabalpur Pooling Station Transmission Line under Transmission System for connectivity of MB Power (M.P.) Limited in Western Region. Power Grid Corporation of India Limited Corrigendum date:- 22.11.2021 |
24.10.2021 | 24.10.2021 | Transmission |
530 |
560/MP/2020 |
24.10.2021 | 24.10.2021 | Misc. | |
529 |
18/MP/2019 |
23.10.2021 | 24.10.2021 | Misc. | |
528 |
156/MP/2014 |
24.10.2021 | 24.10.2021 | Misc. | |
527 |
347/MP/2020 |
23.10.2021 | 23.10.2021 | Misc. | |
526 |
3/RP/2020 in Petition No.309/GT/2015 |
23.10.2021 | 23.10.2021 | Review | |
525 |
191/MP/2021 |
23.10.2021 | 23.10.2021 | Misc. | |
524 |
184/MP/2021 |
23.10.2021 | 23.10.2021 | Misc. | |
523 |
177/MP/2021 |
23.10.2021 | 23.10.2021 | Misc. | |
522 |
104/MP/2017 |
23.10.2021 | 23.10.2021 | Misc. | |
521 |
129/MP/2021 |
23.10.2021 | 23.10.2021 | Misc. | |
520 |
198/TD/2021 |
23.10.2021 | 23.10.2021 | Licence | |
519 |
174/MP/2020 |
22.10.2021 | 22.10.2021 | Misc. | |
518 |
604/MP/2020 |
21.10.2021 | 21.10.2021 | Misc. | |
517 |
585/MP/2020 |
21.10.2021 | 21.10.2021 | Misc. | |
516 |
371/TT/2020 |
18.10.2021 | 20.10.2021 | Transmission | |
515 |
547/TT/2020 |
20.10.2021 | 20.10.2021 | Transmission | |
514 |
Corrigendum to Petition No. 146/MP/2021 |
20.10.2021 | 20.10.2021 | Misc. | |
513 |
Corrigendum to Petition No. 143/MP/2021 |
20.10.2021 | 20.10.2021 | Misc. | |
512 |
IA No. 69/2021 in Petition No. 160/MP/2021 |
20.10.2021 | 20.10.2021 | Misc. | |
511 |
323/TT/2020 |
18.10.2021 | 19.10.2021 | Transmission | |
510 |
658/TT/2020 |
18.10.2021 | 18.10.2021 | Transmission | |
509 |
351/TT/2020 |
17.10.2021 | 18.10.2021 | Transmission | |
508 |
I.A No. 62/2021 in Petition No.21/GT/2021 |
11.10.2021 | 18.10.2021 | Misc. | |
507 |
353/TT/2020 |
17.10.2021 | 17.10.2021 | Transmission | |
506 |
119/TT/2020 |
17.10.2021 | 17.10.2021 | Transmission | |
505 |
55/TT/2020 |
17.10.2021 | 17.10.2021 | Transmission | |
504 |
64/TT/2021 |
17.10.2021 | 17.10.2021 | Transmission | |
503 |
103/TT/2020 |
17.10.2021 | 17.10.2021 | Transmission | |
502 |
146/MP/2021 |
Petition under Section 66 of The Electricity Act, 2003 read with the Regulation 7 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 for approval of introduction of the Green Day Ahead Contract in Day Ahead Market segment at Indian Energy Exchange Limited. Indian Energy Exchange Limited Corrigendum date:- 20.10.2021 |
17.10.2021 | 17.10.2021 | Misc. |
501 |
143/MP/2021 |
Petition under Sections 66 and Section 178(2)(y) of the Electricity Act, 2003 read with Regulations 6 and 7 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 for introduction and approval of Integrated Day Ahead Market at Power Exchange India Limited. Power Exchange India Limited Corrigendum date:- 20.10.2021 |
17.10.2021 | 17.10.2021 | Misc. |
500 |
78/MP/2019 |
16.10.2021 | 17.10.2021 | Misc. | |
499 |
79/MP/2021 |
15.10.2021 | 15.10.2021 | Misc. | |
498 |
IA No. 70 of 2021 in Petition No.287/MP/2018 |
14.10.2021 | 14.10.2021 | Misc. | |
497 |
470/TT/2020 |
14.10.2021 | 14.10.2021 | Transmission | |
496 |
78/TT/2020 |
12.10.2021 | 12.10.2021 | Transmission | |
495 |
7/RP/2021 in Petition No. 77/TT/2020 |
12.10.2021 | 12.10.2021 | Review | |
494 |
21/MP/2019 with IA No. 14/2019 and I.A No. 74/2021 |
12.10.2021 | 12.10.2021 | Misc. | |
493 |
12/RP/2020 in Petition No.249/GT/2016 |
11.10.2021 | 12.10.2021 | Review | |
492 |
467/MP/2019 64/MP/2020 520/MP/2020 612/MP/2020 613/MP/2020 and 730/MP/2020 |
30.09.2021 | 30.09.2021 | Misc. | |
491 |
109/MP/2021 along with IA No. 37/2021 |
29.09.2021 | 30.09.2021 | Misc. | |
490 |
342/MP/2019 with I.A. Nos. 35 of 2021 |
27.09.2021 | 30.09.2021 | Misc. | |
489 |
648/TT/2020 |
29.09.2021 | 30.09.2021 | Transmission | |
488 |
581/TT/2020 |
28.09.2021 | 29.09.2021 | Transmission | |
487 |
687/TT/2020 |
28.09.2021 | 29.09.2021 | Transmission | |
486 |
597/MP/2020 |
28.09.2021 | 29.09.2021 | Misc. | |
485 |
116/TT/2020 |
27.09.2021 | 28.09.2021 | Misc. | |
484 |
322/TT/2020 |
27.09.2021 | 28.09.2021 | Misc. | |
483 |
11/SM/2021 |
27.09.2021 | 27.09.2021 | Suo-Motu | |
482 |
208/TT/2020 |
27.09.2021 | 27.09.2021 | Transmission | |
481 |
150/TT/2020 |
26.09.2021 | 27.09.2021 | Transmission | |
480 |
305/TT/2020 |
27.09.2021 | 27.09.2021 | Transmission | |
479 |
179/MP/2019 |
27.09.2021 | 27.09.2021 | Misc. | |
478 |
220/GT/2020 |
25.09.2021 | 26.09.2021 | Generation | |
477 |
503/TT/2019 |
24.09.2021 | 25.09.2021 | Transmission | |
476 |
190/MP/2021 |
24.09.2021 | 24.09.2021 | Misc. | |
475 |
100/TT/2020 |
21.09.2021 | 22.09.2021 | Transmission | |
474 |
207/TT/2020 |
21.09.2021 | 22.09.2021 | Transmission | |
473 |
326/TT/2020 |
21.09.2021 | 21.09.2021 | Transmission | |
472 |
39/TT/2021 |
20.09.2021 | 21.09.2021 | Transmission | |
471 |
697/TT/2020 |
20.09.2021 | 20.09.2021 | Transmission | |
470 |
418/TT/2019 |
20.09.2021 | 20.09.2021 | Transmission | |
469 |
94/MP/2019 459/MP/2019 460/MP/2019 461/MP/2019 462/MP/2019 463/MP/2019 |
20.09.2021 | 20.09.2021 | Misc. | |
468 |
716/TT/2020 |
18.09.2021 | 19.09.2021 | Transmission | |
467 |
524/MP/2020 |
17.09.2021 | 17.09.2021 | Misc. | |
466 |
30/GT/2020 |
16.09.2021 | 17.09.2021 | Generation | |
465 |
182/MP/2021 |
16.09.2021 | 16.09.2021 | Misc. | |
464 |
126/MP/2016 |
16.09.2021 | 16.09.2021 | Misc. | |
463 |
17/RP/2020 in Petition No. 368/TT/2018 |
16.09.2021 | 16.09.2021 | Review | |
462 |
172/TT/2020 |
15.09.2021 | 15.09.2021 | Transmission | |
461 |
43/TT/2020 |
15.09.2021 | 15.09.2021 | Transmission | |
460 |
148/TT/2020 |
15.09.2021 | 15.09.2021 | Transmission | |
459 |
81/TT/2020 |
