Pet. No. |
Petitioner. |
Subject |
Date of Hearing |
Date of Order |
62/2006 |
Tripura State Electricity Corporation Limited |
Review of the order dated 9.5.2006 in Petition No. 3/2005 |
31-10-06 |
27-12-06 |
49/2002 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for Korba – Budhipadar Transmission System in Western Region for the Period 1.4.2001 to 31.3.2004 |
- |
26-12-06 |
83/2006 |
Powerlinks Transmission Ltd., New Delhi |
Approval of provisional transmission tariff for 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter connector and Northern Region transmission system for the period from 2005-2009 |
- |
26-12-06 |
111/2006 |
Powerlinks Transmission Ltd., New Delhi |
Approval of provisional transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line associated with Tala Hydro Electric Power, East-North inter
connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009 |
21-12-06 |
21-12-06 |
104/2006 |
Power Grid Corporation of India Limited |
Determination of provisional transmission tariff for Bhadrawati-Chandrapur 400 kV D/C transmission line including bays at Bhadrawati (Power Grid) switching station (Extension) and Chandrapur (MSEB) switchyard (Extension) in Western Region from
1.5.2006 to 31.3.2009 |
21-12-06 |
21-12-06 |
101/2006 |
Tamil Nadu Electricity Board, Chennai |
Review of the order dated 2.5.2006 in petition No. 137/2004-Approval of transmission tariff for 400 kV Ramagundum-Hyderabad transmission line in Southern Region and HVDC back-to-back station (2x500 MW) at Chandrapur connecting Western Region and Southern Region for the period 1.4.2004 to 31.3.2009 |
21-12-06 |
21-12-06 |
100/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Determination of provisional transmission tariff for Neelamangala-Mysore 400 kV D/C transmission line along with 2x 315 MVA, 400/220 kV Mysore sub-station and bay extension at Neelamangala (KPTCL) 400/220 sub-station from 1.5.2006 to 31.3.2009 in Southern Region |
21-12-06 |
21-12-06 |
79/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Determination of transmission tariff for 40% Fixed Series Compensation on existing 400 kV S/C Rengali-Indravati transmission line associated with augmentation of capacity of Gazuwaka HVDC back to back project in Eastern Region for the period from 1.10.2005 to 31.3.2009 |
14-12-06 |
15-12-06 |
77/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Determination of transmission tariff for Tala-Siliguri Transmission System in Eastern Region Commissioned on 1.10.2005 for the period 1.10.2005 to 31.3.2009 and remaining transmission system commissioned on 1.5.2006 for the period from
1.5.2006 to 31.3.2009 |
14-12-06 |
14-12-06 |
133/2006 |
Power Grid Corporation of India Limited |
Review of the order dated 9.5.2006 in Petition No. 139/2005-Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in Northern Region for the period from 1.4.2004 to 31.7.2017 |
28-11-06 |
06-12-06 |
78/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Approval of provisional transmission tariff for 400 kV Bareilly sub-station (UPPCL) (extension) and 400 kV Mandaula sub-station (extension) under transmission system associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from 1.5.2006 to 31.3.2009 |
07-12-06 |
07-12-06 |
57/2006 |
Power Grid Corporation of India Ltd |
Approval of transmission tariff for 400 kV D/C Singrauli-Vindhyachal transmission line alongwith (2x250 MW) HVDC back to back at Vindhyachal between Northern Region and Western Region for the period from 1.4.2004 to 31.3.2009 |
19-09-06 |
04-12-06 |
75/2006 |
Power Grid Corporation of India Limited |
Approval of charges for Unified Load Despatch & Communication Scheme in Western Region for the period from 1.2.2006 |
16-11-06 |
27-11-06 |
74/2006 |
Power Grid Corporation of India Limited |
Approval of charges for Unified Load Despatch & Communication Scheme in Eastern Region for the period from 1.9.2005 |
16-11-06 |
27-11-06 |
21/2006 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for 400 kV Ramagundam-Hyderabad D/C transmission line and 400 kV S/C Hyderabad-Kurnool-Gooty transmission line along with associated bays and equipment under Ramagundam Stage-III Transmission System in Southern Region from date of commercial operation to 31.3.2009 |
24-08-06 |
22-11-06 |
20/2006 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 40% Fixed Series Compensation on existing Gooty-Neelmangla 400 kV S/C line and both circuits of Nagarjunasagar-
Cuddapah 400 kV S/C line under FSC Project in Southern region for the period from 1.11.2004 to 31.3.2009 |
