cerc-logo

Orders - 2021

Sl.No. Petition No. Subject Date of Order Date of posting Order on website Category

656

27/TT/2021
31.12.2021 31.12.2021 Transmission

655

471/MP/2019
31.12.2021 31.12.2021 Misc.

654

80/IA/2021
In
Petition No. 405/MP/2019
31.12.2021 31.12.2021 Adoption

653

317/MP/2019
31.12.2021 31.12.2021 Misc.

652

679/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Tuticorin Pooling Station-Salem Pooling Station 765 kV D/C line (initially charged at 400 kV) along with Bay extensions at Salem Pooling Station and Tuticorin Pooling Station and 80 MVAR Line Reactors at each end of both circuits of Tuticorin Pooling Station-Salem Pooling Station 765 kV D/C line (initially charged at 400 kV) under Common System Associated with Coastal Energen Private Limited and Ind-Barath Power (Madras) Limited LTOA Generation Projects in Tuticorin Area (Part-B) in Southern Region. Power Grid Corporation of India Limited
31.12.2021 31.12.2021 Transmission

651

150/MP/2021
31.12.2021 31.12.2021 Misc.

650

40/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 50 MVAR Line Reactor at Jaipur (South) in 400 kV D/C Kota - Jaipur (South) line (Part of 400 kV D/C Rapp- Jaipur TL) utilized as Bus Reactor at Jaipur (South) Sub-station and Asset-II: 400 kV D/C Kota - Jaipur (South) line along with associated bays at Kota and Jaipur (South) (Part of RAPP-Jaipur (S) 400 kV D/C line with one Ckt LlLO at Kota) under “Transmission System associated with RAPP 7 & 8, Part-B”. Power Grid Corporation of India Limited
31.12.2021 31.12.2021 Transmission

649

6/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2009-14 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset comprising of Asset-1& 2: Combined Assets of 500 MVA 400/220 kV ICT-III & 500 MVA 400/220 kV ICT-IV along with associated bay at Maharanibagh Sub-station; Asset-3: 500 MVA, 400/220 kV ICT-II along with associated bays at Lucknow; Asset-4: 400/220 kV ICT along with associated bays at Bahadurgarh Sub-station covered under the Transmission System associated with “Northern Region System Strengthening Scheme- XXIII” in the Northern Region. Power Grid Corporation of India Limited
31.12.2021 31.12.2021 Transmission

648

75/TT/2020
27.12.2021 27.12.2021 Transmission

647

135/TT/2020
24.12.2021 25.12.2021 Transmission

646

72/GT/2021
24.12.20211 24.12.20211 Generation

645

368/GT/2019
23.12.2021 24.12.2021 Generation

644

211/TT/2020
23.12.2021 23.12.2021 Misc.

643

171/MP/2021
23.12.2021 23.12.2021 Misc.

642

148/MP/2021
with
Interlocutory Application No.87/IA/2021
23.12.2021 23.12.2021 Misc.

641

168/MP/2021
23.12.2021 23.12.2021 Misc.

640

I.A. No. 66/IA/2021 in
Petition No. 588/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset comprising of Asset A-1: Siliguri-Purnea 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-2: Purnea-Muzaffarpur (New) 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-3: Muzaffarpur (New)-Gorakhpur 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-4: Gorakhpur-Lucknow 400 kV D/C (Twin Conductor) Transmission Line, Asset A-5: Bareily-Mandola 400 kV D/C (Twin Conductor) Transmission Line and Asset A-6: Muzaffarpur (New)-Muzaffarpur (BSEB) 220 kV (Twin Conductor) transmission line under Tala inter-State Transmission System associated with Tala Hydro Electric Project in Eastern Region, Eastern-Northern Inter-Region and Northern Region. Powerlinks Transmission Limited
23.12.2021 23.12.2021 Adoption

639

213/TT/2020
23.12.2021 23.12.2021 Transmission

638

208/TD/2021
22.12.2021 22.12.2021 Licence

637

533/MP/2020
and
538/MP/2020
22.12.2021 22.12.2021 Misc.

636

Corrigendum to Petition No. 588/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset A-1: Siliguri-Purnea 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-2: Purnea-Muzaffarpur (New) 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-3: Muzaffarpur (New)-Gorakhpur 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-4: Gorakhpur-Lucknow 400 kV D/C (Twin Conductor) Transmission Line, Asset A-5: Bareily-Mandola 400 kV D/C (Twin Conductor) Transmission Line and Asset A-6: Muzaffarpur (New)-Muzaffarpur (BSEB) 220 kV (Twin Conductor) transmission line under Tala inter-State Transmission System associated with Tala Hydro Electric Project in Eastern Region, Eastern-Northern Inter-Region and Northern Region. Powerlinks Transmission Limited
22.12.2021 22.12.2021 Transmission

635

249/AT/2021
22.12.2021 22.12.2021 Adoption

634

25/TT/2021
22.12.2021 22.12.2021 Transmission

633

178/AT/2021
22.12.2021 22.12.2021 Adoption

632

118/TT/2020
22.12.2021 22.12.2021 Transmission

631

49/TT/2020
22.12.2021 22.12.2021 Transmission

630

298/GT/2019
21.12.2021 21.12.2021 Generation

629

179/AT/2021
21.12.2021 21.12.2021 Adoption

628

210/AT/2021
21.12.2021 21.12.2021 Adoption

627

199/MP/2020
20.12.2021 21.12.2021 Misc.

626

226/MP/2021
and
227/MP/2021
16.12.2021 21.12.2021 Misc.

625

157/MP/2015
along with IA No.53/2021
And
Petition No: 121/MP/2017
along with IA No. 64/2021
20.12.2021 20.12.2021 Misc.

624

448/TT/2020
20.12.2021 20.12.2021 Transmission

623

214/MP/2021
17.12.2021 20.12.2021 Misc.

622

18/RP/2021
in
Petition No. 33/TT/2019
20.12.2021 20.12.2021 Review

621

108/GT/2020
18.12.2021 19.12.2021 Generation

620

15/RP/2020
in
281/GT/2018
16.12.2021 16.12.2021 Review

619

333/MP/2018
15.12.2021 16.12.2021 Misc.

618

626/MP/2020 with IA No. 20/2021 & IA No. 42/2021
and
156/MP/2021 with IA No. 59/2021
and
176/MP/2021
16.12.2021 16.12.2021 Misc.

617

207/MP/2021

Petition under Section 79(1)(b), Section 79(1)(f) and Section 79(1)(k) of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement(s) dated 25.06.2019 seeking issuance of appropriate order(s)/ direction(s)/declaration from this Commission that the imposition of safeguard duty on the import of solar cells, whether or not assembled in modules or panels, vide Notification No. 2/2020-Customs (SG) dated 29.07.2020 issued by the Department of Revenue, Ministry of Finance (Government of India) is an event of Change in Law and for seeking approval to the quantum and mechanism of compensation (along with interest) as submitted along with the present Petition in line with the methodology as settled by this Hon’ble Commission vide its order dated 20.08.2021 in Petition No. 536/MP/2020. Eden Renewable Cite Private Limited
16.12.2021 16.12.2021 Misc.

616

41/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-1: LILO of one circuit of Tuticorin JV-Madurai 400 kV (Quad) Line at Tuticorin Pooling Station along with new 765 kV Pooling Station at Tuticorin (initially charged at 400 kV) including 1x80 MVAR, 400 kV Bus Reactor at Tuticorin Pooling Station and Asset-2: LILO of 2nd circuit of Tuticorin JV-Madurai 400 kV (Quad) Line at Tuticorin Pooling Station under Transmission System associated with Common System associated with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA Generation Projects in Tuticorin Area-Part-A in Southern Region. Power Grid Corporation of India Limited
16.12.2021 16.12.2021 Transmission

615

251/TT/2020
14.12.2021 14.12.2021 Transmission

614

217/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 in respect of: (a) 40% fixed series compensation on Gooty- Neelmangla line-II at Gooty and ( b) 40% fixed series compensation on Gooty- Neelmangla line-I at Gooty, Kadapa Nagarjunasagar Circuit–I and Circuit-II at Kadapa under “Fixed Series Compensation on 400 kV lines in Southern Region” . Power Grid Corporation of India Limited
14.12.2021 14.12.2021 Transmission

613

214/TT/2020
14.12.2021 14.12.2021 Transmission

612

44/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Assets consisting of Asset-1: 765/400 kV, 1500 MVA (3x500) ICT-II along with 765 and 400 kV bays at Moga Sub-station (COD 01.06.2012), Asset-2: 765 kV Moga-Bhiwani line bays along with 240 MVAR Line Reactor at Moga Sub-station (COD 01.06.2012), Asset-3: 765 kV 240 MVAR (3x80) Bus Reactor-I along with associated bays at Moga Sub-station (COD 01.06.2012), Asset-4: 765 kV 240 MVAR (3x80) Bus Reactor-II along with associated bays at Moga Sub-station (COD 01.06.2012), Asset-5: 765/400 kV, 1500 MVA (3x500) ICT-I along with 765 and 400 kV bays at Moga Sub-station (COD 01.09.2012) ,Asset-6: combined assets of 1500 MVA 765/400/33 kV ICT-I, ICT-II, ICT-III and ICT-IV along with associated bays at Jhattikara 765/400 kV new Sub-station (COD 01.10.2012), Asset- 7: Combined assets of 1500 MVA 765/400/33 kV ICT-I and ICT-II along with associated bays at Meerut Sub-station (COD 01.06.2013), Asset-8: Associated bays for LILO of both circuits of 400 kV D/C Bamnouli-Mundka/Bawana at Jhattikara 765/400 kV New Sub-station (COD 01.10.2012), Asset-9: One no. 765 kV line bay for 765 kV Agra- Jhattikara line including 765 kV 240 MVAR switchable line reactor as bus reactor operation mode at 765/400 kV Jhattikara (New) Sub-station (COD 01.05.2013), Asset-10: Associated line bays for 765 kV S/C Agra –Jhattikara Transmission Line at Agra Sub-station (COD 01.05.2013), Asset-11: One No. 765 kV line bay for 765 kV Agra-Meerut line along with 765 kV 240 MVAR switchable line reactor under bus reactor operation mode at 765/400/220 kV Meerut Sub-station (COD 01.06.2013), Asset-12: Associated line bays for 765 kV S/C Agra – Meerut Transmission Line at Agra Sub-station (COD 01.06.2013), Asset-13: 765 kV 240 MVAR Bus Reactor along with associated bays at 765/400/220 kV at Meerut Sub-station (COD 01.02.2013), Asset-14: 765 kV 240 MVAR Bus Reactor along with associated bays at 765/400/220 kV at Jhattikara Sub- station (COD 01.10.2012), and Asset-15: Associated bays at Jhattikara for 765 kV Jhattikara – Bhiwani Line (COD 01.10.2012), covered under “765 kV System for Central Part of Northern Grid- Part-II” in Northern Region. Power Grid Corporation of India Limited
13.12.2021 14.12.2021 Transmission

611

438/GT/2020
12.12.2021 13.12.2021 Generation

610

175/MP/2021
13.12.2021 13.12.2021 Misc.

609

174/AT/2021
13.12.2021 13.12.2021 Adoption

608

215/MP/2021
13.12.2021 13.12.2021 Misc.

607

167/MP/2021
13.12.2021 13.12.2021 Misc.

606

20/RP/2021
in
IA No. 64/IA/2020 in Petition No.614/MP/2020
along with
IA No. 63/IA/2021 in IA No. 64/IA/2020 in Petition No. 614/MP/2020
13.12.2021 13.12.2021 Review

605

12/TT/2020
13.12.2021 13.12.2021 Transmission

604

646/TT/2020
13.12.2021 13.12.2021 Transmission

603

15/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: 2 numbers 400 kV Line Bays at Samba Sub-station and 2 numbers 400 kV Line Bays at Jallandhar Sub-station and Asset-2: 2 numbers 400 kV Line Bays at Samba Sub-station and 2 numbers 50 MVAR Line Reactor at Samba Sub-station under Northern Region System Strengthening Scheme – XXIX in the Northern Region. Power Grid Corporation of India Limited
13.12.2021 13.12.2021 Transmission

602

668/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: 1x500 MVA 400/230 kV ICT along with associated bays and equipment at Arasur Sub-station; Asset-2: 1x500 MVA 400/230 kV ICT along with associated bays and equipment at Karaikudi Sub-station; Asset-3: 1x500 MVA 400/230 kV ICT along with associated bays and equipment at Tirunelveli Sub-station; Asset-4: 1x500 MVA 400/230 kV ICT along with associated bays and equipment at Pondicherry Sub-station; Asset-5: 1x500 MVA 400/230 kV ICT along with associated bays and equipment at Kozhikode Sub-station under “Augmentation of transformation capacity” in Southern Region. Power Grid Corporation of India Limited
13.12.2021 13.12.2021 Transmission

601

180/MP/2020
08.12.2021 08.12.2021 Misc.

600

475/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 400 kV D/C (Quard) Circuit-I of Dehradun- Abdullahpur Transmission Line along with associated bays at Dehradun and Abdullahpur Sub-station; Asset-II: 400 kV D/C (Quard) Circuit-II of Dehradun-Abdullahpur Transmission Line along with associated bays at Dehradun and Abdullahpur Sub-station; Asset-III: 400 kV D/C (Quard) Dulhasti-Kishenpur single circuit strung along with associated bays at Kishenpur; and Asset-IV: Two nos. of 63 MVAR 400 kV Line Reactor at Balia (PG) Sub-station (Extn) under “Northern Region System Strengthening Scheme-XXIV” in the Northern Region. Power Grid Corporation of India Limited
08.12.2021 08.12.2021 Transmission

599

I.A No.15/IA/2018
in
Petition No. 92/MP/2018
08.12.2021 08.12.2021 Adoption

598

228/MP/2021

Petition under Section 79(1)(b), Section 79(1)(f) and Section 79(1)(k) of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement(s) dated 28.12.2018 seeking issuance of appropriate order(s) / direction(s) / declaration from this Commission that the imposition of safeguard duty on the import of solar cells, whether or not assembled in modules or panels, vide Notification No. 2/2020-Customs (SG) dated 29.7.2020 issued by the Department of Revenue, Ministry of Finance (Government of India) is an event of Change in Law and for seeking approval of the quantum and mechanism of compensation (along with interest) as submitted along with the present Petition in line with the methodology provided by this Commission vide its order dated 20.8.2021 in Petition No. 536/MP/2020. Mahindra Renewables Private Limited
06.12.2021 06.12.2021 Misc.

597

19/RP/2020
in
Petition No.284/RC/2019
06.12.2021 06.12.2021 Review

596

222/MP/2021
06.12.2021 06.12.2021 Misc.

595

165/TD/2021
06.12.2021 06.12.2021 Licence

594

218/MP/2021
06.12.2021 06.12.2021 Misc.

593

514/TT/2019

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-1: LILO of 2nd circuit of Neyveli-Trichy 400 kV D/C line at Nagapattinam Pooling Station along with associated bays; Asset-2: Strengthening of Neyveli TS-II-TS-I expansion link with higher capacity conductor under “Transmission system associated with Contingency plan for evacuation of power from IL&FS (2x600 MW)” in Southern Region. Power Grid Corporation of India Limited
06.12.2021 06.12.2021 Transmission

592

195/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of 400 kV D/C Ranchi - Sipat Transmission Line with associated bays at Ranchi and Sipat Sub-stations and 40% FSC on 400 kV Ranchi - Sipat Transmission Line at Ranchi Sub-station under Kahalgaon -II, Phase II Transmission System in the Western Region. Power Grid Corporation of India Limited
03.12.2021 03.12.2021 Transmission

591

134/TT/2020
03.12.2021 03.12.2021 Transmission

590

188/MP/2021
02.12.2021 02.12.2021 Misc.

589

122/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-I: 220 kV D/C Faridabad-Samaypur Transmission Line with associated bays and Asset-II: 200 kV D/C Faridabad-Palla Transmission Line with associated bays under Transmission System associated with Faridabad Gas Based Combined Cycle Power Project in Northern Region. Power Grid Corporation of India Limited
01.12.2021 01.12.2021 Transmission

588

211/MP/2018
30.11.2021 30.11.2021 Misc.

587

691/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset-I consisting of (i): 765 kV S/C Bina-Gwalior Transmission Line; (ii) 315 MVA, 400/220/33 kV ICT-I along with associated bays at Gwalior Sub-station; (iii): LILO of 400 kV S/C Korba-Raipur line at Bhatapara Sub-station along with associated bays; (iv): 400 kV Khandwa Rajgarh Circuit-II along with associated bays and 765/400 kV ICT-III at Seoni Sub-station; (v): 400 kV Khandwa-Rajgarh Circuit-I along with associated bays and 63 MVAR Bus Reactor at Bina Sub-station, Asset-II: 400 kV ICT-II at Gwalior Sub-station; and Asset-III: 400/220 kV ICT-II at Bhatapara Sub-station under Sipat-II Transmission System in the Western Region. Power Grid Corporation of India Limited
30.11.2021 30.11.2021 Transmission

586

661/TT/2020
30.11.2021 30.11.2021 Transmission

585

324/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2009-14 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 400 kV S/C Uri-I-Uri-II inter connector transmission line along with Bays at NHPC, Asset-2: 400 kV S/C Uri-II-Wagoora Transmission line along with Bays at Wagoora Sub-station and Asset-3: 400 kV 80 MVAR Bus reactor at Kishenpur Sub-station under “URI-II HEP Transmission System” in Northern Region. Power Grid Corporation of India Limited
30.11.2021 30.11.2021 Transmission

584

289/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-a: 400 kV D/C Dulhasti-Kishenpur Transmission Line with associated bays; Asset-b 400 kV Kishenpur-Wagoora Transmission Line along with associated bays at Kishenpur and Wagoora Sub-stations; and Asset-c: ICTs at Kishenpur under Dulhasti Combined Transmission System associated with the Dulhasti Hydroelectric Project (3x130 MW) in Jammu and Kashmir, Northern Region. Power Grid Corporation of India Limited
29.11.2021 29.11.2021 Transmission

583

712/TT/2020
29.11.2021 29.11.2021 Transmission

582

667/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 400 kV D/C Surjyamaninagar (Tripura)-Indo-Bangladesh Border Transmission Line (operated at 132 kV) and Asset-I(A): 2 Nos. of 132 kV line bays of 400 kV D/C Surjyamaninagar-Indo-Bangladesh border TL at Surjyamaninagar (operated at 132 kV) under “Radial Interconnection between India (NER) and Bangladesh-Indian Portion” in North-Eastern Region. Power Grid Corporation of India Limited
29.11.2021 29.11.2021 Transmission

581

75/MP/2019
28.11.2021 28.11.2021 Misc.

580

198/TD/2021
28.11.2021 28.11.2021 Licence

579

328/TT/2020
26.11.2021 26.11.2021 Transmission

578

200/MP/2019
26.11.2021 26.11.2021 Misc.

577

719/TT/2020
25.11.2021 26.11.2021 Transmission

576

463/TT/2020
25.11.2021 25.11.2021 Transmission

575

598/MP/2020
24.11.2021 24.11.2021 Misc.

