कार्यवाही के अभिलेख (आरओपी) - 2025

Sl.No. Petition No. Subject Date of Hearing Date of posting
ROP on website
Category

1919


Diary No. 641/2025 along with IA (Diary) No. 642/2025

Petition under Sections 79(1)(c), 79(1)(f) and 79(1)(k) of the Electricity Act, 2003 read with Regulation 42 of the Central Electricity Regulatory Commission (Connectivity and General Network Access) Regulations, 2022 (as amended) and Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business Regulations), 2023, seeking directions to Central Transmission Utility of India Limited to consider the documents furnished by Prerak Greentech Solar Private Limited as compliance of the Financial Closure requirement under Regulation 11A(2) of the GNA Regulations, 2022 (as amended) or, in the alternative, to communicate the firm start date of Connectivity and grant a period of 06 (six) months prior thereto for achieving Financial Closure. Prerak Greentech Solar Private Limited
23.12.2025 31.12.2025 Misc.

1918


156/MP/2012, 128/TL/2012, 127/20212

19.12.2025 31.12.2025 Misc.

1917


949/GT/2025, 944/GT/2025

11.12.2025 30.12.2025 Generation

1916


21/RP/2025 in 137/GT/2024

27.11.2025 30.12.2025 Review

1915


666/MP/2025 along with IA Nos. 54, 118, 119, 132/2025

19.12.2025 30.12.2025 Misc.

1914


740/GT/2025, 703/GT/2025

11.12.2025 29.12.2025 Generation

1913


677/GT/2025

11.12.2025 29.12.2025 Generation

1912


676/GT/2025

11.12.2025 29.12.2025 Generation

1911


397/TT/2025

23.12.2025 29.12.2025 Transmission

1910


25/RP/2025 along with IA No. 135 of 2025, 9/RP/2024 along with IA No. 19/IA/2024 and IA (Diary No. 570 of 2025)

23.12.2025 29.12.2025 Review

1909


971/MP/2025

19.12.2025 29.12.2025 Misc.

1908


368/MP/2023

19.12.2025 29.12.2025 Misc.

1907


269/MP/2024

23.12.2025 29.12.2025 Misc.

1906


265/MP/2023

23.12.2025 29.12.2025 Misc.

1905


23/RP/2025 in 45/TT/2023

23.12.2025 29.12.2025 Review

1904


956/MP/2025

23.12.2025 29.12.2025 Misc.

1903


880/MP/2025

19.12.2025 29.12.2025 Misc.

1902


856/MP/2025 along with IA No. 129/2025

23.12.2025 26.12.2025 Misc.

1901


787/MP/2025

23.12.2025 26.12.2025 Misc.

1900


305/MP/2015

23.12.2025 26.12.2025 Misc.

1899


161/MP/2025 along with IA No. 109/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon'ble Supreme Court of India's Order dated 19.4.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12% by way of Notification No. 8/2021- central tax (rate) dated 30.9.2021, in terms of Article 12 of the Power Purchase Agreement dated 7.4.2022 between ReNew Surya Vihaan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Vihaan Private Limited
23.12.2025 26.12.2025 Misc.

1898


751/TT/2025, 545/TT/2025, 405/TT/2025, 528/TT/2025, 392/TT/2025, 530/TT/2025, 568/TT/2025 and 504/TT/2025

23.12.2025 26.12.2025 Transmission

1897


749/TT/2025, 692/TT/2025, 490/TT/2025, 612/TT/2025, 503/TT/2025, 515/TT/2025 and 523/TT/2025

23.12.2025 26.12.2025 Transmission

1896


574/TT/2025, 603/TT/2025, 507/TT/2025 and 633/TT/2025.

23.12.2025 26.12.2025 Transmission

1895


321/MP/2025

09.12.2025 26.12.2025 Misc.

1894


317/MP/2025 along with IA Nos. 58/2025 and 92/2025

09.12.2025 26.12.2025 Misc.

1893


547/MP/2025

03.12.2025 26.12.2025 Misc.

1892


368/MP/2025

03.12.2025 26.12.2025 Misc.

1891


378/MP/2023

25.11.2025 26.12.2025 Misc.

1890


203/MP/2024 with I.A. No. 113/IA/2025

25.11.2025 26.12.2025 Misc.

1889


337/GT/2024

03.12.2025 26.12.2025 Generation

1888


42/GT/2025

03.12.2025 26.12.2025 Generation

1887


889/GT/2025, 890/GT/2025

27.11.2025 26.12.2025 Generation

1886


888/GT/2025, 893/GT/2025

27.11.2025 26.12.2025 Generation

1885


803/GT/2025

27.11.2025 26.12.2025 Generation

1884


650/GT/2025

27.11.2025 26.12.2025 Generation

1883


47/GT/2025

27.11.2025 26.12.2025 Generation

1882


45/GT/2025

27.11.2025 26.12.2025 Generation

1881


337/GT/2024

27.11.2025 26.12.2025 Generation

1880


229/2010

03.12.2025 26.12.2025 Misc.

1879


896/GT/2025, 899/GT/2025

27.11.2025 26.12.2025 Generation

1878


895/GT/2025, 897/GT/2025

27.11.2025 26.12.2025 Generation

1877


894/GT/2025, 898/GT/2025

27.11.2025 26.12.2025 Generation

1876


891/GT/2025

27.11.2025 26.12.2025 Generation

1875


10/RP/2025

27.11.2025 26.12.2025 Generation

1874


932/MP/2025 Along with the I.A. No. 122/2025

23.12.2025 26.12.2025 Misc.

1873


886/TL/2025, 887/AT/2025

23.12.2025 26.12.2025 Licence (Transmission)

1872


885/TL/2025, 884/AT/2025

23.12.2025 26.12.2025 Licence (Transmission)

1871


872/TL/2025, 873/AT/2025

23.12.2025 26.12.2025 Licence (Transmission)

1870


871/TD/2025

23.12.2025 26.12.2025 Licence

1869


868/TD/2025

23.12.2025 26.12.2025 Licence

1868


675/TL/2025, 690/AT/2025

23.12.2025 26.12.2025 Licence (Transmission)

1867


265/MP/2022 alongwith IA No. 63/2023

23.12.2025 26.12.2025 Misc.

1866


245/TL/2025

23.12.2025 26.12.2025 Licence (Transmission)

1865


210/MP/2023

23.12.2025 26.12.2025 Misc.

1864


204/MP/2024 along with IA No. 72/2025 & 114/2025

23.12.2025 26.12.2025 Misc.

1863


166/MP/2025

23.12.2025 26.12.2025 Misc.

1862


104/MP/2022 alongwith IA No. 106/2024

23.12.2025 26.12.2025 Misc.

1861


16/RP/2025 in 9/TT/2023 along with I.A. No. 96/2025

23.12.2025 26.12.2025 Review

1860


458/TT/2024, 691/TT/2025, 829/TT/2025, 580/TT/2025 and 752/TT/2025

23.12.2025 26.12.2025 Transmission

1859


448/TT/2025

23.12.2025 26.12.2025 Transmission

1858


102/TT/2025

23.12.2025 26.12.2025 Transmission

1857


30/RP/2024 in 193/TT/2023

23.12.2025 26.12.2025 Review

1856


96/MP/2015

23.12.2025 24.12.2025 Misc.

1855


1015/MP/2025

19.12.2025 24.12.2025 Misc.

1854


1014/MP/2025 along with IA No. 131/2025

19.12.2025 24.12.2025 Misc.

1853


979/MP/2025

19.12.2025 24.12.2025 Misc.

1852


728/MP/2025 along with IA No. 67/2025

19.12.2025 24.12.2025 Misc.

1851


1000/GT/2025, 955/GT/2025

11.12.2025 23.12.2025 Generation

1850


455/MP/2019, 65/MP/2020, 618/MP/2020

09.12.2025 23.12.2025 Misc.

1849


218/MP/2022 along with IA No. 112/2025, 105/MP/2023 along with IA No. 110/2025

09.12.2025 23.12.2025 Misc.

1848


432/MP/2019 along with IA Nos. 82/2023 & 111/2025

09.12.2025 23.12.2025 Misc.

1847


658/MP/2025

19.12.2025 23.12.2025 Misc.

1846


447/MP/2025

19.12.2025 23.12.2025 Misc.

1845


360/TT/2025

19.12.2025 23.12.2025 Transmission

1844


914/TT/2025

Petition for truing up of transmission tariff for the 2019-24 period and determination of transmission tariff for the 2024-29 period for the combined elements of Talcher and Kolar (HVDC portion) (Combined Asset-I) and combined elements of Talcher and Kolar (AC Portion) (Combined Asset-II) under Transmission System associated with Talcher II project in the Southern Region under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 Power Grid Corporation of India Limited
19.12.2025 22.12.2025 Transmission

1843


519/TT/2025, 745/TT/2025, 747/TT/2025, 917/TT/2025, 967/TT/2025 and 374/TT/2025

19.12.2025 22.12.2025 Transmission

1842


502/TT/2025, 398/TT/2025, 416/TT/2025, and 536/TT/2025

19.12.2025 22.12.2025 Transmission

1841


415/TT/2025

19.12.2025 22.12.2025 Transmission

1840


399/TT/2025, 839/TT/2025, 918/TT/2025, 950/TT/2025 and 951/TT/2025

Petition for truing-up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for Asset-A: 400 kV D/C (Quad) Vadodara-Asoj Transmission Line along with associated bays at Asoj (GETCO Sub-station), Asset-B1: 400 kV Bay at Vadodara GIS for 400 kV D/C Vadodara- Asoj Circuit-1, Asset-B2: 400 kV Bay at Vadodara GIS for 400 kV D/C Vadodara- Asoj Circuit-2, Asset-C1: 765 kV 240 MVAR Switchable Line Reactor of Circuit-I of 765 kV D/C Aurangabad-Padghe Line charged as Bus Reactor at Aurangabad Sub-station, Asset-C2: 765 kV 240 MVAR Switchable Line Reactor of Circuit-II of 765 kV D/C Aurangabad-Padghe Line charged as Bus reactor at Aurangabad Sub-station and Asset-D: Aurangabad-Padghe 765 kV D/C Line and Padghe (Powergrid)-Padghe/Kudus (MSETCL) 400 kV D/C Quad Line alongwith associated bays and establishment of 765/400 kV 2X1500 MVA Padghe GIS Sub-station under "System Strengthening in North/West Part of WR for IPP Projects in Chattisgarh (IPP-E)" in the Western Region. Power Grid Corporation of India Limited
19.12.2025 22.12.2025 Transmission

1839


396/TT/2025

19.12.2025 22.12.2025 Transmission

1837


826/TT/2025, 836/TT/2025, 742/TT/2025, 732/TT/2025, 821/TT/2025, 878/TT/2025 and 831/TT/2025

16.12.2025 22.12.2025 Transmission

1836


591/TT/2025

16.12.2025 22.12.2025 Transmission

1835


910/MP/2025

16.12.2025 22.12.2025 Misc.

1834


865/MP/2025

16.12.2025 22.12.2025 Misc.

1833


864/MP/2025

16.12.2025 22.12.2025 Misc.

1832


533/TT/2025, 562/TT/2025, 563/TT/2025, 729/TT/2025 and 730/TT/2025

16.12.2025 22.12.2025 Transmission

1831


445/TT/2024

16.12.2025 22.12.2025 Transmission

1830


258/TT/2025

16.12.2025 22.12.2025 Transmission

1829


179/MP/2023

25.11.2025 22.12.2025 Misc.

1828


765/MP/2025

09.12.2025 22.12.2025 Misc.

1827


334/MP/2025

09.12.2025 22.12.2025 Misc.

1826


907/MP/2025

16.12.2025 22.12.2025 Misc.

1825


718/GT/2025

11.12.2025 19.12.2025 Generation

1824


702/GT/2025

09.12.2025 19.12.2025 Generation

1823


701/GT/2025

09.12.2025 19.12.2025 Generation

1822


697/GT/2025, 698/GT/2025

09.12.2025 19.12.2025 Generation

1821


254/MP/2024 along with IA No. 64/2025

09.12.2025 19.12.2025 Misc.

1820


IA No. 130/2025 in 550/MP/2025

11.12.2025 18.12.2025 Misc.

1819


396/TT/2024

16.12.2025 18.12.2025 Transmission

1818


354/TT/2025

16.12.2025 18.12.2025 Transmission

1817


282/TT/2025

16.12.2025 18.12.2025 Transmission

1816


207/TT/2024

16.12.2025 18.12.2025 Transmission

1815


975/AT/2025

16.12.2025 18.12.2025 Adoption

1814


906/MP/2025

16.12.2025 18.12.2025 Misc.

1813


863/MP/2025

16.12.2025 18.12.2025 Misc.

1812


858/AT/2025

16.12.2025 18.12.2025 Adoption

1811


855/MP/2025

16.12.2025 18.12.2025 Misc.

1810


IA No. 127/2025 in 788/MP/2025

03.12.2025 18.12.2025 Misc.

1809


911/MP/2025

09.12.2025 17.12.2025 Misc.

1808


412/TT/2025

11.12.2025 16.12.2025 Transmission

1807


655/TT/2025

11.12.2025 15.12.2025 Transmission

1806


634/TT/2025, 486/TT/2025, 561/TT/2025, 510/TT/2025

11.12.2025 15.12.2025 Transmission

1805


606/TT/2025

11.12.2025 15.12.2025 Transmission

1804


477/TT/2025, 478/TT/2025, 479/TT/2025, 483/TT/2025, 484/TT/2025, 520/TT/2025, 593/TT/2025, 598/TT/2025, 609/TT/2025, 611/TT/2025, 404/TT/2025, 534/TT/2025, 496/TT/2025

11.12.2025 15.12.2025 Transmission

1803


337/TT/2022

11.12.2025 15.12.2025 Transmission

1802


58/TT/2025, 194/TT/2025, 537/TT/2025, 543/TT/2025, 576/TT/2025, 493/TT /2025

11.12.2025 15.12.2025 Transmission

1801


30/TT/2021

11.12.2025 15.12.2025 Transmission

1800


1004/MP/2025

11.12.2025 15.12.2025 Misc.

1799


870/AT/2025

11.12.2025 15.12.2025 Adoption

1798


IA No. 129/2025 in 856/MP/2025

11.12.2025 15.12.2025 Misc.

1797


IA No. 128/2025 in 303/MP/2024

11.12.2025 15.12.2025 Misc.

1796


IA No. 126/2025 in 192/MP/2021

11.12.2025 15.12.2025 Misc.

1795


859/MP/2025 along with IA No.107/2025

09.12.2025 15.12.2025 Misc.

1794


835/MP/2025

09.12.2025 15.12.2025 Misc.

1793


814/MP/2025

09.12.2025 15.12.2025 Misc.

1792


716/MP/2025, 717/MP/2025, 721/MP/2025, 726/MP/2025

09.12.2025 15.12.2025 Misc.

1791


757/MP/2025 along with IA No.93/2025

09.12.2025 15.12.2025 Misc.

1790


695/MP/2025

09.12.2025 15.12.2025 Misc.

1789


369/MP/2025 along with IA No. 94/2025, 430/MP/2025 along with IA No. 99/2025

09.12.2025 15.12.2025 Misc.

1788


340/MP/2025

09.12.2025 15.12.2025 Misc.

1787


308/MP/2025

09.12.2025 15.12.2025 Misc.

1786


41/MP/2014, 14/MP/2014, 327/MP/2013

09.12.2025 15.12.2025 Misc.

1785


804/MP/2025

09.12.2025 12.12.2025 Misc.

1784


776/AT/2025

09.12.2025 12.12.2025 Adoption

1783


773/AT/2025

09.12.2025 12.12.2025 Adoption

1782


770/MP/2025 along with IA No. 80/2025

09.12.2025 12.12.2025 Misc.

1781


764/MP/2025

09.12.2025 12.12.2025 Misc.

1780


667/MP/2025 along with IA No. 55/2025

09.12.2025 12.12.2025 Misc.

1779


324/MP/2022

09.12.2025 12.12.2025 Misc.

1778


282/MP/2021, 141/MP/2022

09.12.2025 12.12.2025 Misc.

1777


240/MP/2024 along with IA No. 56/2024

09.12.2025 12.12.2025 Misc.

1776


94/MP/2023

09.12.2025 12.12.2025 Misc.

1775


550/MP/2025

09.12.2025 10.12.2025 Misc.

1774


808/MP/2025

03.12.2025 08.12.2025 Misc.

1773


807/MP/2025

25.11.2025 08.12.2025 Misc.

1772


58/MP/2023, 215/MP/2023

03.12.2025 08.12.2025 Misc.

1771


879/MP/2025

03.12.2025 08.12.2025 Misc.

1770


850/MP/2025 along with I.A. No. 104/2025

03.12.2025 08.12.2025 Misc.

1769


IA No. 124/2025 in Petition No. 769/MP/2025

27.11.2025 08.12.2025 Misc.

1768


956/MP/2025

03.12.2025 08.12.2025 Misc.

1767


872/TL/2025, 873/AT/2025

03.12.2025 08.12.2025 Licence (Transmission)

1766


851/MP/2025

03.12.2025 08.12.2025 Misc.

1765


840/MP/2025

03.12.2025 08.12.2025 Misc.

1764


824/TL/2025, 825/AT/2025

03.12.2025 08.12.2025 Licence (Transmission)

1763


777/MP/2025

03.12.2025 08.12.2025 Misc.

1762


682/MP/2025

03.12.2025 08.12.2025 Misc.

1761


675/TL/2025, 690/AT/2025

03.12.2025 08.12.2025 Licence (Transmission)

1760


673/MP/2025

03.12.2025 08.12.2025 Misc.

1759


670/MP/2025

Petition under Section 79 of Electricity Act, 2003 read with Article 17 of the Power Purchase Agreements dated 25.11.2021 (PPAs) executed between Avaada Sunshine Energy Private Limited, West Central Railway & Rewa Ultra Mega Solar Limited, and Avaada Sunshine Energy Private Limited, Madhya Pradesh Power Management Company Limited & Rewa Ultra Mega Solar Limited seeking declaration that change in Goods and Services Tax from 5% to 12% and 13.8%, respectively w.e.f. 01.10.2021 by way of GST Amendment Notifications qualifies as ‘Change in Law’ event under Article 17 of the PPAs and consequently, direction to respondents to compensate the Petitioner towards additional expenditure incurred on account of the ‘Change in Law’ event along with carrying cost. Avaada Sunshine Energy Private Limited
03.12.2025 08.12.2025 Misc.

1758


431/MP/2025

03.12.2025 08.12.2025 Misc.

1757


335/MP/2025

03.12.2025 08.12.2025 Misc.

1756


330/MP/2025

03.12.2025 08.12.2025 Misc.

1755


322/TL/2024

03.12.2025 08.12.2025 Licence (Transmission)

1754


204/MP/2024 along with IA No. 72/2025 & 114/2025

03.12.2025 08.12.2025 Misc.

1753


196/MP/2023, 207/MP/2023, 208/MP/2023

03.12.2025 08.12.2025 Misc.

1752


786/MP/2025 along with IA No. 84/2025 and

03.12.2025 08.12.2025 Misc.

1751


877/TT/2025

03.12.2025 08.12.2025 Transmission

1750


875/TT/2025

03.12.2025 08.12.2025 Transmission

1749


806/MP/2025

03.12.2025 08.12.2025 Misc.

1748


111/MP/2021 with IA No. 38/2021

03.12.2025 08.12.2025 Misc.

1747


892/GT/2025

27.11.2025 08.12.2025 Generation

1746


763/MP/2025

27.11.2025 08.12.2025 Misc.

1745


320/MP/2022

27.11.2025 08.12.2025 Misc.

1744


874/MP/2025

25.11.2025 08.12.2025 Misc.

1743


66/MP/2025

20.11.2025 08.12.2025 Misc.

1742


410/MP/2024

27.10.2025 08.12.2025 Misc.

1741


912/MP/2025 along with IA No. 117/2025

27.11.2025 03.12.2025 Misc.

1740


254/MP/2024 with I.A. No. 64/2025

18.11.2025 02.12.2025 Misc.

1739


422/MP/2024 with IA No. 90/2024

25.11.2025 02.12.2025 Misc.

1738


632/MP/2025

25.11.2025 02.12.2025 Misc.

1737


654/GT/2025 653/GT/2025

20.11.2025 02.12.2025 Generation

1736


710/GT/2025

20.11.2025 02.12.2025 Generation

1735


473/GT/2014 (on remand from APTEL)

18.11.2025 02.12.2025 Generation

1734


344/TT/2025

27.11.2025 01.12.2025 Transmission

1733


80/TT/2025, 211/TT/2024 & 330/TT/2023

20.11.2025 01.12.2025 Transmission

1732


956/MP/2025 along with IA No. 123/2025

27.11.2025 01.12.2025 Misc.

1731


782/MP/2025, 833/MP/2025, 817/MP/2025

27.11.2025 01.12.2025 Misc.

1730


166/MP/2025

27.11.2025 01.12.2025 Misc.

1729


14/RP/2025

27.11.2025 01.12.2025 Review

1728


11/RP/2025 in 344/MP/2020

27.11.2025 01.12.2025 Review

1727


330/TT/2023

27.11.2025 01.12.2025 Transmission

1726


211/TT/2024

27.11.2025 01.12.2025 Transmission

1725


102/TT/2025

25.11.2025 01.12.2025 Transmission

1724


23/TT/2023

20.11.2025 01.12.2025 Transmission

1723


20/RP/2025 in 359/TT/2023

27.11.2025 01.12.2025 Review

1722


18/RP/2025 in 353/TT/2025

27.11.2025 01.12.2025 Review

1721


17/RP/2025 in 649/TT/2020

27.11.2025 01.12.2025 Review

1720


403/TT/2025, 544/TT/2025, 407/TT/2025, 418/TT/2025, 419/TT/2025, 482/TT/2025, 601/TT/2025, 607/TT/2025 and 196/TT/2025

27.11.2025 01.12.2025 Transmission

1719


860/TL/2025, 861/AT/2025

27.11.2025 01.12.2025 Licence (Transmission)

1718


857/TL/2025, 858/AT/2025

27.11.2025 01.12.2025 Licence (Transmission)

1717


758/AT/2025

27.11.2025 01.12.2025 Adoption

1716


616/MP/2025 along with IA No.50/2025

27.11.2025 01.12.2025 Misc.

1715


319/MP/2023

27.11.2025 01.12.2025 Misc.

1714


61/MP/2022

27.11.2025 01.12.2025 Misc.

1713


100/TT/2025, 152/TT/2025, 604/TT/2025, 505/TT/2025, 538/TT/2025 and 535/TT/2025

27.11.2025 01.12.2025 Transmission

1712


80/TT/2025

27.11.2025 01.12.2025 Transmission

1711


19/RP/2025 in 167/TT/2022

27.11.2025 01.12.2025 Review

1710


524/TT/2025, 540/TT/2025, 532/TT/2025, 494/TT/2025, 500/TT/2025, 417/TT/2025 and 599/TT/2025

27.11.2025 01.12.2025 Transmission

1709


413/TT/2025, 435/TT/2025, 411/TT/2025, 518/TT/2025 & 420/TT/2025

27.11.2025 01.12.2025 Transmission

1708


625/GT/2025, 626/GT/2025

20.11.2025 01.12.2025 Generation

1707


249/MP/2024

25.11.2025 01.12.2025 Misc.

1706


431/MP/2025

26.11.2025 01.12.2025 Misc.

1705


365/MP/2025

25.11.2025 01.12.2025 Misc.

1704


261/MP/2024

25.11.2025 01.12.2025 Misc.

1703


127/MP/2025

27.11.2025 01.12.2025 Misc.

1702


67/MP/2021 along with IA Nos. 17/2021 & 30/2024

27.11.2025 01.12.2025 Misc.

1701


202/MP/2023, 272/MP/2023, 236/MP/2023, 286/MP/2023, 335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024, 139/MP/2024, 334/MP/2024, 121/MP/2024, 124/MP/2024, 142/MP/2024, 195/MP/2024, 98/MP/2024, 519/MP/2024, 115/MP/2025, 117/MP/2025, 146/MP/2025, 145/MP/2025, 144/MP/2025, 116/MP/2025, 585/MP/2025, 323/MP/2025, 333/MP/2025

Petition under Section 79(1)(b) &(f) of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Article 12 of Power Purchase Agreement dated 8.12.2021 seeking Working Group Report 2022 as Change in Law Event. TP Saurya Limited , NTPC Limited , Adani Wind Energy MP One Private Limited , Azure Power Maple Private Limited , Ostro Kannada Power Private Limited, NTPC Green Energy Limited , Ayana Renewable Power Six Private Limited, Tata Power Renewable Energy Limited , Talettutayi Solar Projects Nine Private Limited , ReNew Surya Aayan Private Limited , Solar Energy Jaisalmer Two Private Limited, TP Saurya Limited, ReNew Surya Vihaan Private Limited , ACME Dhaulpur Powertech Private Limited & Anr , Megasolis Renewables Private Limited , Rising Sun Energy (K) Private Limited , SJVN Green Energy Limited
18.11.2025 01.12.2025 Misc.

1700


905/MP/2025

25.11.2025 01.12.2025 Misc.