13.09.2021 | 15.09.2021 | Transmission | |
458 |
Corrigendum to Petition No. 213/MP/2019 |
14.09.2021 | 14.09.2021 | Misc. | |
457 |
Corrigendum to Petition No. 211/MP/2019 |
14.09.2021 | 14.09.2021 | Misc. | |
456 |
715/TT/2020 |
13.09.2021 | 13.09.2021 | Transmission | |
455 |
683/TT/2020 |
12.09.2021 | 13.09.2021 | Transmission | |
454 |
706/TT/2020 |
12.09.2021 | 13.09.2021 | Transmission | |
453 |
696/TT/2020 |
12.09.2021 | 13.09.2021 | Transmission | |
452 |
506/TT/2020 |
12.09.2021 | 13.09.2021 | Transmission | |
451 |
498/TT/2019 |
12.09.2021 | 13.09.2021 | Transmission | |
450 |
472/TT/2019 |
12.09.2021 | 13.09.2021 | Transmission | |
449 |
86/TT/2020 |
11.09.2021 | 12.09.2021 | Transmission | |
448 |
60/MP/2019 |
12.09.2021 | 12.09.2021 | Misc. | |
447 |
46/TT/2014 |
11.09.2021 | 11.09.2021 | Transmission | |
446 |
137/MP/2019 |
11.09.2021 | 11.09.2021 | Misc. | |
445 |
62/MP/2021 |
11.09.2021 | 11.09.2021 | Misc. | |
444 |
13/RP/2021 in Petition No 348/MP/2018 |
10.09.2021 | 10.09.2021 | Review | |
443 |
14/RP/2021 in Petition No 328/MP/2018 |
10.09.2021 | 10.09.2021 | Review | |
442 |
9/RP/2021 in Petition No. 210/MP/2019 And 10/RP/2021 in Petition No. 209/MP/2019 |
08.09.2021 | 08.09.2021 | Review | |
441 |
126/AT/2021 |
08.09.2021 | 08.09.2021 | Adoption | |
440 |
377/MP/2019 |
07.09.2021 | 08.09.2021 | Misc. | |
439 |
31/GT/2020 |
06.09.2021 | 07.09.2021 | Generation | |
438 |
504/TT/2020 |
05.09.2021 | 06.09.2021 | Transmission | |
437 |
53/TT/2015 |
04.09.2021 | 05.09.2021 | Transmission | |
436 |
518/MP/2020 |
05.09.2021 | 05.09.2021 | Misc. | |
435 |
142/MP/2019 |
05.09.2021 | 05.09.2021 | Misc. | |
434 |
492/TT/2019 |
03.09.2021 | 04.09.2021 | Transmission | |
433 |
383/TT/2019 |
03.09.2021 | 04.09.2021 | Transmission | |
432 |
193/TT/2020 |
02.09.2021 | 03.09.2021 | Transmission | |
431 |
300/GT/2020 |
02.09.2021 | 02.09.2021 | Generation | |
430 |
48/MP/2021 |
01.09.2021 | 01.09.2021 | Misc. | |
429 |
105/TT/2020 |
31.08.2021 | 31.08.2021 | Transmission | |
428 |
326/TT/2019 |
31.08.2021 | 31.08.2021 | Transmission | |
427 |
22/RP/2020 alongwith IA No. 48 of 2020 in Petition No. 69/MP/2019 |
31.08.2021 | 31.08.2021 | Review | |
426 |
355/TT/2019 |
31.08.2021 | 31.08.2021 | Transmission | |
425 |
121/TT/2019 |
31.08.2021 | 31.08.2021 | Transmission | |
424 |
135/MP/2021 |
31.08.2021 | 31.08.2021 | Misc. | |
423 |
Review Petition No. 7/RP/2020 in Petition No. 222/MP/2017 |
30.08.2021 | 30.08.2021 | Review | |
422 |
58/MP/2021 |
30.08.2021 | 30.08.2021 | Misc. | |
421 |
Corrigendum to 366/MP/2019 |
27.08.2021 | 27.08.2021 | Misc. | |
420 |
315/TT/2020 |
26.08.2021 | 27.08.2021 | Transmission | |
419 |
136/TL/2021 141/AT/2021 137/TL/2021 138/AT/2021 139/TL/2021 140/AT/2021 |
26.08.2021 | 26.08.2021 | Licence (Transmission) | |
418 |
Corrigendum to 22/TT/2020 |
24.08.2021 | 25.08.2021 | Transmission | |
417 |
223/TT/2020 and 488/TT/2019 |
24.08.2021 | 24.08.2021 | Transmission | |
416 |
Corrigendum to Petition No. 269/TT/2020 |
23.08.2021 | 24.08.2021 | Misc. | |
415 |
536/MP/2020 along with IA No. 71/2020, IA No. 73/2020 and IA No. 2/2021 158/MP/2020 along with IA No. 35/2020 373/MP/2020 454/MP/2019 along with IA No. 19/2020 457/MP/2019 along with IA No. 18/2020 500/MP/2019 along with IA No. 20/2020 |
20.08.2021 | 21.08.2021 | Misc. | |
414 |
455/TT/2020 |
19.08.2021 | 21.08.2021 | Transmission | |
413 |
468/TT/2020 |
19.08.2021 | 19.08.2021 | Transmission | |
412 |
104/TT/2019 |
17.08.2021 | 18.08.2021 | Transmission | |
411 |
30/RP/2020 in Petition No. 168/MP/2019 |
16.08.2021 | 17.08.2021 | Review | |
410 |
70/TD/2021 |
16.08.2021 | 16.08.2021 | Licence | |
409 |
I.A No. 48/2021 in Petition No. 178/GT/2017 |
14.08.2021 | 15.08.2021 | Misc. | |
408 |
161/MP/2020 |
14.08.2021 | 14.08.2021 | Misc. | |
407 |
06/SM/2021 |
A mechanism to determine Compensation on account of installation of Emission Control System by the generating companies in compliance with the Revised Emission Standards issued by Ministry of Environment, Forest & Climate Change (MoEF&CC),Government of India, vide Environment (Protection) Amendment Rules, 2015 on 07.12.2015 in respect of the Thermal Generating stations whose tariff is determined through competitive bidding under Section 63 of the Electricity Act, 2003. Corrigendum (II) date:- 12.09.2023 Corrigendum (I) date:- 11.11.2021 |
13.08.2021 | 13.08.2021 | Suo-Motu |
406 |
18/RP/2020 in Petition No. 10/TT/2019 |
11.08.2021 | 12.08.2021 | Review | |
405 |
45/MP/2019 along with IA No. 24/2021 |
10.08.2021 | 12.08.2021 | Misc. | |
404 |
530/MP/2020 along with I.A. No. 45/IA/2020 |
11.08.2021 | 12.08.2021 | Misc. | |
403 |
86/MP/2021 |
10.08.2021 | 10.08.2021 | Misc. | |
402 |
269/TT/2020 |
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Chukka Transmission System in Eastern Region. Power Grid Corporation of India Ltd. Corrigendum date:- 24.08.2021 |
09.08.2021 | 10.08.2021 | Transmission |
401 |
162/MP/2020 |
07.08.2021 | 07.08.2021 | Misc. | |
400 |
203/MP/2019 |
04.08.2021 | 07.08.2021 | Misc. | |
399 |
9/RP/2019 in 2/SM/2019 |
06.08.2021 | 06.08.2021 | Review | |
398 |
8/RP/2021 in 191/MP/2019 |
06.08.2021 | 06.08.2021 | Review | |
397 |
109/MP/2019 |
05.08.2021 | 05.08.2021 | Misc. | |
396 |
10/SM/2021 |
05.08.2021 | 05.08.2021 | Suo-Motu | |
395 |
108/MP/2019 |
05.08.2021 | 05.08.2021 | Misc. | |
394 |
356/TT/2020 |
05.08.2021 | 05.08.2021 | Transmission | |
393 |
176/MP/2020 |
04.08.2021 | 04.08.2021 | Misc. | |
392 |
147/TT/2020 |
03.08.2021 | 03.08.2021 | Transmission | |
391 |
260/MP/2020 |
