Sl.No. Petition No. Subject Date of Order Date of posting Order on website Category

631

8/TT/2022
30.12.2022 31.12.2022 Transmission

630

628/MP/2020
30.12.2022 31.12.2022 Misc.

629

491/MP/2020
30.12.2022 31.12.2022 Misc.

628

154/MP/2021
30.12.2022 30.12.2022 Misc.

627

206/MP/2022
30.12.2022 30.12.2022 Misc.

626

261/MP/2020
30.12.2022 30.12.2022 Misc.

625

166/MP/2021
30.12.2022 30.12.2022 Misc.

624

229/MP/2019
along with
230/MP/2019
286/MP/2019
227/MP/2019
222/MP/2019
223/MP/2019
237/MP/2019
238/MP/2019
30.12.2022 30.12.2022 Misc.

623

L-1/250/2019/CERC
30.12.2022 30.12.2022 Misc.

622

44/MP/2022
29.12.2022 29.12.2022 Generation

621

17/SM/2022
28.12.2022 28.12.2022 Suo-Motu

620

Corrigendum to Petition No. 234/MP/2019
232/MP/2019
231/MP/2019
224/MP/2019
236/MP/2019
233/MP/2019
228/MP/2019
226/MP/2019
27.12.2022 28.12.2022 Misc.

619

247/TL/2022
27.12.2022 27.12.2022 Licence (Transmission)

618

705/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset -I: Central Sector Portion of 1030.426 km, Asset-II: Central sector portion of 2186.339 km, Asset-III: BBMB portion of 208.438 km, Asset-IV: Central sector portion of 1646.039 km and Asset-V: BBMB portion of 2.35 km under “Establishment of Fibre Optic Communication System in Northern region”. Power Grid Corporation of India Limited
27.12.2022 27.12.2022 Transmission

617

364/MP/2019
23.12.2022 27.12.2022 Misc.

616

279/MP/2019
26.12.2022 27.12.2022 Misc.

615

16/SM/2022
26.12.2022 26.12.2022 Suo-Motu

614

189/MP/2019
23.12.2022 26.12.2022 Misc.

613

285/TD/2022
26.12.2022 26.12.2022 Licence

612

384/GT/2020
23.12.2022 23.12.2022 Generation

611

349/MP/2022 and 350/MP/2022
23.12.2022 23.12.2022 Misc

610

22/TT/2022
21.12.2022 23.12.2022 Transmission

609

16/RP/2022
in
108/GT/2020
20.12.2022 20.12.2022 Generation

608

12/SM/2022
19.12.2022 19.12.2022 Suo-Motu

607

Corrigendum to Petition No. 20/RP/2022
in
283/GT/2020
19.12.2022 19.12.2022 Review

606

48/RP/2022
in
673/TT/2020
16.12.2022 16.12.2022 Review

605

711/TT/2020
16.12.2022 16.12.2022 Transmission

604

606/MP/2020
16.12.2022 16.12.2022 Misc.

603

361/MP/2022
16.12.2022 16.12.2022 Misc.

602

94/MP/2022

Petition under Sections 79(1)(b) and 79(1)(f) of the Electricity Act, 2003, for seeking issuance of urgent directions upon the Respondents for making immediate payment of an amount of Rs. 39,50,89,662/- which has been illegally deducted by them from the monthly energy bills issued by the Petitioner for the period commencing from May’ 21 to October’ 21, and Rs. 26,50,88,621/- for the period November’ 21 to December’ 21 by unilaterally revising PAPP/ PPSA tariff on amount of a skewered and deliberate misinterpretation of the “Misdeclaration” provisions provided under the Article 11 of the Pilot Agreement for Procurement of Power (“PAPP”)/ Pilot Power Supply Agreement (“PPSA”) along with interest/ carrying cost, and consequent judicial command for adhering to the provisions of the PAPP/ PPSA in their letter and spirit. SKS Power Generation (Chhattisgarh) Limited
16.12.2022 16.12.2022 Misc.

601

492/MP/2020

Petition under Section79 (1) (c),79 (1)(d), 79 (1)(f) and 79 (1)(k) of the Electricity Act, 2003, for adjudication of dispute arising out of the action of Power Grid Corporation of India in relation to Bill-3 raised in contravention of Regulation 11 of the Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulation, 2010 read with Billing, Collection, Disbursement (BCD) Procedure and interalia, seeking declaration that the Petitioner is entitled for complete offset of charges billed in Bill-1 as well as Bill-3, in the event the quantum of transmission corridor availed by the Petitioner in any region is, for the corresponding period, equal to or more than the target region LTA quantum and for refund of monthly POC charges paid under Bill-3. DB Power Limited
15.12.2022 15.12.2022 Misc.

600

153/MP/2019
206/MP/2019
225/MP/2019
291/MP/2019
15.12.2022 15.12.2022 Misc.

599

233/GT/2020
15.12.2022 15.12.2022 Generation

598

728/MP/2020
15.12.2022 15.12.2022 Misc.

597

10/TT/2022
14.12.2022 15.12.2022 Transmission

596

144/MP/2019
14.12.2022 14.12.2022 Misc.

595

33/RP/2022
in
367/GT/2020
14.12.2022 14.12.2022 Review

594

158/MP/2022
14.12.2022 14.12.2022 Misc.

593

203/TD/2022
13.12.2022 14.12.2022 Licence

592

4/RP/2022
In
408/GT/2020
13.12.2022 13.12.2022 Review

591

15/SM/2022
09.12.2022 12.12.2022 Suo-Motu

590

Corrigendum to Petition No. 370/TT/2020
08.12.2022 09.12.2022 Transmission

589

320/TT/2020
08.12.2022 09.12.2022 Transmission

588

248/AT/2022
09.12.2022 09.12.2022 Adoption

587

30/RP/2022
in
173/MP/2020
08.12.2022 08.12.2022 Generation

586

278/MP/2018
303/MP/2018
304/MP/2018
339/MP/2018
07.12.2022 08.12.2022 Misc.

585

374/MP/2020
06.12.2022 07.12.2022 Misc.

584

22/RP/2022
in
486/GT/2020
07.12.2022 07.12.2022 Review

583

299/GT/2020
07.12.2022 07.12.2022 Generation

582

346/MP/2022
06.12.2022 06.12.2022 Misc.

581

23/RP/2022
in
451/GT/2020
06.12.2022 06.12.2022 Review

580

285/TD/2022
05.12.2022 06.12.2022 Licence

579

19/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: Kalpakkam PFBR-Sirucheri 230 kV D/C Line; Asset-2: Kalpakkam PFBR-Arani 230 kV D/C Line under Transmission System associated with Kalpakkam PFBR (500 MW) and Asset-3: Kalpakkam PFBR– Kanchipuram 230 kV D/C Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region. Power Grid Corporation of India Limited
05.12.2022 05.12.2022 Transmission

578

169/TT/2020
05.12.2022 05.12.2022 Transmission

577

36/TT/2021
05.12.2022 05.12.2022 Transmission

576

76/MP/2022
05.12.2022 05.12.2022 Misc.

575

20/RP/2022
in
283/GT/2020
03.12.2022 05.12.2022 Review

574

247/TL/2022
01.12.2022 02.12.2022 Licence (Transmission)

573

17/RP/2022
in
452/MP/2019
30.11.2022 30.11.2022 Review

572

205/GT/2020
30.11.2022 30.11.2022 Generation

571

67/MP/2022
30.11.2022 30.11.2022 Misc.

570

293/MP/2018
294/MP/2018
150/MP/2019
471/MP/2019 alongwith IA 60/2020
30.11.2022 30.11.2022 Misc.

569

709/TT/2020
30.11.2022 30.11.2022 Transmission

568

92/TT/2022
30.11.2022 30.11.2022 Transmission

567

145/GT/2020
30.11.2022 30.11.2022 Generation

566

Corrigendum to Petition No. 287/GT/2020
30.11.2022 30.11.2022 Generation

565

247/MP/2021
30.11.2022 30.11.2022 Misc.

564

253/TT/2021
30.11.2022 30.11.2022 Transmission

563

191/GT/2020
28.11.2022 28.11.2022 Generation

562

213/TD/2022
27.11.2022 27.11.2022 Licence

561

12/MP/2019
25.11.2022 25.11.2022 Misc.

560

80/MP/2019
25.11.2022 25.11.2022 Misc.

559

188/MP/2018
185/MP/2018
190/MP/2018
191/MP/2018
184/MP/2018
52/MP/2019
70/MP/2019
25.11.2022 25.11.2022 Misc.

558

202/MP/2019
25.11.2022 25.11.2022 Misc.

557

341/MP/2020
25.11.2022 25.11.2022 Misc.

556

221/TL/2022
25.11.2022 25.11.2022 Licence (Transmission)

555

243/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: Pugalur HVDC station-Edayarpalayam (TANTRANSCO) 400 kV (Quad) D/C transmission line along with associated bays at Pugalur HVDC Station and Edayarpalayam (TANTRANSCO)-Udumalpet 400 kV (Quad) D/C transmission line along with associated bays at Udumalpet Sub-station (Pugalur HVDC-Edayarpalayam line and Edayarpalayam-Udumalpet line are bypassed at Edayarpalayam Sub-station to make Pugalur HVDC-Udumalpet line as an interim arrangement) and Asset-2: Pugalur (HVDC Station)-Thiruvalam 400 kV (Quad) D/C Transmission line along with associated bays and equipment at both ends and 2 numbers 80 MVAR line Reactors at Pugalur (HVDC Station) and 2 numbers 63 MVAR line reactors at Thiruvalam (existing 63 MVAR Bus reactor at Thiruvalam shall be utilized as line reactor in one circuit and second circuit shall have new 63 MVAR Line Reactor) under “HVDC Bipole link between Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu)-North Trichur (Kerala)-Scheme-2 AC System strengthening at Pugalur end” in the Southern Regional Grid. Power Grid Corporation of India Limited
24.11.2022 24.11.2022 Transmission

554

134/MP/2022
24.11.2022 24.11.2022 Misc.

553

135/MP/2018
24.11.2022 24.11.2022 Misc.

552

40/RP/2022
in
192/GT/2020
24.11.2022 24.11.2022 Review

551

424/MP/2019
24.11.2022 24.11.2022 Misc.

550

259/MP/2022
22.11.2022 22.11.2022 Misc.

549

110/MP/2019
along with IAs No. 37/IA/2019, 53/IA/2019 & 29/IA/2020
22.11.2022 22.11.2022 Misc.

548

Corrigendum to Petition No. 349/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014- 19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset consisting of Asset-A: 400 kV Vadodra-Pirana transmission line along with associated bays at Pirana Sub-station (for direct inter connection with 400 kV D/C Vadodra-Asoj transmission line under interim contingency scheme), Asset-B1: 765 kV Indore-Vadodara transmission line (for direct inter-connection with 400 kV D/C Vadodara-Asoj transmission line) by-passing Vadodara Pooling Sub-station under Interim contingency scheme, Asset-B2: Extension of bays at 765/400 kV Indore Sub-station including Switchable Line Reactor (3*80 MVAR, 765 kV) at Indore (initially charged as Bus Reactor under Interim Contingency Scheme till readiness of 765 kV S/C Indore-Vadodara transmission line), Asset-C1: 765/400 kV ICT 1 at Vadodara GIS, 765 kV bay at Vadodara GIS along with 240 MVAR Line Reactor at Vadodara – Indore line, 400 kV GIS bay at Vadodara for Vadodara-Pirana Circuit–2, Asset-C2: 765/400 kV ICT 2 at Vadodara GIS, Asset-C3: 400 kV GIS bay at Vadodara for Vadodara Pirana Circuit 2 and Asset-C4: 240 MVAR Bus Reactor with spare unit at Vadodara GIS under “Transmission System for IPP Generation Projects in Madhya Pradesh and Chhattisgarh in the Western Region”. Power Grid Corporation of India Limited
21.11.2022 21.11.2022 Transmission

547

196/MP/2019
21.11.2022 21.11.2022 Misc.

546

27/RP/2022
alongwith IA No. 51/IA/2022
21.11.2022 21.11.2022 Review

545

137/TL/2022
21.11.2022 21.11.2022 License (Transmission)

544

427/MP/2019
16.11.2022 17.11.2022 Misc.

543

116/TT/2017
16.11.2022 17.11.2022 Transmission

542

84/MP/2022
16.11.2022 16.11.2022 Misc.

541

12/TT/2022

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset: (I) LILO of Korba-Raipur at Sipat, (II) 765 kV Sipat-Seoni Ckt-I & 765/400 kV ICT-I at Seoni and LILO of 400 kV Bhilai-Satpura line along with bay equipment at Seoni (III) 400/220 kV ICT-I along with two 220 kV line bays at Seoni (IV) Ckt-II of 400 kV Nagda-Dehgam Line, (V) Ckt-I of Nagda-Dehgam Line, (VI) 400 kV D/C Seoni-Khandwa T/L alongwith associated bays, 80 MVAR Bus Reactor, 765/400 kV ICT-II at Seoni S/S, LILO of Sardar-Sarovar-Nagda Line & 315MVA, 400/220 kV ICT-I at Rajgarh, (VII) 765 kV Sipat-Seoni Ckt-II and (VIII) 315 MVA, 400/220 kV ICT-II at Seoni Sub-station, ICT-I at Rajgarh and (IX) 315 MVA, 400/220 kV ICT-II at Rajgarh under “Sipat-I Transmission System” in Western Region. Power Grid Corporation of India Limited
14.11.2022 15.11.2022 Transmission

540

266/MP/2022
14.11.2022 14.11.2022 Misc.

539

437/GT/2020
14.11.2022 14.11.2022 Generation

538

203/TD/2022
12.11.2022 14.11.2022 Licence

537

367/MP/2019
381/MP/2019
12.11.2022 14.11.2022 Misc.

536

222/AT/2022
12.11.2022 12.11.2022 Adoption

535

289/MP/2022
11.11.2022 11.11.2022 Misc.

534

77/MP/2022
11.11.2022 11.11.2022 Misc.

533

2/RP/2022
in
468/TT/2020
10.11.2022 11.11.2022 Review

532

234/MP/2019
232/MP/2019
231/MP/2019
224/MP/2019
236/MP/2019
233/MP/2019
228/MP/2019
226/MP/2019
10.11.2022 10.11.2022 Misc.

531

Corrigendum to Petition No. 284/GT/2020
10.11.2022 10.11.2022 Generation

530

247/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 in respect of (1) 400 kV K.V. Kota – Suryapet – I & II feeders for the period 2016-17 to 2018-19, (2) Part of PGCIL 400 kV VJA-NLR line (Nunna – Manubolu) to the extent of 18.405 km (Part of Nunna – Manubolu Ckt-3 from Loc. No: 532/15 to Loc. Nunna Sub-station + Part of VTPS – Manubolu Circuit from Loc. 532/16 to Loc. VTPS) for the period 2015-16 to 2018-19 pertaining to Transmission Corporation of Andhra Pradesh Limited (APTRANSCO) in Southern Region. Transmission Corporation of Andhra Pradesh Limited
07.11.2022 09.11.2022 Transmission

529

14/SM/2022
07.11.2022 07.11.2022 Suo-Motu

528

272/TD/2022
07.11.2022 07.11.2022 Licence

527

111/GT/2020
03.11.2022 03.11.2022 Generation

526

260/MP/2022
03.11.2022 03.11.2022 Misc.

