Screen Reader A+ A A-
cerc-logo

कार्यवाही के अभिलेख (आरओपी) - 2026

Sl.No. Petition No. Subject Date of Hearing Date of posting
ROP on website
Category

1785


442/TT/2026

13.10.2026 16.10.2026 Transmission

1784


400/TT/2026

13.10.2026 16.10.2026 Transmission

1783


633/TT/2025

13.10.2026 16.10.2026 Transmission

1782


487/TT/2026

13.10.2026 16.10.2026 Transmission

1781


478/TT/2026

Petition under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the determination of the transmission tariff for the 2024- 29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for “Extension of Bawana-Mandola 400 kV D/C (Quad) LILO section from Maharani Bagh/ Gopalpur up to Narela S/S along with associated bays so as to form Maharani Bagh-Narela 400 kV D/C (Twin HTLS) and Maharani Bagh-Gopalpur-Narela 400 kV D/C (Twin HTLS) Lines” under “Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II, Part-G1” in the Northern Region. Power Grid Corporation of India Limited
13.10.2026 16.10.2026 Transmission

1780


275/TT/2026, 243/TT/2026, 209/TT/2026 and 69/TT/2026

13.10.2026 16.10.2026 Transmission

1779


90/TT/2026

13.10.2026 16.10.2026 Transmission

1778


87/TT/2019

13.10.2026 16.10.2026 Transmission

1777


18/RP/2025 in 353/TT/2023

13.10.2026 15.10.2026 Review

1776


Diary No. 773/2026

Petition under Sections 79(1)(c) and (k) of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter- State Transmission System) Regulations, 2022, inter alia seeking relaxation of the timeline stipulated under Regulation 5.2(e) for furnishing the Connectivity Bank Guarantees pursuant to the in-principle intimations dated 14.9.2026 bearing Ref. Nos. CTU/NR/Conn/INT2A/2200003250, CTU/NR/Conn/INT2A/2200003257, CTU/NR/Conn/INT2A/2200003261, CTU/NR/Conn/INT2A/2200003263, issued to Eden Renewable Alma Private Limited, Eden Renewable Bercy Private Limited, Eden Renewable Cadet Private Limited and Eden Renewable Cite Private Limited respectively, which were communicated only on 24.9.2026 owing to non-delivery of the Respondent's email dated 14.9.2026; and seeking directions that the period of one month for furnishing the Conn-BGs be reckoned from 24.9.2026. Eden Renewable Alma Private Limited and Ors
13.10.2026 14.10.2026 Misc.

1775


552/MP/2026

13.10.2026 14.10.2026 Misc.

1774


32/RP/2026

13.10.2026 14.10.2026 Review

1773


28/RP/2026

13.10.2026 14.10.2026 Review

1772


17/RP/2026

13.10.2026 14.10.2026 Review

1771


9/RP/2026 along with IA No.55/2026

13.10.2026 14.10.2026 Review

1770


332/MP/2026 along with IA (Diary) No. 733/2026

09.10.2026 14.10.2026 Misc.

1769


270/MP/2026

09.10.2026 14.10.2026 Misc.

1768


Diary No. 376/2026

09.10.2026 14.10.2026 Misc.

1767


45/MP/2026 along with IA No. 13/2026, 36/2026 & (Dy. No.) 386/2026

09.10.2026 14.10.2026 Misc.

1766


177/MP/2025 along with IA No. 135/2026

09.10.2026 14.10.2026 Misc.

1765


444/MP/2026

06.10.2026 13.10.2026 Misc.

1764


488/MP/2026

06.10.2026 13.10.2026 Misc.

1763


452/MP/2026

08.10.2026 12.10.2026 Misc.

1762


435/MP/2026

08.10.2026 12.10.2026 Misc.

1761


Diary No.773/2026

Petition under Sections 79(1)(c) and (k) of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, inter alia seeking relaxation of the timeline stipulated under Regulation 5.2(e) for furnishing the Connectivity Bank Guarantees pursuant to the in-principle intimations dated 14.9.2026 bearing Ref. Nos. CTU/NR/Conn/INT2A/2200003250,CTU/NR/Conn/INT2A/2200003257, CTU/NR/Conn/INT2A/2200003261,CTU/NR/Conn/INT2A/2200003263, issued to Eden Renewable Alma Private Limited, Eden Renewable Bercy Private Limited, Eden Renewable Cadet Private Limited and Eden Renewable Cite Private Limited respectively, which were communicated only on 24.9.2026 owing to non-delivery of the Respondent's email dated 14.9.2026; and seeking directions that the period of one month for furnishing the Conn-BGs be reckoned from 24.9.2026. Eden Renewable Alma Private Limited (ERAPL) and Ors.
09.10.2026 12.10.2026 Misc.

1760


458/MP/2026

09.10.2026 12.10.2026 Misc.

1759


457/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the CERC (Connectivity and General Network Access) Regulations, 2022 (as amended) and Regulation 65 of the CERC (Conduct of Business) Regulations, 2023 inter alia seeking directions to Central Transmission Utility of India Limited to consolidate the Connectivity(ies) granted to the Petitioner pursuant to its 02 (two) Connectivity Applications, aggregating to 300 MW (Hybrid), at the same sub-station namely Fatehgarh-IV Pooling Substation (Sec-I), through the same bay and with the common dedicated transmission line; permit conversion of 120 MW out of the said consolidated Connectivity from the Land Route/Land BG Route to the Letter of Award/Power Purchase Agreement Route under Regulation 5.8(xi)(a), read with Regulation 11A(4), of the GNA Regulations (as amended), on the basis of the Power Purchase Agreement dated 12.8.2025 executed with NHPC Limited; and consequently align the timeline for revocation under Regulation 24.6 of the GNA Regulations (as amended), insofar as it pertains to the balance Connectivity capacity of 180 MW continuing under the Land Route/Land BG Route, with the Scheduled Commencement of Supply Date or the extended Scheduled Commencement of Supply Date, as applicable, under the said Power Purchase Agreement BN Hybrid Power-1 Private Limited
09.10.2026 12.10.2026 Misc.

1758


403/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 (as amended) and Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 inter alia seeking directions to Central Transmission Utility of India Limited to allow consolidation of the quantum of Connectivity capacities granted to the Petitioner pursuant to 03 (three) different Connectivity Applications having same source (wind) aggregating to 124 MW at the same sub-station and the same bay with the same start date of Connectivity and conversion of the said consolidated Connectivity granted under Land Route to the Letter of Award/Power Purchase Agreement Route in terms of Regulation 11A(4) of the GNA Regulations (as amended) on the basis of the Power Purchase Agreement dated 15.04.2026 along with consequential relief(s) thereof. Vena Energy Aura Private Limited
09.10.2026 12.10.2026 Misc.

1757


375/MP/2026

09.10.2026 12.10.2026 Misc.

1756


339/MP/2022 along with IA (Diary) No. 775/2026

09.10.2026 12.10.2026 Misc.

1755


320/MP/2026 along with IA No. 116/2026

09.10.2026 12.10.2026 Misc.

1754


306/MP/2023

09.10.2026 12.10.2026 Misc.

1753


374/MP/2026

08.10.2026 12.10.2026 Misc.

1752


16/RP/2026

08.10.2026 12.10.2026 Review

1751


31/MP/2025

08.10.2026 12.10.2026 Misc.

1750


255/MP/2026

09.10.2026 12.10.2026 Misc.

1749


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021-central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
09.10.2026 12.10.2026 Misc.

1748


61/MP/2026

09.10.2026 12.10.2026 Misc.

1747


63/MP/2024

09.10.2026 12.10.2026 Misc.

1746


25/RP/2026

09.10.2026 12.10.2026 Review

1745


54/MP/2026

Petition under Section 79(1)(a), 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 seeking approval and determination of the revised tariff on account of Change in Law arising from the amendment of Goods and Services Tax (GST) slabs vide Notification No. 8/2021 - Central Tax (Rate) dated 30.09.2021 issued by the Ministry of Finance, in terms of Article 12 of the Power Purchase Agreement dated 15.09.2021, with effect from the date of early part commissioning of the project, i.e., 27 MW commissioned on 05.12.2022, and for the remaining capacity commissioned phase-wise thereafter, along with recovery of pending Late Payment Surcharge (LPS) on supplementary bills raised on account of the said Change in Law after the Scheduled Commercial Operation Date (SCOD) of the entire capacity. JSW Renew Energy Two Limited
09.10.2026 12.10.2026 Misc.

1744


526/MP/2026

08.10.2026 12.10.2026 Misc.

1743


456/MP/2026 along with IA No. 153/2026

08.10.2026 12.10.2026 Misc.

1742


517/MP/2026

08.10.2026 12.10.2026 Misc.

1741


524/MP/2026

08.10.2026 12.10.2026 Misc.

1740


525/MP/2026

08.10.2026 12.10.2026 Misc.

1739


397/MP/2026 along with IA No. 136/2026

08.10.2026 12.10.2026 Misc.

1738


447/MP/2026

08.10.2026 12.10.2026 Misc.

1737


IA No. 180/2026 in 41/MP/2024, IA No. 181/2026 in 41/MP/2024

08.10.2026 12.10.2026 Misc.

1736


41/MP/2014 along with IA No. 110/2026, 14/MP/2014, 327/MP/2013

08.10.2026 12.10.2026 Misc.

1735


26/MP/2026 along with IA No. 182/2026

08.10.2026 12.10.2026 Misc.

1734


161/MP/2025 along with IA No. 109/2025

08.10.2026 12.10.2026 Misc.

1733


144/GT/2026 alongwith 177/IA/2026

08.10.2026 12.10.2026 Generation

1732


990/GT/2025

29.09.2026 12.10.2026 Generation

1731


888/GT/2025, 893/GT/2025

29.09.2026 12.10.2026 Generation

1730


718/GT/2025

29.09.2026 12.10.2026 Generation

1729


654/GT/2025, 653/GT/2025

29.09.2026 12.10.2026 Generation

1728


1005/GT/2025, 70/GT/2026

29.09.2026 12.10.2026 Generation

1727


949/GT/2025, 944/GT/2025

29.09.2026 12.10.2026 Generation

1726


79/GT/2025, 619/GT/2025

29.09.2026 12.10.2026 Generation

1725


984/GT/2025, 84/GT/2026

29.09.2026 12.10.2026 Generation

1724


676/GT/2025, 802/GT/2025

29.09.2026 12.10.2026 Generation

1723


290/GT/2026, 935/GT/2025

29.09.2026 12.10.2026 Generation

1722


968/GT/2025, 1019/GT/2025

29.09.2026 12.10.2026 Generation

1721


429/MP/2026

06.10.2026 09.10.2026 Misc.

1720


540/TD/2026

06.10.2026 08.10.2026 Licence

1719


529/TD/2026

06.10.2026 08.10.2026 Licence

1718


493/MP/2026

06.10.2026 08.10.2026 Misc.

1717


490/MP/2026

06.10.2026 08.10.2026 Misc.

1716


419/TL/2026, 420/AT/2026

06.10.2026 08.10.2026 Licence (Transmission

1715


393/TL/2026

06.10.2026 08.10.2026 Licence (Transmission

1714


373/TL/2026

06.10.2026 08.10.2026 Licence (Transmission

1713


371/TL/2026, 372/AT/2026

06.10.2026 08.10.2026 Licence (Transmission

1712


129/TD/2026

06.10.2026 08.10.2026 Licence

1711


1022/GT/2025, 980/GT/2025

29.09.2026 08.10.2026 Generation

1710


978/GT/2025

29.09.2026 08.10.2026 Generation

1709


895/GT/2025, 897/GT/2025

29.09.2026 08.10.2026 Generation

1708


258/GT/2026

29.09.2026 08.10.2026 Generation

1707


27/RP/2026

29.09.2026 08.10.2026 Review

1706


534/MP/2026 along with IA No. 176/2026

06.10.2026 08.10.2026 Misc.

1705


533/MP/2026

06.10.2026 08.10.2026 Misc.

1704


484/MP/2026

06.10.2026 08.10.2026 Misc.

1703


537/TL/2026, 536/AT/2026

06.10.2026 08.10.2026 Licence (Transmission)

1702


535/MP/2026

06.10.2026 08.10.2026 Misc.

1701


495/MP/2026

06.10.2026 08.10.2026 Misc.

1700


494/MP/2026

06.10.2026 08.10.2026 Misc.

1699


416/MP/2026 along with IA No.174/2026

06.10.2026 08.10.2026 Misc.

1698


426/MP/2026

17.09.2026 08.10.2026 Misc.

1697


406/MP/2026

15.09.2026 08.10.2026 Misc.

1696


485/TT/2026

29.09.2026 06.10.2026 Transmission

1695


712/GT/2025

29.09.2026 05.10.2026 Generation

1694


391/GT/2019

29.09.2026 05.10.2026 Generation

1693


164/GT/2026

29.09.2026 05.10.2026 Generation

1692


144/GT/2026 along with I.A. No. 177/2026

29.09.2026 05.10.2026 Generation

1691


492/TT/2026

29.09.2026 05.10.2026 Transmission

1690


760/MP/2025 along with IA No. 91/2026

Petition under Section 79, including 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 14.11.2023 executed between Renew Surya Vihaan Private Limited, and Solar Energy Corporation of India Ltd. for the development of 200 MW CTU connected Solar power project, read with Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, seeking a declaration that increase in the rate of Goods and Services Tax (GST) vide Notification Nos. 08/2021- Integrated Tax (Rate) dated 30.09.2021 and 08/2021-Central Tax (Rate) (“2021 GST Notifications”) by Ministry of Finance (Department of Revenue) constitute as Change in Law event and for seeking consequent relief qua allowance of the additional expenditure incurred towards such Change in Law event. Renew Surya Vihaan Private Limited
29.09.2026 05.10.2026 Misc.

1689


514/TL/2026, 515/AT/2026

29.09.2026 05.10.2026 Licence (Transmission)

1688


512/TL/2026, 513/AT/2026

29.09.2026 05.10.2026 Licence (Transmission)

1687


511/MP/2026 along with IA No.172/2026

29.09.2026 05.10.2026 Misc.

1686


505/TL/2026, 506/AT/2026

29.09.2026 05.10.2026 Licence (Transmission)

1685


483/TL/2026, 482/AT/2026

29.09.2026 05.10.2026 Licence (Transmission)

1684


359/MP/2026 along with IA (Diary) No. 683/2026

29.09.2026 05.10.2026 Misc.

1683


300/MP/2026

29.09.2026 05.10.2026 Misc.

1682


293/MP/2026

29.09.2026 05.10.2026 Misc.

1681


285/MP/2026 along with IA No.98/2026

29.09.2026 05.10.2026 Misc.

1680


510/MP/2026 along with IA Nos. 170/2026 & 171/2026

29.09.2026 30.09.2026 Misc.

1679


509/MP/2026 along with IA No.169/2026

29.09.2026 30.09.2026 Misc.

1678


508/MP/2026

29.09.2026 30.09.2026 Misc.

1677


498/MP/2026 along with IA No. 165/2026

29.09.2026 30.09.2026 Misc.

1676


169/MP/2022 along with I.A. No. 39/2022

22.09.2026 30.09.2026 Misc.

1675


969/MP/2025

22.09.2026 28.09.2026 Misc.

1674


IA (Diary) No. 725/2026 in 179/MP/2023

22.09.2026 28.09.2026 Misc.

1673


550/MP/2025 along with IA No. 130/2025

22.09.2026 28.09.2026 Misc.

1672


387/MP/2026

22.09.2026 28.09.2026 Misc.

1671


377/MP/2026

22.09.2026 28.09.2026 Misc.

1670


376/MP/2026

22.09.2026 28.09.2026 Misc.

1669


325/MP/2024 along with IA Nos. 78/2024, 105/2024, 34/2025 & 19/2026

22.09.2026 28.09.2026 Misc.

1668


279/MP/2024

22.09.2026 28.09.2026 Misc.

1667


IA No. 155/2026 in 217/MP/2024

22.09.2026 28.09.2026 Misc.

1666


153/MP/2025 alongwith I.A. No.160/2026

22.09.2026 28.09.2026 Misc.

1665


IA No. 141/2026 in 204/MP/2026

22.09.2026 28.09.2026 Misc.

1664


51/MP/2016

22.09.2026 28.09.2026 Misc.

1663


15/RP/2025 along with IA No.90/2025

22.09.2026 28.09.2026 Review

1662


10/SM/2026

22.09.2026 28.09.2026 Suo-Motu

1661


8/SM/2026

22.09.2026 28.09.2026 Suo-Motu

1660


6/SM/2026

22.09.2026 28.09.2026 Suo-Motu

1659


4/SM/2026

22.09.2026 28.09.2026 Suo-Motu

1658


227/MP/2024 alongwith IA No. 93/2026, 264/MP/2026

22.09.2026 28.09.2026 Misc.

1657


71/MP/2023, 764/MP/2025

22.09.2026 28.09.2026 Misc.

1656


379/MP/2026

10.09.2026 28.09.2026 Misc.

1655


278/MP/2023, 104/TT/2020 (On Remand)

22.09.2026 28.09.2026 Misc.

1654


440/TT/2026

22.09.2026 28.09.2026 Transmission

1653


902/TT/2025, 73/TT/2026

22.09.2026 28.09.2026 Transmission

1652


383/TT/2025 Along with I.A. (Diary) Nos. 597/2026 and 670/2026

22.09.2026 28.09.2026 Transmission

1651


74/TT/2026

22.09.2026 28.09.2026 Transmission

1650


421/MP/2026

18.09.2026 25.09.2026 Misc.

1649


971/MP/2025

22.09.2026 25.09.2026 Misc.

1648


11/RP/2025

22.09.2026 25.09.2026 Review

1647


26/RP/2026 along with IA No. 105/2026

22.09.2026 25.09.2026 Review

1646


31/RP/2024

22.09.2026 25.09.2026 Review

1645


32/RP/2023

22.09.2026 25.09.2026 Review

1644


246/MP/2026 along with IA No. 82/2026

22.09.2026 25.09.2026 Misc.

1643


265/MP/2022 along with IA No. 63/2023

18.09.2026 25.09.2026 Misc.

1642


360/TD/2026

18.09.2026 25.09.2026 Licence

1641


94/MP/2023

18.09.2026 25.09.2026 Misc.

1640


370/MP/2026 along with IA No. 128/2026

17.09.2026 24.09.2026 Misc.

1639


473/MP/2026

10.09.2026 24.09.2026 Misc.

1638


335/MP/2024

10.09.2026 24.09.2026 Misc.

1637


155/MP/2023

10.09.2026 24.09.2026 Misc.

1636


267/MP/2024

17.09.2026 24.09.2026 Misc.

1635


380/MP/2026

15.09.2026 24.09.2026 Misc.

1634


386/MP/2026

15.09.2026 24.09.2026 Misc.

1633


359/MP/2026 along with IA (Diary) No. 683/2026

15.09.2026 23.09.2026 Misc.

1632


506/TT/2025, 694/TT/2025, 15/TT/2026 and 273/TT/2026

15.09.2026 23.09.2026 Transmission

1631


350/TT/2026, 297/TT/2026

15.09.2026 23.09.2026 Transmission

1630


177/MP/2025 along with IA No. 135/2026

18.09.2026 23.09.2026 Misc.

1629


584/MP/2020 along with IA Nos. 30/2022 and 116/2025

17.09.2026 23.09.2026 Misc.

1628


225/MP/2023

17.09.2026 23.09.2026 Misc.

1627


432/MP/2019 along with I.A. No. 82/2023, 111/2025

17.09.2026 22.09.2026 Misc.

1626


153/MP/2026

17.09.2026 22.09.2026 Misc.

1625


912/MP/2025

17.09.2026 22.09.2026 Misc.

1624


156/MP/2026

15.09.2026 22.09.2026 Misc.

1623


410/MP/2024

15.09.2026 22.09.2026 Misc.

1622


49/MP/2026

15.09.2026 22.09.2026 Misc.

1621


447/MP/2025

18.09.2026 21.09.2026 Misc.

1620


419/MP/2024

18.09.2026 21.09.2026 Misc.

1619


58/MP/2026 along with IA Nos. 14/2026 & 44/2026

18.09.2026 21.09.2026 Misc.

1618


311/MP/2023 along with IA No.80/2023

17.09.2026 21.09.2026 Misc.

1617


177/MP/2026 along with IA No. 131/2026, 53/MP/2026

17.09.2026 21.09.2026 Misc.

1616


394/MP/2026 along with IA No.134/2026

17.09.2026 21.09.2026 Misc.

1615


1028/MP/2025

17.09.2026 21.09.2026 Misc.

1614


317/MP/2026

17.09.2026 21.09.2026 Misc.

1613


851/MP/2025 along with IA No.29/2026

18.09.2026 21.09.2026 Misc.

1612


476/MP/2026

18.09.2026 21.09.2026 Misc.

1611


454/MP/2025 along with IA No. 40/2025

18.09.2026 21.09.2026 Misc.

1610


427/MP/2026

18.09.2026 21.09.2026 Misc.

1609


412/MP/2026

18.09.2026 21.09.2026 Misc.

1608


402/MP/2026

18.09.2026 21.09.2026 Misc.

1607


296/MP/2025

18.09.2026 21.09.2026 Misc.

1606


261/MP/2024

18.09.2026 21.09.2026 Misc.

1605


240/MP/2024 along with IA No. 56/2024

18.09.2026 21.09.2026 Misc.

1604


675/TL/2025,
31/RP/2026 along with
IA No. 159/2026

18.09.2026 21.09.2026 Licence (Transmission)

1603


56/MP/2026

17.09.2026 21.09.2026 Misc.

1602


934/MP/2025

17.09.2026 21.09.2026 Misc.

1601


111/MP/2014

17.09.2026 21.09.2026 Misc.

1600


331/MP/2026

15.09.2026 21.09.2026 Misc.

1699


846/MP/2025

17.09.2026 21.09.2026 Misc.

1598


475/MP/2026

17.09.2026 21.09.2026 Misc.

1597


390/MP/2026

17.09.2026 21.09.2026 Misc.

1596


318/MP/2026

17.09.2026 21.09.2026 Misc.

1595


155/MP/2026

17.09.2026 21.09.2026 Misc.

1594


103/MP/2026 along with IA No.28/2026

17.09.2026 21.09.2026 Misc.

1593


784/MP/2025

17.09.2026 21.09.2026 Misc.

1592


55/MP/2026 along with IA No.60/2026

17.09.2026 21.09.2026 Misc.

1591


367/MP/2025, 422/MP/2025

17.09.2026 21.09.2026 Misc.

1590


280/MP/2026

15.09.2026 21.09.2026 Misc.

1589


409/MP/2026

15.09.2026 21.09.2026 Misc.

1588


811/MP/2025 along with IA No. 87/2025

15.09.2026 21.09.2026 Misc.

1587


243/MP/2024 along with IA Nos. 58/2024 & 79/2024, 309/MP/2024, 304/MP/2024 along with IA No. 75/2024

15.09.2026 21.09.2026 Misc.

1586


116/MP/2022

15.09.2026 21.09.2026 Misc.

1585


239/MP/2021 along with IA No. 47/2023

15.09.2026 21.09.2026 Misc.

1584


20/MP/2023

15.09.2026 21.09.2026 Misc.

1583


Diary No. 328/2025, Diary No. 324/2025 (Petition No. 470/TT/2026), 662/TT/2025

09.09.2026 16.09.2026 Misc.