03.08.2021 | 03.08.2021 | Misc. | |
390 |
29/RP/2020 alongwith IA No. 59 of 2020 |
27.07.2021 | 02.08.2021 | Review | |
389 |
20/RP/2020 and 25/RP/2020 in Petition No. 446/MP/2019 |
02.08.2021 | 02.08.2021 | Review | |
388 |
155/MP/2021 |
01.08.2021 | 02.08.2021 | Misc. | |
387 |
110/TD/2021 |
31.07.2021 | 31.07.2021 | Licence | |
386 |
114/TD/2021 |
31.07.2021 | 31.07.2021 | Licence | |
385 |
127/TD/2021 |
31.07.2021 | 31.07.2021 | Licence | |
384 |
1/RP/2021 in Petition No. 96/TT/2019 |
31.07.2021 | 31.07.2021 | Review | |
383 |
5/RP/2021 in Petition No. 266/TT/2018 along with I.A. No. 18/2021 and IA No.19/2021 |
31.07.2021 | 31.07.2021 | Review | |
382 |
21/RP/2020 in Petition No. 446/MP/2019 |
31.07.2021 | 31.07.2021 | Review | |
381 |
152/TD/2021 |
31.07.2021 | 31.07.2021 | Licence | |
380 |
16/TT/2020 |
31.07.2021 | 31.07.2021 | Transmission | |
379 |
67/MP/2020 and 515/MP/2020 |
30.07.2021 | 30.07.2021 | Misc. | |
378 |
146/MP/2019 |
26.07.2021 | 29.07.2021 | Misc. | |
377 |
28/RP/2020 with I.A No. 53/IA/2020 in Petition No. 308/GT/2018 |
27.07.2021 | 28.07.2021 | Review | |
376 |
635/RC/2020 & 59/MP/2021 |
27.07.2021 | 27.07.2021 | Misc. | |
375 |
601/GT/2020 |
27.07.2021 | 27.07.2021 | Generation | |
374 |
477/MP/2020 |
26.07.2021 | 26.07.2021 | Misc. | |
373 |
650/TT/2020 |
26.07.2021 | 26.07.2021 | Transmission | |
372 |
31/RP/2020 in Petition No. 187/AT/2019 |
24.07.2021 | 25.07.2021 | Review | |
371 |
26/RP/2020 along with IA No.52/2020 In IA No.69/2019 in Petition No. 202/MP/2018 |
24.07.2021 | 25.07.2021 | Review | |
370 |
140/TT/2020 |
22.07.2021 | 22.07.2021 | Transmission | |
369 |
480/TT/2020 |
22.07.2021 | 22.07.2021 | Transmission | |
368 |
123/TT/2020 |
21.07.2021 | 22.07.2021 | Transmission | |
367 |
I.A No.68/IA/2018 and I.A No.72/IA/2018 in Petition No. 91/MP/2018 |
20.07.2021 | 21.07.2021 | Adoption | |
366 |
22/TT/2020 |
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Vindhyachal Pooling Station and 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Jabalpur Pooling Station for 765 kV D/C Vindhyachal Pooling Station-Jabalpur Pooling Station Transmission Line (TBCB) under Sub-station Extensions for Transmission System associated with Vindhyachal-V Project of NTPC (Part-B) in the Western Region. Power Grid Corporation of India Ltd. Corrigendum date: 24.08.2021 |
20.07.2021 | 21.07.2021 | Transmission |
365 |
77/MP/2021 |
20.07.2021 | 20.07.2021 | Misc. | |
364 |
194/TT/2020 |
19.07.2021 | 20.07.2021 | Transmission | |
363 |
|
19.07.2021 | 20.07.2021 | Misc. | |
362 |
99/TL/2021 |
15.07.2021 | 15.07.2021 | Licence (Transmission) | |
361 |
Corrigendum to Petition No. 546/MP/2020 |
15.07.2021 | 15.07.2021 | Misc. | |
360 |
218/TT/2020 |
10.07.2021 | 10.07.2021 | Transmission | |
359 |
1/TT/2020 |
10.07.2021 | 10.07.2021 | Transmission | |
358 |
101/MP/2021 |
10.07.2021 | 10.07.2021 | Misc. | |
357 |
494/MP/2020 |
10.07.2021 | 10.07.2021 | Misc. | |
356 |
106/TD/2021 |
09.07.2021 | 09.07.2021 | Licence | |
355 |
IA No. 54/2020, 41/2021 and 55/2021 in Suo Motu Petition No. 7/SM/2020 |
09.07.2021 | 09.07.2021 | Misc. | |
355 |
487/TT/2019 |
07.07.2021 | 08.07.2021 | Transmission | |
354 |
9/SM/2021 |
08.07.2021 | 08.07.2021 | Suo-Motu | |
353 |
8/SM/2021 |
08.07.2021 | 08.07.2021 | Suo-Motu | |
352 |
383/TT/2020 |
07.07.2021 | 07.07.2021 | Transmission | |
351 |
485/TT/2019 |
07.07.2021 | 07.07.2021 | Transmission | |
350 |
290/GT/2019 |
07.07.2021 | 07.07.2021 | Generation | |
349 |
358/TT/2019 |
06.07.2021 | 07.07.2021 | Transmission | |
348 |
389/TT/2019 |
06.07.2021 | 07.07.2021 | Transmission | |
347 |
306/TT/2019 |
06.07.2021 | 07.07.2021 | Transmission | |
346 |
304/TT/2019 |
06.07.2021 | 07.07.2021 | Transmission | |
345 |
I.A No.50/2021 In Petition No. 484/MP/2020 And Petition No. 484/MP/2020 |
02.07.2021 | 02.07.2021 | Misc. | |
344 |
491/TT/2019 |
02.07.2021 | 02.07.2021 | Transmission | |
343 |
375/TT/2020 |
02.07.2021 | 02.07.2021 | Transmission | |
342 |
461/TT/2020 |
01.07.2021 | 02.07.2021 | Transmission | |
341 |
60/MP/2021 along with IA No. 12/2021 And 65/MP/2021 along with IA No. 31/2021 and IA No. 33/2021 |
01.07.2021 | 01.07.2021 | Misc. | |
340 |
I.A No.49/2021 In Petition No. 483/MP/2020 And Petition No. 483/MP/2020 |
01.07.2021 | 01.07.2021 | Misc. | |
339 |
495/MP/2020 |
30.06.2021 | 30.06.2021 | Misc. | |
338 |
439/MP/2019 |
30.06.2021 | 30.06.2021 | Misc. | |
337 |
659/TT/2020 |
30.06.2021 | 30.06.2021 | Transmission | |
336 |
5/TT/2020 |
30.06.2021 | 30.06.2021 | Transmission | |
335 |
105/TD/2021 |
29.06.2021 | 29.06.2021 | Licence | |
334 |
358/TT/2020 |
29.06.2021 | 29.06.2021 | Transmission | |
333 |
415/TT/2019 |
29.06.2021 | 29.06.2021 | Transmission | |
332 |
405/TT/2020 |
28.06.2021 | 29.06.2021 | Transmission | |
331 |
4/RP/2021 in Petition No. 68/MP/2017 |
28.06.2021 | 28.06.2021 | Review | |
330 |
IA No.64/2020 In Petition No. 614/MP/2020 |
28.06.2021 | 28.06.2021 | Misc. | |
329 |
114/TD/2021 |
28.06.2021 | 28.06.2021 | Licence | |
328 |
110/TD/2021 |
28.06.2021 | 28.06.2021 | Licence | |
327 |
27/RP/2020 in 57/AT/2020 |
28.06.2021 | 28.06.2021 | Review | |
326 |
351/TT/2019 |
27.06.2021 | 28.06.2021 | Transmission | |
325 |
271/GT/2019 |
26.06.2021 | 26.06.2021 | Transmission | |
324 |
589/TT/2020 and 590/TT/2020 |
25.06.2021 | 25.06.2021 | Generation | |
323 |
42/TD/2021 |
23.06.2021 | 23.06.2021 | Licence | |
322 |
472/GT/2014 474/GT/2014 |
21.06.2021 | 22.06.2021 | Generation | |
321 |
23/RP/2020 in Petition No. 188/AT/2020 |
22.06.2021 | 22.06.2021 | Review | |
320 |
211/MP/2011 |