24-08-06 |
16-11-06 |
60/2004 |
Power Grid Corporation of India Ltd, Gurgaon |
Approval of incentive based on availability of transmission system of Southern Region for the year 2003-04 |
31-10-06 |
22-11-06 |
50/2006 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for LILO of one circuit of 132 kV D/C Siliguri- Rangit transmission line at Gangtok in Eastern Region for the period from 1.10.2005 to 31.3.2009 |
16-11-06 |
21-11-06 |
81/2006 |
Power Grid Corporation of India Ltd., Gurgaon |
Approval of abnormal operation and maintenance expenses on account of additional security for the year 2004-2005 in Eastern Region |
26-10-06 |
27-10-06 |
11/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Fixed and Thyristor Controlled Series Compensation for 400 KV D/C Raipur- Rourkela Transmission Line at Raipur in
Western Region for the period from 1-11-2004 to 31-3-2009 |
24-08-06 |
27-10-06 |
149/2005 |
Power Grid Corporation of India Ltd., Gurgaon |
Approval of transmission tariff for 400/220 kV Khandwa sub-station and LILO of 400 kV D/C Itarsi-Dhule transmission line at Khandwa in Western Region for the period 1.2.2005 to 31.3.2009 |
23-03-06 |
26-10-06 |
138/2005 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for 500 MW HVDC back-to-back station at Gajuwaka (Pole II) (inter-regional asset of Eastern Region & Southern Region) and 400 kV D/C Vijaywada-Gajuwaka transmission line (Southern Region) under augmentation of capacity of Gajuwaka HVDC back-to-back project (500 MW) for the period from 1.3.2005 to 31.3.2009. |
30-03-06 |
23-10-06 |
130/2005 |
Power Grid Corporation of India Ltd., Gurgaon |
Approval of transmission tariff for 220 kV Allahabad-Phulpur S/C transmission line under system improvement scheme in Uttar Pradesh in Northern Region for the period 1.6.2004 to 31.3.2009 |
18-04-06 |
26-10-06 |
89/2002 |
Power Grid Corporation of India Ltd., Gurgaon |
Approval of incentive based on availability of transmission system for the year
2002-03 for Eastern Region |
21-09-06 |
26-10-06 |
118/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Approval of incentive based on availability of transmission system for the year
2005-06 for Eastern Region |
- |
23-10-06 |
117/2006 |
Power Grid Corporation of India Limited, Gurgaon |
Approval of incentive based on availability of transmission system for the year 2005-06 for Northern Region |
- |
23-10-06 |
66/2005 |
Damodar Valley Corporation, Kolkata |
Tariff for generation and inter-State Transmission of Electricity by Damodar Valley Corporation |
10-08-06 |
03-10-06 |
I.A.No. 46/2006 |
Power Grid Corporation of India Limited |
Approval of transmission charges for LILO of 400 k V S/C Singrauli-Kanpur transmission line-I, 400 k V sub-station at Allahabad and LILO of 400 k V S/C Singrauli-Kanpur transmission line-II including ICT I & II at Allahabad with associated bays in Northern Region for the period 2004-09 and for additional capitalisation during 2001-04. |
29-08-06 |
29-08-06 |
43/2006 |
Power Grid Corporation of India Ltd |
Revision of O & M expenses for the years 2001-02 to 2003-04. |
17-08-06 |
28-08-06 |
30/2006 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for LILO of Kolaghat-Rengali 400 kV S/C transmission line at Baripada and establishment of new 400/220/132 kV sub-station at Baripada in Eastern Region for the period from 1.7.2005 to 31.3.2009. |
24-08-06 |
24-08-06 |
60/2004 |
Power Grid Corporation of India Limited, Gurgaon |
Approval of incentive based on availability of transmission system of Southern Region for the year 2003-04. |
08-08-06 |
11-08-06 |
62/2006 |
Tripura State Electricity Corporation Limited |
Review of the order dated 9.5.2006 in Petition No. 3/2005- implementation of the Commission's order dated 6.9.2004 in Petition No. 13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004 . |
10-08-06 |
10-08-06 |
I.A.No. 28/2006 in Petition No. 84/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Kishenpur-Moga Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009. |
06-07-06 |
14-07-06 |
141/2005 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for 400 kV Meerut-Mandola Circuit I & II and ICT II & ICT III for the period 1.4.2004 to 31.3.2009 |
20-04-06 |
31-07-06 |
96/2003 |
Power Grid Corporation of India Ltd. |
Approval for transmission tariff for 400 kV S/C Meramundali-Jeypore transmission line along with extension of Meramundali and Jeypore sub-stations in Eastern Region for the period from 1.1.2004 to 31.3.2004. |
18-07-06 |
19-07-06 |
6/2004 |
Madhya Pradesh State Electricity Board |