1582


Diary No. 414/2026 (Petition No. 471/TT/2026)

09.09.2026 16.09.2026 Misc.

1581


442/TT/2026

09.09.2026 16.09.2026 Transmission

1580


400/TT/2026

09.09.2026 16.09.2026 Transmission

1579


397/TT/2025

09.09.2026 16.09.2026 Transmission

1578


275/TT/2026, 243/TT/2026, 209/TT/2026, 90/TT/2026, 69/TT/2026 and Diary No. 153/2026

09.09.2026 16.09.2026 Transmission

1577


213/TT/2024

09.09.2026 16.09.2026 Transmission

1576


85/TT/2015

09.09.2026 16.09.2026 Transmission

1575


909/TT/2025, 953/TT/2025

08.09.2026 16.09.2026 Transmission

1574


633/TT/2025

08.09.2026 16.09.2026 Transmission

1573


614/MP/2025

15.09.2026 16.09.2026 Misc.

1572


459/MP/2026, 460/MP/2026

15.09.2026 16.09.2026 Misc.

1571


345/MP/2023 along with IA No. 86/2023

15.09.2026 16.09.2026 Misc.

1570


288/MP/2024

15.09.2026 16.09.2026 Misc.

1569


150/MP/2026

15.09.2026 16.09.2026 Misc.

1568


318/MP/2023

10.09.2026 16.09.2026 Misc.

1567


295/TL/2026, 296/AT/2026

10.09.2026 16.09.2026 Licence (Transmission)

1566


240/MP/2026 along with IA Nos. 78/2026 and (Diary) 678/2026

10.09.2026 16.09.2026 Misc.

1565


239/MP/2024 along with IA No. 8/2025

10.09.2026 16.09.2026 Misc.

1564


179/MP/2023, 13/RP/2026 along with IA No. 83/2026

10.09.2026 16.09.2026 Misc.

1563


58/MP/2023, 215/MP/2023

10.09.2026 16.09.2026 Misc.

1562


323/MP/2026 along with IA
No. 117/2026, 42/MP/2026,
212/MP/2026 along with IA
No. 133/2026, 263/MP/2026 along with IA No. 92/2026,
188/MP/2026 along with IA
No. 64/2026, 189/MP/2026 along with IA No. 65/2026,
190/MP/2026 along with IA
No. 66/2026, 192/MP/2026 along with IA No. 70/2026, 211/MP/2026, 291/MP/2026 along with IA No. 100/2026, 311/MP/2026 along with IA
No. 109/2026, 316/MP/2026 along with IA No. 112/2026, 256/MP/2026 along with IA
No.87/2026, 335/MP/2026 along with IA No. 119/2026

Petition under Section 79 of the Electricity Act, 2003, seeking extension of SCSD under Articles 2.1.3, 2.1.4 and 4.5.2 of the Power Purchase Agreement dated 18.04.2024 executed between Apraava Energy Private Limited and NHPC Limited due to delay in obtaining Adoption of tariff and procurement approval, along with the delay in operationalisation of connectivity granted by Central Transmission Utility of India Ltd., adversely impacting the implementation of the Project.
Apraava Energy Private Limited, ACME Renewtech Private Limited and Anr, Tata Power Renewable Energy Limited, Anboto Solar Private Limited, JGRJ Two Solar Private Limited, Sprng Power Private Limited, Green Infra Clean Wind Technology Limited, Hazel Hybren Private Limited, HR Saraswati Energy Private Limited, Juniper Green Beta Private Limited, Avaada Suryapower Private Limited, Sprng Vayu Vidyut Private Limited, Clean Renewable Energy Hybrid Three Private Limited and Anr.
10.09.2026 16.09.2026 Misc.

1561


915/TT/2025

Petition under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Assets-1 to 5 and Asset-7 and the determination cum truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Asset-6A under “Transmission System associated with Tehri Pump Storage Plant (PSP)”. Power Grid Corporation of India Limited
08.09.2026 15.09.2026 Transmission

1560


18/RP/2026 along with I.A. No. 94/2026

08.09.2026 15.09.2026 Review

1559


900/TT/2025

08.09.2026 14.09.2026 Transmission

1558


901/TT/2025

08.09.2026 14.09.2026 Transmission

1557


22/RP/2026 along with I.A. No. 95/2026

08.09.2026 14.09.2026 Review

1556


142/TT/2026, 114/TT/2026, 663/TT/2025, 261/TT/2026, 262/TT/2026, 217/TT/2026, 165/TT/2026, 80/TT/2026, 47/TT/2026, 469/TT/2026, 365/TT/2026, 443/TT/2026 and 361/TT/2026

09.09.2026 14.09.2026 Transmission

1555


122/TT/2026

09.09.2026 14.09.2026 Transmission

1554


321/TT/2026

09.09.2026 14.09.2026 Transmission

1553


349/TT/2026, 354/TT/2026

09.09.2026 14.09.2026 Transmission

1552


439/TT/2026

09.09.2026 14.09.2026 Transmission

1551


531/TT/2025

09.09.2026 14.09.2026 Transmission

1550


127/TT/2014 (On Remand)

09.09.2026 14.09.2026 Transmission

1549


Diary No. 652/2026 along with IA (Diary) No. 653/2026

10.09.2026 14.09.2026 Misc.

1548


Diary No. 423/2026

10.09.2026 14.09.2026 Misc.

1547


351/TL/2026

10.09.2026 14.09.2026 Licence (Transmission)

1546


307/MP/2026, 308/MP/2026

Petition under Section 17(1) and 17(3) of the Electricity Act, 2003 for amalgamation/merger of POWERGRID Kudankulam Transmission Limited, POWERGRID Barmer I Transmission Limited, POWERGRID Bikaner IV Transmission Limited, POWERGRID Siwani Transmission Limited, POWERGRID Fatehgarh Barmer Augmentation Transmission Limited, POWERGRID Ramgarh Transmission Limited, POWERGRID Bhadla Transmission Limited, POWERGRID Fatehgarh Transmission Limited, POWERGRID Bikaner Transmission System Limited, POWERGRID Narela Transmission Limited, POWERGRID Khetri Transmission System Limited, POWERGRID Ajmer Phagi Transmission Limited, POWERGRID Varanasi Transmission System Limited, POWERGRID Neemuch Transmission System Limited, POWERGRID Mithilanchal Transmission Limited, POWERGRID Medinipur Jeerat Transmission Limited, POWERGRID Mahan Rewa Transmission Limited with POWERGRID Ghiror Transmission Limited and Assignment/ Transfer of the transmission licences pursuant to the amalgamation/merger. POWERGRID Kudankulam Transmission Limited & Ors., POWERGRID Sirohi Transmission Limited & Ors.
10.09.2026 14.09.2026 Misc.

1545


113/MP/2026

10.09.2026 14.09.2026 Misc.

1544


109/MP/2026 along with IA (Diary) No. 316/2026

10.09.2026 14.09.2026 Misc.

1543


64/MP/2026

10.09.2026 14.09.2026 Misc.

1542


466/MP/2026 along with IA No. 156/2026, 467/MP/2026 along with IA No. 157/2026

08.09.2026 14.09.2026 Misc.

1541


782/MP/2025 along with IA No. 146/2026, 833/MP/2025 along with IA No. 103/2026, 817/MP/2025

08.09.2026 14.09.2026 Misc.

1540


348/MP/2023 along with IA No. 83/2025, 169/MP/2024 along with IA No. 39/2024 & 115/2026, 178/MP/2025

08.09.2026 14.09.2026 Misc.

1539


319/MP/2023

08.09.2026 14.09.2026 Misc.

1538


232/MP/2023

08.09.2026 14.09.2026 Misc.

1537


168/MP/2023, 775/MP/2025

08.09.2026 14.09.2026 Misc.

1536


30/MP/2026

08.09.2026 14.09.2026 Misc.

1535


96/MP/2026 along with IA No.140/2026, 905/MP/2025 along with IA No.139/2026

08.09.2026 14.09.2026 Misc.

1534


415/MP/2026

08.09.2026 14.09.2026 Misc.

1533


247/MP/2024 alongwith 22/IA/2025

08.09.2026 14.09.2026 Misc.

1532


80/MP/2024

08.09.2026 14.09.2026 Misc.

1531


59/MP/2026

08.09.2026 14.09.2026 Misc.

1530


12/RP/2026

27.08.2026 10.09.2026 Review

1529


23/RP/2026 in 371/TT/2025

08.09.2026 10.09.2026 Review

1528


29/RP/2026 alongwith I.A. No.144/2026

08.09.2026 10.09.2026 Review

1527


413/MP/2026 along with IA No. 138/2026, 411/MP/2026 along with IA (Diary) No. 544/2026

08.09.2026 10.09.2026 Misc.

1526


292/MP/2026 along with IA No. 101/2026

08.09.2026 10.09.2026 Misc.

1525


278/MP/2026, 288/MP/2026, 306/MP/2026, 313/MP/2026, 314/MP/2026, 315/MP/2026

08.09.2026 10.09.2026 Misc.

1524


264/MP/2023

08.09.2026 10.09.2026 Misc.

1523


5/MP/2026

08.09.2026 10.09.2026 Misc.

1522


274/MP/2026

08.09.2026 10.09.2026 Misc.

1521


128/MP/2026

08.09.2026 10.09.2026 Misc.

1520


451/MP/2026

03.09.2026 10.09.2026 Misc.

1519


458/MP/2026 along with IA No. 154/2026

03.09.2026 10.09.2026 Misc.

1518


1025/GT/2025, 19/GT/2026

27.08.2026 07.09.2026 Generation

1517


1013/GT/2025, 947/GT/2025

27.08.2026 07.09.2026 Generation

1516


991/GT/2025, 941/GT/2025

27.08.2026 07.09.2026 Generation

1515


985/GT/2025, 762/GT/2025

27.08.2026 07.09.2026 Generation

1514


894/GT/2025, 898/GT/2025

27.08.2026 07.09.2026 Generation

1513


889/GT/2025

27.08.2026 07.09.2026 Generation

1512


162/GT/2026, 163/GT/2026

27.08.2026 07.09.2026 Generation

1511


161/GT/2026, 139/GT/2026

27.08.2026 07.09.2026 Generation

1510


144/GT/2026 alongwith I.A.dy.No.411/2026

27.08.2026 07.09.2026 Generation

1508


128/GT/2017

27.08.2026 07.09.2026 Generation

1507


116/GT/2026

27.08.2026 07.09.2026 Generation

1506


52/GT/2026, 656/GT/2025

27.08.2026 07.09.2026 Generation

1505


457/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the CERC (Connectivity and General Network Access) Regulations, 2022 (as amended) and Regulation 65 of the CERC (Conduct of Business) Regulations, 2023 inter alia seeking directions to Central Transmission Utility of India Limited to consolidate the Connectivity(ies) granted to the Petitioner pursuant to its 02 (two) Connectivity Applications, aggregating to 300 MW (Hybrid), at the same sub-station namely Fatehgarh-IV Pooling Substation (Sec-I), through the same bay and with the common dedicated transmission line; permit conversion of 120 MW out of the said consolidated Connectivity from the Land Route/Land BG Route to the Letter of Award/Power Purchase Agreement Route under Regulation 5.8(xi)(a), read with Regulation 11A(4), of the GNA Regulations (as amended), on the basis of the Power Purchase Agreement dated 12.8.2025 executed with NHPC Limited; and consequently align the timeline for revocation under Regulation 24.6 of the GNA Regulations (as amended), insofar as it pertains to the balance Connectivity capacity of 180 MW continuing under the Land Route/Land BG Route, with the Scheduled Commencement of Supply Date or the extended Scheduled Commencement of Supply Date, as applicable, under the said Power Purchase Agreement BN Hybrid Power-1 Private Limited
03.09.2026 07.09.2026 Misc.

1504


126/MP/2022 along with IA No.41/2022, 247/MP/2023

03.09.2026 07.09.2026 Misc.

1503


432/MP/2026 along with IA No. 147/2026

03.09.2026 07.09.2026 Misc.

1502


433/MP/2026 along with IA No.148/2026

03.09.2026 07.09.2026 Misc.

1501


456/MP/2026 along with IA No.153/2026

03.09.2026 07.09.2026 Misc.

1500


982/GT/2025, 1017/GT/2025

27.08.2026 07.09.2026 Generation

1499


977/GT/2025

27.08.2026 07.09.2026 Generation

1498


337/MP/2026

27.08.2026 07.09.2026 Misc.

1497


140/GT/2026

27.08.2026 07.09.2026 Generation

1496


740/GT/2025, 703/GT/2025

27.08.2026 07.09.2026 Generation

1495


459/GT/2025, 171/GT/2025

27.08.2026 07.09.2026 Generation

1494


181/GT/2026, 101/GT/2026

27.08.2026 07.09.2026 Generation

1493


258/GT/2026

27.08.2026 07.09.2026 Generation

1492


31/MP/2025

27.08.2026 07.09.2026 Misc.

1491


419/TL/2026, 420/AT/2026

03.09.2026 07.09.2026 Licence (Transmission)

1490


393/TL/2026

03.09.2026 07.09.2026 Licence (Transmission)

1489


447/MP/2026

03.09.2026 07.09.2026 Misc.

1488


330/TL/2026

27.08.2026 07.09.2026 Licence (Transmission)

1487


403/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 (as amended) and Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 inter alia seeking directions to Central Transmission Utility of India Limited to allow consolidation of the quantum of Connectivity capacities granted to the Petitioner pursuant to 03 (three) different Connectivity Applications having same source (wind) aggregating to 124 MW at the same sub-station and the same bay with the same start date of Connectivity and conversion of the said consolidated Connectivity granted under Land Route to the Letter of Award/Power Purchase Agreement Route in terms of Regulation 11A(4) of the GNA Regulations (as amended) on the basis of the Power Purchase Agreement dated 15.04.2026 along with consequential relief(s) thereof. Vena Energy Aura Private Limited
20.08.2026 07.09.2026 Misc.

1486


336/MP/2026

27.08.2026 02.09.2026 Misc.

1485


276/TT/2026

27.08.2026 02.09.2026 Transmission

1484


23/TT/2026, 36/TT/2026, 118/TT/2026, 238/TT/2026, 279/TT/2026 and 509/TT/202

27.08.2026 02.09.2026 Transmission

1483


12/TT/2026, 375/TT/2025, 260/TT/2026, 79/TT/2026, 928/TT/2025, 38/TT/2026 and 63/TT/2026

27.08.2026 02.09.2026 Transmission

1482


174/TT/2026, 33/TT/2026, 166/TT/2026, 253/TT/2026, 325/TT/2026, 151/TT/2025 and 99/TT/2025

Petition under Sections 28(4) and 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the 400 kV D/C (quad) Alipuduar-Jigmeling Transmission Line (Indian Portion) and 2 Nos. 400 kV line bays at Alipurduar Substation under "Transmission System Strengthening in Indian System for Transfer of power from Mangdechhu Hydroelectric Project in Bhutan” in the North Eastern Region. Power Grid Corporation of India Limited
27.08.2026 02.09.2026 Transmission

1481


916/TT/2025, 997/TT/2025, 72/TT/2026, 225/TT/2026, 344/TT/2025, 571/TT/2025 and 731/TT/2025

27.08.2026 02.09.2026 Transmission

1480


353/MP/2026

27.08.2026 02.09.2026 Misc.

1479


347/MP/2026

20.08.2026 02.09.2026 Misc.

1478


337/MP/2025

27.08.2026 02.09.2026 Misc.

1477


278/MP/2023

04.08.2026 02.09.2026 Misc.

1476


191/MP/2019

13.08.2026 02.09.2026 Misc.

1475


101/MP/2010

13.08.2026 02.09.2026 Misc.

1474


25/RP/2025 along with IA No. 135 of 2025, 9/RP/2024 along with IA Nos. 19/2025 and 134/2025

13.08.2026 02.09.2026 Review

1473


3/RP/2026 in 254/MP/2023

06.08.2026 02.09.2026 Misc.

1472


175/MP/2026

13.08.2026 02.09.2026 Misc.

1471


Diary No.466/2026

27.08.2026 01.09.2026 Misc.

1470


179/MP/2023, 13/RP/2026 along with IA No. 83/2026

20.08.2026 01.09.2026 Misc.

1469


266/MP/2024

27.08.2026 31.08.2026 Misc.

1468


Diary No.604/2026 along with IA (Diary) No.605/2026

11.08.2026 31.08.2026 Misc.

1467


625/2026 along with IA (Diary) Nos. 626/2026, 627/2026 and 635/2026

27.08.2026 31.08.2026 Misc.

1466


Addendum in 976/MP/2025

06.08.2026 31.08.2026 Misc.

1465


382/TD/2026

27.08.2026 31.08.2026 Trading.

1464


111/MP/2014

27.08.2026 29.08.2026 Misc.

1463


111/MP/2024 112/MP/2024 15/RP/2024 along with IA No. 97/2024 16/RP/2024 along with IA No. 47/2024

25.08.2026 29.08.2026 Misc.

1462


115/MP/2026

25.08.2026 29.08.2026 Misc.

1461


194/MP/2021

25.08.2026 29.08.2026 Misc.

1460


201/MP/2026

25.08.2026 29.08.2026 Misc.

1459


204/MP/2026 along with IA No. 141/2026

25.08.2026 29.08.2026 Misc.

1458


205/MP/2026

25.08.2026 29.08.2026 Misc.

1457


218/MP/2026

25.08.2026 29.08.2026 Misc.

1456


230/MP/2026

25.08.2026 29.08.2026 Misc.

1455


245/MP/2026

25.08.2026 29.08.2026 Misc.

1454


251/MP/2026

25.08.2026 29.08.2026 Misc.

1453


254/MP/2026

25.08.2026 29.08.2026 Misc.

1452


267/MP/2026

25.08.2026 29.08.2026 Misc.

1451


275/MP/2020 along with IA No. 86/2021 & 132/2026

25.08.2026 29.08.2026 Misc.

1450


299/MP/2026

25.08.2026 29.08.2026 Misc.

1449


302/MP/2026 266/MP/2026 364/MP/2026

25.08.2026 29.08.2026 Misc.

1448


305/MP/2026

25.08.2026 29.08.2026 Misc.

1447


319/MP/2026 along with IA No. 114/2026

25.08.2026 29.08.2026 Misc.

1446


341/MP/2026

27.08.2026 29.08.2026 Misc.

1445


351/TL/2026

27.08.2026 29.08.2026 Licence.

1444


373/TL/2026

25.08.2026 29.08.2026 Licence.

1443


387/MP/2026

25.08.2026 29.08.2026 Misc.

1442


418/MP/2026

25.08.2026 29.08.2026 Misc.

1441


422/MP/2026

25.08.2026 29.08.2026 Misc.

1440


424/MP/2026 alongwith I.A. No. 142/2026

25.08.2026 29.08.2026 Misc.

1439


847/MP/2025

25.08.2026 29.08.2026 Misc.

1438


974/MP/2025 alongwith 8/IA/2026

25.08.2026 29.08.2026 Misc.

1437


394/2026

25.08.2026 29.08.2026 Misc.

1436


Petition (Diary) No.582/2026

27.08.2026 29.08.2026 Misc.

1435


41/MP/2014 along with IA No. 110/2026 14/MP/2014 327/MP/2013

25.08.2026 29.08.2026 Misc.

1434


16/RP/2026

18.08.2026 27.08.2026 Review.

1433


65/MP/2020 618/MP/2020

18.08.2026 27.08.2026 Misc.

1432


312/MP/2026

18.08.2026 27.08.2026 Misc.

1431


321/MP/2025

18.08.2026 27.08.2026 Misc.

1430


374/MP/2026 alongwith I.A. No. 130/2026

13.08.2026 27.08.2026 Misc.

1429


53/MP/2023 along with IA No. 11/2023 167/MP/2023 along with IA No. 32/2024 258/MP/2023 along with IA No. 59/2023 267/MP/2023 216/MP/2026

18.08.2026 27.08.2026 Misc.

1428


112/MP/2026

20.08.2026 27.08.2026 Misc.

1427


335/MP/2026 with IA No. 119/2026

18.08.2026 27.08.2026 Misc.

1426


235/MP/2026 4/MP/2026

20.08.2026 27.08.2026 Misc.

1425


310/MP/2026 along with IA No. 107/2026

18.08.2026 27.08.2026 Misc.

1424


282/MP/2021 along with IA No. 61/2022 141/MP/2022

18.08.2026 27.08.2026 Misc.

1423


397/MP/2026 along with IA No. 136/2026

18.08.2026 27.08.2026 Misc.

1422


667/MP/2025 along with IA No.55/2025

18.08.2026 27.08.2026 Misc.

1421


682/MP/2025

18.08.2026 27.08.2026 Misc.

1420


759/MP/2025 933/MP/2025 952/MP/2025

18.08.2026 27.08.2026 Misc.

1419


850/MP/2025 along with IA No. 104/2025

20.08.2026 27.08.2026 Misc.

1418


971/MP/2025

20.08.2026 27.08.2026 Misc.

1417


970/MP/2025 788/MP/2025 along with IA No.127/2025

20.08.2026 27.08.2026 Misc.

1416


499/2026 along with IA (Diary) No. 593/2026

20.08.2026 27.08.2026 Misc.

1415


830/MP/2025

20.08.2026 25.08.2026 Misc.

1414


550/MP/2025 along with IA No.130/2025

20.08.2026 25.08.2026 Misc.

1413


376/MP/2026

20.08.2026 25.08.2026 Misc.

1412


358/MP/2023 along with IA Nos. 90/2023 & 33/2025

20.08.2026 25.08.2026 Misc.

1411


344/MP/2026

20.08.2026 25.08.2026 Misc.

1410


340/MP/2026

20.08.2026 25.08.2026 Misc.

1409


333/TD/2026

20.08.2026 25.08.2026 Licence

1408


292/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 17 of the power purchase agreements dated 25.11.2021 seeking declaration that change in rate of Goods and Services Tax from 5% to 12% on renewable energy equipment w.e.f. 01.10.2021 on account of amendment to Notification No. 01/2017-Central Tax (Rate) dated 28.06.2017 vide Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 amounts to a ‘Change in Law’ event under Article 17 of the Power Purchase Agreements and to further direct the Respondents to pay compensation along with carrying cost towards additional amount incurred on account of increment in of Goods and Services Tax paid by the Petitioner pursuant to Notifications dated 30.09.2021 and to restitute the Petitioner to the same financial position as it would have been due continuation of Goods and Services Tax rate of 5% which was applicable till 30.09.2021. Talettutayi Solar Projects Nine Private Limited
20.08.2026 25.08.2026 Misc.

1407


248/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreement dated 18.01.2014 and Schedule 1 Clause VIII of the Power Purchase Agreement dated 20.01.2014 and in terms of this Commission’s Order dated 03.06.2019 passed in Petition No. 156/MP/2018 seeking: a) Validation and approval for recovery of the Change in Law compensation, along with the applicable carrying cost/ interest/ late payment surcharge thereof, on account of the additional operational expenditure and additional capital expenditure incurred by the Petitioner towards compliance with the statutory mandate under the Ministry of Environment, Forest & Climate Change Notification dated 25.1.2016 relating to transportation and utilization of fly-ash, which has already been recognized as a Change in Law event by this Commission and the additional expenditure thereof by MB Power has been in principally admitted by this Commission in its Order dated 03.06.2019 passed in Petition No. 156/MP/2018, and; b) Issuance of appropriate directions to Respondents for payment of additional operational expenditure and additional capital expenditure incurred by the Petitioner towards transportation and utilization of the fly-ash along with the applicable carrying cost/ interest/ late payment surcharge. MB Power (Madhya Pradesh) Limited
20.08.2026 25.08.2026 Misc.