20.06.2021 | 20.06.2021 | Misc. | |
319 |
22/RP/2019 in Petition No. 255/TT/2018 |
20.06.2021 | 20.06.2021 | Review | |
318 |
I.A No.43/2021 In Petition No. 626/MP/2020 |
19.06.2021 | 19.06.2021 | Misc. | |
317 |
386/TT/2019 |
19.06.2021 | 19.06.2021 | Transmission | |
316 |
181/MP/2020 alongwith IA No. 14 of 2021 |
17.06.2021 | 19.06.2021 | Misc. | |
315 |
502/GT/2020 |
17.06.2021 | 17.06.2021 | Generation | |
314 |
399/MP/2019 |
17.06.2021 | 17.06.2021 | Misc. | |
313 |
93/MP/2021 |
17.06.2021 | 17.06.2021 | Misc. | |
312 |
263/TT/2019 |
16.06.2021 | 16.06.2021 | Transmission | |
311 |
465/TT/2020 |
16.06.2021 | 16.06.2021 | Transmission | |
310 |
453/MP/2019 |
16.06.2021 | 16.06.2021 | Misc. | |
309 |
555/MP/2020 |
14.06.2021 | 15.06.2021 | Misc. | |
308 |
81/TT/2016 |
13.06.2021 | 15.06.2021 | Transmission | |
307 |
493/TT/2019 |
13.06.2021 | 15.06.2021 | Transmission | |
306 |
116/MP/2021 |
12.06.2021 | 12.06.2021 | Misc. | |
305 |
98/AT/2021 |
12.06.2021 | 12.06.2021 | Adoption | |
304 |
366/MP/2019 |
Petition under Section 79(1)(b) read with Section 79(1)(f) of the Electricity Act, 2003 and Article 10 of the Power Purchase Agreements both dated 01.11.2013 entered into between the Petitioner and the Respondents, seeking approval of the cost to be incurred by the Petitioner on account of change in law, for installation/retrofit of ‘Electrostatic Precipitators’ (ESP), installation of Flue Gas Desulphurisation (FGD), installation of low NOx burners, providing Over Fire Air (OFA) and any other measures for compliance of the notification dated 07.12.2015 issued by the Ministry of Environment, Forests and Climate Change, Government of India in respect of Thermal Power Plants installed/commissioned after 01.01.2003 and before 31.12.2016. D.B. Power Limited (DBPL), Corrigendum date:- 27.08.2021 |
11.06.2021 | 11.06.2021 | Misc. |
303 |
376/MP/2019 |
10.06.2021 | 10.06.2021 | Misc. | |
302 |
Corrigendum to Petition 378/MP/2019 |
10.06.2021 | 10.06.2021 | Misc. | |
301 |
490/GT/2020 |
09.06.2021 | 09.06.2021 | Generation | |
300 |
10/TT/2020 |
09.06.2021 | 09.06.2021 | Transmission | |
299 |
471/TT/2020 |
09.06.2021 | 09.06.2021 | Transmission | |
298 |
651/TT/2020 |
09.06.2021 | 09.06.2021 | Transmission | |
297 |
125/TT/2020 |
09.06.2021 | 09.06.2021 | Transmission | |
296 |
115/MP/2021 |
09.06.2021 | 09.06.2021 | Misc. | |
295 |
559/MP/2020 |
09.06.2021 | 09.06.2021 | Misc. | |
294 |
400/MP/2019 |
09.06.2021 | 09.06.2021 | Misc. | |
293 |
464/TT/2020 |
08.06.2021 | 09.06.2021 | Transmission | |
292 |
458/TT/2020 |
08.06.2021 | 08.06.2021 | Transmission | |
291 |
101/TT/2020 |
08.06.2021 | 08.06.2021 | Transmission | |
290 |
61/TT/2020 |
08.06.2021 | 08.06.2021 | Transmission | |
289 |
273/GT/2019 |
07.06.2021 | 07.06.2021 | Transmission | |
288 |
99/TL/2021 |
05.06.2021 | 05.06.2021 | Licence (Transmission) | |
287 |
23/RP/2019 in Petition No. 171/TT/2018 |
05.06.2021 | 05.06.2021 | Review | |
286 |
546/MP/2020 |
Petition for approval under Section 17 (3) and (4) of the Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of Petitioner No 1 in favour of Petitioner No. 2 / Security Trustee pursuant to the amended and restated Facility Agreement dated 12.10.2020 executed between Petitioner No. 1, REC Limited/ Lender’s Agent and the Lenders, by way of mortgage/ hypothecation/ assignment on project assets for benefit of the Lenders, and for their subsequent transferees, assignees, novatees thereof and any refinancing lenders to the Project, for development, construction and operation of the independent transmission project for “WRSS-21 (Part-B) – Transmission System strengthening for reliving over loadings observed in Gujarat Intra-state system due to RE injections in Bhuj-PS. 1. Lakadia-Vadodara Transmission Project Limited 2. Catalyst Trusteeship Limited Corrigendum Order dated:- 15.07.2021 |
05.06.2021 | 05.06.2021 | Misc. |
285 |
108/MP/2021 |
05.06.2021 | 05.06.2021 | Misc. | |
284 |
29/GT/2020 |
04.06.2021 | 04.06.2021 | Generation | |
283 |
I.A. No. 32/2021 in Petition No. 92/MP/2021 |
04.06.2021 | 04.06.2021 | Misc. | |
282 |
132/TT/2020 |
02.06.2021 | 02.06.2021 | Transmission | |
281 |
721/AT/2020 |
02.06.2021 | 02.06.2021 | Adoption | |
280 |
422/TT/2019 |
01.06.2021 | 01.06.2021 | Transmission | |
279 |
356/TT/2019 |
31.05.2021 | 31.05.2021 | Transmission | |
278 |
89/TL/2021 |
31.05.2021 | 31.05.2021 | Licence (Transmission) | |
277 |
378/MP/2019 |
Application under subsection (4) of section 28 of Electricity Act, 2003 and Regulation 10 of the Central Electricity Regulatory Commission (Fee and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 for determining the SRLDC Charges for the control period 01.04.2019-31.03.2024. Southern Regional Load Despatch Centre (SRLDC) Corrigendum Order dated:- 10.06.2021 |
31.05.2021 | 31.05.2021 | Misc. |
276 |
374/MP/2019 |
31.05.2021 | 31.05.2021 | Misc. | |
275 |
264/TT/2019 |
31.05.2021 | 31.05.2021 | Transmission | |
274 |
380/MP/2018 With IA No.8/2020 |
31.05.2021 | 31.05.2021 | Misc. | |
273 |
351/MP/2018 With IA No. 4/2020 |
31.05.2021 | 31.05.2021 | Misc. | |
272 |
413/TT/2019 |
30.05.2021 | 30.05.2021 | Transmission | |
271 |
591/MP/2020 |
30.05.2021 | 30.05.2021 | Misc. | |
270 |
469/TT/2019 |
29.05.2021 | 29.05.2021 | Transmission | |
269 |
449/TT/2020 |
29.05.2021 | 29.05.2021 | Transmission | |
268 |
7/SM/2021 |
29.05.2021 | 29.05.2021 | Suo Motu | |
267 |
476/TT/2019 |
28.05.2021 | 28.05.2021 | Transmission | |
266 |
84/TT/2019 |
27.05.2021 | 27.05.2021 | Transmission | |
265 |
Corrigendum to Petition No.