1699


669/MP/2025 along with IA No. 56/2025

25.11.2025 01.12.2025 Misc.

1698


435/MP/2024 along with IA No.93/2024

25.11.2025 01.12.2025 Misc.

1697


403/MP/2024

25.11.2025 01.12.2025 Misc.

1696


328/MP/2024

25.11.2025 01.12.2025 Misc.

1695


305/MP/2015

25.11.2025 01.12.2025 Misc.

1694


265/MP/2022

25.11.2025 01.12.2025 Misc.

1693


168/MP/2023

25.11.2025 01.12.2025 Misc.

1692


112/MP/2023

25.11.2025 01.12.2025 Misc.

1691


104/MP/2022

25.11.2025 01.12.2025 Misc.

1690


4/MP/2021

25.11.2025 01.12.2025 Misc.

1689


771/AT/2025

27.11.2025 28.11.2025 Adoption

1688


264/MP/2023

27.11.2025 28.11.2025 Misc.

1687


260/MP/2024

27.11.2025 28.11.2025 Misc.

1686


65/MP/2025 along with IA No. 121/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
27.11.2025 28.11.2025 Misc.

1685


15/RP/2025 along with IA No.90/2025

27.11.2025 28.11.2025 Review

1684


863/MP/2025

25.11.2025 28.11.2025 Misc.

1683


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited (WLL) & Anr.
25.11.2025 28.11.2025 Misc.

1682


296/MP/2025

25.11.2025 28.11.2025 Misc.

1681


161/MP/2025 along with IA No. 109/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon'ble Supreme Court of India's Order dated 19.4.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12% by way of Notification No. 8/2021- central tax (rate) dated 30.9.2021, in terms of Article 12 of the Power Purchase Agreement dated 7.4.2022 between ReNew Surya Vihaan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Vihaan Private Limited
25.11.2025 28.11.2025 Misc.

1680


16/RP/2025 in 9/TT/2023 along with I.A. No. 96/2025

25.11.2025 28.11.2025 Review

1679


652/GT/2025, 651/GT/2025

20.11.2025 27.11.2025 Generation

1678


169/MP/2022 along with I.A. No. 39/2022

20.11.2025 27.11.2025 Misc.

1677


699/GT/2025, 700/GT/2025

18.11.2025 27.11.2025 Generation

1676


622/GT/2025

11.11.2025 27.11.2025 Generation

1675


79/GT/2025

13.11.2025 27.11.2025 Generation

1674


448/TT/2024, 12/TT/2025, 372/TT/2024, 438/TT/2025 and 487/TT/2025

20.11.2025 26.11.2025 Transmission

1673


343/TT/2025

20.11.2025 26.11.2025 Transmission

1672


175/TT/2017

20.11.2025 26.11.2025 Transmission

1671


30/TT/2021

20.11.2025 26.11.2025 Transmission

1670


143/TT/2025 with IA No. 97 of 2025

20.11.2025 26.11.2025 Transmission

1669


683/TT/2025

20.11.2025 26.11.2025 Transmission

1668


285/TT/2023, 287/TT/2023

20.11.2025 26.11.2025 Transmission

1667


396/TT/2024

20.11.2025 26.11.2025 Transmission

1666


285/TT/2024

Petition for the determination of transmission tariff from DOCO to 31.3.2024 for transmission Asset: Sub-station: 400kV Bikaner-II PS (Under TBCB) Extension: [2 Nos. of 400kV Line Bays at Bikaner-II PS Bikaner (PG) 400kV D/C (Quad) line formed after removal of LILO of one circuit of Bhadla-Bikaner (RVPN) 400kV D/C (Quad)], Transmission line: 400kV Bikaner-II PS - Bikaner (PG) (Quad) line: [Removal of LILO of one circuit of Bhadla-Bikaner (RVPN) 400kV D/C (Quad) line at Bikaner (PG) and extension of above LILO section from Bikaner (PG) up to Bikaner-II PS to form Bikaner-II PS Bikaner (PG) 400kV D/C (Quad) line] under “Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part F1”. Power Grid Corporation of India Limited
20.11.2025 26.11.2025 Transmission

1665


104/TT/2024

20.11.2025 26.11.2025 Transmission

1664


382/TT/2025

20.11.2025 26.11.2025 Transmission

1663


30/RP/2024 in 193/TT/2023

20.11.2025 26.11.2025 Review

1662


640/TT/2025, 389/TT/2025

20.11.2025 26.11.2025 Transmission

1661


383/TT/2025

20.11.2025 26.11.2025 Transmission

1660


645/GT/2025, 646/GT/2025

18.11.2025 26.11.2025 Transmission

1659


495/TT/2025

Petition under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulations 15(1)(a) and 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for truing up of the transmission tariff for the 2019-24 period and determination of the transmission tariff for the 2024-29 period for Asset-1: 400 kV Jeypore-Gazuwaka transmission line along with associated bays; and Asset-2: 500 MW HVDC back to back stations at Gazuwaka under “Gazuwaka HVDC back to back project” in the Southern Region. Power Grid Corporation of India Limited
11.11.2025 26.11.2025 Transmission

1658


869/TL/2025 870/TL/2025

20.11.2025 24.11.2025 Transmission

1657


189/TT/2025

20.11.2025 24.11.2025 Licence

1656


378/TT/2025

20.11.2025 24.11.2025 Transmission

1655


196/TT/2025

20.11.2025 24.11.2025 Transmission

1654


620/GT/2025

13.11.2025 24.11.2025 Generation

1653


180/MP/2025 along with IA No. 98/2025, 261/MP/2025 alongwith IA No. 74/2025

20.11.2025 22.11.2025 Misc.

1652


96/MP/2015

16.11.2025 22.11.2025 Misc.

1651


455/MP/2019, 65/MP/2020, 618/MP/2020

11.11.2025 21.11.2025 Misc.

1650


268/MP/2020

11.11.2025 21.11.2025 Misc.

1649


48/MP/2025

11.11.2025 21.11.2025 Misc.

1648


31/MP/2025

11.11.2025 21.11.2025 Misc.

1647


30/MP/2025

11.11.2025 21.11.2025 Misc.

1646


227/MP/2024

10.11.2025 21.11.2025 Misc.

1645


871/TD/2025

20.11.2025 21.11.2025 Licence

1644


868/TD/2025

20.11.2025 21.11.2025 Licence

1643


675/TL/2025, 690/AT/2025

18.11.2025 21.11.2025 Licence (Transmission)

1642


837/MP/2025 along with IA No.100/2025

18.11.2025 20.11.2025 Misc.

1641


642/MP/2025

18.11.2025 20.11.2025 Misc.

1640


320/MP/2025

18.11.2025 20.11.2025 Misc.

1639


305/MP/2025

18.11.2025 20.11.2025 Misc.

1638


198/MP/2023

18.11.2025 20.11.2025 Misc.

1637


107/MP/2024

18.11.2025 20.11.2025 Misc.

1636


337/TT/2022

11.11.2025 18.11.2025 Transmission

1635


720/MP/2025

13.11.2025 18.11.2025 Misc.

1634


680/MP/2025

13.11.2025 18.11.2025 Misc.

1633


331/MP/2024, 581/MP/2025

13.11.2025 18.11.2025 Misc.

1632


432/MP/2019 along with IA No. 82/2023

30.10.2025 18.11.2025 Misc.

1631


249/MP/2024

30.10.2025 18.11.2025 Misc.

1630


171/MP/2024

30.10.2025 18.11.2025 Misc.

1629


830/MP/2025

13.11.2025 17.11.2025 Misc.

1628


415/MP/2024

13.11.2025 17.11.2025 Misc.

1627


552/MP/2025

11.11.2025 17.11.2025 Misc.

1626


451/MP/2025 along with IA No. 36/2025

10.11.2025 17.11.2025 Misc.

1625


484/MP/2024 along with IA No. 98/2024

10.11.2025 17.11.2025 Misc.

1624


317/MP/2025 along with IA No. 58/2025 and IA No.92/2025

10.11.2025 17.11.2025 Misc.

1623


252/MP/2022

10.11.2025 17.11.2025 Misc.

1622


856/MP/2025

10.11.2025 15.11.2025 Misc.

1621


828/AT/2025

11.11.2025 15.11.2025 Adoption

1620


827/TD/2025

13.11.2025 15.11.2025 Licence

1619


811/MP/2025 along with IA No.87/2025

10.11.2025 15.11.2025 Misc.

1618


809/MP/2025 along with IA No. 85/2025

11.11.2025 15.11.2025 Misc.

1617


728/MP/2025 along with IA No. 67/2025

11.11.2025 15.11.2025 Misc.

1616


558/MP/2025

11.11.2025 15.11.2025 Misc.

1615


488/MP/2024

10.11.2025 15.11.2025 Misc.

1614


383/MP/2023, 384/MP/2023, 12/MP/2024

11.11.2025 15.11.2025 Misc.

1613


336/MP/2025

10.11.2025 15.11.2025 Misc.

1612


327/MP/2025 along with IA No.20/2025

11.11.2025 15.11.2025 Misc.

1611


319/MP/2022 along with IA Nos. 63/2022 and 19/2025

10.11.2025 15.11.2025 Misc.

1610


292/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 17 of the power purchase agreements dated 25.11.2021 seeking declaration that change in rate of Goods and Services Tax from 5% to 12% on renewable energy equipment w.e.f. 01.10.2021 on account of amendment to Notification No. 01/2017-Central Tax (Rate) dated 28.06.2017 vide Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 amounts to a ‘Change in Law’ event under Article 17 of the Power Purchase Agreements and to further direct the Respondents to pay compensation along with carrying cost towards additional amount incurred on account of increment in of Goods and Services Tax paid by the Petitioner pursuant to Notifications dated 30.09.2021 and to restitute the Petitioner to the same financial position as it would have been due continuation of Goods and Services Tax rate of 5% which was applicable till 30.09.2021. Talettutayi Solar Projects Nine Private Limited
10.11.2025 15.11.2025 Misc.

1609


239/MP/2024 along with IA Nos. 8/2025 and 70/2025

10.11.2025 15.11.2025 Misc.

1608


188/MP/2021

11.11.2025 15.11.2025 Misc.

1607


36/MP/2024 along with IA No.43/2025, 644/MP/2025

11.11.2025 15.11.2025 Misc.

1606


28/RP/2024 along with IA No. 81/2024 in 255/TT/2021

11.11.2025 15.11.2025 Review

1605


14/RP/2025

10.11.2025 15.11.2025 Review

1604


9/RP/2024 with IA No. 19 of 2024 and IA (Diary No. 570 of 2025)

10.11.2025 15.11.2025 Review

1603


364/MP/2025

10.11.2025 15.11.2025 Misc.

1602


378/MP/2023

10.11.2025 15.11.2025 Misc.

1601


440GT/2024

28.10.2025 15.11.2025 Generation

1600


614/MP/2025

13.11.2025 14.11.2025 Misc.

1599


631/MP/2025

13.11.2025 14.11.2025 Misc.

1598


332/MP/2025, 280/MP/2025

13.11.2025 14.11.2025 Misc.

1597


617/MP/2020

13.11.2025 14.11.2025 Misc.

1596


824/TL/2025, 825/AT/2025

13.11.2025 14.11.2025 Licence (Transmission)

1595


215/MP/2021 along with IA Nos. 34/2022, 2/2023 & 75/2025

13.11.2025 14.11.2025 Misc.

1594


348/MP/2023 along with IA No. 83/2025

13.11.2025 14.11.2025 Misc.

1593


847/MP/2025

06.11.2025 14.11.2025 Misc.

1592


785/MP/2025

06.11.2025 14.11.2025 Misc.

1591


758/AT/2025

06.11.2025 14.11.2025 Adoption

1590


366/MP/2022, 367/MP/2022

30.10.2025 13.11.2025 Misc.

1589


450/MP/2025 along with IA No. 35/2025

20.05.2025 13.11.2025 Misc.

1588


180/MP/2025 along with IA No. 98/2025, 261/MP/2025 along with IA No. 74/2025

10.11.2025 12.11.2025 Misc.

1587


44/GT/2025

28.10.2025 12.11.2025 Generation

1586


291/GT/2014, 292/GT/2014, 316/GT/2014, 319/GT/2014, 323/GT/2014, 338/GT/2014

28.10.2025 12.11.2025 Generation

1585


516/GT/2024

28.10.2025 12.11.2025 Generation

1584


331/MP/2025

10.11.2025 12.11.2025 Misc.

1583


371/MP/2024, 272/MP/2024

10.11.2025 12.11.2025 Misc.

1582


358/MP/2023 along with IA Nos.90/2023 and 33/2025

10.11.2025 12.11.2025 Misc.

1581


368/MP/2023

10.11.2025 12.11.2025 Misc.

1580


314/MP/2025

10.11.2025 12.11.2025 Misc.

1579


273/MP/2024

10.11.2025 12.11.2025 Misc.

1578


257/MP/2024 along with IA No.102/2025

10.11.2025 12.11.2025 Misc.

1577


219/MP/2023

10.11.2025 12.11.2025 Misc.

1576


180/MP/2023, 245/MP/2024, 184/MP/2023, 164/MP/2024, 165/MP/2024, 167/MP/2024

10.11.2025 12.11.2025 Misc.

1575


126/MP/2017

10.11.2025 12.11.2025 Misc.

1574


IA No. 89/2025 in 256/MP/2023

10.11.2025 12.11.2025 Misc.

1573


85/MP/2021 along with IA Nos.26/2021, 6/2025 and 14/2025

10.11.2025 12.11.2025 Misc.

1572


79/MP/2023

10.11.2025 12.11.2025 Misc.

1571


63/MP/2024

10.11.2025 12.11.2025 Misc.

1570


669/MP/2025 along with IA No.56/2025

10.11.2025 12.11.2025 Misc.

1569


304/MP/2025

10.11.2025 12.11.2025 Misc.

1568


218/MP/2022 with IA No. 112/2025, 105/MP/2023 with IA No. 110/2025

30.10.2025 11.11.2025 Misc.

1567


66/MP/2025

06.11.2025 10.11.2025 Misc.

1566


852/MP/2025

06.11.2025 10.11.2025 Misc.

1565


779/MP/2025 along with IA No. 103/2025

06.11.2025 10.11.2025 Misc.

1564


853/MP/2025 along with I.A. No. 105/2025

06.11.2025 10.11.2025 Misc.

1563


848/MP/2025

06.11.2025 10.11.2025 Misc.

1562


808/MP/2025

06.11.2025 10.11.2025 Misc.

1561


366/MP/2025

28.10.2025 10.11.2025 Misc.

1560


649/GT/2025, 53/GT/2025

27.10.2025 10.11.2025 Generation

1559


421/MP/2025

17.10.2025 10.11.2025 Misc.

1558


358/TT/2025, 467/TT/2024, 485/TT/2025, 488/TT/2025, 564/TT/2025, 499/TT/2025, 565/TT/2025, 569/TT/2025, 578/TT/2025 and 637/TT/2025

06.11.2025 10.11.2025 Transmission

1557


805/MP/2025

06.11.2025 10.11.2025 Misc.

1556


771/AT/2025

06.11.2025 10.11.2025 Adoption

1555


859/MP/2025 along with IA No.107/2025

30.10.2025 10.11.2025 Misc.

1554


862/MP/2025

06.11.2025 07.11.2025 Misc.

1553


855/MP/2025

06.11.2025 07.11.2025 Misc.

1552


813/MP/2025

06.11.2025 07.11.2025 Misc.

1551


380/MP/2023

06.11.2025 07.11.2025 Misc.

1550


862/MP/2025

04.11.2025 07.11.2025 Misc.

1549


627/GT/2025, 629/GT/2025

28.10.2025 07.11.2025 Generation

1548


459/GT/2025, 171/GT/2025

28.10.2025 07.11.2025 Generation

1547


334/MP/2025

27.10.2025 07.11.2025 Generation

1546


367/GT/2024

27.10.2025 07.11.2025 Generation

1545


493/TT/2025, 510/TT/2025

06.11.2025 07.11.2025 Transmission

1544


526/TT/2025, 570/TT/2025, 608/TT/2025, 566/TT/2025, 638/TT/2025, 542/TT/2025 & 466/TT/2024

06.11.2025 07.11.2025 Transmission

1543


543/TT/2025, 634/TT/2025, 606/TT/2025, 486/TT/2025, 576/TT/2025 and 561/TT/2025

04.11.2025 06.11.2025 Transmission

1542


596/TT/2025, 590/TT/2025, 600/TT/2025 & 610/TT/2025

04.11.2025 06.11.2025 Transmission

1541


497/TT/2025

30.10.2025 06.11.2025 Transmission

1540


737/MP/2025, 760/MP/2025

04.11.2025 06.11.2025 Misc.

1539


841/MP/2025

04.11.2025 06.11.2025 Misc.

1538


846/MP/2025

04.11.2025 06.11.2025 Misc.

1537


784/MP/2025

04.11.2025 06.11.2025 Misc.

1536


773/AT/2025

04.11.2025 06.11.2025 Adoption

1535


478/TT/2025

04.11.2025 06.11.2025 Transmission

1534


517/TT/2025, 560/TT/2025

30.10.2025 06.11.2025 Transmission

1533


776/AT/2025

04.11.2025 06.11.2025 Adoption

1532


775/MP/2025

04.11.2025 06.11.2025 Misc.

1531


759/MP/2025

04.11.2025 06.11.2025 Misc.

1530


738/MP/2025

04.11.2025 06.11.2025 Misc.

1529


225/MP/2023

04.11.2025 06.11.2025 Misc.

1528


589/TT/2025, 587/TT/2025, 516/TT/2025, 527/TT/2025, 427/TT/2025, 406/TT/2025, 559/TT/2025, 491/TT/2025 & 498/TT/2025

30.10.2025 04.11.2025 Transmission

1527


12/RP/2025 in 132/TT/2023

30.10.2025 04.11.2025 Review

1526


845/MP/2025

30.10.2025 03.11.2025 Misc.

1525


815/MP/2025

30.10.2025 03.11.2025 Misc.

1524


814/MP/2025

30.10.2025 03.11.2025 Misc.

1523


739/MP/2025

30.10.2025 03.11.2025 Misc.

1522


727/MP/2025 along with IA (Diary) No.555/2025

30.10.2025 03.11.2025 Misc.

1521


716/MP/2025, 717/MP/2025, 721/MP/2025, 726/MP/2025

30.10.2025 03.11.2025 Misc.

1520


695/MP/2025, 715/MP/2025

30.10.2025 03.11.2025 Misc.

1519


230/MP/2023

30.10.2025 03.11.2025 Misc.

1518


183/MP/2021

30.10.2025 03.11.2025 Misc.

1517


151/TT/2025

30.10.2025 03.11.2025 Transmission

1516


197/TT/2025, 268/TT/2025, 269/TT/2024, 270/TT/2025, 329/TT/2025 and 597/TT/2025

30.10.2025 03.11.2025 Transmission

1515


474/TT/2024, 16/TT/2025, 190/TT/2025, 387/TT/2025 and 267/TT/2025

30.10.2025 03.11.2025 Transmission

1514


484/TT/2025, 520/TT/2025, 593/TT/2025, 598/TT/2025, 483/TT/2025, 609/TT/2025, 404/TT/2025 and 534/TT/2025

30.10.2025 03.11.2025 Transmission

1513


330/MP/2025

09.09.2025 01.11.2025 Misc.

1512


111/MP/2021 with IA No. 38/2021

28.10.2025 31.10.2025 Misc.

1511


547/MP/2025

27.10.2025 31.10.2025 Misc.

1510


368/MP/2025

27.10.2025 31.10.2025 Misc.

1509


169/MP/2022 along with I.A. Nos. 39/2022 and 40/2022

27.10.2025 31.10.2025 Misc.

1508


78/MP/2024

17.10.2025 31.10.2025 Misc.

1507


303/MP/2025 with IA No. 53/2025

16.10.2025 31.10.2025 Misc.

1506


322/TL/2024

28.10.2025 30.10.2025 Licence (Transmission)

1505


239/MP/2021 along with IA Nos. 47/2023 & 91/2025

28.10.2025 30.10.2025 Misc.

1504


282/MP/2023 along with IA No. 59/2025

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and Ors.
28.10.2025 30.10.2025 Misc.

1503


675/TL/2025, 690/AT/2025

28.10.2025 30.10.2025 Licence (Transmission)

1502


550/MP/2025

28.10.2025 30.10.2025 Misc.

1501


854/MP/2025

28.10.2025 30.10.2025 Misc.

1500


233/MP/2025

27.10.2025 30.10.2025 Misc.

1499


789/TL/2025

27.10.2025 30.10.2025 Licence (Transmission)

1498


411/MP/2024 along with IA (Diary) No. 530/2025

27.10.2025 30.10.2025 Misc.

1497


380/MP/2023

27.10.2025 30.10.2025 Misc.

1496


159/MP/2025

27.10.2025 30.10.2025 Misc.

1495


673/MP/2025

27.10.2025 29.10.2025 Misc.

1494


429/MP/2025

27.10.2025 29.10.2025 Misc.

1493


367/MP/2025, 422/MP/2025

27.10.2025 29.10.2025 Misc.

1492


308/MP/2025

27.10.2025 29.10.2025 Misc.

1491


302/MP/2025

27.10.2025 29.10.2025 Misc.

1490


336/MP/2024

17.10.2025 28.10.2025 Misc.

1489


66/MP/2025

17.10.2025 28.10.2025 Misc.

1488


268/MP/2020

16.10.2025 28.10.2025 Misc.

1487


229/2010

14.10.2025 28.10.2025 Misc.

1486


648/GT/2025, 647/GT/2025

16.10.2025 23.10.2025 Misc.

1485


265/MP/2024

17.10.2025 23.10.2025 Misc.

1484


220/MP/2022, 378/MP/2022

17.10.2025 23.10.2025 Misc.

1483


203/MP/2023

17.10.2025 23.10.2025 Misc.

1482


337/MP/2025

17.10.2025 23.10.2025 Misc.

1481


321/MP/2025

16.10.2025 22.10.2025 Misc.

1480


650/GT/2025

14.10.2025 22.10.2025 Generation

1479


315/MP/2025

16.10.2025 22.10.2025 Misc.

1478


162/MP/2025, 163/MP/2025, 164/MP/2025, 165/MP/2025, 168/MP/2025 and 173/MP/2025

17.10.2025 21.10.2025 Misc.

1477


786/MP/2025 along with IA No. 84/2025 and IA (Diary) No.482/2025

16.10.2025 21.10.2025 Misc.

1476


425/MP/2024

16.10.2025 21.10.2025 Misc.

1475


61/MP/2022

14.10.2025 21.10.2025 Misc.

1474


254/MP/2024 along with I.A. No. 64/2025

26.09.2025 21.10.2025 Misc.

1473


850/MP/2025 along with I.A. No. 525/2025

17.10.2025 21.10.2025 Misc.

1472


810/MP/2025

17.10.2025 21.10.2025 Misc.

1471


727/MP/2025

17.10.2025 21.10.2025 Misc.

1470


277/MP/2024 along with IA Nos. 25/2025 & 26/2025, 446/MP/2025

17.10.2025 21.10.2025 Misc.

1469


194/MP/2021

17.10.2025 21.10.2025 Misc.

1468


141/MP/2024 along with IA No. 29/IA/2024, 362/MP/2024

17.10.2025 21.10.2025 Misc.

1467


854/MP/2025

16.10.2025 21.10.2025 Misc.

1466


772/MP/2025

16.10.2025 21.10.2025 Misc.

1465


324/MP/2022

16.10.2025 21.10.2025 Misc.

1464


264/MP/2023

16.10.2025 21.10.2025 Misc.

1463


248/MP/2023

16.10.2025 21.10.2025 Misc.

1462


240/MP/2024 along with IA Nos. 56/2024

16.10.2025 21.10.2025 Misc.

1461


67/MP/2021 along with IA Nos. 17/2021 & 30/2024

16.10.2025 21.10.2025 Misc.

1460


548/MP/2025

14.10.2025 21.10.2025 Misc.

1459


252/MP/2022

14.10.2025 21.10.2025 Misc.

1458


798/GT/2025

30.09.2025 21.10.2025 Generation

1457


797/GT/2025

30.09.2025 21.10.2025 Generation

1456


792/GT/2025

30.09.2025 21.10.2025 Generation

1455


632/MP/2025

30.09.2025 21.10.2025 Misc.

1454


621/GT/2025

30.09.2025 21.10.2025 Generation

1453


809/MP/2025 along with IA No. 85/2025 & 86/2025

16.10.2025 21.10.2025 Misc.

1452


781/MP/2025

16.10.2025 21.10.2025 Misc.

1451


774/AT/2025

16.10.2025 21.10.2025 Adoption

1450


770/MP/2025

16.10.2025 21.10.2025 Misc.

1449


722/AT/2025

16.10.2025 21.10.2025 Adoption

1448


282/MP/2021, 141/MP/2022

14.10.2025 21.10.2025 Misc.

1447


204/MP/2024 along with IA No. 72/2025

14.10.2025 21.10.2025 Misc.

1446


196/MP/2023, 207/MP/2023, 208/MP/2023

14.10.2025 21.10.2025 Misc.