1406


110/MP/2026

20.08.2026 25.08.2026 Misc.

1405


45/MP/2026 along with IA Nos.13/2026, 36/2026 & (Dy. No.) 386/2026

20.08.2026 25.08.2026 Misc.

1404


785/MP/2025

18.08.2026 25.08.2026 Misc.

1403


320/MP/2025

18.08.2026 25.08.2026 Misc.

1402


265/MP/2026

18.08.2026 25.08.2026 Misc.

1401


362/MP/2026

20.08.2026 24.08.2026 Misc.

1400


342/MP/2026

20.08.2026 24.08.2026 Misc.

1399


320/MP/2026 along with IA No. 116/2026

18.08.2026 24.08.2026 Misc.

1398


219/MP/2026

18.08.2026 24.08.2026 Misc.

1397


Diary No.582/2026

18.08.2026 24.08.2026 Misc.

1396


340/MP/2025

20.08.2026 24.08.2026 Misc.

1395


357/MP/2026

18.08.2026 24.08.2026 Misc.

1394


332/MP/2026

18.08.2026 24.08.2026 Misc.

1393


325/MP/2024 along with IA Nos. 78/2024, 105/2024, 34/2025 & 19/2026

18.08.2026 24.08.2026 Misc.

1392


309/MP/2026

18.08.2026 24.08.2026 Misc.

1391


306/MP/2022 along with IA Nos. 20/2023, 85/2023, 16/2024, 79/2026 & 80/2026

18.08.2026 24.08.2026 Misc.

1390


197/MP/2026

18.08.2026 24.08.2026 Misc.

1389


119/MP/2026

18.08.2026 24.08.2026 Misc.

1388


107/MP/2023, 85/MP/2022 along with IA Nos. 24/2022 & 37/2023, 123/MP/2022 along with IA Nos. 38/2023, 246/MP/2022 along with IA Nos. 8/2023, 56/MP/2023, 185/MP/2023, 205/MP/2023

18.08.2026 24.08.2026 Misc.

1387


87/MP/2024

18.08.2026 24.08.2026 Misc.

1386


198/MP/2026

13.08.2026 24.08.2026 Misc.

1385


244/MP/2026 along with IA No.85/2026

06.08.2026 24.08.2026 Misc.

1384


IA (Diary) No.616/2026 in 669/MP/2025

20.08.2026 20.08.2026 Misc.

1383


654/GT/2025, 653/GT/2025

30.07.2026 17.08.2026 Generation

1382


19/RP/2026

30.07.2026 17.08.2026 Review

1381


994/GT/2025, 733/GT/2025

30.07.2026 17.08.2026 Generation

1380


27/RP/2026

06.08.2026 17.08.2026 Review

1379


171/MP/2026

11.08.2026 17.08.2026 Misc.

1378


368/MP/2025

11.08.2026 17.08.2026 Misc.

1377


376/MP/2023

11.08.2026 17.08.2026 Misc.

1376


410/MP/2024

13.08.2026 17.08.2026 Misc.

1375


345/MP/2026

13.08.2026 17.08.2026 Misc.

1374


375/MP/2026

13.08.2026 17.08.2026 Misc.

1373


206/TL/2026

13.08.2026 17.08.2026 Licence (Transmission)

1372


851/MP/2025 along with IA No. 29/2026

11.08.2026 17.08.2026 Misc.

1371


371/TL/2026, 372/AT/2026

11.08.2026 17.08.2026 Licence (Transmission)

1370


351/TL/2026

11.08.2026 17.08.2026 Licence (Transmission)

1369


295/TL/2026, 296/AT/2026

11.08.2026 17.08.2026 Licence (Transmission)

1368


79/MP/2023, 106/MP/2024

11.08.2026 17.08.2026 Misc.

1367


55/MP/2026 along with IA No.60/2026

11.08.2026 17.08.2026 Misc.

1366


25/MP/2026

11.08.2026 17.08.2026 Misc.

1365


617/MP/2020

13.08.2026 17.08.2026 Misc.

1364


911/MP/2025 along with IA No. 96/2026

13.08.2026 17.08.2026 Misc.

1363


111/MP/2014

11.08.2026 17.08.2026 Misc.

1362


40/MP/2026

11.08.2026 17.08.2026 Misc.

1361


370/MP/2026 along with IA No. 128/2026

04.08.2026 17.08.2026 Misc.

1360


757/MP/2025 along with IA No. 93/2025

13.08.2026 17.08.2026 Misc.

1359


339/MP/2022

13.08.2026 17.08.2026 Misc.

1358


415/MP/2024

13.08.2026 17.08.2026 Misc.

1357


11/RP/2026 in 311/TT/2022

13.08.2026 17.08.2026 Review

1356


1004/MP/2025 along with IA No. 129/2026, 20/MP/2026 along with IA No. 6/2026 & No. 106/2026

11.08.2026 17.08.2026 Misc.

1355


770/MP/2025 along with IA No. 80/2025

11.08.2026 17.08.2026 Misc.

1354


67/MP/2026

11.08.2026 17.08.2026 Misc.

1353


305/MP/2025

11.08.2026 17.08.2026 Misc.

1352


208/MP/2026

11.08.2026 17.08.2026 Misc.

1351


11/RP/2025

06.08.2026 17.08.2026 Review

1350


303/TD/2026

13.08.2026 17.08.2026 Licence

1349


348/TD/2026

11.08.2026 17.08.2026 Licence

1348


1014/MP/2025 along with IA No.131/2025

11.08.2026 17.08.2026 Misc.

1347


300/MP/2023

13.08.2026 17.08.2026 Misc.

1346


272/MP/2024, 371/MP/2024

13.08.2026 17.08.2026 Misc.

1345


149/MP/2026 along with IA Nos. 45/2026 & 104/2026

13.08.2026 17.08.2026 Misc.

1344


129/TD/2026

13.08.2026 17.08.2026 Licence

1343


173/MP/2026

13.08.2026 17.08.2026 Misc.

1342


345/MP/2023 along with IA No.86/2023

13.08.2026 17.08.2026 Misc.

1341


340/MP/2022, 341/MP/2022

13.08.2026 17.08.2026 Misc.

1340


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Private Limited and 4 Ors.
13.08.2026 17.08.2026 Misc.

1339


334/MP/2026

11.08.2026 17.08.2026 Misc.

1338


180/MP/2024

11.08.2026 17.08.2026 Misc.

1337


126/MP/2022 along with IA No.41/2022, 247/MP/2023

11.08.2026 17.08.2026 Misc.

1336


896/GT/2025, 899/GT/2025

30.07.2026 14.08.2026 Generation

1335


1000/GT/2025, 955/GT/2025

30.07.2026 14.08.2026 Generation

1334


111/GT/2026

30.07.2026 14.08.2026 Generation

1333


24/RP/2026 in 46/GT/2025

30.07.2026 14.08.2026 Review

1332


21/RP/2026

30.07.2026 12.08.2026 Review

1331


20/RP/2026

30.07.2026 12.08.2026 Review

1330


9/GT/2026

30.07.2026 12.08.2026 Generation

1329


248/MP/2023

06.08.2026 12.08.2026 Misc.

1328


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
06.08.2026 12.08.2026 Misc.

1327


25/RP/2026

06.08.2026 12.08.2026 Review

1326


177/MP/2025 along with IA (Diary) No. 534/2026

06.08.2026 11.08.2026 Misc.

1325


31/RP/2024

06.08.2026 11.08.2026 Review

1324


258/MP/2024

06.08.2026 10.08.2026 Misc.

1323


218/MP/2022 along with IA No. 112/2025, 105/MP/2023 along with IA No. 110/2025

06.08.2026 10.08.2026 Misc.

1322


346/MP/2020 along with 24/IA/2024

06.08.2026 10.08.2026 Misc.

1321


238/MP/2023

06.08.2026 10.08.2026 Misc.

1320


268/MP/2020

06.08.2026 10.08.2026 Misc.

1319


171/MP/2024

06.08.2026 10.08.2026 Misc.

1318


326/MP/2026

04.08.2026 10.08.2026 Misc.

1317


331/MP/2024

06.08.2026 10.08.2026 Misc.

1316


1006/GT/2025, 1012/GT/2025

30.07.2026 10.08.2026 Generation

1315


960/GT/2025, 18/GT/2026

30.07.2026 10.08.2026 Generation

1314


940/GT/2025, 995/GT/2025

30.07.2026 10.08.2026 Generation

1313


236/GT/2021

30.07.2026 10.08.2026 Generation

1312


49/GT/2025

30.07.2026 10.08.2026 Generation

1311


249/MP/2026

06.08.2026 10.08.2026 Misc.

1310


805/MP/2025

06.08.2026 10.08.2026 Misc.

1309


175/MP/2026

06.08.2026 10.08.2026 Misc.

1308


265/MP/2022 along with IA No.63/2023

04.08.2026 10.08.2026 Misc.

1307


186/MP/2026 along with IA Nos. 62/2026 & 74/2026

06.08.2026 10.08.2026 Misc.

1306


45/MP/2024

06.08.2026 10.08.2026 Misc.

1305


17/RP/2026

06.08.2026 10.08.2026 Review

1304


177/MP/2024 along with IA No. 43/2024

06.08.2026 10.08.2026 Misc.

1303


28/RP/2026

06.08.2026 10.08.2026 Review

1302


12/RP/2025 in 132/TT/2023

06.08.2026 10.08.2026 Review

1301


1/RP/2026 in 3/TT/2023

06.08.2026 10.08.2026 Review

1300


380/MP/2023 along with IA No. 81/2026

06.08.2026 10.08.2026 Misc.

1299


252/MP/2026

06.08.2026 10.08.2026 Misc.

1298


675/TL/2025

06.08.2026 10.08.2026 Licence (Transmission)

1297


94/MP/2023

04.08.2026 10.08.2026 Misc.

1296


232/MP/2024

06.08.2026 10.08.2026 Misc.

1295


248/MP/2024

06.08.2026 10.08.2026 Misc.

1294


229/MP/2026 along with IA. No. 75/2026

06.08.2026 10.08.2026 Misc.

192


58/MP/2026 along with IA Nos. 14/2026 & 44/2026, 257/MP/2026 along with IA No. 89/2026

06.08.2026 10.08.2026 Misc.

1292


233/AT/2026

30.07.2026 10.08.2026 Adoption

1291


234/AT/2026

30.07.2026 10.08.2026 Adoption

1290


251/MP/2023

06.08.2026 07.08.2026 Misc.

1289


263/MP/2026 along with IA No.92/2026

Petition under Section 79 of the Electricity Act, 2003, read with Article 4.5.2 of the Power Purchase Agreement dated 13.08.2024 (as amended) executed between Anboto Solar Private Limited and NTPC Limited, seeking (i) a declaration that the delay in commencement of supply from the Petitioner’s solar power project has occurred due to delay in readiness of the ISTS substation at the Delivery Point, including readiness of the power evacuation and transmission infrastructure of the ISTS network and operationalisation of GNA, constituting a delay beyond the control of the Petitioner within the meaning of Article 4.5.2 of the PPA, (ii) consequent revision of the Scheduled Commencement-of-Supply Date in accordance with Article 4.5.2 of the PPA and aligned with the availability of the transmission system, and (iii) consequential reliefs, including waiver of any adverse contractual consequences arising on account of such delay. Anboto Solar Private Limited
06.08.2026 07.08.2026 Misc.

1288


976/MP/2025

06.08.2026 07.08.2026 Misc.

1287


153/MP/2024

06.08.2026 07.08.2026 Misc.

1286


331/MP/2025

06.08.2026 07.08.2026 Misc.

1285


188/MP/2021 along with IA (Diary) No.595/2026

06.08.2026 07.08.2026 Misc.

1284


242/MP/2026

06.08.2026 07.08.2026 Misc.

1283


304/MP/2025

06.08.2026 07.08.2026 Misc.

1282


285/MP/2026 along with IA No.98/2026

06.08.2026 07.08.2026 Misc.

1281


123/MP/2026 along with IA No. 39/2026

06.08.2026 07.08.2026 Misc.

1280


296/MP/2025

04.08.2026 07.08.2026 Misc.

1279


969/MP/2025

04.08.2026 07.08.2026 Misc.

1278


279/MP/2024 along with I.A. No. 51/2025

04.08.2026 07.08.2026 Misc.

1277


156/MP/2026

04.08.2026 07.08.2026 Misc.

1276


49/MP/2026

04.08.2026 07.08.2026 Misc.

1275


496/MP/2024

31.07.2026 07.08.2026 Misc.

1274


143/MP/2024

31.07.2026 07.08.2026 Misc.

1273


82/MP/2021, 38/MP/2022

31.07.2026 07.08.2026 Misc.

1272


853/MP/2025 along with IA Nos. 105/2025 and 118/2026

04.08.2026 07.08.2026 Misc.

1271


324/TD/2026

04.08.2026 07.08.2026 Licence

1270


614/MP/2025

04.08.2026 07.08.2026 Misc.

1269


329/TL/2026, 328/AT/2026

04.08.2026 07.08.2026 Licence (Transmission)

1268


261/MP/2024

04.08.2026 07.08.2026 Misc.

1267


695/MP/2025, 715/MP/2025

04.08.2026 07.08.2026 Misc.

1266


149/MP/2026 along with IA Nos. 45/2026 & 104/2026

04.08.2026 07.08.2026 Misc.

1265


324/MP/2022

04.08.2026 07.08.2026 Misc.

1264


239/MP/2021 along with IA No. 47/2023

04.08.2026 07.08.2026 Misc.

1263


289/MP/2026

04.08.2026 07.08.2026 Misc.

1262


75/MP/2026

04.08.2026 07.08.2026 Misc.

1261


330/TL/2026

31.07.2026 07.08.2026 Licence (Transmission)

1260


161/MP/2025 along with IA No.109/2025

30.07.2026 07.08.2026 Misc.

1259


506/TT/2025, 694/TT/2025, 15/TT/2026, 350/TT/2026 and 273/TT/2026

31.07.2026 07.08.2026 Transmission

1258


297/TT/2026

31.07.2026 07.08.2026 Transmission

1257


186/MP/2026 along with IA Nos. 62/2026 & 74/2026

04.08.2026 05.08.2026 Misc.

1256


272/TL/2026, 271/AT/2026

31.07.2026 05.08.2026 Licence (Transmission)

1255


220/TL/2025

31.07.2026 05.08.2026 Licence (Transmission)

1254


319/MP/2022 along with IA No. 63/2022

30.07.2026 05.08.2026 Misc.

1253


91/MP/2018, 53/MP/2021 along with IA 26/2003 & 100/2023, 61/MP/2021 along with IA 28/2021 & 42/2022, 149/MP/2021

31.07.2026 05.08.2026 Misc.

1252


349/MP/2024 along with IA Nos. 84/2024

31.07.2026 05.08.2026 Misc.

1251


335/MP/2024

31.07.2026 05.08.2026 Misc.

1250


46/MP/2018
(on remand from APTEL)

30.07.2026 05.08.2026 Misc.

1249


369/MP/2025 along with IA No. 94/2025

31.07.2026 05.08.2026 Misc.

1248


175/MP/2026

31.07.2026 05.08.2026 Misc.

1247


327/MP/2026

31.07.2026 05.08.2026 Misc.

1246


359/MP/2026 along with IA No.123/2026

31.07.2026 05.08.2026 Misc.

1245


531/TT/2025, 662/TT/2025, 122/TT/2026, 349/TT/2026 and 354/TT/2026

31.07.2026 03.08.2026 Transmission

1244


804/MP/2025

31.07.2026 03.08.2026 Misc.

1243


98/MP/2026 along with IA Nos.21/2026 & 43/2026

31.07.2026 03.08.2026 Misc.

1242


26/RP/2026

31.07.2026 03.08.2026 Review

1241


212/MP/2026 along with IA (Diary) No.536/2026

30.07.2026 03.08.2026 Misc.

1240


846/MP/2025

30.07.2026 03.08.2026 Misc.

1239


56/MP/2026

30.07.2026 03.08.2026 Misc.

1238


243/MP/2024 along with IA Nos. 58/2024 & 79/2024, 309/MP/2024, 304/MP/2024 along with IA No.75/2024

30.07.2026 03.08.2026 Misc.

1237


331/MP/2026

30.07.2026 03.08.2026 Misc.

1236


247/MP/2024 alongwith 22/IA/2025

30.07.2026 03.08.2026 Misc.

1235


59/MP/2026

30.07.2026 03.08.2026 Misc.

1234


144/GT/2026 along with I.A. Dy. No. 411/2026

30.07.2026 03.08.2026 Generation

1233


90/GT/2023

30.07.2026 03.08.2026 Generation

1232


368/MP/2023

30.07.2026 03.08.2026 Misc.

1231


311/MP/2023 along with IA No.80/2023

30.07.2026 03.08.2026 Misc.

1230


26/MP/2026 along with IA (Diary) No. 240/2026

30.07.2026 03.08.2026 Misc.

1229


116/MP/2022

30.07.2026 03.08.2026 Misc.

1228


62/MP/2026

30.07.2026 03.08.2026 Misc.

1227


781/MP/2025

30.07.2026 03.08.2026 Misc.

1226


96/MP/2026, 905/MP/2025

30.07.2026 03.08.2026 Misc.

1225


811/MP/2025 along with IA No. 87/2025

30.07.2026 03.08.2026 Misc.

1224


20/MP/2023

30.07.2026 03.08.2026 Misc.

1223


288/MP/2024

30.07.2026 03.08.2026 Misc.

1222


185/TT/2025

31.07.2026 03.08.2026 Transmission

1221


104/TT/2020
(On Remand)

Petition for truing up of the transmission tariff for the 2014-19 tariff period and determination of the transmission tariff for the 2019-24 tariff period under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Condition of Tariff) Regulations, 2014 and the Central Electricity Regulatory Commission (Terms and Condition of Tariff) Regulations, 2019 for Asset-I: Combined Assets: One circuit of 400 kV D/C Dehradun-Bagpat line along with associated bays at both ends. Part of second circuit of 400 kV D/C Dehradun-Bagpat transmission line as 400 kV S/C Roorkee- Dehradun line from Dehradun end and partly as 400 kV S/C Saharanpur-Bagpat line from Bagpat end using part of one circuit of 400 kV D/C Roorkee Saharanpur line (under-NRSS XXI) at intersection point alongwith associated bays at Dehradun and Bagpat end., Asset-II: 400/220 kV, 315 MVA ICT-1 at Dehradun and associated bays with 1 no. 220 kV line bay, 400/220 kV, 315 MVA ICT-II at Dehradun and associated bays with 1 no. 220 kV line bay, and 80 MVAR bus reactor at Dehradun and associated bays and Asset III: 04 Nos. 220 kV bays at Dehradun sub-station under “Northern Region System Strengthening Scheme – XVIII” in the Northern Region. Powergrid Corporation of India Limited
22.07.2026 03.08.2026 Transmission

1220


127/TT/2014
(On Remand)

22.07.2026 31.07.2026 Transmission

1219


18/RP/2015,
130/GT/2016

22.07.2026 30.07.2026 Review

1218


998/TT/2025, 436/TT/2025

22.07.2026 30.07.2026 Transmission

1217


909/TT/2025, 953/TT/2025

22.07.2026 30.07.2026 Transmission

1216


901/TT/2025

22.07.2026 30.07.2026 Transmission

1215


900/TT/2025

22.07.2026 30.07.2026 Transmission

1214


844/TT/2025

22.07.2026 30.07.2026 Transmission

1213


633/TT/2025

22.07.2026 30.07.2026 Transmission

1212


370/TT/2023

22.07.2026 30.07.2026 Transmission

1211


172/TT/2018

22.07.2026 30.07.2026 Transmission

1210


(Diary) No. 500/2026

22.07.2026 30.07.2026 Misc.

1209


912/MP/2025

22.07.2026 27.07.2026 Misc.

1208


265/MP/2023

22.07.2026 27.07.2026 Misc.

1207


153/MP/2026

22.07.2026 27.07.2026 Misc.

1206


7/RP/2025

22.07.2026 27.07.2026 Review

1205


31/MP/2025

20.07.2026 27.07.2026 Misc.

1204


269/MP/2026

20.07.2026 27.07.2026 Misc.

1203


30/MP/2025

20.07.2026 27.07.2026 Misc.

1202


1003/TT/2025

22.07.2026 27.07.2026 Transmission

1201


996/TT/2025, 999/TT/2025, 1001/TT/2025, 37/TT/2026, and 39/TT/2026

22.07.2026 27.07.2026 Transmission

1200


915/TT/2025

Petition under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Assets-1 to 5 and Asset-7 and the determination cum truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Asset-6A under “Transmission System associated with Tehri Pump Storage Plant (PSP)”. Power Grid Corporation of India Limited
22.07.2026 27.07.2026 Transmission

1199


914/TT/2025, 883/TT/2025

22.07.2026 27.07.2026 Transmission

1198


719/TT/2025

22.07.2026 27.07.2026 Transmission

1197


213/TT/2024

22.07.2026 27.07.2026 Transmission

1196


23/RP/2026 in 371/TT/2025

22.07.2026 27.07.2026 Review

1195


22/RP/2026 along with IA No. 95/2026

22.07.2026 27.07.2026 Review

1194


18/RP/2026 along with I.A. No. 94/2026

22.07.2026 27.07.2026 Review

1193


10/RP/2026 In 191/TT/2023

22.07.2026 27.07.2026 Review

1192


743/TT/2025, 839/TT/2025, 492/TT/2025

22.07.2026 27.07.2026 Transmission

1191


28/RP/2024 along with IA No. 81/2024 in 255/TT/2021

20.07.2026 27.07.2026 Review

1190


760/MP/2025

Petition under Section 79, including 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 read with Article 12 of the Power Purchase Agreement dated 14.11.2023 executed between Renew Surya Vihaan Private Limited, and Solar Energy Corporation of India Ltd. for the development of 200 MW CTU connected Solar power project, read with Electricity (Timely Recovery of Costs due to Change in Law) Rules, 2021, seeking a declaration that increase in the rate of Goods and Services Tax (GST) vide Notification Nos. 08/2021- Integrated Tax (Rate) dated 30.09.2021 and 08/2021-Central Tax (Rate) (“2021 GST Notifications”) by Ministry of Finance (Department of Revenue) constitute as Change in Law event and for seeking consequent relief qua allowance of the additional expenditure incurred towards such Change in Law event. Renew Surya Vihaan Private Limited
22.07.2026 27.07.2026 Misc.

1189


737/MP/2025

22.07.2026 27.07.2026 Misc.

1188


177/MP/2026, 53/MP/2026

22.07.2026 27.07.2026 Misc.

1187


264/MP/2023

22.07.2026 27.07.2026 Misc.

1186


280/MP/2024 along with IA No. 102/2026

22.07.2026 27.07.2026 Misc.

1185


64/MP/2026

22.07.2026 27.07.2026 Misc.

1184


63/MP/2024

22.07.2026 27.07.2026 Misc.

1183


61/MP/2026

22.07.2026 27.07.2026 Misc.