335/MP/2020 519/MP/2020 509/MP/2020 516/MP/2020 338/MP/2020 521/MP/2020 526/MP/2020 512/MP/2020 339/MP/2020 | 26.05.2021 | 27.05.2021 | Misc. | |
264 |
611/MP/2020 |
24.05.2021 | 24.05.2021 | Misc. | |
263 |
76/TD/2021 |
23.05.2021 | 23.05.2021 | Licence | |
262 |
361/TT/2019 |
21.05.2021 | 21.05.2021 | Transmission | |
261 |
387/TT/2019 |
20.05.2021 | 20.05.2021 | Transmission | |
260 |
124/TT/2020 |
20.05.2021 | 20.05.2021 | Transmission | |
259 |
14/TT/2020 |
20.05.2021 | 20.05.2021 | Transmission | |
258 |
312/TT/2019 |
20.05.2021 | 20.05.2021 | Transmission | |
257 |
8/TT/2020 |
17.05.2021 | 17.05.2021 | Transmission | |
256 |
59/TT/2020 |
17.05.2021 | 17.05.2021 | Transmission | |
255 |
495/TT/2019 |
14.05.2021 | 14.05.2021 | Transmission | |
254 |
73/MP/2020 alongwith IA No. 21 of 2021 |
13.05.2021 | 14.05.2021 | Misc. | |
253 |
354/TT/2019 |
14.05.2021 | 14.05.2021 | Transmission | |
252 |
509/TT/2019 |
13.05.2021 | 13.05.2021 | Transmission | |
251 |
9/TT/2020 |
13.05.2021 | 13.05.2021 | Transmission | |
250 |
337/TT/2019 |
13.05.2021 | 13.05.2021 | Transmission | |
249 |
142/TT/2020 |
12.05.2021 | 12.05.2021 | Transmission | |
248 |
350/TT/2019 |
12.05.2021 | 12.05.2021 | Transmission | |
247 |
287/MP/2018 |
12.05.2021 | 12.05.2021 | Misc. | |
246 |
350/TT/2020 |
10.05.2021 | 10.05.2021 | Transmission | |
245 |
302/TT/2019 |
09.05.2021 | 10.05.2021 | Transmission | |
244 |
497/TT/2019 |
07.05.2021 | 08.05.2021 | Transmission | |
243 |
315/TT/2019 |
07.05.2021 | 07.05.2021 | Transmission | |
242 |
155/TT/2020 |
06.05.2021 | 07.05.2021 | Transmission | |
241 |
352/TT/2019 |
05.05.2021 | 06.05.2021 | Transmission | |
240 |
621/MP/2020 |
05.05.2021 | 05.05.2021 | Misc. | |
239 |
90/AT/2021 |
05.05.2021 | 05.05.2021 | Adoption | |
238 |
489/TT/2019 |
05.05.2021 | 05.05.2021 | Transmission | |
237 |
5/SM/2021 |
30.05.2021 | 04.05.2021 | Suo Motu | |
236 |
81/MP/2021 |
04.05.2021 | 04.05.2021 | Misc. | |
235 |
4/SM/2021 |
30.04.2021 | 03.05.2021 | Suo Motu | |
234 |
61/MP/2021 |
01.05.2021 | 01.05.2021 | Misc. | |
233 |
210/TT/2020 |
30.04.2021 | 01.05.2021 | Transmission | |
232 |
482/TT/2019 |
30.04.2021 | 30.04.2021 | Transmission | |
231 |
420/TT/2019 |
30.04.2021 | 30.04.2021 | Transmission | |
230 |
480/TT/2019 |
29.04.2021 | 29.04.2021 | Transmission | |
229 |
89/TL/2021 |
29.04.2021 | 29.04.2021 | Licence (Transmission) | |
228 |
277/MP/2020 |
29.04.2021 | 29.04.2021 | Misc. | |
227 |
38/TT/2020 |
29.04.2021 | 29.04.2021 | Transmission | |
226 |
417/TT/2019 |
25.04.2021 | 28.04.2021 | Transmission | |
225 |
348/TT/2019 |
25.04.2021 | 28.04.2021 | Transmission | |
224 |
459/TT/2020 |
25.04.2021 | 28.04.2021 | Transmission | |
223 |
359/TT/2019 |
25.04.2021 | 28.04.2021 | Transmission | |
222 |
332/TT/2019 |
25.04.2021 | 28.04.2021 | Transmission | |
221 |
416/TT/2019 |
28.04.2021 | 28.04.2021 | Transmission | |
220 |
256/TT/2019 |
28.04.2021 | 28.04.2021 | Transmission | |
219 |
335/MP/2020 519/MP/2020 509/MP/2020 516/MP/2020 338/MP/2020 521/MP/2020 526/MP/2020 512/MP/2020 339/MP/2020 |
Petition under Section 79 of the Electricity Act, 2003 read with Regulation 29 of the Central Electricity Regulatory Commission (Terms and Condition of Tariff) Regulations, 2019 for approval of ACE on account of installation of various Emission Control Systems at Vindhyachal Super Thermal Power Station Stage-I (6x210 MW)in compliance with the Ministry of Environment and Forests and Climate Change, Government of India notification dated 7.12.2015. NTPC Ltd. Corrigendum Order dated:- 26.05.2021 |
28.04.2021 | 28.04.2021 | Misc. |
218 |
2/TT/2020 |
27.04.2021 | 28.04.2021 | Transmission | |
217 |
325/TT/2019 |
25.04.2021 | 27.04.2021 | Transmission | |
216 |
246/TT/2019 |
26.04.2021 | 27.04.2021 | Transmission | |
215 |
338/TT/2019 |
26.04.2021 | 26.04.2021 | Transmission | |
214 |
91/MP/2020 631/MP/2020 672/MP/2020 |
25.04.2021 | 26.04.2021 | Transmission | |
213 |
166/TT/2020 |
25.04.2021 | 26.04.2021 | Transmission | |
212 |
357/TT/2019 |
25.04.2021 | 26.04.2021 | Transmission | |
211 |
435/MP/2019 |
24.04.2021 | 24.04.2021 | Misc. | |
210 |
620/MP/2020 along with IA. No. 25/2021 |
22.04.2021 | 22.04.2021 | Misc. | |
209 |
474/TT/2019 |
20.04.2021 | 22.04.2021 | Transmission | |
208 |
516/TT/2019 |
17.04.2021 | 20.04.2021 | Transmission | |
207 |
460/TT/2020 |
17.04.2021 | 19.04.2021 | Transmission | |
206 |
18/TT/2020 |
17.04.2021 | 19.04.2021 | Transmission | |
205 |
414/TT/2019 |
17.04.2021 | 18.04.2021 | Transmission | |
204 |
554/MP/2019 |
18.04.2021 | 18.04.2021 | Misc. | |
203 |
390/GT/2020 |
16.04.2021 | 17.04.2021 | Generation | |
202 |
629/TD/2020 |
15.04.2021 | 16.04.2021 | Licence | |
201 |
76/TD/2021 |
15.04.2021 | 16.04.2021 | Licence | |
200 |
52/AT/2021 |
15.04.2021 | 16.04.2021 | Adoption | |
199 |
375/MP/2019 |
16.04.2021 | 16.04.2021 | Misc. | |
198 |
593/MP/2020 |
16.04.2021 | 16.04.2021 | Misc. | |
197 |
183/MP/2015 |
08.04.2021 | 13.04.2021 | Misc. | |
196 |
366/TT/2018 |
09.04.2021 | 12.04.2021 | Transmission | |
195 |
69/MP/2021 |
08.04.2021 | 08.04.2021 | Misc. | |
194 |
634/MP/2020 |
08.04.2021 | 08.04.2021 | Misc. | |
193 |
433/MP/2019 |
05.04.2021 | 07.04.2021 | Misc. | |
192 |
50/MP/2021 |
06.04.2021 | 07.04.2021 | Misc. | |
191 |
17/MP/2021 |
06.04.2021 | 06.04.2021 | Misc. | |
190 |
457/MP/2020 |
06.04.2021 | 06.04.2021 | Misc. | |
189 |
456/MP/2020 |
06.04.2021 | 06.04.2021 | Misc. | |
188 |
128/TT/2020 |