1445


182/MP/2023

14.10.2025 21.10.2025 Misc.

1444


58/MP/2023, 215/MP/2023

14.10.2025 21.10.2025 Misc.

1443


41/MP/2014, 14/MP/2014, 327/MP/2013

14.10.2025 21.10.2025 Misc.

1442


850/MP/2025 alongwith I.A. No. 525/2025

16.10.2025 21.10.2025 Misc.

1441


840/MP/2025

16.10.2025 21.10.2025 Misc.

1440


755/TL/2025, 756/AT/2025

16.10.2025 21.10.2025 Licence (Transmission)

1439


735/AT/2025

16.10.2025 21.10.2025 Adoption

1438


260/MP/2024

16.10.2025 21.10.2025 Misc.

1437


768/MP/2025 along with IA No. 76/2025 & 77/2025, 769/MP/2025 along with IA No. 78/2025 & 79/2025

14.10.2025 21.10.2025 Misc.

1436


728/MP/2025 along with IA No. 67/2025

14.10.2025 21.10.2025 Misc.

1435


675/TL/2025, 690/AT/2025

14.10.2025 21.10.2025 Licence (Transmission)

1434


666/MP/2025 along with IA No. 54/2025

14.10.2025 21.10.2025 Misc.

1433


616/MP/2025 along with IA No.50/2025

14.10.2025 21.10.2025 Misc.

1432


423/MP/2025

14.10.2025 21.10.2025 Misc.

1431


369/MP/2025 alongwith IA No. 94/2025, 430/MP/2025 alongwith IA No. 99/2025

14.10.2025 21.10.2025 Misc.

1430


340/MP/2025

14.10.2025 21.10.2025 Misc.

1429


305/MP/2015

14.10.2025 21.10.2025 Misc.

1428


265/MP/2022

14.10.2025 21.10.2025 Misc.

1427


94/MP/2023

14.10.2025 21.10.2025 Misc.

1426


36/MP/2024 along with IA No. 43/2025

16.10.2025 21.10.2025 Misc.

1425


14/RP/2025

14.10.2025 21.10.2025 Review

1424


16/RP/2025 in 9/TT/2023 along with I.A. No. 96/2025

14.10.2025 16.10.2025 Misc.

1423


795/GT/2025

30.09.2025 15.10.2025 Generation

1422


794/GT/2025

30.09.2025 15.10.2025 Generation

1421


791/GT/2025

30.09.2025 15.10.2025 Generation

1420


790/GT/2025

30.09.2025 15.10.2025 Generation

1419


763/MP/2025

18.09.2025 14.10.2025 Misc.

1418


171/MP/2024

18.09.2025 14.10.2025 Misc.

1417


828/AT/2025

01.10.2025 13.10.2025 Adoption

1416


777/MP/2025

01.10.2025 13.10.2025 Misc.

1415


803/GT/2025

30.09.2025 13.10.2025 Generation

1414


801/GT/2025

30.09.2025 13.10.2025 Generation

1413


793/GT/2025, 799/GT/2025

30.09.2025 13.10.2025 Generation

1412


223/MP/2022, 170/MP/2025

18.09.2025 13.10.2025 Misc.

1411


619/GT/2025

26.09.2025 10.10.2025 Generation

1410


645/GT/2025, 646/GT/2025

23.09.2025 10.10.2025 Generation

1409


485/GT/2024

23.09.2025 10.10.2025 Generation

1408


341/GT/2025

23.09.2025 10.10.2025 Generation

1407


835/MP/2025

01.10.2025 10.10.2025 Misc.

1406


511/GT/2024

26.09.2025 10.10.2025 Generation

1405


837/MP/2025 along with IA Nos. 100/2025 & 101/2025

01.10.2025 08.10.2025 Misc.

1404


788/MP/2025

01.10.2025 08.10.2025 Misc.

1403


802/GT/2025

30.09.2025 08.10.2025 Generation

1402


796/GT/2025, 800/GT/2025

30.09.2025 08.10.2025 Generation

1401


346/MP/2020 along with IA No.24/2024

30.09.2025 08.10.2025 Misc.

1400


815/MP/2025

26.09.2025 06.10.2025 Misc.

1399


814/MP/2025

26.09.2025 06.10.2025 Misc.

1398


473/GT/2014 (on remand from APTEL)

23.09.2025 06.10.2025 Generation

1397


439/TT/2025, 480/TT/2025, 588/TT/2025, 402/TT/2025 and 583/TT/2025

30.09.2025 04.10.2025 Misc.

1396


734/MP/2025

16.09.2025 04.10.2025 Misc.

1395


96/MP/2015

30.09.2025 04.10.2025 Misc.

1394


713/MP/2025

16.09.2025 04.10.2025 Misc.

1393


782/MP/2025, 833/MP/2025

30.09.2025 04.10.2025 Misc.

1392


771/AT/2015

30.09.2025 04.10.2025 Misc.

1391


314/MP/2022

30.09.2025 04.10.2025 Misc.

1390


713/MP/2025

10.09.2025 04.10.2025 Misc.

1389


753/RC/2025, 754/RC/2025, 674/RC/2025

01.10.2025 03.10.2025 Misc.

1388


584/MP/2025 alongwith IA No. 63/2025

01.10.2025 03.10.2025 Misc.

1387


412/TT/2025, 611/TT/2025, 496/TT/2025, 479/TT/2025 and 477/TT/2025

30.09.2025 03.10.2025 Transmission

1386


830/MP/2025

01.10.2025 03.10.2025 Misc.

1385


811/MP/2025 along with IA No. 87/2025

01.10.2025 03.10.2025 Misc.

1384


787/MP/2025

01.10.2025 03.10.2025 Misc.

1383


484/MP/2024 along with IA No. 98/2024

26.09.2025 03.10.2025 Misc.

1382


481/TT/2025, 512/TT/2025, 567/TT/2025, 401/TT/2025, 355/TT/2025, 342/TT/2025, 372/TT/2025, 386/TT/2025 & 635/TT/2025

30.09.2025 01.10.2025 Transmission

1381


194/TT/2025, 537/TT/2025

30.09.2025 01.10.2025 Transmission

1380


58/TT/2025

30.09.2025 01.10.2025 Transmission

1379


15/TT/2025, 22/TT/2025, 60/TT/2025 & 93/TT/2025

30.09.2025 01.10.2025 Transmission

1378


163/MP/2022

23.09.2025 01.10.2025 Misc.

1377


410/MP/2024

09.09.2025 30.09.2025 Misc.

1376


789/TL/2025

26.09.2025 30.09.2025 Licence (Transmission)

1375


773/AT/2025

26.09.2025 30.09.2025 Adoption

1374


758/AT/2025

26.09.2025 30.09.2025 Adoption

1373


722/AT/2025

26.09.2025 30.09.2025 Adoption

1372


451/MP/2025 along with IA No. 36/2025

26.09.2025 30.09.2025 Misc.

1371


358/MP/2023, along with IA Nos. 90/2023 and 33/2025

26.09.2025 30.09.2025 Misc.

1370


198/MP/2023 along with IA No. 43/2023

26.09.2025 30.09.2025 Misc.

1369


126/MP/2022 along with IA No. 41/2022

26.09.2025 30.09.2025 Misc.

1368


283/MP/2025

23.09.2025 30.09.2025 Misc.

1367


463/MP/2014 along with IA No. 40/2019, OP No. 71/2012, OP No. 72/2012

23.09.2025 30.09.2025 Misc.

1366


807/MP/2025

26.09.2025 29.09.2025 Misc.

1365


424/MP/2025

26.09.2025 29.09.2025 Misc.

1364


378/MP/2023

26.09.2025 29.09.2025 Misc.

1363


320/MP/2022

26.09.2025 29.09.2025 Misc.

1362


41/GT/2025

26.09.2025 29.09.2025 Generation

1361


I.A No. 92/2025 in 317/MP/2025

23.09.2025 29.09.2025 Misc.

1360


830/MP/2025

26.09.2025 29.09.2025 Misc.

1359


180/MP/2025 along with IA No.98/2025, 261/MP/2025 along with IA No.74/2025

26.09.2025 29.09.2025 Misc.

1358


783/MP/2025

26.09.2025 29.09.2025 Misc.

1357


IA No. 94/2025 in 369/MP/2025

23.09.2025 29.09.2025 Misc.

1356


23/TT/2023

16.09.2025 29.09.2025 Transmission

1355


45/GT/2025

16.09.2025 26.09.2025 Generation

1354


42/GT/2025

16.09.2025 26.09.2025 Generation

1353


220/MP/2022, 378/MP/2022

10.09.2025 26.09.2025 Misc.

1352


Corrigendum to 284/MP/2025

17.07.2025 26.09.2025 Misc.

1351


806/MP/2025

23.09.2025 26.09.2025 Misc.

1350


774/AT/2025

23.09.2025 26.09.2025 Adoption

1349


431/MP/2025

23.09.2025 26.09.2025 Misc.

1348


340/MP/2022, 341/MP/2022

23.09.2025 26.09.2025 Misc.

1347


322/TL/2024

23.09.2025 26.09.2025 Licence (Transmission)

1346


IA No. 89/2025 in 256/MP/2023

23.09.2025 26.09.2025 Misc.

1345


452/MP/2025

09.09.2025 24.09.2025 Misc.

1344


817/MP/2025

23.09.2025 24.09.2025 Misc.

1343


815/MP/2025

23.09.2025 24.09.2025 Misc.

1342


814/MP/2025

23.09.2025 24.09.2025 Misc.

1341


780/TD/2025

23.09.2025 24.09.2025 Licence

1340


778/TD/2025

23.09.2025 24.09.2025 Licence

1339


776/AT/2025

23.09.2025 24.09.2025 Adoption

1338


432/MP/2025 alongwith IA No. 95/2025

23.09.2025 24.09.2025 Misc.

1337


215/MP/2021 along with IA Nos. 34/2022, 2/2023 & 75/2025

23.09.2025 24.09.2025 Misc.

1336


365/MP/2025

23.09.2025 24.09.2025 Misc.

1335


305/MP/2015

18.09.2025 24.09.2025 Misc.

1334


814/MP/2025

18.09.2025 22.09.2025 Misc.

1333


815/MP/2025

18.09.2025 22.09.2025 Misc.

1332


302/MP/2022 along with I.A. No. 31/2025, 153/MP/2025

18.09.2025 22.09.2025 Misc.

1331


366/MP/2025

16.09.2025 22.09.2025 Misc.

1330


624/GT/2025

09.09.2025 22.09.2025 Misc.

1329


757/MP/2025 along with IA No.93/2025

18.09.2025 22.09.2025 Misc.

1328


755/TL/2025, 756/AT/2025

18.09.2025 22.09.2025 Licence (Transmission)

1327


723/AT/2025 along with I.A. No. 66/2025

18.09.2025 22.09.2025 Adoption

1326


684/AT/2025

18.09.2025 22.09.2025 Adoption

1325


675/TL/2025, 690/AT/2025

18.09.2025 22.09.2025 Licence (Transmission)

1324


667/MP/2025 along with IA No. 55/2025

18.09.2025 22.09.2025 Misc.

1323


238/AT/2025

18.09.2025 22.09.2025 Adoption

1322


104/MP/2022

18.09.2025 22.09.2025 Misc.

1321


8/RP/2025, 9/RP/2025

18.09.2025 22.09.2025 Review

1320


708/GT/2025

28.08.2025 22.09.2025 Generation

1319


49/GT/2025

28.08.2025 22.09.2025 Generation

1318


227/MP/2024

16.09.2025 19.09.2025 Misc.

1317


203/MP/2024

16.09.2025 19.09.2025 Misc.

1316


622/GT/2025

09.09.2025 19.09.2025 Generation

1315


620/GT/2025

09.09.2025 19.09.2025 Generation

1314


337/GT/2024

09.09.2025 19.09.2025 Generation

1313


79/GT/2025

09.09.2025 19.09.2025 Generation

1312


47/GT/2025

09.09.2025 19.09.2025 Generation

1311


487/TT/2025

16.09.2025 19.09.2025 Transmission

1310


438/TT/2025

16.09.2025 19.09.2025 Transmission

1309


372/TT/2024

16.09.2025 19.09.2025 Transmission

1308


337/TT/2022

16.09.2025 19.09.2025 Transmission

1307


257/TT/2025, 259/TT/2025, 188/TT/2025, 275/TT/2025, 426/TT/2025 and 273/TT/2025

16.09.2025 19.09.2025 Transmission

1306


219/TT/2025

16.09.2025 19.09.2025 Transmission

1305


195/TT/2025, 414/TT/2025, 456/TT/2024, 489/TT/2025 and 495/TT/2025

16.09.2025 19.09.2025 Transmission

1304


38/RP/2023 in 252/MP/2021

16.09.2025 19.09.2025 Review

1303


30/TT/2021

16.09.2025 19.09.2025 Transmission

1302


28/RP/2024 along with IA No. 81/2024 in 255/TT/2021

16.09.2025 19.09.2025 Review

1301


669/MP/2025 along with IA No.56/2025

18.09.2025 19.09.2025 Misc.

1300


781/MP/2025

16.09.2025 19.09.2025 Misc.

1299


736/MP/2025

Petition under Regulation 41 (Power to Relax) and Regulation 42 (Power to Remove Difficulty) read with Regulation 22.4 (b) of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking extension of the current effective/start date of connectivity/GNA of 31.07.2025 till 31.07.2026 on account of delays caused due to the ongoing augmentation works at the Bachau Substation being undertaken by Power Grid Corporation of India Limited (PGCIL), delays in grant of necessary approvals for power drawl by appropriate authorities, and unresolved Right of Way (RoW)/ Law and Order issues, which are in the nature of Force Majeure events and are beyond the control of the Petitioners. Welspun Living Limited (WLL) & Anr.
16.09.2025 19.09.2025 Misc.

1298


94/MP/2023

16.09.2025 19.09.2025 Misc.

1297


642/MP/2025

16.09.2025 19.09.2025 Misc.

1296


550/MP/2025

16.09.2025 19.09.2025 Misc.

1295


328/MP/2024

16.09.2025 19.09.2025 Misc.

1294


296/MP/2025

16.09.2025 19.09.2025 Misc.

1293


288/MP/2024

16.09.2025 19.09.2025 Misc.

1292


265/MP/2022

16.09.2025 19.09.2025 Misc.

1291


261/MP/2024

16.09.2025 19.09.2025 Misc.

1290


181/MP/2021

Petition under Section 79(1)(f) read with Section 79(1)(b) and 79(1)(k) of the Electricity Act, 2003 read with the relevant Regulations seeking issuance of appropriate directions to the Respondent to declare that the Letter of Credit opened by the Respondent is in contravention of the provisions of the PTC-PPA and Procurer-PPA and to direct the Respondent to pay compensation towards such breach of the PPA and also to impose penalty under Regulation 14C for violation of Regulation 7(h) of the CERC (Procedure, Terms and Conditions for Grant of Trading License and Other Related Matters) Regulations, 2009; and to direct the Respondent to refund the excess trading margin and excess rebate charged by the Respondent for the period w.e.f. 31.01.2020 till opening of Payment Security Mechanism (PSM) as per the Procurer-PPA, PTC-PPA and the provisions of the CERC (Procedure, Terms and Conditions for Grant of Trading License and Other Related Matters) Regulations, 2020 issued by this Hon’ble Commission along with Late Payment Surcharge; and to direct that the Respondent shall not be eligible to charge trading margin exceeding 2 Paise/ kWh till such time the Respondent opens PSM in conformity with the PTC-PPA, Procurer-PPA and the applicable Regulations of this Hon’ble Commission. Maruti Clean Coal and Power Limited
16.09.2025 19.09.2025 Misc.

1289


168/MP/2023

16.09.2025 19.09.2025 Misc.

1288


79/MP/2023

16.09.2025 19.09.2025 Misc.

1287


671/MP/2025, 672/MP/2025

16.09.2025 19.09.2025 Misc.

1286


720/MP/2025

10.09.2025 18.09.2025 Misc.

1285


680/MP/2025

10.09.2025 18.09.2025 Misc.

1284


626/GT/2025

09.09.2025 18.09.2025 Misc.

1283


430/MP/2024

10.09.2025 18.09.2025 Misc.

1282


421/MP/2025

10.09.2025 18.09.2025 Misc.

1281


378/MP/2023

10.09.2025 18.09.2025 Misc.

1280


203/MP/2023

10.09.2025 18.09.2025 Misc.

1279


336/MP/2024

10.09.2025 18.09.2025 Misc.

1278


319/MP/2019

10.09.2025 18.09.2025 Misc.

1277


66/MP/2025

10.09.2025 18.09.2025 Misc.

1276


804/MP/2025

16.09.2025 18.09.2025 Misc.

1275


678/TL/2025, 679/AT/2025

16.09.2025 18.09.2025 Licence (Transmission)

1274


513/TL/2024

16.09.2025 18.09.2025 Misc.

1273


371/MP/2024, 272/MP/2024, 273/MP/2024

16.09.2025 18.09.2025 Misc.

1272


126/MP/2017

16.09.2025 18.09.2025 Misc.

1271


112/MP/2023

16.09.2025 18.09.2025 Misc.

1270


71/MP/2023

16.09.2025 18.09.2025 Misc.

1269


4/MP/2021

16.09.2025 18.09.2025 Misc.

1268


655/TT/2025

16.09.2025 18.09.2025 Transmission

1267


304/MP/2025

10.09.2025 18.09.2025 Misc.

1266


219/MP/2023

10.09.2025 18.09.2025 Misc.

1265


124/MP/2022

10.09.2025 18.09.2025 Misc.

1264


67/MP/2021 with IA Nos. 17/2021 & 30/2024

10.09.2025 18.09.2025 Misc.

1263


63/MP/2024

10.09.2025 18.09.2025 Misc.

1262


Diary No. 462/2025 along with IA (Diary) Nos. 463/2025 and 464/2025

09.09.2025 18.09.2025 Misc.

1261


628/GT/2025

09.09.2025 17.09.2025 Generation

1260


364/MP/2025

02.09.2025 17.09.2025 Misc.

1259


700/GT/2025

28.08.2025 17.09.2025 Generation

1258


43/GT/2025

28.08.2025 17.09.2025 Generation

1257


740/GT/2025, 703/GT/2025

28.08.2025 17.09.2025 Generation

1256


699/GT/2025

28.08.2025 17.09.2025 Generation

1255


366/MP/2022, 367/MP/2022

28.08.2025 17.09.2025 Misc.

1254


618/GT/2025

26.08.2025 17.09.2025 Generation

1253


282/MP/2023 along with IA No. 59/2025

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and Ors.
10.09.2025 17.09.2025 Misc.

1252


230/MP/2023

10.09.2025 17.09.2025 Misc.

1251


225/MP/2023

10.09.2025 17.09.2025 Misc.

1250


183/MP/2021

10.09.2025 17.09.2025 Misc.

1249


728/MP/2025 along with IA No. 67/2025

10.09.2025 17.09.2025 Misc.

1248


682/MP/2025

10.09.2025 17.09.2025 Misc.

1247


584/MP/2025 along with IA No.63/2025

10.09.2025 17.09.2025 Misc.

1246


368/MP/2023

10.09.2025 17.09.2025 Misc.

1245


348/MP/2023

10.09.2025 17.09.2025 Misc.

1244


335/MP/2025

10.09.2025 17.09.2025 Misc.

1243


735/AT/2025

02.09.2025 17.09.2025 Adoption

1242


689/TL/2025

09.09.2025 17.09.2025 Licence (Transmission)

1241


482/MP/2024, 483/MP/2024, 296/MP/2024, 297/MP/2024, 442/MP/2024

Petition under Section 79(1)(c) and 79(1)(f) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking quashing of the demand of the one-time GNA charges raised by Central Transmission Utility of India Limited (CTUIL) by way of its letter and emails dated 7.6.2024, 16.7.2024 and 23.07.2024, respectively, on account of the same being not in accordance with the applicable laws and regulations, and consequential refund of Rs. 2,50,71,000/- (Rupees Two Crores Fifty Lakhs Seventy-One Thousand Only) paid by the Petitioner under protest. Apraava Energy Private Limited, Eden Renewable Passy Private Limited, ACME Solar Holdings Limited, Masaya Solar Energy Private Limited
09.09.2025 17.09.2025 Misc.

1240


320/MP/2025

09.09.2025 17.09.2025 Misc.

1239


204/MP/2024 along with IA No. 72/2025

09.09.2025 17.09.2025 Misc.

1238


809/MP/2025 along with IA No. 85/2025

10.09.2025 16.09.2025 Misc.

1237


768/MP/2025 along with IA No. 76/2025 & 77/2025, 769/MP/2025 along with IA No. 78/2025 & 79/2025

02.09.2025 16.09.2025 Misc.

1236


709/GT/2025

28.08.2025 15.09.2025 Generation.

1235


516/GT/2024

28.08.2025 15.09.2025 Generation

1234


440/GT/2024

28.08.2025 15.09.2025 Generation

1233


44/GT/2025

28.08.2025 15.09.2025 Generation

1232


677/GT/2025

26.08.2025 15.09.2025 Generation

1231


676/GT/2025

26.08.2025 15.09.2025 Generation

1230


258/MP/2024

26.08.2025 15.09.2025 Misc.

1229


91/GT/2023

26.08.2025 15.09.2025 Generation

1228


688/TL/2025

09.09.2025 15.09.2025 Licence (Transmission)

1227


320/MP/2025

09.09.2025 15.09.2025 Misc.

1226


248/MP/2023

09.09.2025 15.09.2025 Misc.

1225


188/MP/2021

09.09.2025 15.09.2025 Misc.

1224


85/MP/2021

09.09.2025 15.09.2025 Misc.

1223


718/GT/2025

26.08.2025 11.09.2025 Generation

1222


707/GT/2025

28.08.2025 11.09.2025 Generation

1221


706/GT/2025

28.08.2025 11.09.2025 Generation

1220


705/GT/2025

28.08.2025 11.09.2025 Generation

1219


704/GT/2025

28.08.2025 11.09.2025 Generation

1218


463/MP/2014 along with IA No. 40/2019. OP No. 71/2012, OP No. 72/2012

02.09.2025 09.09.2025 Misc.

1217


429/MP/2025

02.09.2025 09.09.2025 Misc.

1216


716/MP/2025, 717/MP/2025, 721/MP/2025, 726/MP/2025

02.09.2025 08.09.2025 Misc.

1215


338/MP/2025

02.09.2025 08.09.2025 Misc.

1214


302/MP/2025

02.09.2025 08.09.2025 Misc.

1213


331/MP/2025

02.09.2025 06.09.2025 Misc.

1212


713/MP/2025

02.09.2025 06.09.2025 Misc.

1211


675/TL/2025, 690/AT/2025

02.09.2025 06.09.2025 Licence (Transmission)

1210


180/MP/2019 along with IA Nos. 32/2023 & 20/2024

02.09.2025 06.09.2025 Misc.

1209


686/TL/2025

Petition under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 for grant of separate RTM Transmission License to POWERGRID Bikaner IV Transmission Limited to implement transmission project “Augmentation of 2x500 MVA (7th & 8th), 400/220 kV ICTs along with 220 kV Sectionalizer bay (1 set), 220 kV BC (1 no.) bay and 220 kV TBC (1 no.) bay at Bikaner-IV PS & Implementation of 3 nos. of 220 kV line bays for interconnection of M/s Furies Solren Private Limited (300MW) [1 no. bay] & M/s SJVN Green Energy Limited (500MW) [2 no. bays] RE power projects at 765/400/220kV Bikaner-IV PS under “Regulated Tariff Mechanism” (RTM) Mode. POWERGRID Bikaner IV Transmission Limited
02.09.2025 06.09.2025 Licence (Transmission)

1208


41/MP/2014, 14/MP/2014, 327/MP/2013

02.09.2025 06.09.2025 Misc.

1207


162/MP/2025, 163/MP/2025, 164/MP/2025, 165/MP/2025, 168/MP/2025 and 173/MP/2025

02.09.2025 06.09.2025 Misc.

1206


327/MP/2025 along with IA No. 20/2025

28.08.2025 04.09.2025 Generation

1205


127/MP/2025

28.08.2025 04.09.2025 Misc.

1204


753/RC/2025, 754/RC/2025, 674/RC/2025

28.08.2025 04.09.2025 Misc.

1203


739/MP/2025 along with IA (Diary) No. 433/2025

26.08.2025 04.09.2025 Misc.

1202


554/MP/2025 along with IA No. 44/2025

29.07.2025 04.09.2025 Misc.

1201


698/GT/2025

28.08.2025 03.09.2025 Generation

1200


697/GT/2025

28.08.2025 03.09.2025 Generation

1199


30/MP/2025

28.08.2025 03.09.2025 Misc.

1198


702/GT/2025

28.08.2025 03.09.2025 Generation

1197


711/GT/2025

07.08.2025 03.09.2025 Generation

1196


710/GT/2025

28.08.2025 03.09.2025 Generation

1195


712/GT/2025

28.08.2025 03.09.2025 Generation

1194


422/MP/2024 along with IA No. 90/2024

28.08.2025 03.09.2025 Misc.

