cerc-logo

Records of Proceedings(ROP) - 2017


Pet. No.
Subject
Date of Hearing
Date of posting ROP on website
Category


I.A. No. 69/2017 in Petition No. 209/MP/2017

22.12.2017

29.12.2017 Misc.


131/MP/2016

20.12.2017

28.12.2017 Misc.


305/MP/2015 alongwith I.A. No. 82/2017

22.12.2017

28.12.2017 Misc.


13/SM/2017

21.12.2017

27.12.2017 Misc.


11/MP/2017Alongwith I.A. No.73/2017

21.12.2017

27.12.2017 Misc.


255/MP/2017

21.12.2017

27.12.2017 Misc.


126/MP/2016 18/MP/2017

22.12.2017

27.12.2017 Misc.


I.A. No. 81/2017 in Petition No. 167/MP/2016

22.12.2017

27.12.2017 Misc.


184/MP/2017

21.12.2017

27.12.2017 Misc.


95/MP/2017 alongwith IA No. 93/2017

22.12.2017

27.12.2017 Misc.


117/MP/2017

22.12.2017

26.12.2017 Misc.


226/MP/2017

21.12.2017

27.12.2017 Misc.


246/MP/2017

21.12.2017

27.12.2017 Misc.


61/GT/2016

21.12.2017

26.12.2017 Generation.


105/MP/2017 along with IA No. 42/2017

20.12.2017

26.12.2017 Misc.


75/MP/2017

21.12.2017

26.12.2017 Misc.


252/MP/2017

21.12.2017

26.12.2017 Misc.


168/MP/2017

20.12.2017

26.12.2017 Misc.


158/MP/2017 159/MP/2017 160/MP/2017

21.12.2017

26.12.2017 Misc.


242/MP/2017 along with I.A. No. 80/2017

20.12.2017

26.12.2017 Misc.


198/MP/2016

20.12.2017

26.12.2017 Misc.


121/MP/2017

20.12.2017

26.12.2017 Misc.


253/MP/2017 alongwith IA No. 87/2017

21.12.2017

26.12.2017 Misc.


188/MP/2017 189/MP/2017 190/MP/2017 201/MP/2017 202/MP/2017 203/MP/2017 204/MP/2017 211/MP/2017 230/MP/2017 231/MP/2017 232/MP/2017 233/MP/2017

21.12.2017

26.12.2017 Misc.


170/MP/2016 171/MP/2016 179/MP/2016

20.12.2017

26.12.2017 Misc.


258/MP/2017

07.12.2017

15.12.2017 Misc.


244/MP/2016 with I.A. No. 86/2017 139/MP/2017 220/MP/2016 311/MP/2015

07.12.2017

13.12.2017 Misc.


139/MP/2017 220/MP/2016 311/MP/2015 64/MP/2016

21.11.2017

06.12.2017 Misc.


92/MP/2015

21.11.2017

05.12.2017 Misc.


79/RC/2017

21.11.2017

29.11.2017 Misc.


139/MP/2017 220/MP/2016 311/MP/2015 64/MP/2016

21.11.2017

29.11.2017 Misc.


Petition No.244/MP/2016

21.11.2017

27.11.2017 Misc.


Petition No. 198/TT/2017

Determination of transmission tariff for Asset-I: ±800 kV 3000 MW HVDC Pole-III and LILO of Biswanath Chariali-Agra HVDC line for parallel operation of the HVDC station at Alipurduar, Asset-II: ±800 kV 3000 MW HVDC Pole-IV alongwith Earth electrode station and Earth Electrode line at Alipurduar and Agra end, Asset-III: LILO of Bongaigaon-Siliguri 400 kV D/c line (Quad) (under private Sector) alongwith associated bays at Alipurduar, Asset-IV: LILO of Balipara-Salakati 220 kV D/c line alongwith associated bays at new pooling station in Alipurduar, Asset-V: 1x315 MVA 400/220 kV, ICT-I at Alipurduar, Asset-VI: 1x315 MVA 400/220 kV ICT-II at Alipurduar, Asset-VII: 1x125 MVAR 400 kV Bus Reactor-I at Alipurduar and Asset-VIII: 1x125 MVAR 400 kV Bus Reactor-II at Alipurduar, under the transmission system associated with “Transmission system for development of pooling station in Northern part of West Bengal and transfer of power from Bhutan to NR/WR” for tariff block 2014-19. Power Grid Corporation of India Limited (PGCIL).

26.09.2017

11.10.2017 Transmission.


305/MP/2015

28.09.2017

09.10.2017 Misc.


239/MP/2016

28.09.2017

09.10.2017 Misc.


Petition No. 143/MP/2017

28.09.2017

09.10.2017 Misc.


Petition No. 93/MP/2017

28.09.2017

09.10.2017 Misc.


Petition No. 141/MP/2017

28.09.2017

05.10.2017 Misc.


229/MP/2016 101/MP/2017

27.09.2017

05.10.2017 Misc.


Petition No. 10/SM/2017

27.09.2017

04.10.2017 Misc.


Review Petition No. 22/RP/2017 in Petition No. 157/MP/2015

27.09.2017

04.10.2017 Misc.


Petition No.122/MP/2017

28.09.2017

04.10.2017 Misc.


Petition No. 194/MP/2017 Alongwith I.A. 62/2017

27.09.2017

29.09.2017 Misc.


Review Petition No. 35/RP/2017 in Petition No. 154/MP/2015

27.09.2017

29.09.2017 Review.


Petition No. 174/MP/2017

27.09.2017

29.09.2017 Misc.


Petition No. 29/RP/2017

26.09.2017

29.09.2017 Review.


Review Petition No.5/RP/2017 in Petition No. 68/TT/2016

26.09.2017

29.09.2017 Misc.


304/MP/2013 312/MP/2013 313/MP/2013 alongwith I.A. No. 49/2017 I.A. No. 52/2017 in Petition No. 327/MP/2013 A. No. 53/2017 in Petition No. 14/MP/2014 16/MP/2014 I.A. No. 48/2017 in Petition No. 41/MP/2014 42/MP/2014