05.04.2021 | 06.04.2021 | Transmission | |
187 |
542/MP/2020 |
01.04.2021 | 05.04.2021 | Misc. | |
186 |
599/TL/2020 |
01.04.2021 | 01.04.2021 | Licence (Transmission) | |
185 |
493/MP/2020 |
01.04.2021 | 01.04.2021 | Misc. | |
184 |
561/AT/2020 |
01.04.2021 | 01.04.2021 | Adoption | |
183 |
306/TT/2020 |
01.04.2021 | 01.04.2021 | Transmission | |
182 |
104/TT/2020 |
31.03.2021 | 31.03.2021 | Misc. | |
181 |
434/MP/2019 |
26.03.2021 | 31.03.2021 | Misc. | |
180 |
608/MP/2020 |
31.03.2021 | 31.03.2021 | Misc. | |
179 |
313/TT/2019 |
31.03.2021 | 31.03.2021 | Transmission | |
178 |
03/SM/2021 (Suo-Motu) |
31.03.2021 | 31.03.2021 | Suo-Motu | |
177 |
2/SM/2021 (Suo-Motu) |
31.03.2021 | 31.03.2021 | Suo-Motu | |
176 |
01/SM/2021 |
31.03.2021 | 31.03.2021 | Suo-Motu | |
175 |
586/MP/2020 |
26.03.2021 | 31.03.2021 | Misc. | |
174 |
Corrigendum to Petition No.404/MP/2019 |
26.03.2021 | 26.03.2021 | Misc. | |
173 |
558/MP/2020 |
25.03.2021 | 26.03.2021 | Misc. | |
172 |
219/GT/2019 |
26.03.2021 | 26.03.2021 | Generation | |
171 |
80/MP/2021 |
24.03.2021 | 25.03.2021 | Misc. | |
170 |
437/MP/2019 |
21.03.2021 |
24.03.2021 | Misc. | |
169 |
249/TT/2020 |
23.03.2021 | 24.03.2021 | Transmission | |
168 |
369/MP/2018 |
19.03.2021 | 23.03.2021 | Misc. | |
167 |
329/MP/2018 |
19.03.2021 | 23.03.2021 | Misc. | |
166 |
405/MP/2019 |
22.03.2021 | 22.03.2021 | Misc. | |
165 |
339/TT/2019 |
19.03.2021 | 19.03.2021 | Transmission | |
164 |
310/TT/2020 |
19.03.2021 | 19.03.2021 | Transmission | |
163 |
552/AT/2020 |
19.03.2021 | 19.03.2021 | Adoption | |
162 |
81/MP/2019 |
19.03.2021 | 19.03.2021 | Misc. | |
161 |
228/MP/2020 |
19.03.2021 | 19.03.2021 | Misc. | |
160 |
106/MP/2019 |
15.03.2021 | 15.03.2021 | Misc. | |
159 |
5/TD/2021 |
10.03.2021 | 11.03.2021 | Licence | |
158 |
629/TD/2020 |
08.03.2021 | 11.03.2021 | Licence | |
157 |
329/GT/2019 |
10.03.2021 | 10.03.2021 | Generation | |
156 |
226/MP/2020 |
08.03.2021 | 09.03.2021 | Misc. | |
155 |
93/MP/2019 |
08.03.2021 | 09.03.2021 | Misc. | |
154 |
434/GT/2020 |
08.03.2021 | 09.03.2021 | Generation | |
153 |
103/TT/2019 |
05.03.2021 | 08.03.2021 | Transmission | |
152 |
250/TT/2020 |
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Addition of 1X160 MVA, 220/132 kV ICT along with associated bays at Ara 220/132 kV Sub-station, Asset II: Addition of 1X500 MVA, 400/220 kV ICT along with associated bays at Muzaffarpur 400/220 kV Sub-station, Asset III: 1 No. of 1x125 MVAR Bus Reactor and associated bay at 400 KV Maithon Sub-station, Asset IV: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (1st) at 400 KV Maithon Sub-station, Asset V: 01 No. of 01x125 MVAR Bus Reactor (1st) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VI: 01 No. of 1x125 MVAR Bus Reactor (2nd) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VII: 02 Nos of 125 MVAR Bus Reactor I & II at Rengali Sub-station, Asset VIII: Installation of 01x125 MVAR Bus Reactor by replacing existing 1x50 MVAR Bus Reactor at 400 KV Rourkela Sub-station, Asset IX: Installation of 01x125 MVAR Bus Reactor in Parallel with existing 50(3X16.67) MVAR Bus Reactor at Biharsharif Sub-station, Asset X: Installation of 1x125 MVAR Bus Reactor-II after replacing existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XI: Installation of 1x125 MVAR Bus Reactor-I in Parallel with existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XII: Installation of 1X125 MVAR Bus Reactor at 400 kV Gazuwaka Sub-station, Asset XIII: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (2nd) at 400 KV Maithon Sub-station under “Eastern Region Strengthening scheme-IX” in Eastern Region. Power Grid Corporation of India Ltd. Corrigendum Order dated:-07.02.2022 |
05.03.2021 | 08.03.2021 | Transmission |
151 |
1/RC/2021 |
04.03.2021 | 05.03.2021 | Misc. | |
150 |
290/TT/2020 |
05.03.2021 | 05.03.2021 | Transmission | |
149 |
624/MP/2020 |
04.03.2021 | 05.03.2021 | Misc. | |
148 |
38/MP/2021 |
04.03.2021 | 05.03.2021 | Misc. | |
147 |
148/TT/2019 |
04.03.2021 | 05.03.2021 | Transmission | |
146 |
431/MP/2019 |
03.03.2021 | 05.03.2021 | Misc. | |
145 |
330/MP/2020 |
02.03.2021 | 04.03.2021 | Misc. | |
144 |
171/TT/2020 |
03.03.2021 | 04.03.2021 | Transmission | |
143 |
87/MP/2018 |
02.03.2021 | 04.03.2021 | Misc. | |
142 |
623/MP/2020 |
02.03.2021 | 04.03.2021 | Misc. | |
141 |
549/AT/2020 |
01.03.2021 | 02.03.2021 | Adoption | |
140 |
160/AT/2019 and IA No. 81/2019 |
01.03.2021 | 02.03.2021 | Adoption | |
139 |
149/TT/2020 |
01.03.2021 | 02.03.2021 | Transmission | |
138 |
Corrigendum to Petition No. 56/AT/2020 |
26.02.2021 | 01.03.2021 | Adoption | |
137 |
13/TT/2020 |
26.02.2021 | 01.03.2021 | Transmission | |
136 |
248/TT/2019 |
25.02.2021 | 26.02.2021 | Transmission | |
135 |
45/TT/2020 |
25.02.2021 | 26.02.2021 | Transmission | |
134 |
41/MP/2021 |
25.02.2021 | 25.02.2021 | Misc. | |
133 |
430/MP/2019 |
25.02.2021 | 25.02.2021 | Misc. | |
132 |
Corrigendum to Petition No. 305/TT/2019 |
24.02.2021 | 25.02.2021 | Transmission | |
131 |
86/TT/2019 |
21.02.2021 | 22.02.2021 | Transmission | |
130 |
L-1/44/2010-CERC |
21.02.2021 | 21.02.2021 | Misc. | |
129 |
156/TT/2020 |
20.02.2021 | 21.02.2021 | Transmission | |
128 |
324/TT/2019 |
19.02.2021 | 20.02.2021 | Transmission | |
127 |
44/TT/2020 |
19.02.2021 | 19.02.2021 | Transmission | |
126 |
488/TT/2019 |
19.02.2021 | 19.02.2021 | Transmission | |
125 |
327/TT/2020 |
19.02.2021 | 19.02.2021 | Transmission | |