574

321/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-I: 400 kV Vindhyachal-Korba S/C Transmission Line, Asset-II: 400 kV Itarsi-Indore S/C Transmission Line-1, Asset-III: 400 kV Vindhyachal-Jabalpur D/C Transmission Line-1, Asset-IV: 400 kV Jabalpur-Itarsi D/C Transmission Line-1 and Asset-V: 400 kV Indore-Asoj S/C Transmission Line-2 under Vindhyachal Super Thermal Power Station Stage-I Transmission System in Western Region. Power Grid Corporation of India Limited
22.11.2021 22.11.2021 Transmission

573

235/MP/2019
22.11.2021 22.11.2021 Misc.

572

Corrigendum to Petition No. 704/TT/2020
22.11.2021 22.11.2021 Transmission

571

162/MP/2021
21.11.2021 21.11.2021 Misc.

570

196/TT/2021
21.11.2021 21.11.2021 Transmission

569

50/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 periods, truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset-I under System Strengthening Scheme for Eastern Region (Formerly part of Tala Supplementary Scheme) and Asset-II: Conversion of 50 MVAR Line Reactor into Switchable Line Reactor at Subhashgram end of 400 kV S/C Sagardighi-Subhasgram Transmission Line under ERSS XV, now tariff is being claimed under “System Strengthening Scheme for Eastern Region (Formerly part of Tala Supplementary Scheme)” as per Central Electricity Regulatory Commission’s order dated 12.9.2018 in Petition No. 259/TT/2018 in the Eastern Region. Power Grid Corporation of India Limited
21.11.2021 21.11.2021 Transmission

568

208/TD/2021
21.11.2021 21.11.2021 Licence

567

215/TT/2020
20.11.2021 20.11.2021 Transmission

566

241/MP/2021
19.11.2021 19.11.2021 Misc.

565

714/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-I comprising of Combined Elements of (a) 30% FSC on 400 kV Bareilly-Mandola Ckt. 1 and Ckt. 2 at Bareilly, (b) 45% FSC on 400 kV D/C Unnao-Bareilly Ckt. 1 and Ckt. 2 at Unnao and (c) 30% FSC on 400 kV Gorakhpur-Lucknow Ckt. 1 at Lucknow and Asset-II: 30% FSC on 400 kV Gorakhpur-Lucknow Ckt. 2 at Lucknow under system associated with Enhancement of Transmission Capacity of East-West Corridor of Northern Region. Power Grid Corporation of India Limited
18.11.2021 19.11.2021 Transmission

564

05/SM/2020
18.11.2021 18.11.2021 Suo-Motu

563

444/GT/2020
17.11.2021 17.11.2021 Generation

562

501/MP/2019
502/MP/2019
66/MP/2020
267/MP/2020
414/MP/2020
496/MP/2020
499/MP/2020
501/MP/2020
510/MP/2020
545/MP/2020
and
553/MP/2020
17.11.2021 17.11.2021 Misc.

561

400/GT/2020
13.11.2021 15.11.2021 Generation

560

452/MP/2019
&
173/MP/2020
13.11.2021 15.11.2021 Misc.

559

221/MP/2019
13.11.2021 14.11.2021 Misc.

558

224/MP/2021
225/MP/2021
233/MP/2021
13.11.2021 13.11.2021 Misc.

557

468/MP/2019
12.11.2021 13.11.2021 Misc.

556

Corrigendum to 06/SM/2021 (Suo-Motu)
11.11.2021 12.11.2021 Suo-Motu

555

231/MP/2021
12.11.2021 12.11.2021 Misc.

554

197/MP/2018
11.11.2021 11.11.2021 Misc.

553

92/MP/2020
along with
IA No. 5 of 2020
and
IA No. 66 of 2020
11.11.2021 11.11.2021 Misc.

552

214/MP/2019
09.11.2021 10.11.2021 Misc.

551

80/TT/2016
09.11.2021 09.11.2021 Transmission

550

265/TT/2019
07.11.2021 08.11.2021 Transmission

549

616/MP/2020

Petition under Section 38(2) of the of the Electricity Act, 2003 read with Section 79(1)(c) and Section 79(1)(k) of the Act, along with (i) Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) Regulations, 2010;(ii)Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018 (iii) Regulation 111 & 114 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999 and (iv) Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 for execution of the Transmission System for Evacuation of power from potential Solar and Wind Energy Zones in Gujarat (13.5GW) and Madhya Pradesh (4GW). Central Transmission Utility of India Limited
08.11.2021 08.11.2021 Misc.

548

288/GT/2020
07.11.2021 08.11.2021 Generation

547

141/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09and 2009-14 tariff periods, truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset comprising of Asset-I: LILO of both circuits of 400kV D/C Gazuwaka-Vijayawada Transmission Line at Vemagiriand Asset-II: Extension of 400/220 kV sub-station at Vijayawada under System Strengthening-VI of Southern Region Grid in Southern Region. Power Grid Corporation of India Limited
08.11.2021 08.11.2021 Transmission

546

533/MP/2020
07.11.2021 07.11.2021 Misc.

545

8/SM/2021
03.11.2021 03.11.2021 Suo-Motu

544

9/SM/2021
03.11.2021 03.11.2021 Suo-Motu

543

588/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset A-1: Siliguri-Purnea 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-2: Purnea-Muzaffarpur (New) 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-3: Muzaffarpur (New)-Gorakhpur 400 kV D/C (Quad. Conductor) Transmission Line, Asset A-4: Gorakhpur-Lucknow 400 kV D/C (Twin Conductor) Transmission Line, Asset A-5: Bareily-Mandola 400 kV D/C (Twin Conductor) Transmission Line and Asset A-6: Muzaffarpur (New)-Muzaffarpur (BSEB) 220 kV (Twin Conductor) transmission line under Tala inter-State Transmission System associated with Tala Hydro Electric Project in Eastern Region, Eastern-Northern Inter-Region and Northern Region. Powerlinks Transmission Limited
Corrigendum date:- 22.12.2021
02.11.2021 02.11.2021 Transmission

542

95/MP/2021
31.10.2021 01.11.2021 Misc.

541

183/MP/2020
333/MP/2020
342/MP/2020
508/MP/2020
517/MP/2020
and
522/MP/2020
31.10.2021 31.10.2021 Misc.

540

669/TT/2020
31.10.2021 31.10.2021 Transmission

539

708/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: Replacement of 1X100 MVA, 220/132 kV ICT-II by 1X200 MVA, 220/132 kV ICT-II at Raebareli Sub-station, Asset-II: Replacement of 1X100 MVA, 220/132 kV ICT-III by 1X200MVA, 220/132 kV ICT-III at Raebareli Sub-station under “Augmentation of Transformation Capacity at Raebareli and Sitarganj 220/132 kV Sub-stations” in the Northern Region. Power Grid Corporation of India Limited
31.10.2021 31.10.2021 Transmission

538

131/TT/2020
31.10.2021 31.10.2021 Transmission

537

610/MP/2020
28.10.2021 28.10.2021 Misc.

536

133/TT/2020
28.10.2021 28.10.2021 Transmission

535

391/MP/2018
&
100/MP/2019
27.10.2021 27.10.2021 Misc.

534

380/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2009-14 and 2014-19 tariff periods under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 respectively and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-I: 765 kV S/C Agra-Gwalior Transmission Line Circuit-II along with 400 kV bays at Agra and Gwalior Sub-stations and Asset-II: 400 kV D/C Zerda-Kankroli Line along with associated bays under Transmission System Associated with North-West Transmission Corridor Strengthening Scheme in both Western and Northern Regions. Power Grid Corporation of India Limited
27.10.2021 27.10.2021 Transmission

533

128/MP/2021
27.10.2021 27.10.2021 Misc.

532

410/GT/2020
25.10.2021 26.10.2021 Generation

531

704/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of Asset A1: 02 Numbers Line bays along with 02 Numbers 50 MVAR Line Reactors (charged as Bus Reactor) at Jabalpur Pooling Station and Asset B1: 400 kV D/C (Triple Snowbird) MB TPS (Anuppur)-Jabalpur Pooling Station Transmission Line under Transmission System for connectivity of MB Power (M.P.) Limited in Western Region. Power Grid Corporation of India Limited
Corrigendum date:- 22.11.2021
24.10.2021 24.10.2021 Transmission

530

560/MP/2020
24.10.2021 24.10.2021 Misc.

529

18/MP/2019
23.10.2021 24.10.2021 Misc.

528

156/MP/2014
24.10.2021 24.10.2021 Misc.

527

347/MP/2020
23.10.2021 23.10.2021 Misc.

526

3/RP/2020
in
Petition No.309/GT/2015
23.10.2021 23.10.2021 Review

525

191/MP/2021
23.10.2021 23.10.2021 Misc.

524

184/MP/2021
23.10.2021 23.10.2021 Misc.

523

177/MP/2021
23.10.2021 23.10.2021 Misc.

522

104/MP/2017
23.10.2021 23.10.2021 Misc.

521

129/MP/2021
23.10.2021 23.10.2021 Misc.

520

198/TD/2021
23.10.2021 23.10.2021 Licence

519

174/MP/2020
22.10.2021 22.10.2021 Misc.

518

604/MP/2020
21.10.2021 21.10.2021 Misc.

517

585/MP/2020
21.10.2021 21.10.2021 Misc.

516

371/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset comprising of Asset-I: LILO of 220 kV Tanakpur-Bareilly Transmission Line (Ckt.-II) at Sitarganj along with associated bays, Asset-II: 220/132, 100 MVA ICT-I at Sitarganj along with associated bays, Asset-III: 220/132, 100 MVA ICT-Il at Sitarganj along with associated bays, Asset-IV: 220/132, 100 MVA ICT-I at Pithoragarh along with associated bays, Asset-V: 220/132, 100 MVA ICT-II at Pithoragarh along with associated bays and Asset-VI: LILO of one circuit of Dhauliganga-Bareilly Transmission Line at Pithoragarh along with associated bays associated with System Strengthening Scheme in Uttaranchal in Northern Region. Power Grid Corporation of India Limited
18.10.2021 20.10.2021 Transmission

515

547/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of Asset-A: 400 kV, 125 MVAR Bus Reactor at Gorakhpur, Asset-B: 400 kV, 125 MVAR Bus Reactor at Allahabad, Asset-C: 400 kV, 125 MVAR Bus Reactor at Manipuri, Asset-D: 400 kV, 125 MVAR Bus Reactor at Kankroli, Asset-E: 400 kV, 125 MVAR Bus Reactor-I at Vindhyachal, Asset-F: 125 MVAR Bus Reactor-II at Vindhyachal, Asset-G: Extension of 400/220 kV Jalandhar (POWERGRID), Asset-H: Extension of 400/220 kV Amritsar (POWERGRID) Sub-station 400 kV, 80 MVAR Bus-Reactor, Asset-I: Extension of 400/220 kV Hissar (POWERGRID) Sub-station 400 kV, 125 MVAR Bus Reactor, Asset-J: Extension of 400/220 kV Nalagarh (POWERGRID) Sub-station 400 kV, 125 MVAR Bus-Reactor under the scheme “Provision of Bus Reactors in the Northern Region”. Power Grid Corporation of India Limited
20.10.2021 20.10.2021 Transmission

514

Corrigendum to Petition No. 146/MP/2021
20.10.2021 20.10.2021 Misc.

513

Corrigendum to Petition No. 143/MP/2021
20.10.2021 20.10.2021 Misc.

512

IA No. 69/2021
in
Petition No. 160/MP/2021
20.10.2021 20.10.2021 Misc.

511

323/TT/2020
18.10.2021 19.10.2021 Transmission

510

658/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of Asset-I: STATCOM System (+/-) 300 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor), cooling system and STATCOM protection/ controller etc. at Rourkela Sub-station, Asset-II: STATCOM System (+/-) 200 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor and 2x125 MVAR Capacitor), cooling system and STATCOM protection/ controller etc. at Jeypore Sub-station, Asset-III: STATCOM System (+/-) 300 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor), cooling system and STATCOM protection/ controller etc. at Ranchi Sub-station and Asset-IV: STATCOM System (+/-) 200 MVAR complete in all respect including Coupling transformer, Mechanically switched compensation (2x125 MVAR reactor and 2x125 MVAR Capacitor), cooling system and STATCOM protection/ controller etc. at Kishanganj Sub-station under Eastern Region Strengthening Scheme-XI in Eastern Region. Power Grid Corporation of India Limited
18.10.2021 18.10.2021 Transmission

509

351/TT/2020
17.10.2021 18.10.2021 Transmission

508

I.A No. 62/2021
in
Petition No.21/GT/2021
11.10.2021 18.10.2021 Misc.

507

353/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: 400 kV S/C line-2 Ramagundam-Hyderabad in Southern Region and Asset-II: Bhadrawati (Chandrapur) HVDC back-to-back station (2x500 MW) between Western Region and Southern Region associated with Chadrapur HVDC back-to-back project (2x500 MW). Power Grid Corporation of India Limited
17.10.2021 17.10.2021 Transmission

506

119/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 periods, truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-I: 220 kV S/C Unchahar- Raibareilly Transmission Line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow Transmission Line at Raibareilly and 100 MVA, 220/132 kV ICT-III at Raibareilly along with associated bays and Asset-II: 100 MVA, 220/132 kV ICT-II at Raibareilly Sub-station along with associated bays under ‘Unchahar-III Transmission System’ in Northern Region. Power Grid Corporation of India Limited
17.10.2021 17.10.2021 Transmission

505

55/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset-I: 400 kV line bays at Biharshariff Sub-station along with 1x80 MVAR Switchable Line Reactor (for 400 kV D/C Purnea- Biharshariff Transmission Line), 1x80 MVAR Switchable Line Reactor (at Biharshariff Sub-station) and 400 kV line bays at Purnea Sub-station (for 400 kV D/C Purnea-Biharshariff Transmission Line) and Asset-II: 02 numbers 400 kV line bays along with 02 numbers 80 MVAR Switchable Line Reactors at 400 kV Siliguri Sub-station and 02 numbers 400 kV line bays (for 400 kV D/C Siliguri-Bongaigaon Transmission Line) at Bongaigaon Sub-station under “Transmission Schemes for enabling import of NER/ER surplus power by NR” in Eastern Region. Power Grid Corporation of India Limited
17.10.2021 17.10.2021 Transmission

504

64/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff of 2014-19 period and determination of transmission tariff of 2019-24 period in respect of the Combined Asset consisting of Asset-1: Two number of bays at Nalagarh Extension, Asset-2: Two number of bays at Kota Extension, Asset-3: 400 kV D/C Bahadurgarh-Sonepat Line along with its associated bays at Bahadurgarh and Sonepat, Asset-4: 315 MVA ICT-II at Sonepat, Asset-5: 315 MVA ICT-I at Sonepat, Asset-6: Two number of bays at Bhiwadi Extension and Asset-7: 125 MVAR 400 kV Bus-Reactor at Sonepat along with its associated bay covered under “Northern Region System Strengthening Scheme – XII” in the Northern Region. Power Grid Corporation of India Limited
17.10.2021 17.10.2021 Transmission

503

103/TT/2020
17.10.2021 17.10.2021 Transmission

502

146/MP/2021
17.10.2021 17.10.2021 Misc.

501

143/MP/2021
17.10.2021 17.10.2021 Misc.

500

78/MP/2019
16.10.2021 17.10.2021 Misc.

499

79/MP/2021
15.10.2021 15.10.2021 Misc.

498

IA No. 70 of 2021
in
Petition No.287/MP/2018
14.10.2021 14.10.2021 Misc.

497

470/TT/2020
14.10.2021 14.10.2021 Transmission

496

78/TT/2020
12.10.2021 12.10.2021 Transmission

495

7/RP/2021
in
Petition No. 77/TT/2020
12.10.2021 12.10.2021 Review

494

21/MP/2019
with
IA No. 14/2019 and I.A No. 74/2021
12.10.2021 12.10.2021 Misc.

493

12/RP/2020
in
Petition No.249/GT/2016
11.10.2021 12.10.2021 Review

492

467/MP/2019
64/MP/2020
520/MP/2020
612/MP/2020
613/MP/2020
and 730/MP/2020
30.09.2021 30.09.2021 Misc.

491

109/MP/2021 along with IA No. 37/2021
29.09.2021 30.09.2021 Misc.

490

342/MP/2019
with I.A. Nos. 35 of 2021
27.09.2021 30.09.2021 Misc.

489

648/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Meerut-Moga 765 kV S/C Transmission Line along with associated bays at Meerut and Moga 765/400 kV Sub-stations with 02 Numbers 240 MVAR line reactors (01 Number switchable and 01 Number non-switchable line reactor) each at Meerut and Moga under Northern Regional Strengthening Scheme-XXVI in Northern Region. Power Grid Corporation of India Limited
29.09.2021 30.09.2021 Transmission

488

581/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset-A comprising of Asset-I: 01 Number of 12ῼ Series Bus Reactor at Mandola 400/220 kV (POWERGRID) Sub-station along with associated bays and Asset-II: 01 Number of 12ῼ Series Bus Reactor at Ballabhgarh 400/220 kV (POWERGRID) Sub-station along with associated bays, 01 Number Series Line Reactor of 12ῼ in Dadri-Mandola 400 kV, Ckt.-I and 01 Number Series Line Reactor of 12ῼ in Dadri-Mandola 400 kV, Ckt.-II under the scheme Provision of Series Reactors in Northern Region. Power Grid Corporation of India Limited
28.09.2021 29.09.2021 Transmission

487

687/TT/2020
28.09.2021 29.09.2021 Transmission

486

597/MP/2020
28.09.2021 29.09.2021 Misc.

485

116/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset comprising of Asset-a: 400 kV D/C Kanpur-Auraiya transmission line along with bays at Auraiya, Asset-b: Two Numbers 400 kV bays at Kanpur Sub-station associated with 400 kV Kanpur-Auraiya transmission line, Asset-c: LILO of 400 kV D/C Bareilly-Mandola transmission line at Bareilly and Bus Reactor at Bareilly, Asset-d: LILO of 400 kV S/C Lucknow-Moradabad transmission line at Bareilly, Asset-e: LILO of 400 kV Lucknow (UPPCL)-Sultanpur (UPPCL) at Lucknow, Asset-f: 80 MVAR, 420 kV Bus Reactor at Lucknow Sub-station and Asset-g: 400 kV Bareilly-Moradabad transmission line along with associated bays under Northern Region System Strengthening Scheme-I in Northern Region. Power Grid Corporation of India Limited
27.09.2021 28.09.2021 Misc.

484

322/TT/2020
27.09.2021 28.09.2021 Misc.

