143/2005
In
147/2005

Power Grid Corporation of India Ltd.

1. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in Southern Region for the period 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2002-03 to 2004-05.
2. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04 to 2004-05.

06-07-06

15-12-06

129/2005 (Suo Motu)

-

Reimbursement of application fee and publication charges to Central Power Sector Utilities.

-

05-12-06

48/2003

-

Open access in inter-State transmission

-

07-12-06

143/2006

Indraprastha Power Generation Company Limited

Petition under Section 79(1) (f) of the Electricity Act, 2003

28-12-06

28-12-06

15/2006

Shri Gajendra Haldea

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading margin exceeding 4 paise/kWh, notified by the Commission

-

01-12-06

35/2004

National Thermal Power Corporation Limited

Approval of revised fixed charges due to additional capitalisation for the years 2000-2004 for the Talcher Thermal Power Station (460 MW)

27-07-06

25-09-06

35/2004

National Thermal Power Corporation Limited

Approval of revised fixed charges due to additional capitalisation for the year 2000-04 for the Talcher thermal power station (460 MW)

27-07-06

28-07-06

40/2006

Subhash Kabini Power Corporation Ltd

Adjudication of dispute with regard to the amounts payable to Subhash Kabini Power Corporation Ltd by Madhya Pradesh State Electricity Board on account of trading of power

26-09-06

27-10-06

94/2006

Gujarat Urja Vikas Nigam Ltd

Petition for deciding the (i) “Appropriate Commission” having jurisdiction to determine the Transmission charges of the Gujarat transmission system being used incidental to transmission system of CTU for transmission of Central Sector and Bilateral power to the Union Territories of Daman & Diu and Dadra Nagar Haveli and/or (ii) determination of transmission charges for using GETCO system

21-09-06

04-10-06

10/2003

Grid Corporation of Orissa Ltd, Bhubaneswar

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December, 1994 to September, 1996

17-10-06

26-10-06

56/2005

National Thermal Power Corporation Ltd.

Approval of employees cost in respect of Korba Super Thermal Power Station as per the directions of the Appellate Tribunal for Electricity in its order
dated 7.9.2006 in Appeal No. 158/2005

-

16-10-06

40/2006

Subhas Kabini Power Corporation Ltd

Adjudication of dispute with regard to the amounts payable to Subhas Kabini Power Corporation Ltd by Madhya Pradesh State Electricity Board on account of trading of power

26-09-06

26-09-06

1/2006

Northern Regional Load Despatch Centre, New Delhi

Inquiry under Section 143 of the Electricity Act, 2003 for the alleged non-compliance of the directions of Northern Regional Load Despatch Centre by Uttar Pradesh Power Corporation Ltd under Section 29 of the Electricity Act, 2003

02-06-06

13-10-06

41/2006

National Hydroelectric Power Corporation Ltd

Approval of tariff in respect of Rangit Hydroelectric Project for the period 1.4.2001
to 31.3.2004

12-09-06

29-09-06

19/2006

Neyveli Lignite Corporation Ltd. Chennai

Linking of incentive payment to availability instead of Scheduled Plant Load Factor

26-09-06

26-09-06

65/2006

North Eastern Electric Power Corporation Ltd, Shilliong

Approval of revised fixed charges due to additional capitalization for the year 2003-04 for Assam Gas Based Power Project

26-09-06

26-09-06

17/2006

Neyveli Lignite Corporation Limited, Chennai

Seeking direction to TNEB for payment of power bills of NLC as per the Commission's order dated 19.10.2005 and to refund excess rebate availed

14-07-06

14-09-06

103/2006

Re-organisation of State Electricity Boards under Section 131 of the
Electricity Act, 2003

13-06-06

19-09-06

56/2004

Power Grid Corporation of India Ltd., Gurgaon

Approval of incentive based on availability of transmission system for the year 2003-04
for Eastern Region

08-08-06

14-09-06

48/2004

Power Grid Corporation of India Ltd., Gurgaon

Approval of incentive based on availability of transmission system for the year
2003-04 for Western Region

08-08-06

14-09-06

9/2003

Grid Corporation of Orissa Ltd., Bhubasneswar

Payment of outstanding dues by APTRANSCO to GRIDCO for the period
from January, 2001 to July, 2001

06-09-06

12-09-06

32/2006

 NTPC Limited

Recovery of energy charges for the energy supplied during the period 1.1.2000 to 30.6.2001-adjudication of disputes

12-09-06

12-09-06

19/2006

Neyveli Lignite Corporation Ltd, Chennai

Linking of incentive payment to availability instead of scheduled Plant Load Factor

06-06-06

06-06-06

36/2006

National Hydroelectric Power Corporation Ltd.

Implementation of dynamic inflow forecasting and hydro scheduling in respect of Chamera – I HE project in pursuance of the directions of the Commission vide Order dated 8.12.2000 in Review Petition No. 17/2000

01-08-06

29-08-06

154/2005

Torrent Power Generation Limited

In-principle approval of project capital cost and financing plan of Torrent Power Generation Ltd. in respect of SUGEN Combined Cycle Power Project in the State of Gujarat.

27-04-06

22-08-06

28/2006

Grid Corporation of Orissa Ltd., Bhubaneswar

Non-payment of dues of GRIDCO by BSEB and JSEB towards drawal of power from ER Regional Pool during October 1999, November 1999, August 2001 and September 2001.

10-08-06

23-08-06

27/2006

Gajendra Haldea

To restrain PTC from carrying on purchase of electricity from GRIDCO or any other electricity trader.

27-07-06

07-08-06

10/2003

Grid Corporation of Orissa Limited, Bhubaneswar

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996

-

03-08-06

10/2003

Grid Corporation of Orissa Limited, Bhubaneswar

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996.

17-02-06

27-07-06

158/2005

Essar Power Ltd.

In-principle acceptance of the project capital cost and the financing plan of 1500 MW Hazira Combined Cycle Power Project proposed to be set up by Essar Power Ltd.

22-06-06

02-08-06

40/2005 & IA No 4/2006 and IA No. 45/2006

Nagarjuna Power Corporation Ltd

In-principle approval of capital cost for Nagarjuna Power project for the period 1.9.2008 onwards

20-07-06

07-08-06

35/2006

Power Grid Corporation of India Ltd

Seeking reimbursement of additional expenditure incurred towards deployment of special security forces (CISF &TSR) at Bongaigaon and Kumarghat sub-stations for the year 2004-05 in Northeastern Region.

18-07-06

18-07-06

28/2006

Grid Corporation of Orissa Ltd., Bhubaneswar

Non-payment of dues of GRIDCO by BSEB and JSEB towards drawal of power from ER Regional Pool during October 1999, November 1999, August 2001 and September 2001.

20-06-06

24-06-06

157/2005

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year 2004-05 for Southern Region.

-

06-07-06

103/2005

Uttaranchal Jal Vidyut Nigam Ltd

Petition under sections 62 and 79 of the Electricity Act, 2003 seeking permission for filing the proposed tariffs for financial years 2005-06 to 2008-09 of Uttaranchal Jal Vidyut Nigam Ltd and for the Determination of Generation Tariffs for its Hydro Electricity Generation Stations of Dhakrani, Dhalipur, Chibro, Khodri and Kulhal.

05-01-06

29-03-06

No. L-7/25(5)/2003-CERC

Amendment
of the terms and conditions of tariff applicable during
1.4.2004 to 31.3.2009 - Statement of Reasons

-

15-05-06

133/2005

Power Grid Corporation of India Limited

Approval of transmission charges for strengthening of 220 kV transmission system under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.4.2004 to 31.3.2009.

21-03-06

9-05-06

66/2005

Damodar Valley Corporation

Approval of tariff in respect of Damodar Valley Corporation for the period from 1.4.2004 to 31.3.2009.

13-02-06

05-05-06

66/2005

Damodar Valley Corporation

Approval of tariff in respect of Damoday Valley Corporation for the period from 1.4.2004 to 31.3.2009.

-

29-05-06

Pet No.15/2006
with IA No.10/2006

Shri Gajendra Haldea

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading margin exceeding 4 paise/kWh, notified by the Commission.

05-04-06

04-05-06

Pet No.15/2006
with IA No.10/2006

Shri Gajendra Haldea

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading margin exceeding 4 paise/kWh, notified by the Commission.

05-04-06

01-05-06

67/2003
(Suo motu)

Tamil Nadu Electricity Board

Terms and conditions for determination of tariff for the period 1.4.2004 to 31.3.2009.

06-10-05

19-10-05

3/2006

National Thermal Power Corporation Ltd

Approval of recovering the fixed charges on account of capital expenditure at the various offices of NTPC

23-02-06

26-04-06

Amendment of regulations on grant of licence for inter-state trading – Statement of Reasons

-

28-03-06

67/2003
(suo motu)

Bringing generating stations of CPSUs supplying power to single-beneficiary State under the provision of ABT – Kayamkulam CCPP

24-02-06

04-04-06

15/2006

Gajendra Haldea

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading margin exceeding 4 paise/kWh, notified by the Commission.

31-03-06

31-03-06

9/2003

Grid Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from January 2001 to July 2001.

10-01-06

28-03-06

Petition No.15/2006
alongwith IA No. 10/2006

Grid Corporation of Orissa Ltd.

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading margin exceeding 4 paise/kWh, notified by the Commission.

17-03-06

17-03-06

66/2005

Damodar Valley Corporation

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity.