124 |
303/TT/2020 |
18.02.2021 | 18.02.2021 | Transmission | |
123 |
138/TT/2020 |
16.02.2021 | 16.02.2021 | Transmission | |
122 |
114/TT/2020 |
16.02.2021 | 16.02.2021 | Transmission | |
121 |
152/TT/2020 |
15.02.2021 | 15.02.2021 | Transmission | |
120 |
15/TT/2020 |
15.02.2021 | 15.02.2021 | Transmission | |
119 |
L-1/250/2019/CERC |
14.02.2021 | 15.02.2021 | Misc. | |
118 |
172/TT/2019 |
13.02.2021 | 14.02.2021 | Transmission | |
117 |
143/TT/2019 |
13.02.2021 | 14.02.2021 | Transmission | |
116 |
53/TT/2020 |
13.02.2021 | 14.02.2021 | Transmission | |
115 |
Corrigendum to Petition No. 425/TL/2019 |
12.02.2021 | 12.02.2021 | Licence (Transmission) | |
114 |
Corrigendum to Petition No. 445/TL/2019 |
12.02.2021 | 12.02.2021 | Licence (Transmission) | |
113 |
212/TT/2020 |
11.02.2021 | 12.02.2021 | Transmission | |
112 |
167/TT/2020 |
11.02.2021 | 12.02.2021 | Transmission | |
111 |
494/TT/2019 |
11.02.2021 | 12.02.2021 | Transmission | |
110 |
33/TT/2019 |
07.02.2021 | 12.02.2021 | Transmission | |
109 |
287/MP/2018 |
11.02.2021 | 11.02.2021 | Misc. | |
108 |
24/TT/2020 |
11.02.2021 | 11.02.2021 | Transmission | |
107 |
330/MP/2018 |
10.02.2021 | 10.02.2021 | Misc. | |
106 |
479/TT/2019 |
09.02.2021 | 10.02.2021 | Transmission | |
105 |
156/TT/2015 |
09.02.2021 | 10.02.2021 | Transmission | |
104 |
421/TT/2019 |
09.02.2021 | 10.02.2021 | Transmission | |
103 |
79/TT/2020 |
09.02.2021 | 10.02.2021 | Transmission | |
102 |
Review Petition No. 8/RP/2020 in Petition No. 199/GT/2017 |
09.02.2021 | 10.02.2021 | Review | |
101 |
54/TT/2020 |
09.02.2021 | 09.02.2021 | Transmission | |
100 |
328/MP/2018 |
09.02.2021 | 09.02.2021 | Misc. | |
99 |
85/TT/2020 |
08.02.2021 | 09.02.2021 | Misc. | |
98 |
84/TT/2020 |
08.02.2021 | 09.02.2021 | Transmission | |
97 |
484/TT/2019 |
08.02.2021 | 09.02.2021 | Transmission | |
96 |
505/TT/2020 |
06.02.2021 | 09.02.2021 | Transmission | |
95 |
294/MP/2019 |
07.02.2021 | 09.02.2021 | Misc. | |
94 |
406/TT/2020 |
08.02.2021 | 09.02.2021 | Transmission | |
93 |
3/TT/2020 |
08.02.2021 | 09.02.2021 | Transmission | |
92 |
39/TT/2020 |
08.02.2021 | 08.02.2021 | Transmission | |
91 |
80/TT/2020 |
08.02.2021 | 08.02.2021 | Transmission | |
90 |
87/TT/2019 |
05.02.2021 | 08.02.2021 | Transmission | |
89 |
36/TT/2020 |
08.02.2021 | 08.02.2021 | Transmission | |
88 |
127/TT/2020 |
08.02.2021 | 08.02.2021 | Transmission | |
87 |
307/MP/2018 |
08.02.2021 | 08.02.2021 | Misc. | |
86 |
Review Petition No. 5/RP/2020 in Petition No.361/TT/2018 |
01.02.2021 | 08.02.2021 | Review | |
85 |
Review Petition No. 2/RP/2020 in Petition No. 182/TT/2018 |
01.02.2021 | 08.02.2021 | Review | |
84 |
IA. No. 28/2020 in Petition No. 92/MP/2018 |
08.02.2021 | 08.02.2021 | Misc. | |
83 |
334/MP/2020 |
07.02.2021 | 07.02.2021 | Misc. | |
82 |
206/MP/2020 |
05.02.2021 | 06.02.2021 | Misc. | |
81 |
17/TT/2020 |
04.02.2021 | 05.02.2021 | Transmission | |
80 |
4/TT/2020 |
04.02.2021 | 05.02.2021 | Transmission | |
79 |
|
05.02.2021 |
05.02.2021 | Misc. | |
78 |
151/TT/2020 |
04.02.2021 | 05.02.2021 | Transmission | |
77 |
462/TT/2020 |
04.02.2021 | 04.02.2021 | Transmission | |
76 |
276/TT/2020 |
04.02.2021 | 04.02.2021 | Transmission | |
75 |
20/TT/2020 |
02.02.2021 | 04.02.2021 | Transmission | |
74 |
83/TT/2020 |
01.02.2021 | 04.02.2021 | Transmission | |
73 |
117/TT/2020 |
02.02.2021 | 04.02.2021 | Transmission | |
72 |
508/TT/2019 |
01.02.2021 | 04.02.2021 | Transmission | |
71 |
153/MP/2018 154/MP/2018 |
04.02.2021 | 04.02.2021 | Misc. | |
70 |
21/MP/2017 |
04.02.2021 | 04.02.2021 | Misc. | |
69 |
348/MP/2018 |
04.02.2021 | 04.02.2021 | Misc. | |
68 |
168/TT/2020 |
03.02.2021 | 03.02.2021 | Transmission | |
67 |
82/TT/2020 |
02.02.2021 | 03.02.2021 | Transmission | |
66 |
34/TT/2020 |
02.02.2021 | 03.02.2021 | Transmission | |
65 |
113/TT/2019 |
31.01.2021 | 03.02.2021 | Transmission | |
64 |
23/TT/2020 |
31.01.2021 | 03.02.2021 | Transmission | |
63 |
170/TT/2019 |
31.01.2021 | 03.02.2021 | Transmission | |
62 |
153/TT/2020 |
02.02.2021 | 03.02.2021 | Transmission | |
61 |
312/TT/2020 |
02.02.2021 | 03.02.2021 | Transmission | |
60 |
120/TT/2020 |
01.02.2021 | 03.02.2021 | Transmission | |
59 |
504/TT/2019 |
01.02.2021 | 03.02.2021 | Transmission | |
58 |
511/TT/2019 |
01.02.2021 | 03.02.2021 | Transmission | |
57 |
196/TT/2020 |
01.02.2021 | 03.02.2021 | Transmission | |
56 |
33/TT/2020 |
01.02.2021 | 02.02.2021 | Transmission | |
55 |
7/TT/2020 |
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999, revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Stage-1 of 400 kV Thyristor controlled series compensation project (Fact Device) on Kanpur-Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region. Power Grid Corporation of India Ltd. Corrigendum Order dated:-05.02.2022 |
01.02.2021 | 02.02.2021 | Transmission |
54 |
313/TT/2020 |
31.01.2021 | 02.02.2021 | Transmission | |
53 |
515/TT/2019 |
31.01.2021 | 01.02.2021 | Transmission | |
52 |
316/TT/2019 |
27.01.2021 | 01.02.2021 | Transmission | |
51 |
596/AT/2020 |
01.02.2021 | 01.02.2021 | Adoption | |
50 |
395/TT/2019 |