483

11/SM/2021
27.09.2021 27.09.2021 Suo-Motu

482

208/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset comprising of Asset-I: Narendra (New Kudgi)-Narendra (Existing) 400 kV D/C Quad Transmission Line along with associated bays and equipment at Narendra (New Kudgi) Sub-station and Narendra (Existing) Sub-station, Asset-II: One Circuit of Narendra (New Kudgi)-Kolhapur (New) 765 kV D/C Transmission Line (initially charged at 400 kV) along with new 765/400 kV GIS sub-station at Narendra (New Kudgi) (initially charged at 400 kV) and extension of Kolhapur (New) Sub-station associated bays at Narendra (New Kudgi) and Kolhapur (New), Asset-III: Second Circuit of Narendra (New Kudgi)-Kolhapur (New) 765 kV D/C Transmission Line (initially charged at 400 kV) along with associated bays and equipment at Narendra (New Kudgi) and Kolhapur (New) and Asset-IV: LILO of 400 kV D/C Kolhapur-Mapusa at 400 kV Kolhapur GIS (New) along with associated bays and 125 MVAR Bus Reactor along with associated bays at 400 kV Kolhapur GIS (New) under the Transmission System associated with System Strengthening-XVII in Southern Region. Power Grid Corporation of India Limited
27.09.2021 27.09.2021 Transmission

481

150/TT/2020
26.09.2021 27.09.2021 Transmission

480

305/TT/2020
27.09.2021 27.09.2021 Transmission

479

179/MP/2019
27.09.2021 27.09.2021 Misc.

478

220/GT/2020
25.09.2021 26.09.2021 Generation

477

503/TT/2019
24.09.2021 25.09.2021 Transmission

476

190/MP/2021
24.09.2021 24.09.2021 Misc.

475

100/TT/2020
21.09.2021 22.09.2021 Transmission

474

207/TT/2020
21.09.2021 22.09.2021 Transmission

473

326/TT/2020
21.09.2021 21.09.2021 Transmission

472

39/TT/2021

Approval under Regulation-86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff of 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for in respect of Asset-1: Splitting of Dharamjaygarh Pool 765 kV Bus with necessary switching arrangement, installation of 765 kV 1x330 MVAr Bus Reactor along with associated bay at 765 kV Bus Section B of Dharamjaygarh Pool and installation of 420 kV 1x125 MVAr Bus Reactor along with associated bay at 400 kV Bus of Dharamjaygarh Pool, Asset-2: Splitting of Raigarh (Kotra) Pool 765 kV and 400 kV Bus with necessary switching arrangement, installation of 765 kV 1x240MVAr Bus Reactor along with associated bay at 765 kV Bus Section A of Raigarh (Kotra) Pool and installation of 765 kV Bus Reactor Bay at 765 kV Bus Section A of Raigarh (Kotra) Pool and installation of 420 kV, 1x125 MVAr Bus Reactor along with associated bay at 400 kV Bus Section A of Raigarh (Kotra) Pool & Asset-3: Installation of 765 kV 1X240 MVAr Bus Reactor along with associated bay at 765 kV Bus Section A of Champa Pool under Western Region System Strengthening Scheme (XVIII) in the Western Region. Power Grid Corporation of India Limited
20.09.2021 21.09.2021 Transmission

471

697/TT/2020
20.09.2021 20.09.2021 Transmission

470

418/TT/2019

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset I & II comprising of Asset-I (a) 765 kV S/C Seoni-Wardha Transmission Line with associated bays and Assset-I (b) 400 kV D/C Wardha-Akola Transmission Line with associated bays Asset-II: 400 kV D/C Akola-Aurangabad Transmission Line with associated bays at Akola and Aurangabad and 400 kV Bus Reactor at Wardha-Sub-station; and Combined Asset-III & IV comprising of Asset-III: 400/220 kV ICT-I at Wardha Sub-station with associated bays and Asset-IV: 400/220 kV ICT-II at Wardha Sub-station under Sipat-II Supplementary Transmission System in Western Region. Power Grid Corporation of India Limited
20.09.2021 20.09.2021 Transmission

469

94/MP/2019
459/MP/2019
460/MP/2019
461/MP/2019
462/MP/2019
463/MP/2019
20.09.2021 20.09.2021 Misc.

468

716/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset comprising of Asset-A: 400 kV D/C Kishenpur-Samba Transmission Line along with bays at both ends, 01 number 315 MVA, 400/220 kV ICT-I along with associated bays at Samba and 03 numbers 220 kV line bays; and Combined Asset-B consisting of Asset-B1: 400/220 kV, 315 MVA ICT-II at Samba Sub-station along with associated bays and three numbers 220 kV line bays and Asset-B2: 01 number 400 kV, 80 MVAR Bus Reactor at Samba Sub-station along with associated bays under the Transmission System associated with Northern Region Strengthening Scheme-XXII in Northern Region. Power Grid Corporation of India Limited
18.09.2021 19.09.2021 Transmission

467

524/MP/2020
17.09.2021 17.09.2021 Misc.

466

30/GT/2020
16.09.2021 17.09.2021 Generation

465

182/MP/2021
16.09.2021 16.09.2021 Misc.

464

126/MP/2016
16.09.2021 16.09.2021 Misc.

463

17/RP/2020
in
Petition No. 368/TT/2018
16.09.2021 16.09.2021 Review

462

172/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I : Conversion of Fixed Line Reactors (FLR) to Switchable Line Reactors (SLR) - (a) at Madurai end of Madurai-Karaikudi line, (b) at Madurai end of Madurai-Trichy line, (c) at Salem end of Salem-Hosur II line, (d) at Udumulpet end of Udumulpet-Salem II line, (e) at Thiruvalam end on both circuits of Nellore-Thiruvalam & II, (f) at Trichy end of Trichy-Nagapattinam-I line, (g) at Trichy end of Trichy-Nagapattinam-II line, (h) at Sriperumbadur end of Sriperumbadur-Chitoor line, (i) at Sriperumbadur end of Sriperumbadur-SV Chatram line; Asset-II : Conversion of 63 MVAR Fixed Line Reactor at Kochi end on both circuits of Kochi Trinulveli I & II into Switchable Line Reactor and Asset-III: (i) Hyderabad end for Gajwel-Hyderabad II, (ii) Nellore end for Nellore-Thiruvalem I & II, (iii) Gooty end for Kurnool-Gooty line under “Conversion of fixed line Reactors to Switchable Line Reactors” in Southern Region. Power Grid Corporation of India Limited
15.09.2021 15.09.2021 Transmission

461

43/TT/2020
15.09.2021 15.09.2021 Transmission

460

148/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for 2004-09, 2009-14 periods and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 220 kV Dimapur-Misa Transmission Line, LILO 220 kV D/C Kopili-Samaguri Transmission Line and LILO 132 kV D/C Mariani-Dimapur Transmission Line and Asset-Il: 132 kV D/C Doyang-Dimapur Transmission Line, 132 kV S/C Dimapur-lmphal Transmission Line with associated bays for Transmission System associated with Doyang HEP in the North Eastern Region. Power Grid Corporation of India Limited
15.09.2021 15.09.2021 Transmission

459

81/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset comprising of Asset-I: 400 kV Ramagundam-Hyderabad D/C Transmission Line, Asset-II: 400 kV S/C Hyderbad-Kurnool-Gooty Transmission Line, Asset-III: 400 kV Khammam-Nagarjunasagar Transmission Line along with associated bays and equipment and Asset-IV: 400 kV S/C Gooty-Neelmangla Transmission Line associated with Ramagundam Stage-III Transmission System in Southern Region. Power Grid Corporation of India Limited
13.09.2021 15.09.2021 Transmission

458

Corrigendum to Petition No. 213/MP/2019
14.09.2021 14.09.2021 Misc.

457

Corrigendum to Petition No. 211/MP/2019
14.09.2021 14.09.2021 Misc.

456

715/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 400 kV S/C Chamera II Pooling Station Transmission Line, 400/220 kV GIS Pooling Station at Rajera with 400/220 kV 315 MVA ICT-I and ICT-II under Chamera II System and 400 kV S/C Chamera II Pooling Station Transmission Line, 400/220 kV GIS Pooling Station at Rajera with 80 MVAr Bus Reactor at Pooling Point under Chamera II System in Northern Region. Power Grid Corporation of India Limited
13.09.2021 13.09.2021 Transmission

455

683/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 periods and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: Moga-Hissar D/C transmission line alongwith 220 kV Hissar-Hissar (BBMB) D/C line and 400 kV S/C Hissar-Bhiwani Ckt.-I transmission line alongwith associated bays at Hissar and Bhiwani Sub-stations and Asset-II: One bay at Bhiwani Sub-station for termination of one Ckt. of 400 kV Bawana-Bhiwani transmission line and 400 kV Bawana Bhiwani transmission line and 400 kV S/C of Hissar-Bawana transmission line upto Bhiwani alongwith associated bays at Hissar under Moga-Hissar-Bhiwani Transmission System in Northern Region. Power Grid Corporation of India Limited
12.09.2021 13.09.2021 Transmission

454

706/TT/2020
12.09.2021 13.09.2021 Transmission

453

696/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, CERC (Terms and Conditions of Tariff) Regulations, 2014 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff for 2019-24 tariff period in respect of the Combined Asset consisting of Asset-I: LILO of 400 kV Hissar-Bassi transmission line at Bhiwadi along with associated bays; Asset-II: 400 kV D/C Agra-Bhiwadi transmission line along with associated bays; Asset-III: 400 kV D/C Bhiwadi-Moga transmission line along with associated bays at Moga and Bhiwadi end including 02 numbers of 63 MVAR line reactors at Moga end and Asset-IV: 80 MVAR Bus Reactor at Bhiwadi Sub-station under Northern Region System Strengthening Scheme-V in Northern Region. Power Grid Corporation of India Limited
12.09.2021 13.09.2021 Transmission

452

506/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset comprising of Asset-1: 80 MVAR bus reactor along with Nellore 400 kV bay extension; Asset-2: 315 MVA ICT with Cuddapah 400 kV bay extension; Asset-3: 315 MVA ICT with Gooty Extension and IInd 3X167 MVA auto transformer at Kolar and switching arrangement for reactor at Somanahalli; Asset-4: 315 MVA ICT with Gazuwaka Sub-station bay extension; Asset-5: 315 MVA ICT with Munirabad Sub-station bay extension and Asset 6: 315 MVA ICT with Khammam Sub-station bay extension under System Strengthening Scheme-V in Southern Region. Power Grid Corporation of India Limited
12.09.2021 13.09.2021 Transmission

451

498/TT/2019
12.09.2021 13.09.2021 Transmission

450

472/TT/2019
12.09.2021 13.09.2021 Transmission

449

86/TT/2020
11.09.2021 12.09.2021 Transmission

448

60/MP/2019
12.09.2021 12.09.2021 Misc.

447

46/TT/2014
11.09.2021 11.09.2021 Transmission

446

137/MP/2019
11.09.2021 11.09.2021 Misc.

445

62/MP/2021
11.09.2021 11.09.2021 Misc.

444

13/RP/2021
in
Petition No 348/MP/2018
10.09.2021 10.09.2021 Review

443

14/RP/2021
in
Petition No 328/MP/2018
10.09.2021 10.09.2021 Review

442

9/RP/2021 in Petition No. 210/MP/2019
And
10/RP/2021 in Petition No. 209/MP/2019
08.09.2021 08.09.2021 Review

441

126/AT/2021
08.09.2021 08.09.2021 Adoption

440

377/MP/2019
07.09.2021 08.09.2021 Misc.

439

31/GT/2020
06.09.2021 07.09.2021 Generation

438

504/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-1: Re-conductoring of lmphal (POWERGRID)-Yurembam (Imphal Sub-station-Manipur) 132 kV S/c line with high capacity conductor [HTLS of capacity equivalent to that of Single ACSR Moose: 798 A] and Upgradation/ modification of 132 kV line bay equipment for Imphal (POWERGRID) - Yurembam (Imphal Sub-station- Manipur) 132 kV S/c (HTLS) line, Asset-2: 315 MVA, 400/132kV, ICT-III along with associated bays in GIS bays at 400kV Silchar Sub-station, Asset- 3: 200 MVA, 400/132kV Spare ICT at 400kV Silchar Sub-station, Asset 4: 31.5MVAR, 220 kV, Bus Reactor along with associated bay at Mokokchung (POWERGRID) Sub-station, Asset 5: 160 MVA, 220/132kV, lCT (Spare) at Kopili Sub-station and 50MVA, 132/33kV, lCT (Spare) at Nirjuli Sub-station, Asset- 6: lX80MVAr, 420 kV Reactor (Spare) and 1X63 MVAr 420 kV Reactor (Spare) at Bongaigaon Sub-station), Asset-7: 315MVA, 400/220kV, ICT (Spare) at Misa Sub-station under “North Eastern Region Strengthening Scheme-VII (NERSS-VII)” in North-Eastern Region. Power Grid Corporation of India Limited
05.09.2021 06.09.2021 Transmission

437

53/TT/2015
04.09.2021 05.09.2021 Transmission

436

518/MP/2020
05.09.2021 05.09.2021 Misc.

435

142/MP/2019
05.09.2021 05.09.2021 Misc.

434

492/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the Combined Asset comprising of Asset-I: Extension of 400/220 kV Kolhapur (MSEB) Sub-station, Asset-II: 220 kV D/C Vapi-Magarwada Transmission Line along with associated bays and Asset-III: 220 kV D/C Vapi-Khardpada Transmission Line along with associated bays) under WRSS-III Transmission System in Western Region. Power Grid Corporation of India Limited
03.09.2021 04.09.2021 Transmission

433

383/TT/2019
03.09.2021 04.09.2021 Transmission

432

193/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Assets consisting of Asset-I: 400 kV 125 MVAr Bus Reactor with associated bays at Abdullapur and Asset-II: 400 kV D/C Abdullapur-Sonepat Transmission Line alongwith 400 kV associated bays at Abdullapur and Sonepat Sub-station under “System Strengthening in Northern Region Grid for Karcham Wangtoo HEP” in the Northern Region. Power Grid Corporation of India Limited
02.09.2021 03.09.2021 Transmission

431

300/GT/2020
02.09.2021 02.09.2021 Generation

430

48/MP/2021
01.09.2021 01.09.2021 Misc.

429

105/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations,1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 of transmission tariff from dates of commercial operation to 31.3.2019 in respect of Asset-I: LILO of Agra-Bharatpur 220 kV S/C Line at Agra (POWERGRID) Sub-station along with line bays, Asset-II: 1X315 MVA 400/220 kV ICT (Shifted from Ballabhgarh Sub-station) along with ICT bays at Agra (POWERGRID) Sub-station, Asset-III: 1X315 MVA, 400/220 kV ICT along with associated bays at Kaithal Sub-station (Spare ICT from Ballabhgarh) and Asset-IV: 2 numbers 220 kV bays at Kaithal Sub-station under Northern Region System Strengthening Scheme-XXXIV in Northern Region. Power Grid Corporation of India Limited
31.08.2021 31.08.2021 Transmission

428

326/TT/2019
31.08.2021 31.08.2021 Transmission

427

22/RP/2020 alongwith IA No. 48 of 2020
in
Petition No. 69/MP/2019
31.08.2021 31.08.2021 Review

426

355/TT/2019
31.08.2021 31.08.2021 Transmission

425

121/TT/2019
31.08.2021 31.08.2021 Transmission

424

135/MP/2021
31.08.2021 31.08.2021 Misc.

423

Review Petition No. 7/RP/2020
in
Petition No. 222/MP/2017
30.08.2021 30.08.2021 Review

422

58/MP/2021
30.08.2021 30.08.2021 Misc.

421

Corrigendum to 366/MP/2019
27.08.2021 27.08.2021 Misc.

420

315/TT/2020
26.08.2021 27.08.2021 Transmission

419

136/TL/2021
141/AT/2021
137/TL/2021
138/AT/2021
139/TL/2021
140/AT/2021
26.08.2021 26.08.2021 Licence (Transmission)

418

Corrigendum to 22/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Vindhyachal Pooling Station and 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Jabalpur Pooling Station for 765 kV D/C Vindhyachal Pooling Station-Jabalpur Pooling Station Transmission Line (TBCB) under Sub-station Extensions for Transmission System associated with Vindhyachal-V Project of NTPC (Part-B) in the Western Region. Power Grid Corporation of India Ltd.
24.08.2021 25.08.2021 Transmission

417

223/TT/2020 and 488/TT/2019
24.08.2021 24.08.2021 Transmission

416

Corrigendum to Petition No. 269/TT/2020
23.08.2021 24.08.2021 Misc.

415

536/MP/2020 along with IA No. 71/2020, IA No. 73/2020 and IA No. 2/2021 158/MP/2020 along with IA No. 35/2020 373/MP/2020 454/MP/2019 along with IA No. 19/2020 457/MP/2019 along with IA No. 18/2020 500/MP/2019 along with IA No. 20/2020
20.08.2021 21.08.2021 Misc.

414

455/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1 : LILO of both circuits of Bamnauli-Samaypur 400 kV line at Tughlakabad along with associated bays; Asset-2 : 400/220 kV, 2x500 MVA ICT-I and II at 400/220 kV GIS at Tughlakabad Sub-station alongwith associated bays & 400 kV, 125 MVAR Bus reactor at GIS Tughlakabad Sub-station alongwith associated bays, Asset-3 : 400/220 kV, 500 MVA ICT-III at 400/220 kV GIS at Tughlakabad Sub-station alongwith associated bays and Asset-4 : 400/220 kV, 500 MVA ICT-IV at 400/220 kV GIS at Tughlakabad Sub-station alongwith associated bays under “Creation of 400/220 kV Sub-stations in NCT of Delhi during 12th plan period (Part-B1)”in Northern Region. Power Grid Corporation of India Ltd.
19.08.2021 21.08.2021 Transmission

413

468/TT/2020
19.08.2021 19.08.2021 Transmission

412

104/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and determination of transmission tariff for the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for Asset-I: Extension of Kota 400/220 kV Sub-station (POWERGRID)-Shifting of 400 kV, 50 MVAR line reactor from Merta to Kota Sub-station for its use as Bus Reactor and 400 kV Bus reactor bay; Asset-II: Extension of Koteshwar 400/220 kV Sub-station (THDC)-installation of 400 kV, 125 MVAR bus reactor along with associated bay at Koteshwar; Asset-III: Extension of Dehar 400/220 kV Sub-station (BBMB)-installation of 400 kV, 1x63 MVAR bus Reactor-II through a single 400 kV hybrid GIS bay and Asset-IV: Replacement of 250 MVA ICT with 4x105MVA, 1-Phase ICT & retrofitting of associated 400/220 kV bay equipment and protection relays at Dehar under “Strengthening Scheme in Northern Region”. Power Grid Corporation of India Limited
17.08.2021 18.08.2021 Transmission

411

30/RP/2020
in
Petition No. 168/MP/2019
16.08.2021 17.08.2021 Review

410

70/TD/2021
16.08.2021 16.08.2021 Licence

409

I.A No. 48/2021
in
Petition No. 178/GT/2017
14.08.2021 15.08.2021 Misc.

408

161/MP/2020
14.08.2021 14.08.2021 Misc.

407

06/SM/2021
13.08.2021 13.08.2021 Suo-Motu

406

18/RP/2020
in Petition No. 10/TT/2019
11.08.2021 12.08.2021 Review

405

45/MP/2019 along with
IA No. 24/2021
10.08.2021 12.08.2021 Misc.

404

530/MP/2020
along with I.A. No. 45/IA/2020
11.08.2021 12.08.2021 Misc.

403

86/MP/2021
10.08.2021 10.08.2021 Misc.

402

269/TT/2020
09.08.2021 10.08.2021 Transmission

401

162/MP/2020
07.08.2021 07.08.2021 Misc.