13-02-06

17-02-06

Revision of Indian Electricity Grid Code - Statement of Reasons.

-

17-02-06

59/2005

Bihar State Electricity Board, Patna

Sharing of the Transmission Charges of 220 kV D/C Birpara-Salakati Transmission Line and associated sub-station at Birpara (ER) and Salakati (NER) as inter-regional assets between ER and NER

20-01-06

14-02-06

95/2005

Punjab State Electricity Board

Direction to NTPC to tie up and procure adequate quantum of gas at economical rates for Kawas and Gandhar Power Stations and give consent to Gujarat State Petronet Ltd. for laying pipeline in the premises of Kawas and Gandhar Power Stations for supply of gas from Gujarat State Petroleum Corporation Ltd.

24-01-06

16-02-06

148/2005

Punjab State Electricity Board

Direction to NTPC to tie up and procure adequate quantum of Gas/RLNG for Anta, Auriya, Dadri CCGT stations and for settlement of issues relating to scheduling, metering and UI accounting of gas and liquid generation separately, levy of capacity charges proportional to gas fired generation, charging of variable charges as per actuals and supply of information.

24-01-06

30-01-06

154/2005

Torrent Power Generation Limited, Ahmedabad

`In principle" acceptance of project capital cost and financing plan of 1100 MW SUGEN CCPP of Torrent Power Generation Limited.

31-01-06

10-02-06

10/2003

Grid Corporation of Orissa Ltd

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from December 1994 to September 1996.

12-01-06

12-01-06

11/2003
12/2003

Grid Corporation of Orissa Ltd

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from October to December 2000 and March-April 2002

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from September to December 2001.

10-01-06

25-01-06

11/2003

Grid Corporation of Orissa Ltd.

Payment of outstanding dues by APTRANSCO to GRIDCO for the period from October to December 2000 and March-April 2002

10-01-06

25-01-06

136/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Kawas Gas Power Station (656.20 MW).

27-12-05

25-01-06

145/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Kahalgaon Super Thermal Power Station (840 MW).

10-01-06

19-01-06

122/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Feroze Gandhi Unchahar Thermal Station Stage –II (420 MW).

10-01-06

19-01-06

67/2003
(Suo motu)

Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single-beneficiary State in which situated, under the purview of Availability Based Tariff (ABT).

-

03-01-06

-

-

CERC announces trading margin for electricity traders

-

23-01-05



Additional Capitalisation
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

88/2005

National Hydroelectric Power Corporation Ltd..

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Uri Hydroelectric Project

15-09-05

3-02-06

85/2005

National Hydroelectric Power Corporation Ltd..

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Salal Hydroelectric Project

13-09-05

1-02-06

76/2005

National Hydroelectric Power Corporation Ltd..

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Tanakpur Hydroelectric Project

13-09-05

3-02-06

75/2005

National Hydroelectric Power Corporation Ltd..

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Bairasiul Hydroelectric Project

13-09-05

3-02-06

146/200

National Thermal Power Corporation Ltd

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kahalgaon STPS ( 840 MW)

27-12-05

9-05-06

110/2005

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kawas GPS ( 656.20 MW)

22-11-05

9-05-06

109/2005

National Thermal Power Corporation Ltd

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Gandhar GPS ( 657.39 MW)

22-11-05

9-05-06

121/2005

National Hydroelectric Power Corporation Ltd.

Revision of Annual Fixed Charges (AFC) on account of Additional capital expenditure incurred during the tariff period 2001-04 in respect of Rangit Hydroelectric project.

20-12-05

09-05-06



Tariff-Thermal
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

143/2006

Indraprastha Power Generation Company Limited

Petition under Section 79(1) (f) of the Electricity Act, 2003

28-12-06

28-12-06

105/2006

Power Grid Corporation of India Limited, Gurgaon

Determination of provisional transmission tariff for LILO of Nagarjunasagar- Raichur 400 kV S/C line at Mehboobnagar and LILO of both the circuits of Nellor- Sriperumbudur 400 kV D/C line at Almathi along with associated bays at ehoobnagar and Almathi under system strengthening-IV of Southern Region Grid in Southern Region

21-12-06

21-12-06

115/2006

National Thermal Power Corporation Ltd

Approval of provisional tariff for Unit-I (500 MW) of Vindhyachal STPS from date of commercial operation to 31.3.2009

14-12-06

14-12-06

106/2006

National Thermal Power Corporation Ltd.

Final tariff of Unit-I (500 MW) for the period 15.8.2005 to 31.3.2006 and Units I & II (Combined) for the period 1.4.2006 to 31.3.2009 of Rihand STPS Stage II

07-12-06

12-12-06

93/2006

National Thermal Power Corporation Ltd

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Talcher Thermal Power Station

07-12-06

07-12-06

108/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of
Talcher TPS

14-02-06

27-02-06

5/2006

National Thermal Power Corporation

Approval of provisional tariff of Rihand Super Thermal Power Station, Stage-II, unit-I & II (2x500 MW) (Combined) for the period 1.3.2006 to 31.3.2009

27-04-06

06-06-06

96/2006

NTPC Ltd. , New Delhi

Review of order dated 19.7.2006 in Petition No. 159/2004, for approval of tariff in respect of Korba Super Thermal Power station for the period 1.4.2004 to 31.3.09

28-11-06

01-12-06

140/2006

NTPC Ltd., New Delhi

Review of order dated 30.6.2006 in Petition No.148/2004, for approval of tariff in respect of Ramagundam Super Thermal Power Station, for the period 1.4.2004 to 31.3.2009

28-11-06

01-12-06

120/2006

NTPC Ltd. , New Delhi

Review of order dated 21.8.2006 in Petition No. 146/2004, for approval of tariff in respect of Vindhyachal Super Thermal Power station Stage-II for the period 1.4.2004 to 31.3.2009

28-11-06

01-12-06

163/2004

NTPC Ltd., New Delhi

Approval of tariff in respect of Tanda Thermal Power Station, (440 MW) for the period from 1.4.2004 to 31.3.2009

13-12-05

30-11-06

120/2005

NTPC Ltd

Approval of tariff in respect of Kahalgaon Super Thermal Power Station,Stage-I, (840 MW) for the period from 1.4.2004 to 31.3.2009

09-03-06

23-11-06

56/2005

National Thermal Power Corporation Ltd

Approval of employee cost in respect of Korba Super Thermal Power Station as per the directions of the Appellate Tribunal for Electricity in its order dated 7.9.2006 in Appeal No.158/2005

14-11-06

14-11-06

32/2006

NTPC Limited

Recovery of energy charges for the energy supplied during the period 1.1.2000 to 30.6.2001-adjudication of disputes

31-10-06

31-10-06

66/2005

Damodar Valley Corporation, Kolkata

Tariff for generation and inter-State Transmission of Electricity by Damodar Valley Corporation

10-08-06

03-10-06

149/2004

National Thermal Power Corporation Ltd

Approval of tariff in respect of Simhadri Thermal Power Station (1000 MW) for the period from 1.4.2004 to 31.3.2009

15-12-05

22-09-06

186/2004

Neyveli Lignite Corporation Ltd

Approval of tariff in respect of Neyveli Thermal Power Station –I (600 MW) for the period from 1.4.2004 to 31.3.2009

20-12-05

26-09-06

146/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Vindhyachal Super Thermal Power Station Stage-II (1000 MW) for the period from 1.4.2004 to 31.3.2009.

22-12-05

21-08-06

5/2002

Neyveli Lignite Corporation Ltd.

Revised tariff of Thermal Power Station II of NLC for the period 1.4.2001 to 31.3.2004.

26-06-06

21-07-06

IA No. 55/2006

National Thermal Power Corporation Ltd.,

Approval of revised fixed charges due to additional capitalization for the year 2001-02, 2002-03 and 2003-04 for Talcher Thermal Power Station (460 MW).

-

20-07-06

32/2006

NTPC Limited

Recovery of energy charges for the energy supplied during the period 1.1.2000 to 30.6.2001-adjudication of disputes. .

20-07-06

20-07-06

151/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period from 1.4.2004 to 31.3.2009. .

-

21-07-06

151/2004 with I.A. 52/2005

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period from 1.4.2004 to 31.3.2009. .

30-03-06

19-06-06

1/2003

National Thermal Power Corporation Ltd.

Petition for approval of tariff of Unit I & II of Talcher STPS Stage-II (4x500 MW) .

06-07-06

13-07-06

148/2004 with IA No. 39/2005

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Ramagundam Super Thermal Power Station Stage I and Stage II for the period from 1.4.2004 to 31.3.2009. .

15-12-05

30-06-06

159/2004 with IA No. 44/2006

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Korba STPS (2100 MW) for the period from 1.4.2004 to 31.3.2009. .

14-07-06

19-07-06

128/2004

National Thermal Power Corporation Ltd

Approval of tariff in respect of Vindhyachal Super Thermal Power Station Stage-I (1260 MW) for the period from 1.4.2004 to 31.3.2009. .

22-12-05

29-06-06

144/2004

National Thermal Power Corporation Ltd

Approval of tariff in respect of Talcher Super Thermal Power Station Stage-I (1000 MW) for the period from 1.4.2004 to 31.3.2009. .

16-02-06

9-05-06

Rev Pet No. 123/2005
in Pet No. 1/2003

National Thermal Power Corporation Ltd

Review of Order dated 13.6.2005 in Petition No. 1/2003 - Approval of tariff of the Units I and II of Talcher STPS Stage II for the period from 1.8.2003 to 31.3.2004.