525

153/MP/2022
31.10.2022 31.10.2022 Misc.

524

168/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: Bhiwani-Hisar 400 kV D/C line along with associated bays at Bhiwani and Hisar; Asset-2: LILO of Moga- Bhiwadi 400 kV D/C line at Hisar along with associated bays and Asset-3: 765 kV S/C Jaipur (RVPN) - Bhiwani TL (CKT-II) along with associated bays under “Northern Region system Strengthening Scheme XXV” in the Northern Region. Power Grid Corporation of India Limited
31.10.2022 31.10.2022 Transmission

523

93/TT/2020
31.10.2022 31.10.2022 Transmission

522

20/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset 1: 1 number 400 kV Line bay (at POWERGRID, Sikar end) along with 50 MVAR Non-Switchable line reactor for Circuit-I of 400 kV D/C Bikaner (RVPNL)- Sikar (PG) line, Asset 2: 1 number 400 kV Line bay (at POWERGRID, Sikar end) along with 50 MVAR Non-Switchable line reactor for Circuit-II of 400 kV D/C Bikaner (RVPNL)- Sikar (PG) line and Asset 3: 2 Numbers 220 kV Line bays at 765/400/220 kV Fatehpur Sub-station under “Line bays associated with various Regional Strengthening Schemes in the Northern Region”. Power Grid Corporation of India Limited
28.10.2022 28.10.2022 Transmission

521

205/MP/2021
28.10.2022 28.10.2022 Misc.

520

148/MP/2022
25.10.2022 25.10.2022 Misc.

519

657/TT/2020
25.10.2022 25.10.2022 Transmission

518

221/TL/2022
22.10.2022 22.10.2022 Licence (Transmission)

517

201/MP/2019
21.10.2022 21.10.2022 Generation

516

208/MP/2019
21.10.2022 21.10.2022 Misc.

515

251/MP/2019
20.10.2022 21.10.2022 Misc.

514

363/MP/2019
20.10.2022 20.10.2022 Misc.

513

Corrigendum to Petition No. 700/MP/2020
121/MP/2022
20.10.2022 20.10.2022 Misc.

512

270/TT/2021
20.10.2022 20.10.2022 Transmission

511

213/TD/2022
19.10.2022 19.10.2022 Licence

510

693/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Asset: (a) 400 kV Pugalur (HVDC Station)-Pugalur (Existing) (Quad) D/C Transmission Line along with associated bays at Pugalur (HVDC Station) & Pugalur (Existing) Sub-station and (b) 400 kV Pugalur (HVDC Station)-Arasur (Quad) D/C Transmission Line along with associated bays at Pugalur (HVDC Station) & Arasur station under “HVDC Bipole link between the Western Region (Raigarh, Chattisgarh) and Southern Region (Pugalur, Tamil Nadu)-North Trichur (Kerala)-Scheme-2 AC System Strengthening at Pugalur end” in the Southern Regional Grid. Power Grid Corporation of India Limited
17.10.2022 19.10.2022 Transmission

509

14/RP/2022
in
652/TT/2020
17.10.2022 17.10.2022 Review

508

548/GT/2020
17.10.2022 17.10.2022 Generation

507

700/MP/2020
121/MP/2022
17.10.2022 17.10.2022 Misc.

506

172/MP/2022
14.10.2022 14.10.2022 Misc.

505

118/MP/2022
14.10.2022 14.10.2022 Misc.

504

Corrigendum to Petition No. 244/GT/2020
13.10.2022 13.10.2022 Generation

503

42/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff from its COD to 31.3.2019 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: 765 kV D/C Bhuj Pool Sub-station-Banaskantha Transmission Line along with associated bays at both ends, 2x330 MVAR Switchable Line Reactors along with associated bays at both ends, 1 number 1500 MVA, 765/400 kV ICT-2 and 1 number 765 kV, 330 MVAR Bus Reactor along with associated bays at Bhuj Pooling Station, Asset-2: 1 number 1500 MVA, 765/400 kV ICT-1 along with associated bays at Bhuj Pooling Station, Asset-3: 1 number 400 kV, 125 MVAR Bus Reactor along with associated bays at Bhuj Pooling Station and Asset-4: 2 numbers 500 MVA, 400/220 kV ICTs along with associated bays at Bhuj Pooling Station covered under “Green Energy Corridors- Inter-State Transmission Scheme (ISTS)- Part-C” in the Western Region. Power Grid Corporation of India Limited
12.10.2022 13.10.2022 Transmission

502

14/TT/2022
12.10.2022 12.10.2022 Transmission

501

12/RP/2022
in
308/TT/2020
12.10.2022 12.10.2022 Review

500

210/MP/2022

Approval under Section 17(3) and Section 17(4) of Electricity Act 2003, for assignment of licence granted to Koppal-Narendra Transmission Limited pursuant to order dated 28.03.2022 bearing license No. 69/Transmission/2022/CERC (the “Transmission License”) by way of hypothecation for creation of security interest in favour of Axis Trustee Services Limited acting as the security trustee (“Security Trustee”), for the benefit of Axis Bank Limited (“Axis Bank”) (including their respective successors, transferees, novatees, and assigns) (collectively the “Lender”/ “Lenders”) and other secured parties (viz. Lenders’ Agent and the Security Trustee) and creation of other security by way of mortgage/ hypothecation/assignment of rights, title, interest, claims, demands, benefits of Koppal-Narendra Transmission Limited in the project under “Evacuation of power from RE sources in Koppal Wind Energy Zone (Karnataka) (2500MW)” on build, own, operate and maintain basis, as detailed in the schedule to the Transmission License (the “Project”), Project assets, clearances, project documents, agreements, approvals and rights, accounts, receivables of Koppal-Narendra Transmission Limited. Koppal-Narendra Transmission Limited
11.10.2022 11.10.2022 Misc.

499

137/TL/2022
07.10.2022 10.10.2022 Licence (Transmission)

498

165/TT/2022
07.10.2022 07.10.2022 Transmission

497

427/GT/2020
07.10.2022 07.10.2022 Generation

496

431/GT/2020
07.10.2022 07.10.2022 Generation

495

244/GT/2020
03.10.2022 04.10.2022 Generation

494

287/GT/2020
01.10.2022 02.10.2022 Generation

493

302/GT/2020
01.10.2022 02.10.2022 Generation

492

Addendum Order in Petition No. 282/GT/2020
01.10.2022 01.10.2022 Generation

491

347/MP/2019
30.09.2022 30.09.2022 Misc.

490

429/MP/2019
30.09.2022 30.09.2022 Misc.

489

40/MP/2022
47/MP/2022 along with IA No. 5/IA/2022
30.09.2022 30.09.2022 Misc.

488

365/GT/2020
30.09.2022 30.09.2022 Generation

487

685/TT/2020
29.09.2022 29.09.2022 Transmission

486

13/SM/2022
29.09.2022 29.09.2022 Suo-Motu

485

157/MP/2022
29.09.2022 29.09.2022 Misc.

484

359/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Assets consisting of Asset-1: 80 MVAR Bus Reactor at Kaithal Sub-station, Asset-2: LILO of both circuits of 400 kV D/C (QUAD) Meerut -Kaithal 400 kV D/C transmission line and associated bays at Bagpat GIS Sub-station, 125 MVAR Bus Reactor at Bagpat GIS Sub-station and 500 MVA, 400/220 kV ICT-I at Bagpat GIS Sub-station along with 1 number 220 kV line bays, Asset-3:500 MVA 400/220 kV ICT-II at Bagpat GIS Sub-station along with associated bays , Asset-4: 2 Numbers 220 kV Line bays associated with Bagpat GIS, Asset-5: One Number 220 kV line Bay (Bay no. 205 ) associated with Bagpat GIS Sub-station , Asset-6: One Number 220 kV line Bay ( Bay No.210) associated with Bagpat GIS Sub-station , Asset-7: One Number 220 kV line Bay ( Bay No.206 ) associated with Bagpat GIS Sub-station, Asset-8: One Number 220 kV line Bay (Bay No.207) associated with Bagpat GIS Sub-station , Asset-9: One Number 220 kV line Bay (Bay No. 212) associated with Bagpat GIS Sub-station under “Northern Region System Strengthening Scheme-XIX” in Northern Region. Power Grid Corporation of India Limited
28.09.2022 29.09.2022 Transmission

483

403/TT/2020
alongwith I.A. No. 14/IA/2022
27.09.2022 27.09.2022 Transmission

482

396/GT/2020
27.09.2022 27.09.2022 Generation

481

474/TT/2020
26.09.2022 27.09.2022 Transmission

480

254/TT/2021
26.09.2022 26.09.2022 Transmission

479

61/MP/2022
26.09.2022 26.09.2022 Misc.

478

149/TL/2022
26.09.2022 26.09.2022 Licence (Transmission)

477

90/MP/2022
26.09.2022 26.09.2022 Misc.

476

23/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 2 numbers of 240 MVAR, 765 kV Switchable Line Reactors (6x80 MVAR, 765 kV, 1-Ph Shunt Reactor), along with Reactor Bays & 2 Nos. 765 kV Line Bays including PLCC, Telecom equipment and Line Terminal equipment such as LA, CVT & Wave Trap at 765/400 kV Kurnool Sub-station under “Sub-station works associated with additional inter-regional AC link for import of power into Southern Region i.e. Warora-Warangal and Chilakaluripeta-Hyderabad-Kurnool 765 kV Link”. Power Grid Corporation of India Limited
23.09.2022 26.09.2022 Transmission

475

57/MP/2022
23.09.2022 23.09.2022 Generation

474

36/RP/2022
along with IA No. 57/2022
23.09.2022 23.09.2022 Review

473

489/GT/2020
22.09.2022 22.09.2022 Generation

472

654/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: Conversion of 02 numbers 400 kV, 50 MVAR line reactors into switchable line reactors at Abdullapur Sub-station, Asset-II: Conversion of 63 MVAR Fixed Line Reactor of 400 kV Balia (PG)-Sohawal (PG) Line Circuit -1 & 2 to Switchable Line Reactor at Balia (PG) and Conversion of 50 MVAR Fixed Line Reactor of 400 kV Balia (PG)-Sohawal (PG) Line Circuit -1 & 2 to Switchable Line Reactor at Sohawal (PG) and Asset-III: Conversion of 50 MVAR Fixed Line Reactor of 400 kV Kankroli-Zerda Line to Switchable Line Reactor at Kankroli Sub-station under “Conversion of Fixed Line Reactors into Switchable Line Reactors in the Northern Region” Power Grid Corporation of India Limited
20.09.2022 21.09.2022 Transmission

471

157/GT/2020
20.09.2022 20.09.2022 Generation

470

393/GT/2020
19.09.2022 19.09.2022 Generation

469

209/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: 2 numbers 400 kV line bays and 2 numbers 50 MVAR Switchable line reactors each at Cuddapah GIS and Madhugiri ends for terminating Cuddapah – Madhugiri 400 kV (quad) D/C line and Asset-2: 2 numbers 765 kV line bays and 1 number 240 MVAR Switchable line reactor on each circuit of Vemagiri II- Chilakaluripeta 765 kV D/C line at Vemagiri II Pooling Station (2 numbers 240 MVAR Switchable line reactors) under "Sub-station Works Associated with Strengthening of Transmission System beyond Vemagiri" in the Southern Region Power Grid Corporation of India Limited
19.09.2022 19.09.2022 Transmission

468

179/MP/2022
19.09.2022 19.09.2022 Misc.

467

62/MP/2020
16.09.2022 19.09.2022 Misc.

466

19/RP/2021
in
312/TT/2020
13.09.2022 15.09.2022 Review

465

245/GT/2020
14.09.2022 14.09.2022 Generation

464

I.A. No. 50/2022
IN
128/MP/2022
13.09.2022 13.09.2022 Misc.

463

145/TL/2022
13.09.2022 13.09.2022 Licence (Transmission)

462

171/TL/2022
13.09.2022 13.09.2022 Licence (Transmission)

461

18/RP/2022
in
395/GT/2020
12.09.2022 13.09.2022 Review

460

22/RP/2022
in
486/GT/2020
12.09.2022 13.09.2022 Review

459

86/MP/2022
09.09.2022 09.09.2022 Misc.

458

12/SM/2022
08.09.2022 08.09.2022 Suo-Motu

457

186/MP/2022
07.09.2022 07.09.2022 Misc.

456

3/RP/2022
in
156/TT/2015
07.09.2022 07.09.2022 Review

455

43/TT/2022

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Hot Line Speech Communication (Computer Dialling) System for Grid Operation” consisting of PABX & Associated items as installed and commissioned in NERLDC & 07 nos. SLDCs (Assam, Meghalaya, Tripura, Nagaland, Mizoram, Arunachal Pradesh, Manipur) of North Eastern Region under project- “Establishment of Fiber Optic Communication under Wide band Communication Expansion plan in the North Eastern Region.” Power Grid Corporation of India Limited
05.09.2022 07.09.2022 Transmission

454

605/MP/2020
06.09.2022 07.09.2022 Misc.

453

370/TT/2020
05.09.2022 06.09.2022 Transmission

452

173/MP/2019
along with IA No. 67/IA/2020
06.09.2022 06.09.2022 Misc.

451

15/TT/2022
02.09.2022 04.09.2022 Transmission

450

16/TT/2022
02.09.2022 02.09.2022 Transmission

449

261/TT/2015

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from the date of commercial operation(COD) to 31.3.2019 in respect of Asset-1:765 kV Line Bay and 240 MVAR Switchable Line Reactor at Jabalpur Pooling Sub-station for 765 kV S/C Jabalpur-Bina Circuit-III (IPTC); Asset-2: 765 kV Line Bay and 240 MVAR Line Reactor (Non-switchable) at Bina Sub-station for 765 kV S/C Jabalpur-Bina Circuit-III (IPTC); Asset-3: 765 kV Line Bay and 240 MVAR Line Reactor at Jabalpur PS and 765 kV Line Bay and 330 MVAR Switchable Line Reactor at Dharamjaygarh Sub-station for Circuit-3 of 765 kV D/C (Circuit-3 & 4) Dharamjaygarh-Jabalpur PS Transmission Line (IPTC); Asset-4: 765 kV Line Bay and 240 MVAR Line Reactor at Jabalpur PS and 765 kV Line Bay and 330 MVAR Switchable Line Reactor at Dharamjaygarh Sub-station for Circuit-4 of 765 kV D/C (Circuit-3 & 4) Dharamjaygarh-Jabalpur PS Transmission line (IPTC) under "Line Bays and Reactor Provisions at Powergrid Sub-stations associated with Common System Strengthening for Western Region and Northern Region" for tariff block 2014-19 in Western Region. Power Grid Corporation of India Limited
02.09.2022 02.09.2022 Transmission

448

380/MP/2019
334/MP/2019
01.09.2022 01.09.2022 Misc.