400

203/MP/2019
04.08.2021 07.08.2021 Misc.

399

9/RP/2019
in
2/SM/2019
06.08.2021 06.08.2021 Review

398

8/RP/2021
in
191/MP/2019
06.08.2021 06.08.2021 Review

397

109/MP/2019
05.08.2021 05.08.2021 Misc.

396

10/SM/2021
05.08.2021 05.08.2021 Suo-Motu

395

108/MP/2019
05.08.2021 05.08.2021 Misc.

394

356/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset 1: Combined Asset of WRSS-II Set A (Part 1), Asset 2: Combined Asset of WRSS-II Set A (Part 2), Asset 3: Combined Asset of WRSS-II Set B, Asset 4: Combined Asset of WRSS-II Set C, Asset 5: Combined Asset of WRSS-II Set D (Part 1) and Asset 6: Combined Asset of WRSS-II Set D (Part 2) under Western Regional System Strengthening Scheme-II in Western Region. Power Grid Corporation of India Ltd.
05.08.2021 05.08.2021 Transmission

393

176/MP/2020
04.08.2021 04.08.2021 Misc.

392

147/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff 2004-09 tariff period, 2009-14 tariff period and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisting of Asset-i: 400 kV S/C Jalandhar-Amritsar line along with associated bays at Amritsar and Jalandhar, ICT-I along with associated bays at Amritsar Sub-station and 220 kV Verpal feeder bays I and Il at Amritsar Sub-station; Asset-ii: 315 MVA 400/220 kV ICT-II at Gorakhpur S/S along with associated bays (includes 2 Number 220 kV Line Bays) and Asset-iii: LILO of Bawana- Bhiwani line along with associated bays at Bahadurgarh, 315 MVA ICT-I along with associated bays at Bahadurgarh Sub-station and 220 kV Nuna Majra Feeder Bays at Bahadurgarh Sub-station under Transmission System associated with System Strengthening Scheme (Formerly Tala Supplementary Scheme) in the Northern Region. Power Grid Corporation of India Ltd.
03.08.2021 03.08.2021 Transmission

391

260/MP/2020
03.08.2021 03.08.2021 Misc.

390

29/RP/2020 alongwith IA No. 59 of 2020
27.07.2021 02.08.2021 Review

389

20/RP/2020
and 25/RP/2020
in
Petition No. 446/MP/2019
02.08.2021 02.08.2021 Review

388

155/MP/2021
01.08.2021 02.08.2021 Misc.

387

110/TD/2021
31.07.2021 31.07.2021 Licence

386

114/TD/2021
31.07.2021 31.07.2021 Licence

385

127/TD/2021
31.07.2021 31.07.2021 Licence

384

1/RP/2021
in Petition No. 96/TT/2019
31.07.2021 31.07.2021 Review

383

5/RP/2021
in Petition No. 266/TT/2018
along with I.A. No. 18/2021 and IA No.19/2021
31.07.2021 31.07.2021 Review

382

21/RP/2020
in Petition No. 446/MP/2019
31.07.2021 31.07.2021 Review

381

152/TD/2021
31.07.2021 31.07.2021 Licence

380

16/TT/2020
31.07.2021 31.07.2021 Transmission

379

67/MP/2020
and
515/MP/2020
30.07.2021 30.07.2021 Misc.

378

146/MP/2019
26.07.2021 29.07.2021 Misc.

377

28/RP/2020 with I.A No. 53/IA/2020
in
Petition No. 308/GT/2018
27.07.2021 28.07.2021 Review

376

635/RC/2020
&
59/MP/2021
27.07.2021 27.07.2021 Misc.

375

601/GT/2020
27.07.2021 27.07.2021 Generation

374

477/MP/2020
26.07.2021 26.07.2021 Misc.

373

650/TT/2020
26.07.2021 26.07.2021 Transmission

372

31/RP/2020
in
Petition No. 187/AT/2019
24.07.2021 25.07.2021 Review

371

26/RP/2020 along with IA No.52/2020
In
IA No.69/2019 in Petition No. 202/MP/2018
24.07.2021 25.07.2021 Review

370

140/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: 315 MVA, 400/220/33 kV 3-phase Spare ICT at Raipur Sub-station; Asset-II: 315 MVA, 400/220/33 kV 3-Phase Spare ICT at Pune Sub-station; Asset-III: 420 kV, 80 MVAR 3-Phase Shunt Reactor at Wardha Sub-station; Asset-IV: 315 MVA, 400/220/33 kV 3-Phase Spare Transformer at Dehgam Sub-station; Asset-V: 315 MVA, 400/220/33 kV 3-Phase Spare Transformer at Jabalpur; Asset-VI: 400 kV, 125 MVAR 3-Phase Spare Reactor at Itarsi under Provision of Spare ICTs and Reactors in the Western Region. Power Grid Corporation of India Ltd.
22.07.2021 22.07.2021 Transmission

369

480/TT/2020
22.07.2021 22.07.2021 Transmission

368

123/TT/2020
21.07.2021 22.07.2021 Transmission

367

I.A No.68/IA/2018
and
I.A No.72/IA/2018
in
Petition No. 91/MP/2018
20.07.2021 21.07.2021 Adoption

366

22/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Vindhyachal Pooling Station and 2 Numbers 765 kV line Bays along with 2 Numbers 330 MVAr Line Reactor at Jabalpur Pooling Station for 765 kV D/C Vindhyachal Pooling Station-Jabalpur Pooling Station Transmission Line (TBCB) under Sub-station Extensions for Transmission System associated with Vindhyachal-V Project of NTPC (Part-B) in the Western Region. Power Grid Corporation of India Ltd.
Corrigendum date: 24.08.2021
20.07.2021 21.07.2021 Transmission

365

77/MP/2021
20.07.2021 20.07.2021 Misc.

364

194/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of asset (A) LILO of Nagarjunasagar- Gooty 400 kV S/C line at Kurnool (New) Sub-station, (B) Kurnool (New) – Kurnool (APTRANSCO) 400 kV D/C quad line, (C) Establishment of new 765/400 kV Sub-station at Kurnool with 2x1500 MVA transformers, (D) Extension of Kurnool (APTRANSCO) Sub-station and (E) 1x240 MVAR bus reactor at Kurnool (New) Sub-station under “Transmission System associated with Krishnapatnam UMPP Part-C1” in Southern Region. Power Grid Corporation of India Ltd.
19.07.2021 20.07.2021 Transmission

363


717/MP/2020

19.07.2021 20.07.2021 Misc.

362

99/TL/2021
15.07.2021 15.07.2021 Licence (Transmission)

361

Corrigendum to Petition No. 546/MP/2020

Petition for approval under Section 17 (3) and (4) of the Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of Petitioner No 1 in favour of Petitioner No. 2 / Security Trustee pursuant to the amended and restated Facility Agreement dated 12.10.2020 executed between Petitioner No. 1, REC Limited/ Lender’s Agent and the Lenders, by way of mortgage/ hypothecation/ assignment on project assets for benefit of the Lenders, and for their subsequent transferees, assignees, novatees thereof and any refinancing lenders to the Project, for development, construction and operation of the independent transmission project for “WRSS-21 (Part-B) – Transmission System strengthening for reliving over loadings observed in Gujarat Intra-state system due to RE injections in Bhuj-PS. 1. Lakadia-Vadodara Transmission Project Limited
2. Catalyst Trusteeship Limited
15.07.2021 15.07.2021 Misc.

360

218/TT/2020
10.07.2021 10.07.2021 Transmission

359

1/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 400 kV D/C Vijayawada-Nellore Transmission Line, 400 kV D/C Nellore-Sriperumbudur Line, New 400 kV Switching station at Nellore, extension of Vijayawada and Sriperumbudur Sub-station with associated bays under System Strengthening in Southern Region. Power Grid Corporation of India Ltd.,
10.07.2021 10.07.2021 Transmission

358

101/MP/2021
10.07.2021 10.07.2021 Misc.

357

494/MP/2020
10.07.2021 10.07.2021 Misc.

356

106/TD/2021
09.07.2021 09.07.2021 Licence

355

IA No. 54/2020, 41/2021 and 55/2021
in
Suo Motu Petition No. 7/SM/2020
09.07.2021 09.07.2021 Misc.

355

487/TT/2019
07.07.2021 08.07.2021 Transmission

354

9/SM/2021
08.07.2021 08.07.2021 Suo-Motu

353

8/SM/2021
08.07.2021 08.07.2021 Suo-Motu

352

383/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset comprising of Asset-I: 1 x315 MVA, 400/220 kV Transformer at Nalagarh; Asset-II: 1x315 MVA, 400/220 kV Transformer at Abdullahpur; Asset III: 1x500 MVA, 400/220 kV Transformer at Amritsar; and Asset IV: 4x105 MVA, 400/220 kV Single Phase Transformers at Kishenpur associated with Augmentation of Transformation Capacity (Part-I) in Northern and Eastern Region. Power Grid Corporation of India Ltd.
07.07.2021 07.07.2021 Transmission

351

485/TT/2019
07.07.2021 07.07.2021 Transmission

350

290/GT/2019
07.07.2021 07.07.2021 Generation

349

358/TT/2019
06.07.2021 07.07.2021 Transmission

348

389/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset-1 comprising of 400/220 kV Damoh Sub-station along with bays and 400 kV 63 MVAR Bus Reactor along with associated 400 kV bay at Damoh Sub-station and Combined Asset-2 comprising of 400/220 kV ICT-I at Damoh Sub-station along with bays and 400/220 kV, 315 MVA ICT-II along with associated 400 kV and 220 kV bays at Damoh Sub-station under WRSS-IV Transmission Scheme in Western Region. Power Grid Corporation of India Ltd.
06.07.2021 07.07.2021 Transmission

347

306/TT/2019
06.07.2021 07.07.2021 Transmission

346

304/TT/2019
06.07.2021 07.07.2021 Transmission

345

I.A No.50/2021 In
Petition No. 484/MP/2020
And
Petition No. 484/MP/2020
02.07.2021 02.07.2021 Misc.

344

491/TT/2019
02.07.2021 02.07.2021 Transmission

343

375/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: Angul–Jharsuguda (Sundargarh) 765 kV 02nd D/C line with line reactors (switchable) & termination bays at Angul Sub-station and line reactors at Jharsuguda Sub-station, Asset-2: Jharsuguda (Sundargarh) – Dharamjaygarh 765 kV 02nd D/C line with termination bays at Jharsuguda Sub-station and Asset-3: 765 kV, 02x330 MVAR Switchable Line Reactors charged as Bus Reactors at Dharamjaygarh Sub-station (for both Ckts of Jharsuguda (Sundargarh) Dharamjaygarh 765 kV 02nd D/C line) under “East Coast Energy Pvt. Ltd. and NCC Power Projects Ltd. LTOA Generation Projects in Srikakulam Area Part-B” in Eastern and Western Region. Power Grid Corporation of India Ltd.
02.07.2021 02.07.2021 Transmission

342

461/TT/2020
01.07.2021 02.07.2021 Transmission

341

60/MP/2021 along with IA No. 12/2021
And
65/MP/2021 along with IA No. 31/2021 and IA No. 33/2021
01.07.2021 01.07.2021 Misc.

340
I.A No.49/2021
In
Petition No. 483/MP/2020
And
Petition No. 483/MP/2020
01.07.2021 01.07.2021 Misc.

339

495/MP/2020
30.06.2021 30.06.2021 Misc.

338

439/MP/2019
30.06.2021 30.06.2021 Misc.

337

659/TT/2020
30.06.2021 30.06.2021 Transmission

336

5/TT/2020
30.06.2021 30.06.2021 Transmission

335

105/TD/2021
29.06.2021 29.06.2021 Licence

334

358/TT/2020
29.06.2021 29.06.2021 Transmission

333

415/TT/2019
29.06.2021 29.06.2021 Transmission

332

405/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing up of transmission tariff of 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset comprising of Asset-A1: 765 kV Line Bays and 3x80 MVAR line reactor at 765 kV Vadodara GIS for Vadodara-Dhule transmission line (IPTC); Asset-B1: 765 kV Line Bays and 3x80 MVAR Switchable line reactor at 765 kV Jabalpur Pooling Sub-station (for 765 kV S/C Jabalpur-Bhopal line); Asset-B2: 765 kV Line Bays and 3x80 MVAR line reactor at 765 kV Indore Sub-station (for 765 kV S/C Bhopal-Indore line); and Asset-B3: Extension of 765 kV Aurangabad Sub-station for 765 kV S/C line bay under “Line bays and Reactor Provisions at POWERGRID Sub-stations associated with System Strengthening for Western Region”. Power Grid Corporation of India Ltd.
28.06.2021 29.06.2021 Transmission

331

4/RP/2021 in Petition No. 68/MP/2017
28.06.2021 28.06.2021 Review

330

IA No.64/2020 In Petition No. 614/MP/2020
28.06.2021 28.06.2021 Misc.

329

114/TD/2021
28.06.2021 28.06.2021 Licence

328

110/TD/2021
28.06.2021 28.06.2021 Licence

327

27/RP/2020 in 57/AT/2020
28.06.2021 28.06.2021 Review

326

351/TT/2019
27.06.2021 28.06.2021 Transmission

325

271/GT/2019
26.06.2021 26.06.2021 Transmission

324

589/TT/2020
and
590/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Section 79 of the Electricity Act 2003, truing up of transmission tariff of 2014-19 tariff period under Regulation 8 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under Regulation 8 (1) under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 400 kV Double Circuit Siliguri-Purnea Transmission Line, 400 kV Double Circuit Purnea-Muzaffarpur Transmission Line and 220 kV Double Circuit Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in Eastern Region associated with Tala Hydro Electric Project, East-North Interconnector and Northern Region Transmission System. Powerlinks Transmission Limited
25.06.2021 25.06.2021 Generation

323

42/TD/2021
23.06.2021 23.06.2021 Licence

322

472/GT/2014
474/GT/2014
21.06.2021 22.06.2021 Generation

321

23/RP/2020 in Petition No. 188/AT/2020
22.06.2021 22.06.2021 Review

320

211/MP/2011
20.06.2021 20.06.2021 Misc.

319

22/RP/2019 in Petition No. 255/TT/2018
20.06.2021 20.06.2021 Review

318

I.A No.43/2021 In Petition No. 626/MP/2020
19.06.2021 19.06.2021 Misc.

317

386/TT/2019
19.06.2021 19.06.2021 Transmission

316

181/MP/2020 alongwith IA No. 14 of 2021
17.06.2021 19.06.2021 Misc.

315

502/GT/2020
17.06.2021 17.06.2021 Generation

314

399/MP/2019
17.06.2021 17.06.2021 Misc.

313

93/MP/2021
17.06.2021 17.06.2021 Misc.

312

263/TT/2019
16.06.2021 16.06.2021 Transmission

311

465/TT/2020
16.06.2021 16.06.2021 Transmission

310

453/MP/2019
16.06.2021 16.06.2021 Misc.

309

555/MP/2020
14.06.2021 15.06.2021 Misc.

308

81/TT/2016
13.06.2021 15.06.2021 Transmission

307

493/TT/2019
13.06.2021 15.06.2021 Transmission

306

116/MP/2021
12.06.2021 12.06.2021 Misc.

305

98/AT/2021
12.06.2021 12.06.2021 Adoption

304

366/MP/2019

Petition under Section 79(1)(b) read with Section 79(1)(f) of the Electricity Act, 2003 and Article 10 of the Power Purchase Agreements both dated 01.11.2013 entered into between the Petitioner and the Respondents, seeking approval of the cost to be incurred by the Petitioner on account of change in law, for installation/retrofit of ‘Electrostatic Precipitators’ (ESP), installation of Flue Gas Desulphurisation (FGD), installation of low NOx burners, providing Over Fire Air (OFA) and any other measures for compliance of the notification dated 07.12.2015 issued by the Ministry of Environment, Forests and Climate Change, Government of India in respect of Thermal Power Plants installed/commissioned after 01.01.2003 and before 31.12.2016. D.B. Power Limited (DBPL),
Corrigendum date:- 27.08.2021
11.06.2021 11.06.2021 Misc.

303

376/MP/2019
10.06.2021 10.06.2021 Misc.

302

Corrigendum to Petition 378/MP/2019
10.06.2021 10.06.2021 Misc.

301

490/GT/2020
09.06.2021 09.06.2021 Generation

300

10/TT/2020
09.06.2021 09.06.2021 Transmission

299

471/TT/2020
09.06.2021 09.06.2021 Transmission

298

651/TT/2020
09.06.2021 09.06.2021 Transmission

297

125/TT/2020
09.06.2021 09.06.2021 Transmission

296

115/MP/2021
09.06.2021 09.06.2021 Misc.

295

559/MP/2020
09.06.2021 09.06.2021 Misc.

294

400/MP/2019
09.06.2021 09.06.2021 Misc.

293

464/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-1: 400 kV D/C Koteshwar HEP – Koteshwar Pooling Station Circuit – I&II alongwith associated bays, Asset-2: LILO of Circuit-I of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays, Asset-3: LILO of Circuit-II of 765 kV Tehri-Meerut Line at Koteshwar Pooling Station along with associated bays and Asset-4: 50% series compensation at Meerut (Extension) on Tehri Pooling point (Koteshwar) – Meerut 765 kV 2* S/C Lines (Charged at 400 kV) under “Transmission System associated with Koteshwar HEP” in the Northern Region. Power Grid Corporation of India Ltd.
08.06.2021 09.06.2021 Transmission

292

458/TT/2020
08.06.2021 08.06.2021 Transmission

291

101/TT/2020
08.06.2021 08.06.2021 Transmission

290

61/TT/2020
08.06.2021 08.06.2021 Transmission

289

273/GT/2019
07.06.2021 07.06.2021 Transmission

288

99/TL/2021
05.06.2021 05.06.2021 Licence (Transmission)

287

23/RP/2019 in Petition No. 171/TT/2018
05.06.2021 05.06.2021 Review

286

546/MP/2020

Petition for approval under Section 17 (3) and (4) of the Electricity Act, 2003 for creation of security interest over all the movable and immovable assets of Petitioner No 1 in favour of Petitioner No. 2 / Security Trustee pursuant to the amended and restated Facility Agreement dated 12.10.2020 executed between Petitioner No. 1, REC Limited/ Lender’s Agent and the Lenders, by way of mortgage/ hypothecation/ assignment on project assets for benefit of the Lenders, and for their subsequent transferees, assignees, novatees thereof and any refinancing lenders to the Project, for development, construction and operation of the independent transmission project for “WRSS-21 (Part-B) – Transmission System strengthening for reliving over loadings observed in Gujarat Intra-state system due to RE injections in Bhuj-PS. 1. Lakadia-Vadodara Transmission Project Limited
2. Catalyst Trusteeship Limited

Corrigendum Order dated:- 15.07.2021
05.06.2021 05.06.2021 Misc.

285

108/MP/2021
05.06.2021 05.06.2021 Misc.

284

29/GT/2020
04.06.2021 04.06.2021 Generation

283

I.A. No. 32/2021 in Petition No. 92/MP/2021
04.06.2021 04.06.2021 Misc.