1182


54/MP/2026

Petition under Section 79(1)(a), 79(1)(b) and 79(1)(f) of the Electricity Act, 2003 seeking approval and determination of the revised tariff on account of Change in Law arising from the amendment of Goods and Services Tax (GST) slabs vide Notification No. 8/2021 - Central Tax (Rate) dated 30.09.2021 issued by the Ministry of Finance, in terms of Article 12 of the Power Purchase Agreement dated 15.09.2021, with effect from the date of early part commissioning of the project, i.e., 27 MW commissioned on 05.12.2022, and for the remaining capacity commissioned phase-wise thereafter, along with recovery of pending Late Payment Surcharge (LPS) on supplementary bills raised on account of the said Change in Law after the Scheduled Commercial Operation Date (SCOD) of the entire capacity. JSW Renew Energy Two Limited
22.07.2026 27.07.2026 Misc.

1181


42/MP/2026

22.07.2026 27.07.2026 Misc.

1180


8/MP/2026 along with IA No. 3/2026

22.07.2026 27.07.2026 Misc.

1179


318/MP/2026

22.07.2026 27.07.2026 Misc.

1178


301/MP/2026

22.07.2026 27.07.2026 Misc.

1177


293/MP/2026

22.07.2026 27.07.2026 Misc.

1176


971/MP/2025

20.07.2026 27.07.2026 Misc.

1175


934/MP/2025

22.07.2026 26.07.2026 Misc.

1174


584/MP/2020 along with IA Nos. 30/2022 and 116/2025

22.07.2026 26.07.2026 Misc.

1173


300/MP/2026

22.07.2026 26.07.2026 Misc.

1172


194/MP/2024 along with IA No. 46/2024

22.07.2026 26.07.2026 Misc.

1171


86/MP/2026

22.07.2026 26.07.2026 Misc.

1170


80/MP/2024

20.07.2026 26.07.2026 Misc.

1169


5/MP/2026

20.07.2026 26.07.2026 Misc.

1168


616/MP/2025 along with IA Nos. 50/2025 & 113/2026

20.07.2026 26.07.2026 Misc.

1167


335/MP/2025

20.07.2026 22.07.2026 Misc.

1166


307/MP/2026, 308/MP/2026

Petition Under Section 17(1) And 17(3) Of Electricity Act, 2003 For Amalgamation/Merger of POWERGRID Kudankulam Transmission Limited, POWERGRID Barmer I Transmission Limited, POWERGRID Bikaner IV Transmission Limited, POWERGRID Siwani Transmission Limited, POWERGRID Fatehgarh Barmer Augmentation Transmission Limited, POWERGRID Ramgarh Transmission Limited, POWERGRID Bhadla Transmission Limited, POWERGRID Fatehgarh Transmission Limited, POWERGRID Bikaner Transmission System Limited, POWERGRID Narela Transmission Limited, POWERGRID Khetri Transmission System Limited, POWERGRID Ajmer Phagi Transmission Limited, POWERGRID Varanasi Transmission System Limited, POWERGRID Neemuch Transmission System Limited, POWERGRID Mithilanchal Transmission Limited, POWERGRID Medinipur Jeerat Transmission Limited, POWERGRID Mahan Rewa Transmission Limited with POWERGRID Ghiror Transmission Limited And Assignment/ Transfer of Transmission Licences pursuant To Amalgamation/Merger. POWERGRID Kudankulam Transmission Limited & Ors.
20.07.2026 22.07.2026 Misc.

1165


367/MP/2025, 422/MP/2025

20.07.2026 22.07.2026 Misc.

1164


268/MP/2026

20.07.2026 22.07.2026 Misc.

1163


24/MP/2026

20.07.2026 22.07.2026 Misc.

1162


255/MP/2026

20.07.2026 22.07.2026 Misc.

1161


(Diary) No. 510/2026 along with IA (Diary) No. 532/2026

20.07.2026 22.07.2026 Misc.

1160


328/MP/2024

20.07.2026 22.07.2026 Misc.

1159


295/TL/2026, 296/AT/2026

21.07.2026 21.07.2026 Licence (Transmission)

1158


103/MP/2026 along with IA No. 28/2026

20.07.2026 21.07.2026 Misc.

1157


(Diary) No.518/2026 along with IA (Diary) No.543/2026, (Diary) No.520/2026 along with IA (Diary) No.544/2026

20.07.2026 20.07.2026 Misc.

1156


851/MP/2025 along with IA No.29/2026

16.07.2026 20.07.2026 Misc.

1155


58/MP/2023

16.07.2026 20.07.2026 Misc.

1154


294/TD/2026

16.07.2026 20.07.2026 Licence

1153


281/TD/2026

16.07.2026 20.07.2026 Licence

1152


155/MP/2026

16.07.2026 20.07.2026 Misc.

1151


782/MP/2025, 833/MP/2025 along with IA No. 103/2026, 817/MP/2025, 319/MP/2023

16.07.2026 20.07.2026 Misc.

1150


302/MP/2022 along with I.A. No. 49/2023 & 52/2023

16.07.2026 20.07.2026 Misc.

1149


270/MP/2026

16.07.2026 20.07.2026 Misc.

1148


680/MP/2025 along with IA No. 11/2026

16.07.2026 20.07.2026 Misc.

1147


153/MP/2025

16.07.2026 20.07.2026 Misc.

1146


410/MP/2024

16.07.2026 20.07.2026 Misc.

1145


278/MP/2026, 288/MP/2026, 306/MP/2026, 313/MP/2026, 314/MP/2026, 315/MP/2026

16.07.2026 20.07.2026 Misc.

1144


280/MP/2026

16.07.2026 20.07.2026 Misc.

1143


102/MP/2026

16.07.2026 20.07.2026 Misc.

1142


784/MP/2025

14.07.2026 20.07.2026 Misc.

1141


252/MP/2026

03.06.2026 20.07.2026 Misc.

1140


614/MP/2025

16.07.2026 17.07.2026 Misc.

1139


282/MP/2021 along with IA No. 61/2022, 141/MP/2022

16.07.2026 17.07.2026 Misc.

1138


57/MP/2026

16.07.2026 17.07.2026 Misc.

1137


(Diary) No.528/2026 along with IA (Diary) No.529/2026

16.07.2026 17.07.2026 Misc.

1136


397/TT/2025

14.07.2026 17.07.2026 Transmission

1135


79/MP/2023, 106/MP/2024

14.07.2026 17.07.2026 Misc.

1134


240/MP/2026 along with IA No. 78/2026

14.07.2026 17.07.2026 Misc.

1133


292/MP/2026 along with IA No. 101/2026

14.07.2026 17.07.2026 Misc.

1132


1028/MP/2025

14.07.2026 17.07.2026 Misc.

1131


949/GT/2025, 944/GT/2025

29.06.2026 17.07.2026 Generation

1130


323/MP/2026 along with IA No. 117/2026

14.07.2026 17.07.2026 Misc.

1129


194/MP/2021

14.07.2026 17.07.2026 Misc.

1128


250/MP/2026

14.07.2026 17.07.2026 Misc.

1127


127/MP/2025

14.07.2026 17.07.2026 Misc.

1126


298/MP/2026

14.07.2026 17.07.2026 Misc.

1125


234/AT/2026

14.07.2026 17.07.2026 Adoption

1124


421/MP/2025

14.07.2026 17.07.2026 Misc.

1123


106/MP/2026

14.07.2026 17.07.2026 Misc.

1122


155/MP/2023

14.07.2026 17.07.2026 Misc.

1121


171/MP/2026

14.07.2026 17.07.2026 Misc.

1120


239/MP/2024 along with IA No. 8/2025

14.07.2026 16.07.2026 Misc.

1119


303/TD/2026

14.07.2026 16.07.2026 Licence

1118


240/MP/2024 along with IA No. 56/2024

14.07.2026 16.07.2026 Misc.

1117


365/MP/2025

14.07.2026 16.07.2026 Misc.

1116


469/MP/2024, 252/MP/2024

14.07.2026 16.07.2026 Misc.

1115


150/MP/2026

14.07.2026 16.07.2026 Misc.

1114


697/GT/2025, 698/GT/2025

29.06.2026 15.07.2026 Generation

1113


1005/GT/2025, 70/GT/2026

24.06.2026 15.07.2026 Generation

1112


161/GT/2026, 139/GT/2026

24.06.2026 15.07.2026 Generation

1111


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited (WLL) and Anr.
09.07.2026 15.07.2026 Misc.

1110


113/MP/2026

09.07.2026 15.07.2026 Misc.

1109


340/MP/2025

09.07.2026 15.07.2026 Misc.

1108


179/MP/2023, 13/RP/2026 along with IA No. 83/2026

09.07.2026 15.07.2026 Misc.

1107


17/RP/2026

09.07.2026 15.07.2026 Review

1106


358/MP/2023 along with IA Nos. 90/2023 & 33/2025

09.07.2026 15.07.2026 Misc.

1105


IA No. 113/2026 in 616/MP/2025

09.07.2026 15.07.2026 Misc.

1104


520/MP/2024

07.07.2026 15.07.2026 Misc.

1103


939/MP/2025

07.07.2026 15.07.2026 Misc.

1102


258/GT/2026

24.06.2026 13.07.2026 Generation

1101


233/AT/2026

09.07.2026 13.07.2026 Adoption

1100


319/MP/2026 along with IA No. 114/2026

09.07.2026 13.07.2026 Misc.

1099


12/RP/2025 in 132/TT/2023

09.07.2026 13.07.2026 Review

1098


804/MP/2025

09.07.2026 13.07.2026 Misc.

1097


348/MP/2023 along with IA No. 83/2025, 169/MP/2024 along with IA No. 39/2024, 178/MP/2025

09.07.2026 13.07.2026 Misc.

1096


318/MP/2026

09.07.2026 13.07.2026 Misc.

1095


317/MP/2026

09.07.2026 13.07.2026 Misc.

1094


318/MP/2023

09.07.2026 13.07.2026 Misc.

1093


263/MP/2022

09.07.2026 13.07.2026 Misc.

1092


256/MP/2026 along with IA No. 87/2026

09.07.2026 13.07.2026 Misc.

1091


235/MP/2026, 4/MP/2026

09.07.2026 13.07.2026 Misc.

1090


188/MP/2026 along with IA No. 64/2026, 189/MP/2026 along with IA No. 65/2026, 190/MP/2026 along with IA No. 66/2026, 192/MP/2026 along with IA No. 70/2026, 211/MP/2026, 291/MP/2026 along with IA No. 100/2026, 311/MP/2026 along with IA No. 109/2026, 316/MP/2026 along with IA No. 112/2026

09.07.2026 13.07.2026 Misc.

1089


186/MP/2026 along with IA Nos. 62/2026 & 74/2026

09.07.2026 13.07.2026 Misc.

1088


109/MP/2026 along with IA (Diary) No. 316/2026

09.07.2026 13.07.2026 Misc.

1087


25/RP/2026

09.07.2026 13.07.2026 Review

1086


IA No. 104/2026 in Petition No.149/MP/2026

07.07.2026 10.07.2026 Misc.

1085


978/GT/2025

24.06.2026 10.07.2026 Generation

1084


(Diary) No. 482/2026 along with IA (Diary) No. 485/2026

07.07.2026 10.07.2026 Misc.

1083


232/MP/2023

07.07.2026 10.07.2026 Misc.

1082


1020/MP/2025 along with IA No. 84/2026

07.07.2026 10.07.2026 Misc.

1081


695/MP/2025, 715/MP/2025

07.07.2026 10.07.2026 Misc.

1080


320/MP/2025

07.07.2026 10.07.2026 Misc.

1079


48/MP/2025 along with I.A. No. 111/2026

07.07.2026 10.07.2026 Misc.

1078


310/MP/2026 along with IA No. 107/2026

07.07.2026 10.07.2026 Misc.

1077


129/TD/2026

07.07.2026 10.07.2026 Licence

1076


IA No. 106/2026 in 20/MP/2026

07.07.2026 10.07.2026 Misc.

1075


(Diary) No. 483/2026 along with IA (Diary) No. 487/2026

07.07.2026 09.07.2026 Misc.

1074


847/MP/2025

07.07.2026 09.07.2026 Misc.

1073


272/TL/2026, 271/AT/2026

07.07.2026 09.07.2026 Licence (Transmission)

1072


75/MP/2026

07.07.2026 09.07.2026 Misc.

1071


111/MP/2024, 112/MP/2024, 15/RP/2024 along with IA No. 97/2024

07.07.2026 09.07.2026 Misc.

1070


274/MP/2026

07.07.2026 09.07.2026 Misc.

1069


119/MP/2026

07.07.2026 09.07.2026 Misc.

1068


141/MP/2026

07.07.2026 09.07.2026 Misc.

1067


403/MP/2024

07.07.2026 09.07.2026 Misc.

1066


IA No. 108/2026 in 779/MP/2025

07.07.2026 09.07.2026 Misc.

1065


41/MP/2014, 14/MP/2014, 327/MP/2013

07.07.2026 09.07.2026 Misc.

1064


128/MP/2026

07.07.2026 09.07.2026 Misc.

1063


58/MP/2026 along with IA Nos. 14/2026 & 44/2026

07.07.2026 09.07.2026 Misc.

1062


12/RP/2026

29.06.2026 03.07.2026 Misc.

1061


982/GT/2025, 1017/GT/2025

24.06.2026 03.07.2026 Generation

1060


140/GT/2026

24.06.2026 03.07.2026 Generation

1059


Corrigendum to 279/MP/2024

25.05.2026 03.07.2026 Misc.

1058


241/MP/2026 along with IA No. 77/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, seeking relaxation in the time period stipulated under Regulation 8.2(c) of the said Regulations for submission of the Connectivity Bank Guarantees against Intimation of In-Principle Grant of Connectivity (Intimation No. CTU/S/5/Conn/INT-1A2200001607 dated 27.03.2026), condonation of the delay of two (2) days in submission of such Bank Guarantees, and a direction to Central Transmission Utility of India Limited to take the said Bank Guarantees on record and issue the Final Grant of Connectivity for 100 MW (with 50 MW BESS) at NP Kunta Pooling Station, Andhra Pradesh. Pace Digitek Limited
29.06.2026 03.07.2026 Misc.

1057


(Diary) No. 405/2026 along with IA (Diary) No. 406/2026, (Diary) No. 425/2026 along with IA (Diary) No. 427/2026

29.06.2026 03.07.2026 Misc.

1056


18/RP/2026 along with I.A.No.94/2026

29.06.2026 02.07.2026 Review

1055


128/GT/2017

29.06.2026 01.07.2026 Generation

1054


5/RP/2026

29.06.2026 01.07.2026 Review

1053


116/GT/2026

24.06.2026 01.07.2026 Generation

1052


246/MP/2026 along with IA No. 82/2026

24.06.2026 01.07.2026 Misc.

1051


170/MP/2026

18.06.2026 01.07.2026 Misc.

1050


196/TD/2026

29.06.2026 01.07.2026 Licence (Transmission)

1049


172/AT/2026

29.06.2026 01.07.2026 Adoption

1048


244/MP/2026 along with IA No. 85/2026

29.06.2026 01.07.2026 Misc.

1047


1/RP/2026 in 3/TT/2023

29.06.2026 01.07.2026 Review

1046


188/MP/2021

29.06.2026 01.07.2026 Misc.

1045


(Diary) No.441/2026 along with IA (Diary) No. 442/2026

29.06.2026 01.07.2026 Misc.

1044


(Diary) No.460/2026 along with IA (Diary) No. 465/2026

29.06.2026 01.07.2026 Misc.

1043


107/MP/2023, 85/MP/2022 along with IA Nos. 24/2022 & 37/2023, 123/MP/2022 along with IA Nos. 38/2023, 246/MP/2022 along with IA Nos. 8/2023, 56/MP/2023, 185/MP/2023, 205/MP/2023

29.06.2026 01.07.2026 Misc.

1042


278/MP/2023

29.06.2026 01.07.2026 Misc.

1041


324/MP/2022

29.06.2026 01.07.2026 Misc.

1040


228/MP/2026

29.06.2026 01.07.2026 Misc.

1039


98/MP/2026 along with IA Nos. 21/2026 & 43/2026

29.06.2026 01.07.2026 Misc.

1038


168/MP/2026, 169/MP/2026, 187/MP/2026, 193/MP/2026

29.06.2026 01.07.2026 Misc.

1037


(Diary) No. 285/2026

29.06.2026 01.07.2026 Misc.

1036


263/MP/2026 along with IA No. 92/2026

Petition under Section 79 of the Electricity Act, 2003, read with Article 4.5.2 of the Power Purchase Agreement dated 13.08.2024 (as amended) executed between Anboto Solar Private Limited and NTPC Limited, seeking (i) a declaration that the delay in commencement of supply from the Petitioner’s solar power project has occurred due to delay in readiness of the ISTS substation at the Delivery Point, including readiness of the power evacuation and transmission infrastructure of the ISTS network and operationalisation of GNA, constituting a delay beyond the control of the Petitioner within the meaning of Article 4.5.2 of the PPA, (ii) consequent revision of the Scheduled Commencement-of-Supply Date in accordance with Article 4.5.2 of the PPA and aligned with the availability of the transmission system, and (iii) consequential reliefs, including waiver of any adverse contractual consequences arising on account of such delay. Anboto Solar Private Limited
29.06.2026 01.07.2026 Misc.

1035


179/AT/2026

29.06.2026 01.07.2026 Adoption

1034


168/MP/2023, 775/MP/2025

29.06.2026 01.07.2026 Misc.

1033


205/MP/2026

29.06.2026 01.07.2026 Misc.

1032


332/MP/2025, 280/MP/2025

29.06.2026 01.07.2026 Misc.

1031


3/RP/2026 in 254/MP/2023

29.06.2026 01.07.2026 Review

1030


31/RP/2024

29.06.2026 01.07.2026 Review

1029


431/MP/2024 with I.A. 57/2026

29.06.2026 01.07.2026 Misc.

1028


11/RP/2025 in 344/MP/2020

29.06.2026 01.07.2026 Misc.

1027


321/MP/2025

29.06.2026 01.07.2026 Misc.

1026


376/MP/2023

29.06.2026 01.07.2026 Misc.

1025


55/MP/2026 along with IA No. 60/2026

29.06.2026 01.07.2026 Misc.

1024


216/MP/2026

23.06.2026 01.07.2026 Misc.

1023


974/MP/2025 alongwith 8/IA/2026

23.06.2026 01.07.2026 Misc.

1022


7/RP/2025

29.06.2026 30.06.2026 Review

1021


11/RP/2026 in 311/TT/2022

29.06.2026 30.06.2026 Review

1020


227/MP/2024 alongwith IA No. 93/2026, 264/MP/2026

24.06.2026 30.06.2026 Misc.

1019


(Diary) No. 447/2026 along with IA (Diary) No. 453/2026

24.06.2026 29.06.2026 Misc.

1018


206/TL/2026

24.06.2026 29.06.2026 Licence (Transmission)

1017


25/RP/2025 along with IA No. 135 of 2025, 9/RP/2024 along with IA Nos. 19/2025 and 134/2025

23.06.2026 29.06.2026 Review

1016


16/RP/2026

23.06.2026 29.06.2026 Review

1015


296/MP/2025

23.06.2026 29.06.2026 Misc.

1014


265/MP/2022 along with IA No.63/2023, 94/MP/2023

23.06.2026 29.06.2026 Misc.

1013


261/MP/2024

23.06.2026 29.06.2026 Misc.

1012


667/MP/2025 along with IA No.55/2025

24.06.2026 28.06.2026 Misc.

1011


346/MP/2020 along with 24/IA/2024

24.06.2026 28.06.2026 Misc.

1010


332/MP/2025

24.06.2026 28.06.2026 Misc.

1009


239/MP/2021 along with IA No. 47/2023

24.06.2026 28.06.2026 Misc.

1008


238/MP/2023

24.06.2026 28.06.2026 Misc.

1007


143/MP/2024

24.06.2026 28.06.2026 Misc.

1006


325/MP/2024 along with IA Nos. 78/2024, 105/2024, 34/2025 & 19/2026

24.06.2026 28.06.2026 Misc.

1005


266/MP/2024 alongwith IA No. 58/2026

24.06.2026 28.06.2026 Misc.

1004


53/MP/2023 alongwith IA No. 11/2023, 167/MP/2023 alongwith IA No. 32/2024, 258/MP/2023 alongwith IA No. 59/2023, 267/MP/2023

24.06.2026 28.06.2026 Misc.

1003


969/MP/2025

23.06.2026 28.06.2026 Misc.

1002


177/MP/2025

24.06.2026 27.06.2026 Misc.

1001


785/MP/2025

23.06.2026 27.06.2026 Misc.

1000


682/MP/2025

23.06.2026 27.06.2026 Misc.

999


378/MP/2023

23.06.2026 27.06.2026 Misc.

998


(Diary) No. 450/2026 along with IA (Diary) No. 451/2026

24.06.2026 27.06.2026 Misc.

997


(Diary) No.441/2026 along with IA (Diary) No. 442/2026

24.06.2026 27.06.2026 Misc.

996


244/MP/2026 along with IA No. 85/2026

24.06.2026 27.06.2026 Misc.

995


249/MP/2026

24.06.2026 27.06.2026 Misc.

994


248/MP/2026

Petition under Section 79 of the Electricity Act, 2003 read with Article 10 of the Power Purchase Agreement dated 18.01.2014 and Schedule 1 Clause VIII of the Power Purchase Agreement dated 20.01.2014 and in terms of this Commission’s Order dated 03.06.2019 passed in Petition No. 156/MP/2018 seeking: a) Validation and approval for recovery of the Change in Law compensation, along with the applicable carrying cost/ interest/ late payment surcharge thereof, on account of the additional operational expenditure and additional capital expenditure incurred by the Petitioner towards compliance with the statutory mandate under the Ministry of Environment, Forest & Climate Change Notification dated 25.1.2016 relating to transportation and utilization of fly-ash, which has already been recognized as a Change in Law event by this Commission and the additional expenditure thereof by MB Power has been in principally admitted by this Commission in its Order dated 03.06.2019 passed in Petition No. 156/MP/2018, and; b) Issuance of appropriate directions to Respondents for payment of additional operational expenditure and additional capital expenditure incurred by the Petitioner towards transportation and utilization of the fly-ash along with the applicable carrying cost/ interest/ late payment surcharge. MB Power (Madhya Pradesh) Limited
24.06.2026 27.06.2026 Misc.

993


241/MP/2026 along with IA No. 77/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, seeking relaxation in the time period stipulated under Regulation 8.2(c) of the said Regulations for submission of the Connectivity Bank Guarantees against Intimation of In-Principle Grant of Connectivity (Intimation No. CTU/S/5/Conn/INT-1A2200001607 dated 27.03.2026), condonation of the delay of two (2) days in submission of such Bank Guarantees, and a direction to Central Transmission Utility of India Limited to take the said Bank Guarantees on record and issue the Final Grant of Connectivity for 100 MW (with 50 MW BESS) at NP Kunta Pooling Station, Andhra Pradesh. Pace Digitek Limited
24.06.2026 27.06.2026 Misc.

992


228/MP/2026

24.06.2026 27.06.2026 Misc.

991


203/MP/2026

24.06.2026 27.06.2026 Misc.

990


194/MP/2026 along with IA No. 68/2026

23.06.2026 27.06.2026 Misc.

989


123/MP/2026 along with IA No. 39/2026

24.06.2026 27.06.2026 Misc.

988


112/MP/2026

23.06.2026 27.06.2026 Misc.

987


85/MP/2026

24.06.2026 27.06.2026 Misc.