447

32/MP/2022 along with IA Nos. 33/IA/2022 and 43/IA/2022
181/MP/2022
31.08.2022 31.08.2022 Misc.

446

8/TT/2021
30.08.2022 31.08.2022 Transmission

445

152/MP/2022

Petition for approval under Section 17(3) and Section 17(4) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission License and other related matters) Regulations, 2009 for creation of security interest by way of mortgage, hypothecation, charge or assignment over all the movable and immovable assets including over rights, title, interest, claims, demands, benefits under mortgaged properties, project assets, clearance, project documents, agreements and approvals of Kohima-Mariani Transmission Limited in favour of the Security Trustee, i.e., Axis Trustee Services Limited (Respondent No. 8) and for approval of documents creating security and of other documents in relation to the financing of long term loan requirements of the Transmission Project build, owned, operated and maintained by Kohima-Mariani Transmission Limited. Kohima-Mariani Transmission Limited
30.08.2022 30.08.2022 Misc.

444

12/TT/2021
29.08.2022 30.08.2022 Transmission

443

20/RP/2022
in 283/GT/2020
along with IA No. 45/IA/2022
30.08.2022 30.08.2022 Review

442

583/MP/2020
along with
I.A’s No. 68/IA/2021 and 76/IA/2021
29.08.2022 29.08.2022 Misc.

441

279/GT/2020
29.08.2022 29.08.2022 Generation

440

182/MP/2020
28.08.2022 29.08.2022 Misc.

439

143/GT/2020
29.08.2022 29.08.2022 Generation

438

16/RP/2022
in
108/GT/2020
27.08.2022 27.08.2022 Review

437

23/RP/2022
in
451/GT/2020
27.08.2022 27.08.2022 Review

436

89/MP/2022
26.08.2022 27.08.2022 Misc.

435

72/MP/2022
26.08.2022 26.08.2022 Misc.

434

151/RC/2022
25.08.2022 25.08.2022 Misc.

433

673/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019in respect of Asset-I: Combined Assets of 1) Charging of Tehri Pooling-Meerut line Ckt-I at 765kV level along with associated bays at Koteshwar (Tehri Pooling Station) end and 240 MVAR switchable line reactor and associated bays at Meerut end; 2) 765/400kV 800 MVA ICT- II alongwith associated bays at Koteshwar (Tehri Pooling Station); 3) 765/400kV 800 MVA ICT- III alongwith associated bays at Koteshwar (Tehri Pooling Station); 4) 765/400kV 800 MVA ICT- IV alongwith associated bays at Koteshwar (Tehri Pooling Station); Asset-II: Combined Assets of 1) Charging of Tehri Pooling-Meerut line Ckt-II at 765kV level along with associated bays at Koteshwar end and 240 MVAR switchable line reactor and associated bays at Meerut end; 2) 765/400kV 800 MVA ICT- I alongwith associated bays at Tehri (Koteshwar) (GIS Pooling Station); 3) 765/400kV 1500 MVA ICT alongwith associated bays at Meerut Sub-station; 4) Modification of series capacitor at Meerut Sub-station for operation at 765 kV level 5) 765 kV 240 MVAR Bus Reactor along with associated bay at Tehri (Koteshwar) under “Transmission System associated with Tehri Pump Storage Plant (PSP)” Power Grid Corporation of India Limited
24.08.2022 25.08.2022 Transmission

432

10/MP/2021
24.08.2022 24.08.2022 Misc.

431

Corrigendum to Petition No. 70/MP/2019
24.08.2022 24.08.2022 Misc.

430

52/MP/2019 along with IA 78 of 2022
23.08.2022 24.08.2022 Misc.

429

24/RP/2022
in
146/GT/2020
24.08.2022 24.08.2022 Review

428

373/MP/2019
23.08.2022 24.08.2022 Misc.

427

21/RP/2022
in
Petition No. 240/GT/2020
23.08.2022 23.08.2022 Review

426

349/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of theCombined Asset consisting of Asset-A:400 kV Vadodra-Pirana transmission line along with associated bays at Pirana Sub-station (for direct inter connection with 400 kV D/C Vadodra-Asoj transmission line under interim contingency scheme), Asset-B1:765 kV Indore-Vadodara transmission line (for direct inter-connection with 400 kV D/C Vadodara-Asoj transmission line) by-passing Vadodara Pooling Sub-station under Interim contingency scheme, Asset-B2:Extension of bays at 765/400 kV Indore Sub-station including Switchable Line Reactor (3*80 MVAR, 765 kV) at Indore (initially charged as Bus Reactor under Interim Contingency Scheme till readiness of 765 kV S/C Indore-Vadodara transmission line), Asset-C1:765/400 kV ICT 1 at Vadodara GIS, 765 kV bay at Vadodara GIS along with 240 MVAR Line Reactor at Vadodara – Indore line, 400 kV GIS bay at Vadodara for Vadodara-Pirana Circuit–2, Asset-C2: 765/400 kV ICT 2 at Vadodara GIS, Asset-C3: 400 kV GIS bay at Vadodara for Vadodara Pirana Circuit 2 and Asset-C4: 240 MVAR Bus Reactor with spare unit at Vadodara GIS under “Transmission System for IPP Generation Projects in Madhya Pradesh and Chhattisgarh in the Western Region”. Power Grid Corporation of India Limited
Corrigendum Order Date:- 21.11.2022
22.08.2022 23.08.2022 Transmission

425

19/RP/2022
in
296/GT/2020
23.08.2022 23.08.2022 Review

424

8/RP/2022
in
691/TT/2020
22.08.2022 23.08.2022 Review

423

284/GT/2020
18.08.2022 18.08.2022 Generation

422

259/MP/2021
17.08.2022 17.08.2022 Misc.

421

5/RP/2022
14.08.2022 16.08.2022 Review

420

23/RP/2021
in
132/TT/2020
14.08.2022 14.08.2022 Review

419

282/GT/2020
14.08.2022 14.08.2022 Generation

418

27/RP/2021
in
30/GT/2020
14.08.2022 14.08.2022 Review

417

16/RP/2021
in
36/TT/2020
12.08.2022 14.08.2022 Review

416

11/SM/2022
12.08.2022 13.08.2022 Suo-Motu

415

15/RP/2021
in
84/TT/2020
12.08.2022 13.08.2022 Review

414

514/MP/2020
11.08.2022 11.08.2022 Misc.

413

217/MP/2021
11.08.2022 11.08.2022 Misc.

412

70/MP/2019
09.08.2022 10.08.2022 Misc.

411

147/TD/2022
09.08.2022 09.08.2022 Licence

410

154/MP/2022
09.08.2022 09.08.2022 Misc.

409

170/AT/2022
08.08.2022 08.08.2022 Adoption

408

192/GT/2020
04.08.2022 04.08.2022 Generation

407

Corrigendum to Petition No. 9/TT/2021
04.08.2022 04.08.2022 Transmission

406

208/MP/2022
04.08.2022 04.08.2022 Misc.

405

70/MP/2018
03.08.2022 03.08.2022 Misc.

404

145/TL/2022
02.08.2022 02.08.2022 Licence (Transmission)

403

11/RP/2022
in
401/GT/2020
02.08.2022 02.08.2022 Review

402

171/TL/2022
02.08.2022 02.08.2022 Licence (Transmission)

401

158/MP/2021 along
with I.A. No. 61/2021
01.08.2022 01.08.2022 Misc.

400

647/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 Asset-I: 400 kV D/C Manesar-Neemrana line along with associated bays, Asset-II: 500 MVA, 400/220 kV ICT-1 at Neemrana, Asset-III: 315 MVA, 400/220 kV ICT-2 at Neemrana, Asset-IV: 400 kV D/C Bhiwadi – Neemrana transmission line along with associated bays, Asset-V: 80 MVAR Bus Reactor at Neemrana Sub-station, Asset-VI: LILO of 400 kV S/C Bhiwadi-Bassi transmission line at Kotputli Sub-station, Asset-VII: 315 MVA 400/220 kV ICT-I & II with 02 number of 220 kV line bays at Kotputli Sub-station, Asset-VIII: 04 number of 220 kV line bays at Kotputli and Asset-IX: 80 MVAR Bus Reactor at Kotputli Sub-station under “Northern Region System Strengthening Scheme-XV” in Northern Region. Power Grid Corporation of India Limited
29.07.2022 30.07.2022 Transmission

399

126/MP/2017
30.07.2022 30.07.2022 Misc.

398

133/MP/2021

Petition under Section 79 of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the relevant provisions of the PPA, inter alia seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 250 MW wind power project on account of Force Majeure events which delayed the Petitioner in performing its obligations under the Power Purchase Agreement dated 02.01.2018 (“PPA”); declaration that the Petitioner’s Termination Notice dated 20.06.2021 claiming discharge by way of termination of the PPA with respect to the limited un-commissioned capacity of 19.9 MW out of the Project, in accordance with Article 4.5.3 read with Article 13.5 of the PPA is valid and binding; and consequential reliefs in relation thereto. M/s ReNew Power Private Limited
29.07.2022 29.07.2022 Misc.

397

Corrigendum to Petition No. 271/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for (a) 400 kV Meerut-Mandola Ckt-I along with associated bays at Meerut and Mandola Sub-stations, (b) 400 kV Meerut-Mandola Ckt-II along with associated bays at Meerut and Mandola Sub-stations, (c) ICT-II along with associated bays at Meerut Sub-station (COD: 1.4.2003), (d) ICT-III along with associated bays at Meerut Sub-station, (e) ICT-I along with associated bays at Meerut Sub-station, (f) 800 kV Tehri-Meerut Ckt-I along with associated bays, (g) 800 kV Tehri-Meerut Ckt-II and 400 kV S/C Meerut- Muzaffarpur transmission line, and (h) ICT at Muzaffarnagar along with one No. 400 kV and one No. 220 kV bay under Tehri Transmission System in Northern Region. Power Grid Corporation of India Ltd
29.07.2022 29.07.2022 Transmission

396

33/TL/2022
28.07.2022 28.07.2022 Licence (Transmission)

395

10/SM/2022
26.07.2022 26.07.2022 Suo-Motu

394

210/MP/2017
25.07.2022 25.07.2022 Misc.

393

731/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and determination of transmission tariff for 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014 for Asset 1: OPGW link for Betul-Khandwa under Central Sector, Asset 2: OPGW link (125 km) for Mauda-Wardha under Central Sector, Asset 3: 6 numbers OPGW link (92.66 km) under State Sector, Asset 4A: 3 numbers OPGW link (656.926 km) under Central Sector, Asset 4B: OPGW link for Korba-Birsinghpur under Central Sector, Asset 5A: OPGW link (15.462 km) for 400 kV Xeldom-Madgaon under State sector, Asset 5B: OPGW link for 400 kV Vapi–Magarwada under Central Sector and Asset 6: 9 numbers of OPGW link under State Sector-OPGW link (169 km) for) associated with “Establishment of Fibre Optic Communication System in the Western Region under Master Communication Plan (Additional Requirement)”. Power Grid Corporation of India Limited
25.07.2022 25.07.2022 Transmission

392

707/TT/2020
25.07.2022 25.07.2022 Transmission

391

630/MP/2020
25.07.2022 25.07.2022 Misc.

390

Corrigendum to Petition No. 482/TT/2020
23.07.2022 24.07.2022 Transmission

389

150/AT/2022
23.07.2022 23.07.2022 Adoption

388

76/MP/2019
20.07.2022 20.07.2022 Misc.

387

62/MP/2022
20.07.2022 20.07.2022 Misc.

386

149/TL/2022
20.07.2022 20.07.2022 Licence (Transmission)

385

389/MP/2018
20.07.2022 20.07.2022 Misc.

384

272/MP/2021
along with
IA No. 88/IA/2021
20.07.2022 20.07.2022 Misc.

383

472/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset-A: (A1) Associated bays of 765 kV S/C Lucknow-Bareilly transmission line including 3×80 MVAR switchable line reactor at Lucknow (New) and line reactor at Bareilly (New) Sub-station, (A2): 2nd Circuit of 400 kV D/C (Quad) Bareilly (New)-Bareilly (Old) transmission line with associated bays and (A3) : 765/400 kV 1500 MVA ICT-I at Bareilly (New) Sub-station along with associated bays, Asset-B: 765 kV, 3x80 MVAR Bus reactors at Bareilly (New) Sub-station, Asset-C: Associated bays of 1st circuit of 400 kV D/C (Quad) Bareilly (New)- Bareilly (Old) Transmission Line, Asset-D: 765/400 kV 1500 MVA ICT-II at Bareilly (New) Sub-station along with associated bays, Asset-E: 1st circuit of 400 kV D/C (Quad) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays, Asset-F: 2nd circuit of 400 kV D/C (Quad) Bareilly (New)-Kashipur (PTCUL) Transmission Line and associated bays, Asset-G: 400 kV D/C Kashipur-Roorkee line along with associated bays, Asset-H: 400 kV D/C Roorkee-Saharanpur line along with associated bays, Asset-I: 125 MVAR Bus Reactor at Roorkee Sub-station, Asset-J: 765 kV S/C Bareilly-Lucknow Transmission Line at 400 kV level, Asset-K: One circuit of 400 kV D/C Bareilly (New)-Bareilly (Existing) Transmission Line under “Northern Region System Strengthening Scheme - XXI” in the Northern Region. Power Grid Corporation of India Limited
18.07.2022 19.07.2022 Transmission

382

171/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for determination of transmission tariff from the date of commercial operation (COD) to 31.3.2019 in respect of Asset-1: Loop in Portion of LILO of Kadapa-Hindupur 400 kV Double Circuit (D/C) line (both circuits) at NP Kunta Sub-station along with associated bays, Asset-2: Loop out Portion of LILO of Kadapa-Hindupur 400 kV D/C line (both circuits) at NP Kunta Sub-station along with associated bays, Asset-3: 2 numbers of 220 kV line bays (Bay No. 217 & 218) at NP Kunta Sub-station and Asset-4: 4 Numbers of 220 kV line bays (Bay No. 213, 214, 219 & 220) at NP Kunta Sub-station under “Transmission System for Ultra Mega Solar Park in Anantpur District, Andhra Pradesh - Part B (Phase-II). Power Grid Corporation of India Limited
18.07.2022 18.07.2022 Transmission

381

390/TT/2019
18.07.2022 18.07.2022 Transmission

380

105/TL/2022
18.07.2022 18.07.2022 Licence (Transmission)

379

69/TL/2022
18.07.2022 18.07.2022 Licence (Transmission)

378

30/TL/2022
and IA No. 32/2022
18.07.2022 18.07.2022 Licence (Transmission)

377

146/TL/2022
14.07.2022 14.07.2022 Licence
(Transmission)

376

191/MP/2022
12.07.2022 12.07.2022 Misc.

375

117/MP/2022
11.07.2022 12.07.2022 Misc.