282

132/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the period from 1.4.2019 to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Asset consisting of Asset-I: 400/220 kV, 315 MVA, ICT-1 along with associated bays, 400 kV 80 MVAR Bus Reactor along with associated bays, LILO of one circuit of 400 kV D/C Parbati-Amritsar Transmission Line at Hamirpur along with associated bays and Line reactor at Hamirpur GIS Sub-station; and Asset-II: 1 number of 400/220 kV, 315 MVA ICT-II along with associated bays at Hamirpur Sub-station under “Northern Region System Strengthening Scheme-XX” (NRSSS-XX) in Northern Region Power Grid Corporation of India Ltd
02.06.2021 02.06.2021 Transmission

281

721/AT/2020
02.06.2021 02.06.2021 Adoption

280

422/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 2 numbers 765 kV Line bays along with 2x240 MVAR Switchable Line reactors each at Srikakulam & Angul for termination of both circuit of 765 kV D/C Srikakulam-Angul Transmission line, and 1x330 MVAR 765 kV Bus Reactor at Srikakulam under Common System associated with East Coast Energy Private Limited and NCC Power Projects Limited LTOA generation projects in Srikakulam Area-Part-C in the Southern Region and Eastern Region. Power Grid Corporation of India Limited
01.06.2021 01.06.2021 Transmission

279

356/TT/2019
31.05.2021 31.05.2021 Transmission

278

89/TL/2021
31.05.2021 31.05.2021 Licence (Transmission)

277

378/MP/2019
31.05.2021 31.05.2021 Misc.

276

374/MP/2019
31.05.2021 31.05.2021 Misc.

275

264/TT/2019
31.05.2021 31.05.2021 Transmission

274

380/MP/2018 With IA No.8/2020
31.05.2021 31.05.2021 Misc.

273

351/MP/2018 With IA No. 4/2020
31.05.2021 31.05.2021 Misc.

272

413/TT/2019
30.05.2021 30.05.2021 Transmission

271

591/MP/2020
30.05.2021 30.05.2021 Misc.

270

469/TT/2019
29.05.2021 29.05.2021 Transmission

269

449/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: LILO of Patiala-Hissar line at Kaithal Sub-Station along with associated bays; Asset-II: 400 kV D/C Patiala-Ludhiana line along with associated bays at Patiala and Ludhiana Sub-station; Asset-III: LILO of 1st Circuit of 400 kV D/C Nathpa Jhakri-Nalagarh (Triple Snowbird) Line at Rampur and Asset IV: LILO of 2nd ckt. of 400 kV Natpha Jhakri-Nalagarh (Triple Snowbird) line at Rampur covered under “Transmission System associated with Rampur HEP” in the Northern Region. Power Grid Corporation of India Limited
29.05.2021 29.05.2021 Transmission

268

7/SM/2021
29.05.2021 29.05.2021 Suo Motu

267

476/TT/2019
28.05.2021 28.05.2021 Transmission

266

84/TT/2019
27.05.2021 27.05.2021 Transmission

265
Corrigendum to Petition No.
335/MP/2020
519/MP/2020
509/MP/2020
516/MP/2020
338/MP/2020
521/MP/2020
526/MP/2020
512/MP/2020
339/MP/2020
26.05.2021 27.05.2021 Misc.

264

611/MP/2020
24.05.2021 24.05.2021 Misc.

263

76/TD/2021
23.05.2021 23.05.2021 Licence

262

361/TT/2019
21.05.2021 21.05.2021 Transmission

261

387/TT/2019
20.05.2021 20.05.2021 Transmission

260

124/TT/2020
20.05.2021 20.05.2021 Transmission

259

14/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014, and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisting of Asset-a: 50 MVAR Bus reactor at Hisar Sub-station; Asset-b: LILO of 400 kV Moga-Hissar line, ICT-I at Fatehabad Sub-station, 4 nos. 220 kV line bays (feeders from Fatehabad-1 and Fatehabad-2) and 50 MVAR bus reactor bay along with associated bays at Fatehabad Sub-station; Asset-c: Total upstream system including Malerkotla-Ludhiana-Jalandhar transmission line along with associated bays at Ludhiana Sub-station and Malerkotla Sub-station; Asset-d: ICT-I along with associated bays at Ludhiana Sub-station; Asset-e: ICT-II along with associated bays at Ludhiana Sub-station; Asset-f: 315 MVA, 400/220 kV ICT-II along with associated bays at 400/220 kV Fatehabad Sub-station under Northern Region System Strengthening Scheme-III (NRSSS-III) in Northern Region. Power Grid Corporation of India Ltd.
20.05.2021 20.05.2021 Transmission

258

312/TT/2019
20.05.2021 20.05.2021 Transmission

257

8/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisiting of Asset-I: 400 kV D/C Agra-Bassi Transmission Line with associated bays; Asset-II: 3x105 MVA 400/220/33 kV ICT-III along with associated bays at Wagoora Sub-station; Asset-III: 220 kV Zainkot III & IV bays at Wagoora Sub-Station and Asset-IV: 40% FSC on Allahabad-Mainpuri 400 kV D/C line at Mainpuri under Transmission System associated with Northern Region System Strengthening Scheme-II in Northern Region. Power Grid Corporation of India Ltd.
17.05.2021 17.05.2021 Transmission

256

59/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of Asset-I: a) Both circuits of one LILO D/C portion of Simhadri-Vijayawada 400 kV Line at Vemagiri-I (AP) shall be LILOed at Vemagiri-II (PG) (D/C Portion and multi-circuit Portion) along with associated bays at Vemagiri-II (PG); b) Both circuits of Second LILO D/C portion of Simhadri-Vijayawada 400 kV Line at Vemagiri-I (AP) shall be looped in at Vemagiri-II (PG). There shall be NO LOOP OUT. The open section of 400 kV D/C line from Vemagiri-I (AP) shall be used for termination of kV Kota Line along with associated bays at Vemagiri-II (PG); c) Shifting of 2 numbers of 63 MVAr reactors from Gazuwaka to Vemagiri-II (PG) for utilization on Simhadri-II-Vemagiri-II (PG) 400 kV D/C Line under Removal of Constraints in 400 kV Bays Extensions at 400 kV Vemagiri Sub-station in Southern Region. Power Grid Corporation of India Ltd.
17.05.2021 17.05.2021 Transmission

255

495/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 220 kV D/C Unchahar-Kanpur transmission line-I with associated bays, Asset-II: 220 kV D/C Unchahar-Kanpur transmission line-II with associated bays, and Asset-III: LILO of one circuit of 220 kV D/C Panki-Mainpuri line-II of transmission system associated with Unchahar Stage-II in the Northern Region. Power Grid Corporation of India Ltd.
14.05.2021 14.05.2021 Transmission

254

73/MP/2020 alongwith
IA No. 21 of 2021

Petition under Section 79(1)(b) read with Section 79(1)(f) of the Electricity Act, 2003 for (i) approval of ‘Change in Law’; and (ii) consequential relief to compensate for the increase in capital cost due to introduction of the Central Goods and Services Tax Act, 2017, the Integrated Goods and Services Tax Act, 2017 and the State Goods and Services Tax Acts enacted by respective states, and (b) imposition and introduction of Safe Guard Duty on the import of solar cells (whether or not assembled in modules or panels) by way of Notification No.01/2018- Customs SG dated 30.07.2018 issued by the Department of Revenue, Ministry of Finance, in terms of Article 12 read with Article 16.3.1 of the Power Purchase Agreements dated 06.10.2017 between SB Energy One Private Limited and Solar Energy Corporation of India Limited. SB Energy One Private Limited
13.05.2021 14.05.2021 Misc.

253

354/TT/2019
14.05.2021 14.05.2021 Transmission

252

509/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 2 Nos. of 400 kV GIS line bays at Nizamabad (PG) for termination of Nizamabad-Yeddumailaram (Shankarpalli) 400 kV D/C line and Asset-II: 2 Nos. of 400 kV GIS line bays at Maheswaram (PG) for termination of Maheswaram (PG)–Mehboob Nagar 400 kV D/C Transmission Line under the "Provision of line bays for the Scheme-Connectivity lines for Maheshwaram (Hyderabad) 765/400 kV Pooling Station” in the Southern Region. Power Grid Corporation of India Ltd.
13.05.2021 13.05.2021 Transmission

251

9/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Splitting of 400 kV Raipur Bus through bus sectionaliser into two sections at a point between existing line bays of Chandrapur-1 & Chandrapur-2 and shifting of Chandrapur-2 and Chandrapur-3 line bays from section Raipur-B to Raipur-A under “Split Bus Arrangement and Reconfiguration/Shifting of Terminating Lines at Raipur 400 kV Sub-station” in Western Region. Power Grid Corporation of India Ltd.
13.05.2021 13.05.2021 Transmission

250

337/TT/2019
13.05.2021 13.05.2021 Transmission

249

142/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff for 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for combined elements of Talcher and Kolar (HVDC portion) (Combined Asset-I) consisting of Asset-1: Talcher-Kolar HVDC line (Pole-I), including the bipole line, HVDC terminal station (Pole-I) at Talcher and Kolar and the Earth electrode lines and Asset-6: HVDC terminal station at Talcher and Kolar with Pole II; and combined elements of Talcher and Kolar (AC Portion), (Combined Asset-II) consisting of Asset-2: LILO of 400 kV S/C Cuddapah-Bangalore line at Kolar, including associated bays and common facilities at Kolar and 400 kV S/C Kolar-Madras line, with associated bays, Asset-3: 400 kV S/C Hossur-Salem line, 315 MVA 400/220 kV Auto-transformer-I at Hossur, associated bays, and 220 kV switchyard at Hossur, Asset-4: 315 MVA 400/220 Auto-transformer-2 at Hossur, with associated bays, Asset-5: 500 MVA 400/220 kV Auto-transformer (comprising of 4x167 MVA single phase units) associated bays and 220 kV switchyard at Kolar, and 400 kV D/C Kolar-Hoody line along with associated bays, Asset-7: 400 kV D/C Kolar-Hosur line along with associated bays at Kolar and Hosur and Asset-8: 400 kV S/C Salem-Udumalpet line along with associated bay extensions at Salem and Udumalpet under Transmission System associated with Talcher II project in the Southern Region. Power Grid Corporation of India Ltd.
12.05.2021 12.05.2021 Transmission

248

350/TT/2019
12.05.2021 12.05.2021 Transmission

247

287/MP/2018
12.05.2021 12.05.2021 Misc.

246

350/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-A1: 400 kV, 125 MVAR Bus Reactor at Raipur Sub-station, Asset A2: 400 kV, 125 MVAR Bus Reactor at Seoni Sub-station, Asset A3: 400 kV, 63 MVAR Line Reactor at Raipur Sub-station, Asset B1: 1x125 MVAR Bus Reactor at 400 kV Damoh Sub-station, Asset B2: 1x125 MVAR Bus Reactor at 400 kV Bachau Sub-station, Asset B3: 1x125 MVAR Bus Reactor at 400 kV Pirana Sub-station, Asset B4: 1x125 MVAR Bus Reactor-1 at 400 kV Itarsi Sub-station, Asset B5: 1x125 MVAR Bus Reactor-2 at 400 kV Itarsi Sub-station, Asset B6: 1x125 MVAR Bus Reactor at 400 kV Gwalior Sub-station, Asset C1: 400 kV, 1x125 MVAR Bus Reactor at Parli Sub-station, Asset C2: Conversion of 50 MVAR Line Reactor (4 nos.) into switchable Line Reactors at 400/200 kV Pune Sub-station under “Installation of Reactors (Part-II) in Western Region”. Power Grid Corporation of India Ltd.
10.05.2021 10.05.2021 Transmission

245

302/TT/2019
09.05.2021 10.05.2021 Transmission

244

497/TT/2019
07.05.2021 08.05.2021 Transmission

243

315/TT/2019
07.05.2021 07.05.2021 Transmission

242

155/TT/2020
06.05.2021 07.05.2021 Transmission

241

352/TT/2019
05.05.2021 06.05.2021 Transmission

240

621/MP/2020
05.05.2021 05.05.2021 Misc.

239

90/AT/2021
05.05.2021 05.05.2021 Adoption

238

489/TT/2019
05.05.2021 05.05.2021 Transmission

237

5/SM/2021
30.05.2021 04.05.2021 Suo Motu

236

81/MP/2021
04.05.2021 04.05.2021 Misc.

235

4/SM/2021
30.04.2021 03.05.2021 Suo Motu

234

61/MP/2021
01.05.2021 01.05.2021 Misc.

233

210/TT/2020
30.04.2021 01.05.2021 Transmission

232

482/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2001-04, 2004-09, 2009-14 tariff periods, and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for combined asset consisiting of Asset I: 800 kV Kishenpur-Moga Transmission Line-I along with associated bays Asset II: 800 kV Kishenpur-Moga Transmission Line-II along with associated bays Asset III: 420 kV 63 MVAR Bus Reactor at Kishenpur Sub-station with associated bays and 420/220 kV, 250 MVA ICT III at Moga Sub-station with associated bays for transmission system associated with Kishenpur Moga Transmission System in the Northern Region.Power Grid Corporation of India Ltd.
30.04.2021 30.04.2021 Transmission

231

420/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Combined Asset consisting of Asset-I: LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-I at Allahabad; Asset-II: LILO of 400 kV S/C Singrauli-Kanpur Transmission Line-II at Allahabad; Asset-III: ICT-I at Allahabad along with associated bays; and Asset-IV: ICT-II at Allahabad along with associated bays in Northern Region Power Grid Corporation of India Ltd.
30.04.2021 30.04.2021 Transmission

230

480/TT/2019
29.04.2021 29.04.2021 Transmission

229

89/TL/2021
29.04.2021 29.04.2021 Licence (Transmission)

228

277/MP/2020
29.04.2021 29.04.2021 Misc.

227

38/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Asset-1: 2 Nos. 400 kV bays each at Nagapattinam Pooling Station and Salem New (Dharmapuri) for terminating Nagapattinam Pooling Station-Salem New (Dharmapuri) 765 kV D/C Line (Initially charged at 400 kV) being implemented under tariff based bidding and Asset-2: 1 No. 63 MVAR line reactor at Nagapattinam Pooling Station and Salem New (Dharmapuri) each for both circuits of Nagapattinam Pooling Station-Salem New (Dharmapuri) 765 kV D/C Line (Initially charged at 400 kV) under "Common Transmission scheme associated with ISGS projects in Nagapattinam/Cuddalore area of Tamil Nadu-Part-A1 (b)" in the Southern region. Power Grid Corporation of India Ltd.
29.04.2021 29.04.2021 Transmission

226

417/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of 02 Nos. 400 kV line Bays at Parli (POWERGRID) Switching Station (for Parli New (TBCB)-Parli (POWERGRID) 400 kV D/C (Quad) line under TBCB) and 2 Nos. 765 kV line Bays at Solapur (POWERGRID) Sub-station (for Parli New (TBCB)-Solapur (POWERGRID) 765 kV D/C line under TBCB route) under "POWERGRID works associated with Western Region Strengthening Scheme XV" in Western Region Power Grid Corporation of India Ltd.
25.04.2021 28.04.2021 Transmission

225

348/TT/2019
25.04.2021 28.04.2021 Transmission

224

459/TT/2020
25.04.2021 28.04.2021 Transmission

223

359/TT/2019
25.04.2021 28.04.2021 Transmission

222

332/TT/2019
25.04.2021 28.04.2021 Transmission

221

416/TT/2019
28.04.2021 28.04.2021 Transmission

220

256/TT/2019
28.04.2021 28.04.2021 Transmission

219

335/MP/2020
519/MP/2020
509/MP/2020
516/MP/2020
338/MP/2020
521/MP/2020
526/MP/2020
512/MP/2020
339/MP/2020
28.04.2021 28.04.2021 Misc.

218

2/TT/2020
27.04.2021 28.04.2021 Transmission

217

325/TT/2019
25.04.2021 27.04.2021 Transmission

216

246/TT/2019
26.04.2021 27.04.2021 Transmission

215

338/TT/2019
26.04.2021 26.04.2021 Transmission

214

91/MP/2020
631/MP/2020
672/MP/2020
25.04.2021 26.04.2021 Transmission

213

166/TT/2020
25.04.2021 26.04.2021 Transmission

212

357/TT/2019
25.04.2021 26.04.2021 Transmission

211

435/MP/2019
24.04.2021 24.04.2021 Misc.

210

620/MP/2020
along with IA. No. 25/2021
22.04.2021 22.04.2021 Misc.

209

474/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for the 2004-09 period, the 2009-14 period and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 400 kV Vindhyachal-Kanpur line at Singrauli along with bays at Singrauli end (Realignment of Vindhyachal-Kanpur S/C line at Singrauli and Singrauli-Vindhyachal 2nd 400 kV Ckt) and Bus coupler bay at Vindhyachal HVDC under “System Strengthening Scheme in Singrauli-Vindhyachal corridor in the Northern Region”. Power Grid Corporation of India Ltd.
20.04.2021 22.04.2021 Transmission

208

516/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: Additional bays at Kolar and Hosur for second circuit of Kolar-Hosur 400 kV D/C line and Asset-II: 400 kV Hiryur Sub-station, including 315 MVA auto transformer & LILO of Davangere-Hoody 400 kV D/C line at Hiryur with associated bays under SRSS II in Southern Region Power Grid Corporation of India Ltd. (PGCIL)
17.04.2021 20.04.2021 Transmission

207

460/TT/2020
17.04.2021 19.04.2021 Transmission

206

18/TT/2020
17.04.2021 19.04.2021 Transmission

205

414/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff for the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: 40% FSC compensation package for 400kV D/C Khandwa-Seoni transmission line at Khandwa station & 400kV D/C Sipat-Raipur transmission line along with Sub-station bays at Raipur and Sipat and Asset-II: 315 MVA, 400/220 kV ICT with associated 220 kV bays associated with Itarsi (PG)-Itarsi (MPPTCL) Ckt-II and 220 kV bays associated with Itarsi (PG)-Bhopal (MPPTCL) Ckt-II under “WRSS-I Transmission System” in the Western Region. Power Grid Corporation of India Ltd.
17.04.2021 18.04.2021 Transmission

204

554/MP/2019
18.04.2021 18.04.2021 Misc.

203

390/GT/2020
16.04.2021 17.04.2021 Generation

202

629/TD/2020
15.04.2021 16.04.2021 Licence

201

76/TD/2021
15.04.2021 16.04.2021 Licence

200

52/AT/2021
15.04.2021 16.04.2021 Adoption

199

375/MP/2019
16.04.2021 16.04.2021 Misc.

198

593/MP/2020
16.04.2021 16.04.2021 Misc.

197

183/MP/2015
08.04.2021 13.04.2021 Misc.