15.09.2017

26.09.2017 Misc.


44/2017 in 167/MP/2016

14.09.2017

26.09.2017 Misc.


12/SM/2017 alongwith I.A. No. 54/2017

14.09.2017

26.09.2017 Misc.


Petition No. 192/MP/2016 alongwith I.A No. 68/ 2017

14.09.2017

25.09.2017 Misc.


Petition No. 124/M/P/2017

14.09.2017

25.09.2017 Misc.


Petition No. 4/MP/2017 Petition No. 5/MP/2017

14.09.2017

20.09.2017 Misc.


168/MP/2017

14.09.2017

20.09.2017 Misc.


Petition No.170/MP/2016 Petition No. 171/MP/2016 Petition No. 179/MP/2016

14.09.2017

19.09.2017 Misc.


Petition No. 126/MP/2016 Petition No.18/MP/2017 Alongwith I.A. No. 6/2017

14.09.2017

15.09.2017 Misc.


Petition No. 169/MP/2017 Along with I.A. No. 43/2017

14.09.2017

19.09.2017 Misc.


Petition No. 13/SM/2017 alongwith I.A. 65/IA/2017

14.09.2017

19.09.2017 Misc.


Petition No. 63/MP/2017

14.09.2017

15.09.2017 Misc.


98/MP/2017

07.09.2017

13.09.2017 Misc.


14/MP/2017 alongwith I.A. No. 5/2017

07.09.2017

13.09.2017 Misc.


158/MP/2017 159/MP/2017 160/MP/2017

07.09.2017

13.09.2017 Misc.


162/MP/2017

07.09.2017

13.09.2017 Misc.


245/MP/2016

07.09.2017

13.09.2017 Misc.


121/MP/2017

07.09.2017

13.09.2017 Misc.


63/2017 in 173/MP/2017

07.09.2017

13.09.2017 Misc.


Petition No. 129/MP/2017 Alongwith I.A No. 37/2017

07.09.2017

12.09.2017 Misc.


Petition No. 194/MP/2017 Along with I.A. No. 62/2017

07.09.2017

12.09.2017 Misc.


I.A. No. 26/2017 in Petition No. 157/MP/2015

07.09.2017

12.09.2017 Misc.


Petition No. 104/MP/2017

29.8.2017

07.09.2017 Misc.


Petition No. 62/MP/2017

29.8.2017

07.09.2017 Misc.


Petition No. 12/SM/2017

22.8.2017

07.09.2017 Misc.


Petition No. 12/SM/2016

02.8.2017

07.09.2017 Misc.


Petition No. 105/MP/2017 alongwith I.A. No. 42/2017

29.8.2017

07.09.2017 Misc.


Petition No.175/MP/2016

29.8.2017

05.09.2017 Misc.


Petition No. 304/MP/2013,Petition No. 312/MP/2013,Petition No. 16/MP/2014,Petition No. 42/MP/2014

28.08.2017

05.09.2017 Misc.


Petition No. 97/MP/2017

10.08.2017

31.08.2017 Misc.


Petition No. 313/MP/2013 alongwith I.A. No. 49/2017,Petition No. 327/MP/2013 alongwith I.A. No. 52/2017,Petition No. 14/MP/2014 alongwith I.A. No. 53/2017,Petition No. 41/MP/2014 alongwith I.A. No. 48/2017

28.08.2017

31.08.2017 Misc.


Petition No. 94/MP/2017 along with I.A. No. 22 of 2017

22.08.2017

31.08.2017 Misc.


Petition No. 117/MP/2017

22.08.2017

31.08.2017 Misc.


Petition No. 10/MP/2016 alongwith I.A. No.24/2016

22.08.2017

31.08.2017 Misc.


Petition No. 132/MP/2017

22.08.2017

31.08.2017 Misc.


Petition No. 109/MP/2017

22.08.2017

31.08.2017 Misc.


Petition No. 120/MP/2017

22.08.2017

31.08.2017 Misc.


Petition No. 304/MP/2013,Petition No. 312/MP/2013,Petition No. 313/MP/2013,Petition No. 327/MP/2013,Petition No. 14/MP/2014,Petition No. 16/MP/2014,Petition No. 41/MP/2014,Petition No. 42/MP/2014

17.08.2017

31.08.2017 Misc.


Petition No. 18/MP/2017 Alongwith I.A. No. 6/2017

29.08.2017

31.08.2017 Misc.


Petition No. 92/MP/2017

29.08.2017

31.08.2017 Misc.


Petition No. 131/MP/2016

29.08.2017

31.08.2017 Misc.


Petition No.32/MP/2017

29.08.2017

31.08.2017 Misc.


Petition No.189/MP/2016

28.08.2017

31.08.2017 Misc.


Petition No. 1/MP/2017

30.08.2017

30.08.2017 Misc.


Petition No.248/MP/2016 Alongwith I.A. No.64/2016

29.08.2017

30.08.2017 Misc.


Petition No. 173/MP/2017

29.08.2017

30.08.2017 Misc.


Petition No. 153/MP/2017

29.08.2017

30.08.2017 Misc.


Petition No. 66/MP/2017

22.08.2017

29.08.2017 Misc.


Petition No.145/MP/2017

18.08.2017

29.08.2017 Misc.


Petition No. 189/MP/2016

22.08.2017

29.08.2017 Misc.


Petition No. 115/MP/2016

22.08.2017

29.08.2017 Misc.


Petition No. 146/MP/2017

22.08.2017

29.08.2017 Misc.


Petition No. 126/MP/2017

22.08.2017

29.08.2017 Misc.


I.A. No. 40/2017 in Petition No. 8/MP/2014,I.A. No. 39/2017 in Petition No. 112/MP/2015