374

49/MP/2021
11.07.2022 11.07.2022 Misc.

373

379/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset A1: 80 MVAR line reactor of Barh-I Line (charged as bus reactor) at Gorakhpur Sub-station, Asset A2: 80 MVAR line reactor of Barh-II Line (charged as bus reactor) at Gorakhpur Sub-station, Asset B:Barh-II TPS-Gorakhpur 400 kV D/C (Quad) line alongwith 400 kV line bays at Gorakhpur Sub-station (excluding switchable line reactor), Asset C: 125 MVAR Bus Reactor at Gorakhpur Sub-station, Asset D: Converting 2X80 MVAR Line Reactors at Gorakhpur end of 400 kV Barh – Gorakhpur (Quad) transmission line to 2X80 MVAr Switchable Line Reactors under “Immediate Evacuation System associated with Barh-II TPS” in Northern Region.PGCIL
11.07.2022 11.07.2022 Transmission

372

154/TT/2020
11.07.2022 11.07.2022 Transmission

371

189/TT/2021
11.07.2022 11.07.2022 Transmission

370

199/MP/2021
08.07.2022 08.07.2022 Misc.

369

254/TT/2019
08.07.2022 08.07.2022 Transmission

368

486/TT/2019
08.07.2022 08.07.2022 Transmission

367

80/MP/2022 With IA No. 11/2022

Petition under Section 79(1)(c), Section 79(1)(f) and Section 79(1)(k) of the Electricity Act, 2003 read with Regulations 27 and 28 of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2020 and provisions of the Transmission Service Agreement dated 13.02.2019, Long Term Access Agreement dated 26.11.2019 and the Supplementary Long-Term Access Agreement dated 31.08.2021 executed between Central Transmission Utility (erstwhile, Power Grid Corporation of India Limited) and Mahindra Susten Private Limited, seeking directions to Central Transmission Utility of India Limited, to extend the start date of long-term access for Mahindra Susten Private Limited and align the same with Scheduled Commercial Operation Date of the project as extended by Solar Energy Corporation of India Limited, or with further extensions as may be granted as per the terms of the PPA.Mahindra Susten Private Limited
08.07.2022 08.07.2022 Misc.

366

678/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: Unified Real Time Dynamic State Measurement (URTDSM) System (Control Center Equipment, PMU’s and associated equipment) integrated and commissioned at ERLDC Kolkata, SLDCs WBSETCL & DVC, Asset-II: URTDSM System (Control Center Equipment, PMU’s and associated equipment) integrated and commissioned at SLDCs of OPTCL of the Eastern Region under “Phase-I- Unified Real Time Dynamic State Measurement (URTDSM)”. PGCIL
07.07.2022 08.07.2022 Transmission

365

1/MP/2012 124/MP/2012 82/MP/2013 10/MP/2014
07.07.2022 07.07.2022 Misc.

364

200/MP/2021 & 201/MP/2021
06.07.2022 07.07.2022 Misc.

363

125/TD/2022
06.07.2022 06.07.2022 Licence.

362

147/TD/2022
06.07.2022 06.07.2022 Licence.

361

662/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset 1: Installation of +/- 200 MVAR Dynamic Compensation (STATCOM) along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400 kV Hyderabad Sub-station, Asset 2: Installation of +/- 200 MVAR STATCOM along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400/230 kV Udumalpet Sub-station, Asset 3: Installation of +/- 200 MVAR STATCOM along with 2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically Switched Capacitor (MSC) and co-ordinated control mechanism of MSCs and MSRs at 400/230 kV Trichy Sub-station under “System Strengthening in Southern Region XXI” in Southern Region.. PGCIL
05.07.2022 06.07.2022 Transmission

360

192/MP/2019
05.07.2022 05.07.2022 Misc.

359

26/RP/2021
in
Petition No.560/MP/2020
04.07.2022 04.07.2022 Review

358

129/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission(Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-1: SCADA/EMS systems for Main and backup SLDC of Chhattisgarh (CSPTCL); Asset-2: SCADA/EMS systems for Main and backup SLDC of Goa Electricity Department (GED); Asset-3: SCADA/ EMS system upgradation of Main and backup SLDCs and Sub-LDCs of Gujarat (GETCO); Asset-4: SCADA/EMS system up-gradation of Main and backup SLDCs and Sub-LDCs of Madhya Pradesh (MPPTCL); Asset-5: SCADA/EMS system upgradation of Main and backup SLDCs of Daman and Diu (DDED) and Asset-6: SCADA/EMS system upgradation of Main and backup SLDCs and Sub-LDCs of Dadar and Nagar Haveli (DNHED) under “Expansion/Upgradation of SCADA/EMS System of SLDC of the Western Region” in Western Region. Power Grid Corporation of India Limited
30.06.2022 30.06.2022 Transmission

357

23/TT/2021
30.06.2022 30.06.2022 Transmission

356

09/SM/2022
30.06.2022 30.06.2022 Suo-Motu

355

I.A. No.23 of 2022 in 95/MP/2022
29.06.2022 30.06.2022 Misc.

354

543/MP/2020
29.06.2022 30.06.2022 Misc.

353

423/TT/2019
29.06.2022 29.06.2022 Transmission

352

269/MP/2021
28.06.2022 29.06.2022 Misc.

351

12/RP/2022
in Petition No. 308/TT/2020
29.06.2022 29.06.2022 Review

350

159/MP/2022
27.06.2022 27.06.2022 Misc.

349

162/MP/2020
27.06.2022 27.06.2022 Misc.

348

42/TT/2020
27.06.2022 27.06.2022 Transmission

347

164/MP/2019
27.06.2022 27.06.2022 Misc.

346

17/RP/2022
in
Petition No. 452/MP/202019
27.06.2022 27.06.2022 Review

345

186/MP/2021
27.06.2022 27.06.2022 Misc.

344

187/MP/2021
27.06.2022 27.06.2022 Misc.

343

676/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1: Combined asset of 500 MVA, 400/220/33 kV ICT-I along with associated bays at Moga Sub-station; 500 MVA, 400/220/33 kV ICT-II along with associated bays at Moga Sub-station; 500 MVA 400/220 kV Spare Transformer for Northern Region at Neemrana; Asset-2: ICT 500 MVA 400/220 kV Bassi Extension Sub-station; Asset-3: ICT 315 MVA 400/220 kV Allahabad Extension Sub-station; Asset-4: ICT 500 MVA 400/220 kV Meerut Extension Sub-station ; Asset 5: 400/220 kV, 105 MVA ICT along with associated bays at Wagoora Sub-station; Asset-6: 500 MVA ICT along with associated bays at Ludhiana Sub-station; Asset-7: 2 no. of 220 kV bays at Ludhiana Sub-station; Asset 8: 02 No. 220 kV Line Bays at Moga under “Augmentation of Transformers in Northern region Part-A" in Northern Region. Power Grid Corporation of India Limited
25.06.2022 26.06.2022 Transmission

342

159/TT/2021
25.06.2022 26.06.2022 Transmission

341

99/MP/2022
24.06.2022 24.06.2022 Misc.

340

122/MP/2019
20.06.2022 20.06.2022 Misc.

339

100/MP/2022
18.06.2022 19.06.2022 Misc.

338

128/MP/2022

Petition under Section 11(2) of the Electricity Act, 2003 read with 79 of the Electricity Act, 2003, along with Regulation 111-113 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 inter alia seeking directions to Respondent Nos. 1 to 8 to procure the power generated and supplied by the Petitioner from 6.5.2022 onwards in terms of directions as issued by Ministry of Power on 5.5.2022 under Section 11 of the Electricity Act, 2003 and also seeking a declaration/direction with regard to rate/compensation at which such supply of power to Respondent Nos. 1 to 8 for the period between being 6.5.2022 to 31.10.2022, or such other period as extended by Ministry of Power from time to time, based on principles laid down with respect to Section 11(2) of the Electricity Act, 2003. Tata Power Company Limited
17.06.2022 17.06.2022 Misc.

337

107/TL/2022
16.06.2022 16.06.2022 Licence
(Transmission)

336

102/TL/2022
16.06.2022 16.06.2022 Licence
(Transmission)

335

39/MP/2022
16.06.2022 16.06.2022 Misc.

334

8/SM/2022
14.06.2022 15.06.2022 Suo-Motu

333

125/TD/2022
13.06.2022 14.06.2022 Licence

332

111/MP/2022
Along with
I.A. No. 36/IA/2022
13.06.2022 13.06.2022 Misc.

331

9/TT/2021
11.06.2022 12.06.2022 Transmission

330

482/TT/2020
10.06.2022 11.06.2022 Transmission

329

645/TT/2020
10.06.2022 10.06.2022 Transmission

328

485/GT/2020
10.06.2022 10.06.2022 Generation

327

276/TT/2019
09.06.2022 10.06.2022 Transmission

326

173/MP/2020
10.06.2022 10.06.2022 Misc.

325

367/GT/2020
09.06.2022 09.06.2022 Generation

324

28/RP/2021
in
Petition No. 347/MP/2020
09.06.2022 09.06.2022 Review

323

74/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Establishment of 2x500 MVA, 400/220 kV Pooling Station at Banaskantha (Radhanesda) (GIS) along with 1X125 MVAR bus reactor, 2 numbers of 400 kV line bays at Banaskantha (Radhanesda) (GIS) for interconnection of Banaskantha (Radhanesda) Pooling Station-Banaskantha (PG) 400 kV D/C (twin AL59) line and 4 numbers 220 kV line bays at 400/220 kV at Banaskantha (Radhanesda) Pooling Station under “Supplementary Transmission System for Ultra Mega Solar Power Park (700 MW) at Banaskantha (Radhanesda), Gujarat” in Western Region. Power Grid Corporation of India Limited
09.06.2022 09.06.2022 Transmission

322

12/RP/2021
in
Petition No. 167/TT/2020
08.06.2022 09.06.2022 Review

321

69/TL/2022
08.06.2022 08.06.2022 Licence (Transmission)

320

229/MP/2021
along with
IA No. 25/2022
07.06.2022 08.06.2022 Misc.

319

219/MP/2021
07.06.2022 08.06.2022 Misc.

318

103/MP/2021 along with I.A No.71/2021
104/MP/2021 along with I.A No.72/2021
35/MP/2022 along with IA No. 19/2022
36/MP/2022 along with IA No. 20/2022

Petition under Section 79 of the Electricity Act, 2003 along with statutory framework and the Tripartite Transmission Agreement dated 28.10.2018 executed between Power Grid Corporation of India Limited, ACME Solar Holdings Pvt. Ltd. and Fatehgarh-Bhadla Transmission Ltd., the Transmission Service Agreement dated 28.1.2019 executed between ACME Solar Holdings Pvt. Ltd. and Power Grid Corporation of India Ltd. and the Long-Term Access Agreement dated 3.6.2019 executed between Power Grid Corporation of India Ltd. and ACME Solar Holdings Pvt. Ltd. seeking directions to PGCIL to extend start date of LTA/commencement of LTA for ACME Deoghar Solar Power Pvt. Ltd., ACME Dhaulpur Powertech Pvt. Ltd. and align the same with the SCOD of the Projects as extended by SECI. 1.ACME Deoghar Solar Power Private Limited 2.ACME Dhaulpur Powertech Private Limited
3.ACME Solar Holdings Limited
08.06.2022 08.06.2022 Misc.

317

106/AT/2022
08.06.2022 08.06.2022 Adoption

316

469/TT/2020
06.06.2022 07.06.2022 Transmission

315

73/TT/2021
06.06.2022 07.06.2022 Transmission

314

666/TT/2020
06.06.2022 06.06.2022 Transmission

313

425/GT/2020
06.06.2022 06.06.2022 Generation

312

92/MP/2018
06.06.2022 06.06.2022 Misc.

311

7/SM/2022
06.06.2022 06.06.2022 Suo-Motu

310

31/MP/2021
06.06.2022 06.06.2022 Misc.

309

11/TT/2021

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff from the date of commercial operation (COD to 31.3.2019 under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 2 number of line bays at Amritsar 400/220 kV Sub-station, Asset-II (a): 2 number of line bays at Malerkotla GIS 400/220 kV Sub-station, Asset-II (b): 2 number of line bays at Malerkotla GIS 400/220 kV Sub-station, Asset-III: 2 number of 400 kV Malerkotla bays at 400/220 kV GIS Sub-station at Kurukshetra under “Northern Region System Strengthening Scheme-XXXI(Part-B)” in the Northern Region. Power Grid Corporation of India Limited
05.06.2022 05.06.2022 Transmission

308

435/GT/2020
04.06.2022 04.06.2022 Generation

307

381/TT/2020
04.06.2022 04.06.2022 Transmission

306

488/GT/2020
04.06.2022 04.06.2022 Generation

305

420/GT/2020
04.06.2022 04.06.2022 Generation

304

321/MP/2019
03.06.2022 03.06.2022 Misc.

303

32/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff from the date of commercial operation to 31.3.2019 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-A: Combined Asset consisting of Extension of both circuits of 400 kV D/C (Quad) Biharsharif-Sasaram line to Varanasi bypassing Sasaram & associated bays including 50 MVAR line Reactor in each circuit at Varanasi GIS Sub-station and 765 kV Gaya Bay of LILO (Loop in portion) of 765 kV S/C Gaya-Fatehpur T/L including 240 MVAR non-switchable line reactor at Varanasi GIS Sub-station, Asset-B: One circuit of 400 kV D/C Sasaram-Allahabad line to be shifted from NR to ER bus at Sasaram Sub-station and Asset-C: 765 kV Fatehpur Bay of LILO (Loop in portion) of 765 kV S/C Gaya-Fatehpur Line at Varanasi GIS Sub-station under “Northern Region System Strengthening Scheme- XXVIII” in Northern Region. Power Grid Corporation of India Limited
03.06.2022 03.06.2022 Transmission

302

105/TL/2022
03.06.2022 03.06.2022 Licence
(Transmission)

301

129/MP/2022
03.06.2022 03.06.2022 Misc.

300

274/TT/2020
02.06.2022 02.06.2022 Transmission

299

309/TT/2020
02.06.2022 02.06.2022 Transmission

298

690/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from the date of commercial operation (COD) to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: Pole-III (1500 MW) Extension off ±800 kV Champa & Kurukshetra HVDC stations for up gradation of existing HVDC convertor stations from 3000 MW to 6000 MW and Asset-II: Pole-IV (1500 MW) Extension of ± 800 kV Champa & Kurukshetra HVDC stations for up gradation of existing HVDC convertor stations from 3000 MW to 6000 MW under "Transmission System Strengthening in WR-NR Transmission Corridor for IPPs in Chhattisgarh". Power Grid Corporation of India Limited
01.06.2022 02.06.2022 Transmission

297

I.A No. 4/IA/2022
in
Petition No. 92/MP/2021
01.06.2022 01.06.2022 Misc.

296

144/MP/2022
01.06.2022 01.06.2022 Misc.