196

366/TT/2018

Approval under regulation-86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff fromCOD to 31.3.2019 for Asset-1: 1 No. 765kV line bay at 765/400 kV Vindhyachal Pooling Station of POWERGRID (for Sasan UMPPVindhyachal Pooling Station (POWERGRID) 765kV 2nd S/C line), Asset-2: 2 Nos. 400kV line Bays at 765/400 kV Vindhyachal Pooling Station of POWERGRID (for Vindhyachal (IV/V) STPP switchyard (NTPC)–Vindhyachal Pooling Station (POWERGRID) 400kV 2nd D/C (quad) line, Asset-3: 2 Nos. 400kV GIS line bays at Gwalior Substation (for Gwalior Substation-Morena (POWERGRID) 400kV D/C (quad) line, Asset-4: 2 Nos. 765kV GIS line Bay at 765/400 kV Pune (GIS) Substation of POWERGRID (for LILO of one circuit of Aurangabad (POWERGRID)- Padghe (POWERGRID) 765kV D/C line at Pune (GIS) (POWERGRID)), Asset-5: 765kV line bays at 765/400kV Champa Pooling Station and Dharamjaygarh Pooling Station for 765kV S/C Champa Pooling Station-Dharamjaygarh Pooling Station TL and Asset-6: 765kV line bays at 765/400kV Champa Pooling Station and Kotra (Raigarh) Pooling Station for 765kV S/C Champa Pooling Station- Kotra (Raigarh) Pooling Station TL under “POWERGRID works associated with System Strengthening for IPPs in Chhattisgarh and other generation projectsin Western Region”. Power Grid Corporation of India Limited
09.04.2021 12.04.2021 Transmission

195

69/MP/2021
08.04.2021 08.04.2021 Misc.

194

634/MP/2020
08.04.2021 08.04.2021 Misc.

193

433/MP/2019
05.04.2021 07.04.2021 Misc.

192

50/MP/2021
06.04.2021 07.04.2021 Misc.

191

17/MP/2021
06.04.2021 06.04.2021 Misc.

190

457/MP/2020
06.04.2021 06.04.2021 Misc.

189

456/MP/2020
06.04.2021 06.04.2021 Misc.

188

128/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I(a): 400 kV D/C Allahabad-Kanpur Line along with associated bays at both ends including 2X50 MVAr Line Reactor at Kanpur (excluding 2X50 MAVr line reactor at Kanpur Sub-station); Asset-I(b): 1X50 MVAr reactor at Kanpur Sub-station shifted from Mandola Sub-station under TALA HEP (Only Reactor); and Asset-I(c): 1X50 MVAr reactor at Kanpur Sub-station shifted from Kankroli Sub-station under RAPP 5&6 (only Reactor) under Northern Regional System Strengthening Scheme-XXX in Northern Region. Power Grid Corporation of India Ltd.
05.04.2021 06.04.2021 Transmission

187

542/MP/2020
01.04.2021 05.04.2021 Misc.

186

599/TL/2020
01.04.2021 01.04.2021 Licence (Transmission)

185

493/MP/2020
01.04.2021 01.04.2021 Misc.

184

561/AT/2020
01.04.2021 01.04.2021 Adoption

183

306/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 01x160 MVA ICT-I along with associated bays at Daltonganj Sub-station, 1X160 MVA ICT-II along with associated bays at Daltonganj Sub-station and 2X 132 kV line bays at Daltonganj Sub-station, Asset-II: 02 Nos of 132 kV line bays at Daltonganj Sub-station under “Eastern Region Strengthening Scheme – XVII Part A (ERSS-XVII Part-A)” in Eastern Region. Power Grid Corporation of India Ltd.
01.04.2021 01.04.2021 Transmission

182

104/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Combined Assets: One circuit of 400 kV D/C Dehradun-Bagpat line along with associated bays at both ends. Part of second circuit of 400 kV D/C Dehradun-Bagpat Transmission Line as 400 kV S/C Roorkee-Dehradun line from Dehradun end and partly as 400 kV S/C Saharanpur-Bagpat line from Bagpat end using part of one circuit of 400 kV D/C Roorkee-Saharanpur line (under-NRSS XXI) at intersection point along with associated bays at Dehradun and Bagpat end, Asset-II: 400/220 kV, 315 MVA ICT-I at Dehradun and associated bays with 1 no. 220 kV line bay, 400/220 kV, 315 MVA ICT-II at Dehradun and associated bays with 1 no. 220 kV line bay, and 80 MVAR bus reactor at Dehradun and associated bays and Asset-III : 04 Nos. 220 kV bays at Dehradun Sub-station under “Northern Region System Strengthening Scheme-XVIII” in Northern Region. Power Grid Corporation of India Ltd.
31.03.2021 31.03.2021 Misc.

181

434/MP/2019
26.03.2021 31.03.2021 Misc.

180

608/MP/2020
31.03.2021 31.03.2021 Misc.

179

313/TT/2019
31.03.2021 31.03.2021 Transmission

178

03/SM/2021
(Suo-Motu)
31.03.2021 31.03.2021 Suo-Motu

177

2/SM/2021
(Suo-Motu)
31.03.2021 31.03.2021 Suo-Motu

176

01/SM/2021
31.03.2021 31.03.2021 Suo-Motu

175

586/MP/2020
26.03.2021 31.03.2021 Misc.

174

Corrigendum to Petition No.404/MP/2019
26.03.2021 26.03.2021 Misc.

173

558/MP/2020
25.03.2021 26.03.2021 Misc.

172

219/GT/2019
26.03.2021 26.03.2021 Generation

171

80/MP/2021
24.03.2021 25.03.2021 Misc.

170

437/MP/2019

21.03.2021

24.03.2021 Misc.

169

249/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Wardha–Nizamabad 765 kV D/C line along with associated bays, Nizamabad– Dichpalli 400 kV D/C line along with associated bays, Establishment of 765/400 kV GIS at Nizamabad with 2x1500 MVA transformers, 1x240 MVAr Bus Reactor, 2x240 MVAr Switchable Line Reactors along with associated bays, Extension of 765/400 kV Wardha Sub-station with 2x240 MVAr Switchable Line Reactors along with associated bays and Extension of Dichpalli 400 kV Sub-station of TSTRANSCO and Asset-II: Hyderabad (Maheshwaram)-Nizamabad 765 kV D/C Line and 2 nos. 765 kV bays along with 1 no. 240 MVAR switchable line reactor each at Hyderabad (Maheshwaram) and Nizamabad Sub-station each for both circuits of Hyderabad-Nizamabad 765 kV D/C Line under “Wardha-Hyderabad 765 kV link” in Southern Region. Power Grid Corporation of India Ltd.
23.03.2021 24.03.2021 Transmission

168

369/MP/2018
19.03.2021 23.03.2021 Misc.

167

329/MP/2018
19.03.2021 23.03.2021 Misc.

166

405/MP/2019

Petition under Section 79 of the Electricity Act, 2003 read with statutory framework governing procurement of power through competitive bidding ('Competitive Bidding Guidelines') and (a) Article 10 of the PPA dated 9.11.2011 between GMR Kamalanga Energy Limited and Bihar State Electricity Board and (b) Article 13 of the PPA dated 12.3.2009 between GMR Energy Limited (on behalf of GMR Kamalanga Energy Limited ) and PTC India Limited with back to back PPA between PTC India Ltd. and Haryana Distribution companies, for compensation due to Change in Law for compensation due to levy of charges for transportation of fly ash and evolving a mechanism for grant of appropriate adjustment/compensation to offset financial impact on account of levy of charges for transportation of fly ash and carrying cost. 1. GMR Kamalanga Energy Limited
2. GMR Energy Limited
22.03.2021 22.03.2021 Misc.

165

339/TT/2019
19.03.2021 19.03.2021 Transmission

164

310/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-A1: 765/400 kV, 1500 MVA ICT-1 along with associated bays at Jabalpur Pooling Sub-station (New), Asset-A2: 400 kV D/C (Quad) Jabalpur Pooling Sub-station (New)-Jabalpur (Existing) Sub-station Transmission Line along with associated bays, Asset-A3: 400 kV 125 MVAR Bus Reactor-1 with associated bays at Jabalpur 765/400 kV Pooling Sub-station, Asset-A4: 765 kV 3X80 MVAR Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling Sub-station, Asset-B1: 1500 MVA, 765/400 kV ICT-2 with one spare unit at Jabalpur 765/400 kV Pooling Sub-station, Asset-B2:3X80 MVAr, 765 kV Line Reactor to be used as Bus Reactor at Jabalpur Pooling Sub-station for Dharamjaygarh ckt.-1, Asset-B3: 765 kV, 3X110 MVAR, Bus Reactor-1 at Dharamjaygarh Sub-station along with associated bays and LILO of 765 kV S/C Ranchi-WR Pooling Sub-station (near Sipat) Transmission Line at Dharamjaygarh Sub-station, Asset-B4: 765 kV, 3X110 MVAR Bus Reactor-2 at Dharamjaygarh Sub-station along with associated bays, Asset-B5: Circuit-1 of 765 kV D/C Jharsuguda Pooling Sub-station–Dharamjaygarh (near Korba) Line, Asset-B6: Circuit-2 of 765 kV D/C Jharsuguda Pooling Station-Dharamjaygarh (near Korba) Line, Asset-C1: 400 kV 125 MVAR (3 Ph) Bus Reactor-2 with associated bays at Jabalpur 765/400 kV Pooling Sub-station, Asset-C2: 765 kV 3X80 MVAR Bus Reactor-1 with associated bays at Jabalpur Pooling Sub-station, Asset-C3: 765 kV, 3x80 MVAR Line Reactor and associated 765 kV, 1 no. bay for Dharamjaygarh Ckt-2 (Interim Contingency as Bus Reactor) at 765/400 kV Jabalpur Pooling Sub-station and Asset-D: 765 kV D/C Dharamjaygarh-Jabalpur Pooling Sub-station Transmission Line and 2X330 MVAR Switchable Line Reactors with associated bays at Dharamjaygarh Sub-station and line bays at Dharamjaygarh Sub-station under “Transmission System for Phase-1 Generation projects in Orissa Part-B” in Western Region. Power Grid Corporation of India Ltd.
19.03.2021 19.03.2021 Transmission

163

552/AT/2020
19.03.2021 19.03.2021 Adoption

162

81/MP/2019
19.03.2021 19.03.2021 Misc.

161

228/MP/2020
19.03.2021 19.03.2021 Misc.

160

106/MP/2019
15.03.2021 15.03.2021 Misc.

159

5/TD/2021
10.03.2021 11.03.2021 Licence

158

629/TD/2020
08.03.2021 11.03.2021 Licence

157

329/GT/2019
10.03.2021 10.03.2021 Generation

156

226/MP/2020
08.03.2021 09.03.2021 Misc.

155

93/MP/2019
08.03.2021 09.03.2021 Misc.

154

434/GT/2020
08.03.2021 09.03.2021 Generation

153

103/TT/2019
05.03.2021 08.03.2021 Transmission

152

250/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Addition of 1X160 MVA, 220/132 kV ICT along with associated bays at Ara 220/132 kV Sub-station, Asset II: Addition of 1X500 MVA, 400/220 kV ICT along with associated bays at Muzaffarpur 400/220 kV Sub-station, Asset III: 1 No. of 1x125 MVAR Bus Reactor and associated bay at 400 KV Maithon Sub-station, Asset IV: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (1st) at 400 KV Maithon Sub-station, Asset V: 01 No. of 01x125 MVAR Bus Reactor (1st) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VI: 01 No. of 1x125 MVAR Bus Reactor (2nd) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VII: 02 Nos of 125 MVAR Bus Reactor I & II at Rengali Sub-station, Asset VIII: Installation of 01x125 MVAR Bus Reactor by replacing existing 1x50 MVAR Bus Reactor at 400 KV Rourkela Sub-station, Asset IX: Installation of 01x125 MVAR Bus Reactor in Parallel with existing 50(3X16.67) MVAR Bus Reactor at Biharsharif Sub-station, Asset X: Installation of 1x125 MVAR Bus Reactor-II after replacing existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XI: Installation of 1x125 MVAR Bus Reactor-I in Parallel with existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XII: Installation of 1X125 MVAR Bus Reactor at 400 kV Gazuwaka Sub-station, Asset XIII: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (2nd) at 400 KV Maithon Sub-station under “Eastern Region Strengthening scheme-IX” in Eastern Region. Power Grid Corporation of India Ltd.
Corrigendum Order dated:-07.02.2022
05.03.2021 08.03.2021 Transmission

151

1/RC/2021
04.03.2021 05.03.2021 Misc.

150

290/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff period and truing up of tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of Asset-i: 400 kV Siliguri Sub-station (Ext), 400 kV Purnea Sub-station (ext), Asset-ii: 400/220 kV, 315 MVA ICT at Purnea Sub-station, Asset-iii: 400/220 kV Muzaffarpur Sub-station excluding 2 nos. 400 kV bays at Muzaffarpur with line reactor for Muzaffarpur-Gorakhpur Transmission Line and ICT-II and extension of Muzaffarpur Sub-station (BSES) in Eastern Region, Asset-iv: 400/220 kV, 315 MVA ICT–II at Muzaffarpur Sub-station, Asset-v: 400 kV Bareilly Sub-station and 400 kV Mandaula Sub-station, Asset-vi: 400 kV D/C Lucknow (POWERGRID)-Unnao (UPPCL) line with associated bays at both ends, 400 kV D/C Gorakhpur (POWERGRID)-Gorakhpur (UPPCL) line with bays at both end, 2 Nos. 400 kV bays at Gorakhpur (POWRGRID) and 2 nos. 400 kV Lucknow (POWERGRID) for 400 kV D/C Gorakhpur-Lucknow line of POWERLINKS, 400/220 kV 315 MVA ICT at Lucknow with associated bays and 400/220 kV 315 MVA ICT-I at Gorakhpur (POWERGRID) with associated bays, Asset-vii: LILO of one circuit of 400 kV D/C Ballabhgarh-Dadri Transmission line at Maharanibagh GIS along with associated bays and 315 MVA 400/220/33 KV ICT-I at Maharanibagh GIS along with associated bays, Asset-viii: 315 MVA 400/220/33 kV ICT-II at Maharanibagh GIS along with associated bays, Asset-ix: TCSC and 2 nos. of 400 kV bays at Gorakhpur Sub-station associated with 400 kV Muzaffarpur-Gorakhpur line of POWERLINKS, Asset-x: 2 nos. of 400 kV bays at Muzaffarpur with line reactor associated with 400 kV Muzaffarpur-Gorakhpur line of POWERLINKS under “Transmission System associated with TALA HEP East-North Inter connector and Northern Region Transmission System”, an inter-regional asset between Northern Region and Eastern Region. Power Grid Corporation of India Ltd.
05.03.2021 05.03.2021 Transmission

149

624/MP/2020
04.03.2021 05.03.2021 Misc.

148

38/MP/2021
04.03.2021 05.03.2021 Misc.

147

148/TT/2019
04.03.2021 05.03.2021 Transmission

146

431/MP/2019
03.03.2021 05.03.2021 Misc.

145

330/MP/2020
02.03.2021 04.03.2021 Misc.

144

171/TT/2020
03.03.2021 04.03.2021 Transmission

143

87/MP/2018
02.03.2021 04.03.2021 Misc.

142

623/MP/2020
02.03.2021 04.03.2021 Misc.

141

549/AT/2020
01.03.2021 02.03.2021 Adoption

140

160/AT/2019 and IA No. 81/2019
01.03.2021 02.03.2021 Adoption

139

149/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 132 kV S/C Nirjuli-Dikrong Transmission Line along with associated bays and Asset-II: 400 kV D/C Ranganadi-Balipara Transmission Line along with associated bays under “Transmission System associated with Ranganadi HEP” in North Eastern Region. Power Grid Corporation of India Ltd.
01.03.2021 02.03.2021 Transmission

138

Corrigendum to Petition No. 56/AT/2020
26.02.2021 01.03.2021 Adoption

137

13/TT/2020
26.02.2021 01.03.2021 Transmission

136

248/TT/2019
25.02.2021 26.02.2021 Transmission

135

45/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: LILO of one circuit of 400 kV D/C Vapi-Navi Mumbai Transmission Line along with 400/220 kV GIS Kala Sub-station (NEW) in UT DNH 315 MVA 400/220 kV ICT-I & ICT-II and 80 MVAR, 420 kV Bus Reactor and Asset-II: LILO of 2nd Ckt of 400 kV D/C Vapi-Navi Mumbai Transmission Line (i.e. Ckt - 3 & 4 of LILO) alongwith associated bays at Kala Sub-station under “Transmission system for establishment of 400/220 kV GIS Sub-station at Kala in UT of DNH” in Western Region. Power Grid Corporation of India Limited
25.02.2021 26.02.2021 Transmission

134

41/MP/2021
25.02.2021 25.02.2021 Misc.

133

430/MP/2019
25.02.2021 25.02.2021 Misc.

132

Corrigendum to Petition No. 305/TT/2019
24.02.2021 25.02.2021 Transmission

131

86/TT/2019
21.02.2021 22.02.2021 Transmission

130

L-1/44/2010-CERC
21.02.2021 21.02.2021 Misc.

129

156/TT/2020
20.02.2021 21.02.2021 Transmission

128

324/TT/2019
19.02.2021 20.02.2021 Transmission

127

44/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 765 kV D/C Varanasi-Kanpur (new) line and associated bays including 240 MVAr Switchable L/R in both Ckt. at Varanasi GIS Sub-station and 330 MVAr non-switchable L/R in both Ckt. at Kanpur GIS Sub-station; 765 kV S/C Kanpur (new) GIS-Jhatikara line & associated bays including 330 MVAr switchable L/R at Kanpur GIS Sub-station and 330 MVAr non-switchable L/R at Jhatikara Sub-station; 400 kV D/C (Quad) Kanpur (New) GIS-Kanpur (old) line & Associated bays; 2X1500 MVA 765/400 kV ICT-I&II Associated bays at 765/400 kV Kanpur (new) GIS Sub-station; 240 MVAr, 765 kV Bus Reactor-1 & associated bay at Kanpur (new) GIS Sub-station; 240 MVAr, 765 kV Bus Reactor-2 & associated bay at Kanpur (new) GIS Sub-station; Asset-II: LILO of one Ckt of 400 kV D/C Sasaram-Allahabad line & associated bays at Varanasi GIS Sub-station; Asset-Ill: 125 MVAr, 400 kV Bus Reactor & associated bay at Kanpur (new) GIS Sub-station; Asset-IV: 240 MVAr, 765 kV Bus Reactor & associated bay at Jhatikara Sub-station; Asset-V: 125 MVAr, 400 kV Bus Reactor & associated bay at Varanasi GIS Sub-station; Asset-VI: 400 kV D/C (Quad) Sarnath-Varanasi Transmission Line along with associated bays at Varanasi GIS Sub-station under Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal-Part-B in the Northern Region. Power Grid Corporation of India Ltd.
19.02.2021 19.02.2021 Transmission

126

488/TT/2019
19.02.2021 19.02.2021 Transmission

125

327/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-A1: 400/220 kV, 1X315 MVA Transformer at Mapusa ( ICT III) Sub-station along with 2 nos. 220 kV line bays, Asset-B1: 400/220 kV 1X500 MVA Transformer at Navsari Sub-station, Asset-B2(a): 1 no. 400 kV line bays at 765/400 kV Indore Sub-station, Asset-B2(b): 1 no. 400 kV line bays at 765/400 kV Indore Sub-station and Asset-B3: 2 nos. 220 kV line bays at 400/220 kV Pirana Sub-station under “Augmentation of Transformer and Bays in Western Region” . Power Grid Corporation of India Ltd.
19.02.2021 19.02.2021 Transmission

124

303/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-A: 400 kV D/C (Quad) Vadodara-Asoj Transmission Line along with associated bays at Asoj (GETCO Sub-station), Asset-B1:400 kV Bay at Vadodara GIS for 400 kV D/C Vadodara-Asoj circuit-1, Asset-B2: 400 kV Bay at Vadodara GIS for 400 kV D/C Vadodara-Asoj circuit-2, Asset-C1: 765 kV 240 MVAR Switchable Line Reactor of circuit-I of 765 kV D/C Aurangabad-Padghe Line charged as Bus Reactor at Aurangabad Sub-station, Asset-C2:765 kV 240MVAR Switchable Line Reactor of circuit-II of 765 kV D/C Aurangabad-Padghe Line charged as Bus reactor at Aurangabad Sub-station and Asset-D: Aurangabad-Padghe 765 kV D/C Line and Padghe (Powergrid)-Padghe/Kudus (MSETCL) 400 kV D/C Quad Line alongwith associated bays and establishment of 765/400 kV 2X1500 MVA Padghe GIS Sub-station under "System Strengthening in North/West Part of WR for IPP Projects in Chattisgarh (IPP-E)" in Western Region. Power Grid Corporation of India Ltd.
18.02.2021 18.02.2021 Transmission

123

138/TT/2020
16.02.2021 16.02.2021 Transmission

122

114/TT/2020
16.02.2021 16.02.2021 Transmission

121

152/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2009-14 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and truing-up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: 400 kV D/C Twin Conductor Kanpur-Ballabgarh Transmission Line along with its Associated Bays; and Asset-II: 40% FSC at Ballabgarh on 400 kV D/C Kanpur-Ballabgarh Transmission Line covered under the Northern Region System Strengthening Scheme-IX in the Northern Region. Power Grid Corporation of India Ltd.
15.02.2021 15.02.2021 Transmission

120

15/TT/2020
15.02.2021 15.02.2021 Transmission

119

L-1/250/2019/CERC
14.02.2021 15.02.2021 Misc.