Fixation of wheeling charges in respect of Transmission System of Grid Corporation of Orissa Ltd. for wheeling of power from NTPC power stations in Eastern Region (ER) through their system to Madhya Pradesh State Electricity Board (MPSEB), Jabalpur with effect from 1.4.2001. |
04-07-06 |
10-07-06 |
69/2004 |
Power Grid Corporation of India Limited. |
Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009. |
10-11-05 |
16-03-06 |
142/2004 |
National Thermal Power Corporation Ltd. |
Approval of tariff in respect of Feroze Gandhi Unchahar Thermal Power Station Stage I for the period from 1.4.2004 to 31.3.2009. |
06-06-06 |
13-06-06 |
162/2005 |
Power Grid Corporation of India Ltd., Gurgaon |
Approval of incentive based on availability of transmission system for the year 2004-05 for Northern Region. |
- |
06-07-06 |
159/2005 |
Power Grid Corporation of India Ltd. |
Approval of incentive based on availability of transmission system for the year 2004-05 for Eastern Region. |
- |
06-07-06 |
152/2005 |
Power Grid Corporation of India Limited, Gurgaon |
Approval of incentive based on availability of transmission system for the year 2004-05 for Western Region. |
- |
06-07-06 |
144/2005 |
Power Grid Corporation of India Limited |
Petition for approval of tariff for LILO of Purnia-Dalkola 132 kV S/C line and extension at Purnia sub-station in Eastern Region for the period 1.4.2004 to 31.3.2009. |
20-04-06 |
29-06-06 |
23/2006 |
Power Grid Corporation of India Limited |
Approval of provisional transmission tariff for 400 kV D/C Kaiga-Narendra transmission line and 400/220 kV sub-station at Narendra associated with Kaiga-Narendra transmission system in Southern Region for the period from 1.11.2005 to 31.3.2009. |
04-07-06 |
04-07-06 |
I.A.No. 20/2006
in
Pet No. 70/2004 |
Power Grid Corporation of India Limited |
Approval for tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Gazuwaka between Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009. |
23-05-06 |
7-06-06 |
64/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 1X500 MW HVDC back to back station at Sasaram with associated AC switchboard at Sasaram & Allahabad and Auxilliary system including 400 kV Sarnath-Allahabad transmission line with associated bays under Eastern-Northern Inter-regional HVDC transmission system for the period from 1.4.2004 to 31.3.2009 |
23-03-06 |
9-05-06 |
127/2005 |
Power Grid Corporation of India Limited |
Approval of transmission tariff for (A) HVDC terminal station at Talcher and Kolar related with Pole-II, (B) 400 kV D/C Kolar-Hossur transmission line along with associated bays at Kolar and Hossur and (C) 400 kV S/C Salem-Udumalpet transmission line along with associated bay extension at Salem and Udumalpet etc. under transmission system associated with Talcher Super Thermal Power Station Stage-II for the period 1.4.2004 to 31.3.2009. |
30-03-06 |
9-05-06 |
73/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for Bihar Grid Strengthening Scheme in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
28-03-06 |
9-05-06 |
60/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Stage-I of 400 kV Thyristor controlled series compensation project (FACTs devices) on Kanpur– Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for additional capitalisation during 2001-04. |
07-03-06 |
9-05-06 |
3/2005 |
Power Grid Corporation of India Ltd. |
Implementation of the Commission's order dated 6.9.2004 in Petition No.13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004. |
24-11-05 |
9-05-06 |
131/2002 |
Power Grid Corporation of India Ltd. |
Petition for approval of tariff for 400 kV D/C Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004. |
31-01-06 |
9-05-06 |
84/2005 |
Power Grid Corporation of India Ltd. |
Approval of transmission tariff for (A) Talcher-Kolar HVDC line (Pole-I), (B) LILO of 400 kV S/C Cuddapah-Banglore S/C line, common facilities at Kolar, and 400 kV S/C Kolar-Madras line, (C) 400 kV S/C Hossur-Salem line, 315 MVA Auto Transformer-I at Hossur, along with 220 kV switchyard (D) 315 MVA Auto Transformer-2 at Hossur, (E) 500 MVA Auto-transformer (comprising of 4x167 MVA single phase units) at Kolar along with 220 kV switchyard, and 400 kV D/C Kolar-Hoody line, under Transmission System associated with Talcher-II Project for the period 1.4.2004 to 31.3.2009 and additional capitalization for the period 2001-04. |
28-03-06 |
9-05-06 |