1193


701/GT/2025

28.08.2025 03.09.2025 Generation

1192


31/MP/2025

28.08.2025 03.09.2025 Misc.

1191


547/MP/2025

26.08.2025 03.09.2025 Misc.

1190


474/TT/2024, 16/TT/2025, 151/TT/2025, 190/TT/2025, 267/TT/2025 and 387/TT/2025

28.08.2025 02.09.2025 Transmission

1189


617/MP/2020

28.08.2025 02.09.2025 Misc.

1188


319/MP/2022 alongwith IA Nos. 63/IA/2022 and 19/IA/2025

28.08.2025 02.09.2025 Misc.

1187


263/MP/2022

26.08.2025 02.09.2025 Misc.

1186


517/MP/2024

28.08.2025 02.09.2025 Misc.

1185


336/MP/2025

28.08.2025 02.09.2025 Misc.

1184


314/MP/2025

28.08.2025 02.09.2025 Misc.

1183


292/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 17 of the power purchase agreements dated 25.11.2021 seeking declaration that change in rate of Goods and Services Tax from 5% to 12% on renewable energy equipment w.e.f. 01.10.2021 on account of amendment to Notification No. 01/2017-Central Tax (Rate) dated 28.06.2017 vide Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 amounts to a ‘Change in Law’ event under Article 17 of the Power Purchase Agreements and to further direct the Respondents to pay compensation along with carrying cost towards additional amount incurred on account of increment in of Goods and Services Tax paid by the Petitioner pursuant to Notifications dated 30.09.2021 and to restitute the Petitioner to the same financial position as it would have been due continuation of Goods and Services Tax rate of 5% which was applicable till 30.09.2021. Talettutayi Solar Projects Nine Private Limited
28.08.2025 02.09.2025 Misc.

1182


324/MP/2022

26.08.2025 02.09.2025 Misc.

1181


325/MP/2025, 339/MP/2025

26.08.2025 02.09.2025 Misc.

1180


58/MP/2023, 215/MP/2023

26.08.2025 02.09.2025 Misc.

1179


36/MP/2024 along with IA No. 43/2025

26.08.2025 02.09.2025 Misc.

1178


430/MP/2024

28.08.2025 01.09.2025 Misc.

1177


169/MP/2022

28.08.2025 01.09.2025 Misc.

1176


111/MP/2021 with IA No. 38/2021

28.08.2025 01.09.2025 Misc.

1175


625/GT/2025

19.08.2025 01.09.2025 Generation

1174


346/MP/2020 along with IA No.24/2024

19.08.2025 01.09.2025 Misc.

1173


317/MP/2025 with IA No. 58/2025

19.08.2025 01.09.2025 Misc.

1172


303/MP/2025 with IA No. 53/2025

19.08.2025 01.09.2025 Misc.

1171


724/AT/2025, 725/TL/2025

28.08.2025 01.09.2025 Adoption

1170


722/AT/2025

28.08.2025 01.09.2025 Adoption

1169


546/MP/2025

28.08.2025 01.09.2025 Misc.

1168


339/MP/2022

28.08.2025 01.09.2025 Misc.

1167


332/MP/2025, 280/MP/2025

28.08.2025 01.09.2025 Misc.

1166


239/MP/2024 along with IA Nos. 8/2025 and 70/2025

28.08.2025 01.09.2025 Misc.

1165


390/TT/2025

19.08.2025 01.09.2025 Transmission

1164


396/TT/2024, 211/TT/2024, 213/TT/2024, 196/TT/2025

19.08.2025 01.09.2025 Transmission

1163


Corrigendum to 513/TL/2024

07.07.2025 01.09.2025 Licence (Transmission)

1162


463/MP/2014 along with IA No. 40/2019, OP No. 71/2012, OP No. 72/2012

19.08.2025 31.08.2025 Misc.

1161


Corrigendum to 283/MP/2025

05.08.2025 31.08.2025 Misc.

1160


Corrigendum to 640/TT/2025

12.08.2025 29.08.2025 Misc.

1159


117/MP/2023 with IAs No. 79/2023, 86/2024 & 87/2024

26.08.2025 29.08.2025 Misc.

1158


285/TT/2024, 80/TT/2025

26.08.2025 29.08.2025 Transmission

1157


212/TT/2024, 284/TT/2024, 408/TT/2024, 446/TT/2024, 59/TT/2025, 262/TT/2025

26.08.2025 29.08.2025 Transmission

1156


197/TT/2025, 268/TT/2025, 269/TT/2024, 270/TT/2025, 329/TT/2025, 597/TT/2025

26.08.2025 29.08.2025 Transmission

1155


683/TT/2025

26.08.2025 29.08.2025 Transmission

1154


251/TT/2024

26.08.2025 29.08.2025 Transmission

1153


192/TT/2025

26.08.2025 29.08.2025 Transmission

1152


189/TT/2025, 378/TT/2025

26.08.2025 29.08.2025 Transmission

1151


146/MP/2017
(on remand)

26.08.2025 29.08.2025 Misc.

1150


727/MP/2025

26.08.2025 29.08.2025 Misc.

1149


684/AT/2025

12.08.2025 29.08.2025 Adoption

1148


670/MP/2025

Petition under Section 79 of Electricity Act, 2003 read with Article 17 of the Power Purchase Agreements dated 25.11.2021 (PPAs) executed between Avaada Sunshine Energy Private Limited, West Central Railway & Rewa Ultra Mega Solar Limited, and Avaada Sunshine Energy Private Limited, Madhya Pradesh Power Management Company Limited & Rewa Ultra Mega Solar Limited seeking declaration that change in Goods and Services Tax from 5% to 12% and 13.8%, respectively w.e.f. 01.10.2021 by way of GST Amendment Notifications qualifies as ‘Change in Law’ event under Article 17 of the PPAs and consequently, direction to respondents to compensate the Petitioner towards additional expenditure incurred on account of the ‘Change in Law’ event along with carrying cost. Avaada Sunshine Energy Private Limited
26.08.2025 29.08.2025 Misc.

1147


488/MP/2024

26.08.2025 29.08.2025 Misc.

1146


239/MP/2021 with IA Nos. 47/2023, 107/2024 & IA (Dy.) No. 301/2025

26.08.2025 29.08.2025 Misc.

1145


435/MP/2024 alongwith IA No. 93/2024

26.08.2025 29.08.2025 Misc.

1144


116/MP/2022

26.08.2025 29.08.2025 Misc.

1143


678/TL/2025, 679/AT/2025

19.08.2025 29.08.2025 Licence (Transmission)

1142


482/TT/2019, 676/TT/2020

19.08.2025 26.08.2025 Transmission

1141


385/TT/2025, 210/TT/2024

19.08.2025 26.08.2025 Transmission

1140


143/TT/2025

19.08.2025 26.08.2025 Transmission

1139


91/MP/2024 along with IA Nos. 60/2025 & 61/2025

19.08.2025 26.08.2025 Misc.

1138


623/GT/2025

19.08.2025 26.08.2025 Generation

1137


336/MP/2024

19.08.2025 26.08.2025 Misc.

1136


321/MP/2025

19.08.2025 26.08.2025 Misc.

1135


236/GT/2021

19.08.2025 26.08.2025 Generation

1134


39/GT/2025

07.08.2025 26.08.2025 Generation

1133


632/MP/2025

12.08.2025 25.08.2025 Misc.

1132


455/MP/2019, 65/MP/2020, 618/MP/2020

13.08.2025 25.08.2025 Misc.

1131


383/TT/2025

19.08.2025 25.08.2025 Transmission

1130


343/TT/2025

19.08.2025 25.08.2025 Transmission

1129


265/TT/2025

19.08.2025 25.08.2025 Transmission

1128


102/TT/2025

19.08.2025 25.08.2025 Transmission

1127


61/MP/2022

19.08.2025 25.08.2025 Transmission

1126


448/TT/2024, 12/TT/2025

19.08.2025 25.08.2025 Transmission

1125


214/TT/2024, 299/TT/2024, 300/TT/2024, 373/TT/2024, 390/TT/2024, 501/TT/2024, 502/TT/2024 and 266/TT/2025

19.08.2025 25.08.2025 Transmission

1124


235/MP/2021

19.08.2025 25.08.2025 Misc.

1123


219/MP/2023

19.08.2025 25.08.2025 Misc.

1122


159/MP/2025

19.08.2025 25.08.2025 Misc.

1121


79/MP/2023

19.08.2025 25.08.2025 Misc.

1120


277/MP/2024 alongwith IA Nos. 25/2025 & 26/2025, 446/MP/2024

12.08.2025 20.08.2025 Misc.

1119


584/MP/2025 alongwith I.A. No.63/2025

Petition under Section 79 of the Electricity Act, 2003 read with Regulations 10, 41 and 42 of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking deferment of the Start Date of the Hindustan Zinc Limited’s 250 MW GNARE intimated vide notices dated 25.02.2025 and 25.03.2025 issued by Central Transmission Utility of India Limited, and quashing of the Central Transmission Utility of India Limited’s notice dated 23.04.2025 and the National Load Despatch Centre’s Notification of Transmission charges payable by DICs for Billing Month of May, 2025 dated 28.04.2025 imposing arbitrary and illegal financial liabilities (Interlocutory application bringing on record subsequent developments, and seeking interim relief and urgent listing). Hindustan Zinc Limited
12.08.2025 20.08.2025 Misc.

1118


15/TT/2025, 22/TT/2025, 58/TT/2024, 60/TT/2025 and 93/TT/2025

19.08.2025 20.08.2025 Transmission

1117


320/MP/2022

12.08.2025 18.08.2025 Misc.

1116


268/MP/2020

12.08.2025 18.08.2025 Misc.

1115


254/MP/2024

12.08.2025 18.08.2025 Misc.

1114


474/GT/2025

07.08.2025 18.08.2025 Generation

1113


458/GT/2025

07.08.2025 18.08.2025 Generation

1112


46/GT/2025

07.08.2025 18.08.2025 Generation

1111


48/MP/2025

05.08.2025 18.08.2025 Misc.

1110


667/MP/2025 along with IA No. 55/2025

12.08.2025 18.08.2025 Misc.

1109


240/MP/2024 along with IA No.56/2024

05.08.2025 18.08.2025 Misc.

1108


244/AT/2025, 245/TL/2025

05.08.2025 18.08.2025 Adoption

1107


430/MP/2025

05.08.2025 18.08.2025 Misc.

1106


546/MP/2025

05.08.2025 18.08.2025 Misc.

1105


715/MP/2025

12.08.2025 18.08.2025 Misc.

1104


693/MP/2025 along with I.A. No.62/2025

12.08.2025 18.08.2025 Misc.

1103


282/MP/2023 along with IA No. 59/2025

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and Ors.
12.08.2025 18.08.2025 Misc.

1102


255/MP/2025 alongwith IA No. 13/2025

12.08.2025 18.08.2025 Misc.

1101


640/TT/2025, 389/TT/2025, 382/TT/2025

12.08.2025 18.08.2025 Transmission

1100


672/MP/2025

05.08.2025 18.08.2025 Misc.

1099


689/TL/2025

12.08.2025 18.08.2025 Licence (Transmission)

1098


686/TL/2025

Petition under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 for grant of separate RTM Transmission License to POWERGRID Bikaner IV Transmission Limited to implement transmission project “Augmentation of 2x500 MVA (7th & 8th), 400/220 kV ICTs along with 220 kV Sectionalizer bay (1 set), 220 kV BC (1 no.) bay and 220 kV TBC (1 no.) bay at Bikaner-IV PS & Implementation of 3 nos. of 220 kV line bays for interconnection of M/s Furies Solren Private Limited (300MW) [1 no. bay] & M/s SJVN Green Energy Limited (500MW) [2 no. bays] RE power projects at 765/400/220kV Bikaner-IV PS under “Regulated Tariff Mechanism” (RTM) Mode. POWERGRID Bikaner IV Transmission Limited
12.08.2025 18.08.2025 Licence (Transmission)

1097


248/MP/2023

12.08.2025 18.08.2025 Misc.

1096


631/MP/2025

12.08.2025 18.08.2025 Misc.

1095


688/TL/2025

12.08.2025 18.08.2025 Licence (Transmission)

1094


338/MP/2025

12.08.2025 18.08.2025 Misc.

1093


404/2025 along with IA (Diary) No. 405/2025

07.08.2025 18.08.2025 Misc.

1092


723/AT/2025

12.08.2025 16.08.2025 Adoption

1091


322/TL/2024

12.08.2025 16.08.2025 Licence (Transmission)

1090


282/MP/2021, 141/MP/2022

07.08.2025 16.08.2025 Misc.

1089


129/GT/2025

07.08.2025 14.08.2025 Generation

1088


54/GT/2025

07.08.2025 14.08.2025 Generation

1087


50/GT/2025

07.08.2025 14.08.2025 Generation

1086


40/GT/2025

07.08.2025 14.08.2025 Generation

1085


315/MP/2023

13.08.2025 14.08.2025 Misc.

1084


410/TT/2025

12.08.2025 14.08.2025 Transmission

1083


261/MP/2024

07.08.2025 14.08.2025 Misc.

1082


316/MP/2025

12.08.2025 13.08.2025 Misc.

1081


669/MP/2025 alongwith IA Nos. 56/2025 & 68/2025

12.08.2025 14.08.2025 Misc.

1080


250/MP/2022, 251/MP/2022, 252/MP/2022

05.08.2025 14.08.2025 Misc.

1079


283/MP/2025

05.08.2025 14.08.2025 Misc.

1078


315/MP/2025

12.08.2025 13.08.2025 Misc.

1077


673/MP/2025

12.08.2025 13.08.2025 Misc.

1076


655/TT/2025

22.07.2025 13.08.2025 Transmission

1075


695/MP/2025

07.08.2025 13.08.2025 Misc.

1074


126/MP/2017

07.08.2025 13.08.2025 Misc.

1073


417/MP/2024

05.08.2025 12.08.2025 Misc.

1072


581/MP/2025

05.08.2025 12.08.2025 Misc.

1071


369/MP/2025

05.08.2025 12.08.2025 Misc.

1070


368/MP/2025

05.08.2025 12.08.2025 Misc.

1069


184/MP/2019
(On remand from APTEL)

07.08.2025 12.08.2025 Misc.

1068


455/MP/2019, 65/MP/2020, 618/MP/2020

31.07.2025 12.08.2025 Misc.

1067


378/MP/2023

29.07.2025 12.08.2025 Misc.

1066


205/MP/2024 along with IAs No. 49/2024 and 50/2024

29.07.2025 12.08.2025 Misc.

1065


265/MP/2024

30.07.2025 12.08.2025 Misc.

1064


78/MP/2024

29.07.2025 12.08.2025 Misc.

1063


675/TL/2025, 690/AT/2025

05.08.2025 12.08.2025 Licence (Transmission)

1062


337/MP/2025

07.08.2025 11.08.2025 Misc.

1061


IA No.18/2025 in 227/MP/2022

07.08.2025 11.08.2025 Misc.

1060


41/MP/2023 along with IA No.6/2023

07.08.2025 11.08.2025 Misc.

1059


242/MP/2024 along with IA No.57/2024, 216/MP/2024 along with IA No.66/2024 271/MP/2024

29.07.2025 11.08.2025 Misc.

1058


614/MP/2025

07.08.2025 11.08.2025 Misc.

1057


617/AT/2025

07.08.2025 11.08.2025 Adoption.

1056


643/AT/2025

05.08.2025 11.08.2025 Adoption.

1055


180/MP/2025, 261/MP/2025

05.08.2025 10.08.2025 Misc.

1054


183/MP/2021

31.07.2025 08.08.2025 Misc.

1053


615/MP/2025

31.07.2025 08.08.2025 Misc.

1052


517/MP/2024

31.07.2025 08.08.2025 Misc.

1051


383/MP/2023, 384/MP/2023, 12/MP/2024

31.07.2025 08.08.2025 Misc.

1050


295/MP/2024

31.07.2025 08.08.2025 Misc.

1049


141/MP/2024 along with IA Nos. 29/2024

31.07.2025 08.08.2025 Misc.

1048


91/MP/2024 along with IA Nos. 60/2025 and 61/2025

31.07.2025 08.08.2025 Misc.

1047


445/TD/2025

31.07.2025 08.08.2025 Licence

1046


230/MP/2023

05.08.2025 08.08.2025 Misc.

1045


671/MP/2025

05.08.2025 08.08.2025 Misc.

1044


244/AT/2025, 245/TL/2025

05.08.2025 08.08.2025 Adoption

1043


315/MP/2023

31.07.2025 08.08.2025 Misc.

1042


616/MP/2025 along with IA No.50/2025

05.08.2025 08.08.2025 Misc.

1041


368/MP/2023

31.07.2025 08.08.2025 Misc.

1040


238/MP/2024

31.07.2025 08.08.2025 Misc.

1039


107/MP/2024

30.07.2025 08.08.2025 Misc.

1038


244/MP/2024

29.07.2025 08.08.2025 Misc.

1037


258/MP/2024

31.07.2025 05.08.2025 Misc.

1036


111/MP/2021 with IA No. 38/2021

31.07.2025 05.08.2025 Misc.

1035


317/MP/2025 with IA No. 58/2025

31.07.2025 04.08.2025 Misc.

1034


203/MP/2023

30.07.2025 04.08.2025 Misc.

1033


2/MP/2014

29.07.2025 04.08.2025 Misc.

1032


336/MP/2024

29.07.2025 04.08.2025 Misc.

1031


674/RC/2025

31.07.2025 04.08.2025 Licence

1030


9/RP/2024 along with
IA No. 19/IA/2024

30.07.2025 04.08.2025 Review

1029


562/MP/2020

30.07.2025 04.08.2025 Misc.

1028


685/MP/2025

30.07.2025 04.08.2025 Misc.

1027


273/MP/2023

30.07.2025 04.08.2025 Misc.

1026


198/MP/2023

30.07.2025 04.08.2025 Misc.

1025


196/MP/2023,
207/MP/2023,
208/MP/2023

30.07.2025 04.08.2025 Misc.

1024


188/MP/2019 along with
IA No.66/2019

30.07.2025 04.08.2025 Misc.

1023


182/MP/2023

30.07.2025 04.08.2025 Misc.

1022


180/MP/2023,
245/MP/2024,
184/MP/2023,
164/MP/2024,
165/MP/2024,
167/MP/2024

30.07.2025 04.08.2025 Misc.

1021


429/MP/2025

29.07.2025 04.08.2025 Misc.

1020


146/MP/2017 (on remand)

29.07.2025 01.08.2025 Misc.

1019


649/GT/2025,
53/GT/2025

22.07.2025 01.08.2025 Generation

1018


648/GT/2025,
647/GT/2025

22.07.2025 01.08.2025 Generation

1017


668/TD/2025

29.07.2025 01.08.2025 Licence

1016


376/TT/2025,
384/TT/2025

22.07.2025 01.08.2025 Transmission

1015


201/TT/2025,
202/TT/2025
and 363/TT/2025

22.07.2025 01.08.2025 Transmission

1014


273/TT/2025

22.07.2025 01.08.2025 Transmission

1013


219/TT/2025

22.07.2025 01.08.2025 Transmission

1012


652/GT/2025,
651/GT/2025

22.07.2025 31.07.2025 Generation

1011


654/GT/2025,
653/GT/2025

22.07.2025 31.07.2025 Generation

1010


42/GT/2025, 45/GT/2025

22.07.2025 31.07.2025 Generation

1009


204/MP/2024 along with IA (Diary) No.345/2025

29.07.2025 30.07.2025 Misc.

1008


452/MP/2025 along with IA No.38/2025

29.07.2025 30.07.2025 Misc.

1007


456/TT/2024

22.07.2025 30.07.2025 Transmission

1006


489/TT/2025, 495/TT/2025, 414/TT/2025

22.07.2025 30.07.2025 Transmission

1005


426/TT/2025

22.07.2025 30.07.2025 Transmission

1004


275/TT/2025

22.07.2025 30.07.2025 Transmission

1003


188/TT/2025

22.07.2025 30.07.2025 Transmission

1002


487/TT/2025

22.07.2025 29.07.2025 Transmission

1001


258/TT/2025

22.07.2025 29.07.2025 Transmission

1000


438/TT/2025

22.07.2025 29.07.2025 Transmission

999


437/TT/2025

22.07.2025 29.07.2025 Transmission

998


436/TT/2025

22.07.2025 29.07.2025 Transmission

997


271/TT/2025, 409/TT/2025

22.07.2025 29.07.2025 Transmission

996


263/TT/2025, 372/TT/2024

22.07.2025 29.07.2025 Transmission

995


259/TT/2025

22.07.2025 29.07.2025 Transmission

994


257/TT/2025

22.07.2025 29.07.2025 Transmission

993


208/TT/2024

22.07.2025 29.07.2025 Transmission

992


195/TT/2025

22.07.2025 29.07.2025 Transmission

991


650/GT/2025

22.07.2025 28.07.2025 Generation

990


646/GT/2025, 645/GT/2025

22.07.2025 28.07.2025 Generation

989


485/GT/2024

22.07.2025 28.07.2025 Generation

988


475/GT/2025

22.07.2025 28.07.2025 Generation

987


220/MP/2022, 378/MP/2022

22.07.2025 28.07.2025 Misc.

986


348/MP/2025 Along with IA No. 27/2025

17.07.2025 25.07.2025 Misc.

985


250/TT/2024

22.07.2025 23.07.2025 Transmission

984


202/MP/2023, 272/MP/2023, 236/MP/2023, 286/MP/2023, 335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024, 139/MP/2024, 334/MP/2024, 121/MP/2024, 124/MP/2024, 142/MP/2024, 195/MP/2024, 98/MP/2024, 519/MP/2024, 115/MP/2025, 117/MP/2025, 146/MP/2025, 145/MP/2025, 144/MP/2025, 116/MP/2025

Petition under Section 79(1)(b) &(f) of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Article 12 of Power Purchase Agreement dated 8.12.2021 seeking Working Group Report 2022 as Change in Law Event. TP Saurya Limited, NTPC Limited, Adani Wind Energy MP One Private Limited, Azure Power Maple Private Limited, Ostro Kannada Power Private Limited, Adani Wind Energy Kutchh One Ltd., NTPC Green Energy Limited, Ayana Renewable Power Six Private Limited, Tata Power Renewable Energy Limited, Talettutayi Solar Projects Nine Private Limited, ReNew Surya Aayan Private Limited, Solar Energy Jaisalmer Two Private Limited, ACME Dhaulpur Powertech Private Limited & Anr, Megasolis Renewables Private Limited, Mega Suryaurja Private Limited
16.07.2025 22.07.2025 Misc.

983


334/MP/2025

17.07.2025 22.07.2025 Misc.

982


245/MP/2021

17.07.2025 22.07.2025 Misc.

981


203/MP/2024

17.07.2025 22.07.2025 Misc.

980


463/MP/2014 along with IA No. 40/2019, OP No. 71/2012, OP No. 72/2012

16.07.2025 22.07.2025 Misc.

979


260/AT/2025

16.07.2025 21.07.2025 Adoption

978


304/MP/2025

17.07.2025 21.07.2025 Misc.

977


302/MP/2025

17.07.2025 21.07.2025 Misc.

976


301/MP/2025

17.07.2025 21.07.2025 Misc.

975


284/MP/2025

17.07.2025 21.07.2025 Misc.

974


244/AT/2025, 245/TL/2025

17.07.2025 21.07.2025 Adoption

973


180/MP/2019 along with IA Nos. 32/2023 & 20/2024

17.07.2025 21.07.2025 Misc.

972


177/MP/2025

17.07.2025 21.07.2025 Misc.

971


94/MP/2023, 265/MP/2022

17.07.2025 21.07.2025 Misc.

970


666/MP/2025 along with IA No.54/2025

17.07.2025 21.07.2025 Misc.

969


657/MP/2025

17.07.2025 21.07.2025 Misc.

968


550/MP/2025

17.07.2025 21.07.2025 Misc.

967


441/TL/2025, 440/AT/2025

17.07.2025 21.07.2025 Licence (Transmission)

966


371/MP/2024, 272/MP/2024, 273/MP/2024

17.07.2025 21.07.2025 Misc.

965


323/MP/2025, 333/MP/2025

17.07.2025 21.07.2025 Misc.

964


308/MP/2025

17.07.2025 21.07.2025 Misc.

963


305/MP/2025

17.07.2025 21.07.2025 Misc.

962


411/MP/2024

17.07.2025 21.07.2025 Misc.

961


38/RP/2023 in 252/MP/2021

16.07.2025 21.07.2025 Review

960


28/RP/2024 along with IA No. 81/2024 in 255/TT/2021

16.07.2025 21.07.2025 Review

959


425/MP/2024

16.07.2025 21.07.2025 Misc.

958


585/MP/2025

16.07.2025 21.07.2025 Misc.

957


470/TL/2025

16.07.2025 21.07.2025 Licence (Transmission)

956


380/MP/2023

16.07.2025 21.07.2025 Misc.

955


358/MP/2023 along with IA Nos. 90/2023 and 33/2025

16.07.2025 21.07.2025 Misc.

954


264/MP/2022

16.07.2025 21.07.2025 Misc.