118

172/TT/2019
13.02.2021 14.02.2021 Transmission

117

143/TT/2019
13.02.2021 14.02.2021 Transmission

116

53/TT/2020
13.02.2021 14.02.2021 Transmission

115

Corrigendum to Petition No. 425/TL/2019
12.02.2021 12.02.2021 Licence (Transmission)

114

Corrigendum to Petition No. 445/TL/2019
12.02.2021 12.02.2021 Licence (Transmission)

113

212/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-I: Farraka-Gokarna Portion of 400 kV D/C Rajarhat-Purnea Line including LILO at Farakka and Gokarna and associated line bays; Asset-II: 1X80 MVAr bus reactor alongwith associated bays at Gokarna Sub-station and 1X80 MVAr Switchable line reactor along with associated bays at Farakka Sub-station and Asset-III: 02 nos. of 400 kV Line bays for termination of LILO of 02nd Ckt. of Jamshedpur Rourkela 400 kV Line at Chaibasa Sub-station under “Eastern Region Strengthening Scheme-V” in the Eastern Region. Power Grid Corporation of India Ltd.
11.02.2021 12.02.2021 Transmission

112

167/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: 400 kV D/C Solapur (STPP)-Solapur (PG) Transmission Line along with bay extension at Solapur (PG) Sub-station and Asset-II: Extension of 400/220 kV Solapur Sub-station–Augmentation of Sub-station by 1 x 315 MVA (3rd) Transformer (by shifting of 500 MVA Transformer from Wardha to Solapur) covered under “Transmission System for Solapur STPP (2x660 MW)” in the Western Region. Power Grid Corporation of India Ltd.
11.02.2021 12.02.2021 Transmission

111

494/TT/2019
11.02.2021 12.02.2021 Transmission

110

33/TT/2019
07.02.2021 12.02.2021 Transmission

109

287/MP/2018
11.02.2021 11.02.2021 Misc.

108

24/TT/2020
11.02.2021 11.02.2021 Transmission

107

330/MP/2018
10.02.2021 10.02.2021 Misc.

106

479/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-1: 132 kV D/C Agartala-Agartala Ckt-I and II; and Asset-2: 132 kV S/C Agartala–Kumarghat Transmission Line under “Transmission system associated with Agartala GBPP” in the North Eastern Region. Power Grid Corporation of India Ltd.
09.02.2021 10.02.2021 Transmission

105

156/TT/2015
09.02.2021 10.02.2021 Transmission

104

421/TT/2019
09.02.2021 10.02.2021 Transmission

103

79/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: LILO of existing Bangalore- Salem 400 kV S/C Line at Hosur and Extension of 400/220 kV Sub-station at Hosur, Asset-2: Nellore-Thiruvalam 400 kV D/C Quad line along with extension of 400/220 kV Sub-station at Nellore & Thiruvalam and 1X50 MVAR line reactor at both ends of each circuit of Nellore-Thiruvalam 400 kV Quad D/C line along with 450 ohms NGR, Asset-3: Thiruvalam-Melakottaiyur (Sholinganallur) 400 kV D/C Line along with Bay extension of 400 kV Sub-station at Thiruvalam and Extension of 400/220 kV Sub-station at Melakottaiyur (Sholinganallur), Asset-4: 2 Nos. 400 kV 63 MVAR Line Reactors for both circuits of Vijayawada – Nellore 400 kV D/C Transmission Line charged as Bus Reactors at Nellore (AP) Sub-station and Asset-5: 400 kV D/C Vijayawada – Nellore Transmission Line and associated bays along with 1 No. 400 kV 63 MVAR Line Reactor at Vijayawada (Nunna) Sub-station and 1 No. 63 MVAR Line Reactor at Vijayawada TPS under “Southern Region System strengthening Scheme- XVIII” in Southern Region. Power Grid Corporation of India Ltd.
09.02.2021 10.02.2021 Transmission

102

Review Petition No. 8/RP/2020
in
Petition No. 199/GT/2017
09.02.2021 10.02.2021 Review

101

54/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: LILO of both Circuit of 400 kV D/C Rourkela-Raigrah (02nd Line) alongwith 04 Nos of 400 kV Line bays at Jharsuguda (Sundargarh) Sub-station, Asset-II: Split Bus arrangement at 400 kV Bus at Jharsuguda (Sundargarh) Sub-station and Asset-III: 02 Nos of 400 kV Line bays for termination of OPGC (IB TPS)-Jharsuguda 400 kV D/C line (under TBCB) at Jharsuguda (Sundargarh) under “Work associated with common transmission system for Phase-II generation project in Odisha” in Eastern Region. Power Grid Corporation of India Limited
09.02.2021 09.02.2021 Transmission

100

328/MP/2018
09.02.2021 09.02.2021 Misc.

99

85/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the assets consisting of Asset-A: LILO of Kurnool-Thiruvalam 765 kV D/C line along with bays and equipment at 765/400 KV at Cuddapah Sub-station and establishment of 765/400 kV Sub-station at Cuddapah with 2x1500 MVA transformer (GIS) along with associated bays and 2x240 MVAR bus reactors at Cuddapah GIS Sub-station; Asset-B: 400 kV D/C line from Cuddapah GIS to LILO point of NP Kunta portion of Cuddapah-Hindupur 400 kV D/C line along with bays and equipment at Cuddapah GIS; Asset-C: 400 kV D/C line from LILO point of NP Kunta to Hindupur Sub-station along with 2 nos. 400 kV bays and 2x80 MVAR switchable line reactor and 2 nos. 400 kV line bays at Hindupur Sub-station under “System Strengthening-XXIV in Southern Region”. Power Grid Corporation of India Ltd.
08.02.2021 09.02.2021 Misc.

98

84/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Assets consisting of Asset-I: Pole-I of +/- 500 kV, 2500 MW Balia-Bhiwadi HVDC bipole; Asset-II: Pole-II of +/- 500 kV, 2500 MW Balia-Bhiwadi HVDC bipole; Asset- III: LILO of Kahalgaon-Patna 400 kV D/C (Quad) line at Barh Sub-station; Asset-IV: 765 kV S/C Seoni-Bina Transmission Line and Asset-V: Barh-Balia 400 kV D/C Quad Transmission line along-with associated bays at Balia Sub-station covered under the Barh Transmission System in the Northern, Eastern and Western Region. Power Grid Corporation of India Ltd.
08.02.2021 09.02.2021 Transmission

97

484/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of the transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Vallur TPS-Melakottaiyur 400 kV D/C line and Asset-II: Chitoor-Thiruvalam 400 kV D/C Quad line and new 400 kV Thiruvalam Sub-station along with 1X63 MVAr Bus reactor at Thiruvalam Sub-station and associate bays and equipment at Thiruvalam and Chittoor under "Supplementary Transmission System associated with Vallur TPS” in Southern Region. Power Grid Corporation of India Ltd.
08.02.2021 09.02.2021 Transmission

96

505/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from COD to 31.3.2019 of Asset-1: Replacement of 3x167 MVA, 400/220 kV ICTs with 1X500 MVA ICT at Somanhalli Sub-station, Asset-2: Replacement of 4x167 MVA, 400/220 kV ICTs with 1X500 MVA ICT at Somanhalli Sub-station, Asset-3: Replacement of 1x50 MVAr Bus reactor with 1x125 MVAr Bus reactor at 400/220 kV Narendra Sub-station, Asset-4: 01 No. 500 MVA, 765/400 kV Regional Spare ICTs at Thiruvalam Sub-station and Asset-5: 01 No. 500 MVA, 765/400 kV Regional Spare ICTs at Raichur Sub-station under “System Strengthening-XXIII in Southern Region”. Power Grid Corporation of India Ltd.
06.02.2021 09.02.2021 Transmission

95

294/MP/2019
07.02.2021 09.02.2021 Misc.

94

406/TT/2020
08.02.2021 09.02.2021 Transmission

93

3/TT/2020
08.02.2021 09.02.2021 Transmission

92

39/TT/2020
08.02.2021 08.02.2021 Transmission

91

80/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset-A consisting of Combined Element-1: (i) 400 kV D/C RAPP-KankroliTransmission Line along with associated bays, (ii) 50MVAR Bus Reactor along with associated bays at Kankroli Sub-station, and (iii) 400 kV S/C RAPP-Kota Transmission Line along with 80 MVAR Bus Reactor and Combined Element-2: (i) 400/220 kV 315 MVA ICT-II along with associated bays & two no. 220 kV line bays at Kankroli Sub-station,(ii) 400/220 kV 315 MVA ICT-I along with associated bays & 2 no 220 kV line bays at Kankroli Sub-station, and (iii) 400/220 kV 315 MVA ICT-I and ICT-II at Kota Sub-station and 400/220 kV 315 MVA ICT-III at Kankroli Sub-station along with associated bays at Kota and Kankroli Sub-stations respectively under “Transmission System associated with RAPP 5&6” in Northern Region. Power Grid Corporation of India Ltd.
08.02.2021 08.02.2021 Transmission

90

87/TT/2019
05.02.2021 08.02.2021 Transmission

89

36/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 4 Nos. 400 kV Line Bays at Narendra (New) for Kudgi TPS-Narendra (New) 400 kV 2 X D/C Quad Lines, Asset-2: 2 Nos. 400 kV line bays at Narendra (New), 2 Nos. 400 kV line bays at Madhugiri (Tumkur), 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Narendra (New) & 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Madhugiri (Tumkur) for Narendra (New)-Madhugiri (Tumkur) 765 kV D/C line (initially charged at 400 kV), Asset-3: 2 Nos. 400 kV line bays at Madhhugiri (Tumkur) for Madhugiri (Tumkur)-Bidadi 400 kV D/C (Quad) line and Asset-4: 2 Nos. 400 kV line bays at Bidadi for Madhugiri (Tumkur)-Bidadi 400 kV D/C (Quad) line under "Sub-Station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3X800 MW in Phase-I) of NTPC Limited" in Southern Region. Power Grid Corporation of India Ltd.
08.02.2021 08.02.2021 Transmission

88

127/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of the transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset-A consisting of Asset 1: 400 kV D/C (Quad) Gurgaon-Manesar Transmission Line along with associated bays, Asset 2: 400/220 kV 500 MVA ICT-I at Manesar Sub-Station along with associated bays, Asset 3: 400/220 kV 500 MVA ICT-II at Manesar Sub-Station along with associated bays and, Asset 4: 125 MVAR Bus Reactor at Manesar, and Asset-B, consisting of Asset 5: 2 Nos. of 220 kV Line Bays at Fatehabad Sub-Station under “Transmission system associated with NRSS-XIII” in Northern Region. Power Grid Corporation of India Ltd.
08.02.2021 08.02.2021 Transmission

87

307/MP/2018
08.02.2021 08.02.2021 Misc.

86

Review Petition No. 5/RP/2020 in
Petition No.361/TT/2018
01.02.2021 08.02.2021 Review

85

Review Petition No. 2/RP/2020
in Petition No. 182/TT/2018
01.02.2021 08.02.2021 Review

84

IA. No. 28/2020 in
Petition No. 92/MP/2018
08.02.2021 08.02.2021 Misc.

83

334/MP/2020
07.02.2021 07.02.2021 Misc.

82

206/MP/2020

Petition under Section 79(1)(c) of the Electricity Act, 2003 read with section 79(1)(k) of the Electricity Act, 2003 along with regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, seeking appropriate direction(s) and / or order(s) from the Commission in relation to provisions of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 which are preventing the petitioner from exercising its rights under certain provisions of the Power Purchase Agreement entered pursuant to competitive bidding guidelines 2017 with Solar Energy Corporation Of India Limited (SECI) and seeking the Commission to give effect to the detailed procedure as approved by the Commission vide its order dated 15.5.2018 and further seeking the Commission to issue consequential directions to Power Grid Corporation of India Limited in terms of the relief sought in the present petition.Renew Sun Waves Private Limited
05.02.2021 06.02.2021 Misc.

81

17/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: Gooty-Madhugiri 400 kV D/C Transmission Line along with the associated bays and 63 MVAr Bus Reactor at Madhugiri, Asset-II: 2 X 500 MVA transformers along with associated bays at Madhugiri, Asset-III: 220 kV line bays at Madhugiri for termination of 220 kV D/C Madhugiri-Antharasanhalli line, Asset-IV: 220 kV line bays at Madhugiri for termination of 220 kV D/C Madhugiri-Madhugiri line and Asset-V: 220 kV line bays at Madhugiri for termination of 220 kV D/C Madhugiri-Nittur line under "System Strengthening Scheme XIII" in Southern Region. Power Grid Corporation of India Ltd.
04.02.2021 05.02.2021 Transmission

80

4/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-A: LILO of one circuit (Ckt-I) of 400 kV D/C Maithon-Jamshedpur line at Mejia “B”-TPS including PLCC Equipment (excluding wave trap) for the transmission line; Asset-B: 400 kV D/C Koderma TPS-Biharsharif transmission line and 02 nos. associated line bays at Biharsharif Sub-station; and Asset-C: 400 kV D/C Maithon RB-Maithon (PG) transmission line and associated Bay Extension at Maithon Sub-station under the “Start-up Power to DVC and Maithon Right Bank Generation Projects” in the Eastern Region. Power Grid Corporation of India Ltd.
04.02.2021 05.02.2021 Transmission

79


204/MP/2020

05.02.2021

05.02.2021 Misc.

78

151/TT/2020
04.02.2021 05.02.2021 Transmission

77

462/TT/2020

Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from COD to 31.3.2019 for Asset-I: LILO of 400 kV S/C Subhasgram – Jeerat transmission line and associated bays at Rajarhat, 1 no. 400/220 kV 500 MVA ICT (1st) and associated bays along with 4 nos. 220kV line bays at Rajarhat GIS, Asset-II: 2 nos. 400 kV 80 MVAR Switchable Line Reactors (charged as Bus Reactors) along with associated bays at 400kV Purnea S/S, Asset-III: 125 MVAR Bus Reactor (1st) and associated bay at Rajarhat GIS and Asset-IV: 125 MVAR Bus Reactor (2nd) and associated bay at Rajarhat GIS under “Eastern Region Strengthening Scheme V (ERSS-V)” in Eastern Region. Power Grid Corporation of India Ltd.,
04.02.2021 04.02.2021 Transmission

76

276/TT/2020

Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission tariff of Transmission lines connecting between Karnataka and other neighbouring states (Natural Inter State Transmission Lines) pertaining to Karnataka Power Transmission Corporation Limited (KPTCL) namely a) 220 kV S/C line from Ambewadi - Ponda (Karnataka - Goa), b) 220 kV S/C line from Ambewadi - Xyldom (Karnataka - Goa), c) 220 kV S/C line from Sedam - Tandur (Karnataka - Telangana), d) 220 kV S/C line from Allipura - Ragalapadu (Karnataka – Andhra Pradesh), e) 220 kV S/C line from Yerandanahalli - Hosur (Karnataka – Tamil Nadu), f) 220 kV S/C line from Kadakola - Kaniyampet (Karnataka - Kerala) and g) 110 kV S/C line from Konaje - Manjeshwar (Karnataka - Kerala) for the period from 1.4.2019 to 31.3.2024. Karnataka Power Transmission Corporation Limited (KPTCL)
04.02.2021 04.02.2021 Transmission

75

20/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 765 kV Line Bay and 240 MVAr Switchable Line Reactor at Jabalpur Pooling Sub-station for 765 kV S/C Jabalpur-Bina ckt.-III (IPTC), Asset-2: 765 kV Line Bay and 240 MVAr Line Reactor (Non-switchable) at Bina Sub-station for 765 kV S/C Jabalpur-Bina ckt.-III (IPTC), Asset-3: 765 kV Line Bay and 240 MVAr Line Reactor at Jabalpur PS and 765 kV Line Bay and 330 MVAr Switchable Line Reactor at Dharamjaygarh Sub-station for ckt. 3 of 765 kV D/C (ckt. 3 and 4) Dharamjaygarh-Jabalpur PS Transmission line (IPTC) and Asset-4: 765 kV Line Bay and 240 MVAr Line Reactor at Jabalpur PS and 765 kV Line Bay and 330 MVAr Switchable Line Reactor at Dharamjaygarh Sub-station for ckt. 4 of 765 kV D/C (ckt. 3 and 4) Dharamjaygarh-Jabalpur PS Transmission line (IPTC) under “Line Bays and Reactor Provisions at POWERGRID Sub-stations associated with System Strengthening common for Western Region and Northern Region” in Western Region. Power Grid Corporation of India Ltd.,
02.02.2021 04.02.2021 Transmission

74

83/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for transmission assets consisting of Asset-I(A)(a): Establishment of 765/400 kV GIS Pooling Station at Hyderabad (Maheshwaram) with 1x1500MVA 765/400 kV Transformers-I and 2 nos. 240 MVAR Bus Reactor 765 kV alongwith associated bays at Hyderabad (Maheshwaram) Pooling Station; Asset-I(A)(b): Hyderabad (Maheshwaram)-Kurnool 400 kV S/C line; Asset-I(B)(a): 1x1500MVA 765/400 kV ICT-II alongwith associated bays at Maheshwaram Pooling Station; and Asset-I(B)(b):400 kV Maheshwaram-Hyderabad S/C line under “Sub-station works associated with Hyderabad (Maheshwaram) Pooling Station” in the Southern Region. Power Grid Corporation of India Ltd.,
01.02.2021 04.02.2021 Transmission

73

117/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 63 MVAR Line Reactors at Madurai and Trichy Sub-stations, Asset-2: 63 MVAR Bus Reactors at Hossur and Salem Sub-stations, Asset-3: 63 MVAR Bus Reactor at Sriperumbudur Sub-station, Asset-4: 63 MVAR Bus Reactor at Kolar, Hyderabad and Munirabad Sub-stations, Asset-5: 63 MVAR Bus Reactor at Hiriyur Sub-station, Asset-6: 63 MVAR Line Reactor at Udumalpet Sub-station and Asset-7: 63 MVAR Line Reactors at Trivandrum Sub-station along with associated bays under “System Strengthening-VIII in Southern Region”. Power Grid Corporation of India Ltd.
02.02.2021 04.02.2021 Transmission

72

508/TT/2019
01.02.2021 04.02.2021 Transmission

71

153/MP/2018
154/MP/2018
04.02.2021 04.02.2021 Misc.