22.08.2017

25.08.2017 Misc.


Petition No. 95/MP/2017 alongwith I.A. No. 35/2017

10.08.2017

25.08.2017 Transmission.


Petition No.61/MP/2017

22.08.2017

25.08.2017 Misc.


Petition No.68/MP/2017

22.08.2017

25.08.2017 Misc.


Petition No.73/MP/2017

22.08.2017

25.08.2017 Transmission.


Petition No. 142/MP/2017

22.08.2017

25.08.2017 Misc.


60/TT/2017

03.08.2017

22.08.2017 Transmission.


71/TT/2017

03.08.2017

22.08.2017 Transmission.


48/TT/2017

25.07.2017

22.08.2017 Transmission.


174/MP/20177

18.08.2017

22.08.2017 Misc.


13/TT/2017

03.08.2017

22.08.2017 Transmission.


133/TT/2017

03.08.2017

22.08.2017 Transmission.


26/RP/2017 I.A. No. 32/IA/2017

10.08.2017

22.08.2017 Review.


39/TT/2017

03.08.2017

18.08.2017 Transmission.


145/MP/2017

16.08.2017

18.08.2017 Misc.


105/MP/2017 I.A. No. 42/2017

10.08.2017

18.08.2017 Misc.


24/MP/2014

10.08.2017

18.08.2017 Misc.


305/MP/2015

10.08.2017

18.08.2017 Misc.


19/MP/2017

10.08.2017

18.08.2017 Misc.


239/MP/2016

10.08.2017

18.08.2017 Misc.


135/TT/2017

03.08.2017

18.08.2017 Transmission.


69/TT/2017

03.08.2017

18.08.2017 Transmission.


26/TT/2017

03.08.2017

18.08.2017 Transmission.


56/TT/2017

03.08.2017

18.08.2017 Transmission.


179/MP/2016

10.08.2017

16.08.2017 Misc.


57/TT/2017

03.08.2017

16.08.2017 Transmission.


55/TT/2017

03.08.2017

16.08.2017 Transmission.


124/MP/2017 I.A. No. 33 of 2017

10.08.2017

16.08.2017 Misc.


126/MP/2016 I.A. No. 29 of 2016

10.08.2017

16.08.2017 Misc.


141/MP/2017

10.08.2017

16.08.2017 Misc.


99/MP/2017

10.08.2017

16.08.2017 Misc.


Corrigendum 104/MP/2017

27.07.2017

16.08.2017 Misc.


304/MP/2013 312/MP/2013 313/MP/2013 327/MP/2013 14/MP/2014 16/MP/2014 41/MP/2014 42/MP/2014

08.08.2017

11.08.2017 Misc.


119/MP/2017

08.08.2017

10.08.2017 Misc.


189/MP/2016

08.08.2017

10.08.2017 Misc.


87/TT/2017

03.08.2017

10.08.2017 Transmission.


Petition No. 61/GT/2016

25.7.2017

09.08.2017 Generation.


Petition No. 59/TT/2017

03.08.2017

09.08.2017 Transmission.


Petition No. 70/TT/2017

03.08.2017

09.08.2017 Transmission.


Petition No. 88/TT/2017

03.08.2017

09.08.2017 Transmission.


Petition No. 313/TT/2014

11.7.2017

08.08.2017 Transmission.


292/MP/2015

27.7.2017

03.08.2017 Misc.


Petition No. 10/SM/2017

27.7.2017

01.08.2017 Misc.


Petition No. 104/MP/2017

27.7.2017

01.08.2017 Misc.


Petition No. 249/GT/2016

25.7.2017

01.08.2017 Generation.


Petition No. 259//2010 alongwith I.A. No. 41/2017

27.7.2017

01.08.2017 Misc.


Petition No. 145/MP/2017

27.7.2017

31.07.2017 Misc.


Petition No. 172/MP/2016

20.7.2017

31.07.2017 Misc.


Petition No. 48/TT/2017

25.07.2017

31.07.2017 Transmission.


Petition No. 115/TT/2017

Truing up of transmission tariff for 2009-14 tariff block and and determination of transmission tariff for 2014-19 tariff block for Asset-I:- combined assets of 1500 MVA 765/400/33 kV, ICT-I, ICT-II, ICT-III and ICT-IV along with associated bays at Jhatikara 765/400 kV New Sub-station, Asset-II:- Combined assets of 1500 MVA 765/400 /33 kV, ICT-I and ICT-II along with associated bays at Meerut Sub-station, Asset-III:-Associated bays for LILO of both ckts of 400 kV D/C Bamnouli-Mundka/Bawana at Jhatikara 765/400 kV New Sub-station, Asset-IV:- One no 765 kV line bay for 765 kV Agra-Jhatikara line including 765 kV 240 MVAR Switchable Line Reactor as Bus Reactor Operation mode at 765/400 kV Jhatikara (New) Sub-station, Asset-V:- Associated line bays for (765 kV S/C Agra-Jhatikra transmission line) at Agra Sub-station, Asset-VI:- One no. 765 kV line bay for 765 kV Agra-Meerut line along with 765 KV 240 MVAR Switchable Line Reactor under Bus Reactor operation mode at 765/400/220 KV Meerut Sub-station, Asset-VII:- Associated Line bays for 765 kV S/C Agra-Meerut transmission line at Agra Sub-station, Asset-VIII:- 765 kV 240 MVAR Bus Reactor along with associated bays at 765/400/220 kV Meerut Sub-station, Asset-IX:- 765 KV 240 MVAR Bus Reactor along with associated bays at 765/400/220 KV Jhatikara Sub-station, Asset-X:- Associated bays at Jhatikara for 765 kV Jhatikara-Bhiwani Line under 765 KV system for Central part of Northern Grid Part-II. . Power Grid Corporation of India Limited (PGCIL).