295

31/AT/2022
01.06.2022 01.06.2022 Adoption

294

2/GT/2021
01.06.2022 01.06.2022 Generation

293

625/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-1 : 15.5 Km Loop in portion of the line section to provide arrangement for evacuating ROJA power out of the LILO of both Ckts of 400 kV D/C Bareilly-Lucknow Line; Asset-2 : 315MVA, 400/220 kV ICT at Bhiwadi; Asset-3 : 400/220 kV 500 MVA ICT-I at Jaipur South Sub-station alongwith associated bays and 02 nos. 220 KV line bays; ... Power Grid Corporation of India Limited
31.05.2022 31.05.2022 Transmission

292

3/RP/2021
in Petition No. 172/TT/2018
(alongwith I.A. No. 13/2021 and I.A. No. 15/2021)
31.05.2022 31.05.2022 Review

291

120/MP/2022
31.05.2022 31.05.2022 Misc.

290

78/MP/2022
With IA No.9/2022
30.05.2022 30.05.2022 Misc.

289

452/GT/2020
29.05.2022 29.05.2022 Generation

288

205/MP/2021
28.05.2022 29.05.2022 Misc.

287

50/TL/2022
28.05.2022 28.05.2022 Licence
(Transmission)

286

24/AT/2022
27.05.2022 27.05.2022 Adoption

285

202/MP/2018
27.05.2022 27.05.2022 Misc.

284

271/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for (a) 400 kV Meerut-Mandola Ckt-I along with associated bays at Meerut and Mandola Sub-stations, (b) 400 kV Meerut-Mandola Ckt-II along with associated bays at Meerut and Mandola Sub-stations, (c) ICT-II along with associated bays at Meerut Sub-station, (d) ICT-III along with associated bays at Meerut Sub-station, (e) ICT-I along with associated bays at Meerut Sub-station, (f) 800 kV Tehri-Meerut Ckt-I along with associated bays, (g) 800 kV Tehri-Meerut Ckt-II and 400 kV S/C Meerut- Muzaffarpur transmission line, and (h) ICT at Muzaffarnagar along with one No. 400 kV and one No. 220 kV bay under Tehri Transmission System in Northern Region. Power Grid Corporation of India Limited
27.05.2022 27.05.2022 Transmission

283

675/TT/2020
27.05.2022 27.05.2022 Transmission

282

30/TL/2022
27.05.2022 27.05.2022 Licence
(Transmission)

281

138/MP/2022
27.05.2022 27.05.2022 Misc.

280

48/TL/2022
27.05.2022 27.05.2022 Licence
(Transmission)

279

21/RP/2021
(along with IA No. 21/IA/2021 and I.A. No.77/IA/2021)
in
Petition No. 104/TT/2020
27.05.2022 27.05.2022 Review

278

4/RP/2022
In
Petition No. 408/GT/2020
26.05.2022 27.05.2022 Review

277

223/TT/2020
27.05.2022 27.05.2022 Transmission

276

203/TT/2021
26.05.2022 27.05.2022 Transmission

275

488/TT/2019
26.05.2022 26.05.2022 Transmission

274

419/TT/2019
26.05.2022 26.05.2022 Transmission

273

352/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of the transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-A: Consisting of Asset-I: Combined Asset of 400 kV D/C Orai-Orai (UPPTCL) line and associated bays at both ends; 1000 MVA 765/400 kV ICT-I along with associated bays at Orai (GIS) Sub-station; 330 MVAR, 765 kV Bus Reactor-I along with bay at Orai Sub-station; Asset-II: 330 MVAR, 765 kV Bus Reactor-II along with bay at Orai Sub-station; Asset-IV(b): Circuit- II of 765 kV D/C Orai-Aligarh Line with associated bays including 240 MVAR Line Reactor in both Ckt at both end, Asset-V: Combined Asset of LILO of 765 kV S/C Kanpur-Jhattikara Line at Aligarh with associated bays; 330 MVAR, 765 kV Bus Reactor-I along with bay at Aligarh Sub-station; 330 MVAR switchable L/R in 765 kV S/C Kanpur-Aligarh Line at Aligarh, Asset-VI: Combined Asset of 330 MVAR, 765 kV Bus Reactor-II along with bay at Aligarh Sub-station; LILO of 765 kV S/C Agra-Meerut Line at Aligarh with associated bays, Asset-VII: Bay extension at Jhattikara end to convert line reactor of 765 kV S/C Kanpur-Jhattikara TL into switchable line reactor, Asset-IX: 765 kV D/C Jabalpur Pooling station - Orai TL along with 2x330 MVAR line reactor along with Bay Extension at 765/400 kV Jabalpur Pooling Station and 02 nos. 765 Jabalpur Line bays along with 2x330 MVAR line reactor at Orai Sub-station, Asset-X: LILO of one circuit of 765 kV Satna-Gwalior TL along with 765 kV Satna Line Bay at Orai Sub Station and 240 MVAR Line Reactor at Orai Sub-station and 765 kV Gwalior bay at Orai Sub-station; Asset-B: consists of Asset-VIII: Conversion of existing line reactor at Gwalior end of Satna-Gwalior Ckt-1 TL (to be LILO at Orai) in to switchable line reactor and Asset-C: Consists of Asset-III- 1000 MVA, 765/400 kV ICT-II along with associated bays at Orai(GIS) Sub-station and Asset IV(a): Circuit-I of 765 kV D/C Orai- Aligarh Line with associated bays including 240 MVAR Line Reactor in both Ckt at both end under “Inter-Regional System Strengthening Scheme in WR and NR (Part-B)” in Northern Region and Western Region. Power Grid Corporation of India Limited
26.05.2022 26.05.2022 Transmission

272

22/RP/2021
in
Petition No. 29/GT/2020
25.05.2022 26.05.2022 Review

271

7/RP/2022
in
Petition No. 293/GT/2020
24.05.2022 25.05.2022 Review

270

119/MP/2022
24.05.2022 24.05.2022 Misc.

269

525/MP/2020

Petition under Section 79 read with Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 read with Regulation 33A and 33B of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission and related matters) Regulations, 2009 and Regulations 111 and 112 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 invoking the jurisdiction of the Commission for inter-alia resolving discrepancies arising on account of conflict between the SCOD under the PPA and the date of operationalisation of connectivity and long term access, for seeking recognition of Change in Law and Force Majeure events impacting the implementation of the Project by the Petitioner and seeking appropriate reliefs with regard to exemption from payment of transmission charges, opening a Letter of Credit for PoC charges and quashing of Default Notice issued by CTU. Sprng Renewable Energy Private Limited
23.05.2022 24.05.2022 Misc.

268

33/TL/2022
23.05.2022 23.05.2022 Licence
(Transmission)

267

Corrigendum to Petition No. 112/GT/2020
23.05.2022 23.05.2022 Generation

266

190/GT/2020
21.05.2022 22.05.2022 Generation

265

21/RP/2019
in
Petition No. 150/TT/2018
21.05.2022 22.05.2022 Review

264

733/TT/2020
20.05.2022 20.05.2022 Transmission

263

17/RP/2021
in
Petition No. 85/TT/2020
20.05.2022 20.05.2022 Review

262

692/TT/2020
19.05.2022 20.05.2022 Transmission

261

103/AT/2022
17.05.2022 17.05.2022 Adoption

260

11/RP/2021 in Petition No. 85/TT/2019
15.05.2022 15.05.2022 Review

259

238/MP/2017
13.05.2022 13.05.2022 Misc.

258

301/GT/2020
13.05.2022 13.05.2022 Generation

257

97/GT/2020
13.05.2022 13.05.2022 Generation

256

102/TL/2022
13.05.2022 13.05.2022 Licence (Transmission)

255

6/RP/2022 in Petition No.157/MP/2015 and Petition No. 121/MP/2017
and 9/RP/2022 in Petition No.157/MP/2015 and Petition No. 121/MP/2017
and 10/RP/2022 in Petition No.157/MP/2015 and Petition No. 121/MP/2017
13.05.2022 13.05.2022 Review

254

266/TT/2019

Identification of Maharashtra State Electricity Transmission Company Limited (MSETCL) 132 kV Nepanagar (from 220 kV Nepanagar Sub-station, Madhya Pradesh) to Dharni (132/33 kV Dharni Sub-station, MSETCL Amaravati Zone, Maharashtra) line as inter-State transmission system and further determination of inter-State transmission tariff for the tariff period 2019-24 under Section 79(1)(d) of the Electricity Act, 2003 read with Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and in accordance with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for inclusion in POC transmission charges as determined by the Central Electricity Regulatory Commission (CERC) time to time. Maharashtra State Electricity Transmission Company Limited (MSETCL)
11.05.2022 12.05.2022 Transmission

253

232/GT/2020
11.05.2022 11.05.2022 Generation

252

195/MP/2017
11.05.2022 11.05.2022 Misc.

251

28/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-A: 400/220 kV 1X500 MVA ICT-III at Satna along with associated ICT bays and 2 Number 220 kV line bays at Satna (Sub-station; Asset-B: 2 Number 500 MVA, 400/220 kV ICTs along with associated bays and 2 Number 220 kV line bays (for LILO of Parli - Harangul at Parli (Powergrid) Switching Station; Asset-C: 2 Number 220 kV line bays for Parli- Osmanabad 220 kV S/C line at Parli Sub-station; Asset-D: 2 Number 220 kV line bays at Mapusa (Colvale) (PowergridSub-station (for Mapusa (Colvale) (Powergrid) - Tuem 220 kV D/C line) and Asset-E: 2 Number 400 kV line bays for 400 kV D/C Indore (Powergrid)-Ujjain Transmission Line at 765/400 kV Indore (Powergrid) Sub-station under the "Western Region System Strengthening- XVI (WRSS XVI)" scheme in the Western Region. Power Grid Corporation of India Limited
10.05.2022 10.05.2022 Misc.

250

101/AT/2022
10.05.2022 10.05.2022 Adoption

249

Corrigendum to Petition No. 98/GT/2020
10.05.2022 10.05.2022 Generation

248

341/GT/2019
09.05.2022 10.05.2022 Generation

247

2/RP/2020
in
Petition No. 182/TT/2018
10.05.2022 10.05.2022 Review

246

6/SM/2022
09.05.2022 10.05.2022 Suo-Motu

245

146/GT/2020
09.05.2022 09.05.2022 Generation

244

102/TT/2020
07.05.2022 08.05.2022 Transmission

243

393/MP/2019
07.05.2022 08.05.2022 Misc.

242

235/GT/2020
07.05.2022 08.05.2022 Generation

241

241/GT/2020
07.05.2022 07.05.2022 Generation

240

182/GT/2019
07.05.2022 07.05.2022 Generation

239

13/MP/2021
07.05.2022 07.05.2022 Misc.

238

51/AT/2022
06.05.2022 06.05.2022 Adoption

237

5/SM/2022
06.05.2022 06.05.2022 Suo-Motu

236

677/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 determination and truing-up of the transmission tariff from COD to 31.3.2019 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for 02 nos. 400 kV GIS line bays alongwith 01 no. of 80 MVAR switchable line reactor (with 400 ohm NGR) along with associated bay at Kishanganj GIS Sub-station associated with 400 kV D/C (Quad) Kishanganj–Dharbhanga 400 kV D/C line (transmission line under TBCB) under “POWERGRID works associated with Transmission System Strengthening in Indian System for transfer of power from new HEPs in Bhutan” in Eastern Region. Power Grid Corporation of India Limited
05.05.2022 05.05.2022 Transmission

235

26/MP/2019
05.05.2022 05.05.2022 Misc.

234

97/MP/2021
05.05.2022 05.05.2022 Misc.

233

49/AT/2022
04.05.2022 04.05.2022 Adoption

232

404/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 1 X 500 MVA, 400/220 kV Transformer at Panchkula Sub-station, Asset-II: 1 X 500 MVA, 400/220 kV Transformer at Jalandhar Sub-station, Asset-III: 1 X 315 MVA, 400/220 kV Transformer at Samba Sub-station, Asset-IV: 400/220 kV, 3 X 105 MVA ICT along with associated bays at Hamirpur Sub-station, Asset-V: 220 kV, 2 numbers Line bays at Hamirpur Sub-station, Asset-VI: 220 kV, 2 numbers Line bays at Jallandhar Sub-station and Asset-VII: 1 X 500 MVA, 400/220 kV ICT-IV at GIS Gurgaon Sub-station under Augmentation of Transformers in Northern Region-Part B in Northern Region. Power Grid Corporation of India Limited
03.05.2022 03.05.2022 Transmission

231

98/GT/2020
02.05.2022 02.05.2022 Generation

230

107/TL/2022
29.04.2022 01.05.2022 Licence
(Transmission)

229

296/GT/2020
30.04.2022 30.04.2022 Generation

228

663/TT/2020
30.04.2022 30.04.2022 Transmission

227

279/TD/2021
29.04.2022 29.04.2022 Licence

226

413/TT/2020
27.04.2022 27.04.2022 Transmission

225

507/TT/2020
27.04.2022 27.04.2022 Transmission

224

60/TT/2017
26.04.2022 26.04.2022 Transmission

223

272/TT/2020
26.04.2022 26.04.2022 Transmission

222

46/MP/2022
26.04.2022 26.04.2022 Misc.

221

285/MP/2021
26.04.2022 26.04.2022 Misc.

220

Corrigendum to Petition No. 452/MP/2019
26.04.2022 26.04.2022 Misc.

219

345/MP/2018
25.04.2022 26.04.2022 Misc.

218

50/TL/2022
22.04.2022 22.04.2022 Licence
(Transmission)

217

40/MP/2019 along with IA No.22/2021
41/MP/2019 along with IA No. 23/2021
22.04.2022 22.04.2022 Misc.

216

88/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-A: Combined Asset for Part of 400 kV Double Circuit (D/C) Vapi-Navi Mumbai Transmission Line (T/L) (from Vapi Gantry till 1st M/C point at Loc. AP-18) along with bay at Vapi and 220 kV D/C Vapi-Khadoli Transmission line along with associated Bays, Asset-B: 400 kV D/C Vapi-Navi Mumbai Transmission Line, WR1 portion from AP 18 to AP 38 (Part of 400 kV D/C Vapi-Navi Mumbai Transmission Line), Asset-C1: Part of 400 kV D/C Navsari-Boisar T/L from AP 18 to AP 38/0 through LILO point of 400 kV D/C Navsari-Boisar at Magarwada GIS (23 B/0) (D/C portion strung on M/C Twin-Twin portion comprising of 400 kV D/C Navsari-Boisar and 400 kV D/C Vapi-Kudus) & Part of 400 kV D/C Vapi-Kudus T/L from AP 38/0 to AP 44 and Asset-C2: Part of 400 kV D/C Vapi-Kudus T/L from 104/0 to Kudus (MSETCL) Sub-station and associated bays at Kudus (MSETCL) Sub-station under Western Region System Strengthening Scheme-V in Western Region. Power Grid Corporation of India Limited
22.04.2022 22.04.2022 Transmission

215

Interlocutory Application Diary No. 35/2022
in
Petition Diary No.20/2022
22.04.2022 22.04.2022 Misc.