60/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Stage-I of 400 kV Thyristor controlled series compensation project (FACTs devices) on Kanpur– Ballabgarh 400 kV S/C line at Ballabgarh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for additional capitalisation during 2001-04. |
07-03-06 |
9-05-06 |
104/2005 |
Power Grid Corporation of India Ltd |
Petition for approval of tariff for LILO of 400 kV Bongaigaon-Malda transmission line at Purnea and Sub-station at Purnea (New) in Eastern Region for the period 1.11.2003 to 31.3.2004. |
31-01-06 |
9-05-06 |
133/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for strengthening of 220 kV transmission system under System Improvement Scheme in Uttar Pradesh in Northern Region for the period from 1.4.2004 to 31.3.2009. |
21-03-06 |
9-05-06 |
96/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Rihand transmission system in Northern region for the period from 1.4.2004 to 31.3.2009 . |
07-09-05 |
09-05-06 |
70/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 315 MVA, 400/220 kV ICT-IV at Ballabgargh in Northern Region for the period from 1.4.2004 to 31.3.2009 and for the additional capitalisation during 2001-04. |
07-03-06 |
28-04-06 |
Pet No. 74/2004
With
I.A.No. 36/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Kayamkulam Transmission System in Southern Region for the period from 1.4.2004 to 31.3.2009. |
29-09-05 |
09-05-06 |
3/2005 |
Power Grid Corporation of India Ltd. |
Implementation of the Commission's order dated 6.9.2004 in Petition No.13/2004 regarding transmission tariff in North Eastern Region effective from 1.2.2000 to 31.3.2004. |
24-11-05 |
09-05-06 |
IA No. 13/2006
in Petition No. 131/2002 |
Power Grid Corporation of India Ltd. |
Approval of tariff for Talcher-Meramundali transmission line in Eastern Region for the period 1.12.2003 to 31.3.2004 |
28-02-06 |
28-02-06 |
67/2005 |
Power Grid Corporation of India Limited |
Petition for approval of tariff for 400 kV S/C Jamshedpur-Rourkela transmission line in Eastern Region for the period 1.4.2004 to 31.3.2009. |
28-03-06 |
04-05-06 |
112/2005 |
Power Grid Corporation of India Limited |
Petition for approval of tariff for LILO of 400 kV Bongaigaon – Malda transmission line at Siliguri and sub-station at Siliguri (New) in Eastern Region for the period 1.4.2004 to 31.3.2009. |
28-03-06 |
04-05-06 |
128/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Khammam-Nagarjunasagar 400 kV S/C transmission line along with extensions of Khammam and Nagarjunasagar 400/220 kV sub-station under the scheme for strengthening of Grid System and evacuation of power from Ramagundam Stage-III in Southern Region for the period from 1.4.2004 to 31.3.2009. |
30-03-06 |
05-05-06 |
72/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Vindhyachal Stage-I Additional Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009 |
07-09-05 |
02-05-06 |
137/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Ramagundam-Hyderabad transmission line-2 in Southern Region and Bhadrawati (Chandrapur) HVDC back to back station (2x500MW) in Western Region and Southern Region for the period from 1.4.2004 to 31.3.2009. |
21-09-05 |
02-05-06 |
130/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV Ramagundam Transmission System, including ICT at Khammam and Reactor at Gazuwaka under CTP Augmentation in Southern Region for the period from 1.4.2004 to 31.3.2009. |
14-09-05 |
02-05-06 |
105/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Hiriyur sub-station (including 315 MVA Auto Transformer), LILO of Davangere-Hoody 400 kV D/C line at Hiriyur and additional bays at Kolar and Hosur sub-station for 2nd circuit of Kolar-Hosur 400 kV D/C transmission line under System Strengthening Scheme-II in Southern Region for the period from 1.4.2004 to 31.3.2009. |
30-03-06 |
05-05-06 |
129/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 315 MVA 400/230 kV Auto Transformer at Hyderabad and one 50 MVAR Reactor at Cuddapah under Central Transmission Project Augmentation in Southern Region for the period from 1.4.2004 to 31.3.2009. |
14-09-05 |
03-05-06 |
142/2005 |
Power Grid Corporation of India Limited |
Determination of Transmission tariff for 400 kV D/C Rihand-Allahabad, Allahabad-Mainpuri and Mainpuri-Ballabgarh transmission lines with associated bays under Rihand Stage-II transmission system in Northern Region for the period from 1.6.2005 to 31.3.2009. |
18-04-06 |
25-04-06 |
102/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for LILO of 220 kV Panki-Naubasta transmission line at Kanpur sub-station in Northern Region for the period from 1.4.2004 to 31.3.2009 |
07-03-06 |
28-04-06 |