986


30/MP/2026

24.06.2026 27.06.2026 Misc.

985


837/MP/2025 along with IA No.100/2025 & Dy. No. 452/2026, 100/MP/2026

23.06.2026 27.06.2026 Misc.

984


110/MP/2026

23.06.2026 27.06.2026 Misc.

983


175/MP/2026

23.06.2026 27.06.2026 Misc.

982


220/TL/2026, 236/AT/2026

23.06.2026 27.06.2026 Licence (Transmission)

981


263/MP/2026 along with IA No.92/2026

Petition under Section 79 of the Electricity Act, 2003, read with Article 4.5.2 of the Power Purchase Agreement dated 13.08.2024 (as amended) executed between Anboto Solar Private Limited and NTPC Limited, seeking (i) a declaration that the delay in commencement of supply from the Petitioner’s solar power project has occurred due to delay in readiness of the ISTS substation at the Delivery Point, including readiness of the power evacuation and transmission infrastructure of the ISTS network and operationalisation of GNA, constituting a delay beyond the control of the Petitioner within the meaning of Article 4.5.2 of the PPA, (ii) consequent revision of the Scheduled Commencement-of-Supply Date in accordance with Article 4.5.2 of the PPA and aligned with the availability of the transmission system, and (iii) consequential reliefs, including waiver of any adverse contractual consequences arising on account of such delay. Anboto Solar Private Limited
23.06.2026 27.06.2026 Misc.

980


300/MP/2023

23.06.2026 27.06.2026 Misc.

979


305/MP/2025

23.06.2026 27.06.2026 Misc.

978


759/MP/2025, 933/MP/2025, 952/MP/2025

23.06.2026 27.06.2026 Misc.

977


34/MP/2018, 47/MP/2018, 52/MP/2018, 13/MP/2018, 211/MP/2018, 232/MP/2017, 233/MP/2017

23.06.2026 27.06.2026 Misc.

976


914/TT/2025, 915/TT/2025 and 883/TT/2025

18.06.2026 23.06.2026 Transmission

975


I.A. No. 22/2026 in 216/TT/2025

18.06.2026 23.06.2026 Misc.

974


127/TT/2014

18.06.2026 23.06.2026 Transmission

973


900/TT/2025

18.06.2026 23.06.2026 Transmission

972


901/TT/2025

18.06.2026 23.06.2026 Transmission

971


370/TT/2023

18.06.2026 23.06.2026 Transmission

970


719/TT/2025

18.06.2026 23.06.2026 Transmission

969


732/TT/2025

18.06.2026 23.06.2026 Transmission

968


659/TT/2025, 519/TT/2025, 529/TT/2025 and 479/TT/2025

18.06.2026 23.06.2026 Transmission

967


213/TT/2024

18.06.2026 23.06.2026 Transmission

966


844/TT/2025

18.06.2026 23.06.2026 Transmission

965


30/TT/2021

18.06.2026 23.06.2026 Transmission

964


29/TT/2026

18.06.2026 23.06.2026 Transmission

963


354/TT/2025

18.06.2026 23.06.2026 Transmission

962


1002/TT/2025

18.06.2026 23.06.2026 Transmission

961


996/TT/2025, 999/TT/2025, 1001/TT/2025, 1003/TT/2025, 37/TT/2026, and 39/TT/2026

18.06.2026 23.06.2026 Transmission

960


633/TT/2025

18.06.2026 23.06.2026 Transmission

959


207/TT/2024

18.06.2026 23.06.2026 Transmission

958


172/TT/2018

18.06.2026 23.06.2026 Transmission

957


(Diary) No.377/2026 along with IA (Diary) No. 380/2026

16.06.2026 23.06.2026 Misc.

956


185/TT/2025

22.07.2025 22.06.2026 Transmission

955


1013/GT/2025

11.06.2026 22.06.2026 Generation

954


947/GT/2025

11.06.2026 22.06.2026 Generation

953


953/TT/2025, 436/TT/2025, 909/TT/2025 and 998/TT/2025

18.06.2026 22.06.2026 Transmission

952


492/TT/2025

18.06.2026 22.06.2026 Transmission

951


839/TT/2025

18.06.2026 22.06.2026 Transmission

950


743/TT/2025

18.06.2026 22.06.2026 Transmission

949


510/TT/2025, 399/TT/2025 881/TT/2025, 882/TT/2025, 664/TT/2025, 913/TT/2025, 766/TT/2025 and 515/TT/2025

18.06.2026 22.06.2026 Transmission

948


867/TT/2025

18.06.2026 22.06.2026 Transmission

947


696/TT/2025

18.06.2026 22.06.2026 Transmission

946


806/MP/2025

18.06.2026 20.06.2026 Misc.

945


257/MP/2026 along with IA Nos. 89/2026 & 90/2026

18.06.2026 20.06.2026 Misc.

944


658/MP/2025

16.06.2026 20.06.2026 Misc.

943


335/MP/2024

16.06.2026 20.06.2026 Misc.

942


268/MP/2020

16.06.2026 20.06.2026 Misc.

941


256/MP/2026, along with IA Nos. 87/2026 and 88/2026

16.06.2026 20.06.2026 Misc.

940


230/MP/2026

16.06.2026 20.06.2026 Misc.

939


58/MP/2026 along with IA Nos. 14/2026 & 44/2026

16.06.2026 20.06.2026 Misc.

938


912/MP/2025

16.06.2026 19.06.2026 Misc.

937


911/MP/2025 along with IA (Diary) No. 301/2026

16.06.2026 19.06.2026 Misc.

936


331/MP2024, 581/MP2025

16.06.2026 19.06.2026 Misc.

935


254/MP/2026

16.06.2026 19.06.2026 Misc.

934


127/MP/2025

16.06.2026 19.06.2026 Misc.

933


18/RP/2015, 130/GT/2016

11.06.2026 18.06.2026 Review

932


22/GT/2026, 41/GT/2026

16.06.2026 18.06.2026 Generation

931


2/MP/2026

16.06.2026 17.06.2026 Misc.

930


251/MP/2023

16.06.2026 17.06.2026 Misc.

929


970/MP/2025, 788/MP/2025 along with IA No.127/2025

16.06.2026 17.06.2026 Misc.

928


245/MP/2026

16.06.2026 17.06.2026 Misc.

927


617/MP/2020

16.06.2026 17.06.2026 Misc.

926


368/MP/2025

16.06.2026 17.06.2026 Misc.

925


218/MP/2026

16.06.2026 17.06.2026 Misc.

924


59/MP/2026

16.06.2026 17.06.2026 Misc.

923


248/MP/2023

16.06.2026 17.06.2026 Misc.

922


757/MP/2025 along with IA No. 93/2025

16.06.2026 17.06.2026 Misc.

921


110/MP/2024

16.06.2026 17.06.2026 Misc.

920


186/MP/2026 along with IA Nos. 60/2026 & 74/2026

16.06.2026 17.06.2026 Misc.

919


251/MP/2026

16.06.2026 17.06.2026 Misc.

918


369/MP/2025 along with IA No.94/2025, 430/MP/2025 along with IA No.99/2025

16.06.2026 17.06.2026 Misc.

917


171/MP/2024

03.06.2026 17.06.2026 Misc.

916


90/GT/2023

11.06.2026 15.06.2026 Generation

915


195/TL/2026

11.06.2026 15.06.2026 Licence (Transmission)

914


806/MP/2025

11.06.2026 15.06.2026 Misc.

913


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
11.06.2026 15.06.2026 Misc.

912


176/MP/2026

11.06.2026 15.06.2026 Misc.

911


13/RP/2026 along with IA No. 83/2026

11.06.2026 15.06.2026 Review

910


125/TL/2026

11.06.2026 15.06.2026 Licence (Transmission)

909


101/MP/2010

11.06.2026 15.06.2026 Misc.

908


200/AT/2026

11.06.2026 15.06.2026 Adoption

907


237/MP/2026

11.06.2026 15.06.2026 Misc.

906


244/MP/2026 along with IA No.85/2026

11.06.2026 15.06.2026 Misc.

905


24/RP/2025 along with IA No. 125/2025

27.05.2026 15.06.2026 Review

904


135/MP/2026

11.06.2026 12.06.2026 Misc.

903


976/MP/2025

11.06.2026 12.06.2026 Misc.

902


934/MP/2025

11.06.2026 12.06.2026 Misc.

901


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33 kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Private Limited and Ors.
11.06.2026 12.06.2026 Misc.

900


247/MP/2026

11.06.2026 12.06.2026 Misc.

899


234/AT/2026

11.06.2026 12.06.2026 Misc.

898


8/MP/2026 along with IA No. 3/2026

11.06.2026 12.06.2026 Misc.

897


181/GT/2026

25.05.2026 10.06.2026 Generation

896


101/GT/2026

25.05.2026 10.06.2026 Generation

895


515/GT/2024

19.05.2026 10.06.2026 Generation

894


51/GT/2026

19.05.2026 10.06.2026 Generation

893


984/GT/2025, 84/GT/2026

19.05.2026 10.06.2026 Generation

892


355/GT/2023

19.05.2026 10.06.2026 Generation

891


718/GT/2025

25.05.2026 09.06.2026 Generation

890


1/GT/2026

25.05.2026 09.06.2026 Generation

889


180/GT/2026

25.05.2026 09.06.2026 Generation

888


182/GT/2026

25.05.2026 09.06.2026 Generation

887


183/GT/2026

25.05.2026 09.06.2026 Generation

886


9/GT/2026

19.05.2026 09.06.2026 Generation

885


30/MP/2025, 31/MP/2025

03.06.2026 09.06.2026 Misc.

884


103/MP/2026 along with IA No. 28/2026

03.06.2026 09.06.2026 Misc.

883


410/MP/2024

03.06.2026 09.06.2026 Misc.

882


239/TL/2026

03.06.2026 09.06.2026 Licence (Transmission)

881


198/MP/2026

03.06.2026 09.06.2026 Misc.

880


26/MP/2026 along with IA (Diary) No. 240/2026

03.06.2026 09.06.2026 Misc.

879


170/MP/2026

03.06.2026 09.06.2026 Misc.

878


(Diary) No. 322/2026

03.06.2026 09.06.2026 Misc.

877


(Diary) No. 377/2026 along with IA (Diary) No. 380/2026

03.06.2026 09.06.2026 Misc.

876


421/MP/2025

27.05.2026 09.06.2026 Misc.

875


380/MP/2023 along with IA No.81/2026

27.05.2026 08.06.2026 Misc.

874


111/GT/2026

25.05.2026 04.06.2026 Generation

873


(Diary) No.388/2026 along with IA (Diary) No.389/2026

03.06.2026 04.06.2026 Misc.

872


228/MP/2023 along with IA No. 69/2026

03.06.2026 04.06.2026 Misc.

871


107/MP/2024

03.06.2026 04.06.2026 Misc.

870


184/MP/2026

03.06.2026 04.06.2026 Misc.

869


45/MP/2026 along with IA Nos.13/2026 & 36/2026

03.06.2026 04.06.2026 Misc.

868


845/MP/2025

02.06.2026 04.06.2026 Misc.

867


123/MP/2024

27.05.2026 04.06.2026 Misc.

866


415/MP/2024

27.05.2026 04.06.2026 Misc.

865


78/MP/2024

27.05.2026 04.06.2026 Misc.

864


46/MP/2018 (on remand from APTEL)

27.05.2026 04.06.2026 Misc.

863


210/MP/2026 along with IA (Diary) Nos. 253/2026 & 258/2026

02.06.2026 04.06.2026 Misc.

862


251/GT/2017 (on remand)

27.05.2026 02.06.2026 Generation

861


362/MP/2023

27.05.2026 02.06.2026 Misc.

860


153/MP/2024

27.05.2026 02.06.2026 Misc.

859


279/MP/2024

25.05.2026 02.06.2026 Misc.

858


805/MP/2025

27.05.2026 01.06.2026 Misc.

857


301/MP/2023

27.05.2026 01.06.2026 Misc.

856


644/MP/2025

27.05.2026 01.06.2026 Misc.

855


206/TL/2026

27.05.2026 01.06.2026 Misc.

854


240/MP/2026 along with IA No.78/2026

27.05.2026 01.06.2026 Misc.

853


204/MP/2026

27.05.2026 01.06.2026 Misc.

852


331/MP/2025

27.05.2026 01.06.2026 Misc.

851


772/MP/2025

27.05.2026 01.06.2026 Misc.

850


811/MP/2025 along with IA No. 87/2025

27.05.2026 01.06.2026 Misc.

849


130/MP/2026

27.05.2026 01.06.2026 Misc.

848


123/MP/2026 along with IA No.39/2026

27.05.2026 01.06.2026 Misc.

847


311/MP/2023 along with IA No. 80/2023

27.05.2026 01.06.2026 Misc.

846


143/MP/2024

27.05.2026 01.06.2026 Misc.

845


45/MP/2024

27.05.2026 01.06.2026 Misc.

844


844/TT/2025

27.05.2026 01.06.2026 Transmission

843


901/TT/2025

27.05.2026 01.06.2026 Transmission

842


241/MP/2026 along with IA No. 77/2026

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 41 and 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, seeking relaxation in the time period stipulated under Regulation 8.2(c) of the said Regulations for submission of the Connectivity Bank Guarantees against Intimation of In-Principle Grant of Connectivity (Intimation No. CTU/S/5/Conn/INT-1A-2200001607 dated 27.03.2026), condonation of the delay of two (2) days in submission of such Bank Guarantees, and a direction to Central Transmission Utility of India Limited to take the said Bank Guarantees on record and issue the Final Grant of Connectivity for 100 MW (with 50 MW BESS) at NP Kunta Pooling Station, Andhra Pradesh. Pace Digitek Limited
27.05.2026 01.06.2026 Misc.

841


235/MP/2026

27.05.2026 01.06.2026 Misc.

840


304/MP/2025

27.05.2026 01.06.2026 Misc.

839


178/MP/2025

27.05.2026 01.06.2026 Misc.

838


80/MP/2024

27.05.2026 01.06.2026 Misc.

837


190/MP/2024

25.05.2026 01.06.2026 Misc.

836


851/MP/2025 along with IA No.29/2026

27.05.2026 01.06.2026 Misc.

835


57/MP/2026

27.05.2026 01.06.2026 Misc.

834


358/MP/2023 along with IA Nos.90/2023 and 33/2025

27.05.2026 01.06.2026 Misc.

833


632/MP/2025

22.05.2026 01.06.2026 Misc.

832


1025/GT/2025, 19/GT/2026

06.05.2026 01.06.2026 Generation

831


10/RP/2026 In 191/TT/2023

27.05.2026 29.05.2026 Review

830


191/MP/2026 along with IA No.67/2026

27.05.2026 29.05.2026 Misc.

829


201/MP/2026

27.05.2026 29.05.2026 Misc.

828


203/MP/2026

27.05.2026 29.05.2026 Misc.

827


242/MP/2026

27.05.2026 29.05.2026 Misc.

826


306/MP/2022 along with IA Nos. 20/2023, 85/2023, 16/2024, 79/2026 & 80/2026

27.05.2026 29.05.2026 Misc.

825


345/MP/2023 along with IA No.86/2023

27.05.2026 29.05.2026 Misc.

824


196/MP/2023 207/MP/2023 208/MP/2023

25.05.2026 29.05.2026 Misc.

813


197/MP/2026

25.05.2026 29.05.2026 Misc.

822


202/TL/2026

25.05.2026 29.05.2026 Licence (Transmission)

821


211/MP/2026

25.05.2026 29.05.2026 Misc.

820


213/TD/2026

25.05.2026 29.05.2026 Licence

819


217/MP/2024

25.05.2026 29.05.2026 Misc.

818


219/MP/2026

25.05.2026 29.05.2026 Misc.

817


229/MP/2026 along with IA No. 75/2026

25.05.2026 29.05.2026 Misc.

816


232/MP/2024

25.05.2026 29.05.2026 Misc.

815


240/MP/2024 along with IA No.56/2024

25.05.2026 29.05.2026 Misc.

814


243/MP/2024 along with IA Nos. 58/2024 & 79/2024, 309/MP/2024, 304/MP/2024 along with IA No.75/2024

25.05.2026 29.05.2026 Misc.

813


248/MP/2024

25.05.2026 29.05.2026 Misc.

812


257/MP/2024 along with IA No.102/2025

25.05.2026 29.05.2026 Misc.

811


278/MP/2024

25.05.2026 29.05.2026 Misc.

810


371/MP/2024 272/MP/2024

25.05.2026 29.05.2026 Misc.

809


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited (WLL) and Anr
27.05.2026 29.05.2026 Misc.

808


1004/MP/2025 along with IA No. Dy. 181/2026, 20/MP/2026 along with IA No. 6/2026 & Dy. No. 180/2026

25.05.2026 29.05.2026 Misc.

807


241/2026 in Diary No. 233/2026

25.05.2026 29.05.2026 Misc.

806


220/TL/2026, 236/AT/2026

25.05.2026 27.05.2026 Misc.

805


228/MP/2026

25.05.2026 27.05.2026 Misc.

804


194/MP/2024 along with IA No.46/2024

25.05.2026 27.05.2026 Misc.

804


210/MP/2026 along with IA (Diary) Nos. 253/2026 & 258/2026

25.05.2026 27.05.2026 Misc.

803


179/MP/2023

30.04.2026 27.05.2026 Misc.

802


236/GT/2021

19.05.2026 27.05.2026 Generation

801


1026/GT/2025, 17/GT/2026

06.05.2026 27.05.2026 Generation

800


804/MP/2025

25.05.2026 27.05.2026 Misc.

799


845/MP/2025

25.05.2026 27.05.2026 Misc.

798


215/MP/2026

25.05.2026 27.05.2026 Misc.

797


233/AT/2026

25.05.2026 27.05.2026 Adoption

796


207/MP/2026

25.05.2026 27.05.2026 Misc.

795


1014/MP/2025 along with IA No. 131/2025

25.05.2026 27.05.2026 Misc.

794


180/MP/2024

25.05.2026 27.05.2026 Misc.

793


972/MP/2025

22.05.2026 27.05.2026 Misc.

792


151/MP/2026

22.05.2026 27.05.2026 Misc.

791


180/MP/2023, 245/MP/2024, 184/MP/2023, 164/MP/2024, 165/MP/2024, 167/MP/2024

22.05.2026 26.05.2026 Misc.

790


24/RP/2025

22.05.2026 26.05.2026 Review

789


341/GT/2025 along with I.A. No. 4 of 2026

02.01.2026 26.05.2026 Generation

788


186/MP/2026 along with IA Nos. 62/2026 and 74/2026

22.05.2026 26.05.2026 Misc.

787


30/MP/2026

19.02.2026 26.05.2026 Misc.

786


960/GT/2025, 18/GT/2026

06.05.2026 25.05.2026 Generation

785


994/GT/2025, 733//GT/2025

06.05.2026 25.05.2026 Generation

784


940/GT/2025, 995/GT/2025

06.05.2026 25.05.2026 Generation

783


180/MP/2023, 245/MP/2024, 184/MP/2023, 164/MP/2024, 165/MP/2024, 167/MP/2024

19.05.2026 22.05.2026 Misc.

782


680/MP/2025 along with IA No. 11/2026

19.05.2026 22.05.2026 Misc.

781


770/MP/2025 along with IA No. 80/2025

19.05.2026 21.05.2026 Misc.

780


20/MP/2023

19.05.2026 21.05.2026 Misc.

779


584/MP/2020 along with IA No.30/2022 and 116/2025

19.05.2026 21.05.2026 Misc.

778


64/MP/2026

19.05.2026 21.05.2026 Misc.

777


191/MP/2026 along with IA No. 67/2026

19.05.2026 21.05.2026 Misc.

776


186/MP/2026 along with IA Nos. 62/2026 & (Dy.) 300/2026

19.05.2026 21.05.2026 Misc.

775


972/MP/2025

19.05.2026 21.05.2026 Misc.

774


632/MP/2025

19.05.2026 21.05.2026 Misc.

773


227/MP/2026 along with IA No. 73/2026

19.05.2026 21.05.2026 Misc.

772


24/RP/2025 along with IA No. 125/2025

19.05.2026 21.05.2026 Rev

771


340/MP/2022, 341/MP/2022

19.05.2026 21.05.2026 Misc.

770


339/MP/2022

19.05.2026 21.05.2026 Misc.

769


218/MP/2022 along with IA No. 112/2025, 105/MP/2023 along with IA No. 110/2025

12.05.2026 21.05.2026 Misc.

768


106/MP/2024

14.05.2026 21.05.2026 Misc.

767


79/MP/2023

14.05.2026 21.05.2026 Misc.

766


264/MP/2023

13.05.2026 19.05.2026 Misc.

765


60/MP/2026

13.05.2026 19.05.2026 Misc.

764


61/MP/2023

13.05.2026 18.05.2026 Misc.

763


483/TT/2025

14.05.2026 18.05.2026 Transmission

762


1002/TT/2025

14.05.2026 18.05.2026 Transmission

761


900/TT/2025

14.05.2026 18.05.2026 Transmission

760


479/TT/2025

14.05.2026 18.05.2026 Transmission

759


29/TT/2026

14.05.2026 18.05.2026 Transmission

758


10/RP/2025

14.05.2026 18.05.2026 Misc.

757


807/MP/2025

13.05.2026 18.05.2026 Misc.

756


156/MP/2026

13.05.2026 18.05.2026 Misc.

755


53/MP/2026

14.05.2026 18.05.2026 Misc.

754


905/MP/2025

12.05.2026 18.05.2026 Misc.

753


96/MP/2026

12.05.2026 18.05.2026 Misc.

752


365/MP/2025

12.05.2026 18.05.2026 Misc.

751


63/MP/2024

12.05.2026 18.05.2026 Misc.

750


135/MP/2026

13.05.2026 18.05.2026 Misc.

749


58/MP/2023, 215/MP/2023

12.05.2026 18.05.2026 Misc.

748


210/MP/2026 along with IA (Diary) Nos. 253/2026 & 258/2026

12.05.2026 18.05.2026 Misc.

747


172/AT/2026

13.05.2026 18.05.2026 Misc.

746


127/MP/2025

13.05.2026 18.05.2026 Misc.

745


123/MP/2026 along with IA No. 39/2026

13.05.2026 18.05.2026 Misc.

744


67/MP/2026

13.05.2026 18.05.2026 Misc.

743


24/MP/2026

13.05.2026 18.05.2026 Misc.

742


177/MP/2024 along with IA No. 43/2024

14.05.2026 18.05.2026 Misc.

741


146/AT/2026

13.05.2026 18.05.2026 Misc.

740


25/MP/2026

13.05.2026 18.05.2026 Misc.

739


247/MP/2024 along with IA No. 22/2025

13.05.2026 18.05.2026 Misc.

738


116/MP/2022

13.05.2026 18.05.2026 Misc.

737


173/MP/2026

13.05.2026 18.05.2026 Misc.

736


199/MP/2026

Petition seeking approval under Section 17(3) and (4) of the Electricity Act, 2003 for bringing on record the appointment of IDBI Trusteeship Services Limited – Respondent No.2, as a Security Trustee and for creation of security interest by way of hypothecation over the assets of Petitioner and pledge of 51% equity share capital of the Petitioner held by the promoter in the favour of the IDBI Trusteeship Limited – Respondent No. 2 acting on behalf of and for the benefit of the lenders- Respondent Nos. 3 to 5 (and for any subsequent transferees, assign, novatees thereof and any refinancing lenders to the Project), pursuant to the Facility Agreement dated 20.03.2026, the Security Trustee Agreement dated 20.03.2026, the unattested Deed of Hypothecation dated 20.03.2026 and Agreement for Pledge of Share dated 20.03.2026, Sponsor’s Undertaking dated 20.03.2026 and other financing agreements, for the development of the Transmission Project. Raghanesda RE Transmission Limited
13.05.2026 18.05.2026 Misc.