17-01-06

9-05-06

146/2005

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kahalgaon STPS Stage-I ( 840 MW)

27-12-05

9-05-06

197/2004

National Hydroelectric Power Corporation Ltd.

Approval of generation tariff of Salal Hydroelectric Project for the period 1.4.2004 to 31.3.2009

17-11-05

9-05-06

162/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of National Capital Thermal Power Station, Dadri for the period from 1.4.2004 to 31.3.2009.

21-02-06

5-05-06

156/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Faridabad Gas Power Station, for the period from 1.4.2004 to 31.3.2009.

21-02-06

9-05-06

142/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Feroze Gandhi Unchahar Thermal Power Station Stage I for the period from 1.4.2004 to 31.3.2009.

21-02-06

9-05-06

40/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Badarpur Thermal Power Station, New Delhi for the period from 1.4.2004 to 31.3.2009.

14-09-05

9-05-06

109/2005

National Thermal Power Corporation Ltd.

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Gandhar GPS ( 657.39 MW)

22-11-05

9-05-06

25/2005

Power Grid Corporation of India Ltd., Gurgaon

Reimbursement of the cost of hedging as pass through on account of currency and/or interest rate swap in the changed scenario on account of FERV on the foreign loans as per revised AS-11.

23-03-06

9-05-06

Pet No 153/2004
with I.A.No. 55/2005

National Thermal Power Corporation Ltd

Approval of tariff in respect of Farakka Super Thermal Power Station (1600 MW) for the period from 1.4.2004 to 31.3.2009.

16-02-06

9-05-06

39/2005

National Hydroelectric Power Corporation Ltd.

Approval of generation tariff for Chamera Hydroelectric Project Stage –I for the period 1.4.2004 to 31.3.2009

18-10-05

9-05-06

Pet No. 157/2004
with I.A. No. 56/2005

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Singrauli Super Thermal Power Station (2000 MW) for the period from 1.4.2004 to 31.3.2009.

21-02-06

9-05-06

Pet No. 150/2004
with IA No. 51/2005

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Feroze Gandhi Unchahar Thermal Power Station Stage II for the period from 1.4.2004 to 31.3.2009.

21-02-06

9-05-06

Pet No 147/2004
With IA No. 38/2005

National Thermal Power Corporation Ltd. 

Approval of tariff in respect of Kayamkulum Combined Cycle Power Project, for the period from 1.4.2004 to 31.3.2009

17-01-06

9-05-06

110/2005

National Thermal Power Corporation Ltd. 

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kawas GPS ( 656.20 MW)

22-11-05

9-05-06

67/2003
(Suo motu)

National Thermal Power Corporation Ltd.  

Terms and conditions for determination of tariff for the period 1.4.2004 to 31.3.2009.

06-12-05

9-05-06

8/2006

Neyveli Lignite Corporation Ltd.Chennai

Fixation of tariff in respect of NLC Thermal Power Station-I (Expansion) for the period from 9.5.2003 to 31.3.2004.

04-04-06

26-04-06

5/2002

Neyveli Lignite Corporation Ltd

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2003-2004

25-04-06

25-04-06

Rev Pet No. 127/2002
in Pet No. 30/2002

National Thermal Power Corporation Ltd.

Review of order dated 4.10.2002 in Petition No. 30/2002, approving tariff for Rihand Super Thermal Power Station for the period from 1.4.1997 to 31.3.2001

30-03-06

30-03-06

38/2001

National Thermal Power Corporation Ltd.

Generation Tariff for Rihand STPS in Northern Region for the period from 1.4.2001 to 31.3.2004.  

30-03-06 

30-03-06 

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2003-2004.

28-02-06

22-03-06

IA No. 11/2006
Petition No. 146/2004

National Thermal Power Corporation Ltd.

Approval of tariff for Vindhyachal Super Thermal Power Station Stage-II (1260 MW) for the period from 1.4.2004 to 31.3.2009.

22-02-06

23-03-06

IA No. 4/2006 in
Petition No. 40 /2005

M/s. Nagarjuna Power Corporation Limited.

Seeking clarification to Order dated 25th October, 2005 in petition No.40/2005 for approval of tariff of Nagarjuna Power Corporation Limited (1015 MW) for the period 01.09.2008 onwards.

02-03-06

09-03-06

IA No. 52/2005
in
Petition No. 151/2004

National Thermal Power Corporation Ltd

Approval of tariff of Rihand Super Thermal Power Station (1000 MW) for the period from 1.4.2004 to 31.3.2009.

21-02-06

03-03-06

Review Pet
No. 100/2005
in Pet No. 31/2001

Madhya Pradesh State Electricity Board, Jabalpur

Review of order dated 7.4.2005 in petition No.31/2001 - Approval of tariff in respect of Kawas Gas Power Station for the period from 1.4.2001 to 31.3.2004.

07-02-06

16-02-06

5/2002

Neyveli Lignite Corporation Ltd.

Revised Tariff for Thermal Power Station II of NLC for the period from 2001-2002 to 2003-2004.

07-02-06

07-02-06

Review Pet
No. 123/2005
in Pet No. 1/2003

National Thermal Power Corporation Ltd

Review of Order dated 13.6.2005 in Petition No. 1/2003 - Approval of tariff of the Units I and II of Talcher STPS Stage II for the period from 1.8.2003 to 31.3.2004.

17-01-06

17-01-06

 

Gas Based
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

80/2005

NTPC Limited

Approval of tariff in respect of Jhanor Gandhar Gas Power Station (657.39 MW) for the period 1.4.2004 to 31.3.2009

20-07-06

15-12-06

79/2005

National Thermal Power Corporation Ltd

Approval of tariff in respect of Kawas Gas Power Station for the period 1.4.2004 to 31.3.2009

22-06-06

16-11-06

67/20006

Ratnagiri Gas and Power Private Limited(RGPPL)

Approval of one time tariff for Ratnagiri Gas and Power Private Limited(RGPPL) during interim period pending the implementation of revival of the project with LNG as fuel

17-10-06

25-10-06

51/2006

National Thermal Power Corporation Limited

Review of order dated 9.5.2006 in Petition No. 156/2004, for approval of tariff in respect of Faridabad GPS, for the period 1.4.2004 to 31.3.2009

07-09-06

04-10-06

67/2006

Ratnagiri Gas and Power Private Limited(RGPPL)

Approval of one time tariff for Ratnagiri Gas and Power Private Limited(RGPPL) during interim period pending the implementation of revival of the project with LNG as fuel

26-09-06

26-09-06

94/2002

National Thermal Power Corporation Ltd

Approval of tariff from 1.4.2000 to 31.3.2001 of Gandhar Gas Power Station

-

27-09-06

7/2006

Gujarat Urja Vikas Nigam Ltd

Direction to NTPC for refund of amount recovered on account of impact of foreign exchange rate variation for the period 2001-2004 in case of Kawas Gas Power Station.

14-07-06

18-08-06

80/2005 & IA No. 31/2006

National Thermal Power Corporation Ltd., New Delhi

Approval of tariff in respect of Jhanor Gandhar GPS(657.39MW) for the period from 1.4.2004 to 31.3.2009.

20-07-06

03-08-06

115/2005

North Eastern Electric Power Corporation Ltd.

Review of Order dated 22.8.2005 in Petition No. 33/2003 for approval of tariff in respect of Assam Gas Based Power Station for the period from 1.4.2001 to 31.3.2004.

18-04-06

02-08-06

26/2006

Uttar Pradesh Power Corporation Ltd, Lucknow

Revision of operation parameters and norms for the determination of tariff for Tanda TPS for the period from 2004-09.

20-06-06

20-06-06

Pet No. 80/2005 &
IA 31/2006

National Thermal Power Corporation Ltd, New Delhi

Approval of tariff of Jhanor Gandhar Gas Power Station for the period from 1.4.2004 to 31.3.2009

6-06-06

6-06-06

38/2001

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Rihand Super Thermal Power Station for the period from 1.4.2001 to 31.3.2004.

13-04-06

9-06-06

164/2004

National Thermal Power Corporation Ltd.

Approval of tariff from 1.4.2004 to 31.3.2009 in respect of Auraiya Gas Power Station

16-02-06

9-05-06

160/2004

National Thermal Power Corporation Ltd

Approval of tariff in respect of Anta Gas Power Station, for the period from 1.4.2004 to 31.3.2009.

16-02-06

9-05-06

155/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Dadri Gas Power Station, for the period from 1.4.2004 to 31.3.2009.

21-01-06

9-05-06

46/2005

National Thermal Power Corporation Ltd., New Delhi

Petition for relaxation of target availability norm of Kawas Gas Power Station and Gandhar Gas Power Station for the period 1.4.2004 to 31.3.2009.

24-01-06

16-02-06

147/2004

National Thermal Power Corporation Ltd.

Approval of tariff of Kayamkulam Combined Cycle Power Project (359.58 MW) for the period 1.4.2004 to 31.3.2009.

17-01-06

17-01-06


Tarrif-Hydro
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

92/2006

North Eastern Electric Power Corporation Limited

Approval of Additional Capital Expenditure for the period 1.4.2001 to 31.3.2004 in respect of Kopli Hydro Electric Project

26-10-06

24-11-06

171/2004

National Hydroelectric Power Corporation Ltd

Approval of generation tariff of Loktak Hydroelectric Project for the period 1.4.2004 to 31.3.2009 and impact of additional capitalization during 2001-04

06-07-06

04-10-06

66/2005

Damodar Valley Corporation

Approval of tariff in respect of Damodar Valley Corporation for the period from 1.4.2004 to 31.3.2009.