25.07.2017

31.07.2017 Transmission.


Petition No. 143/MP/2017

25.07.2017

31.07.2017 Misc.


Petition No. 229/MP/2016 Petition No. 101MP/2017

27.07.2017

31.07.2017 Misc.


Petition No.18/MP/2017 Alongwith I.A. No. 6/2017

27.07.2017

31.07.2017 Misc.


Petition No. 6/GT/2017 Petition No. 7/GT/2017

25.07.2017

31.07.2017 Generation.


Petition No.192/MP/2016

27.07.2017

31.07.2017 Misc.


Petition No. 9/MP/2017

27.07.2017

31.07.2017 Misc.


Petition No. 4/MP/2017 Petition No. 5/MP/2017

27.07.2017

31.07.2017 Misc.


I.A. No. 27/2017 in Review Petition No. 55/2016

27.07.2017

31.07.2017 Review.


144/MP/2017

27.07.2017

31.07.2017 Misc.


128/GT/2017

25.07.2017

31.07.2017 Generation.


98/MP/2017

27.07.2017

31.07.2017 Misc.


12/SM/2016

27.07.2017

31.07.2017 Misc.


34 of 2017 in 11/MP/2017

27.07.2017

31.07.2017 Misc.


Petition No. 92/MP/2015

25.07.2017

26.07.2017 Misc.


Petition No. 131/MP/2017 Along with I.A. No. 38/2017

20.07.2017

26.07.2017 Misc.


92/MP/2017

25.07.2017

26.07.2017 Misc.


62/MP/2017

18.07.2017

24.07.2017 Misc.


Petition No. 245/MP/2016

18.07.2017

24.07.2017 Misc.


Petition No. 154/MP/2016

20.07.2017

24.07.2017 Misc.


Petition No. 79/RC/2017

18.07.2017

24.07.2017 Review.


Petition No.129/MP/2017 Along with IA. No. 37/2017

20.07.2017

24.07.2017 Misc.


Petition No.130/MP/2017

20.07.2017

24.07.2017 Misc.


Petition No.14/MP/2017 Alongwith I.A. No. 5/2017

20.07.2017

24.07.2017 Misc.


Petition No. 189/MP/2016

20.07.2017

24.07.2017 Misc.


Petition No. 111/TT/2017 Petition No. 112/TT/2017

11.07.2017

24.07.2017 Transmission.


Petition No. 313/TT/2014

11.07.2017

24.07.2017 Transmission.


5/RP/2017 in 68/TT/2016

11.07.2017

24.07.2017 Review.


312/MP/2015

13.07.2017

21.07.2017 Misc.


108/TT/2016

11.07.2017

21.07.2017 Transmission.


311/MP/2015 64/MP/2016

-

21.07.2017 Misc.


22/RP/2017 in 157/MP/2015

18.07.2017

21.07.2017 Review.


121/MP/2017

18.07.2017

21.07.2017 Misc.


26/2017 in 157/MP/2015

18.07.2017

21.07.2017 Misc.


220/MP/2016

18.07.2017

21.07.2017 Misc.


312/MP/2015

13.07.2017

21.07.2017 Misc.


2/RP/2017 IN 46/TT/2014

11.07.2017

21.07.2017 Review.


43/TT/2017

11.07.2017

21.07.2017 Transmission.


131/MP/2016

13.07.2017

19.07.2017 Misc.


1/MP/2017

13.07.2017

19.07.2017 Misc.


175/MP/2016

13.07.2017

19.07.2017 Misc.


60/RP/2016 in 10/SM/2014

06.07.2017

17.07.2017 Misc.


15/MP/2016 186/MP/2016

13.07.2017

17.07.2017 Misc.


10/RP/2017 16/RP/2017 384/TT/2014

11.07.2017

17.07.2017 Review.


6/MP/2013

13.07.2017

17.07.2017 Misc.


240/MP/2016 153/MP/2016

06.07.2017

17.07.2017 Misc.


4/RP/2017 15/RP/2017 156/TT/2015

11.07.2017

17.07.2017 Review.


29/MP/2017 14/2017 & 25/2017

13.07.2017

17.07.2017 Misc.


122/MP/2017

13.07.2017

17.07.2017 Misc.


139/MP/2017

11.07.2017

17.07.2017 Misc.


113/TT/2017

11.07.2017

17.07.2017 Transmission.


132/MP/2017

13.07.2017

17.07.2017 Misc.


9/RP/2017 in 312/TT/2014

11.07.2017

17.07.2017 Review.


11/RP/2017 17/RP/2017 21/RP/2017 24/RP/2017

11.07.2017

17.07.2017 Review.


94/MP/2017 22/2017

13.07.2017

17.07.2017 Misc.


Petition No. 8/RP/2017 in Petition No. 312/TT/2014

11.07.2017

13.07.2017 Review.


Review Petition No. 65/RP/2016 in Petition No. 18/TT/2015,Review Petition No. 66/RP/2016 in Petition No. 528/TT/2014,Review Petition No. 18/RP/2017 in Petition No. 92/TT/2011,Review Petition No. 19/RP/2017 in Petition No. 94/TT/2011

11.07.2017

13.07.2017 Review.


Petition No. 10/MP/2016 Alongwith I.A. No. 24/2016

06.07.2017

12.07.2017 Misc.


Petition No.12/SM/2016

06.07.2017

12.07.2017 Misc.


92/MP/2015

06.07.2017

12.07.2017 Misc.


115/MP/2016

06.07.2017

12.07.2017 Misc.


Petition No.242/MP/2016

06.07.2017

12.07.2017 Misc.


Petition No.33/RC/2017

06.07.2017

11.07.2017 Misc.


Petition No. 248/MP/2016 alongwith I.A. No. 64/2016

06.07.2017

10.07.2017 Misc.


Petition No. 93/MP/2017

06.07.2017

10.07.2017 Misc.


215/TT/2016

Determination of transmission tariff for Asset-1) 2 Nos. 400 KV Line bays at Narendra (New), 2 Nos. 400 kV line bays at Madhugiri (Tumkur), 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Narendra (New) and 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Madhugiri (Tumkur) for Narendra (New)-Madhugiri (Tumkur) 765 kV D/C line (initially charged at 400 kV), Asset-2) 2 Nos. 400 kV line bays at Madhugiri (Tumkur) for Madhugiri (Tumkur)-Bidadi 400 kV D/C (Quad) line and Asset-3) 2 Nos. 400 kV line bays at Bidadi for Madhugiri (Tumkur) - Bidadi 400KV D/C (Quad) line under "Sub-station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3 X 800 MW in Phase -I) of NTPC Limited" in Southern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. PGCIL.