11/2006 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for the balance system of Tarapur Transmission system (commissioned w.e.f. 1.8.2005 and 1.9.2005) associated with Tarapur Atomic Power Station Units 3 & 4 in Western Region for the periods from 1.8.2005 to 31.3.2009 and 1.9.2005 to 31.3.2009, respectively. |
20-04-06 |
26-04-06 |
125/2005 |
Power Grid Corporation of India Ltd. |
Petition for approval of transmission tariff for 132 kV S/C Mau-Balia line in Northern Region for the period 1.5.2003 to 31.3.2004. |
23-02-06 |
25-04-06 |
116/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 50 MVAR Reactor with associated equipment at Chandrapur sub-station in Western Region for the period from 1.4.2004 to 31.3.2009 |
08-09-05 |
25-04-06 |
Pet No. 160/2005
with IA.No. 70/2005 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for 400 kV D/C Dhauliganga-Bareilly (UPPCL) transmission line along with its associated bays at Bareilly (UPPCL) in Northern Region for the period from 1.8.2005 to 31.3.2009. |
21-03-06 |
07-04-06 |
69/2004 |
Power Grid Corporation of India Limited. |
Approval of transmission charges for Korba-Budhipadar transmission system in Eastern and Western Regions for the period from 1.4.2004 to 31.3.2009. |
10-11-05 |
16-03-06 |
Petition No. 84/2004
With
I.A.No. 30/2005 |
Power Grid Corporation of India Limited. |
Approval of transmission charges for Kishenpur-Moga Transmission System in Northern Region for the period from 1.4.2004 to 31.3.2009. |
25-08-05 |
24-02-06 |
59/2005 |
Bihar State Electricity Board, Patna |
Sharing of the Transmission Charges of 220 kV D/C Birpara-Salakati Transmission Line and associated sub-station at Birpara (ER) and Salakati (NER) as inter-regional assets between ER and NER. |
- |
21-02-06 |
107/2005 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for 400 kV S/C Hyderabad-Kurnool-Gooty and Gooty-Neelmangala lines alongwith bay extensions and equipment at Hyderabad, Kurnool & Gooty associated with Ramagundam-III transmission system in Southern Region for the period from date of commercial operation to 31.3.2009. |
31-01-06 |
13-02-06 |
96/2005 |
Power Grid Corporation of India Limited |
Determination of provisional transmission tariff for 40% Fixed Series Compensation on 400 kV S/C Gooty-Neelmangala Circuit-II at Gooty under FSC project in Southern Region for the period from 1.5.2005 to 31.3.2009. |
31-01-06 |
13-02-06 |
Petition No. 70/2004
With
I.A.No. 37/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for 400 kV Jeypore-Gazuwaka transmission line along with associated bays and 500 MW HVDC back to back station at Gazuwaka between Southern Region and Eastern Region for the period from 1.4.2004 to 31.3.2009. |
22-09-05 |
16-02-06 |
112/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for the transmission system associated with Gandhar Gas Power Station I in Western Region for the period from 1.4.2004 to 31.3.2009. |
07-09-05 |
14-02-06 |
73/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Vindhyachal Stage-II Transmission System in Western Region for the period from 1.4.2004 to 31.3.2009. |
07-09-05 |
14-02-06 |
137/2005 |
Power Grid Corporation of India Limited |
Determination of Provisional Transmission tariff for 400 kV D/C Madurai-Thiruvananthapuram transmission system in Southern Region for the period from 1.8.2005 to 31.3.2009. |
31-01-06 |
13-02-06 |
67/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Hathidah River Crossing section of 220 kV D/C Biharsharif-Begusarai transmission line in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
21-07-05 |
10-02-06 |
96/2005 |
Power Grid Corporation of India Limited |
Determination of provisional transmission tariff for 40% Fixed Series Compensation on 400 kV S/C Gooty-Neelmangala Circuit-II at Gooty under FSC project in Southern Region for the period from 1.5.2005 to 31.3.2009. |
31-01-06 |
13-02-06 |
112/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for the transmission system associated with Gandhar Gas Power Station I in Western Region for the period from 1.4.2004 to 31.3.2009. |
07-09-05 |
14-02-06 |
IA No. 1/2006
in
Petition No. 66/2005 |
Damodar Valley Corporation, Kolkata |
Approval of tariff of Damodar Valley Corporation (IA has been filed by DPSC Ltd for clarification of the order dated 21.6.2005). |
7-02-06 |
14-02-06 |
66/2005 |
Damodar Valley Corporation |
Tariff for sale of electricity by Damodar Valley Corporation and the Inter-State Transmission of Electricity |
16-01-06 |
16-01-06 |
Petition No. 97/2004
With
IA No. 24/2005 |
Power Grid Corporation of India Ltd.