735


368/MP/2023

13.05.2026 18.05.2026 Misc.

734


108/MP/2026 along with IA No.26/2026

13.05.2026 18.05.2026 Misc.

733


211/MP/2026

12.05.2026 18.05.2026 Misc.

732


208/MP/2026

12.05.2026 18.05.2026 Misc.

731


169/MP/2024 along with IA No.39/2024

12.05.2026 18.05.2026 Misc.

730


56/MP/2026

13.05.2026 18.05.2026 Misc.

729


54/MP/2026

Petition under Section 79(1)(a), 79(1 )(b) and 79(1 )(f) of the Electricity Act, 2003 seeking approval and determination of the revised tariff on account of Change in Law arising from the amendment of Goods and Services Tax (GST) slabs vide Notification No. 8/2021 - Central Tax (Rate) dated 30.09.2021 issued by the Ministry of Finance, in terms of Article 12 of the Power Purchase Agreement dated 15.09.2021, with effect from the date of early part commissioning of the project, i.e., 27 MW commissioned on 05.12.2022, and for the remaining capacity commissioned phase-wise thereafter, along with recovery of pending Late Payment Surcharge (LPS) on supplementary bills raised on account of the said Change in Law after the Scheduled Commercial Operation Date (SCOD) of the entire capacity. JSW Renew Energy Two Limited
14.05.2026 18.05.2026 Misc.

728


846/MP/2025

12.05.2026 18.05.2026 Misc.

727


450/MP/2025 along with IA No.35/2025

12.05.2026 18.05.2026 Misc.

726


348/MP/2023 along with IA No. 83/2025

12.05.2026 18.05.2026 Misc.

725


319/MP/2022 along with IA No. 63/2022

12.05.2026 18.05.2026 Misc.

724


302/MP/2022 along with I.A. No. 31/2025, 153/MP/2025

12.05.2026 18.05.2026 Misc.

723


254/MP/2024 along with IA No. 64/2025

12.05.2026 18.05.2026 Misc.

722


212/MP/2026

12.05.2026 18.05.2026 Misc.

721


177/MP/2026

12.05.2026 18.05.2026 Misc.

720


101/MP/2010 (On Remand)

12.05.2026 18.05.2026 Misc.

719


49/MP/2026

12.05.2026 18.05.2026 Misc.

718


966/TT/2025

14.05.2026 18.05.2026 Transmission

717


867/TT/2025

14.05.2026 18.05.2026 Transmission

716


515/TT/2025

14.05.2026 18.05.2026 Transmission

715


355/TT/2025

14.05.2026 18.05.2026 Transmission

714


396/TT/2025

14.05.2026 18.05.2026 Transmission

713


775/MP/2025

14.05.2026 18.05.2026 Misc.

712


263/MP/2022

13.05.2026 18.05.2026 Misc.

711


109/MP/2026 along with IA (Diary) No.316/2026

13.05.2026 18.05.2026 Misc.

710


161/MP/2025 along with IA No.109/2025

13.05.2026 18.05.2026 Misc.

709


98/MP/2026 along with IA Nos. 21/2026 & 43/2026

13.05.2026 18.05.2026 Misc.

708


85/MP/2026

13.05.2026 18.05.2026 Misc.

707


62/MP/2026

13.05.2026 18.05.2026 Misc.

706


61/MP/2026

13.05.2026 18.05.2026 Misc.

705


42/MP/2026

13.05.2026 18.05.2026 Misc.

704


40/MP/2026

13.05.2026 18.05.2026 Misc.

703


1000/GT/2025, 955/GT/2025

27.04.2026 15.05.2026 Generation

702


896/GT/2025, 899/GT/2025

27.04.2026 15.05.2026 Generation

701


200/AT/2026

12.05.2026 15.05.2026 Adoption

700


178/MP/2026

12.05.2026 15.05.2026 Misc.

699


155/MP/2023

06.05.2026 15.05.2026 Misc.

698


845/MP/2025

12.05.2026 15.05.2026 Misc.

697


71/MP/2023

12.05.2026 15.05.2026 Misc.

696


86/MP/2026

12.05.2026 15.05.2026 Misc.

695


65/MP/2020, 618/MP/2020

06.05.2026 11.05.2026 Misc.

694


195/TL/2026

06.05.2026 11.05.2026 Licence (Transmission)

693


87/MP/2024

06.05.2026 11.05.2026 Misc.

692


227/MP/2024

29.04.2026 11.05.2026 Misc.

691


296/MP/2025

06.05.2026 11.05.2026 Misc.

690


153/MP/2026

06.05.2026 11.05.2026 Misc.

689


154/MP/2026

06.05.2026 11.05.2026 Misc.

688


43/GT/2025

27.04.2026 11.05.2026 Generation

687


49/GT/2025

27.04.2026 11.05.2026 Generation

686


(Dy.) No. 280/2026 along with IA (Dy.) No. 290/2026

06.05.2026 11.05.2026 Misc.

685


18/RP/2024 in 10/TT/2019

30.04.2026 11.05.2026 Review

684


28/RP/2024 along with IA No. 81/2024 in 255/TT/2021

30.04.2026 11.05.2026 Review

683


188/MP/2026 along with IA No. 64/2026, 189/MP/2026 along with IA No. 65/2026, 190/MP/2026 along with IA No. 66/2026, 192/MP/2026 along with IA (Dy. No.) 220/2026

06.05.2026 11.05.2026 Misc.

682


191/MP/2026 along with IA No. 67/2026

06.05.2026 11.05.2026 Misc.

681


288/MP/2024

06.05.2026 11.05.2026 Misc.

680


265/MP/2022 along with IA No.63/2023, 94/MP/2023

06.05.2026 11.05.2026 Misc.

679


196/TD/2026

06.05.2026 11.05.2026 Licence

678


282/MP/2021 along with IA No.61/2022, 141/MP/2022

06.05.2026 11.05.2026 Misc.

677


126/MP/2022 along with IA No. 41/2022

06.05.2026 11.05.2026 Misc.

676


147/MP/2026

06.05.2026 11.05.2026 Misc.

675


155/MP/2026 along with IA (Diary) No. 254/2026

06.05.2026 11.05.2026 Misc.

674


194/MP/2021

06.05.2026 11.05.2026 Misc.

673


145/AT/2026

06.05.2026 11.05.2026 Adoption

672


469/MP/2024, 252/MP/2024

06.05.2026 11.05.2026 Misc.

671


367/GT/2024

27.04.2026 11.05.2026 Generation

670


654/GT/2025, 653/GT/2025

27.05.2026 11.05.2026 Generation

669


12/RP/2025 in 132/TT/2023

29.04.2026 07.05.2026 Review

668


171/MP/2026

30.04.2026 07.05.2026 Misc.

667


5/RP/2026 in 128/GT/2024

29.04.2026 07.05.2026 Review

666


370/GT/2025 along with I.A. No.37/2026

27.04.2026 07.05.2026 Generation

665


520/MP/2024

27.04.2026 07.05.2026 Misc.

664


939/MP/2025

27.04.2026 07.05.2026 Misc.

663


1006/GT/2025, 1012/GT/2025

24.04.2026 07.05.2026 Generation

662


1013/GT/2025, 947/GT/2025

24.04.2026 07.05.2026 Generation

661


19/RP/2025 in 167/TT/2022

30.04.2026 06.05.2026 Review

660


254/MP/2024 along with IA No. 64/2025

29.04.2026 06.05.2026 Misc.

659


2/RP/2026

29.04.2026 06.05.2026 Review

658


3/MP/2026

29.04.2026 05.05.2026 Misc.

657


111/MP/2024, 112/MP/2024, 15/RP/2024, 16/RP/2024

30.04.2026 05.05.2026 Misc.

656


112/MP/2023

29.04.2026 05.05.2026 Misc.

655


23/RP/2025 in 45/TT/2023

30.04.2026 05.05.2026 Review

654


2/MP/2026

29.04.2026 05.05.2026 Misc.

653


Corrigendum to 378/MP/2023

16.04.2026 05.05.2026 Misc.

652


3/RP/2026 in 254/MP/2023

30.04.2026 05.05.2026 Review

651


188/MP/2026 along with IA No. 64/2026, 189/MP/2026 along with IA No. 65/2026, 190/MP/2026 along with IA No. 66/2026, 192/MP/2026 along with IA (Dy. No.) 220/2026

30.04.2026 04.05.2026 Misc.

650


191/MP/2026 along with IA No. 67/2026

30.04.2026 04.05.2026 Misc.

649


782/MP/2025, 833/MP/2025, 817/MP/2025, 319/MP/2023

29.04.2026 04.05.2026 Misc.

648


Corrigendum to 16/MP/2026

16.04.2026 04.05.2026 Misc.

647


194/MP/2026 along with IA (Diary) No. 167/2026

30.04.2026 04.05.2026 Misc.

646


176/MP/2026

30.04.2026 04.05.2026 Misc.

645


170/MP/2026

30.04.2026 04.05.2026 Misc.

644


777/MP/2025

29.04.2026 04.05.2026 Misc.

643


409/MP/2024 along with IA No. 30/2026

27.04.2026 04.05.2026 Misc.

642


103/MP/2026 along with IA No.28/2026

30.04.2026 04.05.2026 Misc.

641


1028/MP/2025

30.04.2026 04.05.2026 Misc.

640


814/MP/2025

29.04.2026 04.05.2026 Misc.

639


804/MP/2025

29.04.2026 04.05.2026 Misc.

638


781/MP/2025

29.04.2026 04.05.2026 Misc.

637


757/MP/2025 along with IA No.93/2025

29.04.2026 04.05.2026 Misc.

636


695/MP/2025, 715/MP/2025

27.04.2026 04.05.2026 Misc.

635


631/MP/2025

29.04.2026 04.05.2026 Misc.

634


376/MP/2023

29.04.2026 04.05.2026 Misc.

633


320/MP/2025

24.04.2026 04.05.2026 Misc.

632


294/MP/2023

29.04.2026 04.05.2026 Misc.

631


248/MP/2023

29.04.2026 04.05.2026 Misc.

630


225/MP/2023

29.04.2026 04.05.2026 Misc.

629


185/TD/2026

29.04.2026 04.05.2026 Misc.

628


171/MP/2024

24.04.2026 04.05.2026 Misc.

627


107/MP/2024 along with IA No. 15/2026

29.04.2026 04.05.2026 Misc.

626


74/GT/2017 (on remand from APTEL)

24.04.2026 04.05.2026 Generation

625


65/MP/2026

27.04.2026 04.05.2026 Misc.

624


45/MP/2026 along with IA Nos. 13/2026 & 36/2026

29.04.2026 04.05.2026 Misc.

623


31/RP/2024

29.04.2026 04.05.2026 Review

622


107/MP/2026 along with IA No. 24/2026

29.04.2026 04.05.2026 Misc.

621


10/RP/2025

27.04.2026 04.05.2026 review

620


7/RP/2025

29.04.2026 04.05.2026 review

619


17/RP/2025 in 649/TT/2020

30.04.2026 04.05.2026 Review

618


1/RP/2026 in 3/TT/2023

30.04.2026 04.05.2026 Review

617


175/MP/2026

30.04.2026 04.05.2026 Misc.

616


25/RP/2025 along with IA No. 135 of 2025, 9/RP/2024 along with IA Nos. 19/2025 and 134/2025

30.04.2026 04.05.2026 Review

615


11/RP/2025 in 344/MP/2020

30.04.2026 04.05.2026 Review

614


168/MP/2026, 169/MP/2026, 187/MP/2026, 193/MP/2026

30.04.2026 04.05.2026 Misc.

613


186/MP/2026 along with IA Nos. 62/2026 & 63/2026

29.04.2026 04.05.2026 Misc.

612


318/MP/2023

27.04.2026 04.05.2026 Misc.

611


784/MP/2025

27.04.2026 04.05.2026 Misc.

610


41/MP/2014, 14/MP/2014, 327/MP/2013

24.04.2026 04.05.2026 Misc.

609


1014/MP/2025 alongwith IA No. 131/2025

29.04.2026 03.05.2026 Misc.

608


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited (WLL) and Anr.
29.04.2026 03.05.2026 Misc.

607


268/MP/2020

27.04.2026 03.05.2026 Misc.

606


179/AT/2026

29.04.2026 03.05.2026 Adoption

605


55/MP/2026 along with IA No. 60/2026

29.04.2026 03.05.2026 Misc.

604


354/TT/2025

22.04.2026 28.04.2026 Transmission

603


282/TT/2025

22.04.2026 28.04.2026 Transmission

602


207/TT/2024

22.04.2026 28.04.2026 Transmission

601


172/TT/2018

22.04.2026 28.04.2026 Transmission

600


30/TT/2021

22.04.2026 28.04.2026 Transmission

599


IA No. 23/2026 in 320/TT/2023

22.04.2026 28.04.2026 Misc.

598


492/TT/2025

24.04.2026 28.04.2026 Transmission

597


127/TT/2014 (On Remand)

22.04.2026 28.04.2026 Transmission

596


839/TT/2025

22.04.2026 28.04.2026 Transmission

595


732/TT/2025, 510/TT/2025, 399/TT/2025

22.04.2026 28.04.2026 Transmission

594


591/TT/2025, 925/TT/2025

22.04.2026 28.04.2026 Transmission

593


562/TT/2025

22.04.2026 28.04.2026 Transmission

592


448/TT/2025

22.04.2026 28.04.2026 Transmission

591


445/TT/2024

22.04.2026 28.04.2026 Transmission

590


397/TT/2025

22.04.2026 28.04.2026 Transmission

589


4/MP/2026

22.04.2026 28.04.2026 Misc.

588


331/MP/2024, 581/MP/2025

24.04.2026 28.04.2026 Misc.

587


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Private Limited and 4 Ors.
24.04.2026 28.04.2026 Misc.

586


178/MP/2026

22.04.2026 28.04.2026 Misc.

585


131/TL/2026, 132/AT/2026

24.04.2026 28.04.2026 Licence (Transmission)

584


120/AT/2026, 121/TL/2026

24.04.2026 28.04.2026 Adoption

583


46/MP/2018 (on remand from APTEL)

24.04.2026 28.04.2026 Misc.

582


34/MP/2018, 47/MP/2018, 52/MP/2018, 13/MP/2018, 211/MP/2018, 232/MP/2017, 233/MP/2017

24.04.2026 28.04.2026 Misc.

581


18/RP/2015 (On Remand), 130/GT/2016 (On Remand)

24.04.2026 28.04.2026 Review

580


35/MP/2026

22.04.2026 28.04.2026 Misc.

579


410/MP/2024

17.04.2026 28.04.2026 Misc.

578


265/MP/2024

17.04.2026 28.04.2026 Misc.

577


48/MP/2025

16.04.2026 28.04.2026 Misc.

576


378/MP/2023

16.04.2026 27.04.2026 Misc.

575


659/TT/2025, 519/TT/2025, 883/TT/2025 and 529/TT/2025

22.04.2026 27.04.2026 Transmission

574


633/TT/2025

22.04.2026 27.04.2026 Transmission

573


915/TT/2025, 914/TT/2025

Petition under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Assets-1 to 5 and Asset-7 and the determination cum truing-up of the transmission tariff for the 2019-24 period and the determination of the transmission tariff for the 2024-29 period for Asset-6A under “Transmission System associated with Tehri Pump Storage Plant (PSP)”. Power Grid Corporation of India Limited
22.04.2026 27.04.2026 Transmission

572


256/TT/2025

22.04.2026 27.04.2026 Transmission

571


304/MP/2013, 312/MP/2013, 313/MP/2013, 16/MP/2014

24.04.2026 27.04.2026 Misc.

570


188/MP/2021

24.04.2026 27.04.2026 Misc.

569


58/MP/2026 along with IA Nos. 14/2026 & 44/2026

24.04.2026 27.04.2026 Misc.

568


149/MP/2026 along with IA No. 45/2026

24.04.2026 27.04.2026 Misc.

567


971/MP/2025

17.04.2026 27.04.2026 Misc.

566


363/MP/2024

17.04.2026 27.04.2026 Misc.

565


91/MP/2024 along with I.A. No. 60/2025

17.04.2026 27.04.2026 Misc.

564


101/MP/2010 (On Remand)

17.04.2026 27.04.2026 Misc.

563


1020/MP/2025

16.04.2026 27.04.2026 Misc.

562


974/MP/2025 along with IA No. 8/2026

16.04.2026 27.04.2026 Misc.

561


881/TT/2025, 882/TT/2025, 664/TT/2025, 913/TT/2025, 743/TT/2025 and 766/TT/2025

22.04.2026 27.04.2026 Transmission

560


767/TT/2025, 380/TT/2024, 398/TT/2024, and 746/TT/2025

22.04.2026 27.04.2026 Transmission

559


573/TT/2025, 876/TT/2025, 665/TT/2025, 660/TT/2025 and 744/TT/2025

22.04.2026 27.04.2026 Transmission

558


75/MP/2026

17.04.2026 21.04.2026 Misc.

557


94/MP/2023

17.04.2026 21.04.2026 Misc.

556


113/MP/2026

17.04.2026 21.04.2026 Misc.

555


128/MP/2026

17.04.2026 21.04.2026 Misc.

554


644/MP/2025

17.04.2026 21.04.2026 Misc.

553


845/MP/2025

17.04.2026 20.04.2026 Misc.

552


815/MP/2025

17.04.2026 20.04.2026 Misc.

551


403/MP/2024

17.04.2026 20.04.2026 Misc.

550


680/MP/2025 along with IA No. 11/2026

16.04.2026 20.04.2026 Misc.

549


261/MP/2024

17.04.2026 20.04.2026 Misc.

548


202/MP/2023,
272/MP/2023,
236/MP/2023,
286/MP/2023,
335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024,
139/MP/2024,
334/MP/2024,
121/MP/2024,
124/MP/2024,
142/MP/2024,
195/MP/2024,
98/MP/2024,
519/MP/2024,
115/MP/2025,
117/MP/2025,
146/MP/2025,
145/MP/2025,
144/MP/2025,
116/MP/2025,
585/MP/2025,
323/MP/2025,
333/MP/2025

16.04.2026 20.04.2026 Misc.

547


150/MP/2026

17.04.2026 20.04.2026 Misc.

546


146/AT/2026

16.04.2026 20.04.2026 Adoption

545


141/MP/2026

17.04.2026 20.04.2026 Misc.

544


112/MP/2026

16.04.2026 20.04.2026 Misc.

543


21/RP/2025 in 137/GT/2024

16.04.2026 20.04.2026 Review

542


94/AT/2026

16.04.2026 20.04.2026 Adoption

541


5/MP/2026

17.04.2026 20.04.2026 Misc.

540


16/MP/2026

16.04.2026 20.04.2026 Misc.

539


806/MP/2025

17.04.2026 20.04.2026 Misc.

538


632/MP/2025

17.04.2026 20.04.2026 Misc.

537


912/MP/2025

16.04.2026 20.04.2026 Misc.

536


432/MP/2019 along with IA No. 82/2023 & 111/2025

16.04.2026 20.04.2026 Misc.

535


332/MP/2025, 280/MP/2025

16.04.2026 20.04.2026 Misc.

534


368/MP/2025

16.04.2026 20.04.2026 Misc.

533


251/GT/2017 (on remand)

16.04.2026 20.04.2026 Generation

532


239/MP/2024 along with IA No. 8/2025

16.04.2026 20.04.2026 Misc.

531


238/MP/2023

16.04.2026 20.04.2026 Misc.

530


133/TL/2026, 134/AT/2026

16.04.2026 20.04.2026 Licence (Transmission)

529


110/MP/2026

16.04.2026 20.04.2026 Misc.

528


90/GT/2023

16.04.2026 20.04.2026 Generation

527


431/MP/2024 with I.A. 57/2026

16.04.2026 20.04.2026 Misc.

526


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
16.04.2026 20.04.2026 Misc.

525


24/RP/2025 along with IA No. 125/2025

17.04.2026 20.04.2026 Review

524


4/RP/2026 alongwith I.A. Nos. 32/2026, 33/2026 and 47/2026, 7/RP/2026 alongwith I.A. Nos. 48/2026, 49/2026 and 50/2026, 8/RP/2026 alongwith I.A. Nos. 51/2026, 52/2026 and 53/2026

16.04.2026 20.04.2026 Review

523


251/MP/2023

17.04.2026 20.04.2026 Misc.

522


232/MP/2023

17.04.2026 20.04.2026 Misc.

521


348/MP/2023 along with IA No. 83/2025

16.04.2026 20.04.2026 Misc.

520


976/MP/2025

16.04.2026 20.04.2026 Misc.

519


239/MP/2023

16.04.2026 20.04.2026 Misc.

518


367/MP/2025, 422/MP/2025

16.04.2026 20.04.2026 Misc.

517


837/MP/2025 along with IA No.100/2025, 100/MP/2026

16.04.2026 20.04.2026 Misc.

516


145/AT/2026

16.04.2026 20.04.2026 Adoption

515


148/MP/2026 along with IA No. 42/2026

16.04.2026 20.04.2026 Misc.

514


15/RP/2025 along with IA No. 90/2025

16.04.2026 20.04.2026 Review

513


934/MP/2025

07.04.2026 20.04.2026 Misc.

512


972/MP/2025

18.03.2026 20.04.2026 Misc.

511


59/MP/2026

18.02.2026 17.04.2026 Misc.

510


807/MP/2025

07.04.2026 15.04.2026 Misc.

509


970/MP/2025, 788/MP/2025 along with IA No.127/2025

07.04.2026 10.04.2026 Misc.

508


911/MP/2025

07.04.2026 10.04.2026 Misc.

507


764/MP/2025

07.04.2026 10.04.2026 Misc.

506


759/MP/2025, 933/MP/2025, 952/MP/2025

07.04.2026 10.04.2026 Misc.

505


335/MP/2025

07.04.2026 10.04.2026 Misc.

504


301/MP/2024 along with IA No.1/2026

07.04.2026 10.04.2026 Misc.

503


300/MP/2023

07.04.2026 10.04.2026 Misc.

502


151/MP/2026

07.04.2026 10.04.2026 Misc.

501


147/MP/2026

07.04.2026 10.04.2026 Misc.

500


130/MP/2026

07.04.2026 10.04.2026 Misc.

499


107/MP/2023, 85/MP/2022 along with IA Nos. 24/2022 & 37/2023, 123/MP/2022 along with IA Nos. 38/2023, 246/MP/2022 along with IA Nos. 8/2023, 56/MP/2023, 185/MP/2023, 205/MP/2023

07.04.2026 10.04.2026 Misc.

498


92/TD/2026

07.04.2026 10.04.2026 Licence

497


96/MP/2026

07.04.2026 10.04.2026 Misc.

496


78/MP/2026

07.04.2026 10.04.2026 Misc.

495


421/MP/2025

07.04.2026 10.04.2026 Misc.

494


249/MP/2024

07.04.2026 10.04.2026 Misc.

493


106/MP/2026 Along with IA No. 54/2026

07.04.2026 10.04.2026 Misc.