14-07-06

20-07-06

66/2005

Damodar Valley Corporation.

Approval of tariff in respect of Damodar Valley Corporation for the period from 1.4.2004 to 31.3.2009.

14-07-06

21-07-06

93/2005

National Hydroelectric Power Corporation Ltd..

Approval of revised fixed charges on account of additional capital expenditure for the period 1.4.2001 to 31.3.2004 in respect of Loktak Hydroelectric Project

15-09-05

2-03-06

47/2005

National Hydroelectric Power Corporation Ltd.

Approval of generation tariff of Uri Hydroelectric Project for the period 1.4.2004 to 31.3.2009

18-10-05

9-05-06

158/2004

National Hydroelectric Power Corporation Ltd

Approval of generation tariff of Bairasiul Hydroelectric Project for the period 1.4.2004 to 31.3.2009

17-11-05

9-05-06

IA No. 3/2006
in
Petition No.79/2004

North Eastern Electric Power Corporation Ltd., Shillong

Fixation of tariff in respect of sale of power from Kopili Hydro Electric Project Stage-II (1x25 MW) of North-Eastern Electric Power Corporation Limited for the period from 26.7.2004 to 31.3.2009

28-02-06

28-02-06

10/2006

National Thermal Power Corporation Ltd.

Petition under regulations 12 and 13 of the CERC (Terms and Conditions of Tariff) Regulations, 2004 for Removal of difficulties and for relaxation of norms/provisions in regard to Additional Capitalisation from the date of Commercial Operation up to the cut off date for determination of tariff of Ramagundam STPS Stage-III and also for exercise of inherent powers to do substantial justice.

30-03-06

30-03-06

7/2006

Gujarat Urja Vikas Nigam Ltd.

Petition for direction To NTPC to refund the amount recovered on account of impact on Foreign Exchange Rate Variation for the period 2001-04 in case of Kawas Gas Based Power Station and other power stations.

30-03-06

30-03-06

119/2005

Narmada Hydro Electric Development Corporation Ltd., Bhopal

Approval of generation tariff for Indira Sagar Project under Section 79(1) of the CERC (Conduct of Business), Regulations 1999 and Section 79 (1) (a) of the Electricity Act, 2003.

28-02-06

04-04-06

66/2005

Damodar Valley Corporation.

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity

16-01-06

16-01-06

Tariff - Transmission PGCIL
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

62/2006

Tripura State Electricity Corporation Limited

Review of the order dated 9.5.2006 in Petition No. 3/2005

31-10-06

27-12-06

49/2002

Power Grid Corporation of India Limited

Approval of transmission tariff for Korba – Budhipadar Transmission System in Western Region for the Period 1.4.2001 to 31.3.2004

-

26-12-06

83/2006

Powerlinks Transmission Ltd., New Delhi

Approval of provisional transmission tariff for 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter connector and Northern Region transmission system for the period from 2005-2009

-

26-12-06

111/2006

Powerlinks Transmission Ltd., New Delhi

Approval of provisional transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line associated with Tala Hydro Electric Power, East-North inter
connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009

21-12-06

21-12-06

104/2006

Power Grid Corporation of India Limited

Determination of provisional transmission tariff for Bhadrawati-Chandrapur 400 kV D/C transmission line including bays at Bhadrawati (Power Grid) switching station (Extension) and Chandrapur (MSEB) switchyard (Extension) in Western Region from
1.5.2006 to 31.3.2009

21-12-06

21-12-06

101/2006

Tamil Nadu Electricity Board, Chennai

Review of the order dated 2.5.2006 in petition No. 137/2004-Approval of transmission tariff for 400 kV Ramagundum-Hyderabad transmission line in Southern Region and HVDC back-to-back station (2x500 MW) at Chandrapur connecting Western Region and Southern Region for the period 1.4.2004 to 31.3.2009

21-12-06

21-12-06

100/2006

Power Grid Corporation of India Limited, Gurgaon

Determination of provisional transmission tariff for Neelamangala-Mysore 400 kV D/C transmission line along with 2x 315 MVA, 400/220 kV Mysore sub-station and bay extension at Neelamangala (KPTCL) 400/220 sub-station from 1.5.2006 to 31.3.2009 in Southern Region

21-12-06

21-12-06

79/2006

Power Grid Corporation of India Limited, Gurgaon

Determination of transmission tariff for 40% Fixed Series Compensation on existing 400 kV S/C Rengali-Indravati transmission line associated with augmentation of capacity of Gazuwaka HVDC back to back project in Eastern Region for the period from 1.10.2005 to 31.3.2009

14-12-06

15-12-06

77/2006

Power Grid Corporation of India Limited, Gurgaon

Determination of transmission tariff for Tala-Siliguri Transmission System in Eastern Region Commissioned on 1.10.2005 for the period 1.10.2005 to 31.3.2009 and remaining transmission system commissioned on 1.5.2006 for the period from
1.5.2006 to 31.3.2009

14-12-06

14-12-06

133/2006

Power Grid Corporation of India Limited

Review of the order dated 9.5.2006 in Petition No. 139/2005-Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in Northern Region for the period from 1.4.2004 to 31.7.2017

28-11-06

06-12-06

78/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of provisional transmission tariff for 400 kV Bareilly sub-station (UPPCL) (extension) and 400 kV Mandaula sub-station (extension) under transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from 1.5.2006 to 31.3.2009

07-12-06

07-12-06

57/2006

Power Grid Corporation of India Ltd

Approval of transmission tariff for 400 kV D/C Singrauli-Vindhyachal transmission line alongwith (2x250 MW) HVDC back to back at Vindhyachal between Northern Region and Western Region for the period from 1.4.2004 to 31.3.2009

19-09-06

04-12-06

75/2006

Power Grid Corporation of India Limited

Approval of charges for Unified Load Despatch & Communication Scheme in Western Region for the period from 1.2.2006

16-11-06

27-11-06

74/2006

Power Grid Corporation of India Limited

Approval of charges for Unified Load Despatch & Communication Scheme in Eastern Region for the period from 1.9.2005

16-11-06

27-11-06

21/2006

Power Grid Corporation of India Limited

Approval of transmission tariff for 400 kV Ramagundam-Hyderabad D/C transmission line and 400 kV S/C Hyderabad-Kurnool-Gooty transmission line along with associated bays and equipment under Ramagundam Stage-III Transmission System in Southern Region from date of commercial operation to 31.3.2009

24-08-06

22-11-06

20/2006

Power Grid Corporation of India Limited

Approval of transmission charges for 40% Fixed Series Compensation on existing Gooty-Neelmangla 400 kV S/C line and both circuits of Nagarjunasagar-
Cuddapah 400 kV S/C line under FSC Project in Southern region for the period from 1.11.2004 to 31.3.2009

24-08-06

16-11-06

60/2004

Power Grid Corporation of India Ltd, Gurgaon

Approval of incentive based on availability of transmission system of Southern Region for the year 2003-04

31-10-06

22-11-06

50/2006

Power Grid Corporation of India Limited

Approval of transmission tariff for LILO of one circuit of 132 kV D/C Siliguri- Rangit transmission line at Gangtok in Eastern Region for the period from 1.10.2005 to 31.3.2009

16-11-06

21-11-06

81/2006

Power Grid Corporation of India Ltd., Gurgaon

Approval of abnormal operation and maintenance expenses on account of additional security for the year 2004-2005 in Eastern Region

26-10-06

27-10-06

11/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Fixed and Thyristor Controlled Series Compensation for 400 KV D/C Raipur- Rourkela Transmission Line at Raipur in
Western Region for the period from 1-11-2004 to 31-3-2009

24-08-06

27-10-06

149/2005

Power Grid Corporation of India Ltd., Gurgaon

Approval of transmission tariff for 400/220 kV Khandwa sub-station and LILO of 400 kV D/C Itarsi-Dhule transmission line at Khandwa in Western Region for the period 1.2.2005 to 31.3.2009

23-03-06

26-10-06

138/2005

Power Grid Corporation of India Limited

Approval of transmission tariff for 500 MW HVDC back-to-back station at Gajuwaka (Pole II) (inter-regional asset of Eastern Region & Southern Region) and 400 kV D/C Vijaywada-Gajuwaka transmission line (Southern Region) under augmentation of capacity of Gajuwaka HVDC back-to-back project (500 MW) for the period from 1.3.2005 to 31.3.2009.

30-03-06

23-10-06

130/2005

Power Grid Corporation of India Ltd., Gurgaon

Approval of transmission tariff for 220 kV Allahabad-Phulpur S/C transmission line under system improvement scheme in Uttar Pradesh in Northern Region for the period 1.6.2004 to 31.3.2009

18-04-06

26-10-06

89/2002

Power Grid Corporation of India Ltd., Gurgaon

Approval of incentive based on availability of transmission system for the year
2002-03 for Eastern Region

21-09-06

26-10-06

118/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year
2005-06 for Eastern Region

-

23-10-06

117/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year 2005-06 for Northern Region

-

23-10-06

66/2005

Damodar Valley Corporation, Kolkata

Tariff for generation and inter-State Transmission of Electricity by Damodar Valley Corporation

10-08-06

03-10-06

I.A.No. 46/2006

Power Grid Corporation of India Limited

Approval of transmission charges for LILO of 400 k V S/C Singrauli-Kanpur transmission line-I, 400 k V sub-station at Allahabad and LILO of 400 k V S/C Singrauli-Kanpur transmission line-II including ICT I & II at Allahabad with associated bays in Northern Region for the period 2004-09 and for additional capitalisation during 2001-04.