953


484/MP/2024 along with IA No. 98/2024

08.07.2025 17.07.2025 Misc.

952


435/MP/2024 alongwith IA No. 93/2024

08.07.2025 15.07.2025 Misc.

951


92/MP/2023 with IA No. 24/2023

08.07.2025 14.07.2025 Misc.

950


54/MP/2019, 140/MP/2019

08.07.2025 14.07.2025 Misc.

949


302/MP/2022 along with I.A. No. 31/2025

07.07.2025 14.07.2025 Misc.

948


253/MP/2024

07.07.2025 14.07.2025 Misc.

947


227/MP/2024

07.07.2025 14.07.2025 Misc.

946


164/MP/2023, 166/MP/2023

07.07.2025 14.07.2025 Misc.

945


165/MP/2023

07.07.2025 14.07.2025 Misc.

944


98/MP/2023

07.07.2025 14.07.2025 Misc.

943


303/MP/2025 with IA No. 53/2025

07.07.2025 14.07.2025 Misc.

942


336/MP/2024

07.07.2025 14.07.2025 Misc.

941


117/MP/2023 with IAs No. 79/2023, 86/2024 & 87/2024

08.07.2025 14.07.2025 Misc.

940


513/TL/2024, 514/AT/2024

07.07.2025 14.07.2025 Licence (Transmission)

939


658/MP/2025

08.07.2025 14.07.2025 Misc.

938


644/MP/2025

08.07.2025 14.07.2025 Misc.

937


558/MP/2025

08.07.2025 14.07.2025 Misc.

936


79/MP/2023

08.07.2025 14.07.2025 Misc.

935


58/MP/2023, 215/MP/2023

08.07.2025 14.07.2025 Misc.

934


53/MP/2023 alongwith IA No. 11/2023, 167/MP/2023 alongwith IA No. 32/2024, 258/MP/2023 alongwith IA No. 59/2023, 267/MP/2023

08.07.2025 14.07.2025 Misc.

933


254/MP/2024

07.07.2025 11.07.2025 Misc.

932


269/MP/2018 along with IA Nos. 22 & 26 of 2024

08.07.2025 09.07.2025 Misc.

931


78/MP/2023

08.07.2025 09.07.2025 Misc.

930


(Diary) Nos.333/2025 along with IA (Diary) Nos. 338 & 339/2025

07.07.2025 09.07.2025 Misc.

929


348/MP/2023

07.07.2025 09.07.2025 Misc.

928


425/MP/2025

07.07.2025 09.07.2025 Misc.

927


617/AT/2025

03.07.2025 09.07.2025 Adoption

926


296/MP/2025

07.07.2025 09.07.2025 Misc.

925


261/MP/2024

07.07.2025 09.07.2025 Misc.

924


105/MP/2024

07.07.2025 09.07.2025 Misc.

923


63/MP/2024

07.07.2025 09.07.2025 Misc.

922


553/TD/2025

07.07.2025 09.07.2025 Licence

921


230/MP/2023

07.07.2025 09.07.2025 Misc.

920


192/MP/2021, 235/MP/2023 along with IA No.56/2023

Petition under Sections 79(1)(c), 79(1)(f) and 79(1)(k) of the Electricity Act, 2003, read with Article 4.5(a) of the Power Purchase Agreement (PPA) dated 20.8.2019 executed between the Petitioner and Solar Energy Corporation of India Limited (SECI), read with the back-toback Power Sale Agreements (PSAs) dated 17.6.2019 and 26.6.2019 executed between SECI and BSES Yamuna Power Limited (BYPL) and Tata Power Delhi Distribution Limited (TPDDL), respectively, seeking extension of Scheduled Commercial Operation Date (SCOD) and based on the extension of SCOD sought in the instant petition, seeking consequent deferment of operationalization of Long-Term Access (LTA) granted by the Central Transmission Utility of India Limited (CTUIL) to the Petitioner. SBSR Power Cleantech Eleven Private Limited, Tata Power Delhi Distribution Limited
07.07.2025 09.07.2025 Misc.

919


168/MP/2023

07.07.2025 09.07.2025 Misc.

918


112/MP/2023

07.07.2025 09.07.2025 Misc.

917


319/MP/2022 alongwith IA Nos. 63/IA/2022 and 19/IA/2025

03.07.2025 07.07.2025 Misc.

916


235/MP/2021

03.07.2025 07.07.2025 Misc.

915


320/MP/2022

02.07.2025 07.07.2025 Misc.

914


319/MP/2019

02.07.2025 07.07.2025 Misc.

913


220/MP/2022, 378/MP/2022

02.07.2025 07.07.2025 Misc.

912


169/MP/2022 along with I.A. Nos. 39/2022 and 40/2022

02.07.2025 07.07.2025 Misc.

911


47/GT/2025

24.06.2025 07.07.2025 Generation

910


622/GT/2025

24.06.2025 07.07.2025 Generation

909


621/GT/2025

24.06.2025 07.07.2025 Generation

908


620/GT/2025

24.06.2025 07.07.2025 Generation

907


619/GT/2025

24.06.2025 07.07.2025 Generation

906


618/GT/2025

24.06.2025 07.07.2025 Generation

905


341/GT/2025

24.06.2025 07.07.2025 Generation

904


337/GT/2024

24.06.2025 07.07.2025 Generation

903


586/MP/2025

03.07.2025 04.07.2025 Misc.

902


582/AT/2025

03.07.2025 04.07.2025 Adoption

901


556/AT/2025

03.07.2025 04.07.2025 Adoption

900


457/AT/2025

03.07.2025 04.07.2025 Adoption

899


264/MP/2022

03.07.2025 04.07.2025 Misc.

898


240/MP/2023, 302/MP/2023

03.07.2025 04.07.2025 Misc.

897


186/MP/2021

03.07.2025 04.07.2025 Misc.

896


85/MP/2021 along with IA Nos.26/2021, 6/2025 and 14/2025

03.07.2025 04.07.2025 Misc.

895


67/MP/2021 along with IA Nos.30/2024

03.07.2025 04.07.2025 Misc.

894


IA No. 18/2025 in 227/MP/2022

03.07.2025 04.07.2025 Misc.

893


340/MP/2022, 341/MP/2022

02.07.2025 04.07.2025 Misc.

892


315/MP/2022

Petition under Section 38 read with Section 79(1)(c), Section 79(1)(f), Section 79(1)(k) of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2010, Central Electricity Regulatory Commission (Sharing of Inter- State Transmission Charges and Losses) Regulations, 2020 and Clause 10.3 (g) of the Billing, Collection and Disbursement Procedure issued by CTUIL under CERC Sharing Regulations 2020 dated 1.1.2021 for recovery of interest from Central Transmission Utility of India on delay in reimbursement of excess Transmission Charges paid by Sembcorp Energy India Limited towards Bill of Supply for PoC Bill-1 for the month of October 2020 and November 2020 raised by CTUIL. Sembcorp Energy India Limited
02.07.2025 04.07.2025 Misc.

891


314/MP/2022

02.07.2025 04.07.2025 Misc.

890


219/MP/2023

02.07.2025 04.07.2025 Misc.

889


204/MP/2022 along with IA No.16/2023

02.07.2025 04.07.2025 Misc.

888


188/MP/2021

02.07.2025 04.07.2025 Misc.

887


163/MP/2022

02.07.2025 04.07.2025 Misc.

886


126/MP/2022

02.07.2025 04.07.2025 Misc.

885


124/MP/2022

02.07.2025 04.07.2025 Misc.

884


61/MP/2022

02.07.2025 04.07.2025 Misc.

883


424/MP/2025

24.06.2025 04.07.2025 Misc.

882


657/MP/2025

24.06.2025 02.07.2025 Misc.

881


251/TT/2024

20.06.2025 30.06.2025 Transmission

880


384/TT/2025

20.06.2025 30.06.2025 Transmission

879


191/TT/2025

Petition for determination of tariff for Asset 1- Bypassing of Parli(PG) - Parli(M) 400kV Line Ckt 1 and Parli(PG)-Parli(New) 400kV (quad) Line Ckt 1 at the outskirts of Parli(PG) S/s so as to form Parli(M)-Parli(New) 400kV Ckt 1 direct Line, Reconductoring of Parli(PG)-Parli(M) 400kV line Ckt 1 section with twin HTLS conductor with a minimum capacity of 1940 MVA per circuit at a nominal voltage, 400kV bay upgradation work for above line bays at Parli(M) S/s (The current rating of existing bays upgraded from 2000A to 3150A to suit the reconductoring with Twin HTLS conductor) and Asset 2- Bypassing of Parli(PG) - Parli(M) 400kV Line Ckt 2 and Parli(PG)-Parli(New) 400kV (quad) Line Ckt 2 at the outskirts of Parli(PG) S/s so as to form Parli(M)-Parli(New) 400kV Ckt 2 direct Line, Reconductoring of Parli(PG)- Parli(M) 400kV line Ckt 2 section with twin HTLS conductor with a minimum capacity of 1940 MVA per circuit at a nominal voltage, 400kV bay upgradation work for above line bays at Parli(M) S/s (The current rating of existing bays upgraded from 2000A to 3150A to suit the reconductoring with Twin HTLS conductor) under Western Region Expansion Scheme-XXX (WRES-XXX). Power Grid Corporation of India Limited
20.06.2025 30.06.2025 Transmission

878


201/TT/2025, 202/TT/2025, 363/TT/2025, 376/TT/2025

20.06.2025 30.06.2025 Transmission

877


380/TT/2025, 101/TT/2025, 221/TT/2025, 199/TT/2025, 200/TT/2025, 377/TT/2025

20.06.2025 30.06.2025 Transmission

876


192/TT/2025

20.06.2025 30.06.2025 Transmission

875


628/GT/2025

24.06.2025 30.06.2025 Generation

874


627/GT/2025, 629/GT/2025

24.06.2025 30.06.2025 Generation

873


626/GT/2025

24.06.2025 30.06.2025 Generation

872


625/GT/2025

24.06.2025 30.06.2025 Generation

871


624/GT/2025

24.06.2025 30.06.2025 Generation

870


623/GT/2025

24.06.2025 30.06.2025 Generation

869


59/GT/2022

24.06.2025 30.06.2025 Generation

868


551/MP/2025

24.06.2025 30.06.2025 Misc.

867


548/MP/2025

24.06.2025 30.06.2025 Misc.

866


547/MP/2025

24.06.2025 30.06.2025 Misc.

865


421/MP/2025

24.06.2025 30.06.2025 Misc.

864


366/MP/2025

24.06.2025 30.06.2025 Misc.

863


364/MP/2025

24.06.2025 30.06.2025 Misc.

862


348/MP/2025 along with IA No. 27/2025

24.06.2025 30.06.2025 Misc.

861


170/MP/2025

24.06.2025 30.06.2025 Misc.

860


642/MP/2025

24.06.2025 30.06.2025 Misc.

859


552/MP/2025

24.06.2025 30.06.2025 Misc.

858


550/MP/2025

24.06.2025 30.06.2025 Misc.

857


549/MP/2025

24.06.2025 30.06.2025 Misc.

856


546/MP/2025

24.06.2025 30.06.2025 Misc.

855


643/AT/2025

24.06.2025 27.06.2025 Adoption

854


456/TD/2025

24.06.2025 27.06.2025 Licence

853


432/MP/2025

24.06.2025 27.06.2025 Misc.

852


367/MP/2025, 422/MP/2025

24.06.2025 27.06.2025 Misc.

851


365/MP/2025

24.06.2025 27.06.2025 Misc.

850


353/MP/2025

24.06.2025 27.06.2025 Misc.

849


340/MP/2025

24.06.2025 27.06.2025 Misc.

848


336/MP/2025

24.06.2025 27.06.2025 Misc.

847


429/MP/2025

24.06.2025 26.06.2025 Misc.

846


322/TL/2024

20.06.2025 26.06.2025 Licence (Transmission)

845


285/TT/2024

20.06.2025 26.06.2025 Transmission

844


212/TT/2024, 284/TT/2024, 408/TT/2024, 446/TT/2024, 59/TT/2025 & 262/TT/2025

20.06.2025 26.06.2025 Transmission

843


80/TT/2025

20.06.2025 26.06.2025 Transmission

842


431/MP/2025

24.06.2025 26.06.2025 Misc.

841


423/MP/2025

24.06.2025 26.06.2025 Misc.

840


316/MP/2025

21.05.2025 26.06.2025 Misc.

839


640/TT/2025, 389/TT/2025, 382/TT/2025, 410/TT/2025

20.06.2025 25.06.2025 Transmission

838


28/TT/2025

20.06.2025 25.06.2025 Transmission

837


75/AT/2025, 78/TL/2025

20.06.2025 25.06.2025 Adoption

836


554/MP/2025 along with IA No. 44/2025

20.06.2025 24.06.2025 Misc.

835


235/AT/2025

20.06.2025 24.06.2025 Adoption

834


557/TD/2025

20.06.2025 24.06.2025 Licence

833


513/TL/2024, 514/AT/2024

20.06.2025 24.06.2025 Licence (Transmission)

832


468/TL/2025, 469/AT/2025

20.06.2025 24.06.2025 Licence (Transmission)

831


445/TD/2025

20.06.2025 24.06.2025 Licence

830


443/TD/2025

20.06.2025 24.06.2025 Licence

829


441/TL/2025, 440/AT/2025

20.06.2025 24.06.2025 Licence (Transmission)

828


433/TL/2025, 434/AT/2025

20.06.2025 24.06.2025 Licence (Transmission)

827


428/TL/2025

20.06.2025 24.06.2025 Licence (Transmission)

826


426/TL/2024

20.06.2025 24.06.2025 Licence (Transmission)

825


352/TL/2025

20.06.2025 24.06.2025 Licence (Transmission)

824


300/TL/2025

20.06.2025 24.06.2025 Licence (Transmission)

823


260/AT/2025

20.06.2025 24.06.2025 Adoption

822


251/TL/2025

20.06.2025 24.06.2025 Licence (Transmission)

821


73/TL/2025

20.06.2025 24.06.2025 Licence (Transmission)

820


Diary No. 292/2025

05.06.2025 12.06.2025 Misc.

819


586/MP/2025

05.06.2025 11.06.2025 Misc.

818


616/MP/2025 along with IA No.50/2025

05.06.2025 10.06.2025 Misc.

817


557/TD/2025 along with I.A No. 47/2025

05.06.2025 10.06.2025 Licence

816


615/MP/2025 along with IA No.49/2025

05.06.2025 09.06.2025 Misc.

815


554/MP/2025 along with IA No. 44/2025

05.06.2025 09.06.2025 Misc.

814


582/AT/2025

05.06.2025 09.06.2025 Adoption

813


617/AT/2025

05.06.2025 09.06.2025 Adoption

812


556/AT/2025

05.06.2025 09.06.2025 Adoption

811


553/TD/2025

05.06.2025 09.06.2025 Licence

810


494/TL/2024

05.06.2025 09.06.2025 Licence (Transmission)

809


457/AT/2025

05.06.2025 09.06.2025 Adoption

808


456/TD/2025

05.06.2025 09.06.2025 Licence

807


312/AT/2025

05.06.2025 09.06.2025 Adoption

806


254/AT/2025

05.06.2025 09.06.2025 Adoption

805


75/AT/2025, 78/TL/2025

05.06.2025 09.06.2025 Adoption

804


475/GT/2025

27.05.2025 06.06.2025 Generation

803


474/GT/2025

27.05.2025 06.06.2025 Generation

802


458/GT/2025

27.05.2025 06.06.2025 Generation

801


459/GT/2025, 171/GT/2025

27.05.2025 06.06.2025 Generation

800


129/GT/2025

27.05.2025 06.06.2025 Generation

799


54/GT/2025

27.05.2025 06.06.2025 Generation

798


50/GT/2025

27.05.2025 06.06.2025 Generation

797


46/GT/2025

27.05.2025 06.06.2025 Generation

796


41/GT/2025

27.05.2025 06.06.2025 Generation

795


40/GT/2025

27.05.2025 06.06.2025 Generation

794


39/GT/2025

27.05.2025 06.06.2025 Generation

793


367/GT/2024

27.05.2025 04.06.2025 Generation

792


511/GT/2024

29.05.2025 04.06.2025 Generation

791


79/GT/2025

27.05.2025 04.06.2025 Generation

790


214/TT/2024, 299/TT/2024, 300/TT/2024, 373/TT/2024, 390/TT/2024, 448/TT/2024, 501/TT/2024, 502/TT/2024, 12/TT/2025, 265/TT/2025 and 266/TT/2025

29.05.2025 03.06.2025 Transmission

789


263/MP/2022

22.05.2025 03.06.2025 Misc.

788


468/TL/2025, 469/AT/2025

30.05.2025 03.06.2025 Licence (Transmission)

787


470/TL/2025, 471/AT/2025

30.05.2025 03.06.2025 Licence

786


396/TT/2024, 210/TT/2024, 211/TT/2024, and 213/TT/2024

29.05.2025 03.06.2025 Transmission

785


196/TT/2025, 385/TT/2025

30.05.2025 03.06.2025 Transmission

784


272/TT/2025, 345/TT/2025, 215/TT/2025, 193/TT/2025, 203/TT/2025, 204/TT/2025 and 186/TT/2025

30.05.2025 03.06.2025 Transmission

783


187/TT/2025

30.05.2025 03.06.2025 Transmission

782


447/TT/2024

29.05.2025 03.06.2025 Transmission

781


291/GT/2014, 292/GT/2014, 316/GT/2014, 319/GT/2014, 323/GT/2014, 338/GT/2014

27.05.2025 02.06.2025 Generation

780


383/TT/2025

29.05.2025 02.06.2025 Transmission

779


472/TL/2025, 473/AT/2025

30.05.2025 02.06.2025 Licence (Transmission)

778


466/TL/2025, 467/AT/2025

30.05.2025 02.06.2025 Licence (Transmission)

777


464/TL/2025, 465/AT/2025

30.05.2025 02.06.2025 Licence (Transmission)

776


462/AT/2025, 463/TL/2025

30.05.2025 02.06.2025 Adoption

775


460/TL/2025, 461/AT/2025

30.05.2025 02.06.2025 Licence (Transmission)

774


349/AT/2025, 350/TL/2025

29.05.2025 02.06.2025 Adoption

773


247/TL/2025

29.05.2025 02.06.2025 Licence (Transmission)

772


322/TL/2024

22.05.2025 02.06.2025 Licence (Transmission)

771


339/MP/2022

22.05.2025 02.06.2025 Misc.

770


343/TT/2025

29.05.2025 02.06.2025 Transmission

769


390/TT/2025

29.05.2025 02.06.2025 Transmission

768


102/TT/2025

29.05.2025 02.06.2025 Transmission

767


143/TT/2025

29.05.2025 02.06.2025 Transmission

766


482/TT/2019, 676/TT/2020

29.05.2025 02.06.2025 Transmission

765


194/MP/2021

13.05.2025 30.05.2025 Misc.

764


242/MP/2024 along with IA No.57/2024, 216/MP/2024 along with IA No.66/2024, 271/MP/2024

13.05.2025 30.05.2025 Misc.

763


260/AT/2025

13.05.2025 30.05.2025 Adoption

762


443/TD/2025

13.05.2025 30.05.2025 Licence

761


IA No. 65/2023 in 4/MP/2021

22.05.2025 30.05.2025 Misc.

760


111/MP/2021 with IA No. 38/2021

22.05.2025 29.05.2025 Misc.

759


220/MP/2024 along with IA No. 53/2024

22.05.2025 29.05.2025 Misc.

758


370/GT/2025

20.05.2025 29.05.2025 Misc.

757


488/MP/2024

22.05.2025 29.05.2025 Misc.

756


324/MP/2025

22.05.2025 29.05.2025 Misc.

755


279/MP/2025

22.05.2025 29.05.2025 Misc.

754


330/MP/2025

21.05.2025 29.05.2025 Misc.

753


338/MP/2025

21.05.2025 29.05.2025 Misc.

752


292/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 17 of the power purchase agreements dated 25.11.2021 seeking declaration that change in rate of Goods and Services Tax from 5% to 12% on renewable energy equipment w.e.f. 01.10.2021 on account of amendment to Notification No. 01/2017-Central Tax (Rate) dated 28.06.2017 vide Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 amounts to a ‘Change in Law’ event under Article 17 of the Power Purchase Agreements and to further direct the Respondents to pay compensation along with carrying cost towards additional amount incurred on account of increment in of Goods and Services Tax paid by the Petitioner pursuant to Notifications dated 30.09.2021 and to restitute the Petitioner to the same financial position as it would have been due continuation of Goods and Services Tax rate of 5% which was applicable till 30.09.2021. Talettutayi Solar Projects Nine Private Limited
22.05.2025 29.05.2025 Misc.

751


328/MP/2024

08.05.2025 29.05.2025 Misc.

750


277/MP/2024

21.05.2025 29.05.2025 Misc.

749


239/MP/2024 along with IA No. 8/2025

22.05.2025 28.05.2025 Misc.

748


IA No. 2/IA/2025 in 45/GT/2016 (on remand from APTEL), IA No. 3/IA/2025 in 243/GT/2017, IA No. 4/IA/2025 in 409/GT/2020

22.05.2025 28.05.2025 Misc.

747


42/MP/2024 along with IA Nos.14/2024 and 69/2024

22.05.2025 27.05.2025 Misc.

746


386/MP/2023

20.05.2025 26.05.2025 Misc.

745


245/MP/2021

20.05.2025 26.05.2025 Misc.

744


430/MP/2024

22.05.2025 26.05.2025 Misc.

743


422/MP/2024 Along with IA No. 90/2024

22.05.2025 26.05.2025 Misc.

742


366/MP/2022, 367/MP/2022

22.05.2025 26.05.2025 Misc.

741


268/MP/2020

22.05.2025 26.05.2025 Misc.

740


254/MP/2024

22.05.2025 26.05.2025 Misc.

739


369/MP/2025, 430/MP/2025

21.05.2025 26.05.2025 Misc.

738


205/MP/2024 along with IAs No. 49/2024 and 50/2024

20.05.2025 26.05.2025 Misc.

737


215/MP/2021 along with IA Nos. 32/2022 & 2/2023

22.05.2025 26.05.2025 Misc.

736


324/MP/2022

22.05.2025 26.05.2025 Misc.

735


335/MP/2025

21.05.2025 26.05.2025 Misc.

734


225/MP/2023

22.05.2025 25.05.2025 Misc.

733


346/MP/2025 along with IA No.23/2025, 347/MP/2025 along with IA No. 42/2025

22.05.2025 25.05.2025 Misc.

732


239/MP/2021

22.05.2025 24.05.2025 Misc.

731


116/MP/2022

22.05.2025 24.05.2025 Misc.

730


259/MP/2024 along with IA No.59/2024

22.05.2025 24.05.2025 Misc.

729


126/MP/2024

22.05.2025 24.05.2025 Misc.

728


309/MP/2025

22.05.2025 24.05.2025 Misc.

727


294/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 12 of the Power Purchase Agreements dated 19.10.2020 between Avaada Sunrays Energy Pvt. Ltd. and NHPC Limited seeking declaration that (i) Change in Goods and Service Tax from 5% to 12% and 13.8%, respectively, w.e.f 1.10.2021 by way of GST Amendment Notifications dated 30.9.2021, and (ii) requirement of installation of bird diverters on overhead transmission lines in terms of the order dated 19.4.2021 issued by the Hon’ble Supreme Court W.P (C) No. 839 of 2019 qualifies as Change in Law events under Article 12 of the PPA and consequently, directions to NHPC Ltd. to compensate the Petitioner towards the additional expenditure incurred on account of the Change in Law events along with carrying cost. Avaada Sunrays Energy Private Limited
22.05.2025 24.05.2025 Misc.

726


554/MP/2025 along with IA (Diary) No. 254/2025

20.05.2025 24.05.2025 Misc.

725


276/MP/2025 along with IA Nos. 15, 29, and 30/2025

22.05.2025 23.05.2025 Misc.

724


240/MP/2024 along with IA No.56/2024

22.05.2025 23.05.2025 Misc.

723


320/MP/2025

21.05.2025 23.05.2025 Misc.

721


425/MP/2025

21.05.2025 23.05.2025 Misc.

720


359/MP/2025 along with IA (Dy.) No. 885/2024

21.05.2025 23.05.2025 Misc.

719


339/MP/2025

21.05.2025 23.05.2025 Misc.

718


331/MP/2025

21.05.2025 23.05.2025 Misc.

717


180/MP/2025, 261/MP/2025

21.05.2025 23.05.2025 Misc.

716


550/MP/2025

20.05.2025 23.05.2025 Misc.

715


162/MP/2025, 163/MP/2025, 164/MP/2025, 165/MP/2025, 168/MP/2025 & 173/MP/2025

21.05.2025 23.05.2025 Misc.

714


334/MP/2025

21.05.2025 23.05.2025 Misc.

713


321/MP/2025

21.05.2025 23.05.2025 Misc.

712


317/MP/2025

21.05.2025 23.05.2025 Misc.

711


368/MP/2025

21.05.2025 23.05.2025 Misc.

710


455/MP/2019, 65/MP/2020, 618/MP/2020

20.05.2025 23.05.2025 Misc.