20.06.2017

10.07.2017 Transmission.


312/MP/2015

06.07.2017

10.07.2017 Misc.


32/MP/2017

06.07.2017

10.07.2017 Misc.


Petition No.237/TT/2016

20.6.2017

07.07.2017 Transmission.


Petition No.214/TT/2016

20.6.2017

06.07.2017 Transmission.


Petition No.192/MP/2016

18.6.2017

06.07.2017 Misc.


Petition No.108/TT/2017

Truing up of transmission tariff for 2009-14 tariff period and determination of transmission tariff for 2014-19 tariff period for Combined assets i.e. Asset-I: 1099.803 km Fibre optic Communication System in lieu of existing Microwave, Asset-II: 1628.966 km Fibre optic Communication System in lieu of existing Microwave, Asset-III: 493.064 km Fibre optic Communication System in lieu of existing Microwave and Asset-IV: 530.621 km Fibre optic Communication System in lieu of existing Microwave under Fibre Optic Communication System in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links in Northern Region Scheme in Northern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. PGCIL.

20.6.2017

30.06.2017 Transmission.


Petition No.215/TT/2016

Determination of transmission tariff for Asset-1) 2 Nos. 400 KV Line bays at Narendra (New), 2 Nos. 400 kV line bays at Madhugiri (Tumkur), 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Narendra (New) and 2X63 MVAR (fixed) line reactors (with 600 ohm NGRs) at Madhugiri (Tumkur) for Narendra (New)-Madhugiri (Tumkur) 765 kV D/C line (initially charged at 400 kV), Asset-2) 2 Nos. 400 kV line bays at Madhugiri (Tumkur) for Madhugiri (Tumkur)-Bidadi 400 kV D/C (Quad) line and Asset-3) 2 Nos. 400 kV line bays at Bidadi for Madhugiri (Tumkur) - Bidadi 400KV D/C (Quad) line under "Sub-station extension works associated with transmission system required for evacuation of power from Kudgi TPS (3 X 800 MW in Phase -I) of NTPC Limited" in Southern Region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. PGCIL.

20.6.2017

30.06.2017 Transmission.


Petition No.107/TT/2017

20.6.2017

30.06.2017 Transmission.


Petition No.236/TT/2016

20.6.2017

29.06.2017 Transmission.


Petition No. 129/MP/2017 Along with IA. No. 37/2017

20.6.2017

28.06.2017 Misc.


Petition No. 96/TT/2017

20.6.2017

28.06.2017 Transmission.


Petition No. 105/MP/2017 along with I.A. 30/2017

20.6.2017

28.06.2017 Misc.


Petition No. 48/TT/2017

20.6.2017

23.06.2017 Transmission.


Petition No.101/MP/2017

15.06.2017

23.06.2017 Misc.


Petition No. 124/MP/2017 Alongwith I.A. No. 33/2017

20.06.2017

22.06.2017 Misc.


Review Petition No. 65/RP/2016 in Petition No. 18/TT/2015 Review Petition No. 66/RP/2016 in Petition No. 528/TT/2014 Review Petition No. 18/RP/2017 in Petition No. 92/TT/2011 Review Petition No. 19/RP/2017 in Petition No. 94/TT/2011

20.06.2017

22.06.2017 Review.


114/MP/2017

15.06.2017

21.06.2017 Misc.


97/MP/2017

15.06.2017

20.06.2017 Misc.


95/MP/2017

15.06.2017

20.06.2017 Misc.


99/MP/2017

15.06.2017

20.06.2017 Misc.


31/MP/2017

15.06.2017

16.06.2017 Misc.


68/MP/2017

25.05.2017

14.06.2017 Misc.


5/MP/20177

16.05.2017

14.06.2017 Misc.


61/MP/2017

25.05.2017

13.06.2017 Misc.


90/AT/2017

25.05.2017

13.06.2017 Misc.


114/MP/2017

06.06.2017

07.06.2017 Misc.


70/TT/2017

23.05.2017

06.06.2017 Transmission


5/RP/2017 IN 68/TT/2016

23.05.2017

05.06.2017 Review


50/MP/2017 51/MP/2017 52/MP/2017 53/MP/2017 54/MP/2017 65/MP/2017

25.05.2017

01.06.2017 Misc


73/MP/2017

25.05.2017

01.06.2017 Misc


216/MP/2016

25.05.2017

01.06.2017 Misc


88/TT/2017

23.05.2017

31.05.2017 Transmission


13/TT/2017

23.05.2017

31.05.2017 Transmission


86/TT/2017

23.05.2017

31.05.2017 Transmission


87/TT/2017

23.05.2017

31.05.2017 Transmission


26/TT/2017

23.05.2017

30.05.2017 Transmission


66/MP/2017

25.05.2017

29.05.2017 Misc


107/TT/2012

11.05.2017

29.05.2017 Transmission


74/GT/2017

23.05.2017

26.05.2017 Generation


91/TT/2017

23.05.2017

26.05.2017 Transmission


183/TT/2016

23.05.2017

26.05.2017 Transmission


6/RP/2017

23.05.2017

26.05.2017 Review


7/RP/2017 In Petition No. 33/TT/2015

23.05.2017

26.05.2017 Review


2/RP/2017 In Petition No. 46/TT/2014

23.5.2017

26.05.2017 Review


207/TT/2016

11.05.2017

26.05.2017 Transmission


304/MP/2013 312/MP/2013 313/MP/2013 327/MP/2013 14/MP/2014 16/MP/2014 41/MP/2014 42/MP/2014

18.05.2017

26.05.2017 Misc


188/MP/2016

09.05.2017

26.05.2017 Misc


22/GT/2017

23.05.2017

26.05.2017 Generation


192/MP/2016

18.05.2017

26.05.2017 Misc


20/MP/2017

11.05.2017

26.05.2017 Misc


55/RP/2016 in 173/TT/2013 & 111/TT/2015

04.05.2017

24.05.2017 Transmission


I.A. No. 47 of 2016 in 440/MP/2014

16.05.2017

24.05.2017 Transmission


92/MP/2015 303/MP/2015 3/MP/2016 137/MP/2016 167/MP/2016 246/MP/2016

02.05.2017

24.05.2017 Misc


209/TT/2016

11.05.2017

24.05.2017 Transmission


127/MP/2016 with IA 2/2017

16.05.2017

24.05.2017 Misc


92/MP/2017

18.05.2017

24.05.2017 Misc


28/MP/2017 alongwith I.A. No.12/2017

16.05.2017

24.05.2017 Misc


I.A. No. 62 of 2016 in 190/MP/2016

16.05.2017

24.05.2017 Misc


16/RP/2017 In 384/TT/2014

22.05.2017

24.05.2017 Transmission


232/TT/2016

11.05.2017

22.05.2017 Transmission


65/RP/2016 in 18/TT/2015 66/RP/2016 in 528/TT/2014 18/RP/2017 in 92/TT/2011 19/RP/2017 in 94/TT/2011