29-08-06

29-08-06

43/2006

Power Grid Corporation of India Ltd

Revision of O & M expenses for the years 2001-02 to 2003-04.

17-08-06

28-08-06

30/2006

Power Grid Corporation of India Limited

Approval of transmission tariff for LILO of Kolaghat-Rengali 400 kV S/C transmission line at Baripada and establishment of new 400/220/132 kV sub-station at Baripada in Eastern Region for the period from 1.7.2005 to 31.3.2009.

24-08-06

24-08-06

60/2004

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system of Southern Region for the year 2003-04.

08-08-06

11-08-06

62/2006

Tripura State Electricity Corporation Limited

Review of the order dated 9.5.2006 in Petition No. 3/2005- implementation of the Commission's order dated 6.9.2004 in Petition No. 13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004 .

10-08-06

10-08-06

I.A.No. 28/2006 in Petition No. 84/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Kishenpur-Moga Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009.

06-07-06

14-07-06

141/2005

Power Grid Corporation of India Ltd.

Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III for the period 1.4.2004 to 31.3.2009

20-04-06

31-07-06

96/2003

Power Grid Corporation of India Ltd.

Approval for transmission tariff for 400 kV S/C Meramundali-Jeypore transmission line along with extension of Meramundali and Jeypore sub-stations in Eastern Region for the period from 1.1.2004 to 31.3.2004.

18-07-06

19-07-06

6/2004

Madhya Pradesh State Electricity Board

Fixation of wheeling charges in respect of Transmission System of Grid Corporation of Orissa Ltd. for wheeling of power from NTPC power stations in Eastern Region (ER) through their system to Madhya Pradesh State Electricity Board (MPSEB), Jabalpur with effect from 1.4.2001.

04-07-06

10-07-06

69/2004

Power Grid Corporation of India Limited.

Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009.

10-11-05

16-03-06

142/2004

National Thermal Power Corporation Ltd.

Approval of tariff in respect of Feroze Gandhi Unchahar Thermal Power Station Stage I for the period from 1.4.2004 to 31.3.2009.

06-06-06

13-06-06

162/2005

Power Grid Corporation of India Ltd., Gurgaon

Approval of incentive based on availability of transmission system for the year 2004-05 for Northern Region.

-

06-07-06

159/2005

Power Grid Corporation of India Ltd.

Approval of incentive based on availability of transmission system for the year 2004-05 for Eastern Region.

-

06-07-06

152/2005

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year 2004-05 for Western Region.

-

06-07-06

144/2005

Power Grid Corporation of India Limited

Petition for approval of tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period 1.4.2004 to 31.3.2009.

20-04-06

29-06-06

23/2006

Power Grid Corporation of India Limited

Approval of provisional transmission tariff for 400 kV D/C Kaiga-Narendra transmission line and 400/220 kV sub-station at Narendra associated with Kaiga-Narendra transmission system in Southern Region for the period from 1.11.2005 to 31.3.2009.

04-07-06

04-07-06

I.A.No. 20/2006
in
Pet No. 70/2004

Power Grid Corporation of India Limited

Approval for tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Gazuwaka between Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009.

23-05-06

7-06-06

64/2005

Power Grid Corporation of India Limited

Approval of transmission charges for 1X500 MW HVDC back to back station at Sasaram with associated AC switchboard at Sasaram & Allahabad and Auxilliary system including 400 kV Sarnath-Allahabad transmission line with associated bays under Eastern-Northern Inter-regional HVDC transmission system for the period from 1.4.2004 to 31.3.2009

23-03-06

9-05-06

127/2005

Power Grid Corporation of India Limited

Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.4.2004 to 31.3.2009.

30-03-06

9-05-06

73/2005

Power Grid Corporation of India Limited

Approval for tariff for Bihar Grid Strengthening Scheme in Eastern Region for the period from 1.4.2004 to 31.3.2009.

28-03-06

9-05-06

60/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Stage-I of 400 kV Thyristor controlled series compensation project (FACTs devices) on Kanpur– Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for additional capitalisation during 2001-04.

07-03-06

9-05-06

3/2005

Power Grid Corporation of India Ltd.

Implementation of the Commission's order dated 6.9.2004 in Petition No.13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004.

24-11-05

9-05-06

131/2002

Power Grid Corporation of India Ltd.

Petition for approval of tariff for 400 kV D/C Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004.

31-01-06

9-05-06

84/2005

Power Grid Corporation of India Ltd.

Approval of transmission tariff for (A) Talcher-Kolar HVDC line (Pole-I), (B) LILO of 400 kV S/C Cuddapah-Banglore S/C line, common facilities at Kolar, and 400 kV S/C Kolar-Madras line, (C) 400 kV S/C Hossur-Salem line, 315 MVA Auto Transformer-I at Hossur, along with 220 kV switchyard (D) 315 MVA Auto Transformer-2 at Hossur, (E) 500 MVA Auto-transformer (comprising of 4x167 MVA single phase units) at Kolar along with 220 kV switchyard, and 400 kV D/C Kolar-Hoody line, under Transmission System associated with Talcher-II Project for the period 1.4.2004 to 31.3.2009 and additional capitalization for the period 2001-04.

28-03-06

9-05-06

60/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Stage-I of 400 kV Thyristor controlled series compensation project (FACTs devices) on Kanpur– Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for additional capitalisation during 2001-04.

07-03-06

9-05-06

104/2005

Power Grid Corporation of India Ltd

Petition for approval of tariff for LILO of 400 kV Bongaigaon-Malda transmission line at Purnea and Sub-station at Purnea (New) in Eastern Region for the period 1.11.2003 to 31.3.2004.

31-01-06

9-05-06

133/2005

Power Grid Corporation of India Limited

Approval of transmission charges for strengthening of 220 kV transmission system under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.4.2004 to 31.3.2009.

21-03-06

9-05-06

96/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Rihand transmission system in Northern region for the period from 1.4.2004 to 31.3.2009 .

07-09-05

09-05-06

70/2005

Power Grid Corporation of India Limited

Approval of transmission charges for 315 MVA, 400/220 kV ICT-IV at Ballabgargh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for the additional capitalisation during 2001-04.

07-03-06

28-04-06

Pet No. 74/2004
With
I.A.No. 36/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Kayamkulam Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009.

29-09-05

09-05-06

3/2005

Power Grid Corporation of India Ltd.

Implementation of the Commission's order dated 6.9.2004 in Petition No.13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004.

24-11-05

09-05-06

IA No. 13/2006
in Petition No. 131/2002

Power Grid Corporation of India Ltd.

Approval of tariff for Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004

28-02-06

28-02-06

67/2005

Power Grid Corporation of India Limited

Petition for approval of tariff for 400 kV S/C Jamshedpur-Rourkela transmission line in Eastern Region for the period 1.4.2004 to 31.3.2009.

28-03-06

04-05-06

112/2005

Power Grid Corporation of India Limited

Petition for approval of tariff for LILO of 400 kV Bongaigaon – Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.4.2004 to 31.3.2009.

28-03-06

04-05-06

128/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Khammam-Nagarjunasagar 400 kV S/C transmission line along with extensions of Khammam and Nagarjunasagar 400/220 kV sub-station under the scheme for strengthening of Grid System and evacuation of power from Ramagundam Stage-III in Southern Region for the period from 1.4.2004 to 31.3.2009.

30-03-06

05-05-06

72/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Vindhyachal Stage-I Additional Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009

07-09-05

02-05-06

137/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Ramagundam-Hyderabad transmission line-2 in Southern Region and Bhadrawati (Chandrapur) HVDC back to back station (2x500MW) in Western Region and Southern Region for the period from 1.4.2004 to 31.3.2009.

21-09-05

02-05-06

130/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV Ramagundam Transmission System, including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region for the period from 1.4.2004 to 31.3.2009.

14-09-05

02-05-06

105/2005

Power Grid Corporation of India Limited

Approval of transmission charges for Hiriyur sub-station (including 315 MVA Auto Transformer), LILO of Davangere-Hoody 400 kV D/C line at Hiriyur and additional bays at Kolar and Hosur sub-station for 2nd circuit of Kolar-Hosur 400 kV D/C transmission line under System Strengthening Scheme-II in Southern Region for the period from 1.4.2004 to 31.3.2009.

30-03-06

05-05-06

129/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 315 MVA 400/230 kV Auto Transformer at Hyderabad and one 50 MVAR Reactor at Cuddapah under Central Transmission Project Augmentation in Southern Region for the period from 1.4.2004 to 31.3.2009.

14-09-05

03-05-06

142/2005

Power Grid Corporation of India Limited

Determination of Transmission tariff for 400 kV D/C Rihand-Allahabad, Allahabad-Mainpuri and Mainpuri-Ballabgarh transmission lines with associated bays under Rihand Stage-II transmission system in Northern Region for the period from 1.6.2005 to 31.3.2009.

18-04-06

25-04-06

102/2005

Power Grid Corporation of India Limited  

Approval of transmission charges for LILO of 220 kV Panki-Naubasta transmission line at Kanpur sub-station in Northern Region for the period from 1.4.2004 to 31.3.2009

07-03-06

28-04-06

11/2006

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for the balance system of Tarapur Transmission system (commissioned w.e.f. 1.8.2005 and 1.9.2005) associated with Tarapur Atomic Power Station Units 3 & 4 in Western Region for the periods from 1.8.2005 to 31.3.2009 and 1.9.2005 to 31.3.2009, respectively.