Vs
Haryana Vidyut Prasaran Nigam Ltd, Panchkula |
Approval of transmission charges for the transmission system associated with Faridabad Gas Based Combined Cycle Power Project in Northern Region for the period from 1.4.2004 to 31.3.2009. |
17-08-05 |
27-01-06 |
155/2005 |
Power Grid Corporation of India Ltd., Gurgaon |
Reimbursement of loss of Return on Equity in Ranganadi transmission system due to delay in completion of Ranganadi H.E. Project. |
24-01-06 |
30-01-06 |
51/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for 400 kV D/C Biharsharif-Sasaram-Sarnath transmission lines with associated bays under Eastern-Northern inter-regional HVDC transmission system for the period from 1.4.2004 to 31.3.2009. |
09-08-05 |
25-01-06 |
Petition No. 136/2004 With I.A.No. 34/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for 400 kV D/C Kaiga-Sirsi transmission line along with associated bays in Southern Region for the period from 1.4.2004 to 31.3.2009. |
21-09-05 |
27-01-06 |
50/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400/220 kV, 315 MVA transformer at Jeypore substation in Eastern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04. |
09-08-05 |
27-01-06 |
126/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for the transmission system associated with Farakka (I & II) STPS in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
04-08-05 |
05-01-06 |
123/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for Dehri-Karamnasa Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
28-07-05 |
12-01-06 |
77/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for the transmission system associated with RAPP-B Project in Northern Region for the period from 1.4.2004 to 31.3.2009. |
18-08-05 |
13-01-06 |
118/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for the Rangit Transmission System in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
27-07-05 |
17-01-06 |
133/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 315 MVA ICT-III along with associated bay equipment at Nagarjunasagar sub-station in Southern Region for the period from 1.4.2004 to 31.3.2009. |
15-09-05 |
04-01-06 |
36/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for LILO of one circuit of existing Neyveli-Trichy 400 kV D/C transmission line at Neyveli TPS-I expansion in Southern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04. |
22-09-05 |
17-01-06 |
8/2004 |
Power Grid Corporation of India Limited |
Approval of fees and charges payable to Regional Load Despatch Centres for undertaking load despatch functions for the period 1.4.2004 to 31.3.2007 |
21-09-04 |
03-01-06 |
6/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for 230 kV S/C Neyveli-Bahoor transmission line with associated bay equipment at Neyveli in Southern Region for the period from 1.4.2004 to 31.3.2009. |
22-09-05 |
16-01-06 |
35/2005 |
Power Grid Corporation of India Limited |
Approval for tariff for 220 kV D/C Jallandhar-Hamirpur transmission line with associated bays in Northern Region for the period from 1.4.2004 to 31.3.2009. |
25-08-05 |
23-01-06 |
48/2005 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV D/C Vijayawada-Nellore transmission line, 400kV D/C Nellore-Sriperumbudur transmission line, new 400 kV Switching station at Nellore and extension of Vijaywada and Sriperumbudur sub-stations in Southern Region for the period from 1.4.2004 to 31.3.2009 and impact of additional capitalisation during 2001-04. |
22-09-05 |
14-01-06 |
121/2004 |
Power Grid Corporation of India Limited |
Approval of transmission charges for 400 kV D/C Malda - Bongaigaon transmission line in Eastern Region for the period from 1.4.2004 to 31.3.2009. |
28-07-05 |
14-01-06 |
136/2005 |
National Thermal Power Corporation Ltd. |
Revision of O&M expenses for the period 1.4.2001 to 31.3.2004 in respect of Kawas Gas Power Station (656.20 MW). |
27-12-05 |
25-01-06 |