492


102/MP/2026 Along with IA No. 46/2026

07.04.2026 10.04.2026 Misc.

491


551/MP/2025

25.03.2026 09.04.2026 Misc.

490


Corrigendum of 736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited and Anr.
17.02.2026 01.04.2026 Misc.

489


321/MP/2025

25.03.2026 31.03.2026 Misc.

488


120/AT/2026, 121/TL/2026

25.03.2026 31.03.2026 Adoption

487


136/TD/2026

25.03.2026 30.03.2026 Licence

486


785/MP/2025

25.03.2026 30.03.2026 Misc.

485


227/MP/2023

25.03.2026 30.03.2026 Misc.

484


148/MP/2026 along with IA No. 42/2026

25.03.2026 30.03.2026 Misc.

483


58/MP/2026 along with IA Nos. 14/2026 & 44/2026

25.03.2026 30.03.2026 Misc.

482


30/MP/2025, 31/MP/2025

25.03.2026 30.03.2026 Misc.

481


905/MP/2025

25.03.2026 30.03.2026 Misc.

480


614/MP/2025

25.03.2026 30.03.2026 Misc.

479


340/MP/2025

25.03.2026 30.03.2026 Misc.

478


107/MP/2024 along with IA No. 15/2026

25.03.2026 30.03.2026 Misc.

477


53/MP/2023 alongwith IA No. 11/2023, 167/MP/2023 alongwith IA No. 32/2024, 258/MP/2023 alongwith IA No. 59/2023, 267/MP/2023

25.03.2026 30.03.2026 Misc.

476


979/MP/2025

25.03.2026 30.03.2026 Misc.

475


969/MP/2025

25.03.2026 30.03.2026 Misc.

474


409/MP/2024 along with IA No.30/2026

25.03.2026 30.03.2026 Misc.

473


131/TL/2026, 132/AT/2026

25.03.2026 30.03.2026 Licence (Transmission)

472


119/MP/2026

25.03.2026 30.03.2026 Misc.

471


123/MP/2026 along with IA No. 38/2026

25.03.2026 30.03.2026 Misc.

470


317/MP/2025 along with IA Nos. 58/2025 and 92/2025

25.03.2026 30.03.2026 Misc.

469


93/TD/2026

25.03.2026 30.03.2026 Licence

468


171/MP/2024

25.03.2026 30.03.2026 Misc.

467


133/TL/2026, 134/AT/2026

25.03.2026 30.03.2026 Licence (Transmission)

466


218/MP/2022 along with IA No. 112/2025, 105/MP/2023 along with IA No. 110/2025

25.03.2026 30.03.2026 Misc.

465


149/MP/2026 along with IA No. 45/2026

25.03.2026 30.03.2026 Misc.

464


87/MP/2026

25.03.2026 30.03.2026 Misc.

463


135/MP/2026

25.03.2026 27.03.2026 Misc.

462


IA No. 128/2025 in 303/MP/2024

25.03.2026 27.03.2026 Misc.

461


331/MP/2025

25.03.2026 27.03.2026 Misc.

460


325/MP/2024 along with IA Nos. 78/2024, 105/2024 & 19/2026

25.03.2026 27.03.2026 Misc.

459


682/MP/2025

25.03.2026 27.03.2026 Misc.

458


847/MP/2025

25.03.2026 27.03.2026 Misc.

457


98/MP/2026 along with IA Nos. 21/2026 & 43/2026

25.03.2026 27.03.2026 Misc.

456


667/MP/2025 along with IA No.55/2025

25.03.2026 27.03.2026 Misc.

455


145/AT/2026

25.03.2026 27.03.2026 Adoption

454


1029/TL/2025

18.03.2026 27.03.2026 Licence (Transmission)

453


900/TT/2025

19.03.2026 24.03.2026 Transmission.

452


1002/TT/2025

19.03.2026 24.03.2026 Transmission.

451


29/TT/2026

19.03.2026 24.03.2026 Transmission.

450


30/TT/2021

19.03.2026 24.03.2026 Transmission.

449


875/TT/2025

19.03.2026 24.03.2026 Transmission.

448


877/TT/2025

19.03.2026 24.03.2026 Transmission.

447


16/MP/2026

18.03.2026 24.03.2026 Misc.

446


640/TT/2025

19.03.2026 24.03.2026 Transmission.

445


322/TL/2024 alongwith IA No. 35/2026

18.03.2026 24.03.2026 Licence.

444


770/MP/2025 along with IA No. 80/2025

18.03.2026 24.03.2026 Misc.

443


421/MP/2025 Along with I.A. No. 31/2026

18.03.2026 24.03.2026 Misc.

442


266/MP/2024

18.03.2026 24.03.2026 Misc.

441


202/MP/2023,
272/MP/2023,
236/MP/2023,
286/MP/2023,
335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024,
139/MP/2024,
334/MP/2024,
121/MP/2024,
124/MP/2024,
142/MP/2024,
195/MP/2024,
98/MP/2024,
519/MP/2024,
115/MP/2025,
117/MP/2025,
146/MP/2025,
145/MP/2025,
144/MP/2025,
116/MP/2025,
585/MP/2025,
323/MP/2025,
333/MP/2025

11.03.2026 23.03.2026 Misc.

440


954/TT/2025

19.03.2026 23.03.2026 Transmission

439


565/TT/2025

19.03.2026 23.03.2026 Transmission

438


515/TT/2025

19.03.2026 23.03.2026 Transmission

437


355/TT/2025

19.03.2026 23.03.2026 Transmission

436


606/TT/2025, 415/TT/2025, 749/TT/2025, 692/TT/2025, 490/TT/2025 612/TT/2025, 503/TT/2025 and 523/TT/2025

19.03.2026 23.03.2026 Transmission

435


479/TT/2025 and 483/TT/2025

19.03.2026 23.03.2026 Transmission

434


412/TT/2025, 494/TT/2025, 578/TT/2025 and 599/TT/2025

19.03.2026 23.03.2026 Transmission

432


867/TT/2025

19.03.2026 20.03.2026 Transmission

431


415/MP/2024

18.03.2026 20.03.2026 Misc.

430


125/TL/2026 And IA No. 34/2026, 124/AT/2026

18.03.2026 20.03.2026 Licence (Transmission)

429


966/TT/2025

19.03.2026 20.03.2026 Transmission

428


820/TT/2025

19.03.2026 20.03.2026 Transmission

427


396/TT/2025

19.03.2026 20.03.2026 Transmission

426


389/TT/2025

19.03.2026 20.03.2026 Transmission

425


320/MP/2022

18.03.2026 20.03.2026 Misc.

424


210/MP/2023

18.03.2026 20.03.2026 Misc.

423


26/MP/2026 along with IA No. 12/2026

18.03.2026 20.03.2026 Misc.

422


851/MP/2025 along with IA No. 29/2026

18.03.2026 20.03.2026 Misc.

421


278/MP/2023

18.03.2026 20.03.2026 Misc.

420


617/MP/2020

18.03.2026 20.03.2026 Misc.

419


168/MP/2023

18.03.2026 20.03.2026 Misc.

418


6/MP/2026

18.03.2026 20.03.2026 Misc.

417


99/MP/2026

18.03.2026 20.03.2026 Misc.

416


324/MP/2022

18.03.2026 20.03.2026 Misc.

415


48/MP/2026

18.03.2026 20.03.2026 Misc.

414


230/MP/2023

18.03.2026 20.03.2026 Misc.

413


27/TL/2026, 28/AT/2026

18.03.2026 20.03.2026 Licence (Transmission)

412


103/MP/2026 along with IA No. 28/2026

18.03.2026 &
19.03.2026
20.03.2026 Misc.

411


811/MP/2025 along with IA No. 87/2025

18.03.2026 19.03.2026 Misc.

410


305/MP/2025

18.03.2026 19.03.2026 Misc.

409


196/MP/2023, 207/MP/2023, 208/MP/2023

18.03.2026 19.03.2026 Misc.

408


369/MP/2025 along with IA No.94/2025, 430/MP/2025 along with IA No.99/2025

18.03.2026 19.03.2026 Misc.

407


110/MP/2024

18.03.2026 19.03.2026 Misc.

406


108/MP/2026 along with IA No.26/2026

18.03.2026 19.03.2026 Misc.

405


8/MP/2026 along with IA No.3/2026

18.03.2026 19.03.2026 Misc.

404


106/MP/2024

03.03.2026 19.03.2026 Misc.

403


781/MP/2025

11.03.2026 16.03.2026 Misc.

402


713/MP/2025

11.03.2026 16.03.2026 Misc.

401


91/MP/2026

11.03.2026 16.03.2026 Misc.

400


891/GT/2025

24.02.2026 16.03.2026 Generation

399


31/AT/2026

11.03.2026 16.03.2026 Adoption

398


109/MP/2026

11.03.2026 16.03.2026 Misc.

397


108/MP/2026 along with IA No.26/2026

11.03.2026 16.03.2026 Misc.

396


792/GT/2025

10.02.2026 16.03.2026 Generation

395


798/GT/2025

10.02.2026 16.03.2026 Generation

394


236/GT/2021

24.02.2026 12.03.2026 Generation

393


139/2026 along with IA (Diary) No.144/2026

11.03.2026 12.03.2026 Misc.

392


363/MP/2024

03.03.2026 07.03.2026 Misc.

391


331/MP/2024, 581/MP/2025

03.03.2026 07.03.2026 Misc.

390


203/MP/2024

03.03.2026 07.03.2026 Misc.

389


107/MP/2026 along with IA Nos.24/2026 & 25/2026

03.03.2026 07.03.2026 Misc.

388


79/MP/2023

03.03.2026 06.03.2026 Misc.

387


1029/TL/2025

03.03.2026 06.03.2026 Licence (Transmission)

386


1014/MP/2025 along with IA No. 131/2025

03.03.2026 06.03.2026 Misc.

385


910/MP/2025 along with IA No.10/2026

03.03.2026 06.03.2026 Misc.

384


865/MP/2025

03.03.2026 06.03.2026 Misc.

383


864/MP/2025

03.03.2026 06.03.2026 Misc.

382


845/MP/2025

03.03.2026 06.03.2026 Misc.

381


739/MP/2025

03.03.2026 06.03.2026 Misc.

380


685/MP/2025

03.03.2026 06.03.2026 Misc.

379


631/MP/2025

03.03.2026 06.03.2026 Misc.

378


450/MP/2025 along with IA No. 35/2025

03.03.2026 06.03.2026 Misc.

377


264/MP/2023

03.03.2026 06.03.2026 Misc.

376


177/MP/2024 along with IA No.43/2024

03.03.2026 06.03.2026 Misc.

375


155/MP/2024

03.03.2026 06.03.2026 Misc.

374


127/MP/2025

03.03.2026 06.03.2026 Misc.

373


100/MP/2026

03.03.2026 06.03.2026 Misc.

372


61/MP/2023

03.03.2026 06.03.2026 Misc.

371


103/MP/2026 along with IA (Diary) No. 130/2026

03.03.2026 06.03.2026 Misc.

370


IA No. 23/2026 in 320/TT/2023

03.03.2026 06.03.2026 Misc.

369


Combined RoP in 391/TT/2024, 449/TT/22024, 454/TT/2024, 499/TT/2025, 577/TT/2025 and 818/TT/2025

27.02.2026 06.03.2026 Transmission

368


744/TT/2025, 529/TT/2025

27.02.2026 05.03.2026 Transmission

367


602/TT/2025, 18/TT/2025, 819/TT/2025, 462/TT/2024, 822/TT/2025, 750/TT/2025 and 748/TT/2025

27.02.2026 05.03.2026 Transmission

366


380/TT/2024, 389/TT/2024, 398/TT/2024, 743/TT/2025, 746/TT/2025 and 766/TT/2025

27.02.2026 05.03.2026 Transmission

365


I.A. 22/2026 in 216/TT/2025

27.02.2026 05.03.2026 Misc.

364


241/TT/2016, 6/TT/2018

13.01.2026 02.03.2026 Transmission

363


21/RP/2025 in 137/GT/2024

24.02.2026 02.03.2026 Review

362


710/GT/2025

24.02.2026 02.03.2026 Generation

361


254/MP/2024 along with IA No. 64/2025

19.02.2026 02.03.2026 Misc.

360


65/MP/2020, 618/MP/2020

19.02.2026 02.03.2026 Misc.

359


625/GT/2025, 626/GT/2025

10.02.2026 02.03.2026 Generation

358


932/MP/2025 along with IA No. 122/2025

26.02.2026 02.03.2026 Misc.

357


824/TL/2025

26.02.2026 02.03.2026 Licence (Transmission)

356


772/MP/2025

26.02.2026 02.03.2026 Misc.

355


32/TD/2026

26.02.2026 02.03.2026 Licence

354


57/MP/2026

26.02.2026 02.03.2026 Misc.

353


48/MP/2026

26.02.2026 02.03.2026 Misc.

352


78/MP/2026

26.02.2026 02.03.2026 Misc.

351


66/TD/2026

26.02.2026 02.03.2026 Licence

350


99/MP/2026

26.02.2026 02.03.2026 Misc.

349


94/AT/2026

26.02.2026 02.03.2026 Adoption

348


640/TT/2025, 389/TT/2025

13.01.2026 27.02.2026 Transmission

347


972/MP/2025

24.02.2026 26.02.2026 Misc.

346


906/MP/2025

24.02.2026 26.02.2026 Misc.

345


846/MP/2025

24.02.2026 26.02.2026 Misc.

344


814/MP/2025

24.02.2026 26.02.2026 Misc.

343


804/MP/2025

24.02.2026 26.02.2026 Misc.

342


775/MP/2025

24.02.2026 26.02.2026 Misc.

341


322/TL/2024

24.02.2026 26.02.2026 Licence (Transmission)

340


91/MP/2026

24.02.2026 26.02.2026 Misc.

339


63/MP/2024

24.02.2026 26.02.2026 Misc.

338


75/MP/2026 along with IA No. 17/2026

24.02.2026 26.02.2026 Misc.

337


58/MP/2023, 215/MP/2023

24.02.2026 26.02.2026 Misc.

336


31/AT/2026

24.02.2026 26.02.2026 Adoption

335


45/MP/2026 along with IA Nos. 13/2026 & (Dy. No.) 55/2026

24.02.2026 26.02.2026 Misc.

334


27/TL/2026, 28/AT/2026

24.02.2026 26.02.2026 Licence (Transmission)

333


16/MP/2026

24.02.2026 26.02.2026 Misc.

332


21/MP/2026

24.02.2026 26.02.2026 Misc.

321


368/MP/2023

19.02.2026 23.02.2026 Misc.

330


365/MP/2025

19.02.2026 23.02.2026 Misc.

329


268/MP/2020 along with I.A. No. 20/2026

19.02.2026 23.02.2026 Misc.

328


62/MP/2026

18.02.2026 23.02.2026 Misc.

327


552/MP/2025

19.02.2026 23.02.2026 Misc.

326


348/MP/2023 along with IA No.83/2025

19.02.2026 23.02.2026 Misc.

325


161/MP/2025 along with I.A. No. 109/2025

19.02.2026 23.02.2026 Misc.

324


35/MP/2026

19.02.2026 23.02.2026 Misc.

323


25/MP/2026

19.02.2026 23.02.2026 Misc.

322


61/MP/2022

17.02.2026 23.02.2026 Misc.

321


1029/TL/2025

19.02.2026 21.02.2026 Licence (Transmission)

320


741/TT/2025

19.02.2026 21.02.2026 Transmission

319


680/MP/2025 along with IA No. 11/2026

19.02.2026 21.02.2026 Misc.

318


71/MP/2023

19.02.2026 21.02.2026 Misc.

317


24/MP/2026

19.02.2026 21.02.2026 Misc.

316


65/MP/2026

18.02.2026 21.02.2026 Misc.

315


32/RP/2023

18.02.2026 21.02.2026 Review

314


447/MP/2025

17.02.2026 21.02.2026 Transmission

313


853/MP/2025 along with IA No. 105/2025

17.02.2026 21.02.2026 Misc.

312


519/TT/2025 and 914/TT/2025

17.02.2026 21.02.2026 Transmission

311


562/TT/2025

17.02.2026 21.02.2026 Transmission

310


507/TT/2025, 603/TT/2025, 574/TT/2025, 967/TT/2025, 745/TT/2025, 747/TT/2025, 917/TT/2025 and 374/TT/2025

17.02.2026 21.02.2026 Transmission

309


533/TT/2025, 563/TT/2025, 729/TT/2025 and 730/TT/2025

17.02.2026 21.02.2026 Transmission

308


633/TT/2025

17.02.2026 21.02.2026 Transmission

307


634/TT/2025, 486/TT/2025, 561/TT/2025, 918/TT/2025, 950/TT/2025 951/TT/2025, and 1021/TT/2025

17.02.2026 21.02.2026 Transmission

306


Diary No. 97/2026 along with IA (Diary) No. 98/2026

19.02.2026 21.02.2026 Misc.

305


IA (Diary) No. 96/2026 in Petition No. 1015/MP/2025

19.02.2026 21.02.2026 Misc.

304


1/RP/2026

17.02.2026 20.02.2026 Review

303


53/MP/2026

18.02.2026 19.02.2026 Misc.

302


42/MP/2026

18.02.2026 19.02.2026 Misc.

301


40/MP/2026

18.02.2026 19.02.2026 Misc.

300


88/MP/2026

18.02.2026 19.02.2026 Misc.

299


61/MP/2026

18.02.2026 19.02.2026 Misc.

298


54/MP/2026

Petition under Section 79(1)(a), 79(1 )(b) and 79(1 )(f) of the Electricity Act, 2003 seeking approval and determination of the revised tariff on account of Change in Law arising from the amendment of Goods and Services Tax (GST) slabs vide Notification No. 8/2021 - Central Tax (Rate) dated 30.09.2021 issued by the Ministry of Finance, in terms of Article 12 of the Power Purchase Agreement dated 15.09.2021, with effect from the date of early part commissioning of the project, i.e., 27 MW commissioned on 05.12.2022, and for the remaining capacity commissioned phase-wise thereafter, along with recovery of pending Late Payment Surcharge (LPS) on supplementary bills raised on account of the said Change in Law after the Scheduled Commercial Operation Date (SCOD) of the entire capacity. JSW Renew Energy Two Limited
18.02.2026 19.02.2026 Misc.

297


85/MP/2026

18.02.2026 19.02.2026 Misc.

296


25/RP/2025 along with IA No. 135 of 2025

17.02.2026 19.02.2026 Review

295


9/RP/2024 along with IA No. 19 of 2024

17.02.2026 19.02.2026 Review

294


86/MP/2026

18.02.2026 19.02.2026 Misc.

293


87/MP/2026

18.02.2026 19.02.2026 Misc.

292


60/MP/2026

18.02.2026 19.02.2026 Misc.

291


31/RP/2024

18.02.2026 19.02.2026 Review

290


2/RP/2026

18.02.2026 19.02.2026 Review

289


7/RP/2025

18.02.2026 19.02.2026 Review

288


49/MP/2026

18.02.2026 19.02.2026 Misc.

287


56/MP/2026

18.02.2026 19.02.2026 Misc.

286


64/MP/2026

18.02.2026 19.02.2026 Misc.

285


67/MP/2026

18.02.2026 19.02.2026 Misc.

284


55/MP/2026

18.02.2026 19.02.2026 Misc.

283


839/TT/2025

17.02.2026 19.02.2026 Transmission

282


258/TT/2025, 826/TT/2025, 836/TT/2025, 742/TT/2025, 821/TT/2025, 878/TT/2025 and 831/TT/2025

17.02.2026 19.02.2026 Transmission

281


510/TT/2025, 399/TT/2025 and 925/TT/2025

17.02.2026 19.02.2026 Transmission

280


354/TT/2025

17.02.2026 19.02.2026 Transmission

279


832/TT/2025

17.02.2026 19.02.2026 Transmission

278


282/TT/2025

17.02.2026 19.02.2026 Transmission

277


343/TT/2025, 175/TT/2017 (On Remand)

17.02.2026 19.02.2026 Transmission

276


397/TT/2025

17.02.2026 19.02.2026 Transmission

275


445/TT/2024

17.02.2026 19.02.2026 Transmission

274


207/TT/2024

17.02.2026 19.02.2026 Transmission

273


18/RP/2025 in 353/TT/2023

17.02.2026 19.02.2026 Review

272


732/TT/2025

17.02.2026 19.02.2026 Transmission

271


591/TT/2025

17.02.2026 19.02.2026 Transmission

270


376/MP/2023

17.02.2026 18.02.2026 Misc.

269


400/TT/2025

17.02.2026 18.02.2026 Transmission

268


777/MP/2025

17.02.2026 18.02.2026 Misc.

267


757/MP/2025 along with IA No. 93/2025

17.02.2026 18.02.2026 Misc.

266


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited and Anr.
Corrigendum ROP dated: 01.04.2026
17.02.2026 18.02.2026 Misc.

265


403/MP/2024

17.02.2026 18.02.2026 Misc.

264


378/MP/2023

17.02.2026 18.02.2026 Misc.

263


260/MP/2024

17.02.2026 18.02.2026 Misc.

262


234/MP/2023

Petition under Section 66 and 79 of the Electricity Act, 2003, read with Regulation 15 of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010, thereby imploring this Commission for setting aside the communication dated 13.03.2023 issued by Respondent No.1 rejecting the Renewable Energy Certificate for the month of July, 2022 and by relaxing the timeline provided in Regulation 7 of the Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and direct the Respondent No.1 to issue REC to the Petitioner corresponding to the generation of power for the month of July, 2022. Tadas Wind Energy Limited
17.02.2026 18.02.2026 Misc.

261


112/MP/2023

17.02.2026 18.02.2026 Misc.

260


104/MP/2022 along with IA No. 106/2024

17.02.2026 18.02.2026 Misc.

259


67/MP/2021 along with IA Nos. 17/2021 & 30/2024

17.02.2026 18.02.2026 Misc.

258


10/RP/2025

17.02.2026 18.02.2026 Review

257


318/MP/2023

17.02.2026 18.02.2026 Misc.

256


294/MP/2023

12.02.2026 18.02.2026 Misc.

255


248/MP/2023

12.02.2026 18.02.2026 Misc.

254


225/MP/2023

12.02.2026 18.02.2026 Misc.

253


300/MP/2023

12.02.2026 16.02.2026 Misc.

252


4/MP/2026

12.02.2026 16.02.2026 Misc.

251


765/MP/2025

12.02.2026 16.02.2026 Misc.

250


673/MP/2025

12.02.2026 16.02.2026 Misc.

249


614/MP/2025

12.02.2026 16.02.2026 Misc.

248


320/MP/2025

12.02.2026 16.02.2026 Misc.

247


315/MP/2025

12.02.2026 16.02.2026 Misc.

246


301/MP/2024 along with IA No. 1/2026

12.02.2026 16.02.2026 Misc.

245


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and Ors.
12.02.2026 16.02.2026 Misc.

244


278/MP/2023

12.02.2026 16.02.2026 Misc.

243


249/MP/2024

12.02.2026 16.02.2026 Misc.

242


238/MP/2023

12.02.2026 16.02.2026 Misc.

241


228/MP/2023

12.02.2026 16.02.2026 Misc.

240


159/MP/2025

12.02.2026 16.02.2026 Misc.

239


188/MP/2021

12.02.2026 16.02.2026 Misc.