20-04-06

26-04-06

125/2005

Power Grid Corporation of India Ltd.

Petition for approval of transmission tariff for 132 kV S/C Mau-Balia line in Northern Region for the period 1.5.2003 to 31.3.2004.

23-02-06

25-04-06

116/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 50 MVAR Reactor with associated equipment at Chandrapur sub-station in Western Region for the period from 1.4.2004 to 31.3.2009

08-09-05

25-04-06

Pet No. 160/2005
with IA.No. 70/2005

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for 400 kV D/C Dhauliganga-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.8.2005 to 31.3.2009.

21-03-06

07-04-06

69/2004

Power Grid Corporation of India Limited.

Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009.

10-11-05

16-03-06

Petition No. 84/2004
With
I.A.No. 30/2005

Power Grid Corporation of India Limited.

Approval of transmission charges for Kishenpur-Moga Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009.

25-08-05

24-02-06

59/2005

Bihar State Electricity Board, Patna

Sharing of the Transmission Charges of 220 kV D/C Birpara-Salakati Transmission Line and associated sub-station at Birpara (ER) and Salakati (NER) as inter-regional assets between ER and NER.

-

21-02-06

107/2005

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for 400 kV S/C Hyderabad-Kurnool-Gooty and Gooty-Neelmangala lines alongwith bay extensions and equipment at Hyderabad, Kurnool & Gooty associated with Ramagundam-III transmission system in Southern Region for the period from date of commercial operation to 31.3.2009.

31-01-06

13-02-06

96/2005

Power Grid Corporation of India Limited

Determination of provisional transmission tariff for 40% Fixed Series Compensation on 400 kV S/C Gooty-Neelmangala Circuit-II at Gooty under FSC project in Southern Region for the period from 1.5.2005 to 31.3.2009.

31-01-06

13-02-06

Petition No. 70/2004
With
I.A.No. 37/2005

Power Grid Corporation of India Limited

Approval for tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Gazuwaka between Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009.

22-09-05

16-02-06

112/2004

Power Grid Corporation of India Limited

Approval of transmission charges for the transmission system associated with Gandhar Gas Power Station I in Western Region for the period from 1.4.2004 to 31.3.2009.

07-09-05

14-02-06

73/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Vindhyachal Stage-II Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009.

07-09-05

14-02-06

137/2005

Power Grid Corporation of India Limited

Determination of Provisional Transmission tariff for 400 kV D/C Madurai-Thiruvananthapuram transmission system in Southern Region for the period from 1.8.2005 to 31.3.2009.

31-01-06

13-02-06

67/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Hathidah River Crossing section of 220 kV D/C Biharsharif-Begusarai transmission line in Eastern Region for the period from 1.4.2004 to 31.3.2009.

21-07-05

10-02-06

96/2005

Power Grid Corporation of India Limited

Determination of provisional transmission tariff for 40% Fixed Series Compensation on 400 kV S/C Gooty-Neelmangala Circuit-II at Gooty under FSC project in Southern Region for the period from 1.5.2005 to 31.3.2009.

31-01-06

13-02-06

112/2004

Power Grid Corporation of India Limited

Approval of transmission charges for the transmission system associated with Gandhar Gas Power Station I in Western Region for the period from 1.4.2004 to 31.3.2009.

07-09-05

14-02-06

IA No. 1/2006
in
Petition No. 66/2005

Damodar Valley Corporation, Kolkata

Approval of tariff of Damodar Valley Corporation (IA has been filed by DPSC Ltd for clarification of the order dated 21.6.2005).

7-02-06

14-02-06

66/2005

Damodar Valley Corporation

Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity

16-01-06

16-01-06

Petition No. 97/2004
With
IA No. 24/2005

Power Grid Corporation of India Ltd.
Vs
Haryana Vidyut Prasaran Nigam Ltd, Panchkula

Approval of transmission charges for the transmission system associated with Faridabad Gas Based Combined Cycle Power Project in Northern Region for the period from 1.4.2004 to 31.3.2009.

17-08-05

27-01-06

155/2005

Power Grid Corporation of India Ltd., Gurgaon

Reimbursement of loss of Return on Equity in Ranganadi transmission system due to delay in completion of Ranganadi H.E. Project.

24-01-06

30-01-06

51/2005

Power Grid Corporation of India Limited

Approval for tariff for 400 kV D/C Biharsharif-Sasaram-Sarnath transmission lines with associated bays under Eastern-Northern inter-regional HVDC transmission system for the period from 1.4.2004 to 31.3.2009.

09-08-05

25-01-06

Petition No. 136/2004 With I.A.No. 34/2005

Power Grid Corporation of India Limited

Approval for tariff for 400 kV D/C Kaiga-Sirsi transmission line along with associated bays in Southern Region for the period from 1.4.2004 to 31.3.2009.

21-09-05

27-01-06

50/2005

Power Grid Corporation of India Limited

Approval of transmission charges for 400/220 kV, 315 MVA transformer at Jeypore substation in Eastern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04.

09-08-05

27-01-06

126/2004

Power Grid Corporation of India Limited

Approval of transmission charges for the transmission system associated with Farakka (I & II) STPS in Eastern Region for the period from 1.4.2004 to 31.3.2009.

04-08-05

05-01-06

123/2004

Power Grid Corporation of India Limited

Approval of transmission charges for Dehri-Karamnasa Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009.

28-07-05

12-01-06

77/2004

Power Grid Corporation of India Limited

Approval of transmission charges for the transmission system associated with RAPP-B Project in Northern Region for the period from 1.4.2004 to 31.3.2009.

18-08-05

13-01-06

118/2004

Power Grid Corporation of India Limited

Approval of transmission charges for the Rangit Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009.

27-07-05

17-01-06

133/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 315 MVA ICT-III along with associated bay equipment at Nagarjunasagar sub-station in Southern Region for the period from 1.4.2004 to 31.3.2009.

15-09-05

04-01-06

36/2005

Power Grid Corporation of India Limited

Approval of transmission charges for LILO of one circuit of existing Neyveli-Trichy 400 kV D/C transmission line at Neyveli TPS-I expansion in Southern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04.

22-09-05

17-01-06

8/2004

Power Grid Corporation of India Limited

Approval of fees and charges payable to Regional Load Despatch Centres for undertaking load despatch functions for the period 1.4.2004 to 31.3.2007

21-09-04

03-01-06

6/2005

Power Grid Corporation of India Limited

Approval for tariff for 230 kV S/C Neyveli-Bahoor transmission line with associated bay equipment at Neyveli in Southern Region for the period from 1.4.2004 to 31.3.2009.

22-09-05

16-01-06

35/2005

Power Grid Corporation of India Limited

Approval for tariff for 220 kV D/C Jallandhar-Hamirpur transmission line with associated bays in Northern Region for the period from 1.4.2004 to 31.3.2009.

25-08-05

23-01-06

48/2005

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV D/C Vijayawada-Nellore transmission line, 400kV D/C Nellore-Sriperumbudur transmission line, new 400 kV Switching station at Nellore and extension of Vijaywada and Sriperumbudur sub-stations in Southern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04.

22-09-05

14-01-06

121/2004

Power Grid Corporation of India Limited

Approval of transmission charges for 400 kV D/C Malda - Bongaigaon transmission line in Eastern Region for the period from 1.4.2004 to 31.3.2009.

28-07-05

14-01-06

136/2005

National Thermal Power Corporation Ltd.

Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Kawas Gas Power Station (656.20 MW).

27-12-05

25-01-06


Review- General
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order
         

Review- Thermal
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

59/2006

NTPC Limited

Review of order dated 9.5.2006 in Petition No. 153/2004, for approval of tariff in respect of Farakka STPS, for the period 1.4.2004 to 31.3.2009

07-09-06

27-10-06

56/2006

National Thermal Power Corporation Ltd

Review of order dated 9.5.2006 in Petition No. 147/2004, for approval of tariff in respect of Kayamkulam Combined Cycle Power Project, for the period 1.4.2004 to 31.3.2009

07-09-06

27-10-06

80/2006

National Thermal Power Corporation Limited

Review of order dated 29.6.2006 in Petition No. 128/2004, for approval of tariff in respect of Vindhyachal STPS Stage-I for the period 1.4.2004 to 31.3.2009

07-09-06

27-09-06

58/2006

National Thermal Power Corporation Limited

Review of order dated 9.5.2006 in Petition No. 157/2004 determining the tariff in respect of Singrauli Super Thermal Power Station for the period 1.4.2004 to 31.3.2009

07-09-06

26-10-06

54/2006

National Thermal Power Corporation Limited

Review of order dated 9.5.2006 in Petition No. 160/2004, for approval of tariff in respect of Anta GPS, for the period 1.4.2004 to 31.3.2009

07-09-06

26-10-06

53/2006

National Thermal Power Corporation Ltd

Review of order dated 9.5.2006 in Petition No. 142/2004, for approval of tariff in respect of Feroze Gandhi Unchahar Thermal Power Station, Stage-I for the period 1.4.2004 to 31.3.2009

07-09-06

26-10-06

57/2006

National Thermal Power Corporation Limited

Review of order dated 5.5.2006 in Petition No.162/2004 determining the tariff in respect of National Capital Thermal Power Station, Dadri for the period 1.4.2004 to 31.3.2009

07-09-06

26-10-06

52/2006

National Thermal Power Corporation Ltd

Review of order dated 9.5.2006 in Petition No. 155/2004, for approval of tariff in respect of Dadri Gas Power Station for the period 1.4.2004 to 31.3.2009

07-09-06

26-10-06

24/2006
Pet No. 32/2003

NTPC Ltd Vs Grid Corporation of Orissa Limited

Review of order dated 27.2.2006 in petition No. 108/2005 for revision of O & M expenses in respect of Talcher Thermal Power Station (460 MW) for the period from 1.4.2001 to 31.3.2004.