214

112/MP/2022
22.04.2022 22.04.2022 Misc.

213

26/RP/2021
in
Petition No.560/MP/2020
22.04.2022 22.04.2022 Review

212

486/GT/2020
21.04.2022 22.04.2022 Generation

211

246/MP/2018
21.04.2022 21.04.2022 Misc.

210

362/GT/2020
21.04.2022 21.04.2022 Generation

209

94/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 Asset-I: SCADA system at DVC, Asset-II: SCADA system at Sikkim, Asset-III: SCADA system at BSPTCL, Asset-IV: SCADA system at JUSNL, Asset-V: SCADA system at DVC Main control centre (Howrah), Asset-VI: SCADA system at BSPTCL (Integration of RTUs to Main & Backup Control Centres and RTUs: 44 Numbers), Asset-VII: SCADA system at DVC (Integration of RTUs to Main & Backup Control Centres and RTUs: 31 Numbers), Asset-VIII: SCADA system at JUSNL (Integration of RTUs to Main & Backup Control Centres and RTUs: 15 Numbers), Asset-IX: SCADA system at Sikkim (Integration of RTUs to Main & Backup Control Centres and RTUs: 5 Numbers) and Asset-X: SCADA system at BSPTCL (Integration of RTUs to Main & Backup Control Centres and RTUs: 10 Numbers) under Expansion/ Upgradation of SCADA/EMS System of SLDCs of Eastern Region. Power Grid Corporation of India Limited
18.04.2022 18.04.2022 Transmission

208

26/TT/2021

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and determination of transmission tariff for 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: Replacement of existing 1 no. 220/132 kV, 50 MVA, ICT(existing) by 160 MVA, 220/132 kV ICT-I at Balipara (PG) Sub-station along with replacement of 132 kV equipment and Asset-II: 2nd 400/220 kV, 315 MVA ICT, new 220 kV Bus arrangement (GIS) with 4 nos. of 220 kV Bays at Bongaigaon Sub-station of POWERGRID along with stringing of 2nd Circuit of 220 kV D/C Bongaigaon-Salakati Transmission Line and 1 no. of 220 kV line bay at Salakati Sub-station (for 220 kV D/C Bongaigaon-Salakati Transmission Line) under “North Eastern Region Strengthening Scheme-III” in the North-Eastern Region. Power Grid Corporation of India Limited
18.04.2022 18.04.2022 Transmission

207

451/GT/2020
16.04.2022 17.04.2022 Generation

206

2/RP/2021
16.04.2022 16.04.2022 Review

205

48/TL/2022
16.04.2022 16.04.2022 Licence (Transmission)

204

90/MP/2019
15.04.2022 16.04.2022 Misc.

203

3/GT/2021
15.04.2022 16.04.2022 Generation

202

467/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Assets of (i) 400 kV Gandhar-Padge Single Cirucit (S/C) transmission line with associated bays and 400 kV Gandhar-Gandhar S/C transmission line and (ii) 220 kV Gandhar-Bharuch Double Circuit (D/C) transmission line with associated bays and 400 kV Gandhar-Dehgam D/C transmission line with Sub-station at Dehgam associated with Gandhar Gas Power Station (Stage-I) in Western Region. Power Grid Corporation of India Limited
15.04.2022 15.04.2022 Transmission

201

240/GT/2020
14.04.2022 14.04.2022 Generation

200

Corrigendum to Petition No. 391/GT/2019
14.04.2022 14.04.2022 Generation

199

253/GT/2020
14.04.2022 14.04.2022 Generation

198

702/GT/2020
13.04.2022 13.04.2022 Generation

197

275/MP/2018
11.04.2022 12.04.2022 Misc.

196

680/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of true up of transmission tariff of 2009-14 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 in respect of Asset-1: LILO of one Circuit of 400 kV Bawana-Bahadurgarh-Hissar Line at Bhiwani Sub-station, truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: LILO of one Circuit of 400 kV Bawana-Bahadurgarh-Hissar Line at Bhiwani Sub-station; Asset-2: 400/220 kV 315 MVA ICT-I & II along with associated bays at Bhiwani Sub-station; Asset-3: LILO of Circuit-1 of 400 kV D/C Bareilly-Mandola Line at Meerut Sub-station; Asset-4: LILO of Circuit-2 of 400 kV D/C Bareilly-Mandola Line at Meerut Sub-station; Asset-5: 765 kV Bays for Bhiwani-Moga Line at Bhiwani Sub-station; 765 kV 240 MVAR Bus Reactor-I along with associated bays at Bhiwani Sub-station; 765/400 kV 1000 MVA ICT-I along with associated bays at Bhiwani Sub-station; 2 Numbers 400 kV Bays for Hisar-Bahadurgarh at Bhiwani Sub-station; Asset-6: LILO of Hisar-Bawana at Bhiwani along with 2 Numbers 400 kV Bays at Bhiwani Sub-station; Asset-7: 765 kV bays for Jattikalan- Bhiwani Line at Bhiwani Sub-station; Asset-8: 765 kV S/C Meerut-Bhiwani Line along with associated bays at Meerut and Bhiwani and 765 kV, 240 MVAR Line Reactor at Bhiwani Sub-station; Asset-9: 765/400 kV,1000 MVA ICT-II along with associated bays at Bhiwani Sub-station; Asset-10: 765 kV 240 MVAR Bus Reactor-II along with associated bays at Bhiwani Sub-station, and Asset-11: 400/220 kV Ballabhgarh Sub-station (re-alignment works) under “765 kV System for Central Part of Northern Grid-Part III” in Northern Region. Power Grid Corporation of India Limited
11.04.2022 11.04.2022 Transmission

195

115/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods and truing-up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: 500 MW HVDC back to back station at Gazuwaka, Asset-II: Vijayawada-Gazuwaka 400 kV D/C Line and 50% FSC Jeypore-Gazuwaka 400 kV D/C Transmission Line at Jeypore and Asset-III: (a) 40% FSC on Rengali-Indravati 400 kV S/C Transmission Line and (b) 40% FSC on Meramundali-Jeypore 400 kV S/C Transmission Line at Jeypore under “Augmentation of capacity of Gazuwaka HVDC back to back project (500 MW)” in Southern Region and Eastern Region. Power Grid Corporation of India Limited
11.04.2022 11.04.2022 Transmission

194

260/AT/2021
11.04.2022 11.04.2022 Adoption

193

198/MP/2019
along with IA No.57/2021
10.04.2022 11.04.2022 Misc.

192

277/AT/2021
11.04.2022 11.04.2022 Adoption

191

5/RP/2020 in Petition No. 361/TT/2018
09.04.2022 11.04.2022 Review

190

426/GT/2020
08.04.2022 09.04.2022 Generation

189

258/AT/2021
08.04.2022 08.04.2022 Adoption

188

703/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset-I: Asset-(i): LILO connectivity to DVC’s Andal TPS (portion of 400 kV Durgapur-Jamshedpur Transmission Line), Asset (ii): 400 kV D/C Bripada-Mendhasal Transmission Line and associated bays at Baripada and Mendhasal Sub-station, Asset (iii): 400 kV D/C Andal (DVC)-Jamshedpur section of Durgapur Jamshedpur Transmission Line and associated bays at Jamshedpur and Asset (iv): 400 kV D/C Baripada-DVC (Jamshedpur) Transmission Line (part of 400 kV D/C Jamshedpur-Baripada Transmission Line) and associated bays at Baripada Sub-station, Asset-II: Balance portion of 400 kV D/C Baripada-Jamshedpur (DVC) Transmission Line along with bay at Jamshedpur, Asset-III: Re-Conductoring of Ckt-II of 400 kV D/C Siliguri-Purnea (HTLS Conductor.) Transmission Line, and Asset-IV: Re-Conductoring of Ckt-I of 400 kV D/C Siliguri-Purnea (HTLS Conductor) Transmission Line under “Eastern Region Strengthening Scheme-I” in Eastern Region.PGCIL.
08.04.2022 08.04.2022 Transmission

187

6/RP/2021 in 136/TT/2017
08.04.2022 08.04.2022 Review

186

149/MP/2019
06.04.2022 07.04.2022 Misc.

185

278/AT/2021
07.04.2022 07.04.2022 Adoption

184

Addendum in 7/SM/2021
06.04.2022 06.04.2022 Misc.

183

279/TD/2021
06.04.2022 06.04.2022 Licence

182

234/MP/2021
05.04.2022 06.04.2022 Misc.

181

394/MP/2018
05.04.2022 05.04.2022 Misc.

180

276/AT/2021
05.04.2022 05.04.2022 Adoption

179

689/TT/2020
04.04.2022 05.04.2022 Transmission

178

195/MP/2021
05.04.2022 05.04.2022 Misc.

177

498/MP/2020
04.04.2022 04.04.2022 Misc.

176

286/AT/2021
02.04.2022 02.04.2022 Adoption

175

4/SM/2022
01.04.2022 01.04.2022 Suo-Motu

174

212/MP/2019
31.03.2022 31.03.2022 Misc.

173

71/RC/2022
31.03.2022 31.03.2022 Misc.

172

32/RP/2020
in
Petition No. 107/TT/2017
31.03.2022 31.03.2022 Review

171

3/SM/2022
31.03.2022 31.03.2022 Suo-Motu

170

293/GT/2019
31.03.2022 31.03.2022 Generation

169

250/MP/2021
31.03.2022 31.03.2022 Misc.

168

219/TT/2020
29.03.2022 30.03.2022 Transmission

167

655/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 1X500 MVA,765/400 kV Transformer as spare ICT at Agra Sub-station; Asset-II: 1X500 MVA, 765/400 kV Transformer as spare ICT at Fatehpur Sub-station; and Asset-III: 765/400 kV,500 MVA, single phase Auto Transformer as spare ICT at Jhatikara Sub-station under “Spare 765/400 kV Transformers for Northern Region” in Northern Region. Power Grid Corporation of India Limited
29.03.2022 29.03.2022 Transmission

166

476/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: Combined Assets of (1) 400 kV D/C Ajmer (New)-Ajmer (RVPN) Transmission Line along with associated bays at both ends; (2) 400 kV, 125 MVAR Bus Reactor along with associated bay at Ajmer (New) Sub-station; (3) 765/400 kV, 3X500 MVA ICT-I along with associated bays at Ajmer (New) Sub-station; (4) 400 kV D/C Chittorgarh (New)-Chittorgarh (RVPN) Transmission Line along with associated bays at both ends; (5) 765 kV, 240 MVAR Bus Reactor along with associated bay at Chittorgarh (New) Sub-station; (6) 400 kV, 125 MVAR Bus Reactor along with associated bay at Chittorgarh (New) Sub-station; (7) 765/400 kV, 3X500 MVA ICT-I along with associated bays at Chittorgarh (New) Sub-station; (8) 765/400 kV, 3X500 MVA ICT-II along with associated bays at Chittorgarh (New), Asset-II: Combined Assets of (1) 765 kV, 240 MVAR Bus Rector along with associated bay at Ajmer (New) Sub-station; (2) 765/400 kV, 3X500 MVA ICT-II along with associated bays at Ajmer (New) Sub-station, Asset-III: 2X400 kV D/C (Quad) Tirunelveli Pooling Station-Tuticorin Pooling station line along with new 400/230 kV (GIS) Tirunelveli Pooling Sub-station with 2X125 MVAR 400 kV Bus reactors and associated bays at 400/230 kV Tuticorin Pooling station and Asset-IV: 2X500 MVA 400/230 kV transformers along with associated bays and equipment at new 400/230 kV (GIS) Tirunelveli Pooling Sub-station covered under Green Energy Corridors: Inter-State Transmission Scheme (ISTS)- Part-A. Power Grid Corporation of India Limited
28.03.2022 29.03.2022 Transmission

165

280/TL/2021
28.03.2022 28.03.2022 Licence (Transmission)

164

121/TT/2020
26.03.2022 28.03.2022 Transmission

163

551/MP/2020
25.03.2022 25.03.2022 Misc.

162

284/TD/2021
25.03.2022 25.03.2022 Licence

161

136/MP/2019
25.03.2022 25.03.2022 Misc.

160

372/GT/2019
25.03.2022 25.03.2022 Generation

159

452/MP/2019
24.03.2022 24.03.2022 Misc.

158

65/MP/2019
22.03.2022 24.03.2022 Misc.

157

419/GT/2020
23.03.2022 23.03.2022 Generation

156

Corrigendum to Petition No. 533/MP/2020
Petition No. 538/MP/2020
23.03.2022 23.03.2022 Misc.

155

213/MP/2021
23.03.2022 23.03.2022 Misc.

154

35/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Ckt 2: Section of 400 kV D/C Teesta-III HEP-Kishanganj Transmission Line from Teesta III HEP to LILO Point at Rangpo; Ckt 1(a): Section of 400 kV D/C Teesta-III HEP-Kishanganj Transmission Line from Dikchu to Teesta III HEP; Ckt 1(b): Section of 400 kV D/C Teesta-III HEP- Kishanganj Transmission Line from Dikchu to LILO Point at Rangpo; Ckt 2(a): Section of 400 kV D/C Teesta-III HEP-Kishanganj Transmission Line from Rangpo LILO Point to Kishanganj along with 1 No. of bay and 1 No. of 63 MVAR reactor at Kishanganj; Ckt 1(c): Section of 400 kV D/C Teesta-III HEP-Kishanganj Transmission Line from Rangpo LILO Point to Kishanganj along with 1 No. of bay and 1 No. of 63 MVAR reactor at Kishanganj under “400 kV D/C (Quad Moose) Teesta-III HEP-Kishanganj transmission line along with two line bays and two number of 63 MVAR reactors at Kishanganj Switchyard” in Eastern Region. Teesta Valley Power Transmission Limited
22.03.2022 22.03.2022 Transmission

153

117/MP/2019
22.03.2022 22.03.2022 Misc.

152

112/GT/2020
22.03.2022 22.03.2022 Generation

151

257/TL/2021
22.03.2022 22.03.2022 Licence (Transmission)

150

262/TD/2021
22.03.2022 22.03.2022 Licence

149

395/GT/2020
21.03.2022 22.03.2022 Generation

148

3/TD/2022
21.03.2022 21.03.2022 Licence

147

285/MP/2019
21.03.2022 21.03.2022 Misc.