709


184/MP/2019 (On remand from APTEL)

20.05.2025 23.05.2025 Misc.

708


336/MP/2024

19.05.2025 23.05.2025 Misc.

707


54/MP/2019, 140/MP/2019

19.05.2025 23.05.2025 Misc.

706


249/MP/2022, 250/MP/2022, 251/MP/2022, 252/MP/2022

13.05.2025 23.05.2025 Misc.

705


325/MP/2025

21.05.2025 23.05.2025 Misc.

704


315/MP/2025

21.05.2025 23.05.2025 Misc.

703


428/TL/2025

20.05.2025 23.05.2025 Licence (Transmission)

702


424/TL/2024, 426/TL/2024, 513/TL/2024, 514/AT/2024, 73/TL/2025

20.05.2025 23.05.2025 Licence (Transmission)

701


104/MP/2022

20.05.2025 23.05.2025 Misc.

700


295/MP/2024

19.05.2025 23.05.2025 Misc.

699


314/MP/2025

21.05.2025 23.05.2025 Misc.

698


26/TT/2025, 281/TT/2025

20.05.2025 23.05.2025 Transmission

697


250/TT/2024

20.05.2025 23.05.2025 Transmission

696


2/MP/2014

20.05.2025 22.05.2025 Misc.

695


91/MP/2018, 53/MP/2021 along with IA 26/2003 & 100/2023, 61/MP/2021 along with IA. 28/2021 & 42/2022, 149/MP/2021

13.05.2025 22.05.2025 Misc.

694


265/MP/2023

08.05.2025 22.05.2025 Misc.

693


450/MP/2025 along with IA No.35/2025

20.05.2025 22.05.2025 Misc.

692


452/MP/2025 along with IA No. 38/2025

19.05.2025 22.05.2025 Misc.

691


517/MP/2024

19.05.2025 22.05.2025 Misc.

690


617/MP/2020

19.05.2025 22.05.2025 Misc.

689


441/TL/2025, 440/AT/2025

20.05.2025 22.05.2025 Licence (Transmission)

688


238/MP/2024

20.05.2025 22.05.2025 Misc.

687


444/TL/2025

19.05.2025 22.05.2025 Licence (Transmission)

686


442/TL/2025

19.05.2025 22.05.2025 Licence (Transmission)

685


433/TL/2025, 434/AT/2025

20.05.2025 22.05.2025 Licence (Transmission)

684


395/MP/2025

19.05.2025 22.05.2025 Misc.

683


351/AT/2025, 352/TL/2025

19.05.2025 22.05.2025 Adoption

682


310/AT/2025

19.05.2025 22.05.2025 Adoption

681


282/MP/2021, 141/MP/2022

19.05.2025 22.05.2025 Misc.

680


75/AT/2025, 78/TL/2025

19.05.2025 22.05.2025 Adoption

679


91/MP/2024

19.05.2025 22.05.2025 Misc.

678


36/MP/2024 along with IA No.43/2025

20.05.2025 22.05.2025 Misc.

677


83/MP/2025

19.05.2025 22.05.2025 Misc.

676


312/AT/2025

13.05.2025 22.05.2025 Adoption

675


183/MP/2021

13.05.2025 20.05.2025 Misc.

674


453/MP/2025 along with IA No.39/2025, 455/MP/2025 along with IA No.41/2025

13.05.2025 19.05.2025 Misc.

673


362/TD/2025

13.05.2025 19.05.2025 Licence

672


496/MP/2024

08.05.2025 19.05.2025 Misc.

671


302/MP/2022 along with I.A. No. 31/2025

13.05.2025 16.05.2025 Misc.

670


346/MP/2020

13.05.2025 16.05.2025 Misc.

669


153/MP/2025

13.05.2025 16.05.2025 Misc.

668


227/MP/2023

13.05.2025 16.05.2025 Misc.

667


446/MP/2025

13.05.2025 16.05.2025 Misc.

666


315/MP/2023

13.05.2025 16.05.2025 Misc.

665


235/AT/2025

13.05.2025 16.05.2025 Adoption

664


337/MP/2025

13.05.2025 16.05.2025 Misc.

663


223/MP/2022

13.05.2025 15.05.2025 Misc.

662


301/MP/2025

08.05.2025 14.05.2025 Misc.

660


417/MP/2024

08.05.2025 14.05.2025 Misc.

659


363/MP/2024

08.05.2025 14.05.2025 Misc.

658


2/GT/2024

08.05.2025 14.05.2025 Generation

657


267/MP/2024

08.05.2025 14.05.2025 Misc.

656


126/MP/2017

07.05.2025 14.05.2025 Misc.

655


238/AT/2025

08.05.2025 14.05.2025 Misc.

654


234/AT/2025

08.05.2025 14.05.2025 Misc.

653


232/MP/2024

08.05.2025 14.05.2025 Misc.

652


180/MP/2019, along with IA Nos. 32/2023 & 20/2024

08.05.2025 14.05.2025 Misc.

651


94/MP/2023, 265/MP/2022

07.05.2025 14.05.2025 Misc.

650


IA No.42/2025 in 347/MP/2025

07.05.2025 14.05.2025 Misc.

649


435/MP/2024

08.05.2025 14.05.2025 Misc.

648


358/MP/2023 along with IA Nos. 90/2023 and 33/2025

08.05.2025 14.05.2025 Misc.

647


325/MP/2024 along with IA Nos. 78/2024 and 105/2024

08.05.2025 14.05.2025 Misc.

646


306/MP/2023

08.05.2025 14.05.2025 Misc.

645


282/MP/2022

08.05.2025 14.05.2025 Misc.

644


250/AT/2025, 251/TL/2025

08.05.2025 14.05.2025 Adoption

643


239/AT/2025

08.05.2025 14.05.2025 Adoption

642


562/MP/2020

07.05.2025 14.05.2025 Misc.

641


278/MP/2022

07.05.2025 14.05.2025 Misc.

640


254/MP/2023

08.05.2025 13.05.2025 Misc.

639


38/RP/2023 in 252/MP/2021

08.05.2025 13.05.2025 Review

638


9/RP/2024 along with IA No. 19/IA/2024

08.05.2025 13.05.2025 Review

637


463/MP/2014 along with IA No. 40/2019
OP No. 71/2012
OP No. 72/2012

07.05.2025 13.05.2025 Misc.

636


378/MP/2023

08.05.2025 13.05.2025 Misc.

635


218/MP/2022, 105/MP/2023

08.05.2025 13.05.2025 Misc.

634


203/MP/2024

08.05.2025 13.05.2025 Misc.

633


303/MP/2023

30.04.2025 13.05.2025 Misc.

632


380/MP/2023

08.05.2025 13.05.2025 Misc.

631


264/MP/2022

08.05.2025 13.05.2025 Misc.

630


428/MP/2024 along with IA (Diary) No.232/2025

07.05.2025 11.05.2025 Misc.

629


311/MP/2025

07.05.2025 11.05.2025 Misc.

628


299/AT/2025, 300/TL/2025

07.05.2025 11.05.2025 Misc.

627


262/MP/2024

07.05.2025 11.05.2025 Misc.

626


261/MP/2024

07.05.2025 11.05.2025 Misc.

625


88/MP/2019 along with IA No.66/2019

07.05.2025 11.05.2025 Misc.

624


186/MP/2021

07.05.2025 11.05.2025 Misc.

623


592/MP/2020

07.05.2025 10.05.2025 Misc.

622


242/AT/2025

07.05.2025 10.05.2025 Adoption

621


296/MP/2025

07.05.2025 10.05.2025 Misc.

620


241/AT/2025

07.05.2025 10.05.2025 Adoption

619


324/MP/2025

30.04.2025 07.05.2025 Misc.

618


279/MP/2023

30.04.2025 07.05.2025 Misc.

617


319/MP/2022 alongwith IA No. 63/IA/2022

28.04.2025 07.05.2025 Misc.

616


113/MP/2025

30.04.2025 07.05.2025 Misc.

615


302/MP/2022 along with I.A. No. 31/2025

28.04.2025 07.05.2025 Misc.

614


190/MP/2024

28.04.2025 07.05.2025 Misc.

613


Corrigendum to 28/RP/2024 in 255/TT/2021 along with IA No. 81/2024

23.04.2025 06.05.2025 Review

612


349/AT/2025, 350/TL/2025

30.04.2025 06.05.2025 Adoption

611


253/AT/2025, 252/TL/2025

30.04.2025 06.05.2025 Adoption

610


230/MP/2023

30.04.2025 06.05.2025 Misc.

609


192/MP/2021, 235/MP/2023 along with IA No.56/2023

Petition under Sections 79(1)(c), 79(1)(f) and 79(1)(k) of the Electricity Act, 2003, read with Article 4.5(a) of the Power Purchase Agreement (PPA) dated 20.8.2019 executed between the Petitioner and Solar Energy Corporation of India Limited (SECI), read with the back-to- back Power Sale Agreements (PSAs) dated 17.6.2019 and 26.6.2019 executed between SECI and BSES Yamuna Power Limited (BYPL) and Tata Power Delhi Distribution Limited (TPDDL), respectively, seeking extension of Scheduled Commercial Operation Date (SCOD) and based on the extension of SCOD sought in the instant petition, seeking consequent deferment of operationalization of Long-Term Access (LTA) granted by the Central Transmission Utility of India Limited (CTUIL) to the Petitioner. SBSR Power Cleantech Eleven Private Limited, Tata Power Delhi Distribution Limited
30.04.2025 06.05.2025 Misc.

608


202/MP/2023, 272/MP/2023, 286/MP/2023, 335/MP/2023, 16/MP/2024, 40/MP/2024, 81/MP/2024, 82/MP/2024, 25/MP/2024, 43/MP/2024, 49/MP/2024, 57/MP/2024, 139/MP/2024, 334/MP/2024, 121/MP/2024, 124/MP/2024, 142/MP/2024, 195/MP/2024, 236/MP/2023, 98/MP/2024, 519/MP/2024, 115/MP/2025, 117/MP/2025, 146/MP/2025, 145/MP/2025, 144/MP/2025, 116/MP/2025

Petition under Section 79(1)(b) &(f) of the Electricity Act, 2003 read with Regulation 111 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Article 12 of Power Purchase Agreement dated 8.12.2021 seeking Working Group Report 2022 as Change in Law Event. TP Saurya Limited, NTPC Limited , Azure Power Maple Private Limited, Ostro Kannada Power Private Limited, Adani Wind Energy Kutchh One Ltd., NTPC Green Energy Limited, Tata Power Renewable Energy Limited, Talettutayi Solar Projects Nine Private Limited, ReNew Surya Aayan Private Limited, Ayana Renewable Power Six Private Limited, Solar Energy Jaisalmer Two Private Limited, TP Saurya Limited, Ayana Renewable Power Three Private Limited, ACME Dhaulpur Powertech Private Limited & Anr, ACME Raisar Solar Energy Private Limited and Anr, Megasolis Renewables Private Limited, Mega Suryaurja Private Limited
29.04.2025 06.05.2025 Misc.

607


244/AT/2025, 245/TL/2025

30.04.2025 06.05.2025 Adoption

606


236/AT/2025, 237/TL/2025

30.04.2025 06.05.2025 Adoption

605


289/MP/2024

29.04.2025 06.05.2025 Misc.

604


362/MP/2023

29.04.2025 05.05.2025 Misc.

603


361/MP/2023

29.04.2025 05.05.2025 Misc.

602


413/MP/2024

30.04.2025 05.05.2025 Misc.

601


351/AT/2025, 352/TL/2025

30.04.2025 05.05.2025 Adoption

600


323/MP/2025, 333/MP/2025

29.04.2025 05.05.2025 Misc.

599


336/MP/2024

28.04.2025 04.05.2025 Misc.

598


263/MP/2024

28.04.2025 04.05.2025 Misc.

597


220/MP/2024 along with IA No.53/2024

28.04.2025 04.05.2025 Misc.

596


191/MP/2024

28.04.2025 04.05.2025 Misc.

595


165/MP/2023

28.04.2025 04.05.2025 Misc.

594


386/MP/2023

23.04.2025 04.05.2025 Misc.

593


419/MP/2024

29.04.2025 04.05.2025 Misc.

592


279/MP/2025

30.04.2025 04.05.2025 Misc.

591


75/AT/2025, 78/TL/2025

29.04.2025 04.05.2025 Adoption

590


425/MP/2024

29.04.2025 02.05.2025 Misc.

589


424/TL/2024, 426/TL/2024, 513/TL/2024, 514/AT/2024, 73/TL/2025

22.04.2025 02.05.2025 Licence (Transmission)

588


362/TD/2025

29.04.2025 02.05.2025 Licence

587


282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. ACME Deoghar Solar Power Pvt. Ltd. and Ors.
28.04.2025 02.05.2025 Misc.

586


235/MP/2021

28.04.2025 02.05.2025 Misc.

585


204/MP/2024

28.04.2025 02.05.2025 Misc.

584


105/MP/2024

28.04.2025 02.05.2025 Misc.

583


348/MP/2023

30.04.2025 02.05.2025 Misc.

582


262/MP/2024

30.04.2025 02.05.2025 Misc.

581


IA No. 18/2025 in 227/MP/2022

30.04.2025 02.05.2025 Misc.

580


411/MP/2024

29.04.2025 02.05.2025 Misc.

579


244/MP/2024

30.04.2025 02.05.2025 Misc.

578


240/AT/2025

30.04.2025 02.05.2025 Adoption

577


254/AT/2025

29.04.2025 02.05.2025 Adoption

576


248/MP/2024

29.04.2025 02.05.2025 Misc.

575


173/MP/2023

29.04.2025 02.05.2025 Misc.

574


65/MP/2024

29.04.2025 02.05.2025 Misc.

573


141/MP/2024 along with IA No.29/2024

28.04.2025 01.05.2025 Misc.

572


332/MP/2025, 280/MP/2025

28.04.2025 01.05.2025 Misc.

571


41/MP/2023

28.04.2025 01.05.2025 Misc.

570


255/MP/2025 along with IA No. 13/2025

28.04.2025 01.05.2025 Misc.

569


327/MP/2025 along with IA No. 20/2025

28.04.2025 01.05.2025 Misc.

568


371/MP/2024

28.04.2025 01.05.2025 Misc.

567


324/MP/2025

28.04.2025 01.05.2025 Misc.

566


28/TT/2025

23.04.2025 30.04.2025 Transmission

565


28/RP/2024 in 255/TT/2021 along with IA No. 81/2024

23.04.2025 29.04.2025 Review

564


461/TT/2024, 463/TT/2024, 464/TT/2024, 475/TT/2024, 169/TT/2025, 391/TT/2025, 328/TT/2025, 205/TT/2025, 381/TT/2025 and 198/TT/2025

22.04.2025 29.04.2025 Transmission

563


272/TT/2025, 345/TT/2025, 187/TT/2025, 196/TT/2024, 215/TT/2025, 193/TT/2025, 385/TT/2025, 203/TT/2025, 204/TT/2025 and 186/TT/2025.

22.04.2025 29.04.2025 Transmission

562


303/MP/2025

23.04.2025 28.04.2025 Misc.

561


155/MP/2023

23.04.2025 28.04.2025 Misc.

560


291/GT/2014, 292/GT/2014, 316/GT/2014, 319/GT/2014, 323/GT/2014, 338/GT/2014

23.04.2025 28.04.2025 Generation

559


85/MP/2021 along with IA Nos. 26/2021, 6/2025 and 14/2025

22.04.2025 28.04.2025 Misc.

558


264/MP/2023

23.04.2025 28.04.2025 Misc.

557


Diary No.212/2025 along with IA (Diary) No. 213/2025

24.04.2025 26.04.2025 Misc.

556


Diary No.204/2025 along with IA (Diary) Nos. 205 & 206/2025

24.04.2025 26.04.2025 Misc.

555


Diary No.209/2025 along with IA (Diary) No.210/2025, Diary No.214/2025 along with IA (Diary) No.216/2025

24.04.2025 26.04.2025 Misc.

554


310/RC/2024

25.03.2025 25.04.2025 Misc.

553


330/TT/2023

23.04.2025 25.04.2025 Misc.

552


Diary No.169/2025 along with IA (Diary) No.196/2025

24.04.2025 25.04.2025 Misc.

551


469/MP/2024, 252/MP/2024

23.04.2025 25.04.2025 Misc.

550


249/MP/2024

22.04.2025 25.04.2025 Misc.

549


2/MP/2014

23.04.2025 25.04.2025 Misc.

548


247/MP/2024

23.04.2025 25.04.2025 Misc.

547


162/MP/2024

22.04.2025 25.04.2025 Misc.

546


127/MP/2025 along with IA No.28/2025

23.04.2025 25.04.2025 Misc.

545


159/MP/2025

23.04.2025 25.04.2025 Misc.

544


247/TL/2025, 248/AT/2025

23.04.2025 25.04.2025 Licence (Transmission)

543


41/MP/2024

23.04.2025 25.04.2025 Misc.

542


238/MP/2024

23.04.2025 25.04.2025 Misc.

541


347/MP/2023 along with IA No.54/2024

23.04.2025 25.04.2025 Misc.

540


482/MP/2024, 483/MP/2024, 296/MP/2024, 297/MP/2024, 442/MP/2024

Petition under Section 79(1)(c) and 79(1)(f) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking quashing of the demand of the one-time GNA charges raised by Central Transmission Utility of India Limited (CTUIL) by way of its letter and emails dated 7.6.2024, 16.7.2024 and 23.07.2024, respectively, on account of the same being not in accordance with the applicable laws and regulations, and consequential refund of Rs. 2,50,71,000/- (Rupees Two Crores Fifty Lakhs Seventy-One Thousand Only) paid by the Petitioner under protest. Apraava Energy Private Limited, Eden Renewable Passy Private Limited, ACME Solar Holdings Limited , Masaya Solar Energy Private Limited
22.04.2025 25.04.2025 Misc.

539


243/MP/2024 along with IA Nos. 58/2024 & 79/2024, 309/MP/2024, 304/MP/2024 along with IA No.75/2024

22.04.2025 25.04.2025 Misc.

538


259/MP/2024 along with IA No. 59/2024

23.04.2025 25.04.2025 Misc.

537


301/MP/2025

22.04.2025 25.04.2025 Misc.

536


269/MP/2018 along with IA Nos. 22 & 26 of 2024

22.04.2025 25.04.2025 Misc.

535


30/RP/2024
In
193/TT/2023

23.02.2025 25.02.2025 Review

534


18/RP/2024 in 10/TT/2019 alongwith IA No. 52/2024

23.02.2025 25.04.2025 Review

533


180/MP/2023, 245/MP/2024

22.04.2025 25.04.2025 Misc.

532


67/MP/2021 along with IA Nos. 17/2021 and 30/2024

22.04.2025 25.04.2025 Misc.

531


2//RP/2025 In 158/MP/2023

23.04.2025 25.04.2025 Review

530


217/TT/2025, 216/TT/2025, 210/TT/2025 & 214/TT/2025

22.04.2025 25.04.2025 Transmission

529


384/TT/2025, 380/TT/2025, 221/TT/2025, 192/TT/2025, 199/TT/2025, 200/TT/2025, 201/TT/2025, 202/TT/2025, 376/TT/2025, 377/TT/2025 & 363/TT/2025

22.04.2025 25.04.2025 Transmission

528


Diary No.207/2025 along with IA (Diary) No.208/2025

24.04.2025 24.04.2025 Misc.

527


335/MP/2024

17.04.2025 24.04.2025 Misc.

526


245/MP/2021 along with IA No. 41/2024

17.04.2025 24.04.2025 Misc.

525


128/GT/2024

25.03.2025 24.04.2025 Generation

524


438/MP/2024

22.04.2025 24.04.2025 Misc.

523


345/MP/2023 along with IA No. 86/2023

22.04.2025 24.04.2025 Misc.

522


327/MP/2024

22.04.2025 24.04.2025 Misc.

521


308/MP/2025

22.04.2025 24.04.2025 Misc.

520


307/MP/2024, 308/MP/2024

22.04.2025 24.04.2025 Misc.

519


302/MP/2025

22.04.2025 24.04.2025 Misc.

518


284/MP/2025

22.04.2025 24.04.2025 Misc.

517


180/MP/2024

22.04.2025 24.04.2025 Misc.

516


177/MP/2025

22.04.2025 24.04.2025 Misc.

515


278/MP/2024

08.04.2025 24.04.2025 Misc.

514


IA No. 2/IA/2025 in 45/GT/2016 (on remand from APTEL), IA No. 3/IA/2025 in 243/GT/2017, IA No. 4/IA/2025 in 409/GT/2020

17.04.2025 23.04.2025 Misc.

513


395/MP/2025

17.04.2025 23.04.2025 Misc.

512


219/TT/2025, 264/TT/2025

17.04.2025 21.04.2025 Transmission

511


455/MP/2019, 65/MP/2020, 618/MP/2020

17.04.2025 21.04.2025 Misc.

510


358/MP/2023 along with IA Nos. 90/2023 and 33/2025

17.04.2025 21.04.2025 Misc.

509


347/MP/2025 along with IA No. 24/2025

17.04.2025 21.04.2025 Misc.

508


307/MP/2025

Petition under Section 79(1)(c) of the Electricity Act, 2003 read with Regulation 65 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 and Regulation 41 & 42 of the Central Electricity Regulatory Commission (Connectivity and Grant Network Access) Regulations 2022, seeking appropriate directions to the Central Transmission Utility of India Limited to accept and allow submission of Insurance Surety Bond(s) from an Insurer as per the Guidelines dated 03.01.2022 issued by IRDAI and / or Letter of Undertaking as Payment on Order Instrument issued by REC, PFC and IREDA instead of Bank Guarantee issued by any scheduled commercial bank for the purpose Conn- BGs and Land BGs under the Central Electricity Regulatory Commission (Connectivity and Grant Network Access) Regulations 2022. ACME Solar Holdings Limited and Ors.
17.04.2025 21.04.2025 Misc.

507


305/MP/2025

17.04.2025 21.04.2025 Misc.

506


304/MP/2025

17.04.2025 21.04.2025 Misc.

505


276/MP/2025 along with IA Nos. 15, 29, and 30/2025

17.04.2025 21.04.2025 Misc.

504


260/MP/2024

17.04.2025 21.04.2025 Misc.

503


240/MP/2024 along with IA No. 56/2024

17.04.2025 21.04.2025 Misc.

502


215/MP/2021

17.04.2025 21.04.2025 Misc.

501


161/MP/2023

17.04.2025 21.04.2025 Misc.

500


111/MP/2024, 112/MP/2024, 15/RP/2024, 16/RP/2024

17.04.2025 21.04.2025 Misc.

499


141/TT/2025

17.04.2025 21.04.2025 Transmission

498


101/TT/2025

17.04.2025 21.04.2025 Transmission

497


496/MP/2024 along with I.A. No. 102/2024

08.04.2025 15.04.2025 Misc.

496


399/GT/2020

08.04.2025 15.04.2025 Generation

495


370/GT/2025

08.04.2025 15.04.2025 Generation

494


153/MP/2025

08.04.2025 15.04.2025 Misc.

493


91/MP/2018,
53/MP/2021 along with IA 26/2003 & 100/2023,
61/MP/2021 along with IA. 28/2021 & 42/2022,
149/MP/2021

02.04.2025 15.04.2025 Misc.

492


78/MP/2024

02.04.2025 15.04.2025 Misc.

491


422/MP/2024

25.02.2025 15.04.2025 Misc.

490


395/MP/2025 along with IA No.32/2025

08.04.2025 11.04.2025 Misc.

489


210/MP/2023

08.04.2025 11.04.2025 Misc.

487


31/RP/2024

08.04.2025 11.04.2025 Review

486


27/RP/2024

08.04.2025 11.04.2025 Review

485


336/MP/2024

02.04.2025 11.04.2025 Misc.

484


303/MP/2023

02.04.2025 11.04.2025 Misc.

483


332/MP/2024

08.04.2025 10.04.2025 Misc.

482


329/MP/2024 along with IA No. 17/2025

08.04.2025 10.04.2025 Misc.

481


309/MP/2025

08.04.2025 10.04.2025 Misc.

480


307/MP/2023

08.04.2025 10.04.2025 Misc.

479


243/AT/2025

08.04.2025 10.04.2025 Adoption

478


126/MP/2024

08.04.2025 10.04.2025 Misc.

477


71/MP/2023

08.04.2025 10.04.2025 Misc.

476


71/MP/2021

08.04.2025 10.04.2025 Misc.

475


312/AT/2025

02.04.2025 09.04.2025 Adoption

474


265/MP/2021

02.04.2025 09.04.2025 Misc.

473


176/AT/2025, 175/TL/2025

02.04.2025 09.04.2025 Adoption

472


68/AT/2025

02.04.2025 09.04.2025 Adoption

471


254/AT/2025

02.04.2025 07.04.2025 Adoption

470


230/MP/2023

02.04.2025 07.04.2025 Misc.