22-06-06

22-06-06

Review Pet No. 132/2005
in
Pet No. 32/2003

North Eastern Electric Power Corporation Ltd.

Review of order dated 9.9.2005 in Petition No.32/2003 for approval of tariff in respect of Agartala Gas Turbine Power Project for the period from 1.4.2001 to 31.3.2004.

18-04-06

6-06-06

Rev Pet No. 123/2005
in PetNo. 1/2003

National Thermal Power Corporation Ltd

Review of Order dated 13.6.2005 in Petition No. 1/2003 - Approval of tariff of the Units I and II of Talcher STPS Stage II for the period from 1.8.2003 to 31.3.2004.

09-05-06

07-01-06


Review- Hydro
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

68/2006

National Hydroelectric Power Corporation Limite.

Review of order dated 9.5.2006 in Petition No. 30/2005 for approval of tariff in
respect of Tankapur HE Project, for the period 1.4.2004 to 31.3.2009

17-10-06

17-10-06

49/2006

National Hydroelectric Power Corporation Limited

Review of order dated 9.5.2006 in Petition No. 175/2004, for approval of tariff
in respect of Rangit HE Project, for the period 1.4.2004 to 31.3.2009

26-09-06

29-09-06

46/2006

National Hydroelectric Power Corporation Limited.

Review of order dated 9.5.2006 in Petition No. 197/2004, for approval of tariff in respect of Salal HE Project, Stage–I & II, for the period 1.4.2004 to 31.3.2009.

17-08-06

30-08-06

47/2006

National Hydroelectric Power Corporation Limited.

Review of order dated 9.5.2006 in Petition No. 47/2005, for approval of tariff in respect of Uri HE Project, for the period 1.4.2004 to 31.3.2009.

17-08-06

30-08-06

86/2005

National Hydroelectric Power Corpn. Ltd., Faridabad

Revision of Annual Fixed Charges (AFC) on account of Additional capital expenditure incurred during the tariff period 2001-04 for Chamera HEP Stage-I

27-04-06

15-09-05

Rev Pet No.12/2006
in
Pet No 185/2004

National Hydroelectric Power Corporation Ltd

Review of order dated 15.9.2005 in Petition No.185/2004 - Approval of tariff in respect of Chamera Hydroelectric Project Stage II for the period from 2.11.2003 to 31.3.2004.

25-04-06

09-05-06


Review- Transmission
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

62/2006

Tripura State Electricity Corporation Limited

Review of the order dated 9.5.2006 in Petition No. 3/2005

31-10-06

27-12-06

49/2002

Power Grid Corporation of India Limited

Approval of transmission tariff for Korba – Budhipadar Transmission System
in Western Region for the Period 1.4.2001 to 31.3.2004

-

26-12-06

91/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year
2005-06 for Western Region.

-

04-09-06

60/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of incentive based on availability of transmission system for the year
2005-06 for Southern Region

-

24-08-06

46/2006

Power Grid Corporation of India Ltd.

Approval of transmission charges for LILO of 400 kV S/C Singrauli-Kanpur
transmission line-I, 400 kV sub-station at Allahabad and LILO of 400 kV S/C
Singrauli-Kanpur transmission line-II including ICT-I and II at Allahabad with
associated bays in Northern Region for the tariff period 2004-09 and for
additional capitalization during 2001-04.

07-09-06

19-09-06

72/2006

Assam State Electricity Board, Guwahati

Review of the order dated 9.5.2006 in Petition No. 3/2005- implementation of the Commission's order dated 6.9.2004 in Petition No.13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004 .

10-08-06

10-08-06

189/2004

Assam State Electricity Board

Review Petition against the order dated 6.9.2004 of the Commission in Petition no. 13/2004 of PGCIL.

04-08-05

07-04-06


Provisional Tariff-Thermal
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

29/2006

NTPC Limited, New Delhi

Tariff for infirm power supply prior to the date of commercial operation from Unit- I (500 MW) of Vindhyachal Super Thermal Power Station, Stage-III

20-07-06

14-07-06


Provisional Tariff-Hydro
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

184/2004

Satluj Jal Vidyut Nigam Ltd., New Shimla

Provisional tariff for the period from 1.4.2006 to 31.3.2007 in respect of
Nathpa Jhakri Hydro Electric Power Station

20-06-06

20-06-06

107/2005

Power Grid Corporation of India Limited.

Determination of Provisional Transmission tariff for 400 kV S/C Hyderabad-Kurnool-Gooty and Gooty-Neelmangala lines alongwith bay extensions and equipment at Hyderabad, Kurnool & Gooty associated with Ramagundam-III transmission system in Southern Region for the period from date of commercial operation to 31.3.2009.

31-01-06

13-02-06



Provisional Tariff-Transmission
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

105/2006

Power Grid Corporation of India Limited, Gurgaon

Determination of provisional transmission tariff for LILO of Nagarjunasagar- Raichur 400 kV S/C line at Mehboobnagar and LILO of both the circuits of Nellor- Sriperumbudur 400 kV D/C line at Almathi along with associated bays at Mehoobnagar and Almathi under system strengthening-IV of Southern Region Grid in Southern Region

21-12-06

21-12-06

44/2006

North Eastern Electric Power Corporation Ltd

Declaring 132 kV Balipara-Khupi (Tenga)-Kimi transmission line and associated 220/132 kV & 132/33 sub-stations of Kameng Hydroelectric Project, 600 MW of NEEPCO as dedicated transmission line

19-09-06

19-09-06

33/2006

Powerlinks Transmission Ltd., New Delhi

Approval of provisional transmission tariff for 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter connector and Northern Region transmission system for the period from 2005-2009.

27-07-06

18-08-06

34/2006

Power Grid Corporation of India Limited, Gurgaon

Approval of provisional transmission tariff for 400 kV Bareilly sub-station (UPPCL) (extension) and 400 kV Mandaula sub-station (extension) under transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from 1.5.2006 to 31.3.2009.

27-07-06

18-08-06

138/2005

Power Grid Corporation of India Limited

Approval of transmission tariff for 500 MW HVDC back to back station (II) at Gazuwaka (inter-Regional asset of Eastern Region and Southern Region) and 400 kV D/C Vijaywada-Gazuwaka line along with bay extension and equipments at Vijaywada and Gazuwaka (Southern Region) under augmentation of capacity of Gazuwaka HVDC back to back project from 1.3.2005 to 31.3.2009.

30-03-06

06-07-06

111/2005

Power Grid Corporation of India Limited

Determination of provisional transmission tariff for 400 kV Tarapur-Padghe Ckt-I including bay extension at Padghe sub-station associated with Tarapur Atomic Power Station Units III and IV in Western Region for the period from 1.3.2005 to 31.3.2009.

23-02-06

25-04-06


License
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

142/2006

Inter-State Trading in electricity

27-12-06

27-12-06

76/2006

Malaxmi Energy Trading Private Limited, Hyderabad

Grant of licence for inter-State trading in electricity to Malaxmi Energy
Trading Private Limited, Hyderabad

12-12-06

12-12-06

15/2006

Shri Gajendra Haldea

Seeking direction to Grid Corporation of Orissa Ltd., not to charge trading
margin exceeding 4 paise/kWh, notified by the Commission

12-12-06

12-12-06

98/2006

GEA Energy System (India) Limited, Chennai

Grant of licence for inter-State trading in electricity to GEA Energy System (India) Limited, Chennai

07-12-06

07-12-06

142/2006

Inter-State Trading in electricity

-

30-11-06

97/2006

Torrent Power transmission Company Pvt. Ltd

Application for grant of transmission licence to Torrent Power Transmission Private Limited

31-10-06

15-11-06

98/2006

GEA Energy System (India) Limited, Chennai

Grant of licence for inter-State trading in electricity to GEA Energy System (India) Limited, Chennai

26-10-06

26-10-06

22/2004

Adani Exports Limited

Grant of licence for inter-state trading in electricity to Adani Exports
Limited

-

07-09-06

18/2006

Northeast Power Transmission Company Pvt. Ltd

Application for grant of transmission licence

08-08-06

11-09-06

63/2006

Gajendra Haldea

To restrain PTC from carrying on purchase of electricity from GRIDCO or any other electricity trader.

29-08-06

29-08-06

126/2005

Energy Development Company Ltd.

Grant of licence for inter-state trading in electricity to Energy Development Company Ltd.

29-08-06

29-08-06

31/2004

Global Energy Limited, Mumbai

Grant of licence for inter-state trading in electricity to Global Energy Limited (GEL) - (Contact CERC for Order)
Note:-

14-07-06

28-08-06

I.A. No. 56/2006

Instinct Advertising & Marketing Pvt. Limited

Grant of licence for inter-state trading in electricity to Instinct Advertising & Marketing Pvt. Limited, New Delhi

-

11-08-06

40/2006

Subhash Kabini Power Corporation Limited

Disputes on the payment of the amounts payable on account of trading of power.