146

355/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of combined asset comprising of Asset-A: 400/220 kV, 315 MVA ICT-I at Fatehpur extension, 400/220 kV, 315 MVA ICT-II at Fatehpur Extension, LILO of Singhrauli-Kanpur at Fatehpur, LILO of Fatehpur (UPPCL)-Kanpur (UPPCL) 220 kV D/C line at Fatehpur, LILO of Allahabad-Kanpur 400 kV S/C Line at Fatehpur, 765 kV Sasaram-Fatehpur S/C Transmission Line, LILO of Ckt.-I 220 kV D/C Dehri-Bodhgaya at Gaya Sub-station and associated 220 kV Line bays, LILO of Ckt.-II 220 kV D/C Dehri-Bodhgaya at Gaya Sub-station and associated 220 kV Line bays, 315 MVA 400/220 kV ICT-I at Gaya Extension, 315 MVA 400/220 kV ICT-II at Gaya Extension, 765 kV S/C Fatehpur-Agra Transmission Line, Asset-B: 400 kV D/C Maithon (RB)-Ranchi (PG) Transmission Line and associated bays at Ranchi Sub-station, Asset-C: 400 kV D/C Maithon (RB)-Mejia Transmission Line, Asset-D: One Ckt. of 400 kV D/C Biharsharif-Sasaram Transmission Line (Ckt. III) and Part of Ckt. IV of 400 kV D/C Biharsharif-Sasaram Transmission Line charged as Biharsharif-Gaya line, Asset-E: Part of another Ckt. of 400 kV D/C Biharsharif-Sasaram Transmission Line (Ckt. IV) charged as Sasaram-Balia line, Asset-F: 400 kV D/C Maithon-Koderma (part of Koderma TPS-Gaya) (QUAD) Transmission Line, Asset-G: Balance portion of 400 kV D/C Koderma Gaya Transmission Line Ckt. II including multi circuit, Asset-H: Balance portion of 400 kV D/C Koderma Gaya Transmission Line Ckt. I including multi circuit and Asset-I: 400 kV D/C Bokaro TPS Extension-Koderma TPS line and PLCC Equipment for Koderma TPS-Bokaro TPS line under Supplementary Transmission System associated with DVC & Maithon Right Bank Project in Eastern and Northern Regions. Power Grid Corporation of India Limited
21.03.2022 21.03.2022 Transmission

145

450/MP/2019
21.03.2022 21.03.2022 Misc.

144

511/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of combined elements comprising of Kaiga - Narendra 400 kV D/C Transmission Line, 400/220 kV Sub-station at Narendra with one 315 MVA ICT and 2nd 315 MVA ICT at Narendra Sub-station under “Kaiga-Narendra Transmission System” in the Southern Region. Power Grid Corporation of India Limited
21.03.2022 21.03.2022 Transmission

143

656/TT/2020
21.03.2022 21.03.2022 Transmission

142

318/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: 400 kV Salem Pooling Station (Dharmapuri)-Salem 400 kV D/C Quad line along with new 765/400 kV Pooling Station at Salem (Dharmapuri) (initially charged at 400 kV) and bay extensions at Salem 400/220 kV existing Sub-station; and Asset-2: Salem Pooling Station-Madhugiri Pooling Station 765 kV S/C Line (initially charged at 400 kV) along with associated Bays and equipment at Salem PS and Madhugiri PS and 400 kV 63 MVAR line reactor at Madhugiri end only of the Salem Pooling Station-Madhugiri 765 kV S/C Line (Initially charged at 400 kV) under “Transmission System associated with Common System associated with Coastal Energen Private Limited and Ind-Bharat Power (Madras) Limited LTOA generation projects in Tuticorin area- Part-B in Southern Region”. Power Grid Corporation of India Limited
17.03.2022 19.03.2022 Transmission

141

391/GT/2019
17.03.2022 17.03.2022 Generation

140

364/GT/2020
16.03.2022 17.03.2022 Generation

139

314/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of 2004-09 and 2009-14 tariff periods, truing up of transmission tariff of 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: 400 kV D/C Rihand-Allahabad, Allahabad-Mainpuri and Mainpuri-Ballabgarh transmission line with associated bays, Asset-II: ICT-I at Patiala Sub-station, LILO of one circuit of Nalagarh-Hissar transmission line at Kaithal, 400 kV S/C Patiala-Malerkotla transmission and ICT- III at Abdullapur Sub-station with associated bays, Asset-III: ICT-I and II at Kaithal and 4 number of 220 kV line bays at Kaithal Sub-station, Asset-IV: ICT-II at Patiala Sub-station and LILO of one circuit (400 kV) of Nalagarh-Hissar transmission line at Patiala Sub-station with associated bays, Asset-V: 315 MVA, 400/220 kV ICT-I and ICT-II along with associated bays and 4 number 220 kV line bays at Mainpuri Sub-station, Asset-VI: 400 kV S/C Dadri-Panipat transmission line with associated bays and Asset-VII: 2 number of 220 kV bays at Abdullapur Sub-station under "Transmission System associated with Rihand Stage-Il” in Northern Region. Power Grid Corporation of India Limited
14.03.2022 15.03.2022 Transmission

138

357/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset-1: LILO of one circuit of 400 kV D/C Gooty-Tumkur (Vasantnarsapur) D/C line at Tumkur (Pavagada) pooling station, Asset-2: LILO of second circuit of 400 kV D/C Gooty-Tumkur (Vasantnarsapur) D/C line at Tumkur (Pavagada) pooling station along with associated bays and equipment, Asset-3: New 400/220 kV pooling station at Tumkur (Pavagada) with 1x500 MVA 400/220 KV ICT along with associated bays and equipment, Asset-4: 1x125 MVAR 400 kV Bus Reactor along with associated bays and equipment at 400/220 kV Tumkur (Pavagada) pooling station, Asset-5: LILO of 400 kV D/C Bellary-Tumkur (Vasantnarsapur) D/C (Quad Moose) Transmission Line at Tumkur (Pavagada) pooling station along with associated bays and equipment, Asset-6: 1x500 MVA 400/220 kV ICT-II at 400/220 kV Tumkur (Pavagada) pooling station along with associated bays and equipment and Asset-7: 1x500 MVA 400/220 kV ICT-III at 400/220 kV Tumkur (Pavagada) pooling station along with associated bays and equipment under Transmission System for Ultra Mega Solar Power Park at Tumkur (Pavagada), Karnataka-Phase-I in Southern Region. Power Grid Corporation of India Limited
14.03.2022 14.03.2022 Transmission

137

145/TT/2018
Along with
IA No.89/IA/2018, IA No. 47/IA/2020 & IA No.75/IA/2021
14.03.2022 14.03.2022 Transmission

136

1/RP/2022
in
Petition No.156/MP/2014
13.03.2022 13.03.2022 Review

135

653/TT/2020
13.03.2022 13.03.2022 Transmission

134

30/TT/2021
13.03.2022 13.03.2022 Transmission

133

107/GT/2020
11.03.2022 11.03.2022 Generation

132

28/RP/2021
in
347/MP/2020
10.03.2022 10.03.2022 Review

131

236/GT/2020
10.03.2022 10.03.2022 Misc.

130

674/TT/2020
08.03.2022 08.03.2022 Transmission

129

211/AT/2021
08.03.2022 08.03.2022 Misc.

128

278/GT/2020
08.03.2022 08.03.2022 Generation

127

34/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from the date of commercial operation (COD) to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-I: Combined Asset consisting of: a) 765 kV D/C Ajmer (New)-Bikaner (New) line along with 240 MVAR, 765 kV switchable line reactor and associated bays at Ajmer end and 330 MVAR, 765 kV switchable line reactor and associated bays at Bikaner end; b) 2 Nos. of 765/400 kV 3*500 MVA ICT along with associated bays at Bikaner Sub-station; c) 1 No. 765 kV, 3*110 MVAR Bus Reactor along with associated bays at Bikaner (New) Sub-station; d) 1 no. of 400 kV, 125 MVAR Bus Reactor along with associated bay at Bikaner (New) Sub-station ; e) LILO of one ckt. of 400 kV Badhla (RVPNL) - Bikaner (RVPNL) D/C line at Bikaner (New) along with associated Bays; and Asset-II: 765 kV D/C Bikaner (New)-Moga line along with 2 Nos. 330 MVAR, 765 kV switchable line reactor and associated bays at Bikaner end and 2 Nos. 330 MVAR, 765 kV switchable line reactor and associated bays at Moga end under “Green Energy Corridor ISTS-Part-D” in Northern Region. Power Grid Corporation of India Limited
08.03.2022 08.03.2022 Transmission

126

267/MP/2021
08.03.2022 08.03.2022 Misc.

125

479/TT/2020
06.03.2022 07.03.2022 Transmission

124

713/TT/2020
02.03.2022 03.03.2022 Transmission

123

664/TT/2020
02.03.2022 02.03.2022 Transmission

122

68/TT/2021
02.03.2022 02.03.2022 Transmission

121

378/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: LILO of both circuits of 400 kV D/C Kishenpur Wagoora T/L along with bays at New Wanpoh & 1 No. 315 MVA, 400/220 kV ICT-I along with associated bays at New Wanpoh and 03 No. 220 kV Line Bays; Asset-II: 400/220 kV 315 MVA ICT-II along with associated bays at New Wanpoh Sub-station; Asset-III: 400 kV 125 MVAR Bus Reactor along with associated bays; and Asset-IV: 400 kV D/C Kishenpur-New Wanpoh Line along with associated bays at both ends associated with “Northern Region System Strengthening Scheme-XVI” in Northern Region. Power Grid Corporation of India Limited
01.03.2022 02.03.2022 Transmission

120

289/TT/2019
28.02.2022 28.02.2022 Transmission

119

316/TT/2020
28.02.2022 28.02.2022 Transmission

118

70/MP/2019
28.02.2022 28.02.2022 Misc.

117

466/TT/2020
28.02.2022 28.02.2022 Transmission

116

248/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: (a) 50 MVAr Reactor at Narendra Sub-station, (b) Narendra–Davanagere 400 kV D/C Transmission Line and 50 MVAr Bus Reactor at Mysore, (c) LILO of Kolar-Sripreumbudur 400 kV S/C line along with 50 MVAr reactor at Kalivanthapattu; Asset-II: (d) 2nd Auto Transformer at Hiriyur Sub-station; Asset-III: (e) 1st 315 MVA Auto transformer at Kalivanthapattu Sub-station and (f) 2nd Auto transformer at Kalivanthapattu Sub-station along with associated bays and equipment; and Asset-IV: Mysore-Kozhikode 400 kV D/C Transmission Line along with new 400/220 kV Sub-station with 2x315 MVA ICTs and 2x50 MVAr Switchable Line Reactors at Kozhikode Sub-station and extension of Mysore Sub-station under transmission system associated with Kaiga 3 and 4 (2x235 MW) Project in the Southern Region. Power Grid Corporation of India Limited
28.02.2022 28.02.2022 Transmission

115

193/TT/2019
28.02.2022 28.02.2022 Transmission

114

24/RP/2020
in
Petition No. 367/MP/2019
28.02.2022 28.02.2022 Review

113

25/RP/2021
in
Petition No.135/MP/2021
28.02.2022 28.02.2022 Review

112

308/TT/2020
along with
IA No. 56/IA/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset–I: 400 kV D/C Palatana-Silchar Twin Moose Conductor Transmission Line, Asset–II: 400 kV D/C Silchar-Byrnihat (one circuit on D/C towers) Twin Moose Conductor Transmission Line, Asset–III: 400 kV D/C Byrnihat-Bongaigaon (one circuit on D/C towers) Twin Moose Conductor Transmission Line, Asset–IV: 400 kV D/C Silchar- Azara (one circuit on D/C towers) Twin Moose Conductor Transmission Line and Asset–V: 400 kV D/C Azara-Bongaigaon Transmission Line (one circuit on D/C towers) Twin Moose Conductor Transmission Line of North East Transmission Company Limited (NETCL) in North Eastern Region. North East Transmission Company Limited
28.02.2022 28.02.2022 Transmission

111

02/SM/2022
25.02.2022 26.02.2022 Suo-Motu

110

283/AT/2021
25.02.2022 25.02.2022 Misc.

109

169/MP/2021
24.02.2022 24.02.2022 Misc.

108

283/GT/2020
23.02.2022 23.02.2022 Generation

107

284/TD/2021
23.02.2022 23.02.2022 Trading

106

10/RP/2020
in
240/GT/2017
and
241/GT/2017
22.02.2022 22.02.2022 Review

105

614/MP/2020
Along with
IA No. 1/IA/2022
21.02.2022 22.02.2022 Misc.

104

275/MP/2019 along with IA No.9/2020
And
IA No. 2/2022
21.02.2022 22.02.2022 Misc.

103

250/MP/2019
And
IA No. 3/2022
21.02.2022 22.02.2022 Misc.

102

280/TL/2021
21.02.2022 21.02.2022 Licence (Transmission)

101

722/MP/2020
&
723/MP/2020
18.02.2022 20.02.2022 Transmission

100

256/MP/2021
18.02.2022 20.02.2022 Transmission

99

360/TT/2020
18.02.2022 19.02.2022 Transmission

98

273/MP/2021
18.02.2022 18.02.2022 Misc.

97

644/TT/2020
18.02.2022 18.02.2022 Transmission

96

3/TD/2022
17.02.2022 17.02.2022 Trading

95

652/TT/2020
17.02.2022 17.02.2022 Transmission

94

160/MP/2021
along with
IA No. 84/IA/2021
16.02.2022 16.02.2022 Misc.

93

262/TD/2021
15.02.2022 15.02.2022 Trading

92

523/MP/2020
15.02.2022 15.02.2022 Misc.

91

206/MP/2021
15.02.2022 15.02.2022 Misc.

90

266/TD/2021
15.02.2022 15.02.2022 Trading

89

268/MP/2021
14.02.2022 15.02.2022 Misc.

88

348/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of the Combined Asset consisting of Asset-I: LILO of Dehar-Bhiwani 400 kV S/C Line at Rajpura Sub-station, Asset-II: LILO of Dehar-Panipat 400 kV S/C Line at Panhckula Sub-station, Asset-III: Extension of Chamera 400/220 kV Pooling Sub-station (GIS)- 01 number of 220 kV line bay and Asset-IV: 400 kV Anta Bay at Kota Sub-Station for 400 kV S/C Anta-Kota Line (Line owned by RVPNL) associated with the “Northern Region System Strengthening Scheme-XXVII” in the Northern Region. Power Grid Corporation of India Limited
15.02.2022 15.02.2022 Transmission

87

373/MP/2019
14.02.2022 15.02.2022 Misc.

86

374/MP/2020
14.02.2022 15.02.2022 Misc.

85

562/MP/2020
With IA No. 79/2021
14.02.2022 14.02.2022 Misc.

84

25/RP/2021
in
Petition No.135/MP/2021
14.02.2022 14.02.2022 Review

83

276/GT/2018
along with
I.A No.72/IA/2019
12.02.2022 12.02.2022 Generation

82

179/MP/2020
11.02.2022 12.02.2022 Misc.

81

274/MP/2021
And
275/MP/2021
09.02.2022 10.02.2022 Misc.

80

Corrigendum to Petition No. 418/GT/2020
08.02.2022 09.02.2022 Generation

79

230/TD/2021
09.02.2022 09.02.2022 Trading

78

88/MP/2021
09.02.2022 09.02.2022 Misc.

77

Corrigendum to Petition No. 473/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff for the 2001-04, 2004-09 and 2009-14 tariff periods and truing up of transmission tariff for the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-a: 220 kV D/C RAPP-B-Chittorgarh Transmission Line, Asset-b: 220 kV S/C RAPP-B Udaipur Transmission Line, along with associated bays at Udaipur end and LILO of 220 kV D/C RAPP–Kota Line at RAPP-B including PLCC system and Asset-c: 220 kV S/C RAPP-B-Anta Transmission Line with associated bays at Anta end under “Transmission System associated with RAPP-B Project” in the Northern Region. Power Grid Corporation of India Limited
09.02.2022 09.02.2022 Misc.