469


192/MP/2021
235/MP/2023 along with IA No.56/2023

Petition under Sections 79(1)(c), 79(1)(f) and 79(1)(k) of the Electricity Act, 2003, read with Article 4.5(a) of the Power Purchase Agreement (PPA) dated 20.8.2019 executed between the Petitioner and Solar Energy Corporation of India Limited (SECI), read with the back-to- back Power Sale Agreements (PSAs) dated 17.6.2019 and 26.6.2019 executed between SECI and BSES Yamuna Power Limited (BYPL) and Tata Power Delhi Distribution Limited (TPDDL), respectively, seeking extension of Scheduled Commercial Operation Date (SCOD) and based on the extension of SCOD sought in the instant petition, seeking consequent deferment of operationalization of Long-Term Access (LTA) granted by the Central Transmission Utility of India Limited (CTUIL) to the Petitioner. SBSR Power Cleantech Eleven Private Limited, Tata Power Delhi Distribution Limited
02.04.2025 07.04.2025 Misc.

468


174/MP/2024

02.04.2025 07.04.2025 Misc.

467


88/AT/2025

02.04.2025 07.04.2025 Adoption

466


87/AT/2025

02.04.2025 07.04.2025 Adoption

465


86/AT/2025

02.04.2025 07.04.2025 Adoption

464


75/AT/2025
78/TL/2025

02.04.2025 07.04.2025 Adoption

463


319/MP/2019

02.04.2025 07.04.2025 Misc.

462


268/MP/2020

02.04.2025 07.04.2025 Misc.

461


254/MP/2024

02.04.2025 07.04.2025 Misc.

460


I.A. No. 31/2025 in Petition No. 302/MP/2022

02.04.2025 07.04.2025 Misc.

459


205/MP/2024 along with IAs No. 49/2024 and 50/2024

02.04.2025 07.04.2025 Misc.

458


302/MP/2024

04.03.2025 03.04.2025 Misc.

457


52/MP/2025

25.02.2025 02.04.2025 Misc.

456


276/MP/2025, along with IA Nos.15, 29, and 30/2025

25.03.2025 31.03.2025 Misc.

455


484/MP/2024

25.03.2025 30.03.2025 Misc.

454


417/MP/2024

25.03.2025 30.03.2025 Misc.

453


363/MP/2024

25.03.2025 30.03.2025 Misc.

452


346/MP/2020

25.03.2025 30.03.2025 Misc.

451


331/MP/2024

25.03.2025 30.03.2025 Misc.

450


253/MP/2024

25.03.2025 30.03.2025 Misc.

449


227/MP/2023

25.03.2025 30.03.2025 Misc.

448


260/AT/2025

25.03.2025 28.03.2025 Adoption

447


243/AT/2025

25.03.2025 28.03.2025 Adoption

446


461/TT/2024, 463/TT/2024, 464/TT/2024, 475/TT/2024 & 169/TT/2025

25.03.2025 27.03.2025 Transmission

445


18/TT/2025, 19/TT/2025, 57/TT/2025, 85/TT/2025, 184/TT/2025 & 460/TT/2024

25.03.2025 27.03.2025 Transmission

444


457/TT/2024, 3/TT/2025, 33/TT/2025, 34/TT/2025, 35/TT/2025 & 136/TT/2025

25.03.2025 27.03.2025 Transmission

443


313/TD/2025

25.03.2025 27.03.2025 Licence

442


297/TD/2025

25.03.2025 27.03.2025 Licence

441


254/MP/2023

25.03.2025 27.03.2025 Misc.

440


132/TT/2025

25.03.2025 27.03.2025 Transmission

439


26/TT/2025

25.03.2025 27.03.2025 Transmission

438


497/MP/2024 along with IA No.104/2024

25.03.2025 27.03.2025 Misc.

437


428/MP/2024

25.03.2025 27.03.2025 Misc.

436


311/MP/2025

25.03.2025 27.03.2025 Misc.

435


310/AT/2025

25.03.2025 27.03.2025 Adoption

434


299/AT/2025
300/TL/2025

25.03.2025 27.03.2025 Adoption

433


298/TL/2025

25.03.2025 27.03.2025 Licence (Transmission)

432


269/MP/2018 along with IA Nos. 22 & 26 of 2024

25.03.2025 27.03.2025 Misc.

431


239/MP/2024 along with IA No.8/2025

25.03.2025 27.03.2025 Misc.

430


233/MP/2025

25.03.2025 27.03.2025 Misc.

429


33/RP/2024 in 328/TT/2023

20.03.2025 24.03.2025 Review

428


250/TT/2024

20.03.2025 24.03.2025 Transmission

427


430/MP/2024

20.03.2025 24.03.2025 Misc.

426


424/TL/2024
426/TL/2024
513/TL/2024
514/AT/2024

20.03.2025 22.03.2025 Licence (Transmission)

425


265/MP/2023

20.03.2025 21.03.2025 Misc.

424


59/GT/2022

20.03.2025 21.03.2025 Generation

423


239/AT/2025

20.03.2025 21.03.2025 Adoption

422


238/AT/2025

20.03.2025 21.03.2025 Adoption

421


235/AT/2025

20.03.2025 21.03.2025 Adoption

420


234/AT/2025

18.03.2025 21.03.2025 Adoption

419


179/MP/2025

20.03.2025 21.03.2025 Misc.

418


491/TL/2024

20.03.2025 21.03.2025 Licence (Transmission)

417


250/AT/2025
251/TL/2025

20.03.2025 21.03.2025 Adoption

416


246/AT/2025

20.03.2025 21.03.2025 Adoption

415


242/AT/2025

20.03.2025 21.03.2025 Adoption

414


241/AT/2025

20.03.2025 21.03.2025 Adoption

413


178/MP/2025

20.03.2025 21.03.2025 Misc.

412


463/MP/2014 along with IA No. 40/2019
71/2012
72/2012

18.03.2025 20.03.2025 Misc.

411


347/MP/2025 along with IA No.24/2025

18.03.2025 20.03.2025 Misc.

410


346/MP/2025 along with IA No.23/2025

18.03.2025 20.03.2025 Misc.

409


244/AT/2025
245/TL/2025

18.03.2025 20.03.2025 Adoption

408


236/AT/2025
237/TL/2025

18.03.2025 20.03.2025 Adoption

407


69/TL/2025

18.03.2025 20.03.2025 Licence (Transmission)

406


276/MP/2025 along with IA Nos. 15/2025, Diary No. 146/2025 & 147/2025

13.03.2025 19.03.2025 Misc.

405


218/MP/2022
105/MP/2023

18.03.2025 19.03.2025 Misc.

404


255/MP/2025 along with IA No. 13/2025

18.03.2025 19.03.2025 Misc.

403


380/MP/2023

18.03.2025 19.03.2025 Misc.

402


242/MP/2024 along with IA No. 57/2024
216/MP/2024 along with IA No.66/2024
271/MP/2024

18.03.2025 19.03.2025 Misc.

401


IA No. 18/2025 in
227/MP/2022

18.03.2025 19.03.2025 Misc.

400


468/TT/2024, 207/TT/2025, 286/TT/2025, 285/TT/2025, 291/TT/2025, 292/TT/2025, 293/TT/2025, 290/TT/2025 & 294/TT/2025

13.03.2025 18.03.2025 Transmission

399


463/TT/2024

11.03.2025 18.03.2025 Transmission

398


460/TT/2024

11.03.2025 17.03.2025 Transmission

397


461/TT/2024

11.03.2025 18.03.2025 Transmission

396


457/TT/2024

11.03.2025 18.03.2025 Transmission

395


85/TT/2025

11.03.2025 18.03.2025 Transmission

394


1/TT/2025

11.03.2025 18.03.2025 Transmission

393


3/TT/2025, 6/TT/2025, 17/TT/2025, 18/TT/2025, 19/TT/2025, 29/TT/2025, 33/TT/2025, 34/TT/2025, 35/TT/2025, 57/TT/2025, 103/TT/2025, 136/TT/2025 and 169/TT/2025

11.03.2025 18.03.2025 Transmission

392


459/TT/2024

11.03.2025 18.03.2025 Transmission

391


475/TT/2024

11.03.2025 18.03.2025 Transmission

390


184/TT/2025

11.03.2025 18.03.2025 Transmission

389


464/TT/2024

11.03.2025 18.03.2025 Transmission

388


239/MP/2021

27.02.2025 18.03.2025 Misc.

387


281/TT/2025

13.03.2025 17.03.2025 Transmission

386


287/TT/2025, 288/TT/2025, 274/TT/2025, 289/TT/2025, 295/TT/2025, 318/TT/2025

13.03.2025 17.03.2025 Transmission

385


322/TL/2024

13.03.2025 17.03.2025 Licence (Transmission)

384


252/TL/2025
253/AT/2025

13.03.2025 17.03.2025 Licence (Transmission)

383


243/AT/2025

13.03.2025 17.03.2025 Adoption

382


148/MP/2024

13.03.2025 17.03.2025 Misc.

381


277/MP/2024

11.03.2025 17.03.2025 Misc.

380


240/AT/2025

13.03.2025 13.03.2025 Adoption

379


429/MP/2024

Petition for approval under Section 17 (3) and Section 17 (4) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2024for creation of security interest by way of hypothecation, charge or assignment over rights, title, interest, claims, demands, benefits under, clearance, project documents (except fixed assets), agreements and approvals of Kohima- Mariani Transmission Limited in favour of the Debenture Trustee, i.e., Axis Trustee Services Limited (Respondent No. 8) and for approval of documents creating security and of other documents in relation to the financing of the Transmission Project build, owned, operated and maintained by Kohima-Mariani Transmission Limited. Kohima-Mariani Transmission Limited
11.03.2025 13.03.2025 Misc.

378


315/MP/2023

11.03.2025 13.03.2025 Misc.

377


247/TL/2025
248/AT/2025

11.03.2025 13.03.2025 Licence (Transmission)

376


64/AT/2025
63/TL/2025

11.03.2025 13.03.2025 Adoption

375


301/MP/2025

11.03.2025 13.03.2025 Misc.

374


62/AT/2025

11.03.2025 13.03.2025 Adoption

373


362/MP/2023

04.03.2025 13.03.2025 Misc.

372


361/MP/2023

04.03.2025 13.03.2025 Misc.

371


254/AT/2025

11.03.2025 12.03.2025 Adoption

370


232/MP/2024

11.03.2025 12.03.2025 Misc.

367


166/MP/2025

11.03.2025 12.03.2025 Misc.

368


161/MP/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon'ble Supreme Court of India's Order dated 19.4.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12% by way of Notification No. 8/2021- central tax (rate) dated 30.9.2021, in terms of Article 12 of the Power Purchase Agreement dated 7.4.2022 between ReNew Surya Vihaan Private Limited and Solar Energy Corporation of India Limited ReNew Surya Vihaan Private Limited
11.03.2025 12.03.2025 Misc.

367


148/MP/2024

04.03.2025 12.03.2025 Misc.

366


493/AT/2024
494/TL/2024

04.03.2025 12.03.2025 Adoption

365


2/IA/2025 in
45/GT/2016 (on remand from APTEL)
3/IA/2025 in 243/GT/2017
4/IA/2025 in 409/GT/2020

25.02.2025 12.03.2025 Misc.

364


278/MP/2025

04.03.2025 10.03.2025 Misc.

363


277/MP/2025

04.03.2025 10.03.2025 Misc.

362


66/MP/2025

04.03.2025 10.03.2025 Misc.

361


31/MP/2025

04.03.2025 10.03.2025 Misc.

360


30/MP/2025

04.03.2025 10.03.2025 Misc.

359


54/MP/2019
140/MP/2019

25.02.2025 10.03.2025 Misc.

358


225/MP/2023

27.02.2025 06.03.2025 Misc.

357


173/MP/2023

27.02.2025 06.03.2025 Misc.

356


514/AT/2024
513/TL/2024

04.03.2025 06.03.2025 Adoption

355


510/AT/2024
509/TL/2024

04.03.2025 06.03.2025 Adoption

354


508/AT/2024
507/TL/2024

04.03.2025 06.03.2025 Adoption

353


225/TL/2024

04.03.2025 06.03.2025 Licence (Transmission)

352


276/MP/2025 along
with IA Nos.15
& 16 of 2025

27.02.2025 06.03.2025 Misc.

351


328/MP/2024

25.02.2025 05.03.2025 Misc.

350


205/MP/2024 along with
IAs No. 49/2024 and 50/2024

27.02.2025 04.03.2025 Misc

349


111/MP/2021 with
IA No. 38/2021

19.02.2025 04.03.2025 Misc

348


91/MP/2018
53/MP/2021 along with
IA 26/2003 & 100/2023
61/MP/2021 along
with IA. 28/2021 &
42/2022, 149/MP/2021

25.02.2025 04.03.2025 Misc

347


203/MP/2024

27.02.2025 04.03.2025 Misc

346


319/MP/2022 alongwith
IA No. 63/IA/2022

19.02.2025 04.03.2025 Misc

345


243/AT/2025

27.02.2025 03.03.2025 Adoption

344


617/MP/2020

27.02.2025 03.03.2025 Misc

343


IA No. 65/2023 In
4/MP/2021

27.02.2025 03.03.2025 Misc

342


192/MP/2023 along with IA No. 76/2023

27.02.2025 03.03.2025 Misc

341


282/MP/2021
141/MP/2022

27.02.2025 03.03.2025 Misc

340


104/MP/2022

27.02.2025 03.03.2025 Misc

339


428/MP/2024

27.02.2025 03.03.2025 Misc

338


107/MP/2021 along with IA No. 36/2021

27.02.2025 03.03.2025 Misc

337


188/MP/2019 along with IA No.66/2019

27.02.2025 03.03.2025 Misc

336


176/AT/2025
175/TL/2025

27.02.2025 03.03.2025 Adoption

335


246/MP/2024

27.02.2025 03.03.2025 Misc

334


186/MP/2021

27.02.2025 03.03.2025 Misc

333


61/MP/2023

27.02.2025 03.03.2025 Misc

332


41/MP/2024

27.02.2025 03.03.2025 Misc

331


426/TL/2024

27.02.2025 03.03.2025 Licence (Transmission)

330


424/TL/2024

27.02.2025 03.03.2025 Licence (Transmission)

329


235/MP/2021

27.02.2025 03.03.2025 Misc

328


38/RP/2023 in 252/MP/2021

25.02.2025 03.03.2025 Review

327


9/RP/2024 along with
IA No. 19/IA/2024

25.02.2025 03.03.2025 Review

326


360/MP/2024

25.02.2025 03.03.2025 Misc

325


204/MP/2024

25.02.2025 03.03.2025 Misc

324


260/MP/2024

25.02.2025 03.03.2025 Misc

323


306/MP/2023

25.02.2025 03.03.2025 Misc

322


439/MP/2024

Petition under Section 17 (1) and 17(3) of Electricity Act, 2003 (‘the Act’) for amalgamation/merger of Powergrid Khavda II-B Transmission Limited, Powergrid Khavda RE Transmission System Limited, Powergrid KPS2 Transmission System Limited, Powergrid KPS3 Transmission Limited, Powergrid ERWR Power Transmission Limited, Powergrid Raipur Pool Dhamtari Transmission Limited, Powergrid Dharamjaigarh Transmission Limited, Powergrid Bhadla Sikar Transmission Limited, Powergrid Ananthpuram Kurnool Transmission Limited, Powergrid Neemrana Bareilly Transmission Limited, Powergrid Koppal Gadag Transmission Limited, Powergrid Bidar Transmission Limited and Powergrid Khavda II-C Transmission Limited and assignment/ transfer of Transmission Licences pursuant to amalgamation/merger. POWERGRID Khavda II-B Transmission Limited & 12 Ors.
25.02.2025 03.03.2025 Misc

321


264/MP/2022

25.02.2025 03.03.2025 Misc

320


180/MP/2019

25.02.2025 03.03.2025 Misc

319


325/MP/2024 along with
IA Nos. 78/2024 and 105/2024

25.02.2025 03.03.2025 Misc

318


74/AT/2025

25.02.2025 03.03.2025 Adoption

317


500/MP/2024

25.02.2025 03.03.2025 Misc

316


215/MP/2021

25.02.2025 03.03.2025 Misc

315


378/MP/2023

27.02.2025 03.03.2025 Misc

314


247/MP/2024

27.02.2025 03.03.2025 Misc

313


254/MP/2024

25.02.2025 03.03.2025 Misc

312


9/RP/2015

25.02.2025 03.03.2025 Review

311


2/GT/2024

27.02.2025 03.03.2025 Generation

310


336/MP/2024

25.02.2025 03.03.2025 Misc

309


151/MP/2024

25.02.2025 03.03.2025 Misc

308


104/TT/2024

25.02.2025 03.03.2025 Transmission

307


86/TT/2024
127/TT/2024
150/TT/2024
181/TT/2024
183/TT/2024
187/TT/2024

25.02.2025 03.03.2025 Transmission

306


186/TT/2024

25.02.2025 03.03.2025 transmission

305


450/TT/2024
451/TT/2024
452/TT/2024
455/TT/2024
465/TT/2024
470/TT/2024
471/TT/2024
472/TT/2024
473/TT/2024

25.02.2025 03.03.2025 Transmission

304


268/MP/2020

20.02.2025 27.02.2025 Misc

303


113/MP/2025

20.02.2025 27.02.2025 Misc

302


30/RP/2024
In
193/TT/2023

20.02.2025 25.02.2025 Review

301


2/RP/2025

20.02.2025 25.02.2025 Review

300


1/RP/2025 alongwith
IA No. 1/2025
in 12/TT/2023

20.02.2025 25.02.2025 Review

299


18/RP/2024
In
10/TT/2019

20.02.2025 25.02.2025 Review

298


330/TT/2023

20.02.2025 25.02.2025 Transmission

297


126/MP/2025

20.02.2025 25.02.2025 Misc.

296


28/RP/2024 along with
IA No. 81/2024

20.02.2025 25.02.2025 Review

295


264/MP/2024

20.02.2025 24.02.2025 Misc.

294


432/MP/2019 (with IA No.82/2023)

20.02.2025 24.02.2025 Misc.

293


455/MP/2019
65/MP/2020
618/MP/2020

19.02.2025 24.02.2025 Misc.

292


265/MP/2021

20.02.2025 24.02.2025 Misc.

291


262/MP/2024

20.02.2025 24.02.2025 Misc.

290


129/MP/2024

20.02.2025 24.02.2025 Misc.

289


322/TL/2024

19.02.2025 24.02.2025 Licence (Transmission)

288


230/MP/2023

19.02.2025 24.02.2025 Misc.

287


220/MP/2024 along with
IA No.53/2024

19.02.2025 24.02.2025 Misc.

286


210/MP/2023

19.02.2025 24.02.2025 Misc.

285


181/MP/2021

Petition seeking issuance of appropriate directions to the Respondent to declare that the Letter of Credit opened by the Respondent is in contravention of the provisions of the PTCPPA and Procurer-PPA and to direct the Respondent to pay compensation towards such breach of the PPA and also to impost penalty under Regulation 14C for violation of Regulation 7(c) of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2009; and to direct the Respondent to refund the excess trading margin and excess rebate charged by the Respondent for the period w.e.f 31.1.2020 till opening of Payment Security Mechanism as per the Procurer-PPA, PTC-PPA and the provisions of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations, 2020 issued by this Commission along with Late Payment Surcharge; and to direct that the Respondent shall not be eligible to charge trading margin exceeding 2 paise/kWh till such time the Respondent opens Payment Security Mechanism in conformity with the PTC-PPA, Procurer- PPA and the applicable Regulations of this Commission. Maruti Clean Coal and Power Limited
19.02.2025 24.02.2025 Misc.

284


87/AT/2025

19.02.2025 24.02.2025 Adoption

283


85/MP/2021 along with
IA Nos. 26/2021,
6/2025 and 14/2025

19.02.2025 24.02.2025 Misc.

282


27/RP/2024

20.02.2025 24.02.2025 Review

281


65/MP/2025

Petition under Section 79 of the Electricity Act, 2003 for seeking an appropriate adjustment/ compensation to offset financial/ commercial impact of Change in Law event on account of Hon’ble Supreme Court of India’s Order dated 19.04.2021 in Writ Petition (Civil) No. 838 of 2019 titled M.K. Ranjitsinh & Ors. v. Union of India & Ors. with respect to undergrounding of power lines in the Priority and Potential habitats of Great-Indian Bustard and compensation to offset financial/ commercial impact of Change in Law events on account of increase in the rate of goods and services tax from 5% to 12 % by way of Notification No. 8/2021- central tax (rate) dated 30.09.2021, in terms of Article 12 of the Power Purchase Agreement dated 07.04.2022 between ReNew Surya Aayan Private Limited and Solar Energy Corporation of India Limited. ReNew Surya Aayan Private Limited
19.02.2025 24.02.2025 Misc.

280


89/MP/2025

19.02.2025 24.02.2025 Misc.

279


255/MP/2025 along with
I.A No. 13/2025

19.02.2025 24.02.2025 Misc.

278


513/TL/2024,
514/AT/2024

19.02.2025 22.02.2025 Licence (Transmission)

277


492/AT/2024

20.02.2025 22.02.2025 Adoption

276


409/MP/2024

19.02.2025 22.02.2025 Misc.

275


269/MP/2018 along with
IA Nos. 22 & 26 of 2024

19.02.2025 22.02.2025 Misc.

274


256/MP/2023

19.02.2025 22.02.2025 Misc.

273


238/MP/2024

19.02.2025 22.02.2025 Misc.

272


205/MP/2022

19.02.2025 22.02.2025 Misc.

271


111/MP/2024,
112/MP/2024, 15/RP/2024,
16/RP/2024

19.02.2025 22.02.2025 Misc.

270


68/AT/2025

19.02.2025 22.02.2025 Adoption

269


72/AT/2025

19.02.2025 22.02.2025 Adoption

268


75/AT/2025,
78/TL/2025

19.02.2025 22.02.2025 Adoption

267


83/MP/2025

19.02.2025 22.02.2025 Misc.

266


86/AT/2025

19.02.2025 22.02.2025 Adoption

265


88/AT/2025

19.02.2025 22.02.2025 Adoption

264


222/TT/2025

12.02.2025 21.02.2025 Transmission

263


219/TT/2025

12.02.2025 21.02.2025 Transmission

262


218/TT/2025

12.02.2025 21.02.2025 Transmission

261


213/TT/2025

12.02.2025 21.02.2025 Transmission

260


206/TT/2025

12.02.2025 21.02.2025 Transmission

259


134/TT/2025

12.02.2025 21.02.2025 Transmission

258


122/TT/2025

12.02.2025 21.02.2025 Transmission

257


141/TT/2025

07.02.2025 21.02.2025 Transmission

256


510/AT/2024,
509/TL/2024

11.02.2025 19.02.2025 Adoption

255


508/AT/2024,
507/TL/2024

11.02.2025 19.02.2025 Adoption

254


487/TL/2024

11.02.2025 19.02.2025 Licence (Transmission)

253


319/MP/2019

11.02.2025 18.02.2025 Misc.

252


108/TT/2025

12.02.2025 17.02.2025 Transmission

251


111/TT/2025,
110/TT/2025,
96/TT/2025,
109/TT/2025,
107/TT/2025,
97/TT/2025,
24/TT/2025, 94/TT/2025,
95/TT/2025, 123/TT/2025,
121/TT/2025,
120/TT/2025,
119/TT/2025,
118/TT/2025,
128/TT/2025,
133/TT/2025,
125/TT/2025,
227/TT/2025,
183/TT/2025,
181/TT/2025,
228/TT/2025,
229/TT/2025,
20/TT/2025,
230/TT/2025,
220/TT/2025, 2/TT/2025, 56/TT/2025,
212/TT/2025,
231/TT/2025,
223/TT/2025,
224/TT/2025,
148/TT/2025,
225/TT/2025,
232/TT/2025,
135/TT/2025,
226/TT/2025,
209/TT/2025,
211/TT/2025
& 208/TT/2025

12.02.2025 17.02.2025 Transmission

250


182/TT/2025

12.02.2025 17.02.2025 Transmission

249


28/TT/2025

12.02.2025 17.02.2025 Transmission

248


155/MP/2023

11.02.2025 13.02.2025 Misc.

247


497/MP/2024 along with
IA No.104/2024

11.02.2025 12.02.2025 Misc.

246


482/MP/2024,
483/MP/2024,
296/MP/2024,
297/MP/2024,
442/MP/2024

Petition under Section 79(1)(c) and 79(1)(f) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 seeking quashing of the demand of the one-time GNA charges raised by Central Transmission Utility of India Limited (CTUIL) by way of its letter and emails dated 7.6.2024, 16.7.2024 and 23.07.2024, respectively, on account of the same being not in accordance with the applicable laws and regulations, and consequential refund of Rs. 2,50,71,000/- (Rupees Two Crores Fifty Lakhs Seventy-One Thousand Only) paid by the Petitioner under protest. Apraava Energy Private Limited, Eden Renewable Passy Private Limited, ACME Solar Holdings Limited, Masaya Solar Energy Private Limited
11.02.2025 12.02.2025 Misc.

245


469/MP/2024,
252/MP/2024

11.02.2025 12.02.2025 Misc.

244


345/MP/2022,
6/MP/2024, 7/MP/2024

11.02.2025 12.02.2025 Misc.

243


319/MP/2023

11.02.2025 12.02.2025 Misc.