238


218/MP/2022 along with IA No. 112/2025, 105/MP/2023 along with IA No. 110/2025

10.02.2026 16.02.2026 Misc.

237


75/MP/2026 along with I.A.No.17/2026

10.02.2026 12.02.2026 Misc.

236


912/MP/2025 along with IA No. 16/2026

10.02.2026 12.02.2026 Misc.

235


885/TL/2025, 884/AT/2025

10.02.2026 12.02.2026 Licence (Transmission)

234


807/MP/2025

10.02.2026 12.02.2026 Misc.

233


239/MP/2024 along with IA No. 8/2025

10.02.2026 12.02.2026 Misc.

232


239/MP/2023

10.02.2026 12.02.2026 Misc.

231


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
10.02.2026 12.02.2026 Misc.

230


34/MP/2026

10.02.2026 12.02.2026 Misc.

229


15/RP/2025 along with IA No. 90/2025

10.02.2026 12.02.2026 Review

228


3/MP/2026

03.02.2026 11.02.2026 Misc.

227


2/MP/2026

03.02.2026 11.02.2026 Misc.

226


251/MP/2023

10.02.2026 11.02.2026 Misc.

225


232/MP/2023

10.02.2026 11.02.2026 Misc.

224


1014/MP/2025 along with I.A. No. 131/2025

10.02.2026 11.02.2026 Misc.

223


247/MP/2023

10.02.2026 11.02.2026 Misc.

222


107/MP/2024 along with IA No. 15/2026

10.02.2026 11.02.2026 Misc.

221


21/MP/2026

10.02.2026 11.02.2026 Misc.

220


10/MP/2026

10.02.2026 11.02.2026 Misc.

219


383/MP/2023, 384/MP/2023, 12/MP/2024

05.02.2026 10.02.2026 Misc.

218


Corrigendum to
202/MP/2023,
272/MP/2023,
236/MP/2023,
286/MP/2023,
335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024,
139/MP/2024,
334/MP/2024,
121/MP/2024,
124/MP/2024,
142/MP/2024,
195/MP/2024,
98/MP/2024,
519/MP/2024,
115/MP/2025,
117/MP/2025,
146/MP/2025,
145/MP/2025,
144/MP/2025,
116/MP/2025,
585/MP/2025,
323/MP/2025,
333/MP/2025

20.01.2026 10.02.2026 Misc.

217


550/MP/2025 along with IA No.130/2025

03.02.2026 09.02.2026 Misc.

216


45/MP/2026 along with IA No. 13/2026

03.02.2026 09.02.2026 Misc.

215


932/MP/2025 along with IA No. 122/2025

05.02.2026 09.02.2026 Misc.

214


410/MP/2024

05.02.2026 09.02.2026 Misc.

213


368/MP/2025

05.02.2026 09.02.2026 Misc.

212


1004/MP/2025, 20/MP/2026 along with IA No.6/2026

05.02.2026 09.02.2026 Misc.

211


859/MP/2025 along with IA No. 107/2025

05.02.2026 09.02.2026 Misc.

210


670/MP/2025

Petition under Section 79 of Electricity Act, 2003 read with Article 17 of the Power Purchase Agreements dated 25.11.2021 (PPAs) executed between Avaada Sunshine Energy Private Limited, West Central Railway & Rewa Ultra Mega Solar Limited, and Avaada Sunshine Energy Private Limited, Madhya Pradesh Power Management Company Limited & Rewa Ultra Mega Solar Limited seeking declaration that change in Goods and Services Tax from 5% to 12% and 13.8%, respectively w.e.f. 01.10.2021 by way of GST Amendment Notifications qualifies as ‘Change in Law’ event under Article 17 of the PPAs and consequently, direction to respondents to compensate the Petitioner towards additional expenditure incurred on account of the ‘Change in Law’ event along with carrying cost. Avaada Sunshine Energy Private Limited
05.02.2026 09.02.2026 Misc.

209


432/MP/2019 along with
IA No. 82/2023
& 111/2025

05.02.2026 09.02.2026 Misc.

208


223/MP/2022,
170/MP/2025

05.02.2026 09.02.2026 Misc.

207


210/MP/2023

05.02.2026 09.02.2026 Misc.

206


36/MP/2024 along with
IA No. 43/2025

05.02.2026 09.02.2026 Misc.

205


4/SM/2025

05.02.2026 09.02.2026 Suo-Motu

204


994/GT/2025,
733/GT/2025

21.01.2026 06.02.2026 Generation

203


960/GT/2025,
18/GT/2026

21.01.2026 06.02.2026 Generation

202


940/GT/2025,
995/GT/2025

21.01.2026 06.02.2026 Generation

201


892/GT/2025

21.01.2026 06.02.2026 Generation

199


652/GT/2025,
651/GT/2025

21.01.2026 06.02.2026 Generation

198


367/GT/2024

21.01.2026 06.02.2026 Generation

197


759/MP/2025

05.02.2026 06.02.2026 Misc.

196


IA No. 128/2025
in
303/MP/2024

05.02.2026 06.02.2026 Misc.

195


644/MP/2025

05.02.2026 06.02.2026 Misc.

194


166/MP/2025

05.02.2026 06.02.2026 Misc.

193


58/MP/2026 along with IA No. 14/2026

05.02.2026 06.02.2026 Misc.

192


835/MP/2025

05.02.2026 06.02.2026 Misc.

191


127/MP/2025

03.02.2026 06.02.2026 Misc.

190


IA No.9/2026
in
809/MP/2025

03.02.2026 06.02.2026 Misc.

189


46/TD/2026

03.02.2026 06.02.2026 Licence

188


124/MP/2022

03.02.2026 06.02.2026 Misc.

187


5/MP/2026

03.02.2026 06.02.2026 Misc.

186


58/MP/2026 along with IA (Dy.) No.10/2026

03.02.2026 06.02.2026 Misc.

185


91/MP/2024 along with IA No. 60/2025

03.02.2026 06.02.2026 Misc.

184


6/MP/2026

03.02.2026 06.02.2026 Misc.

183


41/MP/2023 along with IA No. 6/2023

03.02.2026 06.02.2026 Misc.

182


61/MP/2023

03.02.2026 06.02.2026 Misc.

181


264/MP/2023

03.02.2026 06.02.2026 Misc.

180


702/GT/2025

21.01.2026 06.02.2026 Generation

179


1026/GT/2025,
17/GT/2026

21.01.2026 06.02.2026 Generation

178


1025/GT/2025,
19/GT/2026

21.01.2026 06.02.2026 Generation

177


654/GT/2025,
653/GT/2025

21.01.2026 05.02.2026 Generation

176


317/MP/2025 along with
IA Nos. 58/2025
and 92/2025

21.01.2026 04.02.2026 Misc.

175


90/GT/2023

21.01.2026 03.02.2026 Generation

174


227/MP/2023

15.01.2026 30.01.2026 Misc.

173


1029/TL/2025

21.01.2026 28.01.2026 Licence (Transmission)

172


245/TL/2025

20.01.2026 28.01.2026 Licence (Transmission)

171


35/MP/2026

21.01.2026 27.01.2026 Misc.

170


34/MP/2026

21.01.2026 27.01.2026 Misc.

169


27/TL/2026,
28/AT/2026

21.01.2026 27.01.2026 Licence (Transmission)

168


975/AT/2025

21.01.2026 26.01.2026 Adoption

167


859/MP/2025 along with
IA No.107/2025

21.01.2026 26.01.2026 Misc.

166


811/MP/2025 along with
IA No. 87/2025

21.01.2026 26.01.2026 Misc.

165


IA No. 9/2026
in
809/MP/2025

21.01.2026 26.01.2026 Misc.

164


31/AT/2026

21.01.2026 26.01.2026 Adoption

163


202/MP/2023,
272/MP/2023,
236/MP/2023,
286/MP/2023,
335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024,
139/MP/2024,
334/MP/2024,
121/MP/2024,
124/MP/2024,
142/MP/2024,
195/MP/2024,
98/MP/2024,
519/MP/2024,
115/MP/2025,
117/MP/2025,
146/MP/2025,
145/MP/2025,
144/MP/2025,
116/MP/2025,
585/MP/2025,
323/MP/2025,
333/MP/2025

20.01.2026 26.01.2026 Misc.

162


719/TT/2025

21.01.2026 26.01.2026 Transmission

161


572/TT/2025,
379/TT/2025,
636/TT/2025,
592/TT/2025,
575/TT/2025,
508/TT/2025,
511/TT/2025,
605/TT/2025,
579/TT/2025,
513/TT/2025,
514/TT/2025
and 904/TT/2025.

21.01.2026 26.01.2026 Transmission

160


509/TT/2025,
571/TT/2025

21.01.2026 26.01.2026 Transmission

159


492/TT/2025

21.01.2026 26.01.2026 Transmission

158


450/MP/2025 along with
IA No.35/2025

21.01.2026 26.01.2026 Misc.

157


375/TT/2025

21.01.2026 26.01.2026 Transmission

146


357/TT/2025,
541/TT/2025,
594/TT/2025,
501/TT/2025,
639/TT/2025,
388/TT/2025,
476/TT/2025,
555/TT/2025,
371/TT/2025,
539/TT/2025,
525/TT/2025,
595/TT/2025,
and 903/TT/2025

21.01.2026 26.01.2026 Transmission

155


17/RP/2025
in
649/TT/2020

21.01.2026 26.01.2026 Review

154


18/RP/2025
in
353/TT/2023

21.01.2026 26.01.2026 Review

153


296/MP/2025

21.01.2026 26.01.2026 Misc.

152


261/MP/2024

21.01.2026 26.01.2026 Misc.

151


179/MP/2023

21.01.2026 26.01.2026 Misc.

150


328/MP/2024

20.01.2026 26.01.2026 Misc.

149


215/MP/2021 along
with IA Nos. 34/2022,
2/2023 & 75/2025

20.01.2026 26.01.2026 Misc.

148


602/TT/2025,
529/TT/2025

20.01.2026 26.01.2026 Transmission

147


844/TT/2025

20.01.2026 26.01.2026 Transmission

146


832/TT/2025

20.01.2026 26.01.2026 Transmission

145


820/TT/2025

20.01.2026 26.01.2026 Transmission

144


741/TT/2025

20.01.2026 26.01.2026 Transmission

143


617/MP/2020

20.01.2026 26.01.2026 Misc.

142


26/MP/2026 along with
IA No. 12/2026

20.01.2026 26.01.2026 Misc.

141


874/MP/2025

15.01.2026 26.01.2026 Misc.

140


48/MP/2025

13.01.2026 26.01.2026 Misc.

139


400/TT/2025

20.01.2026 22.01.2026 Transmission

138


331/MP/2024,
581/MP/2025

20.01.2026 22.01.2026 Misc.

137


455/MP/2019,
65/MP/2020,
618/MP/2020

06.01.2026 22.01.2026 Misc.

136


632/MP/2025

06.01.2026 22.01.2026 Misc.

135


301/MP/2024 along with
IA No.1/2026

20.01.2026 22.01.2026 Misc.

134


8/MP/2026 and
IA No. 3/2026

15.01.2026 20.01.2026 Misc.

133


24/RP/2025 along with
IA No. 125/2025

15.01.2026 19.01.2026 Misc.

132


463/MP/2014 along with
IA No. 40/2019

15.01.2026 19.01.2026 Misc.

131


551/MP/2025

15.01.2026 19.01.2026 Misc.

130


203/MP/2024

08.01.2026 19.01.2026 Misc.

129


422/MP/2024 with
IA No. 90/2024

08.01.2026 19.01.2026 Misc.

128


Diary No. 3/2026
along with IA (Diary)
No.10/2026

08.01.2026 19.01.2026 Licence (Transmission)

127


30/MP/2025,
31/MP/2025

06.01.2026 19.01.2026 Misc.

126


781/MP/2025

15.01.2026 19.01.2026 Misc.

125


974/MP/2025 along with
IA No. 8/2026

13.01.2026 19.01.2026 Misc.

124


23/RP/2025
in
45/TT/2023

15.01.2026 19.01.2026 Review

123


20/RP/2025
In
359/TT/2023

15.01.2026 19.01.2026 Review

122


16/RP/2025
in
9/TT/2023 along with
I.A. No. 96/2025

15.01.2026 19.01.2026 Review

121


1021/TT/2025,
925/TT/2025,
731/TT/2025

13.01.2026 19.01.2026 Transmission

120


524/TT/2025,
532/TT/2025,
540/TT/2025,
922/TT/2025,
923/TT/2025,
927/TT/2025,
929/TT/2025,
931/TT/2025,
417/TT/2025,
500/TT/2025,
930/TT/2025,
661/TT/2025,
919/TT/2025,
189/TT/2025 and
954/TT/2025

13.01.2026 19.01.2026 Transmission

119


924/TT/2025,
926/TT/2025,
921/TT/2025,
920/TT/2025,
962/TT/2025,
964/TT/2025,
413/TT/2025,
435/TT/2025,
411/TT/2025,
518/TT/2025
and 420/TT/2025

13.01.2026 26.01.2026 Transmission

118


877/TT/2025

13.01.2026 19.01.2026 Transmission

117


875/TT/2025

13.01.2026 19.01.2026 Transmission

116


683/TT/2025

13.01.2026 19.01.2026 Transmission

115


494/TT/2025,
599/TT/2025 and
565/TT/2025

13.01.2026 19.01.2026 Transmission

114


343/TT/2025 and
175/TT/2017

13.01.2026 19.01.2026 Transmission

113


1028/MP/2025

15.01.2026 19.01.2026 Misc.

112


1014/MP/2025 along with
IA No. 131/2025

15.01.2026 19.01.2026 Misc.

111


910/MP/2025 along with
IA No.10/2026

15.01.2026 19.01.2026 Misc.

110


885/TL/2025,
884/AT/2025

13.01.2026 19.01.2026 Licence (Transmission)

109


852/MP/2025

15.01.2026 19.01.2026 Misc.

108


841/MP/2025

15.01.2026 19.01.2026 Misc.

107


772/MP/2025

15.01.2026 19.01.2026 Misc.

106


304/MP/2025

13.01.2026 19.01.2026 Misc.

105


180/MP/2025,
261/MP/2025

15.01.2026 19.01.2026 Misc.

104


116/MP/2022

13.01.2026 19.01.2026 Misc.

103


36/MP/2024 along with
IA No. 43/2025,
644/MP/2025

13.01.2026 19.01.2026 Misc.

102


11/RP/2025 in
344/MP/2020

15.01.2026 19.01.2026 Review

101


IA No. 9/2026 in
809/MP/2025

15.01.2026 19.01.2026 Misc.

100


4/MP/2021

15.01.2026 19.01.2026 Misc.

99


363/MP/2024

06.01.2026 19.01.2026 Misc.

98


710/GT/2025

02.01.2026 19.01.2026 Generation

97


801/GT/2025

23.12.2025 19.01.2026 Generation

96


1020/MP/2025

13.01.2026 16.01.2026 Misc.

95


806/MP/2025

13.01.2026 16.01.2026 Misc.

94


223/MP/2022,
170/MP/2025

13.01.2026 16.01.2026 Misc.

93


837/MP/2025 along with
IA No. 100/2025

15.01.2026 16.01.2026 Misc.

92


263/MP/2022

13.01.2026 16.01.2026 Misc.

91


53/MP/2023 alongwith
IA No. 11/2023,
167/MP/2023 alongwith
IA No. 32/2024,
258/MP/2023 alongwith
IA No. 59/2023,
267/MP/2023

13.01.2026 16.01.2026 Misc.

90


91/MP/2024

13.01.2026 16.01.2026 Misc.

89


345/MP/2023 along with
IA No. 86/2023

13.01.2026 16.01.2026 Misc.

88


73/TL/2025

13.01.2026 16.01.2026 Licence (Transmission)

87


79/MP/2023

13.01.2026 16.01.2026 Misc.

86


705/GT/2025

11.12.2025 15.01.2026 Generation

85


704/GT/2025

11.12.2025 15.01.2026 Generation

84


21/MP/2026

08.01.2026 14.01.2026 Misc.

83


1014/MP/2025 along with
IA No. 131/2025

08.01.2026 14.01.2026 Misc.

82


179/MP/2023

08.01.2026 14.01.2026 Misc.

81


1015/MP/2025 along with
IA No. 5/2026

08.01.2026 14.01.2026 Misc.

80


7/MP/2026 along with
IA Nos. 2/IA/2026
and 7/IA/2026

Petition under Sections 79(1)(c), 79(1)(f) and 79(1)(k) of the Electricity Act, 2003 read with Regulation 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access) Regulations, 2022 (as amended) and Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business Regulations), 2023, seeking directions to Central Transmission Utility of India Limited to consider the documents furnished by Prerak Greentech Solar Private Limited as compliance of the Financial Closure requirement under Regulation 11A(2) of the GNA Regulations, 2022 (as amended) or, in the alternative, to communicate the firm start date of Connectivity and grant a period of 06 (six) months prior thereto for achieving Financial Closure. Prerak Greentech Solar Private Limited
08.01.2026 14.01.2026 Misc.

79


230/MP/2023

08.01.2026 14.01.2026 Misc.

78


194/MP/2021

08.01.2026 14.01.2026 Misc.

77


628/GT/2025

23.12.2025 14.01.2026 Generation

76


621/GT/2025,
622/GT/2025

23.12.2025 14.01.2026 Generation

75


49/GT/2025

11.12.2025 14.01.2026 Generation

74


43/GT/2025

11.12.2025 14.01.2026 Generation

73


976/MP/2025

13.01.2026 14.01.2026 Misc.

72


331/MP/2025

13.01.2026 14.01.2026 Misc.

71


257/MP/2024 along with
IA No. 102/2025

13.01.2026 14.01.2026 Misc.

70


810/MP/2025

08.01.2026 12.01.2026 Misc.

69


1004/MP/2025,
20/MP/2026 along with
IA (Diary) Nos. 671/2025
& 672/2025

08.01.2026 12.01.2026 Misc.

68


972/MP/2025

08.01.2026 12.01.2026 Misc.

67


970/MP/2025

08.01.2026 12.01.2026 Misc.

66


845/MP/2025

08.01.2026 12.01.2026 Misc.

65


127/MP/2025

08.01.2026 12.01.2026 Misc.

64


61/MP/2023

08.01.2026 12.01.2026 Misc.

63


848/MP/2025

08.01.2026 12.01.2026 Misc.

62


180/MP/2023,
245/MP/2024,
184/MP/2023,
164/MP/2024,
65/MP/2024,
167/MP/2024

08.01.2026 12.01.2026 Misc.

61


124/MP/2022

08.01.2026 12.01.2026 Misc.

60


107/MP/2023,
85/MP/2022 along with
IA Nos. 24/2022 &
37/2023,
123/MP/2022 along
with IA No. 38/2023,
246/MP/2022 along
with IA No. 8/2023,
56/MP/2023,
185/MP/2023,
205/MP/2023

08.01.2026 12.01.2026 Misc.

59


96/MP/2015

08.01.2026 12.01.2026 Misc.

58


16/MP/2026

08.01.2026 12.01.2026 Misc.

57


642/MP/2025

06.01.2026 12.01.2026 Misc.

56


969/MP/2025

08.01.2026 09.01.2026 Misc.

55


378/MP/2023

08.01.2026 09.01.2026 Misc.

54


802/GT/2025

23.12.2025 09.01.2026 Generation

53


799/GT/2025

23.12.2025 09.01.2026 Generation

52


793/GT/2025

23.12.2025 09.01.2026 Generation

51


155/MP/2023

06.01.2026 09.01.2026 Misc.

50


645/GT/2025,
646/GT/2025

02.01.2026 09.01.2026 Generation

49


236/GT/2021

02.01.2026 09.01.2026 Generation

48


796/GT/2025,
800/GT/2025

23.12.2025 09.01.2026 Generation

47


171/MP/2024

23.12.2025 09.01.2026 Misc.

46


550/MP/2025 along with
IA No. 130/2025

06.01.2026 09.01.2026 Misc.

45


939/MP/2025

06.01.2026 09.01.2026 Misc.

44


807/MP/2025

06.01.2026 09.01.2026 Misc.

43


227/MP/2024

06.01.2026 09.01.2026 Misc.

42


268/MP/2020

02.01.2026 09.01.2026 Misc.

41


1013/GT/2025

19.12.2025 09.01.2026 Generation

40


1012/GT/2025

19.12.2025 09.01.2026 Generation

39


947/GT/2025

19.12.2025 09.01.2026 Generation

38


707/GT/2025

11.12.2025 09.01.2026 Generation

37


706/GT/2025

11.12.2025 09.01.2026 Generation

36


708/GT/2025,
709/GT/2025

11.12.2025 09.01.2026 Generation

35


934/MP/2025

06.01.2026 09.01.2026 Misc.

34


933/MP/2025,
952/MP/2025

06.01.2026 09.01.2026 Misc.

33


713/MP/2025

06.01.2026 09.01.2026 Misc.

32


322/TL/2024

06.01.2026 09.01.2026 Licence (Transmission)

31


469/MP/2024,
252/MP/2024

06.01.2026 09.01.2026 Misc.

30


631/MP/2025

06.01.2026 09.01.2026 Misc.

29


233/MP/2025

06.01.2026 09.01.2026 Misc.

28


264/MP/2023

06.01.2026 09.01.2026 Misc.

27


67/MP/2021 along with
IA Nos. 17/2021
& 30/2024

06.01.2026 09.01.2026 Misc.

26


159/MP/2025

06.01.2026 09.01.2026 Misc.

25


41/MP/2023 along with
IA No.6/2023

06.01.2026 09.01.2026 Misc.

24


648/GT/2025,
647/GT/2025

23.12.2025 08.01.2026 Generation

23


795/GT/2025

23.12.2025 07.01.2026 Generation

22


791/GT/2025,
797/GT/2025

23.12.2025 07.01.2026 Generation

21


790/GT/2025

23.12.2025 07.01.2026 Generation

20


794/GT/2025

23.12.2025 07.01.2026 Generation

19


1006/GT/2025

19.12.2025 07.01.2026 Generation

18


711/GT/2025

11.12.2025 07.01.2026 Generation

17


254/MP/2024 along with
IA No. 64/2025

02.01.2026 05.01.2026 Misc.

16


680/MP/2025

02.01.2026 05.01.2026 Misc.

15


484/MP/2024 along with
IA No. 98/2024

02.01.2026 05.01.2026 Misc.

14


473/GT/2014 (on remand
from APTEL)

02.01.2026 05.01.2026 Generation

13


824/TL/2025,
825/AT/2025

02.01.2026 04.01.2026 Licence (Transmission)

12


776/AT/2025

02.01.2026 04.01.2026 Adoption

11


773/AT/2025

02.01.2026 04.01.2026 Adoption

10


614/MP/2025

02.01.2026 04.01.2026 Misc.

9


367/MP/2025,
422/MP/2025

02.01.2026 04.01.2026 Misc.

8


332/MP/2025

02.01.2026 04.01.2026 Misc.

7


302/MP/2025

02.01.2026 04.01.2026 Misc.

6


260/MP/2024

02.01.2026 04.01.2026 Misc.

5


180/MP/2025,
261/MP/2025

02.01.2026 04.01.2026 Misc.

4


63/MP/2024

02.01.2026 04.01.2026 Misc.

3


11/TD/2026

02.01.2026 04.01.2026 Licence

2


10/MP/2026

02.01.2026 04.01.2026 Misc.

1


289/MP/2024

23.12.2025 01.01.2026 Misc.