70

21/MP/2017
04.02.2021 04.02.2021 Misc.

69

348/MP/2018
04.02.2021 04.02.2021 Misc.

68

168/TT/2020
03.02.2021 03.02.2021 Transmission

67

82/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for the Combined Asset consisting of Asset-I(A): LILO of Neelamangala-Somanhalli 400 kV D/C Line at Bidadi; Asset-I(B): 1X63 MVAR Bus Reactor at Bidadi; Asset-II(A): 1X500 MVA ICTs with associated bays and equipments and downstream network at Bidadi GIS Sub-station; Asset-II(B): 1X500 MVA ICTs with associated bays and equipments and downstream network at Bidadi GIS Sub-station under System Strengthening-X in Southern Region. Power Grid Corporation of India Ltd.
02.02.2021 03.02.2021 Transmission

66

34/TT/2020
02.02.2021 03.02.2021 Transmission

65

113/TT/2019
31.01.2021 03.02.2021 Transmission

64

23/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 of Combined Asset consisting of Asset-1: 315 MVA 400/220 kV Spare Inter-Connecting Transformer at 400/220 kV Hisar Sub-station, Asset-2: 315 MVA 400/220 kV Spare Inter-Connecting Transformer at 400/220 kV Lucknow Sub-station; and Asset-3: 315 MVA, 400/220 kV ICT at Bhiwadi in Northern Region under “Provision of spare ICTs and reactors in Eastern, Northern, Southern and Western Regions”. Power Grid Corporation of India Limited
31.01.2021 03.02.2021 Transmission

63

170/TT/2019
31.01.2021 03.02.2021 Transmission

62

153/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset of Asset-I: LILO of 400 kV Rishikesh-Muzaffarnagar Transmission line at Roorkee along with associated bays at Roorkee Sub-station, Asset-II: 315 MVA 400/220 kV ICT-I along with associated bays at Roorkee Sub-station, Asset-III: 315 MVA 400/220 kV ICT-II along with associated bays at Roorkee Sub-station associated with System Strengthening Scheme in Roorkee in Northern Region. Power Grid Corporation of India Ltd.
02.02.2021 03.02.2021 Transmission

61

312/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I:400 kV D/C Lara STPS-I to Raigarh (Kotra) Pooling Station Transmission Line along with associated bays at Raigarh (Kotra) Pooling Station and Asset-II: 400 kV D/C (Quad) Lara STPS-I Champa Line along with associated bays at Champa Pooling Station under “Transmission System associated with Lara STPS-I (2x800 MW) Generation Project of NTPC” in Western Region. Power Grid Corporation of India Ltd.
02.02.2021 03.02.2021 Transmission

60

120/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset 1: LILO of existing Kolar-Sriperumbudur 400 kV S/C line at Thiruvalam alongwith associated bays; Asset 2: Kurnool-Thiruvalam 765 kV D/C line alongwith associated bays and equipment both at Kurnool and Thiruvalam Sub-stations (charged at 400 kV) and 2x240 MVAR, 765 kV line reactor at both Kurnool and Thiruvalam Sub-stations alongwith associated bays and equipment; Asset 3: Up-gradation of 400 kV Sub-station at Thiruvalam to 765/400 kV with 2x1500 MVA, 765/400 kV transformers and Asset 4: 765 kV and 400 kV ICT bays at Thiruvalam under the "System Strengthening-XIX Scheme” in the Southern Region. Power Grid Corporation of India Ltd.
01.02.2021 03.02.2021 Transmission

59

504/TT/2019
01.02.2021 03.02.2021 Transmission

58

511/TT/2019
01.02.2021 03.02.2021 Transmission

57

196/TT/2020
01.02.2021 03.02.2021 Transmission

56

33/TT/2020
01.02.2021 02.02.2021 Transmission

55

7/TT/2020
01.02.2021 02.02.2021 Transmission

54

313/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-A1: 765 kV D/C Wardha Aurangabad Transmission Line 1 and associated bays along with 765 kV 3x80 MVAr Line, Asset-A2: 765/400 kV 1500 MVA ICT-1 with bays and equipment at Aurangabad Sub-station, Asset-A3: 400 kV 80 MVAR Switchable Line Reactor for Aurangabad-Boisar Transmission Line ckt 1 charged as Bus Reactor at Aurangabad Sub-station, Asset-A4: 400 kV 80 MVAR Switchable Line Reactor for Aurangabad-Boisar Transmission Line ckt 2 charged as Bus Reactor at Aurangabad Sub-station, Asset-A5: 400/220 kV 500 MVA ICT-3 with bays and equipment’s at Boisar Sub-station, Asset-A6: 400 kV 80 MVAR Line Reactor for Aurangabad-Boisar Transmission Line ckt 1 charged as Bus Reactor at Boisar Sub-station, Asset-A7: 400 kV 80 MVAR Line Reactor for Aurangabad-Boisar Transmission Line ckt 2 charged as Bus Reactor at Boisar Sub-station, Asset-B1: 400 kV D/C Aurangabad Boisar Transmission Line (From Aurangabad to Loc 313/0 on D/C Towers and from Loc 332/0 to Boisar Sub-station on Multicircuit towers, Asset-B2: Part of 400 kV D/C Navsari-Boisar Transmission Line from Loc 332/0 to Boisar Sub-station on Multi circuit Tower, Asset-C1: 3x110 MVAR Switchable Line Reactor to be charged as Bus reactor 1 at 762/400 kV Wardha Sub-station, Asset-C2: 3x110 MVAR Switchable Line Reactor to be charged as Bus reactor 2 at 762/400 kV Wardha Sub-station, Asset-C3: 3x80 MVAR 765 kV Line reactor for 765 kV D/C Wardha Aurangabad Line 1 to be used as Bus Reactor at Aurangabad Sub-station, Asset-C4: 3x80 MVAR 765 kV Bus Reactor at Aurangabad Sub-station, Asset-C5: 765/400 kV 1500 MVA ICT-2 at Aurangabad Sub-station under “Transmission System Strengthening in Western region for IPPs in Chhattisgarh (IPP-D)”. Power Grid Corporation of India Ltd.
31.01.2021 02.02.2021 Transmission

53

515/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 2 nos. of 400 kV bays at Khammam (existing) Sub-station and 2 nos. of 400 kV bays at Nagarjunasagar Sub-station, Asset-2: LILO of Gazuwaka-Vijayawada 400 kV S/C line at Vemagiri Pooling-station along with associated bays, Asset-3: Establishment of 765/400 kV GIS Pooling-station at Vemagiri with 1x1500 MVA 765/400 kV Transformers, 2 nos. of 240 MVAR 765 kV and 1 no. of 80 MVAR 400 kV Bus Reactors at Vemagiri and 2nos. of 765 kV bays along with 1 no. of 240 MVAR switchable line reactor each at Vemagiri & Srikakulam Pooling-station each for both circuits of Srikakulam Pooling-station-Vemagiri Pooling-station 765 kV D/C line, Asset-4: 1x1500 MVA, 765/400 kV ICT-II along with associated bays and Equipment at Vemagiri Pooling-station under “Transmission system associated with Sub-station works Associated with System Strengthening in Southern Region for Import of Power from Eastern Region” in Southern Region. Power Grid Corporation of India Ltd.
31.01.2021 01.02.2021 Transmission

52

316/TT/2019
27.01.2021 01.02.2021 Transmission

51

596/AT/2020
01.02.2021 01.02.2021 Adoption

50

395/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: Ckt-III of 400 kV D/C Vindhyachal-Satna Transmission Line alongwith associated bays; Asset-II: 400/220 kV, 315 MVA ICT-II at Satna Sub-station; Asset-III: Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; Asset-IV: LILO of 400 kV Satna-Bina Ckt-I & II at Bina (POWERGRID) Sub-station; Asset-V: Circuit IV of 400 kV D/C Satna-Bina Transmission Line; Asset-VI: Circuit III of 400 k V D/C Satna-Bina Transmission Line; Asset-VII: LILO of 400 kV D/C Raipur-Rourkela Transmission Line alongwith associated bays; Asset-VIII: 400/220 kV, 315 MVA ICT-II along with associated bay equipment at Raigarh Sub-station under “Vindhyachal-III Transmission System” in Western Region. Power Grid Corporation of India Ltd.
Corrigendum Order dated:-07.02.2022
27.01.2021 01.02.2021 Transmission

49

599/TL/2020
01.02.2021 01.02.2021 Licence (Transmission)

48

68/MP/2020
31.01.2021 31.01.2021 Misc.

47

260/MP/2019
31.01.2021 31.01.2021 Misc.

46

264/MP/2020
29.01.2021 29.01.2021 Misc.

45

Review Petition No. 7/RP/2020 In Petition No. 222/MP/2017
28.01.2021 29.01.2021 Review

44

76/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 1 No. 315 MVA, 400/220/33 kV, 3-Phase Transformer at Biharsharif Sub-station and 1 No. 315 MVA, 400/220/33 kV, 3-Phase Transformer at Jamshedpur Sub-station, Asset-2: 1 No. 80 MVAR, 420 kV, 3-Phase Reactor at Rourkela Sub-station, Asset-3: 1 No. 315 MVA, 400/220 kV, 3-Phase ICT at Durgapur Sub-station, Asset-4: 1 No. 160 MVA, 220/132 kV, 3-Phase ICT at Siliguri Sub-station, Asset-5: 1 No. 315 MVA, 400/220 kV, 3-Phase ICT at Rourkela Sub-station and Asset-6: 1 No. 50 MVA, 132/66 kV, 3-Phase ICT at Gangtok Sub-station under “Provision of Spare ICTs and Reactors for Eastern, Northern, Southern and Western Regions” in Eastern Region. Power Grid Corporation of India Ltd.
27.01.2021 28.01.2021 Transmission

43

51/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: 765 kV D/C Solapur–Aurangabad Transmission Line along with 2 x 240 MVAR Switchable Line Reactor with associated bays at Solapur Sub-station and Asset-II: 2 x 240 MVAR Switchable Line Reactor along with associated bays at Aurangabad Sub-station associated with “Inter-Regional System Strengthening Scheme for Western Region and Northern Region (Part-A)”. Power Grid Corporation of India Ltd.
27.01.2021 28.01.2021 Transmission

42

21/TT/2020
27.01.2021 28.01.2021 Transmission

41

475/TT/2019
27.01.2021 28.01.2021 Transmission

40

331/MP/2020
28.01.2021 28.01.2021 Misc.

39

481/TT/2019
27.01.2021 28.01.2021 Transmission

38

311/TT/2019
27.01.2021 28.01.2021 Transmission

37

191/MP/2019
27.01.2021 28.01.2021 Misc.

36

512/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 in respect of Combined Asset consisting of Asset-I: 400 kV Transmission Line for Swapping of Kahalgaon #1 bay with Sasaram #1 bay at Biharsharif Sub-station; Asset-II: 400 kV Transmission Line for Swapping of Purnea (1 and 2) Bays with Sasaram bays (3 and 4) at Biharsharif Sub-station; Asset-III: Split Bus arrangement with tie line breaker for 400 kV Biharsharif Sub-station; Asset-IV: Split Bus Arrangement at Durgapur Sub-station and Asset-V: Split Bus Arrangement at Maithon Sub-station assets under Split Bus arrangement for various Sub-stations in the Eastern Region. Power Grid Corporation of India Ltd.
27.01.2021 28.01.2021 Transmission

35

477/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-1: 315 MVA ICT-IV along with associated bays at Moga Sub-station, Asset-2: ICT-II along with associated bays and 2 nos PSEB feeder bays at Amritsar Sub-station, and 400 kV Bus reactor bay and 2 nos. PSEB line bays at Moga Sub-station under “Augmentation of transformation capacity at Amritsar and Moga Sub-stations” in the Northern Region. Power Grid Corporation of India Ltd.
Corrigendum Order dated:-05.02.2022
27.01.2021 28.01.2021 Transmission

34

99/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: LILO of both circuit of Siliguri-Purnea 400 kV D/C line along with associated 400 kV Bays; LILO of both circuit of Siliguri Dhalkhola 220 kV D/C line along with 220 kV associated bays at Kishanganj (GIS); 400/220 kV 500 MVA ICT-II with associated bays at Kishanganj (GIS); and 400 kV 125 MVAR Bus Reactor I with associated bays at Kishanganj (GIS), Asset-2(a): 400/220 kV 500 MVA ICT-I with associated bays at Kishanganj (GIS), Asset-2(b): 400 kV 125 MVAR Bus Reactor-II with associated bays at Kishanganj (GIS) under “Transfer of Power from Generation Projects in Sikkim to NR / WR Part-A” in Eastern Region. Power Grid Corporation of India Ltd.
27.01.2021 28.01.2021 Transmission

33

292/MP/2019
28.01.2021 28.01.2021 Misc.

32

314/TT/2019
25.01.2021 27.01.2021 Transmission

31

473/TT/2019

Approval under Regulation86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff ofthe2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-a: 220 kV D/C RAPP-B-Chittorgarh Transmission Line, Asset-b: 220 kV S/C RAPP-B-Udaipur Transmission Line along with associated bays at Udaipur end and LILO of 220 kV D/C RAPP–KOTA Line at RAPP-B including PLCC system and Asset-c: 220 kV S/C RAPP-B-Anta Transmission Line with associated bays at Anta end under “Transmission System associated with RAPP-B Project” in the Northern Region. Power Grid Corporation of India Limited
Corrigendum Order dated:- 09.02.2022
25.01.2021 27.01.2021 Transmission

30

255/TT/2019
25.01.2021 27.01.2021 Transmission

29

270/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: 3x110 MVAR Line reactor for 765 kV D/C Raipur PS-Wardha Line 1 Ckt-2 to be charged as Bus reactor at Wardha Sub-station, Asset-2a: 765 kV 3X110 MVAR Bus Reactor at Wardha Sub-station, Asset-2b: 3x110 MVAR Line Reactor for 765 kV D/C Raipur-Wardha Line 1 Ckt-1 charged as Bus Reactor at Wardha Sub-station, Asset-2c: 765 kV D/C Raipur Pooling Station-Wardha line-I Transmission Line, Asset-2d: 765 kV 240 MVAR Switchable Line Reactor of Wardha I bay at Raipur Pooling Station (Charged as a Bus Reactor), Asset-2e: 765 kV 240 MVAR Switchable Line Reactor of Wardha II bay at Raipur Pooling Station (Charged as a Bus Reactor) under “Integration of Pooling Stations in Chhattisgarh with central part of WR for IPP generation projects in Chhattisgarh” in Western Region (IPP-C). Power Grid Corporation of India Ltd
25.01.2021 27.01.2021 Transmission

28

71/MP/2020
27.01.2021 27.01.2021 Misc.

27

85/TT/2019
25.01.2021 27.01.2021 Transmission

26

353/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of Transmission Tariff for 2001-04 tariff block, 2004-09 tariff block, 2009-14 tariff block and truing up of Transmission Tariff of 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of Transmission Tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 for Asset-A: 220 kV Allahabad-Rewa Road D/C Transmission Line Ckt-1, Asset-B: 220 kV Allahabad-Rewa Road D/C Transmission Line Ckt-II, Asset-C: LILO of 220 kV Modipuram Nara Transmission Line, Asset-D: LILO of 220 kV Modipuram-Simbholi Transmission Line, Asset-E: 220 kV Allahabad-Phulpur S/C Transmission Line and Asset-F: 220 kV S/C Meerut-Shatabdinagar Transmission Line under transmission system associated with 220 kV System Strengthening Scheme in UP in Northern Region. Power Grid Corporation of India Limited
25.01.2021 27.01.2021 Transmission

25

510/TT/2019
25.01.2021 27.01.2021 Transmission

24

126/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations,2019 of Asset-1:315 MVA, 400/220 kV ICT-I and II along with bays and LILO of one ckt of 400 kV D/C Navsari-Kala Transmission Line at Magarwada Sub-station, Asset-2:400 kV, 80 MVAR Bus Reactor along with associated bays at GIS Magarwada (New) and Asset-3:LILO of 2nd ckt of 400 kV D/C Navsari-Boisar Transmission Line at Magarwada Sub-station under “Establishment of 400/220 kV GIS at Magarwada in Union Territory of Daman & Diu” in Western Region. Power Grid Corporation of India Limited
24.01.2021 27.01.2021 Transmission

23

69/TT/2020
24.01.2021 27.01.2021 Transmission

22

160/MP/2020
27.01.2021 27.01.2021 Misc.

21

336/MP/2020
27.01.2021 27.01.2021 Misc.

20

159/MP/2020
27.01.2021 27.01.2021 Misc.

19

185/MP/2020
27.01.2021 27.01.2021 Misc.

18

71/MP/2019
25.01.2021 27.01.2021 Misc.

17

136/TT/2020
24.01.2021 27.01.2021 Transmission

16

186/MP/2018
25.01.2021 25.01.2021 Misc.

15

9/RP/2020
in
245/MP/2018
25.01.2021 25.01.2021 Review

14

404/MP/2019
25.01.2021 25.01.2021 Misc.

13

213/MP/2019
25.01.2021 25.01.2021 Misc.

12

211/MP/2019
25.01.2021 25.01.2021 Misc.

11

265/MP/2020
25.01.2021 25.01.2021 Misc.

10

579/AT/2020
25.01.2021 25.01.2021 Adoption

9

44/MP/2019
25.01.2021 25.01.2021 Misc.

8

64/MP/2019
25.01.2021 25.01.2021 Misc.

7

365/MP/2019
24.01.2021 24.01.2021 Misc.

6

177/MP/2019 and 178/MP/2019
24.01.2021 24.01.2021 Misc.

5

281/MP/2019
24.01.2021 24.01.2021 Misc.

4

151/MP/2019
24.01.2021 24.01.2021 Misc.

3

6/RP/2020 along with I.A. No. 11 of 2020
24.01.2021 24.01.2021 Review

2

354/GT/2018
24.01.2021 24.01.2021 Generation

1

157/MP/2018 alongwith I.A. 2 of 2019
24.01.2021 24.01.2021 Misc.