09.05.2017

22.05.2017 Review


19/MP/2017

16.05.2017

19.05.2017 Misc


84/AT/2017

16.05.2017

19.05.2017 Misc


18/MP/2017 Alongwith I.A. No. 6/2017

16.05.2017

19.05.2017 Misc


141/MP/2016

09.05.2017

19.05.2017 Misc


62/MP/2017

09.05.2017

19.05.2017 Misc


81/AT/2017

16.05.2017

19.05.2017 Misc


292/MP/2015

16.05.2017

19.05.2017 Misc


9/MP/2017

16.05.2017

18.05.2017 Misc


54/RP/2016

11.05.2017

18.05.2017 Review


216/MP/2016

16.05.2017

18.05.2017 Misc


4/MP/2017

16.05.2017

18.05.2017 Misc


10/MP/2016 alongwith I.A. No.24/2016

16.05.2017

18.05.2017 Misc


193/MP/2016

25.04.2017

18.05.2017 Misc


2/MP/2017

16.05.2017

18.05.2017 Misc


233/TT/2016

11.05.2017

18.05.2017 Misc


213/TT/2016

11.05.2017

18.05.2017 Transmission


221/TT/2016

11.05.2017

18.05.2017 Transmission


40/TT/2017

04.05.2017

16.05.2017 Transmission


234/TT/2016

11.05.2017

15.05.2017 Transmission


42/TT/2017

11.05.2017

15.05.2017 Transmission


200/TT/2016

11.05.2017

15.05.2017 Transmission


229/MP/2016

09.05.2017

15.05.2017 Misc


12/SM/2016

09.05.2017

15.05.2017 Misc


95/MP/2017

09.05.2017

15.05.2017 Misc


I.A. No. 23/IA/2017 in Review Petition No. 19/RP/2017

11.05.2017

12.05.2017 Review


189/MP/2016

09.05.2017

12.05.2017 Misc


94/MP/2017 along with I.A. No. 22 of 2017

09.05.2017

12.05.2017 Misc


41/TT/2017

Truing up transmission tariff for 2009-14 tariff block and determination of tariff for 2014-19 tariff block for Combined Asset: a) 400/220kV,315MVAR,ICT-I along with associated bays at Hamirpur GIS S/S, b) 400kV,80 MVAR Bus Reactor along with associated bays at Hamirpur GIS S/S and c) LILO of one circuit of 400kV D/C Parbati-Amritsar T/L at Hamirpur along with associated bays & Line reactor at Hamirpur GIS S/S, under Northern region system strengthening scheme-XX in Northern region under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation 6 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations’ 2014. Power Grid Corporation of India Limited (PGCIL).

04.05.2017

12.05.2017 Transmission


16/TT/2017

04.05.2017

12.05.2017 Transmission


29/MP/2017 Along with I.A. No. 14/2017

09.05.2017

12.05.2017 Misc


1/MP/2017

09.05.2017

12.05.2017 Misc


131/MP/2016

09.05.2017

12.05.2017 Misc


175/MP/2016

09.05.2017

12.05.2017 Misc


6/SM/2017

08.05.2017

12.05.2017 Misc


37/TT/2017

04.05.2017

11.05.2017 Transmission


218/TT/2016

04.05.2017

11.05.2017 Transmission


6/SM/2017

08.05.2017

11.05.2017 Misc


153/MP/2016

02.05.2017

11.05.2017 Misc


46/TT/2017

04.05.2017

11.05.2017 Transmission


43/TT/2017

04.05.2017

11.05.2017 Transmission


63/MP/2017

04.05.2017

08.05.2017 Misc


11/MP/2017

02.05.2017

08.05.2017 Misc


21/MP/2017

02.05.2017

08.05.2017 Misc


240/MP/2016

02.05.2017

08.05.2017 Misc


211/MP/2016 Alongwith I.A. No. 21 of 2017

27.04.2017

05.05.2017 Misc


312/MP/2015

02.05.2017

05.05.2017 Misc


28/MP/2017 alongwith I.A. No.12/2017

02.05.2017

05.05.2017 Misc


42/RP/2016 in 236/MP/2015 44/RP/2016 in 236/MP/2015

27.04.2017

05.05.2017 Review


I.A. No. 47/2016 in 440/MP/2014

02.05.2017

05.05.2017 Misc


31/MP/2017

25.04.2017

03.05.2017 Misc


32/MP/2017

25.04.2017

03.05.2017 Misc


228/MP/2016

27.04.2017

03.05.2017 Misc


248/MP/2016 alongwith I.A. No. 64/2016

2704.2017

01.05.2017 Misc


242/MP/2016

27.04.2017

01.05.2017 Misc


3/MP/2017

27.04.2017

01.05.2017 Misc


60/RP/2016 alongwith I.A. 52/2016 in 10/SM/2014

27.04.2017

01.05.2017 Review


14/MP/2017 alongwith I.A. No. 5/2017

25.04.2017

01.05.2017 Misc


115/MP/2016

27.04.2017

01.05.2017 Misc


139/MP/2016

Petition under Section 79 (1) of the Electricity Act,2003 read with related provisions of the Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation 22 (6) (ii) (Chapter-3) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Regulation 31 (6) (b) (Chapter-7) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for allowing recovery of Energy Charge shortfall during the period of 2012-13, 2013-14 and 2014-15 as well as the modification of design energy for 2014-15, 2015-16 and 2016-17 for calculation of ECR till the energy charge shortfall of the previous years has been made up for the Ranganadi Hydro Electric Plant (RHEP), where actual energy generated by the station during a year is less than its approved design energy for reasons beyond the control of the generating company (NEEPCO). NEEPCO.