242


248/MP/2024

11.02.2025 12.02.2025 Misc.

241


244/MP/2024

11.02.2025 12.02.2025 Misc.

240


240/MP/2024 along with
IA No. 56/2024

11.02.2025 12.02.2025 Misc.

239


188/MP/2021

11.02.2025 12.02.2025 Misc.

238


71/MP/2023

11.02.2025 12.02.2025 Misc.

237


254/MP/2023

11.02.2025 12.02.2025 Misc.

236


132/TT/2025

07.02.2025 12.02.2025 Transmission

235


91/TT/2025

07.02.2025 12.02.2025 Transmission

234


142/TT/2025, 14/TT/2025,
124/TT/2025,
130/TT/2025,
25/TT/2025,
26/TT/2025,
149/TT/2025,
27/TT/2025,
131/TT/2025,
90/TT/2025,
13/TT/2025,
92/TT/2025,
140/TT/2025,
139/TT/2025,
104/TT/2025,
105/TT/2025,
106/TT/2025,
23/TT/2025,
114/TT/2025,
138/TT/2025 &
137/TT/2025

07.02.2025 12.02.2025 Transmission

233


107/MP/2023,
85/MP/2022 along with IA Nos. 24/2022 & 37/2023,
123/MP/2022 along with IA No. 38/2023,
246/MP/2022 along with IA No. 8/2023,
56/MP/2023,
185/MP/2023,
205/MP/2023

10.02.2025 12.02.2025 Misc.

232


478/TL/2024

06.02.2025 12.02.2025 Licence (Transmission)

231


161/MP/2023

06.02.2025 12.02.2025 Misc.

230


13/MP/2024,
39/MP/2024,
126/MP/2024

06.02.2025 12.02.2025 Misc.

229


496/MP/2024 along with
I.A. No. 102/2024

06.02.2025 12.02.2025 Misc.

228


249/MP/2022,
250/MP/2022,
251/MP/2022,
252/MP/2022

06.02.2025 12.02.2025 Misc.

227


223/MP/2022

06.02.2025 12.02.2025 Misc.

226


191/MP/2024

06.02.2025 12.02.2025 Misc.

225


190/MP/2024

06.02.2025 12.02.2025 Misc.

224


24/RP/2023

06.02.2025 12.02.2025 Review

223


16/RP/2023

06.02.2025 12.02.2025 Review

222


9/RP/2015

06.02.2025 12.02.2025 Review

221


6/RP/2024

06.02.2025 12.02.2025 Review

220


303/MP/2023

14.01.2025 12.02.2025 Misc.

219


493/AT/2024,
494/TL/2024

06.02.2025 11.02.2025 Adoption

218


426/TL/2024

06.02.2025 11.02.2025 Licence (Transmission)

217


424/TL/2024

06.02.2025 11.02.2025 Licence (Transmission)

216


261/MP/2024

06.02.2025 10.02.2025 Misc.

215


241/MP/2024 along with
IA No.10/2025

06.02.2025 10.02.2025 Misc.

214


490/AT/2024

06.02.2025 10.02.2025 Adoption

213


345/MP/2023 along with
IA No.86/2023

06.02.2025 10.02.2025 Misc.

212


246/MP/2024

06.02.2025 10.02.2025 Misc.

211


94/MP/2023,
278/MP/2022,
282/MP/2022,
265/MP/2022 along with
IA No. 63/2023

06.02.2025 10.02.2025 Misc.

210


77/MP/2025 along with
IA No.5/2025

06.02.2025 10.02.2025 Misc.

209


64/AT/2025,
63/TL/2025

06.02.2025 10.02.2025 Adoption

208


62/AT/2025

06.02.2025 10.02.2025 Adoption

207


12/RP/2024 in
391/GT/2020

06.02.2025 10.02.2025 Review

206


20/RP/2023

06.02.2025 10.02.2025 Review

205


173/TT/2013,
111/TT/2015 (On remand), 33/RP/2016

06.02.2025 10.02.2025 Transmission

204


160/MP/2025

06.02.2025 10.02.2025 Misc.

203


84/TD/2025

06.02.2025 10.02.2025 Licence

202


506/MP/2024

28.01.2025 07.02.2025 Misc.

201


435/MP/2024

28.01.2025 07.02.2025 Misc.

200


122/MP/2022

28.01.2025 07.02.2025 Misc.

199


223/MP/2023 along with
IA No.53/2023

28.01.2025 07.02.2025 Misc.

198


386/MP/2023

28.01.2025 07.02.2025 Misc.

197


99/TT/2025

29.01.2025 04.02.2025 Transmission

196


409/MP/2024

29.01.2025 04.02.2025 Misc.

195


278/MP/2024

29.01.2025 04.02.2025 Misc.

194


245/MP/2021 with IA No. 41/2024

28.01.2025 04.02.2025 Misc.

193


243/MP/2024 along with
IA Nos. 58/2024 &
79/2024,
309/MP/2024,
304/MP/2024 along with
IA No.75/2024

29.01.2025 03.02.2025 Misc.

192


147/MP/2025

29.01.2025 03.02.2025 Misc.

191


259/MP/2024 along with
IA No. 59/2024

28.01.2025 03.02.2025 Misc.

190


168/MP/2019

28.01.2025 03.02.2025 Misc.

189


153/MP/2025

29.01.2025 03.02.2025 Misc.

188


484/MP/2024

28.01.2025 03.02.2025 Misc.

187


137/GT/2024

23.01.2025 03.02.2025 Generation

186


276/MP/2024 along with
IA Nos. 99/2024 & 100/2024

16.01.2025 03.02.2025 Misc.

185


302/MP/2024

29.01.2025 03.02.2025 Misc.

184


289/MP/2024

29.01.2025 03.02.2025 Misc.

183


430/MP/2024

28.01.2025 03.02.2025 Misc.

182


431/MP/2024

28.01.2025 03.02.2025 Misc.

181


520/MP/2024

28.01.2025 03.02.2025 Misc.

179


205/MP/2024 along with
IAs No. 49/2024 and 50/2024

28.01.2025 03.02.2025 Misc.

178


98/TT/2025, 11/TT/2025, 157/TT/2025, 158/TT/2025, 155/TT/2025, 81/TT/2025, 36/TT/2025, 38/TT/2025, 37/TT/2025, 32/TT/2025, 154/TT/2025 & 156/TT/2025

29.01.2025 03.02.2025 Transmission

177


242/MP/2024 along with IA No. 57/2024
216/MP/2024 along with IA No.66/2024
271/MP/2024

29.01.2025 02.02.2025 Misc.

176


67/MP/2021 along with
IA Nos. 17/2021 and 30/2024

29.01.2025 02.02.2025 Misc.

175


9/RP/2024

29.01.2025 01.02.2025 Review

174


488/MP/2024

29.01.2025 01.02.2025 Misc.

173


438/MP/2024

29.01.2025 01.02.2025 Misc.

172


348/MP/2023

29.01.2025 01.02.2025 Misc.

171


294/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 12 of the Power Purchase Agreements dated 19.10.2020 between Avaada Sunrays Energy Pvt. Ltd. and NHPC Limited seeking declaration that (i) Change in Goods and Service Tax from 5% to 12% and 13.8%, respectively, w.e.f 1.10.2021 by way of GST Amendment Notifications dated 30.9.2021, and (ii) requirement of installation of bird diverters on overhead transmission lines in terms of the order dated 19.4.2021 issued by the Hon’ble Supreme Court W.P (C) No. 839 of 2019 qualifies as Change in Law events under Article 12 of the PPA and consequently, directions to NHPC Ltd. to compensate the Petitioner towards the additional expenditure incurred on account of the Change in Law events along with carrying cost. Avaada Sunrays Energy Private Limited
29.01.2025 01.02.2025 Misc.

170


292/MP/2024

Petition under Section 79 of the Electricity Act, 2003 and Article 17 of the power purchase agreements dated 25.11.2021 seeking declaration that change in rate of Goods and Services Tax from 5% to 12% on renewable energy equipment w.e.f. 01.10.2021 on account of amendment to Notification No. 01/2017-Central Tax (Rate) dated 28.06.2017 vide Notification No. 8/2021- Central Tax (Rate) dated 30.09.2021 amounts to a ‘Change in Law’ event under Article 17 of the Power Purchase Agreements and to further direct the Respondents to pay compensation along with carrying cost towards additional amount incurred on account of increment in of Goods and Services Tax paid by the Petitioner pursuant to Notifications dated 30.09.2021 and to restitute the Petitioner to the same financial position as it would have been due continuation of Goods and Services Tax rate of 5% which was applicable till 30.09.2021. Talettutayi Solar Projects Nine Private Limited
29.01.2025 01.02.2025 Misc.

169


244/MP/2021 along with IA No. 30/2023

29.01.2025 01.02.2025 Misc.

168


186/MP/2021

28.01.2025 01.02.2025 Misc.

167


429/MP/2024

Petition for approval under Section 17 (3) and Section 17 (4) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2024for creation of security interest by way of hypothecation, charge or assignment over rights, title, interest, claims, demands, benefits under, clearance, project documents (except fixed assets), agreements and approvals of Kohima- Mariani Transmission Limited in favour of the Debenture Trustee, i.e., Axis Trustee Services Limited (Respondent No. 8) and for approval of documents creating security and of other documents in relation to the financing of the Transmission Project build, owned, operated and maintained by Kohima-Mariani Transmission Limited. Kohima-Mariani Transmission Limited
28.01.2025 01.02.2025 Misc.

166


517/MP/2024

28.01.2025 01.02.2025 Misc.

165


61/TL/2025

25.01.2025 01.02.2025 Licence (Transmission)

164


279/MP/2023

28.01.2025 01.02.2025 Misc.

163


73/TL/2025, 74/AT/2025

28.01.2025 01.02.2025 Licence (Transmission)

162


71/TL/2025, 72/AT/2025

28.01.2025 01.02.2025 Licence (Transmission)

161


69/TL/2025, 70/AT/2025

28.01.2025 01.02.2025 Licence (Transmission)

160


513/TL/2024, 514/AT/2024

28.01.2025 01.02.2025 Licence (Transmission)

159


Addendum of 497/MP/2024 along with IA No. 104/2024

13.01.2025 31.01.2025 Misc.

158


253/MP/2024

21.01.2025 29.01.2025 Misc.

157


418/MP/2024

23.01.2025 29.01.2025 Misc.

156


250/TT/2024

23.01.2025 29.01.2025 Transmission

155


208/TT/2024

23.01.2025 29.01.2025 Transmission

154


185/TT/2024

23.01.2025 29.01.2025 Transmission

153


184/TT/2024

23.01.2025 29.01.2025 Transmission

152


182/TT/2024

23.01.2025 29.01.2025 Transmission

151


159/TT/2024

23.01.2025 29.01.2025 Transmission

150


149/TT/2024

23.01.2025 29.01.2025 Transmission

149


422/MP/2024

23.01.2025 29.01.2025 Misc.

148


269/MP/2024

23.01.2025 29.01.2025 Misc.

147


265/MP/2023

23.01.2025 29.01.2025 Misc.

146


54/MP/2019
140/MP/2019

23.01.2025 29.01.2025 Misc.

145


227/MP/2023

21.01.2025 29.01.2025 Misc.

144


346/MP/2020

21.01.2025 29.01.2025 Misc.

143


236/GT/2021

21.01.2025 29.01.2025 Misc.

142


2/GT/2024

21.01.2025 29.01.2025 Generation

141


491/TL/2024,
492/AT/2024

23.01.2025 29.01.2025 Licence (Transmission)

140


487/TL/2024

23.01.2025 29.01.2025 Licence (Transmission)

139


486/TL/2024

23.01.2025 29.01.2025 Licence (Transmission)

138


428/MP/2024

23.01.2025 29.01.2025 Misc.

137


425/MP/2024

23.01.2025 29.01.2025 Misc.

136


419/MP/2024

23.01.2025 29.01.2025 Misc.

135


65/MP/2024

23.01.2025 29.01.2025 Misc.

134


415/MP/2024

21.01.2025 28.01.2025 Misc.

133


180/MP/2019

13.01.2025 23.01.2025 Misc.

132


411/MP/2024

21.01.2025 23.01.2025 Misc.

131


437/TL/2024

21.01.2025 23.01.2025 Licence (Transmission)

130


338/MP/2022

21.01.2025 23.01.2025 Misc.

129


239/MP/2024 along
with IA No.1360/2024

21.01.2025 23.01.2025 Misc.

128


227/MP/2022 along
with IA No. 55/2022

21.01.2025 23.01.2025 Misc.

127


129/MP/2024

21.01.2025 23.01.2025 Misc.

126


91/MP/2018,
53/MP/2021 along
with IA 26/2003 &
100/2023,
61/MP/2021 along
with IA. 28/2021
& 42/2022,
149/MP/2021

21.01.2025 23.01.2025 Misc.

125


151/MP/2024

21.01.2025 23.01.2025 Misc.

124


417/MP/2024

21.01.2025 23.01.2025 Misc.

123


463/MP/2014 along with
IA No. 40/2019,
OP No. 71/2012,
OP No. 72/2012

21.01.2025 23.01.2025 Misc.

122


9/RP/2015

14.01.2025 23.01.2025 Review

121


247/MP/2024

06.01.2025 23.01.2025 Misc.

120


241/MP/2024

21.01.2025 22.01.2025 Misc.

119


2/IA/2025 in 45/GT/2016
(on remand from APTEL),
3/IA/2025 in
243/GT/2017,
4/IA/2025 in 409/GT/2020

07.01.2025 22.01.2025 Misc.

118


413/MP/2024

21.01.2025 22.01.2025 Misc.

117


380/MP/2023

21.01.2025 22.01.2025 Misc.

116


217/MP/2024

21.01.2025 22.01.2025 Misc.

115


91/MP/2024

21.01.2025 22.01.2025 Misc.

114


497/MP/2024 along with
IA No. 104/2024

13.01.2025 22.01.2025 Misc.

113


519/MP/2024,
Dy. No. 1300/2024,
Dy. No. 40/2025,
Dy. No.33/2025,
Dy. No. 29/2025,
Dy. No. 25/2025,
Dy. No. 22/2025

16.01.2025 21.01.2025 Misc.

112


202/MP/2023,
272/MP/2023,
286/MP/2023,
335/MP/2023,
16/MP/2024, 40/MP/2024,
81/MP/2024, 82/MP/2024,
25/MP/2024, 43/MP/2024,
49/MP/2024, 57/MP/2024,
139/MP/2024,
334/MP/2024,
121/MP/2024,
124/MP/2024,
142/MP/2024,
195/MP/2024,
236/MP/2023,
98/MP/2024

16.01.2025 21.01.2025 Misc.

111


153/MP/2024

16.01.2025 21.01.2025 Misc.

110


436/TL/2024

16.01.2025 20.01.2025 Licence (Transmission)

109


403/MP/2024

16.01.2025 20.01.2025 Misc.

108


371/MP/2024

16.01.2025 20.01.2025 Misc.

107


364/MP/2024

16.01.2025 20.01.2025 Misc.

106


322/TL/2024

16.01.2025 20.01.2025 Licence (Transmission)

105


82/MP/2025 along with
IA No.7/2025

16.01.2025 20.01.2025 Misc.

104


67/MP/2021 along with
IA Nos. 17/2021 and 30/2024

16.01.2025 20.01.2025 Misc.

103


410/MP/2024

16.01.2025 20.01.2025 Misc.

102


363/MP/2024

16.01.2025 20.01.2025 Misc.

101


74/GT/2024,
130/GT/2014

16.01.2025 20.01.2025 Generation

100


223/MP/2022

14.01.2025 20.01.2025 Misc.

99


9/RP/2015

14.01.2025 20.01.2025 Review

98


331/MP/2024

14.01.2025 17.01.2025 Misc.

97


330/MP/2024

14.01.2025 17.01.2025 Misc.

96


32/RP/2024

14.01.2025 17.01.2025 Review

95


16/RP/2023, 24/RP/2023

14.01.2025 17.01.2025 Review

94


20/RP/2023

14.01.2025 17.01.2025 Review

93


12/RP/2024

14.01.2025 17.01.2025 Review

92


10/RP/2024

14.01.2025 17.01.2025 Review

91


6/RP/2024

14.01.2025 17.01.2025 Review

90


409/MP/2024

13.01.2025 17.01.2025 Misc.

89


344/MP/2024

13.01.2025 17.01.2025 Misc.

88


336/MP/2024

13.01.2025 17.01.2025 Misc.

87


335/MP/2024

13.01.2025 17.01.2025 Misc.

86


361/MP/2024

14.01.2025 17.01.2025 Misc.

85


329/MP/2024 along with IA (Diary) No. 26/2025

14.01.2025 17.01.2025 Misc.

84


327/MP/2024

14.01.2025 17.01.2025 Misc.

83


307/MP/2023 along with
IA No. 48/2024

14.01.2025 17.01.2025 Misc.

82


237/MP/2023

14.01.2025 17.01.2025 Misc.

81


269/MP/2018 along with
IA Nos. 22 & 26 of 2024

13.01.2025 17.01.2025 Misc.

80


107/MP/2023,
85/MP/2022 along with
IA Nos. 24/2022 & 37/2023,
123/MP/2022 along with
IA No. 38/2023,
246/MP/2022 along with
IA No. 8/2023, 56/MP/2023,
185/MP/2023,
205/MP/2023

14.01.2025 17.01.2025 Misc.

79


56/MP/2022

14.01.2025 17.01.2025 Misc.

78


IA No. 95/2024 in
132/MP/2024

07.01.2025 17.01.2025 Misc.

77


34/RP/2024 along with
IA No. 96/IA/2024

14.01.2025 17.01.2025 Review

76


33/RP/2024

14.01.2025 17.01.2025 Review

75


332/MP/2024

14.01.2025 16.01.2025 Misc.

74


71/MP/2021

14.01.2025 16.01.2025 Misc.

73


67/MP/2021 along with
IA Nos. 17/2021 and 30/2024

14.01.2025 16.01.2025 Misc.

72


31/RP/2024

14.01.2025 16.01.2025 Review

71


493/AT/2024,
494/TL/2024

13.01.2025 16.01.2025 Adoption

70


490/AT/2024,
489/TL/2024

13.01.2025 16.01.2025 Adoption

69


360/MP/2024

13.01.2025 16.01.2025 Misc.

68


313/TL/2024,
316/TL/2024,
317/TL/2024

13.01.2025 16.01.2025 Licence (Transmission)

67


210/MP/2023

13.01.2025 16.01.2025 Misc.

66


42/MP/2024 along with IA Nos. 14/2024 and 69/2024

13.01.2025 16.01.2025 Misc.

65


41/MP/2023

13.01.2025 16.01.2025 Misc.

64


90/GT/2023

14.11.2024 15.01.2025 Generation

63


362/MP/2024

13.01.2025 15.01.2025 Misc.

62


303/MP/2024

13.01.2025 15.01.2025 Misc.

61


227/MP/2022 along with
IA No. 55/2022

13.01.2025 15.01.2025 Misc.

60


205/MP/2022

13.01.2025 15.01.2025 Misc.

59


173/MP/2023

13.01.2025 15.01.2025 Misc.

58


126/MP/2017

13.01.2025 15.01.2025 Misc.

57


263/MP/2024

07.01.2025 13.01.2025 Misc.

56


203/MP/2024

07.01.2025 13.01.2025 Misc.

55


80/MP/2024

07.01.2025 13.01.2025 Misc.

54


279/MP/2024

06.01.2025 13.01.2025 Misc.

53


173/TT/2013,
111/TT/2015,
33/TT/2016 (On Remand)

06.01.2025 13.01.2025 Transmission

52


152/MP/2024

07.01.2025 12.01.2025 Misc.

51


111/MP/2024,
112/MP/2024,
15/RP/2024, 16/RP/2024

07.01.2025 12.01.2025 Misc.

50


4/TT/2025

07.01.2025 12.01.2025 Transmission

49


238/MP/2024

07.01.2025 12.01.2025 Misc.

48


220/MP/2024 along with
IA No.53/2024

07.01.2025 12.01.2025 Misc.

47


225/TL/2024

07.01.2025 12.01.2025 Licence (Transmission)

46


188/MP/2019 along with
IA No.66/2019

07.01.2025 12.01.2025 Misc.

45


402/AT/2024

07.01.2025 12.01.2025 Adoption

44


478/TL/2024

06.01.2025 12.01.2025 Licence (Transmission)

43


280/MP/2024

06.01.2025 12.01.2025 Misc.

42


330/TT/2023

06.01.2025 12.01.2025 Misc.

41


350/MP/2024 along with
IA Nos. 101 & 103/2024

06.01.2025 12.01.2025 Misc.

40


404/AT/2024

07.01.2025 12.01.2025 Adoption

39


453/TT/2024,
479/TT/2024,
480/TT/2024,
481/TT/2024,
495/TT/2024,
7/TT/2025, 8/TT/2025,
76/TT/2025, 9/TT/2025,
10/TT/2025 & 5/TT/2025

07.01.2025 12.01.2025 Transmission

38


420/AT/2024

07.01.2025 12.01.2025 Adoption

37


423/AT/2024

06.01.2025 12.01.2025 Adoption

36


427/AT/2024

06.01.2025 12.01.2025 Adoption

35


477/TL/2024

06.01.2025 12.01.2025 Licence (Transmission)

34


279/MP/2023

06.01.2025 09.01.2025 Misc.

33


128/GT/2024

26.12.2024 09.01.2025 Generation

32


256/MP/2023

06.01.2025 08.01.2025 Misc.

31


288/MP/2024

06.01.2025 08.01.2025 Misc.

30


287/MP/2024

06.01.2025 08.01.2025 Misc.

29


277/MP/2024

06.01.2025 08.01.2025 Misc.

28


264/MP/2022

06.01.2025 08.01.2025 Misc.

27


35/MP/2024

06.01.2025 08.01.2025 Misc.

26


174/MP/2024

30.12.2024 06.01.2025 Misc.

25


227/MP/2024

06.11.2024 06.01.2025 Misc.

24


399/GT/2020

26.12.2024 06.01.2025 Generation

23


107/MP/2023,
85/MP/2022 along with
IA Nos. 24/2022 & 37/2023,
123/MP/2022 along with
IA No. 38/2023,
246/MP/2022 along with
IA No. 8/2023, 56/MP/2023,
185/MP/2023,
205/MP/2023

03.01.2025 06.01.2025 Misc.

22


191/MP/2024

30.12.2024 03.01.2025 Misc.

21


190/MP/2024

30.12.2024 03.01.2025 Misc.

20


125/MP/2024 along with
IA No. 21/2024

30.12.2024 03.01.2025 Misc.

19


500/MP/2024

30.12.2024 02.01.2025 Misc.

18


469/MP/2024,
252/MP/2024

30.12.2024 02.01.2025 Misc.

17


439/MP/2024

Petition under Section 17 (1) and 17(3) of Electricity Act, 2003 (‘the Act’) for amalgamation/merger of Powergrid Khavda II-B Transmission Limited, Powergrid Khavda RE Transmission System Limited, Powergrid KPS2 Transmission System Limited, Powergrid KPS3 Transmission Limited, Powergrid ERWR Power Transmission Limited, Powergrid Raipur Pool Dhamtari Transmission Limited, Powergrid Dharamjaigarh Transmission Limited, Powergrid Bhadla Sikar Transmission Limited, Powergrid Ananthpuram Kurnool Transmission Limited, Powergrid Neemrana Bareilly Transmission Limited, Powergrid Koppal Gadag Transmission Limited, Powergrid Bidar Transmission Limited and Powergrid Khavda II-C Transmission Limited and assignment/ transfer of Transmission Licences pursuant to amalgamation/merger. POWERGRID Khavda II-B Transmission Limited & 12 Ors.
30.12.2024 02.01.2025 Misc.

16


378/MP/2023

30.12.2024 02.01.2025 Misc.

15


325/MP/2024 along with
IA Nos. 78/2024 and 105/2024

30.12.2024 02.01.2025 Misc.

14


319/AT/2024,
322/TL/2024

30.12.2024 02.01.2025 Adoption

13


313/TL/2024,
316/TL/2024,
317/TL/2024

30.12.2024 02.01.2025 Licence (Transmission)

12


215/MP/2021

30.12.2024 02.01.2025 Misc.

11


362/MP/2023

27.12.2024 02.01.2025 Misc.

10


361/MP/2023

27.12.2024 02.01.2025 Misc.

9


78/MP/2024

30.12.2024 02.01.2025 Misc.

8


342/AT/2024,
343/TL/2024

30.12.2024 01.01.2025 Adoption

7


328/MP/2024

30.12.2024 01.01.2025 Misc.

6


324/TL/2024

30.12.2024 01.01.2025 Licence (Transmission)

5


306/MP/2023

30.12.2024 01.01.2025 Misc.

4


246/MP/2024

30.12.2024 01.01.2025 Misc.

3


244/MP/2021 along with
I.A. No. 30/IA/2023

30.12.2024 01.01.2025 Misc.

2


196/MP/2024

30.12.2024 01.01.2025 Misc.

1


216/TT/2020
(on remand from APTEL)

30.12.2024 01.01.2025 Transmission