20-07-06

20-07-06

183/2004 With IA No. 49/2006

Induj Enertech Ltd

Application for grant of license for inter-state trading in electricity.

18-07-06

18-07-06

Pet No. 27/2006
alongwith I.A. No. 38/2006

Gajendra Haldea

To restrain PTC from carrying on purchase of electricity from GRIDCO or any other electricity trader.

20-06-06

20-06-06

31/2004

Global Energy Limited

Grant of licence for inter-state trading in electricity to Global Energy limited.

6-06-06

6-06-06

Pet No. 27/2006
Along with I.A. No. 38/2006

Gajendra Haldea

To restrain PTC from carrying on purchase of electricity from GRIDCO or any other electricity trader.

23-05-06

23-05-06

126/2005

Energy Development Company Ltd

Grant of licence for inter-state trading in electricity to Energy Development Company Ltd.

23-05-06

23-05-06

31/2004

Global Energy Limited

Grant of inter-state trading in electricity

25-04-06

25-04-06

161/2005

Power Trading Company Limited,. Mumbai

Grant of licence for inter-state trading in electricity to JSW Power Trading Company Limited,. Mumbai.

25-03-06

13-04-06

153/2005

21st Century Infrastructure (India) Pvt. Ltd.

Grant of licence for inter-state trading in electricity to 21st Century Infrastructure (India) Pvt. Ltd.

07-03-06

16-03-06

31/2004

Global Energy Limited.

Grant of inter-state trading in electricity.

09-03-06

16-03-06

161/2005

JSW Power Trading Company Limited , Mumbai

Grant of licence for inter-state trading in electricity to JSW Power Trading Company Limited, Mumbai.

28-02-06

06-03-06

16/2005

Suryachakra Power Corporation Ltd.

Grant of licence for inter-state trading in electricity to Suryachakra Power Corporation Ltd.

12-01-06

22-02-06

16/2005

Suryachakra Power Corporation Pvt. Ltd.

Application for grant of licence to Suryachakra Power Corporation Ltd.

12-01-06

12-01-06

Amendment of regulations on grant of licence for inter-state trading –Statement of Reasons

-

28-03-03


ABT, UI & IEGC Matters
Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

116/2005

Northern Regional Load Despatch Centre, New Delhi

Bringing Bhakra Beas Management Board (BBMB) power stations under the purview of Unscheduled Interchange (UI) mechanism at the regional level

21-09-06

22-12-06

67/2006

Bringing generating stations of Central Public Sector Undertakings(CPSU's) supplying power to single beneficiary State under provision of
Availability Based Tariff (ABT)

28-11-06

07-12-06

67/2003 (SUO MOTU)

Bringing generating stations of CPSU's supplying power to single beneficiary State under provision of ABT- Neyveli Lignite Corporation-Thermal Power Station-I

21-09-06

06-12-06

123/2006

Northern Regional Load Despatch Centre

Review of the Commission's notification No. L-68(84)/2006-CERC dated22.8.2006 in respect of amendment of Indian Electricity Grid Code

28-11-06

06-12-06

Petition No. 67/2003
(SUO MOTU)

Bringing Generating station of CPSU`s supplying power to single beneficiary State under provision of ABT Neyveli Lignite Corporation- Thermal Power Station-I

12-09-06

12-09-06

Petition No. 67/2003
(SUO MOTU)

Bringing Generating station of CPSU`s supplying power to single beneficiary State under provision of ABT-Indira Sagar Project

12-09-06

12-09-06

23/2005

Eastern Regional Load Despatch Centre, Kolkata

Non-payment of Unscheduled Interchange (UI) charges by Jharkhand State Electricity Board (JSEB), Ranchi.

18-07-06

18-07-06

23/2005

Eastern Regional Load Despatch Centre, Kolkata

Non-payment of Unscheduled Interchange (UI) charges by Jharkhand State Electricity Board (JSEB), Ranchi.

18-07-06

18-07-06

67/2003

Bringing Generating station of CPSU`s supplying power to single beneficiary State under provision of ABT-Neyveli Lignite Corporation-Thermal Power Station-I.

-

13-07-06

67/2003

Bringing Generating station of CPSU`s supplying power to single beneficiary State under provision of ABT-Indira Sagar Project.

-

13-07-06

iegc

Indian Electricity Grid Code.

-

23-06-06

67/2003

Bringing generating stations of CPSU's supplying power to single beneficiary State under provision of ABT-Neyveli Lignite Corporation – Thermal Power Station – I.

27-05-06

03-07-06

99/2005

Northern Regional Load Despatch Centre, New Delhi

Maintaining the regional grid frequency above 49.0 Hz by curbing overdrawals in line with Section 6.2(l) and 7.4.4 respectively of the Indian Electricity Grid Code (IEGC).

20-06-06

20-06-06

25/2006

Northern Regional Load Despatch Centre

Protecting the grid from indisciplined overdrawal from the grid.

8-06-06

8-06-06

99/2005

Northern Regional Load Despatch Centre, New Delhi

Maintaining the regional grid frequency above 49.0 Hz by curbing over-drawals in line with sections 6.2(I) and 7.4.4 of the Indian Electricity Grid Code (IEGC)

8-06-06

8-06-06

22/2006

Northern Regional Load Despatch Centre, New Delhi

Ensuring secure and reliable operation of Northern Regional Grid by maintaining the regional grid frequency above 49.0 Hz.

8-06-06

8-06-06

14/2006

Western Regional Load Despatch Centre, Mumbai

Non-payment of dues by MPSEB

8-06-06

8-06-06

148/2005

Punjab State Electricity Board

Direction to NTPC to tie up and procure adequate quantum of Gas/RLNG for Anta, Auraiya, Dadri CCGT stations and for settlement of issues relating to scheduling, metering and UI accounting of gas and liquid generation separately, levy of capacity charges proportional to gas fired generation, charging of variable charges as per actuals and supply of information.

25-04-06

02-06-06

25/2006

Northern Regional Load Despatch Centre

Protecting the grid from indisciplined overdrawal from the grid.

-

29-05-06

4/2006

Northern Regional Load Despatch Centre

Approval for rationalisation of Unscheduled Interchange (UI) price vector and establishment of payment security mechanism for UI charges.

27-04-06

27-05-06

Petition No. 67/2003
(Suo motu)

National Thermal Power Corporation Ltd

Terms and conditions for determination of tariff for the period 1.4.2004 to 31.3.2009.

06-12-05

09-05-06

99/2005

Northern Regional Load Despatch Centre, New Delhi

Maintaining the regional grid frequency above 49.0 Hz by curbing overdrawals in line with Section 6.2(1) and 7.4.4 respectively of the Indian Electricity Grid Code (IEGC).

24-01-06

24-01-06

151/2005

Northern Regional Load Despatch Centre., New Delhi

Endangering the Northern Regional Grid Security by continuous violation of Sections 6.2 (l) and 7.4.4 of the Indian Electricity Grid Code (IEGC)

16-02-06

16-02-06

151/2005

Northern Regional Load Despatch Centre., New Delhi

Endangering the Northern Regional Grid Security by continuous violation of Sections 6.2 (l) and 7.4.4 of the Indian Electricity Grid Code (IEGC)

02-03-06

08-03-06

25/2006

Northern Regional Load Despatch Centre

Protecting the grid from undisciplined overdrawal from the grid.

09-05-06

09-05-06

13/2006

U.P. Power Corporation Ltd., Lucknow

Application of Formula/Methodology dated 11.5.2004 evolved by Ministry of Power, Government of India to adjust UI charges payable by Madhya Pradesh viz-a-viz UI gain of Chhattisgarh.

18-04-06

04-05-06

Revision of Indian Electricity Grid Code - Statement of Reasons.

-

-

67/2003

Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single-beneficiary State in which situated, under the purview of Availability Based Tariff (ABT) - Indirasagar HEP.

31-01-06

13-02-06

67/2003

Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single-beneficiary State in which situated, under the purview of Availability Based Tariff (ABT) - Simhadri STPS.

31-01-06

13-02-06

67/2003

Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single-beneficiary State in which situated, under the purview of Availability Based Tariff (ABT) - TPS-I NLC.

31-01-06

13-02-06

67/2003

Bringing Generating Stations of Central Public Sector Undertakings (CPSUs) supplying power to a single-beneficiary State in which situated, under the purview of Availability Based Tariff (ABT) - Kayamkulam GPS.

31-01-06

13-02-06


RLDC/ULDC

Pet. No.
Petitioner.
Subject
Date of Hearing
Date of Order

1/2006

Northern Regional Load Despatch Centre, New Delhi

Inquiry under Section 143 of the Electricity Act, 2003 for the alleged non-compliance of the directions of Northern Regional Load Despatch Centre by Uttar Pradesh Power Corporation Ltd under Section 29 of the Electricity Act, 2003 .

-

21-08-06

139/2005

Power Grid Corporation of India Ltd.

Approval of charges for Unified Load Despatch & Communication Scheme in Northern Region for the period from 1.4.2004 to 31.7.2017 and additional capitalization during 2002-03 to 2004-05.

21-03-06

09-05-06

4/2006

Northern Regional Load Despatch Centre

Approval for rationalisation of Unscheduled Interchange (UI) price vector and establishment of payment security mechanism for UI charges.

27-04-06

27-04-06

NRLDC Petition on continued over-drawal by UPPCL at low frequency to be heard on 09.5.2006.

01-05-06

09-05-06