27.04.2017

01.05.2017 Misc


220/MP/2016

27.04.2017

01.05.2017 Misc


245/MP/2016

27.04.2017

01.05.2017 Misc


125/TT/2016

13.04.2017

01.05.2017 Transmission


184/TT/2016

13.04.2017

01.05.2017 Transmission


10/MP/2017

25.04.2017

01.05.2017 Misc


312/MP/2015

27.04.2017

28.04.2017 Misc


24/MP/2017

25.04.2017

28.04.2017 Misc


27/MP/2017

25.04.2017

28.04.2017 Misc


192/MP/2016

25.04.2017

28.04.2017 Misc


20/MP/2017

25.04.2017

27.04.2017 Misc


154/MP/2016

25.04.2017

27.04.2017 Misc


195/TT/2016

13.04.2017

27.04.2017 Transmission


204/TT/2016

13.04.2017

27.04.2017 Transmission


203/TT/2016

13.04.2017

24.04.2017 Transmission


237/TT/2016

13.04.2017

24.04.2017 Transmission


205/TT/2016

13.04.2017

24.04.2017 Transmission


26/TT/2017

13.04.2017

24.04.2017 Transmission


47/TT/2017

Approval under Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation 6 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for determination of (i) Truing up Transmission tariff for 2009-14 tariff block and (ii) Transmission tariff for 2014-19 tariff block, for Asset A: Asset-1- 400kV 315 MVA Transformer at Bina S/S; Asset B: Asset I -400 kV D/C Pirana-Dehgam TL along with associated bays at Pirana and Dehgam S/S and 400 /220 kV Pirana S/S (New); Asset II- ICT-I (1X315MVA) 400/220 kV at Pirana S/S along with associated bays; Asset III- ICT-II (1X315MVA) 400/220 kV at Pirana S/S and associated bays Asset IV- Bina Bay Extension with 1x315MVA ICT along with associated 400 kV and 220 kV Bays; Asset V-400/220kV Gwalior (Extension) S/S with 1x315MVA ICT along with associated 400/220kV Bays, Asset C: Asset-1- ICT III at 400/220 kV Pune s/s along with associated bays and Asset 2- ICT III at Wardha s/s along with associated bays and Asset D: ICT III at Raipur along with bay extension associated with WRSS VI. PGCIL.