76

24/MP/2019
08.02.2022 09.02.2022 Misc.

75

354/TT/2020
08.02.2022 09.02.2022 Transmission

74

24/RP/2021
in
373/MP/2020
07.02.2022 08.02.2022 Review

73

Corrigendum to Petition No. 314/TT/2019
08.02.2022 08.02.2022 Transmission

72

239/MP/2021
08.02.2022 08.02.2022 Misc.

71

257/TL/2021
07.02.2022 08.02.2022 Licence (Transmission)

70

Corrigendum to Petition No. 250/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: Addition of 1X160 MVA, 220/132 kV ICT along with associated bays at Ara 220/132 kV Sub-station, Asset II: Addition of 1X500 MVA, 400/220 kV ICT along with associated bays at Muzaffarpur 400/220 kV Sub-station, Asset III: 1 No. of 1x125 MVAR Bus Reactor and associated bay at 400 KV Maithon Sub-station, Asset IV: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (1st) at 400 KV Maithon Sub-station, Asset V: 01 No. of 01x125 MVAR Bus Reactor (1st) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VI: 01 No. of 1x125 MVAR Bus Reactor (2nd) and associated bay equipment at 400 KV Durgapur Sub-station, Asset VII: 02 Nos of 125 MVAR Bus Reactor I & II at Rengali Sub-station, Asset VIII: Installation of 01x125 MVAR Bus Reactor by replacing existing 1x50 MVAR Bus Reactor at 400 KV Rourkela Sub-station, Asset IX: Installation of 01x125 MVAR Bus Reactor in Parallel with existing 50 (3X16.67) MVAR Bus Reactor at Biharsharif Sub-station, Asset X: Installation of 1x125 MVAR Bus Reactor-II after replacing existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XI: Installation of 1x125 MVAR Bus Reactor-I in Parallel with existing 1X50 MVAR Bus Reactor at Jamshedpur Sub-station, Asset XII: Installation of 1X125 MVAR Bus Reactor at 400 kV Gazuwaka Sub-station, Asset XIII: Replacement of 1 No. of 1x315 MVA, 400/220 kV ICT with 1x500 MVA, 400/220 kV ICT (2nd) at 400 KV Maithon Sub-station under “Eastern Region Strengthening scheme-IX” in Eastern Region. Power Grid Corporation of India Limited
07.02.2022 07.02.2022 Transmission

69

Corrigendum to Petition No. 395/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-I: Ckt-III of 400 kV D/C Vindhyachal-Satna transmission line along with associated bays, Asset-II: 400/220 kV, 315 MVA ICT-II at Satna Sub-station, Asset-III: Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays, Asset-IV: LILO of 400 kV Satna-Bina Ckt-I & II at Bina (Power Grid) Sub-station, Asset-V: Circuit IV of 400 kV D/C Satna-Bina transmission line, Asset-VI: Circuit III of 400 k V D/C Satna-Bina transmission line, Asset-VII: LILO of 400 kV D/C Raipur-Rourkela transmission line alongwith associated bays, Asset-VIII: 400/220 kV 315, MVA ICT-II along with associated bays equipment at Raigarh Sub-station under “Vindhyachal Stage-III Transmission System” in the Western Region. Power Grid Corporation of India Limited
07.02.2022 07.02.2022 Transmission

68

209/TT/2020
07.02.2022 07.02.2022 Transmission

67

Corrigendum to Petition No. 477/TT/2019

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and revision of transmission tariff of the 2004-09 and 2009-14 tariff periods and truing up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Combined Asset consisting of Asset-1: 315 MVA ICT-IV along with associated bays at Moga Sub-station, Asset-2:ICT-II along with associated bays and 2 numbers PSEB feeder bays at Amritsar Sub-station, and 400 kV Bus reactor bay and 2 numbers PSEB line bays at Moga Sub-station under “Augmentation of transformation capacity at Amritsar and Moga Sub-stations” in the Northern Region. Power Grid Corporation of India Limited
05.02.2022 05.02.2022 Transmission

66

Corrigendum to Petition No. 7/TT/2020
05.02.2022 05.02.2022 Transmission

65

114/MP/2019
04.02.2022 04.02.2022 Misc.

64

Corrigendum to Petition No. 594/MP/2020
04.02.2022 04.02.2022 Misc.

63

514/MP/2020
and
49/MP/2021
04.02.2022 04.02.2022 Misc.

62

317/TT/2020
03.02.2022 04.02.2022 Transmission

61

671/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Asset-I: 1x500 MVA, 400/220 kV ICT along with associated transformer bays and 220 kV line bays at Itarsi Sub-station, Asset-II: 1x500 MVA, 400/220 kV ICT-2 along with associated bays and 2 numbers 220 kV line bays at 400/220 kV Indore Sub-station, Asset-III: 2 numbers 220 kV line bays at 400/220 kV Indore Sub-station, Asset-IV: 1x500 MVA, 400/220 kV ICT-1 along with associated bays at 400/220 kV Indore Sub-station, Asset-V: 1 number 220 kV line bay at 400/220 kV Indore Sub-station and Asset-VI: 1 number 220 kV line bay at 400/220 kV Indore Sub-station under Western Region System Strengthening Scheme-XIV in Western Region. Power Grid Corporation of India Limited
03.02.2022 03.02.2022 Transmission

60

34/MP/2022
02.02.2022 02.02.2022 Misc.

59

513/MP/2020
31.01.2022 31.01.2022 Misc.

58

401/GT/2020
31.01.2022 31.01.2022 Generation

57

16/MP/2021
31.01.2022 31.01.2022 Misc.

56

142/TT/2021
30.01.2022 30.01.2022 Transmission

55

688/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset A1: 420 kV, 125 MVAR Bus Reactor at Jabalpur Sub-station, Asset A2: 420 kV, 125 MVAR Bus Reactor at Khandwa Sub-station, Asset A3: 420 kV, 125 MVAR Bus Reactor at Bhatapara Sub-station, Asset B: 420 kV, 125 MVAR Bus Reactor at Shujalpur Sub-station, Asset C1: 420 kV, 125 MVAR Bus Reactor at Raigarh Sub-station, Asset C2: 420 kV, 80 MVAR Switchable Line Reactor at Solapur Sub-station and Asset C3: 420 kV, 125 MVAR Bus Reactor at Aurangabad Sub-station under Installation of Reactors in Western Region. Power Grid Corporation of India Limited
29.01.2022 29.01.2022 Transmission

54

636/MP/2020

Petition under Section 79(1)(b) of the Electricity Act, 2003 read with Article 10 of the Case-1 long-term Power Purchase Agreement dated 27.11.2013 along with Addendum No. 1 dated 20.12.2013 entered into between Dhariwal Infrastructure Ltd. and Tamil Nadu Generation and Distribution Corporation Ltd. for the supply of 100 MW Contracted Capacity from Unit 2 of its 2 x 300 MW Coal based thermal generating station located at Tadali, Chandrapur in the State of Maharashtra, seeking an in principle approval of the Additional Capital Expenditure to be incurred on account of installation of Limestone based Wet Flue Gas De-Sulphurization system necessitated by a Change in Law event i.e., Environment (Protection) Amendment Rules, 2015 dated 7.12.2015 and Environment (Protection) Amendment Rules, 2018 dated 28.6.2018 issued by the Ministry of Environment, Forest and Climate Change (MoEFCC) read with the letter issued by Central Pollution Control Board dated 11.12.2017. Dhariwal Infrastructure Limited
28.01.2022 28.01.2022 Misc.

53

300/MP/2018
and
301/MP/2018
28.01.2022 28.01.2022 Misc.

52

165/MP/2019
28.01.2022 28.01.2022 Misc.

51

174/MP/2019
28.01.2022 28.01.2022 Misc.

50

280/GT/2020
27.01.2022 27.01.2022 Generation

49

298/MP/2018
27.01.2022 27.01.2022 Misc.

48

15/MP/2019
25.01.2022 25.01.2022 Misc.

47

418/GT/2020
24.01.2022 25.01.2022 Generation

46

28/GT/2020
24.01.2022 25.01.2022 Generation

45

132/MP/2021
24.01.2022 25.01.2022 Misc.

44

1/SM/2022
22.01.2022 24.01.2022 Suo-Motu

43

627/MP/2020
24.01.2022 24.01.2022 Misc.

42

22/RP/2021
in
Petition No. 29/GT/2020
24.01.2022 24.01.2022 Review

41

251/TD/2021
23.01.2022 23.01.2022 Trading

40

325/TT/2020
22.01.2022 22.01.2022 Transmission

39

216/TT/2020 alongwith Petition No.184/TT/2013 & Petition No.146/TT/2016
22.01.2022 22.01.2022 Transmission

38

243/TT/2020
21.01.2022 21.01.2022 Transmission

37

89/TT/2020
21.01.2022 21.01.2022 Transmission

36

296/MP/2019
21.01.2022 21.01.2022 Misc.

35

345/MP/2020
21.01.2022 21.01.2022 Misc.

34

594/MP/2020
20.01.2022 21.01.2022 Misc.

33

286/MP/2018
20.01.2022 20.01.2022 Misc.

32

377/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-I: 125 MVAR Bus Reactor at 400/220 kV Sonepat Sub-station Extension; Asset-II: 125 MVAR Bus Reactor at 400/220 kV Jaipur (South) Sub-station Extension; Asset-III: 125 MVAR Bus Reactor at 400/220 kV Bassi Sub-station Extension; Asset-IV: 125 MVAR Bus Reactor at 400/220 kV Manesar Sub-station Extension; Asset-V: 125 MVAR Bus Reactor at 400/220 kV Panchkula Sub-station Extension; Asset-VI: 125 MVAR Bus Reactor at 400/220 kV Kaithal Sub-station Extension and Asset-VII: 125 MVAR Bus Reactor at 400/220 kV Kanpur Sub-station Extension under “Bus Reactors In Northern Region (Phase-II)” in Northern Region. Power Grid Corporation of India Limited
19.01.2022 19.01.2022 Transmission

31

700/MP/2020
19.01.2022 19.01.2022 Transmission

30

682/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of transmission tariff of the 2014-19 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset I(A): Extension of 400/220 kV Sikar Sub-station with 1X500 MVA, 400/220/33 kV auto transformer along with associated bays, Asset I(B): Extension of 400/220 kV Sikar Sub-station with 2 nos. 220 kV line bays, Asset II(A): 400/220 kV, 500 MVA ICT along with associated bays at 400/220 kV Mainpuri Sub-station and Asset II(B): 2 Numbers 220 kV line bays at 400/220 kV Mainpuri Sub-station under Augmentation of Transformation Capacity at Mainpuri and Sikar in Northern Region. Power Grid Corporation of India Limited
18.01.2022 19.01.2022 Transmission

29

544/MP/2020
along with
IA No. 54/IA/2020
18.01.2022 18.01.2022 Misc.

28

481/TT/2020

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of the 2014-19 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 of Combined Asset comprising of Asset 1: ±300 MVAR STATCOM at 400 kV Aurangabad Sub-station, Asset 2: ±200 MVAR STATCOM at 400 kV Gwalior Sub-station, Asset 3: ±300 MVAR STATCOM at 400 kV Satna Sub-station and Asset 4: ±300 MVAR STATCOM at 400 kV Solapur Sub-station under Installation of STATCOMs in Western Region. Power Grid Corporation of India Limited
18.01.2022 18.01.2022 Transmission

27

24/TT/2021

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing-up of the transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-A: 1 number 765 kV line bay at 765/400 kV Bilaspur Pooling Station for Sipat STPS (NTPC) - Bilaspur PS (PG) 765 kV 3rd S/C) and Asset-B: 2 Numbers 765 kV line bays at 765/400 kV Bilaspur Pooling Station (POWERGRID) for Bilaspur PS (PG)-Rajnandgaon(TBCB) 765 kV D/C line along with 2 Numbers 240 MVAR, 765 kV Switchable Line Reactors at 765/400 kV Bilaspur Pooling Station end under “POWERGRID Works associated with Additional System Strengthening for Sipat STPS” in Western Region. Power Grid Corporation of India Limited
18.01.2022 18.01.2022 Transmission

26

240/MP/2019
18.01.2022 18.01.2022 Misc.

25

449/MP/2019
17.01.2022 18.01.2022 Misc.

24

311/TT/2020
17.01.2022 17.01.2022 Transmission

23

163/TT/2020
17.01.2022 17.01.2022 Transmission

22

595/MP/2020
11.01.2022 14.01.2022 Misc.

21

293/GT/2020
11.01.2022 12.01.2022 Generation

20

710/TT/2020

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for truing up of transmission tariff of the 2009-14 and 2014-19 tariff periods under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Combined Asset consisting of Asset-1: 765 kV S/C Moga – Bhiwani Transmission Line; Asset-2: 765 kV S/C Jatikalan – Bhiwani Transmission Line associated with 765 kV system; Asset-3: LILO of both circuits of 400 kV D/C Bamnauli – Mundka/Bawana at Jatikalan 765/400 kV Sub-station; Asset-4: Agra – Jatikalan 765 kV S/C Transmission Line; and Asset-5: Agra – Meerut 765 kV S/C Transmission Line under “765 kV System for Central Part of Northern Grid Part-I in Northern Region”. Power Grid Corporation of India Limited
10.01.2022 12.01.2022 Transmission

19

297/GT/2020
11.01.2022 11.01.2022 Generation

18

109/GT/2020
11.01.2022 11.01.2022 Generation

17

665/TT/2020
11.01.2022 11.01.2022 Transmission

16

273/TT/2020
10.01.2022 10.01.2022 Transmission

15

165/TD/2021
10.01.2022 10.01.2022 Trading

14

283/MP/2019
07.01.2022 10.01.2022 Misc.

13

622/GT/2020
08.01.2022 09.01.2022 Generation

12

230/TD/2021
with
Interlocutory Application No: 85/IA/2021
08.01.2022 09.01.2022 Trading

11

408/GT/2020
08.01.2022 09.01.2022 Generation

10

106/GT/2020
06.01.2022 06.01.2022 Generation

9

124/MP/2021
05.01.2022 05.01.2022 Misc.

8

293/MP/2018
294/MP/2018 and
150/MP/2019
03.01.2022 05.01.2022 Misc.

7

252/TT/2020
04.01.2022 04.01.2022 Transmission

6

170/MP/2021
04.01.2022 04.01.2022 Misc.

5

695/TT/2020
03.01.2022 03.01.2022 Transmission

4

684/TT/2020
03.01.2022 03.01.2022 Transmission

3

660/TT/2020
03.01.2022 03.01.2022 Transmission

2

447/TT/2020
03.01.2022 03.01.2022 Transmission

1

686/TT/2020
01.01.2022 02.01.2022 Transmission