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: Ckt-III of 400 kV D/C Vindhyachal-Satna Transmission Line alongwith associated bays; Asset-II: 400/220 kV, 315 MVA ICT-II at Satna Sub-station; Asset-III: Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; Asset-IV: LILO of 400 kV Satna-Bina Ckt-I & II at Bina (POWERGRID) Sub-station; Asset-V: Circuit IV of 400 kV D/C Satna-Bina Transmission Line; Asset-VI: Circuit III of 400 k V D/C Satna-Bina Transmission Line; Asset-VII: LILO of 400 kV D/C Raipur-Rourkela Transmission Line alongwith associated bays; Asset-VIII: 400/220 kV, 315 MVA ICT-II along with associated bay equipment at Raigarh Sub-station under “Vindhyachal-III Transmission System” in Western Region. Power Grid Corporation of India Ltd. Corrigendum Order dated:-07.02.2022 |
27.01.2021 | 01.02.2021 | Transmission |
49 |
599/TL/2020 |
01.02.2021 | 01.02.2021 | Licence (Transmission) | |
48 |
68/MP/2020 |
31.01.2021 | 31.01.2021 | Misc. | |
47 |
260/MP/2019 |
31.01.2021 | 31.01.2021 | Misc. | |
46 |
264/MP/2020 |
29.01.2021 | 29.01.2021 | Misc. | |
45 |
Review Petition No. 7/RP/2020 In Petition No. 222/MP/2017 |
28.01.2021 | 29.01.2021 | Review | |
44 |
76/TT/2020 |
27.01.2021 | 28.01.2021 | Transmission | |
43 |
51/TT/2020 |
27.01.2021 | 28.01.2021 | Transmission | |
42 |
21/TT/2020 |
27.01.2021 | 28.01.2021 | Transmission | |
41 |
475/TT/2019 |
27.01.2021 | 28.01.2021 | Transmission | |
40 |
331/MP/2020 |
28.01.2021 | 28.01.2021 | Misc. | |
39 |
481/TT/2019 |
27.01.2021 | 28.01.2021 | Transmission | |
38 |
311/TT/2019 |
27.01.2021 | 28.01.2021 | Transmission | |
37 |
191/MP/2019 |
27.01.2021 | 28.01.2021 | Misc. | |
36 |
512/TT/2019 |
27.01.2021 | 28.01.2021 | Transmission | |
35 |
477/TT/2019 |
Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-1: 315 MVA ICT-IV along with associated bays at Moga Sub-station, Asset-2: ICT-II along with associated bays and 2 nos PSEB feeder bays at Amritsar Sub-station, and 400 kV Bus reactor bay and 2 nos. PSEB line bays at Moga Sub-station under “Augmentation of transformation capacity at Amritsar and Moga Sub-stations” in the Northern Region. Power Grid Corporation of India Ltd. Corrigendum Order dated:-05.02.2022 |
27.01.2021 | 28.01.2021 | Transmission |
34 |
99/TT/2020 |
27.01.2021 | 28.01.2021 | Transmission | |
33 |
292/MP/2019 |
28.01.2021 | 28.01.2021 | Misc. | |
32 |
314/TT/2019 |
Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of 400 kV S/C Chamera-1 Kishenpur Transmission System in Northern Region. Power Grid Corporation of India Limited Corrigendum Order dated:- 08.02.2022 |
25.01.2021 | 27.01.2021 | Transmission |
31 |
473/TT/2019 |
Approval under Regulation86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff ofthe2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-a: 220 kV D/C RAPP-B-Chittorgarh Transmission Line, Asset-b: 220 kV S/C RAPP-B-Udaipur Transmission Line along with associated bays at Udaipur end and LILO of 220 kV D/C RAPP–KOTA Line at RAPP-B including PLCC system and Asset-c: 220 kV S/C RAPP-B-Anta Transmission Line with associated bays at Anta end under “Transmission System associated with RAPP-B Project” in the Northern Region. Power Grid Corporation of India Limited Corrigendum Order dated:- 09.02.2022 |
25.01.2021 | 27.01.2021 | Transmission |
30 |
255/TT/2019 |
25.01.2021 | 27.01.2021 | Transmission | |
29 |
270/TT/2020 |
25.01.2021 | 27.01.2021 | Transmission | |
28 |
71/MP/2020 |
27.01.2021 | 27.01.2021 | Misc. | |
27 |
85/TT/2019 |
25.01.2021 | 27.01.2021 | Transmission | |
26 |
353/TT/2019 |
25.01.2021 | 27.01.2021 | Transmission | |
25 |
510/TT/2019 |
25.01.2021 | 27.01.2021 | Transmission | |
24 |
126/TT/2020 |
24.01.2021 | 27.01.2021 | Transmission | |
23 |
69/TT/2020 |
24.01.2021 | 27.01.2021 | Transmission | |
22 |
160/MP/2020 |
27.01.2021 | 27.01.2021 | Misc. | |
21 |
336/MP/2020 |
27.01.2021 | 27.01.2021 | Misc. | |
20 |
159/MP/2020 |
27.01.2021 | 27.01.2021 | Misc. | |
19 |
185/MP/2020 |
27.01.2021 | 27.01.2021 | Misc. | |
18 |
71/MP/2019 |
25.01.2021 | 27.01.2021 | Misc. | |
17 |
136/TT/2020 |
24.01.2021 | 27.01.2021 | Transmission | |
16 |
186/MP/2018 |
25.01.2021 | 25.01.2021 | Misc. | |
15 |
9/RP/2020 in 245/MP/2018 |
25.01.2021 | 25.01.2021 | Review | |
14 |
404/MP/2019 |
25.01.2021 | 25.01.2021 | Misc. | |
13 |
213/MP/2019 |
Petition under Section 79 of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 22.06.2016 executed between Yarrow Infrastructure Private Limited and National Thermal Power Corporation Limited for seeking approval of Change in Law events due to enactment of the GST Laws. Yarrow Infrastructure Private Limited Corrigendum Order dated:- 14.09.2021 |
25.01.2021 | 25.01.2021 | Misc. |
12 |
211/MP/2019 |
Petition under Section 79 of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 27.06.2016 executed between Rattan India Solar 2 Private Ltd. and Solar Energy Corporation of India Ltd. for seeking approval of Change in Law events due to enactment of the GST Laws RattanIndia Solar 2 Private Ltd Corrigendum Order dated:- 14.09.2021 |
25.01.2021 | 25.01.2021 | Misc. |
11 |
265/MP/2020 |
25.01.2021 | 25.01.2021 | Misc. | |
10 |
579/AT/2020 |
25.01.2021 | 25.01.2021 | Adoption | |
9 |
44/MP/2019 |
25.01.2021 | 25.01.2021 | Misc. | |
8 |
64/MP/2019 |
25.01.2021 | 25.01.2021 | Misc. | |
7 |
365/MP/2019 |
24.01.2021 | 24.01.2021 | Misc. | |
6 |
177/MP/2019 and 178/MP/2019 |
24.01.2021 | 24.01.2021 | Misc. | |
5 |
281/MP/2019 |
24.01.2021 | 24.01.2021 | Misc. | |
4 |
151/MP/2019 |
24.01.2021 | 24.01.2021 | Misc. | |
3 |
6/RP/2020 along with I.A. No. 11 of 2020 |
24.01.2021 | 24.01.2021 | Review | |
2 |
354/GT/2018 |
24.01.2021 | 24.01.2021 | Generation | |
1 |
157/MP/2018 alongwith I.A. 2 of 2019 |
24.01.2021 | 24.01.2021 | Misc. |