13.04.2017

24.04.2017 Transmission


56/RP/2016

13.04.2017

24.04.2017 Transmission


Petition No.29/MP/2017 Alongwith I.A. No. 14/2017

05.04.2017

11.04.2017 Misc


23/GT/2017

21.3.2017

30.03.2017 Generation


6/GT/2017
7/GT/2017

21.3.2017

30.03.2017 Generation


I.A. No.8 of 2017 in 16/MP/2014

27.03.2017

30.03.2017 Misc


29/MP/2017 alongwith I.A. No. 14/2017

27.03.2017

30.03.2017 Misc


55/RP/2016 IN 173/TT/2013 & 111/TT/2015

22.03.2017

27.03.2017 Review


29/MP/2017 with I.A. No. 14/2017

21.03.2017

21.03.2017 Misc


1/RP/2017

07.02.2017

15.03.2017 Review


84/MP/2016 alongwith I.A. No. 30/2016 and I.A. No.7/2017

16.2.2017

28.02.2017 Misc


10/MP/2017

16.2.2017

28.02.2017 Misc


I.A. No. 8/2017 in 16/MP/2014

16.2.2017

28.02.2017 Misc


I.A. No. 9/2017 in 21/MP/2017

16.2.2017

28.02.2017 Misc


10/MP/2016 alongwith I.A. No.24/2016

16.02.2017

28.02.2017 Misc


183/TT/2016

14.2.2017

28.02.2017 Transmission


309/GT/2015 221/GT/2015 89/MP/2016

14.2.2017

28.02.2017 Generation


146/TT/2016

14.2.2017

28.02.2017 Transmission


128/MP/2016

14.2.2017

28.02.2017 Misc


I.A. No. 62/2016 in 190/MP/2016

16.2.2017

28.02.2017 Misc


188/MP/2016

16.2.2017

28.02.2017 Misc


24/MP/2017

16.2.2017

28.02.2017 Misc


20/MP/2017

14.2.2017

27.02.2017 Misc


12/MP/2017

16.2.2017

27.02.2017 Misc


224/MP/2016

16.2.2017

27.02.2017 Misc


61/GT/2016

14.2.2017

27.02.2017 Generation


177/MP/2016

14.2.2017

20.02.2017 Misc


1/MP/2017

16.02.2017

20.02.2017 Misc


133/MP/2016

16.02.2017

20.02.2017 Misc


I.A. No. 55/2016 in 19/RP/2016

14.02.2017

20.02.2017 Review


249/GT/2016 alongwith I.A 65/2016

14.02.2017

20.02.2017 Generation


130/GT/2016

14.02.2017

20.02.2017 Generation


126/MP/2016 alongwith I.A. No. 29 of 2016

14.02.2017

20.02.2017 Misc


3/MP/2017

09.02.2017

17.02.2017 Misc


84/MP/2016alongwith I.A. No. 30/2016 and I.A. No.7/2017

14.02.2017

17.02.2017 Misc


2/RP/2017

07.02.2017

17.02.2017 Review


198/MP/2016

14.02.2017

17.02.2017 Misc


235/TT/2016

07.02.2017

16.02.2017 Transmission


20/MP/2017

09.02.2017

16.02.2017 Misc


222/TT/2016

07.02.2017

16.02.2017 Transmission


206/TT/2016

07.02.2017

15.02.2017 Transmission


208/TT/2016

09.02.2017

15.02.2017 Transmission


150/MP/2016

09.02.2017

15.02.2017 Misc


223/TT/2016

07.2.2017

14.02.2017 Transmission


I.A. No. 57/2016 in 304/MP/2013

07.02.2017

14.02.2017 Misc


210/TT/2016

7.2.2017

14.02.2017 Transmission


200/TT/2016

7.2.2017

14.02.2017 Transmission


248/MP/2016

09.02.2017

13.02.2017 Misc


99/MP/2016

09.02.2017

13.02.2017 Misc


153/MP/2016

09.02.2017

13.02.2017 Misc


292/MP/2015

09.02.2017

13.02.2017 Misc


229/MP/2016

09.02.2017

13.02.2017 Misc


38/MP/2016

Petition under Section 79(1)(c) read with 79 (1)(f) and 79(1)(k) of the Electricity Act, 2003 inter-alia seeking a declaration that the factor/events, namely, delay in forest clearance of land for main plant, cancellation of allocated coal block to the petitioner, non-signing of Fuel Supply Agreement, delay in acquisition/procurement of land for main plant, delay in approval of land for ash Pond by State of Odisha, delay in clearance of railway line from Eastern Coast Railway, Odisha, delay in clearance for construction of dedicated transmission line from Ministry of Power in the construction of the 2X660 MW coal based Thermal Power Plant located in Dhenkenkenal District Odisha as force majeure events under BPTA dated 24.2.2010, seeking extension of time period for achieving the commercial operation date of project and other consequential reliefs under the BPTA dated 24.2.2010. Lanco Badandh Power Limited.

09.02.2017

13.02.2017 Misc


141/MP/2016

09.02.2017

13.02.2017 Misc


189/MP/2016

09.02.2017

13.02.2017 Misc


216/MP/2016

09.02.2017

13.02.2017 Misc


227/MP/2016

09.02.2017

13.02.2017 Misc


242/MP/2016

09.02.2017

13.02.2017 Misc


60/RP/2016 alongwith I.A. 52/2016 in 10/SM/2014

09.02.2017

13.02.2017 Review


55/RP/2016

24.1.2017

10.02.2017 Review


I.A. No. 57/2016 in 304/MP/2013

31.1.2017

07.02.2017 Misc


37/RP/2016

24.1.2017

07.02.2017 Review


51/RP/2016

24.1.2017

07.02.2017 Review


237/TT/2016

24.1.2017

07.02.2017 Transmission


188/MP/2015

24.1.2017

07.02.2017 Misc


244/MP/2016

31.1.2017

07.02.2017 Misc


187/MP/2016

24.1.2017

07.02.2017 Misc


63/RP/2016

24.1.2017

06.02.2017 Review


59/RP/2016 IN 87/TT/2015

24.1.2017

02.02.2017 Review


154/MP/2016

24.1.2017

02.02.2017 Misc


61/RP/2016 IN 127/TT/2014

24.1.2017

02.02.2017 Review


64/RP/2016

24.1.2017

02.02.2017 Review


38/RP/2016 IN 33/TT/2013

24.1.2017

02.02.2017 Review


240/MP/2016

24.1.2017

02.02.2017 Misc


63/RP/2016

24.1.2017

02.02.2017 Review


180/MP/2016

19.01.2017

02.02.2017 Transmission


125/TT/2016

24.01.2017

01.02.2017 Misc


226/MP/2016

24.01.2017

01.02.2017 Misc


I.A. No. 47/2016 in 440/MP/2014

24.01.2017

31.01.2017 Misc


41/MP/2016

19.01.2017

31.01.2017 Misc


312/MP/2015

19.01.2017

31.01.2017 Misc


172/MP/2016

19.01.2017

27.01.2017 Misc


127/MP/2016 along with I.A. No. 2/2017

19.01.2017

27.01.2017 Misc


172/MP/2016

19.01.2017

27.01.2017 Misc


139/MP/2016

Petition under Section 79 (1) of the Electricity Act,2003 read with related provisions of the Chapter-V of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Regulation 22 (6) (ii) (Chapter-3) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 and Regulation 31 (6) (b) (Chapter-7) of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for allowing recovery of Energy Charge shortfall during the period of 2012-13, 2013-14 and 2014-15 as well as the modification of design energy for 2014-15, 2015-16 and 2016-17 for calculation of ECR till the energy charge shortfall of the previous years has been made up for the Ranganadi Hydro Electric Plant (RHEP), where actual energy generated by the station during a year is less than its approved design energy for reasons beyond the control of the generating company (NEEPCO) North Eastern Electric Power Corporation Limited

19.1.2017

25.1.2017 Misc


I.A. No. 57/2016 in 304/MP/2013

19.1.2017

25.1.2017 Misc


115/MP/2016

19.1.2017

24.1.2017 Misc


115/MP/2016

19.1.2017

24.1.2017 Misc


167/MP/2016 alongwith I.A. 42/2016

19.1.2017

24.1.2017 Misc


42/RP/2016 in 236/MP/2015

44/RP/2016 in 236/MP/2015

19.1.2017

24.1.2017 Review


188/MP/2016

19.1.2017

24.1.2017 Misc


202/TD/2016

19.1.2017

24.1.2017 Licensing


243/MP/2016

19.1.2017

24.1.2017 Misc


245/MP/2016

17.1.2017

24.1.2017 Misc


192/MP/2016

19.1.2017

24.1.2017 Misc


220/MP/2016

19.1.2017

24.1.2017 Misc


193/MP/2016

19.1.2017

24.1.2017 Misc


240/MP/2016

17.1.2017

20.1.2017 Misc


24/MP/2014

17.01.2017

20.01.2017 Misc


242/MP/2016

17.01.2017

20.01.2017 Misc


246/MP/2016

17.01.2017

20.01.2017 Misc


228/MP/2016

17.1.2017

20.01.2017 Misc


175/MP/2016

17.1.2017

20.01.2017 Misc


239/MP/2016

17.01.2017

20.01.2017 Misc


I.A. No. 57/2016 in 304/MP/2013

03.01.2017

06.01.2017 Misc


248/MP/2016 With IA No. 64/2016

03.01.2017

04.01.2017 Misc


248/MP/2016

29.12.2016

02.01.2017 Misc